technical studies for potential/new housing sites · • appropriate height for lighting switch,...

22
41 Project Life Cycle Feasibility Studies and Conceptual Layout Scheme Design and Project Budget Site Inspection and Acceptance Detailed Design and Specification Tender Construction (Foundation) Construction (Building) Maintenance Period Final Account Technical Studies for Potential/New Housing Sites 1. Air Ventilation Assessment 2. Microclimate Studies 3. Retail Viability Study 4. Project Feasibility Studies 5. Architectural Feasibility Studies 6. Site Potential Studies 7. Visual Impact Assessment 8. Heritage Impact Assessment 9. Ecological Assessment 10. Land Use Studies 11. Planning and Engineering Study 12. Environmental Assessment Study 13. Air Quality Objectives Assessment 14. Odour Assessment 15. Chimney Emission Impact Assessment 16. Traffic Impact Assessment 17. Drainage Impact Assessment 18. Sewerage Impact Assessment 19. Land Decontamination Study 20. Ground Assessment 21. Natural Terrain Hazardous Study 22. Potentially Hazardous Installations Assessment 23. Tree Survey 24. Condition Survey for Existing Building 25. Land Surveying 26. Archeological Study DCD Academy

Upload: others

Post on 26-Oct-2020

2 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Technical Studies for Potential/New Housing Sites · • Appropriate height for lighting switch, door bell ... Easy maintenance for A/C Provide railing to all roof Providing Easy

41

Project Life Cycle

Feasibility

Studies and

Conceptual

Layout

Scheme Design

and Project

Budget

Site Inspection

and

Acceptance

Detailed Design

and

Specification

TenderConstruction

(Foundation)

Construction

(Building)

Maintenance

Period

Final

Account

• Technical Studies for Potential/New Housing Sites1. Air Ventilation Assessment

2. Microclimate Studies

3. Retail Viability Study

4. Project Feasibility Studies

5. Architectural Feasibility Studies

6. Site Potential Studies

7. Visual Impact Assessment

8. Heritage Impact Assessment

9. Ecological Assessment

10. Land Use Studies

11. Planning and Engineering Study

12. Environmental Assessment Study

13. Air Quality Objectives Assessment

14. Odour Assessment

15. Chimney Emission Impact Assessment

16. Traffic Impact Assessment

17. Drainage Impact Assessment

18. Sewerage Impact Assessment

19. Land Decontamination Study

20. Ground Assessment

21. Natural Terrain Hazardous Study

22. Potentially Hazardous Installations Assessment

23. Tree Survey

24. Condition Survey for Existing Building

25. Land Surveying

26. Archeological Study

DC

D A

ca

de

my

Page 2: Technical Studies for Potential/New Housing Sites · • Appropriate height for lighting switch, door bell ... Easy maintenance for A/C Provide railing to all roof Providing Easy

Care and Attention to Details for Quality Housing at the micro level :

Living Space and Services

Quality means “fitness for purpose”. Functional and cost-effective “No-frills Quality Housing” means creating

(a) green and healthy living space for residents, (b) convenient & comfortable,

(c) free from nuisance and avoiding spread of disease, (d) receiving ample lighting & ventilation yet free from noise nuisance.

DC

D A

ca

de

my

42

Page 3: Technical Studies for Potential/New Housing Sites · • Appropriate height for lighting switch, door bell ... Easy maintenance for A/C Provide railing to all roof Providing Easy

Functional & Cost Effective Design

(Quality Housing Initiatives)

1 Enhanced Buildability, Consistency and Economy of Scale

2 Better Healthy Living, Safety and Easy Maintenance

3 Focus on Customer Needs & continuous enhancement

4 Reinforcing Universal Design

4 Types of Modular Flat Design

developed in 2008 with reference to the allocation standard

Since 2000, due to limited availability of land resources, the topography, size and configuration of housing sites, we change from Standard Block Design to Site Specific Design with Modular Flat Design.

DC

D A

ca

de

my

Improving Habitable Space & Enhancing Spatial

43

Page 4: Technical Studies for Potential/New Housing Sites · • Appropriate height for lighting switch, door bell ... Easy maintenance for A/C Provide railing to all roof Providing Easy

Furniture layout

44

20

00

20

00

2000

sofa / bed and TV can be located on either wall side

This arrangement enhances

flexibility of furniture layout

e.g. locating bunk bed, sofa,

dining table etc.

