techtown 1st floor renovation

29
EXIST ELEV NO 1 EXIST STAIR NO 1 EXIST STAIR NO 1 7 6 5 4 3 2 1 8 3.6 EXIST STAIR NO 1 7 6 5 4 3 2 1 8 3.6 EXIST ELEV NO 1 EXIST STAIR NO 1 BURROUGHS ST 25'-0" WIDE TECH TOWN PARKING 50 SPACES TECH TOWN 440 BURROUGHS ST CASS AVE 30'-0" WIDE TECHTOWN DISTRICT PAST The New Amsterdam Historic District is a concentration of early twentieth century industrial buildings associated with Detroit’s booming manufacturing base. A number of the district’s buildings are fine examples of the reinforced concrete architecture of Albert Kahn. TODAY TechTown, an innovation district in Midtown Detroit, is brimming with potential. The nonprofit provides entrepreneurs and start-ups in Southeast Michigan with programs and partnering opportunities. The character of the area itself is unique, featuring building infrastructure that played an important role in the automotive innovations of a bygone era that is today rich with opportunity for reuse. FIRST FLOOR RENOVATION TECH ONE BUILDING Interior Renovation 20,638 Square Foot (Scope of Work) TechTown's vision for the first floor renovation is to create a more, open, collaborative environment of entrepreneurs, along with the best in class conference center to serve the expanding need for sophisticated and flexible meeting space for the TechTown business as a whole. The First Floor renovation will open up the interior space by removing existing partitions and expose the big, beautiful windows to bring more natural light. The first floor, will host a membership based co-working space of mobile entrepreneurs. TechTown Management Office relocation from the second floor to the first floor is also part of this renovation project. 12-29 January 3, 2012 TechTown First Floor Renovation 440 Burroughs St. - Detroit, MI TECH ONE INDEX OF DRAWINGS Sheet Number Sheet Name Sheet Issue Date A1.01 First Floor Plan 02/22/13 A2.02 First Floor Reflected Ceiling Plan 02/22/13 A5.01 Enlarged Plans - PTD SHEET 02/22/13 A5.02 Enlarged Plans - PTD SHEET 02/22/13 A5.03 Enlarged Plans 02/22/13 A5.05 Interior Elevations - PTD SHEET 02/22/13 A5.06 Interior Elevations - PTD SHEET 02/22/13 A5.08 Interior Elevations 02/22/13 A5.09 Interior Elevations 02/22/13 A5.10 Interior Sections 02/22/13 A5.11 3-D Interior Views 02/22/13 A6.01 Wall Types + Interior Plan Details 02/22/13 A6.02 Interior Details 02/22/13 A6.03 Interior Details 02/22/13 A6.05 Millwork Details - PTD SHEET 02/22/13 A6.06 Millwork Details - PTD SHEET 02/22/13 A7.01 Door Schedule 02/22/13 A8.01 Finish Plan - PTD SHEET 02/22/13 A8.02 Finish Schedule - PTD SHEET 02/22/13 A8.03 Furniture Plan - PTD SHEET 02/22/13 FP1-01-01 Fire Projection Floor Plan - Level 1 02/22/13 M00-00-01 Mechanical General - Legends + Abbriviations 02/22/13 M00-00-02 Mechanical Specifications 02/22/13 MD1-01-01 Mechanical Demolition Floor Plan - Level 1 02/22/13 MH1-01-01 Mechanical HVAC Floor Plan - Level 1 02/22/13 MH7-00-01 Mechanical Schedules + Details 02/22/13 MP1-01-01 Mechanical Piping Floor Plan - Level 1 02/22/13 MP1-01-02 Mechanical Plumbing Floor Plan - Level 1 02/22/13 SET ISSUED FOR: QUALITY REVIEW 1/18/2013 PERMIT / BIDS 2/22/2013 AD1.01 First Floor Demolition Plan 02/22/13 AD1.02 Temporary Construction Plan 02/22/13 AD2.01 First Floor Demolition Reflected Ceiling Plan 02/22/13 AD3.01 Demolition Photos 02/22/13 AD3.02 Demolition Photos 02/22/13 AG.01 Cover + Index 02/22/13 AG.02 Code Summary + Egress Plan 02/22/13 AG.03 Reference Symbols + Abbreviations 02/22/13 E00-00-01 Electrical Legend + General Notes 02/22/13 E00-00-02 Electrical Specifications 02/22/13 ED1-01-01 Electrical Demolition Floor Plan- Level 1 02/22/13 EL1-01-01 Electrical Lighting Floor Plan - Level 1 02/22/13 EL5-00-01 Electrical Lighting Details 02/22/13 EL7-00-01 Electrical Lighting Schedules 02/22/13 EL7-00-02 Electrical Lighting Schedules 02/22/13 EP1-01-01 Electrical Power Floor Plan- Level 1 02/22/13 EP6-00-01 Electrical One- Line Diagram 02/22/13 EP7-00-01 Electrical Panel Board Schedules 02/22/13 EP7-00-02 Electrical Panel Board Schedules 02/22/13 EY1-01-01 Electrical Auxiliary System Floor Plan - Level 1 02/22/13 S-1.01 Partition Support Framing Plan + Details 02/22/13 440 BURROUGHS TECH ONE BUILDING 5 Story Reinforced Concrete Building Build in 1929 Designed by Albert Kahn Originally the G. A. Richards Oakland Company Service Department , now Tech One Building and home of TechTown innovative business incubator and acceleration center. This is a historically designated building contract architect for original Albert Kahn building documents and State Historical Preservation Office documents, if required. PROJECT NUMBER: DATE: PROJECT CONTACTS: Phoenix Contractors, Inc 2111 Golfside Ypsilanti, Michigan 48197 p 734 487 9640 f 734 487 1252 www.phoenixco.biz CONSTRUCTION MANAGER: ISSUED FOR: SITE MAP: LOCATION MAP: PROJECT DESCRIPTION: TechTown 440 Burroughs Street Detroit, Michigan 48202 p 313 921 9340 f 313 921 0986 www.techtownwsu.org OWNER: Ghafari Associates LLC. 17101 Michigan Ave. Dearborn, MI 48126 p 313 441 3000 f 313 441 1545 www.ghafari.com MECHANICAL ELECTRICAL + PLUMBING: Patrick Thompson Design, Inc. 486 West Milwaukee, Suite 100C Detroit, MI 48201 p 313 820 3268 www.patrickthompsondesign.com INTERIOR DESIGNER: Centric Design Studio, LLC 440 Burroughs Street, No. 170 Detroit, Michigan 48202 p 313 486 1908 f 313 216 2777 www.centricdesignstudio.com ARCHITECT: JMS Engineering Services, LLC 32401 West 8 Mile, Suite 2-5 Livoinia, MI 48152 p 313 399.2932 STRUCTURAL ENINEERING: INDEX OF DRAWINGS

Post on 18-Oct-2014

318 views

Category:

Business


0 download

DESCRIPTION

TechTown vision for the first-floor redesign is to create a more open, collaborative environment for entrepreneurs, along with a best-in-class conference center to serve the expanding need for sophisticated and flexible meeting space in this building. My duties on this project include: - Field measurements & existing condition verification. - Project document setup. - Construction documentation & detailing utilizing Revit.

