Technical Centers Department

Fermilab Long Range Planning Committee Open Forum On Detector R&D

October 30, 2003R. Ray

Facilities Available for Detector R&D

Not in Technical Division!

PPD

Page 2: Technical Centers Department Fermilab Long Range Planning Committee Open Forum On Detector R&D October 30, 2003 R. Ray Facilities Available for Detector

Fermilab Long Range Planning Committee Open Forum On Detector R&D - Oct. 30, 2003 2

Engineering and Draftingprovided by PPD Mechanical Dept.

89 People:

5 Physicists9 Engineering Physicists1 Material Scientist4 Engineering Associates1 Engineer1 Computing Professional2 Designer/Drafters66 Techs

Page 3: Technical Centers Department Fermilab Long Range Planning Committee Open Forum On Detector R&D October 30, 2003 R. Ray Facilities Available for Detector

Fermilab Long Range Planning Committee Open Forum On Detector R&D - Oct. 30, 2003 3

Silicon Detector CenterSilicon Detector Center

• Team of talented, experienced engineers, designers and technicians

• Extensive experience with: Micron precision assembly Engineering of low-mass, stiff structures Thermal management issues

• Extensive equipment and resources

>7000 ft2 of high-quality clean room space 6000 ft2 operated as class 10000 1000 ft2 operated as class 5000

17 CMMs of various accuracies and measurement ranges

1 automated optical measurement system (OGP)

2600 ft2 of burn-in space

6 Kulicke & Soffa wire bonding machines

Page 4: Technical Centers Department Fermilab Long Range Planning Committee Open Forum On Detector R&D October 30, 2003 R. Ray Facilities Available for Detector

Fermilab Long Range Planning Committee Open Forum On Detector R&D - Oct. 30, 2003 4

SiDet ProjectsSiDet Projects

• BTeV Pixel Detector 62 half-stations ~400k pixels per half station total of 23*106 pixels pixel size 400*50 m Total area of 0.5 m2

• BTeV Strip Detector Potential new SiDet project 1.5 m2 of planar silicon strip detectors

Page 5: Technical Centers Department Fermilab Long Range Planning Committee Open Forum On Detector R&D October 30, 2003 R. Ray Facilities Available for Detector

Fermilab Long Range Planning Committee Open Forum On Detector R&D - Oct. 30, 2003 5

SiDet ProjectsSiDet Projects

• CMS TOB Detector 5,928 modules for the CMS Tracker

Outer Barrel 8M wire bonds Single-sided detectors, 500m thick,

122/183m pitch Modules assembled on 688 rods Modules build using Aerotech Robot

Gantry system Half of work done here, half at UCSB

• CMS Forward Pixel Detector 4 disks; each half disk has 12

Aluminum blades 12 Mpixels, pixel size 100x150 m Plaquette with VHDI, HDI, sensors and

readout chips wrapped around blade

Page 6: Technical Centers Department Fermilab Long Range Planning Committee Open Forum On Detector R&D October 30, 2003 R. Ray Facilities Available for Detector

Fermilab Long Range Planning Committee Open Forum On Detector R&D - Oct. 30, 2003 6

SiDet ProjectsSiDet Projects

•Run IIb silicon detectors for CDF and D0 Each detector ~8m2 of silicon

CANCELED

• Cancellation of Run IIb silicon detectors leaves us with excess capacity at SiDet

• Could take on additional CMS work

• Could expand into other areas: Diamond detectors for beam monitoring CCD cameras for astronomy/astrophysics …

Page 7: Technical Centers Department Fermilab Long Range Planning Committee Open Forum On Detector R&D October 30, 2003 R. Ray Facilities Available for Detector

Fermilab Long Range Planning Committee Open Forum On Detector R&D - Oct. 30, 2003 7

Vacuum Deposition and Thin Film CoatingsVacuum Deposition and Thin Film Coatings

• Facility in Lab 7 Run by Eileen HahnHigh demand from outside Fermilab

• Vacuum deposited thin films of precise thickness from sputtering or evaporation.

• Film thickness as small as 10 Å with tolerances of 1 Å

• Applications: Mirror fiber ends Cerenkov mirrors CsI photocathodes Ti & Ni coated microwave absorbers Gold coated foils …

Page 8: Technical Centers Department Fermilab Long Range Planning Committee Open Forum On Detector R&D October 30, 2003 R. Ray Facilities Available for Detector

Fermilab Long Range Planning Committee Open Forum On Detector R&D - Oct. 30, 2003 8

Vacuum Deposition and Thin Film CoatingsVacuum Deposition and Thin Film Coatings

Other capabilities: Fiber and connector polishing (P3) Fiber splicing Plasma etch cleaning Vacuum baking and annealing (1000° C) RGA and outgassing analysis

Page 9: Technical Centers Department Fermilab Long Range Planning Committee Open Forum On Detector R&D October 30, 2003 R. Ray Facilities Available for Detector

Fermilab Long Range Planning Committee Open Forum On Detector R&D - Oct. 30, 2003 9

CNC Routing FacilityCNC Routing Facility

• Facility in Lab 8 run by Phyllis Deering for precision cutting, drilling and milling of plastic, wood, G-10, carbon fiber, etc. Parts vary from fractions of an inch to 17’ long.

