Technical Assistance Consultant’s Report This consultant’s report does not necessarily reflect the views of ADB or the Government concerned, and ADB and the Government cannot be held liable for its contents. (For project preparatory technical assistance: All the views expressed herein may not be incorporated into the proposed project’s design. Project Number: 52109-001 Knowledge and Support Technical Assistance (KSTA) February 2019 Strengthening the Asia Pacific Public Electronic Procurement Network For National Public Procurement Agency (LKPP), Indonesia

Upload: others

Post on 16-Oct-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Technical Assistance Consultant’s Report...ADB conducted multiple assessments of SPSE, including the latest assessment on SPSE 3.6. in 2017 and identified necessary modifications

Technical Assistance Consultant’s Report

This consultant’s report does not necessarily reflect the views of ADB or the Government concerned, and ADB and the Government cannot be held liable for its contents. (For project preparatory technical assistance: All the views expressed herein may not be incorporated into the proposed project’s design.

Project Number: 52109-001 Knowledge and Support Technical Assistance (KSTA) February 2019

Strengthening the Asia Pacific Public Electronic Procurement Network

For National Public Procurement Agency (LKPP), Indonesia

Page 2: Technical Assistance Consultant’s Report...ADB conducted multiple assessments of SPSE, including the latest assessment on SPSE 3.6. in 2017 and identified necessary modifications

ADBAssessmentofSPSE4.3

1

Assessment Report INDONESIAE-GPSYSTEM(SPSEVERSION4.3)

FEBRUARY2019

Page 3: Technical Assistance Consultant’s Report...ADB conducted multiple assessments of SPSE, including the latest assessment on SPSE 3.6. in 2017 and identified necessary modifications

ADBAssessmentofSPSE4.3

2

Disclaimer TheviewsandrecommendationspresentedinthisreportaresolelytheviewsoftheconsultantandarenottobeinterpretedasanofficialpositionoftheAsianDevelopmentBank.TheinformationandrecommendationspresentedinthisreportarebasedonthepresentationsandinformationabouttheLKPPSPSEe-procurementsystemsharedbythemembersoftheLKPP,theSPSEsystemdeveloper,duringacountryvisitinJanuary2019.TheconsultantdoesnotclaimtohaveacompleteworkingknowledgeofallaspectsoftheSPSEsystemfromasinglevisitandapologizesifanyinformationpresentedmisrepresentsthesystem’sfunctions,featuresorpoliciessupportingtheitsimplementationandoperation.Anycommentsorchangespresentedbyanyoftheparticipatingagencieswillbeaccommodatedinthefinalreport.

ThisreportdoesnotrepresentafullassessmentoftheLKPPSPSEsystem,butservestoprovideanupdateonissuesraisedinthepreviousreviewin2017oftheSPSEICBsystemimplementationforuseinADB-fundedprojects.

Page 4: Technical Assistance Consultant’s Report...ADB conducted multiple assessments of SPSE, including the latest assessment on SPSE 3.6. in 2017 and identified necessary modifications

ADBAssessmentofSPSE4.3

3

Table of Contents Disclaimer................................................................................................................................................2

Abbreviations..........................................................................................................................................4

Background..............................................................................................................................................5

Summary.................................................................................................................................................7

PriortoFirstUse..................................................................................................................................9

FutureConsiderations.........................................................................................................................9

SPSE4.3SystemReview........................................................................................................................12

SupportofInternationalProcurement..............................................................................................14

TenderCreation.................................................................................................................................15

BidDocumentTemplates..................................................................................................................17

SystemBOQ.......................................................................................................................................17

e-Bidding............................................................................................................................................18

BidOpeningandEvaluation..............................................................................................................18

SecurityoftheProcess......................................................................................................................20

BidSecurity........................................................................................................................................21

VendorRegistration...........................................................................................................................21

ReportingandMonitoring.................................................................................................................22

Page 5: Technical Assistance Consultant’s Report...ADB conducted multiple assessments of SPSE, including the latest assessment on SPSE 3.6. in 2017 and identified necessary modifications

ADBAssessmentofSPSE4.3

4

Abbreviations ADB AsianDevelopmentBank

LKPP(NPPA) NationalPublicProcurementAgency

LPSE LayananPengadaanSecaraElektronik/LocalElectronicServicePoint(SystemProviderandServiceProvider)

SPSE SistemPengadaanSecaraElektronik/ElectronicProcurementSystem

PIU ProjectImplementationUnit

AMEL AplikasiMonitoringEvaluasiLokal/MonitoringDashboard

SBD StandardBiddingDocument

EA ExecutingAgency

PusDatin MinistryofPublicWorks-CentreforDataProcessing

Keppres PresidentialDecree

Perpres PresidentialRegulation

SiRUP ProcurementPlanningSystem

SiKAP VendorManagementSystem

Page 6: Technical Assistance Consultant’s Report...ADB conducted multiple assessments of SPSE, including the latest assessment on SPSE 3.6. in 2017 and identified necessary modifications

ADBAssessmentofSPSE4.3

5

Background NationalPublicProcurementAgency(LKPP)developedandreleasedthee-procurementsystemknownasSPSEin2008.In2012,LKPPissuedadecreewhichrequiredSPSEtobewidelyusedbygovernmententitiesincludingtheexecutingandimplementingagenciesofADB-financedprojects.ADBconductedmultipleassessmentsofSPSE,includingthelatestassessmentonSPSE3.6.in2017andidentifiednecessarymodificationsinordertouseSPSEforADB-financedprocurement.

ToaccommodateADBrequirements,LKPPdevelopedaspecialversionofSPSE,knownasSPSEICB,basedonSPSE3.6.ThesystemwasimplementedtosupportADB-fundedprojectsprocessedundertheMinistryofPublicWorksandHousing(MPWH).SPSEICBwasconfiguredtosupportandmanagetheuseofframeworkagreementsforconsultantempanelment,supporttheregistrationofforeignbiddersandprovideanEnglishuserinterface.ToaccommodatetheuseoftheEnglishinterface,SPSEICBwasmodifiedtoexcludetheuseofAppendo,theencryptionutilityappliedinSPSE’ssubmissionprocesswhichwasinBahasaonly.ForSPSEICB,encryptionofsubmissionswasmanagedinternallywithintheapplicationandallsubmissionswerestoredinthedatabaseinanencryptedformat.AdditionalmodificationswerealsomadetosupporttherequirementsofMPWHaspartofMPWH’transitiontotheSPSEplatform,includingsupportforuploadingmultiplefilesaspartofthebidsubmissionprocess.

LKPPhasrecentlyupgradedtheSPSEsystemtoversion4.3.ThenewreleaserepresentsasignificantenhancementtotheSPSEsystemincludinganewuserinterfaceandadditionalprocurementworkflowssuchassupportforreverseauctions-fasttenders.Thenewversionalsoincorporatesthegenerationofpartsofthebiddingdocument–TechnicalRequirements,Qualifications,BidValidityandBillofQuantities–whicharesupportedbyattachedofthefullbiddingdocument,TermsofReference/SpecificationsandDraftContract.AswithearlierversionsofSPSE,thenewversionssupportmultipleprocurementprocessesfor1and2-envelopprocess,multiplestageprocurementandpreorpost-qualificationbasedonthetypeofprocurementbeingconducted–Goods,Works,ConsultingServicesandotherservices.