TRANSCRIPT

Page 1: TechTown 1st Floor Renovation

EXIST ELEVNO 1 EXIST STAIR

NO 1EXIST STAIR

NO 1

7654321 83.6

EXIST STAIRNO 1

7654321 83.6

EXIST ELEVNO 1 EXIST STAIR

NO 1

BURROUGHS ST25'-0" WIDE

TECH TOWN PARKING50 SPACES

TECH TOWN440 BURROUGHS ST

CA

SS A

VE30

'-0" W

IDE

TECHTOWN DISTRICT

PAST

The New Amsterdam Historic District is a concentration of early twentieth centuryindustrial buildings associated with Detroit’s booming manufacturing base. A numberof the district’s buildings are fine examples of the reinforced concrete architectureof Albert Kahn.

TODAY

TechTown, an innovation district in Midtown Detroit, is brimming with potential. Thenonprofit provides entrepreneurs and start-ups in Southeast Michigan with programsand partnering opportunities. The character of the area itself is unique, featuringbuilding infrastructure that played an important role in the automotive innovations ofa bygone era that is today rich with opportunity for reuse.

FIRST FLOOR RENOVATION

TECH ONE BUILDING

Interior Renovation20,638 Square Foot (Scope of Work)

TechTown's vision for the first floor renovation is to create a more,open, collaborative environment of entrepreneurs, along with thebest in class conference center to serve the expanding need forsophisticated and flexible meeting space for the TechTownbusiness as a whole.

The First Floor renovation will open up the interior space byremoving existing partitions and expose the big, beautiful windowsto bring more natural light. The first floor, will host a membershipbased co-working space of mobile entrepreneurs.

TechTown Management Office relocation from the second floor tothe first floor is also part of this renovation project.

12-29

January 3, 2012

TechTown First Floor Renovation440 Burroughs St. - Detroit, MI

TECH ONE

INDEX OF DRAWINGSSheet

Number Sheet Name Sheet Issue Date

A1.01 First Floor Plan 02/22/13A2.02 First Floor Reflected Ceiling Plan 02/22/13A5.01 Enlarged Plans - PTD SHEET 02/22/13A5.02 Enlarged Plans - PTD SHEET 02/22/13A5.03 Enlarged Plans 02/22/13A5.05 Interior Elevations - PTD SHEET 02/22/13A5.06 Interior Elevations - PTD SHEET 02/22/13A5.08 Interior Elevations 02/22/13A5.09 Interior Elevations 02/22/13A5.10 Interior Sections 02/22/13A5.11 3-D Interior Views 02/22/13A6.01 Wall Types + Interior Plan Details 02/22/13A6.02 Interior Details 02/22/13A6.03 Interior Details 02/22/13A6.05 Millwork Details - PTD SHEET 02/22/13A6.06 Millwork Details - PTD SHEET 02/22/13A7.01 Door Schedule 02/22/13A8.01 Finish Plan - PTD SHEET 02/22/13A8.02 Finish Schedule - PTD SHEET 02/22/13A8.03 Furniture Plan - PTD SHEET 02/22/13

FP1-01-01 Fire Projection Floor Plan - Level 1 02/22/13

M00-00-01 Mechanical General - Legends + Abbriviations 02/22/13M00-00-02 Mechanical Specifications 02/22/13MD1-01-01 Mechanical Demolition Floor Plan - Level 1 02/22/13MH1-01-01 Mechanical HVAC Floor Plan - Level 1 02/22/13MH7-00-01 Mechanical Schedules + Details 02/22/13MP1-01-01 Mechanical Piping Floor Plan - Level 1 02/22/13MP1-01-02 Mechanical Plumbing Floor Plan - Level 1 02/22/13

SET ISSUED FOR:

QUALITY REVIEW 1/18/2013PERMIT / BIDS 2/22/2013

AD1.01 First Floor Demolition Plan 02/22/13AD1.02 Temporary Construction Plan 02/22/13AD2.01 First Floor Demolition Reflected Ceiling Plan 02/22/13AD3.01 Demolition Photos 02/22/13AD3.02 Demolition Photos 02/22/13

AG.01 Cover + Index 02/22/13AG.02 Code Summary + Egress Plan 02/22/13AG.03 Reference Symbols + Abbreviations 02/22/13

E00-00-01 Electrical Legend + General Notes 02/22/13E00-00-02 Electrical Specifications 02/22/13ED1-01-01 Electrical Demolition Floor Plan- Level 1 02/22/13EL1-01-01 Electrical Lighting Floor Plan - Level 1 02/22/13EL5-00-01 Electrical Lighting Details 02/22/13EL7-00-01 Electrical Lighting Schedules 02/22/13EL7-00-02 Electrical Lighting Schedules 02/22/13EP1-01-01 Electrical Power Floor Plan- Level 1 02/22/13EP6-00-01 Electrical One- Line Diagram 02/22/13EP7-00-01 Electrical Panel Board Schedules 02/22/13EP7-00-02 Electrical Panel Board Schedules 02/22/13EY1-01-01 Electrical Auxiliary System Floor Plan - Level 1 02/22/13

S-1.01 Partition Support Framing Plan + Details 02/22/13

440 BURROUGHS

TECH ONE BUILDING

5 StoryReinforced Concrete BuildingBuild in 1929Designed by Albert Kahn

Originally the G. A. Richards Oakland Company Service Department , nowTech One Building and home of TechTown innovative business incubatorand acceleration center.

This is a historically designated building contract architect for originalAlbert Kahn building documents and State Historical Preservation Officedocuments, if required.

