TECHNICAL SPECIFICATION
FOR
OIL-IMMERSED DISTRIBUTION TRANSFORMERS
(CONVENTIONAL & HERMETICALLY SEALED)
50 KVA up to 5000 KVA –22 / 0.4 KV
Issue: May-2018 / Rev- 1
اختياريةتوجد بنود (Optional items ) الطرح. بلق يعيجب تحديدها بواسطة شركة التوز
Ministry Of Electricity and Renewable Energy وزارة الكهرباء والطاقة المتجددة
Egyptian Electricity Holding Company الشركة القابضة لكهرباء مصر
EDMS 08- 200- 1 EEHC DISTRIBUTION MATERIALS SPECIFICATION
Date: 21-05-2018
Page 2 of 20
CONTENTS
1 SCOPE 3
2 GENERAL SPECIFICATIONS 3
3 SERVICE CONDITIONS 4
4 VOLTAGE RATIO 4
5 VECTOR GROUP 4
6 RATED POWER 4
7 TAPPING RANGE 5
8 OVERLOAD CAPACITY 5
9 CAPABILITY OF WITHSTANDING SHORT CIRCUITS 5
10 LIMITS OF TEMPERATURE RISE 6
11 COOLING 6
12 INSULATION LEVEL 6
13 IMPEDANCE VOLTAGE 6
14 BUSHINGS 7
15 CORE 7
16 WINDINGS 8
17 TRANSFORMER OIL 8
18 OIL EXPANSION CONSERVATOR 9
19 TANK 9
20 ACCESSORIES 10
21 WHEELS 10
22 NAME PLATE 10
23 TRANSFORMER LOSSES 11
24 PENALTY AND REJECTION 12
25 TRANSFORMER TESTING 13
26 GUARANTEE TABLE : 15
27 MAX PERMITTED POWER LOSSES OF TRANSFORMERS (
at 95ºC ) : 16
GUARANTEE TABLE DISTRIBUTION TRANSFORMER 17
Ministry Of Electricity and Renewable Energy وزارة الكهرباء والطاقة المتجددة
Egyptian Electricity Holding Company الشركة القابضة لكهرباء مصر
EDMS 08- 200- 1 EEHC DISTRIBUTION MATERIALS SPECIFICATION
Date: 21-05-2018
Page 3 of 20
1. SCOPE
This specification covers the supply of three (3) phase conventional or
hermetically sealed , two-winding oil immersed distribution transformers to be
installed indoor/outdoor.
2. GENERAL SPECIFICATIONS
The transformer shall be designed, for indoor installation with high voltage and
low voltage porcelain bushings provided with screwed stems and nuts with
washers. The tank shall be made of steel with bolted cover. Temperatures
between -5 ºC to 95ºC.
The transformers should comply with the latest edition of IEC publications
unless otherwise the specific requirements:
IEC 60076 for power transformer
Part 1 – General
Part 2 – Temperature rise
Part 3 – Insulation levels and dielectric tests
Part 4 – lightening impulse and switching impulse testing
Part 5 – Ability to withstand short circuit
IEC 60345 Loading guide for oil immersed power transformers
IEC 60137 For bushings
IEC 60214 For Tap Changer
IEC 60551 Determination of transformer and reactor sound levels.
IEC 60296 For new insulating oil transformer
EN 50464-4 Endurance test ( Tank Test For Hermetical Sealed Type ).
Ministry Of Electricity and Renewable Energy وزارة الكهرباء والطاقة المتجددة
Egyptian Electricity Holding Company الشركة القابضة لكهرباء مصر
EDMS 08- 200- 1 EEHC DISTRIBUTION MATERIALS SPECIFICATION
Date: 21-05-2018
Page 4 of 20
3. SERVICE CONDITIONS
The transformers should be manufactured for the local service conditions as:-
Altitude less than 1000 meters
Max. ambient temperature 45ºC
Min. ambient temperature -5ºC
Relative humidity 10-100 %
4. VOLTAGE RATIO
The ratio of the transformers shall be 22000/400 v, + 0.5 % as a tolerance, 50 Hz
at no-load.
5. VECTOR GROUP
The winding connection group of the transformers shall be delta on the primary
side and star on the secondary side in accordance with the vector group Dyn11
as specified in IEC 60076.
