SW/R16623 – Rev 1
Page 1 of 16
20th September 2016
Wintech Engineering Limited, Halesfield 2, Telford, Shropshire, TF7 4QH
www.wintechtesting.com |Tel: +44 (0)1952 586580 | Fax: +44 (0)1952 586585
Technical Report Report No R16623
Product Tested: Thermal brake window ALTW62
Test Conducted for: Alumin Techno LLC
Selitskogo str.
12-211
220075
FEZ “Minsk”
Minsk Region
Minsk Area
Standard Specified: PAS 24:2012 – Enhanced security performance requirements for
doorsets and windows in the UK
Project No: 16623
Date of Test: 16th September 2016
Test Conducted at: Wintech Engineering Limited
Halesfield 2
Telford
Shropshire
TF7 4QH
Test Conducted by: D Woodcock Laboratory Technician
Dave Adams Laboratory Engineer
D Knight Laboratory Technician
Report Compiled by: S Ward Laboratory Apprentice
Authorised by: M Wass Technical Director
Revision 1 – This report has been amended to include an update to the overall number of pages/page
numbers in the contents. Includes updated sample description and drawings, a change of the
company name/address under test conducted for and under who supplied the sample information, as
well as an update to the information about what the test sample was mounted in. This Revision of the
report replaces all Previous Versions. 13/10/2016
This report is copyright and contains 16 numbered pages
REPRODUCTION OF THIS DOCUMENT IN WHOLE OR ANY PART THEREOF MUST NOT BE MADE WITHOUT PRIOR
WRITTEN PERMISSION FROM WINTECH ENGINEERING LTD.
This report and the results shown within are based upon the information, drawings, samples and tests referred to in the report. The
results obtained do not necessarily relate to samples from the production line of the above named company and in no way constitute
any form of representation or warranty as to the performance or quality of any products supplied or to be supplied by them. Wintech
Engineering Ltd or its employees accept no liability for any damages, charges, cost or expenses in respect of or in relation to any
damage to any property or other loss whatsoever arising either directly or indirectly from the use of the report.
SW/R16623 – Rev 1
Page 2 of 16
20th September 2016
Wintech Engineering Limited, Halesfield 2, Telford, Shropshire, TF7 4QH
www.wintechtesting.com |Tel: +44 (0)1952 586580 | Fax: +44 (0)1952 586585
Contents
Page No.
1. Introduction 3
2. Summary of Test Results 3
3. Description of Test Sample 4
4. Test Arrangement 7
5. Test Procedures 8
6. Test Results 9
7. System Drawings 11
SW/R16623 – Rev 1
Page 3 of 16
20th September 2016
Wintech Engineering Limited, Halesfield 2, Telford, Shropshire, TF7 4QH
www.wintechtesting.com |Tel: +44 (0)1952 586580 | Fax: +44 (0)1952 586585
1. Introduction
This report describes testing of a window sample conducted at the test laboratory of Wintech
Engineering Ltd on behalf of ALUTECH Systems s.r.o. in order to determine compliance with PAS 24:2012.
Wintech Engineering Ltd is accredited by the United Kingdom Accreditation Service as UKAS Testing
Laboratory No. 2223
2. Summary of Results
The following summarises the results of testing carried out, in accordance with PAS 24:2012
Test Description Result
C.4.3 – Manipulation Test Pass
C.4.4.2 – Infill Manual Test Pass
C.4.4.3 – Infill Mechanical Test Pass
C.4.5 – Mechanical Loading Test Pass C.4.6 – Manual Check Test Pass Overall Classification in accordance with PAS 24:2012 WKT
More comprehensive details are reported in Section 6.
Note: These results are valid only for the conditions under which the test was conducted
Note: All measurement devices, instruments and other relevant equipment were calibrated and traceable to
National Standards.