Min. 2000 mm spacing from

wall for accommodating a

combined bed with storage

at living area

Space for fridge

or shoe rack

High Zone -

Reduced by

50mm from

the wall

thickness in

Low Zone

• Co-ordinated dimensions approach - different

flat sizes share common denominator dimension.

2000

DC

D A

ca

de

my

Rationalized Flat Layout

44

Page 5: Technical Studies for Potential/New Housing Sites · • Appropriate height for lighting switch, door bell ... Easy maintenance for A/C Provide railing to all roof Providing Easy

The positioning of flat entrance door and bathroom door facilitateseffective use of living space inside the flat in response to tenants’feedback for maintaining flexibility of furniture layout.

45

Option 1 Option 2

Min. 2000mm spacing

from wall for

accommodating a

combined bed with

storage at living area

Option 3 Option 4

Options of furniture layout by residents within the 1-bedroom flat

DC

D A

ca

de

my

Rationalized Flat Layout

Page 6: Technical Studies for Potential/New Housing Sites · • Appropriate height for lighting switch, door bell ... Easy maintenance for A/C Provide railing to all roof Providing Easy

Universal Design

Barrier Free Access

(Inside Flat)

Widen door width –800mm (flat entrance)750mm (kitchen and bathroom)

• Power socket at 1m from ground• Lever or D-type door handle• Large lighting switch and door bell

• Appropriate height for lighting switch, door bell and power socket

• Lever type sink mixer• Leveled entranceD

CD

Aca

de

my

46

Page 7: Technical Studies for Potential/New Housing Sites · • Appropriate height for lighting switch, door bell ... Easy maintenance for A/C Provide railing to all roof Providing Easy

3.2 Improving Energy Efficiency, Saving Water & Enhancing Healthy Living

• Where feasible, we Install at the upper roof and roof on lift machine room floor, generating about 2.5% energy for the communal areas.

Renewable Energy Installation –Grid Connected Photovoltaic System

Energy Saving Initiative –Two level lighting design in Common Area

• Enable high efficiency lighting and saving in electricity

• Implemented since 2008, we maintain a minimum lighting level for safety and security; while the manual switch integrated with the door phone handset in each domestic flat and the provision at strategic positions at the lift lobby and corridors enable the required illumination level up to 85 lux

Improving Energy Efficiency, Saving Water & Enhancing Healthy Living

DC

D A

ca

de

my

47

Page 8: Technical Studies for Potential/New Housing Sites · • Appropriate height for lighting switch, door bell ... Easy maintenance for A/C Provide railing to all roof Providing Easy

Regenerative power for lifts & Use of Permanent Magnet

48

• A technology that can be used to drive lift machine with probable energy saving

• Trial installation has been tested successfully in Kai Ching Estate completed in 2014. From the preliminary measured results, it indicates that more than 20% of the energy consumed by lifts can be regenerated for use by communal facilities

Gearless Permanent Magnet Synchronous (PMS) Lift Motor

DC

D A

ca

de

my

Energy Saving Initiative –

Improving Energy Efficiency……

Page 9: Technical Studies for Potential/New Housing Sites · • Appropriate height for lighting switch, door bell ... Easy maintenance for A/C Provide railing to all roof Providing Easy

49

Twin Water Tanks System

a) In 2008, we pioneered the system to provide uninterrupted water supply to tenants when one of the compartments is being cleaned

b) Direct discharge of residual waste water to waste stacks

c) Less water wastage under well-planned cleansing cycle for water tanks

d) Provide convenience and better hygiene condition

Rainwater Harvesting System helps reduce fresh water consumption by providing filtered rainwater for irrigation. Recently, we are exploring –

(a) Root Zone Irrigation System supplies water directly to plant roots, i.e. minimizing water loss in evaporation & reducing irrigation water; and

(b) Zero Irrigation Planting System.