6. RATED POWER
The transformer should be able to deliver for an unlimited period of time at the
main tapping of the tap changer, the maximum continuous power rating of
(50-63-100-160-200-300-400- 500-630-800-1000-1250-1500-1600-2000-2500-
3000-3500-4000-5000 K.V.A.) without exceeding the allowable temperature
rise limit .
Ministry Of Electricity and Renewable Energy وزارة الكهرباء والطاقة المتجددة
Egyptian Electricity Holding Company الشركة القابضة لكهرباء مصر
EDMS 08- 200- 1 EEHC DISTRIBUTION MATERIALS SPECIFICATION
Date: 21-05-2018
Page 5 of 20
7. TAPPING RANGE
The transformers should be equipped with 3 phase, 3 wires, and lockable
manual off load tap changer, on the high voltage winding. The tap changer
switch is mounted on the tank cover.
The voltage regulation shall be affected in seven steps having the following
sequences (referred to input voltage):-
Tap No 1 (+5 %)
Tap No 2 (+2.5 %)
Tap No 3 (0 %)
Tap No 4 (-2.5 %)
Tap No 5 (-5 %)
Tap No 6 (-7.5 %)
Tap No 7 (-10 %)
8. OVERLOAD CAPACITY
Permissible overload capacity 20 % for 1.5 hr ( without exceeding the
permissible heating ) or according to IEC 60354 (according to distribution Co.
requirement).
9. CAPABILITY OF WITHSTANDING SHORT CIRCUITS
Transformers should be capable of withstanding, without damage, the thermal
and mechanical effects of short circuits at the terminals for 3 sec. duration
(S.C. level of 22 KV network is 750 M.V.A).
Ministry Of Electricity and Renewable Energy وزارة الكهرباء والطاقة المتجددة
Egyptian Electricity Holding Company الشركة القابضة لكهرباء مصر
EDMS 08- 200- 1 EEHC DISTRIBUTION MATERIALS SPECIFICATION
Date: 21-05-2018
Page 6 of 20
10. LIMITS OF TEMPERATURE RISE
The transformer shall be able to deliver its max. continuous ratings, without
exceeding the permissible temperature rise limits:-
Top oil level temperature rise 45ºK
Winding temperature rise measured by resistance method 55ºK
Hot spot 60 ºC
11. COOLING
Cooling is by natural circulation of oil internal to the transformer and by
external air i.e ONAN.
12. INSULATION LEVEL
The following test voltages shall be applicable to the transformers:-
a. High voltage :Impulse withstand voltages are 125 KV for indoor
145 KV for outdoor
b. Power frequency withstand voltage 50 KV./ 1 minute
c. Low voltage Power frequency withstand voltage 3 KV. /1 minute
13. IMPEDANCE VOLTAGE
The impedance at mid-tap shall be as follow :
4 % for transformers (50-63- 100-160-200-300-400-500-630 KVA ) at 95 ºC
5 % for transformers ( 800-1000-1250 KVA ) at 95 ºC
6 % for transformers ( 1500-1600-2000-2500 KVA ) at 95 ºC
7 % for transformers (3000- 3500-4000-5000 KVA ) at 95 ºC
Ministry Of Electricity and Renewable Energy وزارة الكهرباء والطاقة المتجددة
Egyptian Electricity Holding Company الشركة القابضة لكهرباء مصر
EDMS 08- 200- 1 EEHC DISTRIBUTION MATERIALS SPECIFICATION
Date: 21-05-2018
Page 7 of 20
14. BUSHINGS
Bushings are of porcelain and generally comply with the requirement of
IEC 60137 publication . The minimum creepage distance shall not be less than
2 cm/ KV for indoor, 4 cm/KV for outdoor (as per…. EDC requirements).
The high voltage bushings shall be fitted with duplex arc gap set at 65 mm.
For transformers with rating from 500 KVA and higher, the low voltage
bushing should be provided with copper flags and for transformers with ratings
lower than 500 KVA, the low voltage bushing should be provided with suitable
copper bars or copper flag.