SW/R16623 – Rev 1
Page 4 of 16
20th September 2016
Wintech Engineering Limited, Halesfield 2, Telford, Shropshire, TF7 4QH
www.wintechtesting.com |Tel: +44 (0)1952 586580 | Fax: +44 (0)1952 586585
3. Description of Test Sample
Product range name: Thermal brake window ALTW62
Configuration: One leaf window
Opening direction: Inside open
Outer Frame
Outer frame width: 1188 mm Outer frame material: Aluminium
Outer frame height: 2345 mm Outer frame gasket
Outer frame Part Numbers Gasket type: EPDM
Top: AYPC.W62.0103 Manufacturer: Secil, Turkey
Bottom: AYPC.W62.0103 Product name: FRK52
Lock side: AYPC.W62.0103 Product code: 10820200
Hinge side: AYPC.W62.0103 Threshold None
Outer frame section size Manufacturer: -
Width: 72 mm Product name: -
Depth: 62 mm Product code: -
Reinforcing: none Material: -
Manufacturer: - Outer frame joint method
Product name: - Head: Aluminium press corner
with polyurethane glue
Product code: - Foot: Aluminium press corner
with polyurethane glue
Material: -
Leaf
Leaf width: 1100 mm Leaf material: Aluminium
Leaf height: 2257 mm Leaf gasket
Leaf Part Numbers Gasket type: EPDM
Top: AYPC.W62.0203 Manufacturer: Secil, Turkey
Bottom: AYPC.W62.0203 Product name: FRK98
Lock side: AYPC.W62.0203 Product code: 10821000
Hinge side: AYPC.W62.0203 Leaf midrail: None
Leaf section size Manufacturer:
Width: 92 mm Product name:
Depth: 70,4 mm Product code:
Reinforcing: none Material:
Manufacturer: - Leaf joint method
Product name: - Head: Aluminium press corner
with polyurethane glue
Product code: - Foot: Aluminium press corner
with polyurethane glue
Material: -
Glazing
Glass unit Glazing gasket
Manufacturer: Belarusian man Gasket type: EPDM
Inner thickness: 8 mm tempered Manufacturer: Secil, Turkey
Spacer material: aluminium, 14 mm Product name: FRK38
SW/R16623 – Rev 1
Page 5 of 16
20th September 2016
Wintech Engineering Limited, Halesfield 2, Telford, Shropshire, TF7 4QH
www.wintechtesting.com |Tel: +44 (0)1952 586580 | Fax: +44 (0)1952 586585
Outer thickness: 8 mm tempered Product code: 10415500
Unit sizes: Glazing clip none
Bead Manufacturer:
Manufacturer: AluminTechno, LLC Product name:
Product name: AYPC.C48.2605 Product code:
Product code: 10407621 Glazing tape details none
Bead size: 22x20 mm Manufacturer:
Bead material: Aluminium Product name:
Product code:
Hardware
Manufacturer: Product description: Product code: Quantity:
Hinges: SAVIO (Italy) Non-handed hinge kit (weight capacity
110 Kg) in aluminum, premounted upper
pin and counterplate in stainless steel 43,
premounted nylon bushing and
adjustment grub screw, 2 socket flat
head screws M5x12 in stainless steel
mounted on lower window leaf, 1 socket
flat head screw M5x8 in stainless steel
304, nylon pin covers
3200.729 1 set
Hinge fixing: SAVIO (Italy) Right lower support and pin for
secondary leaf hinge (weight capacity
110-140 Kg), in stainless steel 304, right pin
in stainless steel 201 with premounted
counterplate in stainless steel 430 and pin
in galvanized steel,1 self-forming
countersunk head screw M5x18 in
stainless steel 304
3200.730R 1 set
Hinge protectors: none - - -
Hinge protector fixings: none - - -
Door lock: none - - -
Door lock fixings: none - - -
Cylinder: none - - -
Cylinder fixing: none - - -
Handle: SAVIO (Italy) Handle for tilt and turn in die-cast metal
or brass, dist. between centres 84.5-98
mm, 2 TORX® (T15) cap screws M5x13 in
stainless steel
873.1 1 pc.
Handle fixings: SAVIO (Italy) 2 screw M5x13
TORX
2 pc.
Touch Bar none - - -
Cylinder Support none - - -
Cylinder Escutcheon none - - -
Keeps: SAVIO (Italy) Right kit for 6 closing points in white
galvanized zamak, premounted screws
in stainless steel 304 and 430
3200.820R 1 set
Keep fixings: SAVIO (Italy) M5x12 1 set
Keeps: SAVIO (Italy) Right Kit for 8 closing points in white
galvanized zamak, premounted screws
in stainless steel 304 and 430
3200.825R 1 set
Keep fixings: SAVIO (Italy) M5x12 1 set
SW/R16623 – Rev 1
Page 6 of 16
20th September 2016
Wintech Engineering Limited, Halesfield 2, Telford, Shropshire, TF7 4QH
www.wintechtesting.com |Tel: +44 (0)1952 586580 | Fax: +44 (0)1952 586585
Keeps: SAVIO (Italy) Intermediate closing point in white
galvanized zamak, premounted screws
in stainless steel 304 and 430, and
adjustable locking piece
3200.810 1 set
Drip bar: AluminTechno,
LLC
Aluminium profile AYPC.C48.0611 1 pc.