PROJECT NUMBER:

DATE:

PROJECT CONTACTS:

Phoenix Contractors, Inc

2111 Golfside

Ypsilanti, Michigan 48197

p 734 487 9640 f 734 487 1252

www.phoenixco.biz

CONSTRUCTION MANAGER:

ISSUED FOR:

SITE MAP:LOCATION MAP:PROJECT DESCRIPTION:

TechTown

440 Burroughs Street

Detroit, Michigan 48202

p 313 921 9340 f 313 921 0986

www.techtownwsu.org

OWNER:

Ghafari Associates LLC.

17101 Michigan Ave.

Dearborn, MI 48126

p 313 441 3000 f 313 441 1545

www.ghafari.com

MECHANICAL ELECTRICAL + PLUMBING:

Patrick Thompson Design, Inc.

486 West Milwaukee, Suite 100C

Detroit, MI 48201

p 313 820 3268

www.patrickthompsondesign.com

INTERIOR DESIGNER:

Centric Design Studio, LLC

440 Burroughs Street, No. 170

Detroit, Michigan 48202

p 313 486 1908 f 313 216 2777

www.centricdesignstudio.com

ARCHITECT:

JMS Engineering Services, LLC

32401 West 8 Mile, Suite 2-5

Livoinia, MI 48152

p 313 399.2932

STRUCTURAL ENINEERING:

INDEX OF DRAWINGS

Page 2: TechTown 1st Floor Renovation

UP

UP

UPDN

G.4

G

F.4

F

E.4

E

D.4

D

A.7

B

B.5

C.5

C

765432

A.9

G.2

1 8

H

AA.8

3.6

G.5

TECH TOWNMANAGEMENT

103

EVENTSPACE 1

126

EVENTSPACE 2

125

VESTIBULE101

KRESGECONNECT VIDEOCONFERENCING

108

TRAINING/ACCELERATION112

STORAGE B120

STORAGE A107

ELEC109

N.I.C

N.I.C

71'-8"

97'-10"

130'-2"

BUILDING CODE SUMMARY

BUILDING AREA(PARA 502.1

BUILDING USE GROUP(CHAPTER 3)

MIXED USE(TABLE 302.3.2 & PARA 302.3

TYPE OF CONSTRUCTION(CHAPTER 6)

FIRE SUPPRESSION REQUIRED(SECTION 903)

ALLOWABLE BUILDING HEIGHT(TABLE 503)

HEIGHT MODIFICATIONS(SECTION 504)

TABULAR FLOOR AREA PER STORY(TABLE 503)

ACTUAL FLOOR AREA PER STORY(GROSS FLOOR AREA PARA 502.1)

TOTAL AREA

OCCUPANT LOAD PER STUDY(TABLE 1004.1.2

TOTAL OCCUPANT LOAD

MAXIMUM LENGTH OF EXIT TRAVEL(TABLE 1015.1)

MAXIMUM LENGTH OF DEAD END CORRIDOR(PARA 1016.3)

CAPACITY OF EGRESS COMPONENTS

EXIT ACCESS CORRIDORS(TABLE 1005.1 & PARA 1016.2)

STAIRWAYS(TABLE 1005.1 & PARA 1009.1)

RAMPS(TABLE 1005.1 & PARA 1010.5.1)

DOORS(TABLE 1005.1 & PARA 1006.1.1)

FIRE RESISTANCE RATINGS OF EGRESS COMPONENTS

CORRIDORS(TABLE 1016.1 & PARA 1016.1)

EXIT PASSAGEWAYS(PARA 1020.3)

STAIR SHAFTS(PARA 1019.1)

HORIZONTAL EXITS(PARA 1021.2)

AREA OF REFUGE(PARA 1007.6.2)

FIRE RESISTANCE RATING OF SEPARATIONS

SHAFTS - OTHER THAN STAIRS(PARA 707.4)

ATRIUMS(PARA 404.5)

FURNACE ROOMS OVER 400,000 BTU(TABLE 302.1.1)

BOILER ROOMS OVER 15 PSI & 10 HP(TABLE 302.1.1)

STORAGE ROOMS OVER 100 SF(TABLE 302.1.1)

WASTE AND LINEN COLLECTION ROOMS(TABLE 302.1.1)

FIRE WALLS(TABLE 705.4)

EXTERIOR WALLS(TABLE 602)

FIRE RESISTANCE RATINGS OF STRUCTURAL ELEMENTS

INTERIOR AND EXTERIORBEARING WALLS,COLUMNS, BEAMS,GIRDERS, TRUSSES, ANDARCHES (TABLE 601)

SUPPORTING MORE THAN ONE FLOOR,COLUMNS OR OTHER BEARING WALLS

SUPPORTING ONE FLOOR ONLY

SUPPORTING A ROOF ONLY

28,425 SQ. FT.

B

0 HOUR

TYPE 2B

YES

3 STORIES

N/A

23,000

YES

TOTAL AREA 69,690 SQ. FT./FLOOR ALLOWABLE

SEE EGRESS OCCUPANT LOAD TABLE

SEE EGRESS OCCUPANT LOAD TABLE

300 FEET

50 FEET

0.15 INCHES/OCCUPANT

0.2 INCHES/OCCUPANT

N/A

0.15 INCHES/OCCUPANT

0 HOUR

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

0 HOUR

N/A

2 HOUR

0 HOUR

0 HOUR

0 HOUR

0 HOUR

20,638 SQ. FT. AREA OF SCOPE OF WORK

MIXED USE - BUSINESS, ASSEMBLY & STORAGE UNIT

302.3.1 NON SEPARATED USES

FULLY SPRINKLED BUILDING - EXISTING

1 STORY - 20 FEET

200% INCREASE FOR SPRINKLED BUILDINGINCREASE TO 69,690 SQ. FT.

WITH SPRINKLER SYSTEM

WITH SPRINKLER SYSTEM

2 EXITS REQUIRED - 3 PROVIDED

32' MIN.