As option:
For outdoor transformer the surge arrestor (gap less than metal oxide) 10KA,
24KV max. continuous operating voltage 20KV ± 5% (leakage pass 4cm/kv at
least) should be installed with medium voltage bushing.
15. CORE
The core should be made of low loss steel lamination which are made of cold
rolled grain oriented, annealed, high permeability, non-ageing, silicon steel type
with thickness less than 0.3 mm for each lamination.
The lamination should be insulated with suitable varnish or paint, solid
insulation is not acceptable.
The core, framework, clamping arrangement & general structure should be
mechanically robust to withstand any shocks to which they may be subjected
during transport, installation, service & faults.
The core construction should provide efficient cooling of its internal parts.
Ministry Of Electricity and Renewable Energy وزارة الكهرباء والطاقة المتجددة
Egyptian Electricity Holding Company الشركة القابضة لكهرباء مصر
EDMS 08- 200- 1 EEHC DISTRIBUTION MATERIALS SPECIFICATION
Date: 21-05-2018
Page 8 of 20
The core joints should be properly interleaved, precautions shall be taken to
keep the noise at the level of 48-56 db ,according to rated capacity and at
measured distance of 1(one)meter, at mid tap & no-load & eliminate vibration
in the core when loaded & to diminish harmonic voltage as far as possible
especially the third harmonics.
16. WINDINGS
The winding conductors should be made of the best quality, high conductivity
electrolytic copper, complying with the requirements of the IEC publication
max. flux density in the yoke should not be more than 1.6 tesla.
The windings shall be clamped effectively so that they withstand shocks and
vibrations during transport and forces produced by the most severe short circuit
currents as indicated in item “9” of this specification.
17. TRANSFORMER OIL
The oil shall be of the best quality mineral oil of high breakdown strength, low
viscosity, high resistance to oxidation and shall not deteriorate under all loading
conditions.
It is required to have the ability to mix with another oil type.
Kinematic viscosity less than 16.5 mm2/s at 40ºC
Flash point ºC (open). > 140
Pour point ºC < - 30
Total acidity > 0.03 mg KOH per g of oil
Dissipation factor at 90 ºC < 0.005
Ministry Of Electricity and Renewable Energy وزارة الكهرباء والطاقة المتجددة
Egyptian Electricity Holding Company الشركة القابضة لكهرباء مصر
EDMS 08- 200- 1 EEHC DISTRIBUTION MATERIALS SPECIFICATION
Date: 21-05-2018
Page 9 of 20
Breakdown voltage, as delivered > 50 KV / 2.5 mm
(test method 7.12)- IEC 60296
(Specification of oil according to BS 148 , 1984 & IEC 60296 Latest edition ) .
يئة.بلوغير ضار با لخلطل لقابالمستخدم في المحول ن يكون الزيت يجب ا
18. OIL EXPANSION CONSERVATOR
It shall be made of sheet steel with an adequate capacity to allow for the extreme
changes in the oil level e.g. when the transformer is off circuited at 0ºC and
when the transformer is full loaded at 45ºC ambient.
The quantity of oil shall be plainly marked on the conservator.
The conservator is provided with oil level indicator (sight glass at low voltage
side), dehydrate breather with orange silica-gel, oil filling and drain plugs and a
connection pipe for connecting the oil to the transformer.
ىخفضعلى ان يزود المحىل التقليذي بمبيه للزيت واحية الجهذ الم
19. TANK
The transformer tank shall be made of best quality plate steel with bolted cover.
The tank shall be rigid enough to withstand the mechanical stresses due those
occurring during transformer lifting and transport, without deformation and also
due to effects of S.C. inside the transformer.
Radiators should be welded to the tank. The transformer should have sufficient expansion for oil breath
( hermetically sealed)
Ministry Of Electricity and Renewable Energy وزارة الكهرباء والطاقة المتجددة
Egyptian Electricity Holding Company الشركة القابضة لكهرباء مصر
EDMS 08- 200- 1 EEHC DISTRIBUTION MATERIALS SPECIFICATION
Date: 21-05-2018
Page 10 of 20
20. ACCESSORIES
1- Drain plug complete with control tap
2- Welded lifting shackles
3- Tank earthing , M 10 stud with nut shall be used.
4- Dial thermometer.