TheSPSEsystemisfullysupportedandmaintainedin-housebyLKPP.LKPPhasandcontinuestoprovidethenecessaryresourcestosupportthedevelopmentandmaintenanceoftheirSPSEplatformaswellastestingandsupportandmonitoringofeachoftheLPSEsysteminstallations.Overthepastyears,LKPPhasbeenabletodemonstratetheirabilitytoaddressanyrequirementsofthenationalgovernmentanddonorswithon-goingupdatesofthesystemincludingtheimplementationoftheSPSEICBplatformtosupportADBrequirementsincludingtheuseofframeworkagreements.

ADBwillassesstheupgradedSPSEtoensureitsatisfiesADB'srequirementsandiftheupgradedversioncanaccommodateprocurementforupcomingADB-financedprojects.SinceSPSE'sprocurementtransactiondataandinformation(includingprocurementplan)willalsobeusedtosupportADB'sresult-basedlending(RBL)operationsinIndonesia,thedatastructureandmanagementunderthenewSPSEversionwillalsobereviewedtoensurethereadinessofitsfacilitytoprovidenecessarymonitoringandreportingtosupportRBLrequirements.

Theassessmentwill:

Page 7: Technical Assistance Consultant’s Report...ADB conducted multiple assessments of SPSE, including the latest assessment on SPSE 3.6. in 2017 and identified necessary modifications

ADBAssessmentofSPSE4.3

6

i) assessthechangesintroducedtoSPSEuponreleaseofversion4.3.anditscompliancewithMDBe-GPGuidelines;

ii) providecommentsonthepossibilityofusingSPSE4.3.forprocurementofcivilworks,goodsandconsultingservicesunderADB-financedprojectsfollowingADBProcurementGuidelines,ADBProcurementPolicyandProcurementRegulationsforADBBorrowers;

iii) identificationofbottlenecksandissuesincollectingtheprocurementtransactiondatainformation;and,

iv) providerecommendationsforsystemimprovementandformulatethenextdevelopmentstages.

Page 8: Technical Assistance Consultant’s Report...ADB conducted multiple assessments of SPSE, including the latest assessment on SPSE 3.6. in 2017 and identified necessary modifications

ADBAssessmentofSPSE4.3

7

Summary SPSE4.3representsasignificantenhancementtoearlierversions,includingSPSE3.6,withacompleteredesignoftheuserinterfaceandtheadditionofnewfunctionalities.

SomeofthemainchangestoSPSEare:

Ø TenderCreationsupporttemplatesfordefiningBidDocumentcomponents

a. DraftContractb. TOR/Specificationsc. Qualificationsd. SubmissionRequirements;

Ø IntegratedBOQ;Ø SupportStandardProcurement

processes1and2envelop,single-ortwo-stagebidding;

Ø NewProcesses–FastTender,ReverseAuction;

Ø Recordingoflowvaluecontractawardsforprocurementconductedoutsidethesystem;

Ø EnhanceduserrolestodefineBidCommittee,committingofficersandevaluation;

Ø ImprovedfunctionalitytomapVendorqualificationsfromacentralVendorprofiletoasubmission;and,

Ø UpdatedAppendoutilitytoprovidebettersupporttothebidsubmissionprocessestoensurecompliancewiththesubmissionrequirementsdefinedinthetenderdetails.

Thechangesrepresentasignificantadvancementinthedevelopmentofthee-GPsysteminIndonesia,inparticularwiththeimprovedtendercreationprocessandtheintroductionofacentralvendormanagementsystem(SiKAP)tosupportthemanagementofvendorqualificationsandthetransferofthequalificationinformationtoabidresponseindifferentSPSEinstallations.LKPPisalsointroducingacontractmanagementmodulewiththenewrelease,aswellasnewprocurementmonitoringtoolswiththeAMEL(AplikasiMonitoringEvaluasiLokal)systemthatintegrateprocurementplanninginformationsystem(SiRUP)andprocurementrecordsfromSPSEwithContractrecords.AMELprovidesacleanDashboardviewofprocurementactivity,plansandcontractswithinanorganization.ThenewFastTenderprocurementprovidesanoptiontoexpediteprocurementwithselectedpre-qualifiedvendorswhenpricewillbetheprimarydecisionfactor.

Figure1SPSE4.3HomePage

Page 9: Technical Assistance Consultant’s Report...ADB conducted multiple assessments of SPSE, including the latest assessment on SPSE 3.6. in 2017 and identified necessary modifications

ADBAssessmentofSPSE4.3

8

AswithearlierversionsoftheSPSEplatform,SPSE4.3isfoundtobegenerallycompliantwithMDBe-GPguidelinesandsupportofacceptedprocurementprocesses.Thesystemadhereswiththegeneralprinciplesforaprocurementsystem,namely:

Ø transparency,Ø non-discrimination,Ø equalityofaccess,Ø opencompetition,Ø accountability,andØ securityofprocess.

Thecurrentreleaseofthesystemis,however,designedprimarilytosupportthenationalprocurementlawsandprocessesasdefinedbyLKPPandgearedmoretowardsnationalprocurementactivityunderstatefunds.ThecurrentreleaseofSPSE4.3andtheAppendoutilityrequiredforbidsubmissionareinBahasaonly.Aswell,anydocumentationoruserguideisalsoinBahasaonlyandanysupportprovidedbylocalLPSEinstallationswouldalsoonlybeavailableinBahasaonly.

ThecurrentreleaseofthesystemwouldallowADBtoapplyADBstandardbiddingdocuments(SBD)toatenderpackageandthee-submissionrequirementscanbedefinedtosupportthesubmissionofADBformsandschedulesaspartofthesubmissionprocess.TheAppendoutilitywouldsupportthesubmissionandopeningprocessandensurethesecurityandintegrityofthesubmissionspriortoandafterbidopening,thoughtheAppendoutilityisinBahasaonlyandwouldonlybeapplicableifthetenderwasbeingconductedinBahasaonly.

SystemdevelopmentinitiativestomigratefunctionalitypreviouslydevelopedforSPSEICBtoSPSE4.3arestillunderdevelopmentandareexpectedtobecompletedin4-6months.InclusionoftheSPSEICBfunctionswillincorporateADBfunctionalityforframeworkagreements,supportforEnglishuserinterfaceandEnglishbiddocumentswhenrequired,foreignuserregistrationandtheinclusionoftheprocurementoptionforpre-qualificationwithasingleenvelop.LKPPwouldalsoneedtoaddressuserguiderequirementsinEnglishtoprovidepropersupportforEnglishusers.And.IfAppendoistobeapplied,anEnglishoptionintheAppendoutilitywouldberequired.Presently,theSPSEICBplatformdoesnotapplyAppendoforsubmissionencryption.ForSPSEICB,thesubmissionprocessbypassestheAppendoutilityandallowsuserstouploadsubmissionsrequirementsdirectlyintothesystemviaanSSLconnectionandallsubmissionsarestoredinthesysteminasystemencrypteddatabaseformattoensurethesecurityandintegrityofthesubmissioninformation.