Two 12’ x 5’ Thermwood routing machines High-speed 16’ x 5’ Gerber routing machine Dual table 17’ x 5’ Axxiom routing machine

• Recent large jobs include: Optical fiber manifolds for MINOS CMS muon honeycomb panels,

copper cooling plates GLAST scintillator tile production

and assembly

Page 10: Technical Centers Department Fermilab Long Range Planning Committee Open Forum On Detector R&D October 30, 2003 R. Ray Facilities Available for Detector

Fermilab Long Range Planning Committee Open Forum On Detector R&D - Oct. 30, 2003 10

Lab 3Lab 3

• Carbon fiber facility and high-quality lab space run by John Krider 2700 ft2 of clean room space that can be operated at class 1000 CMM with large active volume (1.5 x 1.5 x 4 m3) Ongoing work on BTeV straws, CKM straws in vacuum, beam instrumentation

• Carbon Fiber Facility (Dave Butler): Autoclave oven with 12 x 18 x 48 in3 active area 6 x 6 x 12 ft3 walk in oven for large carbon fiber structures Recent work includes carbon fiber cylinders for D0 fiber

tracker, numerous supports and widgets for silicon detectors including stave support, bulkheads and support cylinders for Run IIb detectors.

Page 11: Technical Centers Department Fermilab Long Range Planning Committee Open Forum On Detector R&D October 30, 2003 R. Ray Facilities Available for Detector

Fermilab Long Range Planning Committee Open Forum On Detector R&D - Oct. 30, 2003 11

Machine Development and MaintenanceMachine Development and Maintenance

• Facility in Lab 8, run by John Korienek, to design and build specialized machines and equipment.

• Self contained group with designer, drafting, electronics, programming and machining capabilities.

• Recent work and current projects include: D0 fiber mounting machine Fiber polishing machines CMS magnetic field mapping machine Optical Transition Radiator for BD Cartridge support system for Apache Point Observatory Many more …

Page 12: Technical Centers Department Fermilab Long Range Planning Committee Open Forum On Detector R&D October 30, 2003 R. Ray Facilities Available for Detector

Fermilab Long Range Planning Committee Open Forum On Detector R&D - Oct. 30, 2003 12

Detector Support CenterDetector Support Center

• Lab 6 facility run by Karen Kephart • Provides technical and mechanical support to experimenters involved in detector construction and prototyping in Lab 6 and in the field.

• Facilities include: Wire chamber winding machines Plastics/scintillator shop PMT test facility

• Recent Projects include: CKM vacuum veto prototype CDF COT BTeV straws GLAST scintillator tiles Chambers for Beams Division, …

Page 13: Technical Centers Department Fermilab Long Range Planning Committee Open Forum On Detector R&D October 30, 2003 R. Ray Facilities Available for Detector

Fermilab Long Range Planning Committee Open Forum On Detector R&D - Oct. 30, 2003 13

PMT Test FacilityPMT Test Facility

• Facility designed to study the response of PMTs for light levels of a few pe’s to millions of pe’s. Mantained by Hogan Nguyen.

• It consists of a liquid dye contained in a quartz vessel, pumped into flourescence by a nitrogen laser.   The flourescence  light is  viewed by 2 Pin Photodiodes and a quartz optical fiber carrying light to a dark box containing a PMT.   The laser light intensity arriving at the dye can be adjusted by a variable filter wheel.

• The 2 Pin diodes are digitized by a 20-bit Burr-Brown ADC  (0.5 fc/count sensitivity).   The linearity of the Pin Diode Burr-Brown ADC combination is better than 0.5%  over the entire dynamic range.  

Page 14: Technical Centers Department Fermilab Long Range Planning Committee Open Forum On Detector R&D October 30, 2003 R. Ray Facilities Available for Detector

Fermilab Long Range Planning Committee Open Forum On Detector R&D - Oct. 30, 2003 14

Scintillation Detector DevelopmentScintillation Detector Development

• Facility in Labs 5 & 6 run by Anna Pla for detector and scintillator R&D

• Recent work includes: Extruded scintillator strips for MINOS - process development and QC K2K scintillator strips LiF R&D for neutron detection

• Recently commissioned a new extrusion facility in Lab 5 in collaboration with NICADD

Page 15: Technical Centers Department Fermilab Long Range Planning Committee Open Forum On Detector R&D October 30, 2003 R. Ray Facilities Available for Detector

Fermilab Long Range Planning Committee Open Forum On Detector R&D - Oct. 30, 2003 15

SCINTILLATOR EXTRUSION FACILITYSCINTILLATOR EXTRUSION FACILITY

Detector R&D, prototyping, Scintillator R&D :

• Berstorff ZE40 UTS• 40-mm twin screw extruder• 200 HP, 1200 rpm• 25 – 135 kg / h • Route 1 and 2

• Leistritz Micro 18 GL-30• 18-mm twin screw• 500 rpm• Up to 3 kg / h• Route 1

• Morgan-Press G-100T• Injection molding machine• Up to 100 cm3

Polystyrene pellets

Dopants and additives

Inert gas (nitrogen)

EXTRUDER(40-mm twin screw)

Pelletize(scintillating pellets)

Profile extrusion(scintillator bar/strip)

Injection molding

1 2

Page 16: Technical Centers Department Fermilab Long Range Planning Committee Open Forum On Detector R&D October 30, 2003 R. Ray Facilities Available for Detector

Fermilab Long Range Planning Committee Open Forum On Detector R&D - Oct. 30, 2003 16

Final WordFinal Word

• PPD also has vast mechanical engineering and design resources in the Mechanical Department (Mike Crisler)

Cryo and vacuum engineering, design and support Finite Element Analysis Process Engineering, etc.

The Technical Centers Department has the people, resources and facilitiesfor conducting state-of-the-art detector R&D. Come and talk to us!