In the case of using hermetically sealed transformers, the following shall be
installed:
Pressure Relief valve (PVR).
DGPT2 device.
The transformer tank can be hermetically sealed by means of a nitrogen cushion.
21. WHEELS
The enclosure base should be fitted with 4 wheels to facilitate moving of the
transformers during installation in two perpendicular directions.
22. NAME PLATE
Each transformer should be fitted with a name plate fitted in a visible position,
showing the information listed below. Entries on the plate should be indelibly
marked by etching or engraving:
a) Manufacturers serial number
b) Year of manufacture
c) Type: Conventional /Hermetically Sealed.
d) Number of phases
e) Rated power
Ministry Of Electricity and Renewable Energy وزارة الكهرباء والطاقة المتجددة
Egyptian Electricity Holding Company الشركة القابضة لكهرباء مصر
EDMS 08- 200- 1 EEHC DISTRIBUTION MATERIALS SPECIFICATION
Date: 21-05-2018
Page 11 of 20
f) Rated frequency
g) Rated voltages
h) Rated currents
i) Vector group
j) Impedance voltage
k) Type of oil
l) Total weight
m) Weight of oil
n) Connection diagram
o) A table giving tapping voltages of the positions
23. TRANSFORMER LOSSES
The transformer should be designed for minimum losses, when comparing
between different tenders, the present worth value of the annual capitalized cost
of guaranteed losses in the transformers shall be added according to the
following formula :-
P. w = K x 8760 x C [Wi + ( LS.F) P2 Wcu ]
Where
K = Present worth factor (L.E)
K=( (1+i)N -1 / i (i+1)
N ( )
i: interest rate , N: number of years
C = Cost of KWH which can be assumed to be 1.40 L.E (according to the
max commercial cost of KWH and can be adjusted as EEHC update) LS.F = Loss factor for the load = 0.4 Wi = Iron (No load) losses in KW at rated voltage and main tapping
Ministry Of Electricity and Renewable Energy وزارة الكهرباء والطاقة المتجددة
Egyptian Electricity Holding Company الشركة القابضة لكهرباء مصر
EDMS 08- 200- 1 EEHC DISTRIBUTION MATERIALS SPECIFICATION
Date: 21-05-2018
Page 12 of 20
Wload = Load losses in KW at full load and 95ºC at main tap
P = Peak load (P.U.) = 0.8
24. PENALTY AND REJECTION
24-1 Rejection of Material:
If during inspection tests at the works attended by the customer
representative engineer any material is found to be defective or not
manufactured according to the specifications agreed upon the customer
representative engineer have the right to reject such material if he is not
convinced that it can satisfactorily be repaired. In such case the contractor
shall be obliged to replace the defective material without being entitled to
any extra payment whatsoever or to any extension of time of completion of
contract.
24-2 Penalty And Rejection For Decreased Efficiency
The contractor should keep the No load losses and load losses and to be
within the guaranteed values, should the loss values, measured from the
works tests, exceed the allowable tolerances in the IEC or approved equal
standards, then the customer representative shall have the right to reject
the transformer with such losses.
However, the measured losses deviate from the guaranteed figures, but lie
within the allowable tolerances (10 % total losses ) , then the excess losses
shall be evaluated as per the following formula and the contractor shall be
penalized accordingly.
P.W = K x 8760 x C [dwi+ (LS.F) (p2) dwcu] LE
Ministry Of Electricity and Renewable Energy وزارة الكهرباء والطاقة المتجددة
Egyptian Electricity Holding Company الشركة القابضة لكهرباء مصر
EDMS 08- 200- 1 EEHC DISTRIBUTION MATERIALS SPECIFICATION
Date: 21-05-2018
Page 13 of 20
Where:
P.W= present worth (L.E) of annual capitalized cost of losses at 11%
rate of interest over 20 years.
K = Present worth factor (L.E)
K=( (1+i)N -1 / i (i+1)
N ( )
i: interest rate , N: number of years
C = Cost of KWH= 1.40 L.E (liable to adjusted at the time of evaluation
of the penalty) LS.F = Loss factor for the load = 0.4 dwi = Excess losses in KW at rated voltage and main tapping
dwcu = Excess Load losses in KW at full load and 95ºC at main tapping.