Subjecttoaddressingtheissueslistedinthefollowingsectionsofthisassessment,ADBcouldconsiderapplyingSPSE4.3forADB-fundedprojectsunderOpenCompetitiveBiddingwhentheexpectedprocurementwouldbelimitedtonationaladvertisement,andtheprocurementandassociatedbiddingdocumentwouldbeinBahasaonly.Ifinternationalbidder’sparticipation/competitionisexpectedandtheprocurementwouldbeconductedinEnglish,ADBshouldconsiderusingthecurrentversionofSPSEICBwhereforeignvendorscanregisterinthesystemuntilsuchtimeasthenewSPSEICBbasedonversion4.3isavailable.

ItshouldbenotedthatSPSE4.3isthee-GPapplicationdevelopedandmaintainedbyLKPP.Useofthesystemoccursthroughlocallyinstalledcopiesatthegovernmentdepartmentorlocalcity.Each

Page 10: Technical Assistance Consultant’s Report...ADB conducted multiple assessments of SPSE, including the latest assessment on SPSE 3.6. in 2017 and identified necessary modifications

ADBAssessmentofSPSE4.3

9

installationisknownasanLPSEandeachsystemoperatesasanindependentapplication.ThelocalsystemadminateachLPSEisresponsiblefortheregistrationvendorsandofficersintheirsystemaswellastheverificationofvendordocumentsduringtheregistrationprocess.EachLPSEisresponsibleforthelocalinfrastructurerequiredtosupportandoperatethee-GPsystem,includingfacilities,hardware,security,networkconnections,localfirewalls,disasterrecoveryplanandanyviruscheckingservicesthatmaybeapplied.Atpresent,thereareover550LPSEinstallationsacrossIndonesiausingSPSE4.3.

ADBmaywishtocoordinatewithLKPPtoensuretheproposedLPSEsysteminstallationstobeappliedtoADBfundedprojectsareinstalledandconfiguredwithpropersecurityprotocolssuchasansecuresocketlayerconnection(SSL),andtoverifyifadisasterrecoveryplanisinplaceforthesysteminstallation.Thiswillensureasecureanduninterruptedsystemenvironmentisprovidedforthee-GPapplication.

PriortoFirstUse

ADBcouldallowalocalLPSEusingtheSPSE4.3systemtoconductADB-fundedprocurementunderOpenCompetitiveBidderwithnationaladvertisementonlyandtheprocurementwillbeconductedinBahasaonly.Theprocurementwouldalsoneedtofollowtheexistingprocurementoptionsavailableforthetypeofprocurementbeingconducted.

Priortofirstuse,ADB,theexecutingagency(EA)andLKPPwillneedtoaddressthefollowing:

1. StandardBiddingDocument:ADBandtheEAwillneedtoseparatethecurrentbiddingdocumentintothesectionsthatmaptothetemplateinSPSE4.3.ADBandtheEAshouldalsoverifythattheinstructionstothebidderproperlyreflectthefunctionsinSPSEforsubmittedclarifications,submittingthebidresponseswithAppendo,makingmodificationsandwithdrawingabid.Note:thecurrentversionofSPSE4.3isinBahasaonly,hencetheprocurementwillbeconductedinBahasa.

2. SiteSecurity:LKPPandtheEAshouldensurethelocalLPSEisusingasecuresocketlayer(https://)onthelocalinstallationtoensuresecurecommunicationbetweenusersandthesystem.LKPPshouldalsocoordinatewithBSNN-BadanSiberdanSandiNegara/StateCyberandCryptographyAgencytoconductsitesecurityauditsontheLPSEtoensurethesysteminstallationcomplieswithstatesecuritystandards.

3. INAPROC:LKPPshouldensureannouncementsfortheLPSEoftheEAlinkdirectlytothetenderannouncementontheLPSEpublishedbytheEA.ItwasobservedthatsomelinksinthetenderdetailsinINAPROCwereinvalidlinkstotenderannouncementsontheLPSE.

4. VendorProfileData:VendorprofiledataintheSPSEdatabaseshouldbestoredinanencryptedformattominimizetheriskofdatabeingaccessedbyhackers.Largevolumeofvendorinformationwouldbeavaluablefindforanyhacker.

FutureConsiderations

ItisunderstoodthatsupportforSPSEICBintheSPSE4.3platformisstillunderdevelopmentandisexpectedtobecompletedin4-6months(June2019).Oncecomplete,thenewSPSEICBwould

Page 11: Technical Assistance Consultant’s Report...ADB conducted multiple assessments of SPSE, including the latest assessment on SPSE 3.6. in 2017 and identified necessary modifications

ADBAssessmentofSPSE4.3

10

supportanEnglishuserinterface,ADBframeworkagreements,foreignvendorregistrationandtheoptionofapplyingpre-qualificationtoasingleenvelopprocurement.

InadditiontosupportforSPSEICB,thefollowingsuggestionsareprovidedforLKPPandADBtoconsiderasfutureimprovementstothesystem.

1. FastTender:ADBcouldexaminetheuseofFastTenderforselectedemergencypurchases.TheuseofFastTenderwouldprovideasimplifiedprocesstoinvitevendorstosubmitapricebidforworks,goodsorconsultingservices.Currently,FastTenderappliesreverseauctiononly.ADBcouldrequestLKPPtoseeifFastTendercouldalsosupportthesubmissionofapricebidonly.TheuseofFastTenderwouldalsobedependentontheabilitytoinviteproperlyqualifiedvendorstoparticipateinatender.

2. SiKAP:LKPPshouldconsidermakingSiKAP(thevendormanagementsystem)thecentralregistryforallLPSEincludingSPSEICB.TheregistrationfunctionwithinthelocalLPSEwouldlinkdirectlytoSiKAP.MakingSiKAPthecentralVendorRegistrationsystemandVendorManagementSystemwouldprovideLKPPwithmuchgreatercontrolovervendordatatohelpensuretheintegrityandsecurityoftheinformation.VendorinformationonalocalLPSEwouldnowonlyincludequalificationinformationmappedfromSiKAPatthetimeofthesubmissionbyaVendor.ThelocalLPSEwouldstillbeinvolvedintheregistrationprocessbyverifyingthesupportingdocumentationprovidedbylocalvendors.InsteadofinitiallybeingverifiedinthelocalLPSEvendordatabase,theverificationwouldberecordedinSiKAPbytheLPSEandmadeavailabletoallLPSEsthroughSiKAP.Allvendors,bydefault,wouldautomaticallybesetupforsinglesignon.LKPPwouldalsobeabletoestablishaforeignregistrationprocesswithinSiKAPanddesignateanLPSEresponsiblefortheverificationofforeigndocumentssubmittedelectronically.ForeignvendorswouldthenbeabletoparticipateinanyinternationaltenderpublishedbyanySPSE.

3. SystemDocumentation:LKPPshouldprovideauserguideinEnglishonceanEnglishUserinterfaceisinplace.ThesystemQandApagesshouldalsosupportEnglishaswellasthedocumentstosupporttheregistrationprocess–designatetheuserandpowerofattorneyforms.