EXISTING STAIRS

508.4 TABLE

MIXED USE - BUSINESS & STORAGE USE GROUPSSEPARATION REQUIREMENTS

EXISTING WALLS

INTERIOR LOAD BEARING WALLS (0 HOUR)

ALL INTERIOR WALL

MICHIGAN BUILDING CODE 2009 EDITION(UNLESS OTHERWISE NOTED)

MEANS OF EGRESS OCCUPANT LOAD (TABLE 1004.1.1)OCCUPANCY

BUSINESS (B)

SQUARE FEET OF FLOOR AREA PER OCCUPANT

100 NSF / OCCUPANT

BUILDING FLOOR AREA FOR USE

20,638 SQUARE FEET

OCCUPANT LOAD

270 OCCUPANTS

PLUMBING FIXTURE COUNTMICHIGAN BUILDING CODE 2009 EDITION(UNLESS OTHERWISE NOTED)

USE GROUP POPULATION = BUSINESS (B)

NUMBER REQUIRED (TABLE 403.1):W/C: 1/XX OCCLAV: 1/XX OCC

NUMBER PROVIDED

JANITOR'S CLOSETS

DRINKING FOUNTAINS

WATER CLOSETS

MALE

2

WC: 1/25 OCCFOR FIRST 50WC: 1/50 FORREMAINING

4 EXISTING

1 SERVICE SINK REQUIRED1 SERVICE SINK PROVIDED

1 PER 100 (B) 2 DRINKING FOUNDATIONS REQUIRED2 DRINKING FOUNDATION EXISTING

FEMALE

2

WC: 1/25 OCCFOR FIRST 50WC: 1/50 FORREMAINING

4 EXISTING

URINALS

SEE NOTE 1

1

UNISEX MALE

2

LAV: 1/40 OCCFOR FIRST 50WC: 1/80 FORREMAINING

4

FEMALE

3

LAV: 1/40 OCCFOR FIRST 50WC: 1/80 FORREMAINING

4

UNISEX

LAVATORIES BATHTUBS/SHOWERS

MALE

N/A

FEMALE

N/A

1 HOUR FIRE SEPARATION

2 HOUR FIRE SEPARATION

EXIT

EGRESS TRAVEL DISTANCE

AREA OF WORK

440 BurroughsSt.Detroit, MI 48202ph. 313.486.1908

www.centricdesignstudio.com

Do Not Scale Drawings

Date

Drawn by

Checked by

Client:

Project:

Location:

Consultants:

Seal:

Sheet Title:

Patrick Thompson Design485 Milwaukee Ave. Ste. 100C Detroit, MI 48202

313.820.3268www.patrickthompsondesign.com

Ghafari Associates, LLC17101 Michigan Ave. Dearborn, MI 48126 USA

TEL +1.313.441.3000www.ghafari.com

Project number

JMS Engineering Services32401 West 8 Mile, Suite 2-5

Livonia, MI 48152 | 313.399.2932

2/28

/201

3 7:

37:5

8 PM

AG.02

Code Summary +Egress Plan

02/22/13C.M/ C.B.S. LITTLE

12-29

TechTown First FloorRenovation

440 Burroughs St. - Detroit, MI

1/16" = 1'-0"A5.051 EGRESS PLAN

1/18/2013 QUALITY REVIEW

CODE SUMMARYBUILDING: MICHIGAN BUILDING CODE 2009, WHICH INCLUDES MICHIGAN BARRIER-FREE DESIGN RULES

MECHANICAL: MICHIGAN MECHANICAL CODE 2009

PLUMBING: MICHIGAN PLUMBING CODE 2009

ELECTRICAL: MICHIGAN ELECTRICAL CODE 2009, NEC

ENERGY: 2009 MICHIGAN UNIFORM ENERGY CODE

ZONING:

PER CITY OF DETROIT ZONING ORDINANCE

M3 GENERAL INDUSTRIAL DISTRICT 103.0000

RESEARCH OR TESTING LABORATORIES + BUSINESS PERMITTED AS MATTER OF RIGHT

USE GROUP "B"

NOTE TO CONTRACTORSEXIST RESTROOMS TO REMAIN. RESTROOMSNOT IN CONTRACT SCOPE FOR THISPROJECT. NO CHANGES ARE REQUIRED

2/22/2013 PERMITS/BIDS

Date: Submitted for:

Page 3: TechTown 1st Floor Renovation

AB ANCHOR BOLTABR ABRASIVEABV ABOVEAC ACOUSTIC/ACOUSTICALA/C AIR CONDITIONINGACC ACCESSACH AIR CONDITIONING UNITADD ADDENDUMADDN ADDITIONADDNL ADDITIONALADH ADHESIVEADJ ADJUSTABLEAFF ABOVE FINISH FLOORAGGR AGGREGATEAHU AIR HANDLING UNITALT ALTERNATEALUM/AL ALUMINUMAMP AMPEREAMT AMOUNTANCH ANCHOR& ANDANOD ANODIZEDAP ACCESS PANELAPPD APPROVEDAPPROX APPROXIMATEARCH ARCHITECT/ARCHITECTURALASPH ASPHALTASSY ASSEMBLY@ ATAUTO AUTOMATICAVG AVERAGE

B/B BACK TO BACKBBD BULLETIN BOARDBD BOARDBETW BETWEENBF BARRIER FREEBIT BITUMINOUSBJF BITUMINOUS JOINT FILLERBLDG BUILDINGBLK BLOCK/BLOCKINGBLVD BOULEVARDBM BEAM/BENCHMARKBOT BOTTOMBPL BASE PLATEBR BEDROOM/BRASS/BULLET RESISTANTBRG BEARINGBRK BRICKBRL BEARING PLATEBS BOTH SIDESBSMT BASEMENTBTU BRITISH THERMAL UNITBULL BULLETINBUR BUILT-UP ROOFBW BOTH WAYS

CA COMPRESSED AIRCAB CABINETCAT CATALOG NUMBERCB CATCH BASIN/CHALKBOARDC/C CENTER TO CENTERCCTV CLOSED CIRCUIT TELEVISIONCEM CEMENTCER CERAMICCF CUBIC FEETCFL COUNTER FLASHINGCFM CUBIC FEET PER MINUTECG CORNER GUARDCH COAT HOOKCI CAST IRONCIP CAST IRON PIPE/CAST IN PLACECIR CIRCLE/CIRCULARCJ CONTROL JOINTCL CENTERLINE/CLASSCLG CEILINGCLL CONTRACT LIMIT LINECLOS CLOSETCLR CLEARCMU CONCRETE MASONRY UNITCNL CHANNELCNTR COUNTERCO CLEAN OUT/COMPANYCOL COLUMNCOMP COMPOSITION/COMPOSITECONC CONCRETECOND CONDUITCONF CONFERENCECONN CONNECTIONCONST CONSTRUCTIONCONT CONTINUE/CONTINUOUSCONTR CONTRACTORCORR CORRIDOR/CORRUGATEDCP CONTROL PANELCPL CEMENT PLASTERCSK COUNTERSINKCTR CENTER/CENTEREDCUH CABINET UNIT HEATERCW COLDWATERCY CUBIC YARDCYC CYCLESCYL CYLINDER