P = Peak load (P.U.) = 0.8
No credit shall be given for any decrease in the value of loss(es) below
the guaranteed.
24-3 Replacement of Rejected Material And Equipment
If according to the above articles, any material or equipment is rejected,
the contractor shall be obliged to replace it without extra payment.
25. TRANSFORMER TESTING
Customer representative has the right to send its representative to attend any or
all of these tests. Testing dates shall be advised by the contractor to permit
witnessing by Customer representative (s) . test certificates shall be sent to
customer representative.
Ministry Of Electricity and Renewable Energy وزارة الكهرباء والطاقة المتجددة
Egyptian Electricity Holding Company الشركة القابضة لكهرباء مصر
EDMS 08- 200- 1 EEHC DISTRIBUTION MATERIALS SPECIFICATION
Date: 21-05-2018
Page 14 of 20
A. Type Tests :
These tests shall be carried out on one transformer for each type in
accordance with the requirements of IEC standards for transformers, these
shall include the following:
1- Full wave lightning impulse voltage withstand test.
2- Temperature rise test.
3- Chemical oil tests.
B. Routine Tests :
These tests shall be applied on each transformer in accordance with the
requirements of IEC standards for transformers, these shall include the following
1- Measurement of d.c. winding resistance .(the allowable deviation in
the dc resistance value between phases should be less than 5% at high
voltage side and should be less than 10% at low voltage side)
2- Turns ratio and polarity check or vector-group symbol.
3- Measurement of impedance voltage
4- Measurement of load losses.
5- Measurement of No-load losses.
6- Induced over voltage withstand test .
7- Separate – source power frequency voltage withstand test.
8- Electrical oil tests.
9- Insulation tests between windings and earth and between winding
each other (absorption factor (R60/R15 > 1.3 )) .
R60: insulation resistance at 60 second.
R15: insulation resistance at 15 second.
Ministry Of Electricity and Renewable Energy وزارة الكهرباء والطاقة المتجددة
Egyptian Electricity Holding Company الشركة القابضة لكهرباء مصر
EDMS 08- 200- 1 EEHC DISTRIBUTION MATERIALS SPECIFICATION
Date: 21-05-2018
Page 15 of 20
C. Special Tests :
Special tests shall be made in accordance with the requirements of IEC
standards for types of transformers those have not yet supplied or for
transformers those have delivered but their design is modified , these shall
include the following:
1- Short circuit test
2- Measurements of sound level test
26. GUARANTEE TABLE :
The attached guarantee table shall be duly completed, signed & submitted with
the offer
Ministry Of Electricity and Renewable Energy وزارة الكهرباء والطاقة المتجددة
Egyptian Electricity Holding Company الشركة القابضة لكهرباء مصر
EDMS 08- 200- 1 EEHC DISTRIBUTION MATERIALS SPECIFICATION
Date: 21-05-2018
Page 16 of 20
27. MAX PERMITTED POWER LOSSES OF TRANSFORMERS ( at 95ºC ) :
% Z load losses (W) at
95ºC
No load losses
(W) at 400 V
Power
(KVA)
4 875 168 50
4 1260 224 63
4 1505 272 100
4 2170 384 160
4 2520 456 200
4 3815 576 300
4 4638 638 400
4 5460 700 500
4 6430 825 630
5 7700 1015 800
5 9450 1222 1000
5 11700 1500 1250
6 13860 1785 1500
6 14900 1950 1600
6 15750 2736 2000
6 16300 3400 2500
7 19750 3950 3000
7 22850 4075 3500
7 25950 4200 4000
7 31500 5000 5000
N.B.
It is necessary to add a valve with a tap to each transformer to get an oil specimen
for testing.