4. SystemBOQ:LKPPmaywishtoexpandtheBOQoptionswithstructuredExcelTemplatestobetterreflectADBandotherdonorpricingschedulesandtosupportmultiplecurrencies.ADBcansharetemplatescurrentlybeingdevelopedinIndiaasareference.

5. Pre-QualificationforSingleEnvelop:Itwasnotedthatpre-qualificationforsingleenvelopprocurementwasnotsupported.ThisoptionshouldstillbeavailableforADB-fundedpackages.

6. ReportingandMonitoring:Donor-fundedprojects.ADBandotherdonorswanttobeabletoviewandmonitordonor-fundedprocurementacrossallorganizations.Currently,thefundingsourceisdefinedinSiRUPprocurementplanrecords,butthesourceoffundsdoesnotappeartobeincludedinSPSErecords.LKPPshouldincludesourceoffunds,includingthedonororganization,inSPSETenderdatasothatrecordscanbeextractedbasedonthesourceofdonorfunds.

Page 12: Technical Assistance Consultant’s Report...ADB conducted multiple assessments of SPSE, including the latest assessment on SPSE 3.6. in 2017 and identified necessary modifications

ADBAssessmentofSPSE4.3

11

7. ReportingandMonitoring:TypeofProcurement.LKPPshouldconsideraddingasub-typetothetypeofprocurementinordertoreceiveamoregranularviewoftheprocurementactivitybeingconducted.TheoldMPHW’ssystemusedtoincludealistofabout30typesofworksprojects.ThesameorsimilarlistcouldbeappliedtoSPSE,andLKPPcouldalsoaddasub-typeforGoods,ConsultingServicesandotherservices.Aninitialsub-typelistcouldreflectthehigh-levelclassificationoftheUnitedNationsStandardProductsandServicesCode(UNSPSC)orcommonprocurementvocabulary(CPV)codestructures.Theinclusionofasub-typecouldassisttheADBandLKPPinmonitoringprocurementactivityunderanRBLprogramsuchasthecurrentprogramtoupgradeirrigationsystemsacrossmultipleorganizations.

8. VendorAnalytics:AMELprovidesaverystrongreportingtoolformonitoringprocurementactivityagainstaprocurementplanandcontractimplementation.LKPP,however,shouldalsoconsideranalyticsrelatedtovendoractivityandtendercommitteeactivity.InadditiontoprocurementdatafromalocalLPSE,LKPPshouldalsocollecttransactiondataforvendorexpressionofinterestandsubmission,includingpricebid.Bycollectingvendortransactionrecords,LKPPwouldbeabletogaugethecompetitionlevelfordifferenttypesofprocurement.Severalcountriesarebeginningtoanalyzeactivitydatatoexamineprocurementpatternsanddeterminewhichbiddersareparticipatingintheprojects,whoiswinning,orwhythereislittlecompetitioninselectprojects.Theyalsoanalyzepricedata,notjustfromthewinningbidbutfromallsubmissionstotrackpricepatternsonpastandfutureprojects.Thecollectionofvendortransactionrecordswouldalsoallowthedonortobettergaugetheprocurementcompetitionondonor-fundedprocurement.

Page 13: Technical Assistance Consultant’s Report...ADB conducted multiple assessments of SPSE, including the latest assessment on SPSE 3.6. in 2017 and identified necessary modifications

ADBAssessmentofSPSE4.3

12

SPSE 4.3 System Review SPSE4.3representsasignificantchangetotheSPSEplatformwithacleanerandeasier-to-navigateuserinterfacethatappliestoallcomponentsandfunctionsofthesystem.Thenewreleasealsointroducesanewvendormanagementsub-system(SiKAP)toprovidebettersupporttothesinglesign-onprocessandmappingofVendorProfileinformationfromoneLPSEsystemtoasubmissioninanotherLPSEsystem.

Thoughtheuserinterfacehaschangedsignificantly,SPSE4.3appearstofollowtheunderlyingprocurementworkflowsandprocessesoftheearlierversionsincludingtheneedtocreateatenderpackagefromanapprovedbudgetplanlistedintheSiRUPprocurementplansystem.

Themainchangestothesystemareassociatedwiththetendercreationprocess.Newworkflowprovidesstructuretothebiddocumentandenablesthetendercommitteetodefinesubmissionrequirementsandqualificationslinkedtodatainavendor’sprofile.AswithearlierversionsofSPSE,allpackagescreatedinthesystemmustbelinkedtoanapprovedbudgetintheSiRUPsystem.Duringthecreationofthepackage,thecommittingofficerwilluploadcomponentsoftheresultingbiddocumentincludingdraftcontract,termsofreference,specificationsandotherdocumentstobeappliedbytheselectedtendercommittee.Thecommittingofficerwillalsodefinetheestimatedpricing(HPS)bylotthatwillbeappliedtotheBillofQuantities(BOQ)tobecompletedbythebidders.

Thenewsystemalsoincludesadditionalworkflowfortendercommitteeofficerstosupportthepackageandtendercreationprocess.TenderCommitteeofficersmustacceptandapproveatenderbeforeitispublishedandacceptandapprovetheresultsofbidopeningandevaluationbeforeproceedingtocontractawardnoticeandcontractaward.

Page 14: Technical Assistance Consultant’s Report...ADB conducted multiple assessments of SPSE, including the latest assessment on SPSE 3.6. in 2017 and identified necessary modifications

ADBAssessmentofSPSE4.3

13

Aswithearlierversions,thesystemsupportsonlinemessagingtosupportbidclarificationsduringthebiddingprocessandtoseekclarificationduringtheevaluationprocess.

Thesystemalsoallowscommitteememberstogeneratebidopeningreportsandbidevaluationreportsfromthedatacollectedinthesystem.Theapprovedreportscanthenbeuploadedinthesystemandpublishedforpublicaccessasrequired.

TheSPSEsystemcontinuestoprovidecommitteememberswithdifferentprocurementoptionsforthemanagementofatenderforGoods,Services,Works,ConsultingServicesandotherservices,includingsingleenvelopandtwoenvelopprocurementprocesswitheitherpre-orpost-qualification.Theresultingcontractcanbedefinedaslump-sum,unitprice,bestvalueorframeworkagreementwithoneormorewinners.

Duringthereviewofthesystem,itwasnotedthatpre-qualificationforsingleenvelopprocurementwasnotsupported.ThisoptionshouldstillbeavailableforADB-fundedpackages.

Thenewsystemincludesanewprocurementfunctionforfasttenders.FastTendersallowsacommitteetoinviteselectedvendorsregisteredinthesystembasedonqualificationcriteriadefinedinthevendorprofile.Thetenderisevaluatedonpriceonly,usingareverseauction.Thecommitteewouldpublishthespecificationsortermsofreferenceforthepackage,invitevendorsandinitiateareverseauctiononclosingdateandtime.FastTendersdoesnotsettimelimitsfortheannouncementperiodnoristhereavaluelimitonthesizeofthepackage.Theonlyrequirementispre-establishedqualificationsintheVendorprofileusedtoinviteallvendorswiththeassociatedqualificationstoparticipateinthetender.Afterthecompletionoftheauction,thecommitteecanconductapost-qualificationontherankedbidderandrequestsupportinginformationtosupporttheirsubmissionandprice.FastTenderscouldbeappliedtoemergencyprocurementorotherprocurementneedsthatrequireanexpeditedprocesswherepriceisthemainevaluationcriteria.

