team wrecked week 9 deliverables: engineering analysis

12
Team Wrecked Week 9 Deliverables: Engineering Analysis

Upload: osborn-summers

Post on 26-Dec-2015

215 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Team Wrecked Week 9 Deliverables: Engineering Analysis

Team Wrecked

Week 9 Deliverables: Engineering Analysis

Page 2: Team Wrecked Week 9 Deliverables: Engineering Analysis

Energy Experiment

h = 3 ft

w = 2.5 lb

d = 25 ft

Weight was dropped from a fixed pivot point like a pendulum

Wanted to achieve a distance of 25 ft.

Page 3: Team Wrecked Week 9 Deliverables: Engineering Analysis

Experimental Results

4

5

6

7

8

9

10

11

10 15 20 25 30 35

Distance (ft)

Pot

entia

l Ene

rgy

(lbf*

ft)

Page 4: Team Wrecked Week 9 Deliverables: Engineering Analysis

Spring-loaded Arm - FBD

Page 5: Team Wrecked Week 9 Deliverables: Engineering Analysis

Shear and Bending Diagrams

Page 6: Team Wrecked Week 9 Deliverables: Engineering Analysis

Powered Arm - FBD

Page 7: Team Wrecked Week 9 Deliverables: Engineering Analysis

Shear and Bending

Page 8: Team Wrecked Week 9 Deliverables: Engineering Analysis

Governing Equations

I

My

bhI

FrT

kxF

kxmghU

spring

3

2

2

1

2

1

Page 9: Team Wrecked Week 9 Deliverables: Engineering Analysis

EES Equations

Page 10: Team Wrecked Week 9 Deliverables: Engineering Analysis

Important EES Results

• Spring constant, k = 129.7 lbf/in.

• Max spring force = 152.8 lbf

• Torque required by motor = 229.2 lbf-in.

• Max beam stress, σ = 24.7 ksi

Page 11: Team Wrecked Week 9 Deliverables: Engineering Analysis

Material Selection

Tensile Yield Strengths

  σ (ksi)

Engineering Plastics ~ 2.5-17

Wrought Aluminum Alloy ~ 5-73

Aluminum Casting Alloy ~ 9-30

Copper Alloys ~ 10-60

Cast Iron ~ 47-120

Stainless Steel ~ 40-195

Carbon Steel ~ 26-118

Page 12: Team Wrecked Week 9 Deliverables: Engineering Analysis

New Design