DC

D A

ca

de

my

Water Saving Initiatives

…….. Saving Water & Enhancing Healthy Living Healthy Living Initiatives &

Better Living

Page 10: Technical Studies for Potential/New Housing Sites · • Appropriate height for lighting switch, door bell ... Easy maintenance for A/C Provide railing to all roof Providing Easy

50

Common W-trap System

• Waste water from wash basin/shower now directed to replenish the common W-trap connected to the floor drain under the new design

• Avoid drying up of water seal to prevent the spread of foul air, germs and epidemic disease between floors

• Ensure healthy living

DC

D A

ca

de

my

Healthy Living Initiatives & Better Living

…….. Enhancing Healthy Living

Page 11: Technical Studies for Potential/New Housing Sites · • Appropriate height for lighting switch, door bell ... Easy maintenance for A/C Provide railing to all roof Providing Easy

51

DC

D A

ca

de

my

51

A Sustainable Community & Management Systems

To meet present social, economical and environmental needs butNOT at the expense of future generations.

OHSAS 18001(Health & Safety)

ISO 14001 (Environmental)

ISO 50001(Energy)

ISO 9001(Quality)

ISO 31000(Risk)

ISO 26000(Social Responsibility)

Through the European Foundation for Quality Management (EFQM) Model, we seamlessly integrate various management principles and

practices into our daily operations (deployed since 2008).

• Implementing carbon emission estimation (CEE) for buildings with life cycle of 100 years

• Annual Sustainability Reporting according to Global Reporting Initiative (GRI)

Page 12: Technical Studies for Potential/New Housing Sites · • Appropriate height for lighting switch, door bell ... Easy maintenance for A/C Provide railing to all roof Providing Easy

Leadership in Sustainable Use & Maintenance

52

Design for Safety : Caring for Workers & End Users

Space for BS maintenance

Strengthened Parapets to fix gondola

Easy maintenance for A/C Provide railing to all roof

Providing Easy and Safe Access for Maintenance and Cleansing Personnel – Upper Roof

Cat Ladder - provided and located away

from edge of building

Steel Stair

Upper Roof

with

Safe Access

Suspended Steel

Service Platform

An Integrated Example – Safe Access to Upper Roof

Permanent anchorage to access lift pit

Page 13: Technical Studies for Potential/New Housing Sites · • Appropriate height for lighting switch, door bell ... Easy maintenance for A/C Provide railing to all roof Providing Easy

Leadership in Green Building Assessment

53

• Setting a green building benchmark• Since 2011, BEAM Plus Gold ready (all new projects with standard at least Gold rating)

• 7 & 13 BEAM Plus Provisional Platinum & Gold new projects

1st Neighborhood Platinum1st EB Final Platinum

PA PLATINUM (NB)

Most Platinum

1st Residential

PA GOLD (NB)

Page 14: Technical Studies for Potential/New Housing Sites · • Appropriate height for lighting switch, door bell ... Easy maintenance for A/C Provide railing to all roof Providing Easy

Sharing Knowledge with Building Industry Stakeholders

54

Research & Development

Regular liaison with

business partners

Experience sharing

with industry

stakeholders

Engage tenants

Taking on board

advanced construction practices

Collaboration, Sharing & Advancement

• Sharing experiences through visits internationally, forums,

and conferences, over 50talks per annum

Page 15: Technical Studies for Potential/New Housing Sites · • Appropriate height for lighting switch, door bell ... Easy maintenance for A/C Provide railing to all roof Providing Easy

Sharing Knowledge in Community

55

Community Engagement

• Website & publications

• Community educational activities

• Community engagement workshops

• Eco-Expo

• HA Exhibition Centre

Page 16: Technical Studies for Potential/New Housing Sites · • Appropriate height for lighting switch, door bell ... Easy maintenance for A/C Provide railing to all roof Providing Easy

Sharing Knowledge with Residents

56

• Housing Channel for publicity of environmental issues

• Action Seedling to engage contractors and estate tenants

• Smart Meter - Display of communal gas, water and electricity consumption data

Green Delight in Estates community educational programme

• “All About Waste” Campaign

• Waste Reduction in Estates Photo Competition

• Green Living Carnivals

• Eco-workshops, Green Days, Organic Farming Days

• We initiate Green Groups to

educate our residents

Page 17: Technical Studies for Potential/New Housing Sites · • Appropriate height for lighting switch, door bell ... Easy maintenance for A/C Provide railing to all roof Providing Easy