InadditiontoFastTenders,SPSE4.3allowsprocurementcommitteestorecordtheresultsoftendersconductedoutsideofthesystem.Thisfunctionisdesignedforlowvalueprocurementandenablesthesystemtotrackandmonitorlowvaluetransactionswithoutapplyingburdensomeprocessesandminimumtimelinestocompletesimpletransactions.Directprocurementpackagesarelinkedtobudgetplansandcontractmanagementlikeothertenderstosupportthemonitoringtools.

SPSE4.3alsoincorporatesanewcontractmanagementmoduletomanagethecontractaward,originalcontractvalue,contractstartdateandcontractcompletiondate,andvalueof

Page 15: Technical Assistance Consultant’s Report...ADB conducted multiple assessments of SPSE, including the latest assessment on SPSE 3.6. in 2017 and identified necessary modifications

ADBAssessmentofSPSE4.3

14

contractoncompletion.Thecontractmanagementmodulewillallowthecommitteetostoreanoriginalcopyofthecontractandrecordanycontractvariationsandadjustments,invoicesandpaymentsthroughtocontractcompletion.Thewinningvendorisinvitedtoparticipateinthecontractmanagementfunctioninordertoexchangeinformationandsubmitdocumentsasrequired.

TosupportthemonitoringofprocurementactivityunderSPSE4.3,LKPPhasalsointroducednewmonitoringtoolsthroughtheAMELdashboardwhichincorporatesdatacollectedfromtheprocurementplanningsystem(SiRUP),thee-procurementsystem(SPSE4.3)andthecontractmanagementsysteminordertoprovidemanagementandthepublicwithanoverviewofallprocurementactivityagainsttheoriginalprocurementplanforanorganization.

SupportofInternationalProcurement

SPSE4.3doesrepresentasignificantenhancementtoSPSE3.6;however,overallsupportfordonor-fundedprocurementthatwasappliedtoSPSEICBisstillunderdevelopment.LKPPexpectstocompletethetransitionofSPSEICBthatwasbasedonSPSE3.6tothenewSPSE4.3platformin4-6months(expecteddeliveryinJune2019).

SPSEICBincludessupportforforeignregistration,procurementunderframeworkagreementsandanEnglishuserinterfaceinordertofullysupportinternationalcompetitionondonor-fundedprojects.SPSEICBalsosupportspre-qualificationwithsingleenvelopprocurementprocessanddoesnotapplytheAppendoutilityforthesubmissionofbids.ThesecurityofthesubmissionsismanagedwithintheSPSEICBapplication,allowingbidderstouploadrequiredsubmissioninformationandstoretheinformationinanencrypteddatabasefield.TheAppendoutilitywasbypassedbecauseitwasinBahasaonlyandcouldcauseissuesforinternationalbidderswhenthebiddingwasbeingconductedinEnglish.

ADBhasbeenmonitoringtheprogressofthetransitionofSPSEICBtotheSPSE4.3platformtoensureallADBprocurementrequirementscontinuetobesupportedandensureanEnglishuserinterfaceisfullysupportedintheSPSEapplicationandtheAppendoutility,ifitisappliedtointernationaltenders.

ADBandLKPPwillalsoneedtoreviewtheregistrationprocessandhowvendorprofileinformationforinternationalparticipantswillbeincludedwithinthequalificationconditionsunderSPSE4.3.

Page 16: Technical Assistance Consultant’s Report...ADB conducted multiple assessments of SPSE, including the latest assessment on SPSE 3.6. in 2017 and identified necessary modifications

ADBAssessmentofSPSE4.3

15

UnderSPSEICB,qualificationsweremanagedseparatelybyhavingbiddersuploadthenecessaryinformationaspartofthesubmissionandverifiedaspartofapost-qualificationprocess.

LKPPshouldexamineoptionsforcollectinginternationalinformationinthevendorprofiletoallowtheSPSEpre-qualificationsoptionstoallowasrequired.InternationaltendersshouldalsoallowacommitteetoexcludesomedefaultqualificationssuchasalocaltaxIDandbusinesspermit.TherequirementforataxIDorbusinesspermitshouldonlyberequiredpriortothestartofacontract.

ADBwouldalsoneedtoreviewdebarmentaspartofvendorqualification,asunderADBprocurementguidelinesonlyADBdebarmentlistwouldapply.VendordebarmentaspartofthesystemqualificationcouldbeoptionalforADB-fundedprojects.FurtherdiscussionswithLKPPonthisissuearerequired.

Itwasobservedthatthesourceoffundsisidentifiedintheprocurementplanrecords,butthisinformationdidnotappeartocarryforwardtothetenderdetails.WiththetransitionofSPSEIBCtoSPSE4.3,LKPPshouldexamineoptionsforincludingthesourceoffundsinthetenderdetailsandtoclearlyidentifythedonor(ADB,WB,JICA,etc)sothatthetenderpackagesareclearlyidentifiedasadonorprojectforthespecificdonor.

TenderCreation

PackagesarecreatedbyacommittingofficerbylinkinganewpackagetoanapprovedbudgetplanrecordfromtheSiRUPsystem.Thebudgetplandefinesthebudgetallocationcodes,sourcesoffunds(statefunds,donorfunds),fundsavailableandtypeofprocurement.

AllpackagesmustbelinkedtoanapprovedbudgetfromSiRUP.TheSiRUPrecordsaremaintainedoutsideofSPSEbyanassignedofficerwhomustcreateanannualprocurementplanwhichwillbeapprovedbytheMinistryofFinance.AcopyoftheapprovedSiRUPrecordsareincludingwiththeSPSEdatabasetoallowthecommittingofficertoselecttheappropriateplanforthepackage.

Oncetheplanisselected,theofficermaycreateanewtitle,definealocationforthepackage,definetheestimatedvalue,anduploaddraftcontract,termsofreferenceandspecificationsthatwillbeusedforcreationofthetenderbytheassignedtendercommittee.

Note:SPSEonlylinksapackagetoaprocurementplan.TheSPSEdoesnotmanagetheinformation

Page 17: Technical Assistance Consultant’s Report...ADB conducted multiple assessments of SPSE, including the latest assessment on SPSE 3.6. in 2017 and identified necessary modifications

ADBAssessmentofSPSE4.3

16

associatedwiththeprocurementplan.SPSEdoesnotverifyifthefundsavailableunderaplanhavebeenallocatedtootherpackagesoriftheestimatedbudgetforthepackageexceedstheplanbudgetorremainingfundsavailable.ManagementofthebudgetswithintheprocurementplanareoutsideofthescopeoftheSPSEapplication.

Oncethepackageiscreated,itwillbeassignedtoadesignatedtendercommittee.Theheadofthecommitteewillthenassignofficersresponsibleforthecreationandpublicationofthetender,thetenderopeningandevaluation.