D DEEP/DEPTHDA DOUBLE ACTINGDB DECIBELDBL DOUBLEDES DESIGNDET DETAILDF DRINKING FOUNTAINDH DOUBLE HUNGDIA DIAMETERDIAG DIAGONALDIFF DIFFUSERDIM DIMENSIONDISC DISCONNECTDISP DISPENSER/DISPOSALDIV DIVIDER/DIVISIONDL DEAD LOADDN DOWNDO DITTODP DAMPPROOFINGDR DOOR/DRAIN/DINING ROOMDRN DRAINDS DOWN SPOUTDT DRAIN TILEDUP DUPLICATEDW DISHWASHERDWG DRAWING

E EASTEA EACHEB EXPANSION BOLTEC ELECTRICAL CONTACTOR/EXPOSED CONSTRUCTIONE/E END TO ENDEE EACH ENDEF EACH FACE/EXHAUST FANEG EXHAUST GRILLEEIFS EXTERIOR INSULATION AND FINISH SYSTEMEJ EXPANSION JOINTEJF EXPANSION JOINT FILLEREL/ELEV ELEVATION/ELEVATORELAST ELASTOMERICELEC ELECTRIC/ELECTRICALEMER EMERGENCYENCL ENCLOSURE/ENCLOSEDENTR ENTRANCE/ENTRYEP ELECTRICAL PANELEPDM ETHYLENE PROPYLENE DIENE MONOMEREQ EQUAL/EQUIVALENTEQUIP EQUIPMENTER EXHAUST REGISTERESC ESCALATOREST ESTIMATEETC ETCETERAEW EACH WAYEWC ELECTRIC WATER COOLER

MT METAL THRESHOLDMTD MOUNTEDMTG MEETINGMTL METAL/METTALICMTL WP METALLIC WATERPROOFINGMULL MULLION

N NORTHNA NOT APPLICABLENAT NATURALNIC NOT IN CONTRACTNO or # NUMBERNOM NOMINALNOR NORMALNRC NOISE REDUCTION COEFFICIENTNTS NOT TO SCALE

OA OUTSIDE AIR/OVERALLOBGL OBSCURE GLASSOC ON CENTEROD OUTSIDE DIAMETER/OUTSIDE DIMENSIONOF OUTSIDE FACE DIMENSIONOFF OFFICEOH OPPOSITE HAND/OVERHEADO/O OUT TO OUTOF/CI OWNER FURNISHED / CONTRACTOR INSTALLEDOPER OPERATOR/OPERATIONOPG OPENINGOPP OPPOSITEORIG ORIGINALORN ORNAMENTALOZ OUNCE

PA PUBLIC ADDRESSPASS PASSAGE/PASSENGERPBD PARTICLE BOARDPC PIECE/PIECES/PRECAST CONCRETEPCF POUNDS PER CUBIC FOOTPCP PRECAST CONCRETE PANELPE PASSANGER ELEVATORPERF PERFORATEDPERIM PERIMETERPERM PERMANENTPERP PERPENDICULARPG PAGEPKG PARKINGPL PLATE/PROPERTY LINEPLAS PLASTERPLAT PLATFORMPLBG PLUMBINGPLF POUNDS PER LINEAR FOOTPLWD PLYWOODPNL PANELPOL POLISHEDPORT PORTABLEPOS POSITION/POSITIVEPR PAIRPREFAB PREFABRICATEDPRL PARALLELPROJ PROJECT/PROJECTIONPROP PROPERTY/PROPOSEDPSF POUNDS PER SQUARE FOOTPSI POUNDS PER SQUARE INCHPT POINT/PAINTPTD PAINTEDPTN PARTITIONPVG PAVINGPVC POLYVINYLCLORIDEPVMT PAVEMENT

QTY QUANTITYQTR QUARTER

EX EXPOSEDEXC EXCAVATEDEXH EXHAUSTEXIST EXISTINGEXP EXPANSIONEXT EXTERIOR

F DEGREES FAHRENHEITFA FIRE ALARMFAB FABRICATEDFACP FIRE ALARM CONTROL PANELFAS FASTENERFD FLOOR DRAINFDAPR FIRE DAMPERFDC FIRE DEPARTMENT CONNECTIONFDN FOUNDATIONFE FIRE EXTINGUISHERFEC FIRE EXTINGUISHER CABINETFF FACTORY FINISHF/F FACE TO FACE/FINISH TO FINISHFFE FINISH FLOOR ELEVATIONFF&E FIXTURES, FURNISHINGS AND EQUIPMENTFH FIRE HYDRANTFHC FIRE HOSE CABINETFIG FIGUREFIN FINISH/FINISHEDFIN FLR/FF FINISH FLOORFIXT FIXTUREFLASH FLASHINGFLG FLOORING/FLASHING/FLANGEFLR FLOORFLUOR FLUORESCENTFPM FEET PER MINUTEFPR FIREPROOF/FIREPROOFINGFR FIRE RETARDANTFRM FRAMEFS FULL SIZEFT FEET/FOOTFTG FOOTINGFTP FULLY TEMPEREDFTR FINNED TUBE RADIATIONFURN FURNISH/FURNISHEDFURR FURRING/FURREDFUT FUTUREFVC FIRE VALVE CABINETFVS FIRE VALVE STATION

G GASGA GAUGEGAL GALLONGALV GALVANIZEDGB GRAB BARGC GENERAL CONTRACTORGENL GENERALGF GROUND FACEGFRC GLASS FIBER REINFORCED CONCRETEGL GLASS/GRID LINEGND GROUNDGPH GALLONS PER HOURGPM GALLONS PER MINUTEGWB GYPSUM WALL BOARDGYP GYPSUM

H HIGHHB HOSE BIBBHC HOLLOW COREHD HEAVY DUTYHDWD HARDWOODHDWE HARDWAREHEX HEXAGONHHWR HEATING HOT WATER RETURNHHWS HEATING HOT WATER SUPPLYHM HOLLOW METALHORIZ HORIZONTALHP HIGH POINT/HORSE POWER/HIGH PRESSUREHR HOURHS HEAT STRENGTHENEDHT HEIGHTHTG HEATINGHTR HEATERH/V HEATING AND VENTILATIONHVAC HEATING, VENTILATING AND AIR CONDITIONINGHVC HOSE VALVE CABINETHW HOT WATERHWH HOT WATER HEATER

ID IDENTIFICATION/INSIDE DIAMETERIE INVERT ELEVATIONIN or " INCH/INCHESINCAND INCANDESCENTINCL INCLUDE/INCLUDINGINFO INFORMATIONINSUL INSULATATE/INSULATIONINT INTERIOR/INTERNALINTER INTERMEDIATEINV INVERTIS INSIDE