Sharing Knowledge in Office : Corporate Achievement

57

• Direct involvement in communityenvironmental projects

• Environmental activities – organic farming, donate used goods; reduce energy, water, paper consumption, green corner display;

• Environmental training – DCD Academy

Staff Training• We have >200 BEAM practitioners

Page 18: Technical Studies for Potential/New Housing Sites · • Appropriate height for lighting switch, door bell ... Easy maintenance for A/C Provide railing to all roof Providing Easy

Receiving Awards in Recognition of our Excellence

58

Building Awards• Green Building Award 2014, 2012• HKILA Design Award 2014, ZIS• Quality Building Award 2014, EHC• BIM Excellence Awards 2014• HKIE Environmental Paper Award 2012, Marine Mud

Material• HKILA Design Award 2012, SMP• HKIA Special Annual Awards 2012 – CEE model• HKIE Environmental Paper Award 2011, Insitu

Backfilling• HKIE, Innovation Award for the Engineering Industry

Cross-sector Achievements• International Outstanding Achievement

Awards 2014• Green Award• Green Purchaswi$e Award• Green Management Award• Corporate Green Governance Award• Green Office Management Award• Wastewi$e label• Hong Kong Awards for Environmental

Excellence• Civil Service Outstanding Service Award

Accreditations• ISO 9001 certification• ISO 14001 certification• OHSAS 18000:2007

Accreditations• ISO 50001 certification• CarbonCare Label• Sustainable Building Index Verified

Mark

Page 19: Technical Studies for Potential/New Housing Sites · • Appropriate height for lighting switch, door bell ... Easy maintenance for A/C Provide railing to all roof Providing Easy

Safety Health Security

Well-being Comfort Convenience

Green Building Leadership

59

Key Performance Indices

• 34% less costly than private sector

• 30% less construction waste

• 75% lower accident rates

We Care• We care for the environment• We care for the people:

• Together we build a sustainable and harmonious community

Please take a look at our sustainability videohttp://www.housingauthority.gov.hk/hdw/video/videoshell_Environmental_corporate_Cant.html

Our Core Values: Caring, Customer-focused, Creative, Committed以人為本

Air Quality

Noise Control

Green Materials

Control of Hazardous

Materials

Estate Greening and

Landscaping

Green Activities

Waste Management

Micro-climate Studies

Staff Development and

Participation

Operation with

Cost-Effectiveness

Engaging Various Parties

Water Conservation

Sustainable Living

Environment

Enhancing Estate

Management & Services

Safety Performance

Public Health & Hygiene

Housing Rent Policy

Resource Optimization

Financial Performance Energy and Carbon Emissions

Biodiversity

Environmental

Social

Economic

Please read our Sustainability Reporthttp://www.housingauthority.gov.hk/mini-site/hasr1415/common/index.html

• Customer satisfaction index rises, with max. of 98.1%

video

Page 20: Technical Studies for Potential/New Housing Sites · • Appropriate height for lighting switch, door bell ... Easy maintenance for A/C Provide railing to all roof Providing Easy

60

2.2 Designing for People with Nature in Mind

A balanced design assuring social, economic and environmental

sustainability of public housingD

CD

Aca

de

my

Outcome : Happy, Healthy, Satisfied Residents

Page 21: Technical Studies for Potential/New Housing Sites · • Appropriate height for lighting switch, door bell ... Easy maintenance for A/C Provide railing to all roof Providing Easy

DC

D A

CA

DE

MY

4. Exemplary ProjectHong Kong Housing Authority’sHung Fuk Estate(Quality Building Award 2018; Green Building Award 2016)

61

Page 22: Technical Studies for Potential/New Housing Sites · • Appropriate height for lighting switch, door bell ... Easy maintenance for A/C Provide railing to all roof Providing Easy

香港房屋委員會Hong Kong Housing Authority

1

HUNG FUK ESTATE is located in a low density rural area of Yuen Long district. It is about 327m from Hung Shui KiuLight Rail Station.

The Site and the Neighbourhood

Restaurants, banks, clinic, pharmacy, supermarket, convenience stores, schools, laundry, retail shops, post box, temporary wet market are within 500m walking distance (shown yellow on the location map).