Ministry Of Electricity and Renewable Energy وزارة الكهرباء والطاقة المتجددة
Egyptian Electricity Holding Company الشركة القابضة لكهرباء مصر
EDMS 08- 200- 1 EEHC DISTRIBUTION MATERIALS SPECIFICATION
Date: 21-05-2018
Page 17 of 20
GUARANTEE TABLE
DISTRIBUTION TRANSFORMER
22 / 0.4 KV
1- Manufacturer
2- Type
3- Standard specification
4- Rated output at 45ºC ambient ( KVA )
5- Method of cooling
6- Oil type
7- System of connection
8- Material of insulation
HV winding ـ
LV winding ـ
Major insulation ـ
9- Material of core and its cross-section area ( mm² )
10- Max. core flux density at full load ( tesla )
11- Turns ratio
12- No load losses (watts )
13- load losses at full load current and 95ºC winding temperature (watts)
14- Resistance per phase at 95ºC For primary ( ohms )
For secondary (ohms )
15- Cross-sectional area of cu windings For primary ( mm² )
For secondary ( mm² )
Ministry Of Electricity and Renewable Energy وزارة الكهرباء والطاقة المتجددة
Egyptian Electricity Holding Company الشركة القابضة لكهرباء مصر
EDMS 08- 200- 1 EEHC DISTRIBUTION MATERIALS SPECIFICATION
Date: 21-05-2018
Page 18 of 20
16- Permissible symmetrical S.C current at L.V side terminals for 2 sec (KA)
17- Primary voltage at normal tapping (volts )
18- Corresponding secondary voltage at
No load (volts ) ـ
Full load at 1 p .f. at 95ºC (volts ) ـ
Full load at 0.8 p.f. at 95ºC (volts ) ـ
( % ) Regulation at 1 p.f. at 95ºC ـ
( % ) Regulation at 0.8 p.f .at 95ºC ـ
19- Permissible overload duration without change of specified temp. rise
according to IEC 60354
yes [ ]
no [ ]
20- Full load current at LV side (Amps )
Full load current at HV side (Amps ) ـ
No load current at LV side (Amps ) ـ
21- Impedance voltage ( % )
22- Efficiency at normal ratio and 95ºC ( % )
( % ) At 100% rated output 1 p.f ـ
( % ) At 100% rated output 0.8 p.f ـ
( % ) At 75 % rated output 1 p.f ـ
( % ) At 75 % rated output 0.8 p.f ـ
( % ) At 50 % rated output 1.p.f ـ
( % ) At 50% rated output 0.8 P.F ـ
( % ) At 25 % rated output 1 p.f ـ
Ministry Of Electricity and Renewable Energy وزارة الكهرباء والطاقة المتجددة
Egyptian Electricity Holding Company الشركة القابضة لكهرباء مصر
EDMS 08- 200- 1 EEHC DISTRIBUTION MATERIALS SPECIFICATION
Date: 21-05-2018
Page 19 of 20
( % ) At 25 % rated output 0.8 p.f ـ
23- Temperature rise at rated output above 45°C ambient temperature
A- At oil top level (°C )
B- Winding temperature (°C )
C- Core temperature (°C )
24- Tapping switch (on H.V. Side)
No. of steps ـ
( % ) Value of the step ـ
25- Medium voltage insulators
Length of leakage ( mm ) ـ
Arc gap (mm) ـ
26- Means for firmly bracing of trans . Winding to avoid loosening
them due to S.C
27- Transformers shall be complete with all accessories in tendered
specifications [Customer Spec ]
yes [ ]
no [ ]
28- Transformers shall be manufactured according to standards
mentioned in tendered spec. and will satisfy all requirements in
tender specifications
yes [ ]
no [ ]
29- Tender specifications are attached with our offer and each page is
signed by us
yes [ ]
no [ ]
30- Overall dimensions (Length x Width x Height ) ( mm x mm x
mm )
Ministry Of Electricity and Renewable Energy وزارة الكهرباء والطاقة المتجددة
Egyptian Electricity Holding Company الشركة القابضة لكهرباء مصر
EDMS 08- 200- 1 EEHC DISTRIBUTION MATERIALS SPECIFICATION
Date: 21-05-2018
Page 20 of 20
31- Total weight of trans. With oil (kgm
)
Weight of oil (kgm )
32- Noise level ( db )
33- Colour of silica gel
I/we guarantee the correctness of above data for transformers we are offering to
Customer Company For Distributing Electricity.
Date: / / Signature of tenderer
N / B:
1- No offers shall be considered unless attached with both above guarantee table
dully completed and signed for each size of trans. and also our tendered
specifications with all pages signed by tenderer.
2- Tenderer shall sign “√” in front of yes or no in the above guarantee table.