JB JUNCTION BOX/JOINT BACKERJC JANITOR CLOSETJF JOINT FILLERJR JUNIORJST JOISTJT JOINT

K KIP (1000#)KD KNOCK DOWNKIT KITCHENKO KNOCK OUTKP KICK PLATE

LAB LABORATORYLAM LAMINATE/LAMINATEDLAV LAVATORYLEV LEVELLF LINEAR FEET/FOOTLG LONGLH LEFT HANDLHRB LEFT HAND REVERSE BEVELLIN LINEAR DIFFUSERLL LIVE LOADLLH LONG LEG HORIZONTALLLV LONG LEG VERTICALLOC LOCATIONLP LIGHTING PANEL/LOW POINTLSF LIGHT GAUGE STEEL FRAMINGLT LIGHT/LAUNDRY TRAYLTG LIGHTINGLV LOW VOLTAGELW LIGHT WEIGHTLWC LIGHT WEIGHT AGGREGATE CONCRETE

MACH MACHINEMAINT MAINTENANCEMAS MASONRYMATL MATERIALMAU MAKE-UP AIR UNITMAX MAXIMUMMC MEDICINE CABINET/MECHANICAL CONTRACTORMCC MOTOR CONTROL CENTERMDOT MICHIGAN DEPARTMENT OF TRANSPORTATIONMDS METAL DIVIDER STRIPMECH MECHANICALMED MEDIUMMEMB MEMBRANEMES METAL EDGE STRIPMEZZ MEZZANINEMFR MANUFACTURERMH MANHOLEMI MISCELLANEOUS IRONMIN MINIMUMMISC MISCELLANEOUSMK MARKML METAL LATHmm MILLIMETERMO MASONRY OPENINGMOD MODEL/MODULEMOV MOVEABLE

R RISERRAD or R RADIUSRAG RETURN AIR GRILLERC RAIN CONDUCTORRCP REFLECTED CEILING PLANRD ROAD/ROOF DRAINREBAR REINFORCEMENT BARREC RECESSRECV RECEIVE/RECEIVINGREF REFER/REFERENCEREFL REFLECTIVE/REFLECTEDREFR REFRIGERATORREG REGISTERREINF REINFORCEDCONCRETE/REINFORCE/REINFORCEMENTREM REMOVE/REMOVABLEREQD REQUIREDRET RETURNREV REVISED/REVISIONRFG ROOFINGRH RIGHT HANDRHR RIGHT HAND REVERSERM ROOMRND ROUNDRO ROUGH OPENINGROW RIGHT OF WAYRS ROOF SUMPRTU ROOF TOP UNITRV ROOF VENTILATIONRWC RAIN WATER CONDUCTOR

S SOUTH/STORM/SINKSA SUPPLY AIRSAG SUPPLY AIR GRILLESAN SANITARYSAR SUPPLY AIR REGISTERSB SOIL BEARINGSC SOLID CORESCHED SCHEDULESD SUPPLY DUCT/DIFFUSERSECT SECTIONSF SQUARE FEET/SQUARE FOOT/SUPPLY FANSHR SHOWERSHT SHEETSIM SIMILARSNT SEALANTSOG SLAB ON GRADESP SPACINGSPEC SPECIFICATIONSPKLR SPRINKLERSPKR SPEAKERSQ SQUARESTAG STAGGEREDSTC SOUND TRANSMISSION CLASSSS SERVICE SINKSST STAINLESS STEELST STREETSTD STANDARDSTIFF STIFFENERSTL STEELSTM STEAMSTOR STORAGESTRL STRUCTURALSUB SUBSTATIONSUPP SUPPORTSURF SURFACE/SURFACINGSUSP SUSPEND/SUSPENSIONSW SWITCHSYM SYMBOL/SYMMETRICALSYS SYSTEM

T THERMOSTAT/TREADT/ TOP OFTAN TANGENTT&B TOP AND BOTTOMT&G TONGUE AND GROOVETB TEST BOARING/TOWEL BARTBD TACKBOARD/TO BE DETERMINEDTD TRENCH DRAINTECH TECHNICALTEL TELEPHONETEMP TEMPERATURE/TEMPORARY/TEMPEREDTHK THICK/THICKNESSTHR THRESHOLDTHRU THROUGH/THROUGHOUTTOS TOP OF STEEL/TOP OF SLAB

TP TANGENT POINTTRAN TRANSOM/TRANSFORMERTS TUBE SECTION/TUBE STEEL/THICKENED SLABTV TELEVISIONTW THROUGH WALLTYP TYPICAL

UC UNDERCUTUG UNDERGROUNDUH UNIT HEATERUL UNDERWRITER'S LABORATORYULT ULTIMATEUNEX UNEXCAVATEDUNFIN UNFINISHEDUON UNLESS OTHERWISE NOTEDUR URINALUSGS UNITED STATES GEOLOGICAL SURVEY

VAC VACUUMVAR VARIABLE/VARIESVCP VITRIFIED CLAY PIPEVENT VENTILATE/VENTILATIONVERT VERTICAL/VERTICALLYVEST VESTIBULEVIF VERIFY IN FIELDVIT VITREOUSVOL VOLUMEVR VAPOR RETARDERVTR VENT THRU ROOF

W WIDE/WIDTH/WEST/WASTE/WATTSW/ WITHWC WATER CLOSETWCAB WALL CABINETWD WOODWH WALL HYDRANTWL WORKING LINEWM WATER METERWO WINDOW OPENINGW/O WITHOUTWP WATERPROOFING/WATERPROOF/WEATHERPROOFWP WORKING POINTWR WASTE RECEPTICLE/WATER RESISTANTWSCT WAINSCOTWT WEIGHT/WATERTIGHTW/W WALL TO WALLWWF WELDED WIRE FABRICWWM WELDED WIRE MESHWGL WIRE GLASS

YD YARDYP YIELD POINTYR YEARYS YIELD STRENGTH

101

1 View Name1/8" = 1'-0"A101

A101

2

3

4

1

0

Roomname101

NameElevation

A101 1

DESCRIPTION STARTS AT WALL SURFACEDESIGNATED

WALL CONSTRUCTION TYPE NUMBERAS SEEN ON WALL TYPE SHEET.