Drip bar fixings: Durer, Russia Screw 3,9x13 DIN7981 18100600 5 pc.
Additional Hardware: SAVIO (Italy) Anti-burglar device for groove 14-18 mm
and 2 countersunk head screws M5x18 in
stainless steel.
3200.836 8 sets
SAVIO (Italy) RH SKG security kit in white galvanized
zamak, 8 countersunk head screws
M5x18 in stainless steel.
3200.837R 1 set
The description of the test sample in this section has been supplied by Alumin Techno LLC and has not
been verified by Wintech Engineering Limited.
See Section 7 for test sample drawings as supplied by Alumin Techno LLC.
SW/R16623 – Rev 1
Page 7 of 16
20th September 2016
Wintech Engineering Limited, Halesfield 2, Telford, Shropshire, TF7 4QH
www.wintechtesting.com |Tel: +44 (0)1952 586580 | Fax: +44 (0)1952 586585
4. Test Arrangement
4.1 Test Rig
The test sample was supplied mounted in 100 x 75 mm timber sub-frame in accordance with
manufacturer’s installation requirements. It was fitted into the test rig, shown below which was
constructed to meet the requirements of the test specification and was fitted plumb, square and
without twist or bends.
Figure 1 – Test rig used for testing
4.2 Attack Tool Groups
Tool Set A
A.2.1.1 Assorted mild steel wire
A.2.1.2 Two credit cards
A.2.1.3 Two paint scrapers
A.2.1.4 One craft knife
A.2.1.5 Two flat blade screwdrivers, 150mm length
Tool Set B
A.2.2.1 One 25mm wood chisel
A.2.2.2 One 6mm wood chisel
A.2.2.3 One flat blade screwdriver, 200mm length
A.2.2.4 One brick bolster
A.2.2.5 One crosspoint screwdriver, 200mm length
A.2.2.6 One cross head screwdriver, 200mm length
4.3 Temperature
A digital data logger capable of measuring temperature with an accuracy of ± 1°C was used.
4.4 Mechanical Load Application
A series of parallel to plane loads and perpendicular to plane loads were applied to the products in
using hydraulic cylinders.
SW/R16623 – Rev 1
Page 8 of 16
20th September 2016
Wintech Engineering Limited, Halesfield 2, Telford, Shropshire, TF7 4QH
www.wintechtesting.com |Tel: +44 (0)1952 586580 | Fax: +44 (0)1952 586585
5. Test Procedures
5.1 Manipulation test
The objective of this test was to highlight any inherent vulnerability in the design of the window which,
from the outside, would permit entry by the hardware being operated, released or disengaged when
tested using all of group A tools from Section A.2.1 of PAS 24:2012 and, where applicable, tools specified
in A.2.2.3, A.2.2.5 and A.2.2.6 in group B from Section A.2.2 of PAS 24:2012. No single attack technique
was used for more than 3 minutes.
5.2 Infill manual test
The objective of this test was to assess the vulnerabilities of the infill retention system, including gaskets
and beading, using tool sets A & tool set B as described in section A.2.1 & A.2.2 of PAS 24:2012 for a
maximum period of 3 minutes.
5.3 Infill mechanical test
The objective of this test was to assess the ability of the glazed unit to withstand a specified sequence
of loading without gaining entry through the sample. The loads and loading sequence were in
accordance with Section C.4.4.3 of PAS 24:2012.
5.4 Mechanical loading test
A series of perpendicular to plane and parallel to plane loads were applied progressively in order to
assess the specimen’s integrity during a specified sequence of loading. All perpendicular to plane loads
were held for 8-12 seconds. All parallel to plane loads were applied and maintained while the
perpendicular to plane loads were applied, maintained and removed.
