tec_auto tune optimization presentation_aggregate_5-29-15

10
TOTAL ENERGY CONCEPTS® Line Power Optimization Diesel Genset Optimization

Upload: ron-saf

Post on 20-Feb-2017

11 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: TEC_Auto Tune Optimization Presentation_Aggregate_5-29-15

TOTAL ENERGY CONCEPTS®

Line Power Optimization

Diesel Genset Optimization

Page 2: TEC_Auto Tune Optimization Presentation_Aggregate_5-29-15

2

TOTAL ENERGY CONCEPTS®

Founded in 2003, based in Minnesota• Over 9000 Installations Internationally• National Company, Regional Execution

One Focus• Electrical Power Optimization to Save Customers $$

Guiding Principal • 100% Customer Satisfaction

Value Proposition• Turnkey, Customized, Facility-Wide Savings

Page 3: TEC_Auto Tune Optimization Presentation_Aggregate_5-29-15

3

ELECTRICAL POWER OPTIMIZATIONUtility Line Power• Facility-wide system• Reduced energy usage• Power protection / PQ• Reduced maintenance

Diesel Genset Power• Genset specific• Reduced fuel consumption • Reduced CO2 emissions• Increased capacity

Page 4: TEC_Auto Tune Optimization Presentation_Aggregate_5-29-15

4

FACILITY-WIDE POWER OPTIMIZATION

Page 5: TEC_Auto Tune Optimization Presentation_Aggregate_5-29-15

5

LINE POWER CASE STUDY

Location– Northern IA

Baseline Expense– $144,084

Savings with TEC– 31.34%

Payback Rate– 22.9 Months

250,726 kWh Saved

Page 6: TEC_Auto Tune Optimization Presentation_Aggregate_5-29-15

6

GENERATOR OPTIMIZATION SYSTEMV-Blox® AutoTune GOS• Custom-Engineered• Fully Automatic• Very Low Maintenance

Reduced Fuel Consumption• 4 to 30%*

Reduced Amp Load• 40 to 50%

Reduced CO2 Emissions• 15 to 30%

*Based upon percent loading prior to power correction

Page 7: TEC_Auto Tune Optimization Presentation_Aggregate_5-29-15

7

GENERATOR OPTIMIZATION SYSTEM

Page 8: TEC_Auto Tune Optimization Presentation_Aggregate_5-29-15

8

DIESEL GENSET CASE STUDY

Location– Upper Midwest

Reduction in Amps– 44.4%

Fuel Savings– 20%

Payback Rate– 9 Months– $3.25/Gallon

AutoTune GOS installed on a 910 KW genset with cone, jaws, and conveyors

Saving 11 Saving 11 gallons per 

hour

Page 9: TEC_Auto Tune Optimization Presentation_Aggregate_5-29-15

9

NEXT STEPS & TEC PROCESS

Line Power Facilities1. Agreement on targets &

conditions for success2. Survey & Design3. Proposal4. Order & Install5. Verify Savings (90 days)6. Monitor Future Savings

Genset Operations1. Agreement on targets &

conditions for success2. In-field engineering, power

analysis & design3. Proposal4. Order & Install5. Verify Savings / Reductions

Page 10: TEC_Auto Tune Optimization Presentation_Aggregate_5-29-15

THANK YOU

We measure our success by the measured & verified value that our work

adds to the bottom line of your business.

Visit us online at www.totalenergyconcepts.com