1

A-101.01MATCH LINE

A-102.01

A-101.01MATCH LINE

A-102.01

SHEET IDENTIFICATIONNUMBER (INDICATES SHEET

NUMBER OF DRAWING)

SHEET IDENTIFICATION NUMBER(INDICATES SHEET NUMBER

WHERE DRAWN)

0

SHEET IDENTIFICATION(INDICATES SHEET WHERE DRAWN)

IDENTIFICATIONNUMBER (NUMBERON SHEET WHERE

DRAWN)

SHEET IDENTIFICATION(INDICATES SHEET

WHERE DRAWN)

COLUMN IDENTIFICATION FOREXISTING CONSTRUCTION

COLUMN IDENTIFICATION FORNEW CONSTRUCTION

SHEET IDENTIFICATION

DETAIL & ENLARGED PLAN LOCATION INDICATION

SECTION INDICATION

SIMILAR TO IDENTIFIED DETAIL

ELEVATION INDICATION

COLUMN INDICATION

NORTH INDICATION

REVISION IDENTIFICATION

DIMENSION LINE IDENTIFICATION

REVISION CLOUD IDENTIFICATIONDOOR IDENTIFICATIONOPENINGS (DOOR & BORROWED LIGHT) SHALLREPEAT ROOM NUMBER ASSIGNED TO ROOM.MULTIPLE OPENINGS TO ROOM SHALL REPEATROOM NUMBER WITH A POSTSCRIPT LETTER FOREACH ADDITIONAL OPENING REQUIRED.

101 / 101A / 101B FOR NUMBER NEEDED

ROOM NAME AND NUMBER IDENTIFICATION

IDENTIFICATION NUMBER(NUMBER ON SHEET

WHERE DRAWN)

SHEET IDENTIFICATION(INDICATES SHEET

WHERE DRAWN)

WINDOW IDENTIFICATION

WALL IDENTIFICATION

CEILING HEIGHT IDENTIFICATION

LEVEL INDICATION

INDICATESDIRECTION OF VIEW

DESCRIPTION STARTS AT WALL SURFACEDESIGNATED

MATCHLINE IDENTIFICATION

REFERENCE SYMBOLS

8'-0"

1A101

1i

1t

0' - 2"

440 BurroughsSt.Detroit, MI 48202ph. 313.486.1908

www.centricdesignstudio.com

Do Not Scale Drawings

Date

Drawn by

Checked by

Client:

Project:

Location:

Consultants:

Seal:

Sheet Title:

Patrick Thompson Design485 Milwaukee Ave. Ste. 100C Detroit, MI 48202

313.820.3268www.patrickthompsondesign.com

Ghafari Associates, LLC17101 Michigan Ave. Dearborn, MI 48126 USA

TEL +1.313.441.3000www.ghafari.com

Project number

JMS Engineering Services32401 West 8 Mile, Suite 2-5

Livonia, MI 48152 | 313.399.2932

2/28

/201

3 7:

38:1

9 PM

AG.03

Reference Symbols +Abbreviations

02/22/13CM

S. LITTLE

12-29

TechTown First FloorRenovation

440 Burroughs St. - Detroit, MI

Date: Submitted for:

2/22/2013 PERMITS/BIDS

Page 4: TechTown 1st Floor Renovation

UP

Tectonic Copyright 2007

UP

UPDN

T

T

T

T

T

UP

UP

G.4

G

F.4

F

E.4

E

D.4

D

A.7

B

B.5

C.5

C

765432

A.9

G.2

1 8

H

A

A.8

3.6

G.5

EXISTMAINTENANCE

OFFICE

EXISTLOADING

DOCK

EXISTSTORAGE

EXISTSTORAGE

EXIST ELEVMACHINE

ROOMEXIST ELEV

NO 3

EXIST STAIRNO 3

EXISTCORRIDOR

EXISTGENERATOR

ROOM

EXIST BOILERROOM

EXIST ELEVNO 1 EXIST STAIR

NO 1

EXIST MEN

EXIST WOMEN

EXISTJC

EXIST STAIRNO 2

EXIST ELEVNO 2

EXISTVESTIBULE

EXIST FIREPUMP ROOM

EXIST IT

EXISTSTORAGE

EXISTSTORAGE

EXIST CONF

EXISTOFFICE

EXIST PRE FUNCTION

EXISTMAILBOXES

EXIST CONFEXIST CONF EXIST CONF EXIST CONF

EXIST OFFICE EXIST OFFICE EXIST OFFICE EXIST OFFICE EXIST OFFICE

EXIST CAFE

EXIST SERVICE

EXISTKITCHENEXIST COPY

ROOM

EXIST OPENOFFICE

EXISTSERVICE/SECURITY

DESK

EXIST OFFICE

EXIST OFFICE

EXISTSTORAGE

EXIST OFFICE

EXISTCORRIDOR

EXIST LUNCH

EXIST MECH

EXIST OFFICE

EXIST OFFICEEXIST OFFICE

EXIST OFFICE

EXIST CONF

EXIST CONF

EXISTSTORAGE

EXISTSTORAGE

EXISTSTORAGE EXIST OFFICE

EXIST OFFICE

EXIST CONF

EXIST OFFICE EXIST OFFICE EXIST OFFICE EXIST OFFICE

EXIST OFFICE

EXIST OPENOFFICE

EXIST OFFICE

EXISTUNISEX

EXISTOFFICE

EXIST OFFICEEXIST OFFICE

EXISTCORRIDOR

EXISTVESTIBULE

EXISTMAINTENANCE

OFFICE

EXISTKITCHENETTE

EXISTMAILBOXES

EXIST MECHEXIST OFFICE

150'

- 0"

30' - 6" 31' - 0" 10' - 7" 9' - 11" 33' - 0" 20' - 6" 33' - 0" 20' - 0"

188' - 6"

10' -

8"

2' -

8"1'

- 2"

6' -

6"10

' - 1

0"10

' - 1

0"10

' - 1

0"10

' - 1

0"10

' - 1

0"10

' - 1

0"10

' - 1

0"10

' - 1

0"10

' - 1

0"10

' - 1

0"6'

- 0"

6' -

2"8'

- 6"

1

1

11

8

1

1

10

1 10

1

10

1

8

1 1 1

1

1

11

1

8

11

1

1

1

1

1

1

1

1

1

1 1

1

1

1

1

1

1

11

1

1

8 1

1

1

1

1

1

1

11

1

1 1 1

1

18

1

8

18

1

3

11

1

8

1

1

11

1

1

1

11

1

11

1

1

1

1

1

1

1

11

1

1

2

9

1

1

1

3

1

8

11

1

1111

11

12

VIF

3' -

0"

1

14

13

13 13

3

3 33

313

13

13

13

13

EXISTING MILLWORKAND SINK TO REMAIN

11

8

16

A5.09 13

EXISTING CHASE TO REMAIN

19 1819

19

EXISTING TO BE REMOVED

EXISTING TO REMAIN

EXISTING FLOOR FINISH TO BE REMOVED

NIC - NOT IN CONTRACT

DEMOLITION - LEGEND

ALL WALLS, CEILINGS, DOORS AND FLOOR FINISHESSHALL BE REMOVED UNLESS NOTED OTHERWISE ORSHOWN AS REMAINING.