Theassignedofficerwillcompletethetenderdetailsandworkflowstobeappliedtothetender,suchasthetypeofprocurement(goods,services,works,consultingservices)andifthetenderwillfollowasingleortwoenvelopsubmission,pre-orpost-qualification,typeofcontract,submissionrequirementsandqualifications,aswellasfinalizethebiddocumentanddefinethescheduleofactivitiesforthetender.Thescheduleofactivitieswillincludetheannouncementperiodaswellasperiodstoregistertobid,todownloadbiddocuments,tosubmitclarification,tosubmitbidresponses;bidclosingdateandtime;bidopeningdateandtime;evaluationperiod;qualificationreview;awardperiod;and,contractannouncement.Thetenderwillbecontrolledbythescheduleofactivitiesandprocurementmethodapplied(oneortwoenvelop).

Thestructureofthescheduleofactivitiesisdependentontheprocurementprocesstobefollowedforthepackage(oneenveloportwoenvelop;pre-qualificationorpost-qualification,singlestageortwostagebidding).FastTenderispresentedwithaverysimplescheduleforpublicationdateandbidclosingdateandtime.

Note:InSPSE4.3,itappearsthatsingleenvelopwithpre-qualificationwasnolongerincludedasanoption.Thisprocurementoptionwasincludedinversion3.6andinSPSEICB.

Afterthetenderisapprovedbytheheadofthecommittee,thetenderispublishedintheLPSEportalandINAPROC,thenationale-GPportal

Page 18: Technical Assistance Consultant’s Report...ADB conducted multiple assessments of SPSE, including the latest assessment on SPSE 3.6. in 2017 and identified necessary modifications

ADBAssessmentofSPSE4.3

17

listingalltenderannouncementspublishedineachLPSE.

Thepublicandvendorscanviewthepublictenderannouncement.IfviewedfromtheINAPROCportal,thetenderdetailswillincludealinktotheLPSEsystemwherethetenderisbeingprocessed.

BidDocumentTemplates

Thenewsystemappliesabiddocumenttemplatetosupportthepublicationofthebiddocument.Thoughatemplateisapplied,thecontentofthetemplateiscomprisedofuploadeddocumentsthatreflectthesectionsofthebiddocumenttobeappliedtothetender.Thesectionsincludethetermsofreference/specificationsforthetender,draftcontractandotherinformationwhichcanincludeformsandschedulestobecompletedbybidders.ThetemplatealsoincludesaqualificationsectionthatreflectsvendorqualificationsandinformationmaintainedintheVendorProfilewithintheSPSEapplication.QualificationsmayincludecurrenttaxIDandcertificates,businesspermits,registrationcertificates,financialstatements,managementteam,experts,workexperienceandequipment.

Aseachsectionofthetemplateiscompletedbyuploadingacorrespondingdocument,theappliedtemplatestructurecanstillallowatendercommitteetoapplyanADBbiddingdocumenttoapackagebyuploadingtheappropriatepartsoftheADBSBDtothecorrespondingtemplatesections.

SystemBOQ

TheestimatedpricingfortheBOQcanbesetupusinganonlineformtodefinepriceitems.Eachitemincludesanitemname,unitofmeasure,quantity,unitprice,tax(%)tobeapplied,totalcostandremarks.Ifthepackagewouldincludemorethan15items,theofficercanaddadditionalitemrowsoran

Page 19: Technical Assistance Consultant’s Report...ADB conducted multiple assessments of SPSE, including the latest assessment on SPSE 3.6. in 2017 and identified necessary modifications

ADBAssessmentofSPSE4.3

18

Exceltemplatecanbeusedtodefinealongerlistofitemstobepriced.

TheestimatepricewillformthestructurefortheBOQassociatedwiththetender.Bidderswillberequiredtoenterunitpricingandtheformwillcalculatethetotalpricewithtaxes.PricinginthecurrentreleaseofSPSEisinIndonesiaRupiahonly.

Duringbidopening,thesystemcanextractthelotpricingandtotalpricebidfromtheBOQformstorecordvendorpricinginthesystem,rankbiddersaccordingtopriceandwhereappliedcalculatethebestvaluebycombiningpricewithtechnicalscore.

ThecurrentstructureoftheBOQislimitedtocollectinglotpricingandtotalpricingonlyinIndonesianRupee.Italsodoesnotsupportmultiplecurrency.

IfADBrequiresadditionalpricescheduleinformationasmaybedefinedinthebiddingdocument,vendorsmaycompleteseparatepricingschedulestocalculatetheirbidprice,thenrecordtheirbidpriceinIndonesiaRupeesinthesystemBOQformwhichmaybesetupasasinglelotifawardwillbeontotalpriceorasmultiplelotsifawardwillbebylot.

LKPPmaywishtoexamineoptionsfordevelopingmultipleBOQoptionswhenapplyingastructureExcelfile.ExceltemplatescanbecreatedtoreflectADBpricingschedulesandsupportmultiplecurrencies.TheuseofstructureExcelTemplateswouldstillallowthesystemtoextracttotalpricingfromtheExcelspreadsheetstoincludeinbidopeningandothercomparativereports.SimilarinitiativeswithExcelTemplatesareoccurringinIndiawithNICtosupportADBbiddocuments.

e-Bidding

Oncethetenderispublished,interestedbidderscanviewthetenderannouncementandscheduleofactivities;however,interestedbiddersmustregistertobidinordertoaccesstotheassociatedbiddocumentsforthetender,submitanyclarificationstothetendercommitteeandrespondtothetenderusingtheAppendoutility.

ThesubmissionrequirementsforthetenderaremappedtoAppendobyapplyingtheAppendokeydefinedinthetenderdetails.AppendoallowsthebiddertopreparetheirresponseofflinebyattachinganyrequireddocumentsandcompletinganyformssuchastheBOQ.Appendowillorganizetheresponseinoneortwoenvelopsbasedonthetypeoftenderandensurethebidderrespondstoallrequirementsbeforetheresponsecanbeencryptedanduploadedinthesystem.Onceuploaded,thebiddercanviewareceiptoftheresponseonthesystem.ThebiddermayuseAppendotomakemodificationstotheirsubmissionandresubmittheirresponse,orwithdrawtheirresponsepriortothebidclosingdateandtime.

Bidderscanmonitortheprogressofthetenderbymonitoringthescheduleofactivitieswhichwillidentifythecurrentstageofthetenderprocessaswellasbyviewinganyinformationpublishedbythetendercommitteesuchasbidopeningreportsornoticeofaward.

BidOpeningandEvaluation

Page 20: Technical Assistance Consultant’s Report...ADB conducted multiple assessments of SPSE, including the latest assessment on SPSE 3.6. in 2017 and identified necessary modifications

ADBAssessmentofSPSE4.3

19

Whenthebidopeningtimeisreached,theassignedprocurementofficerwillusetheAppendoutilitytoopenthebidsubmissions.ThetenderdetailsfortheprocurementofficerwillincludeanewAppendokeythattheofficerwillcopytoAppendo.ThiskeywillallowAppendotodownloadsubmissionstoalocalworkstationanddecryptthefiles.TheAppendokeyisonlymadeavailabletoauthorizeduserswhomustalsologintotheAppendoutilitywiththeirIDandpasswordtoverifytheiridentity.Oncedownloaded,thesubmissionswillbeorganizedinadirectoryforthepackageandorganizedbyparticipant.Thecontentofeachparticipantdirectorywillreflectthesubmissionrequirementsforthepackage.

