technical performance measures

11
DESIGN REVIEW, EVALUATION, and FEEDBACK Tracking and Controlling to TPMs Tracking of Other Design Considerations Conducting Design Reviews INCORPORATING DESIGN CHANGES

Upload: jassfer-alina

Post on 10-Dec-2014

124 views

Category:

Education


1 download

DESCRIPTION

 

TRANSCRIPT

Page 1: Technical Performance Measures

DESIGN REVIEW, EVALUATION, and FEEDBACK• Tracking and Controlling to TPMs• Tracking of Other Design

Considerations• Conducting Design Reviews INCORPORATING DESIGN CHANGES

Page 2: Technical Performance Measures

What is…..

Tracking and Controlling TPMs

TPMs- Are set of measures that provides the supplier and acquirer with insight into progress to plan of the technical solution.

Page 3: Technical Performance Measures

What is…..

TPMs

Tracking and Controlling TPMs

- Are set of measures that provides the supplier and acquirer with insight into progress to plan of the technical solution.

Page 4: Technical Performance Measures

Tracking and Controlling TPMsWhat is…..

Page 5: Technical Performance Measures

Tracking and Controlling TPMsWhat is…..

Attribute- determine how well a system or system element is satisfying or expected to satisfy a technical requirement or goal.

Page 6: Technical Performance Measures

Tracking and Controlling TPMs example

• When a loaf of bread is finished baking, its

internal temperature should be 200°F• To reach this internal

temperature, commercial bakeries bake the loaf at 445°F

Solar Oven

Page 7: Technical Performance Measures

Tracking of Other Design Considerations As the designer evolves through the detail design and

development process, including the conduct of the essential trade-off analyses leading to the selection of specific components, he/she must be cognizant of considerations other than the obvious TPMs.

Conducting Design Reviews1. Identifications of the items to be reviewed2. A selected date for the review.3. An agenda for the review.4. A design review board representing the

organizational elements and disciplines.

Page 8: Technical Performance Measures

Tracking of Other Design Considerations As the designer evolves through the detail design and

development process, including the conduct of the essential trade-off analyses leading to the selection of specific components, he/she must be cognizant of considerations other than the obvious TPMs.

Conducting Design Reviews6. Equipment and/or software requirements for the review.7. Design data requirements for the review.8. Funding requirements.9. Reporting requirements and the mechanism for accomplishing the follow-up actions.

Page 9: Technical Performance Measures

Incorporating Design Changes

After a baseline has been established as a result of a formal design review, changes are frequently initiated for any one of a number of reasons such as correct design deficiency, improve a product, incorporate a new technology, improve the level of sustainability, respond to a change in operational requirements, vompensate for an obsolete component..

Page 10: Technical Performance Measures

Configuration Control Board

- Each proposed change must be thoroughly evaluated in terms of its impact on other elements of the system, the specified TPMs, life cycle cost, and the various considerations.

Page 11: Technical Performance Measures

THANK YOU!