5.5 Manual check test
The objective of this test was to assess any vulnerabilities of the sample that are not covered by the
standard loading cases assessed in the mechanical loading test C.4.5. The tools described in Section
B.4.6.2 of PAS 24:2012 were used for a maximum period of 15 minutes in an attempt to gain entry through
the sample.
SW/R16623 – Rev 1
Page 9 of 16
20th September 2016
Wintech Engineering Limited, Halesfield 2, Telford, Shropshire, TF7 4QH
www.wintechtesting.com |Tel: +44 (0)1952 586580 | Fax: +44 (0)1952 586585
6. Test Results
The temperature measured inside the laboratory during the test was: 22.0 °C
Note The test samples were stored in a non-destructive environment at a temperature of 15 – 30°C and a r.h. of
25 – 75 % for a minimum of 24 hours, testing was also conducted at those conditions. Prior to testing, the
door was closed and locked from the outside and any keys were removed.
6.1 Manipulation test
Attempts were made from the external face to operate, release and disengage the system hardware
in order to gain entry through the sample in accordance with Section C.4.3 of PAS 24:2012. The test
lasted a total of 9 minutes during which no entry was gained.
6.2 Infill manual test
Attempts were made from the external face to remove gaskets and beading in order to gain access to
and remove the glazed unit using tools A.2.2 & A.2.3 in accordance with Section C.4.4.2 of PAS 24:2012.
No entry was gained throughout the test.
6.3 Infill mechanical test
A series of loads were applied to the external face of the infill in order to remove the infill and gain
access through the window as defined in Section C.4.4.3 of PAS 24:2012. A load of 2.0kN was applied
to each corner of the infill. Each load was held for 8-12 seconds before being removed. No entry was
gained throughout this test.
6.4 Mechanical loading test
A series of loads were applied to the sample as defined in Section C.4.5 of PAS 24:2012. A parallel-to-
plane load was applied and held while a perpendicular-to-plane load was applied and held. The
perpendicular-to-plane load was then removed followed by the parallel-to-plane load. This was
conducted at each loading point as shown in Figure 2. No entry was gained throughout this test.
Figure 2 – Loading points
2 5
6
SW/R16623 – Rev 1
Page 10 of 16
20th September 2016
Wintech Engineering Limited, Halesfield 2, Telford, Shropshire, TF7 4QH
www.wintechtesting.com |Tel: +44 (0)1952 586580 | Fax: +44 (0)1952 586585
6.5 Manual check test
Attempts were made from the external face to gain entry through the sample by attacking those areas
that were not tested during the mechanical loading test C.4.5. The overall attack time was limited to 15
minutes with no single attack technique being used for more than 3 minutes. No entry was gained
through this test.
SW/R16623 – Rev 1
Page 11 of 16
20th September 2016
Wintech Engineering Limited, Halesfield 2, Telford, Shropshire, TF7 4QH
www.wintechtesting.com |Tel: +44 (0)1952 586580 | Fax: +44 (0)1952 586585
7. System Drawings
SW/R16623 – Rev 1
Page 12 of 16
20th September 2016
Wintech Engineering Limited, Halesfield 2, Telford, Shropshire, TF7 4QH
www.wintechtesting.com |Tel: +44 (0)1952 586580 | Fax: +44 (0)1952 586585
SW/R16623 – Rev 1
Page 13 of 16
20th September 2016
Wintech Engineering Limited, Halesfield 2, Telford, Shropshire, TF7 4QH
www.wintechtesting.com |Tel: +44 (0)1952 586580 | Fax: +44 (0)1952 586585
SW/R16623 – Rev 1
Page 14 of 16
20th September 2016
Wintech Engineering Limited, Halesfield 2, Telford, Shropshire, TF7 4QH
www.wintechtesting.com |Tel: +44 (0)1952 586580 | Fax: +44 (0)1952 586585
SW/R16623 – Rev 1
Page 15 of 16
20th September 2016
Wintech Engineering Limited, Halesfield 2, Telford, Shropshire, TF7 4QH
www.wintechtesting.com |Tel: +44 (0)1952 586580 | Fax: +44 (0)1952 586585
SW/R16623 – Rev 1
Page 16 of 16
20th September 2016
Wintech Engineering Limited, Halesfield 2, Telford, Shropshire, TF7 4QH
www.wintechtesting.com |Tel: +44 (0)1952 586580 | Fax: +44 (0)1952 586585
---- END OF REPORT ----