Theofficerwillbeabletoviewdecryptedsubmissionsontheirlocalworkstation.Evaluationisconductedoffline.

Iftheprocurementprocesswasdefinedasatwoenvelopprocess,Appendowillonlyopenthefirstenvelop.Thesecondenvelop(pricebid)willonlybeopenedwhentheevaluationofthefirstenvelopiscompleteandonlyforqualifiedbidders.

TheSPSEworkflowwillprovideofficerswithasequenceofactivitiestorecordtheresultsoftheevaluationprocessfromacceptanceofsubmissiononopening,pre-orpost-qualificationofvendors,technicalevaluationresults,priceevaluationandfinalevaluationrankings.

Page 21: Technical Assistance Consultant’s Report...ADB conducted multiple assessments of SPSE, including the latest assessment on SPSE 3.6. in 2017 and identified necessary modifications

ADBAssessmentofSPSE4.3

20

Officerswillrecordtheresultsoftheevaluationinthesystemformsforbidopeningandevaluationwhichwillbeconfiguredinaccordancetothetenderdetailsrequirementsdefinedwhenthetenderwascreatedwithpast/fail,technicalscoreandprice.

Thesystemprovidesoptionstogeneratebidopeningandevaluationreportsfromtheinformationenteredinthesystembytheofficer.Eachofficerofthetendercommitteemustacceptthebidopeningresultsbeforeproceedingtotheevaluationstage.

Allofficersmustalsoaccepttheevaluationresultsbeforemovingtopost-qualificationandawardstages.Thesystemprovidesoptionstotheofficerforgeneratingopeningandevaluationreportsthatcanbesignedbycommitteemembersanduploadedinthesystemforinternaluseorpublicdistribution.

Fortheverificationofqualificationinformation,theSPSEsystemwilllinktheofficerintotheSiKAPvendormanagementsystemtoverifyandapprovethequalificationderailssubmittedbythevendorfromtheirvendorprofile.QualificationsaremanagedseparatelyfromothercomponentsofthebidresponsesastheinformationismappedfromtheVendorprofileandformspartoftheresponse.VendorscanapplyinformationintheirVendorprofile..Submissionsaredecryptedandsavedontheofficer’slocalworkstationforreviewandevaluation.

SecurityoftheProcess

Securityofthee-submissionprocessismanagedthroughtheAppendoutility.BidderspreparetheirresponsesofflineusingAppendo.Whentheirresponseiscomplete,Appendowillpackandencrypttheirsubmission,andthenuploadthepackedfiletotheSPSEsystem.Oncesubmitted,thebidderwillseeanoticeofreceiptoftheirsubmissioninthesystem.BidderscancontinuetouseAppendotomodifytheirsubmissionupuntilthebidclosingdateandtime.

OnlyencryptedsubmissionsareuploadedtotheSPSEsystemandnouserwillhaveaccesstothesubmissionfilesorAppendokeytodecryptthemuntilthedefinedbidopeningtime.Oncethebidopeningtimeisreached,thesystemwilldisplaytheAppendodecryptionkeytoauthorizedmembersofthetendercommitteesothattheymaydownloadsubmissionsandconductthebidopening.Duringthebidopening,thesystemwillautomaticallydisplaythelistofparticipantsandifthetenderisasinglefile,thesystemwilllistthetotalpricebidsenteredsecureformsduringthesubmissionprocess.

Thesubmissionandopeningprocessensurethesecurityandintegrityoftheprocurementprocess.

Page 22: Technical Assistance Consultant’s Report...ADB conducted multiple assessments of SPSE, including the latest assessment on SPSE 3.6. in 2017 and identified necessary modifications

ADBAssessmentofSPSE4.3

21

InadditiontothesubmissionspreparedwithAppendo,qualificationinformationsubmittedbyabidderiscopiedfromthebidder’svendorprofilemanagedinthelocalLPSEorcopiedfromSiKAP(thevendormanagementsystem)ifparticipatinginatenderhostedinaseparateLPSEsystem.

ItisunderstoodthatvendorprofiledataisstoredasplaintextintheSPSEdatabase.Thoughsomeofthevendorinformationisgeneralpublicinformationorinformationisnot.Thesystemshouldstoreallvendor-relatedinformationinanencrypted,securemannertopreventanyhackerfromacquiringgeneralinformationaboutavendor.Largecollectionsofvendorinformationwouldpresentanassettoanynefariousparty,moresothanaspecificbidsubmission.

ItwasalsoobservedthatnotallLPSEsystemsappliedasecuresocketlayer(https://)toensureasecure,encryptedtransmissionofanydatafromauser’sworkstationtotheSPSEapplication.

BidSecurity

SecuritiesaremanagedoutsideoftheSPSEsystem.Whenabidsecurityisrequired,Bidderswillberequiredtofollowtherequirementsforabidsecurityasdefinedinthebiddingdocument.Bidderswilluploadanelectroniccopyoftheirbidsecurityinstrumentaspartoftheirsubmission,thoughtheywillalsoberequiredtosubmitoriginalcopiesofthebidsecurityinstrumentasthedesignatedlocationdefinedinthebiddingdocument.

TheSPSEsystemdoesnotmanageorrecordthereceiptofanyphysicalsubmissionsuchasabidsecurity.

VendorRegistration

Asnoted,thenationalprocurementsysteminIndonesiaissupportedthroughanetworkoflocale-GPsysteminstallations,allbasedontheSPSEplatform.Currently,thereareover550individualsysteminstallationsandeachsystemisresponsiblefortheregistrationandsupportofitsusers,includingbothvendorsparticipatingintheprocurementandprocurementofficersconductingtheprocurement.

VendorswishingtoparticipateinatenderonanLPSEsystemmustfirstregisterintheirlocalLPSE.TheregistrationprocessincludescompletingonlineregistrationformsintheSPSEsystemandpresentingnotarizedcopiesofsupportingregistrationdocumentstothelocalLPSEforverification.

OnceregisteredinthelocalLPSE,vendorscanapplyforsinglesign-onthatwillallowthemtologontoanyLPSEsystemandparticipateinanytender.

WithSPSE4.3,LKPPalsointroducedanewSiKAP(vendormanagementsystem)tofacilitatethecentralmanagementofvendorprofileinformation.RegisteredvendorscanmaptheirvendorprofilestoSiKAP,thenapplytheirvendorqualificationinformationfromSiKAPtoatenderpackageonanyLPSE.

Movingforward,LKPPshouldconsidermakingSiKAPthecentralregistrationsystemforSPSE,andhavevendorsregisterdirectlytoSiKAPversusthelocalLPSE.TheregistrationprocesscouldstillallowvendorstoidentifytheirlocalLPSEwheretheywouldsubmitoriginalcopiesofregistrationdocumentsforverification.UsingSiKAPasthecentralregistrywouldprovideLKPPmorecontroland

Page 23: Technical Assistance Consultant’s Report...ADB conducted multiple assessments of SPSE, including the latest assessment on SPSE 3.6. in 2017 and identified necessary modifications

ADBAssessmentofSPSE4.3

22

securityoverthevendorprofileandqualificationinformationandtheywouldalsobeabletobettermonitorvendorparticipationintendersacrosseachLPSE.Vendors,bydefault,wouldalreadybesetupforsinglesign-onandwouldnotneedtomanageinformationinmorethanonelocation.Whenbidding,animageoftherequiredqualificationinformationwouldbecopiedtothetenderpackage.

