Page 1: Technical report for ISOLDE Mats Lindroos on behalf of the ISOLDE team

Technical report for ISOLDE

Mats Lindroos on behalf of the ISOLDE team

Page 2: Technical report for ISOLDE Mats Lindroos on behalf of the ISOLDE team

Outline

• Shutdown work• R&D priority list from upgrade group• R&D work at ISOLDE• Start-up with new control system• REX integration, R&D and operation• Technical support for ISOLDE

experimental area• Towards the future

Page 3: Technical report for ISOLDE Mats Lindroos on behalf of the ISOLDE team

Shutdown

• Smooth shutdown with repair (and re-installation) of GPS front-end completed

• Major “un-scheduled” power cut during start-up phase– ISOLDE facility “survived”– Major additional work for ISOLTRAP

• Broken computers

– New emergency power-cut procedures in the process of being established

Page 4: Technical report for ISOLDE Mats Lindroos on behalf of the ISOLDE team

R&D priority list

• ISOLDE upgrade group has established a priority list for ISOLDE R&D– http://isolde-

upgrade.web.cern.ch/isolde-upgrade/

Page 5: Technical report for ISOLDE Mats Lindroos on behalf of the ISOLDE team

Priority 1

Page 6: Technical report for ISOLDE Mats Lindroos on behalf of the ISOLDE team

ATB-IF R&D• P-induced shock waves recorded on Ta, Pb (10 mm diameter cylinders) and CNGS

shape Graphite targets. Perpendicular velocity measured every 200 ns, total movement ~30 microns. (Analysis on-going).

• Laser induced cavitations in Water jet were measured, (Analysis on-going).

• Systematic off-line target tests were extended to emittance measurements and stable mass-scan analysis (test results available on the web).

• To ease stable beam exercise of surface ion-sources a mass-marker will be systematically added.

• Off-line test of a solid state laser RILIS under way, emittance and absolute ionisation efficiency. (Kim, Thomas, Klaus & ATB-IF)

• Front-end 6 being assembled (completion end of June) extended stable beam tests are foreseen (sept).

• Pre-study of target vessels, ion-sources feed trough and connectors for 10 micro A beam started.

• The emitance of a standard LaB6 negative surface ion-source was measured as a fuction of the electron suppression

Page 7: Technical report for ISOLDE Mats Lindroos on behalf of the ISOLDE team

AB-OP

• ECR source modified and commissioned for 2004 run– RF generator fault prevented Ar tests in April

• RFQ cooler design completed– Fabrication of main vacuum vessel in Mainz– Discussion with LMU for fabrication of remianing

pieces– Off-line source from MISTRAL mounted in building

275 (with faraday cage) for tests– Grant application in UK (Manchester) for power

suuplies, RF generator and Vacuum system

Page 8: Technical report for ISOLDE Mats Lindroos on behalf of the ISOLDE team

1. Laser Beam Control

QP2

OPTICAL PATH:18 m to GPS23 m to HRS

M1

Pr1

Pr2

Pr3

M5

M2

Laser Cabin

Pr4

SC

QP1

DG

CCD2CCD1

M4

QP4

Power meter

Pr5Mass separator

On-line control of laser beam positioning using CCD cameras:

“Laser Imager” program is available in the new Linux-based control system

Image of UV beam at the CCD camera

Shutdown 2003-2004: RILIS Development

Page 9: Technical report for ISOLDE Mats Lindroos on behalf of the ISOLDE team

2. New ionization schemes

a. DysprosiumStep 1 – = 606 - 677 nm – scanned

Step 2 – 2= 606 - 677 nm – scanned

Step 3 – 3=510.6 & 578.21 nm (CVL) - fixed

b. YttriumStep 1 – = 407 - 414 nm (2) – scanned

Step 2 – 2= 565 - 677 nm – scanned

Step 3 – 3= 510.55 nm (CVL) - fixed

RILIS efficiency = ~ 20%

RILIS efficiency = 80 x surface ion source efficiency

Optimal ionization schemes

510.6 nm

414.3 nm

662.4 nm

Ei=6.22 eV

625.9 nm

607.5 nm

Ei=5.94 eV

Dy

Y

510.6 nm578.2 nm

Shutdown 2003-2004: RILIS Development

Page 10: Technical report for ISOLDE Mats Lindroos on behalf of the ISOLDE team

REX-ISOLDE• All REX posts allocated• Work package plan for Operation,

maintenance and R&D established• Working group (AB management) to

follow full implementation of REX as a CERN facility

• Migration of FEC from W95 to XP– Agreement made for CO post

• Shutdown work completed– R&D on molecular beams, good results

for SeCO and AlF R&D on cooling in REX trap

– Hardware upgrade of EBIS (baking system, realignment, interlocks etc)

– Mass separator - new beam diagnostic boxes

– Commissioning of 9 gap IH structure• New ideas for further upgrade being

discussed

Page 11: Technical report for ISOLDE Mats Lindroos on behalf of the ISOLDE team

Beam preparation with REX-TRAP

Dipolar ExcitationQuadrupolar excitation

Rotating Wall cooling(Investigated method)

BBB

Cooling method tests

Lorentz force is compressing the ion cloud

Sideband cooling (actual method)

buffer gas buffer gas + c

quadrupolar rf field in the transversal plane c = q/m B

E

Accumulation Cooling Ejection

Cooling by buffer gas collisions10-4 mbar Ne P. Delahaye

Page 12: Technical report for ISOLDE Mats Lindroos on behalf of the ISOLDE team

Charge exchange process

40Ar+ ions

Sideband excitation

78Kr+ ions 130Xe+ ions

ms142 s7.2ms115Of interest for the « ion catcher » devices

Cooling by buffer gas collisions10-4 mbar Ne

Molecule cooling for contaminants free beams SeCO+, and AlF+ molecular beams tested SnS+ to be tested

P. Delahaye

Page 13: Technical report for ISOLDE Mats Lindroos on behalf of the ISOLDE team

TOF SeCO

Page 14: Technical report for ISOLDE Mats Lindroos on behalf of the ISOLDE team

New control system

• New LINUX/JAVA based control system commissioned for ISOLDE– Scanners and wire grids still running under

windows on dedicated consoles• W95->WXP

• Please check USERS applications for XP compatibility

• For “introduction” and feed-back please contact Tim Giles

Page 15: Technical report for ISOLDE Mats Lindroos on behalf of the ISOLDE team

New controls

Page 16: Technical report for ISOLDE Mats Lindroos on behalf of the ISOLDE team

Technical support at ISOLDE

• Re-organization of technical support for ISOLDE in progress– Experimental area section in ATB group and

new OP EIC post– Work package plan for all technical support for

operation, maintenance and R&D in the experimental area established

– More at next meeting…

Page 17: Technical report for ISOLDE Mats Lindroos on behalf of the ISOLDE team

Towards the future…

• Tendering in progress for hall extension– Building start July 2004

– Work on hall partition (with dust barrier) from 1 January to 15 March 2005

• Class A lab under construction– Work on partition 15

November to 15 February 2005