ThecurrentregistrationprocessinSPSE4.3isgearedtonationalvendorsandisinBahasaonly.TheprocessrequiresalocalbusinesspermitandtaxIDtocompletetheregistrationprocess.

UnderSPSEICB,LKPPsimplifiedtheregistrationprocessforforeignbiddersandallowedthemtosubmitsupportingdocumentationelectronically.BymakingSiKAPtheinitialregistrationsystem,LKPPwouldbeabletocentralizetheregistrationandverificationofforeignvendorstooneadmingroupandallowforeignfirmstoparticipateinaninternationaltenderbeingprocessedatanyLPSEsite.LKPPshouldalsoexamineoptionsforrecordingforeigntaxIDs,permitsandpastworkinthevendorprofilebyincludingacountryoforiginfortheinformationbeingrecorded.CollectingforeigninformationaspartofthevendorprofilequalificationinformationwouldallowLKPPtoapplythequalificationconditionsoftheSPSE4.3procurementprocesstointernationaltenders.

ReportingandMonitoring

ThemonitoringandevaluationunithasintroducednewmonitoringdashboardstoprovidequickandeasyaccesstoprocurementactivitybyLPSEandtheorganizationsinanLPSE.Thenewmonitoringdashboard(AMEL–samplesite:https://lpse.lkpp.go.id/amel)integratesdatafromSiRUP,LPSESPSEande-ContractandTreasuryforpaymentinformation.AMELprovidesaverygoodoverviewofalltypesofactivitybyorganizationacrossallLPSEs.Ausercanquicklyviewanddrilldownprocurementactivityatdifferentstagesfromplanning,procurementandcontracttoimplementationand

completion.

Page 24: Technical Assistance Consultant’s Report...ADB conducted multiple assessments of SPSE, including the latest assessment on SPSE 3.6. in 2017 and identified necessary modifications

ADBAssessmentofSPSE4.3

23

AllinformationisorganizedbyOrganizationandausercanquicklydrilldowntoviewdifferentstagesofactivityoftheprocurementfromplanningthroughcompletion.Withineachdashboard,ausermayalsoviewdetailrecordedunderanyofthechartspresented.Theusermayalsodownloadrecordstotheirownspreadsheettoconductfurtheranalysisofthedata.

AMELiscurrentlyininitialtestphaseandisonlyavailabletoasmallsubsetoftheparticipatingLPSEorganizations.

ThoughAMELprovidesamuch-improvedmonitoringtool,LKPPshouldalsoconsideradditionaloptionsformonitoringandreviewingdatacollectedfromtheSPSEapplication.

Forfutureconsideration,itwouldbeofinteresttoADBandotherdonorsifAMELcouldprovidealternateoptionsfortheprimaryreportfilter.Atpresent,thedataisbasedonanLPSEorganization.ADBwouldliketobeabletosettheprimaryfiltertoafundingsourcesuchas“ADBFunds”inordertohaveadashboardviewofallorganizationsconductingADB-fundedprocurement.AsecondaryfilterwouldbeanADB-fundedprogramfollowedbyindividualorganizations.Thetypeofinformationdisplayed,andthelayoutoftheinformation,wouldbelikethecurrentAMELdashboard.FromcurrentobservationsofthedataelementsinSiRUPandSPSE,itappearsthatfundingsourceisdefinedinSiRUPbutnotcarriedforwardtotheTenderpackageinSPSE.LKPPshouldincludethefundingsource—includingthedonororganization—inSiRUPandSPSEsothatfurtheranalysiscouldbeperformedonthesourceoffunds.

Inadditiontothebasictypeofprocurement—Goods,Works,ConsultingServicesandotherservices—itwouldalsobeofinteresttohaveamoredetailedbreakdownofeachtypeofprocurement.InearlierversionsofthePublicWorkssystem,PubicWorksincludedasub-typeofworksprojects.Thesub-typeincludedalistofabout30typesofprojectsfromroadworkstoconstruction.LKPPshouldconsiderincludingalistofsub-typesforthedifferenttypesofprocurementtogainabetter

Page 25: Technical Assistance Consultant’s Report...ADB conducted multiple assessments of SPSE, including the latest assessment on SPSE 3.6. in 2017 and identified necessary modifications

ADBAssessmentofSPSE4.3

24

understandingofthetypesofGoods,Works,ConsultingServicesandotherservicesbeingprocured.ItisunderstoodthatLKPPhasbeenplanningtoaddcommoditycodestotenderrecordstoprovidesuchamoredetailedbreakdowntothetypeofprocurementbeingconducted.Theuseofasub-typewouldprovideastopgapmeasuretoprovideimprovedreporting.Theinitialsub-typecouldreflecthighlevelcommodityclassesfromthecommoditycodetablessothatitwouldeasilymaptothecommoditycodesinthefuture.Theuseofasub-typewouldalsoallowthesystemtoproducereportsthatwouldallowADBtomonitoractivityunderaResultsBasedLoan(RBL).Atpresent,thereisanRBLprogramforirrigationprojects,thoughcurrentdatainSPSEmakesitchallengingtoproducerecordsorreportsrelatedtothisactivity.Ifasub-typewereappliedtoWorksprocurementfor

irrigationwork,thecollectionandreportingofthisinformationwouldbestraightforward.Thetypeofprocurementandsub-typescouldalsobecomeprimaryreportfiltersinAMEL,enablingadashboardviewofprocurementactivitybythetypeofprocurement.Combiningtypeandsub-typeofprocurementwithunitpricingcollectedintheBOQwouldalsoallowLKPPtogainabetterunderstandingofunitpricingacrossprojectsbyLPSE.Asub-typeshouldalsoallowthesystemtobetterexaminevalueformoney–economy,efficiencyandlevelofcompetitionbetweenprojects,organizationsandLPSE.

Otherinformationofinterestwouldbetheabilitytogaugeprocurementactivitybyvendors.AMELcurrentlypresentsprocurementinformationrelatedtostagesofprocurementandvaluetoidentifysavings.Thesystemcanalsotrackcanceledtendersandretenders.ADBandotherdonorsarealsointerestedingainingabetterunderstandingofactivityinthemarketplaceontendersbyknowingthenumberofvendorsviewinganannouncement,registeringtobid,submittingabid,withdrawingabid,andmodifyingabidtogaugethelevelofcompetitiongeneratedbythee-GPsystem.LKPPshouldalsowanttogainabetterunderstandingofthedifferentlevelsofactivityoccurringatdifferentLPSEs

Page 26: Technical Assistance Consultant’s Report...ADB conducted multiple assessments of SPSE, including the latest assessment on SPSE 3.6. in 2017 and identified necessary modifications

ADBAssessmentofSPSE4.3

25

andINAPROCtodeterminewherevendorsareviewingandaccessingopportunitiesandiftheyareparticipatingandwinningtendersoutsidetheirlocalLPSE.