SEE MECH AND ELEC DEMO DRAWINGS FOR ADDITIONALDEMO WORK AND FOR SERVICES THAT MUST REMAINACTIVE.

SAWCUT AND REMOVE FLOOR SLAB AS REQUIRED FORUTILITIES. COORDINATE WITH MECH AND ELEC DRAWINGS.

PATCH AND REPAIR ALL EXISTING MATERIALSTO REMAIN AS NEEDED WHERE REMOVAL OF EXISTINGCONSTRUCTION OR WHERE THE REQUIRED OF NEWCONSTRUCTION, ALTERS THE EXISTING MATERIALS.

DEMO DRAWINGS SHOW GENERAL INTENT AND AREA.EXACT EXTENT IS TO BE DETERMINED BY FIELDVERIFICATION AND COORDINATION WITH THE CONTRACTDOCUMENTS. REFER TO PROJECT MANUAL FORADDITIONAL REQUIREMENTS. ALL CONDITIONS SHALLBE FIELD VERIFIED DURING BID PROCESS. NOTIFYARCHITECT AND/OR CONSTRUCTION MANAGER OF ALLCONDITIONS AFFECTING INTENT OF NEW CONSTRUCTION.

ALL DOOR HARDWARE TO BE REMOVED AND SALVAGED.TURN OVER TO OWNER'S REPRESENTATIVE UPONCOMPLETION OF DEMOLITION PHASE.

ALL ITEMS TO REMAIN SHALL BE CLEANED, INSPECTEDAND VERIFIED OF WORKING ORDER. NOTIFY ARCHITECT /ENGINEER AND OWNER'S REPRESENTATIVE IF ANY ITEMIS NOT IN WORKING ORDER.

CONTRACTOR TO LOCATE ON SITE INDIVIDUAL DUMPSTERFOR RECYCLE DEMOLITION ITEMS PER N.I.H. REGULATIONS.COORDINATE FINAL LOCATIONS WITH OWNER'SREPRESENTATIVE.

EXISTING FIRE EXIT SIGNS, STROBES, HORNS,SPEAKER AND SMOKE DETECTORS. SEE ARCHITECTURAL +ELECTRICAL DRAWINGS.

CONTRACTOR TO REMOVE ALL FURNITURE, FILE CABINETSAND STORAGE UNITS UNLESS OTHERWISE NOTED.

CONTRACTOR TO REMOVE ALL ART WORK, SIGNAGE,MARKER BOARDS, TACK BOARDS, PROJECTION SCREENSAND CLOCKS. SALVAGE AND COORDINATE STORAGE WITHOWNER FOR REUSE. SEE ARCHITECTURAL FOR REUSELOCATION.

ALL WORK TO CONFORM TO THE REQUIREMENTS OF THELOCAL AND STATE CODES.

SEE MECHANICAL, AND ELECTRICAL DEMOLITION DRAWINGSFOR ADDITIONAL SCOPE OF DEMOLITION AND NEW WORK.

DEMOLITION - GENERAL NOTES1.

2.

3.

4.

5.

6.

7.

8.

9.

10.

11.

12.

13.

10

1

2

3

REMOVE EXISTING PARTITION, DOORS AND ASSOCIATEDCOMPONENTS.

REMOVE PORTION OF WALL AND ASSOCIATED COMPONENTSAS REQUIRED FOR NEW OPENING.

REMOVE PLUMBING FIXTURES, SEE MECH FOR ADDITIONALSCOPE.

RECEPTION DESK TO REMAIN FOR PRECONSTRUCTIONPHASE- REMOVAL, DEMOLITION TO BE COORDINATED WITHCONSTRUCTION MANAGER.

REMOVE SIDE LITE, GLASS AND ASSOCIATEDCOMPONENTS.

REMOVE CARPET TILE FLOOR AS REQUIRED FOR WORK.SALVAGE FOR RECYCLING + COORDINATE STORAGE WITHOWNER.

REMOVE TILE FLOORING IN CAFE.

REMOVE EXISTING MILLWORK/CASEWORK AND ASSOCIATEDCOMPONENTS TO FACILITATE WORK.

REMOVE EXISTING EXHAUST FAN VENT FROM EXISTINGWINDOW PANE. SEE SHEET AD1.01 & MECH. FOR ADDITIONALSCOPE.

REMOVE EXISTING MAILBOXES AND ASSOCIATEDCOMPONENTS TO FACILITATE WORK. SALVAGE ANDCOORDINATE STORAGE WITH OWNER FOR REUSE. SEE A1.01FOR REUSE LOCATION.

REMOVE EXISTING DOOR, FRAME AND ASSOCIATEDCOMPONENTS TO FACILITATE WORK. (RECYLE DOORS).COORDINATE WITH CM/OWNER FOR STORAGE.

REMOVE EXISTING ACOUSTICAL PANEL AND ASSOCIATEDCOMPONENTS. EXISTING STUD FRAMING, GYP. BD. SOFFITAND GYP. BD. ON KITCHEN SIDE TO REMAIN.

REMOVE EXISTING EQUIPMENT.

REMOVE EXISTING ELECTRICAL EQUIPMENT. SEE ELEC. FORADDITIONAL SCOPE.

REMOVE ROLLER SHADES AND SALVAGE FOR REUSE.COORDINATE STORAGE WITH CM/ OWNER.

REMOVE EXISTING TUBE STEEL COLUMN AND HEADERPATCH / REPAIR FLOOR AS NEEDED TO FACILITATE NEWWORK.

REMOVE REACH-IN COOLER- STORE FOR REUSE-COORDINATE WITH CM/ OWNER.

EXISTING CARPET TILES TO REMAIN DURING 1ST PHASE OFDEMOLITION / CONSTRUCTION. TILE TO BE REMOVED ASREQUIRED FOR WORK. SALVAGE FOR REYCLING,COORDINATE STORAGE WITH OWNER. SEE SHEET AD1.02FOR TEMPORARY CONSTRUCTION LAYOUT. COORDINATEPHASING REMOVAL WITH CM / OWNER.

EXISTING CERAMIC FLOOR TILES TO REMAIN DURING 1STPHASE OF DEMOLITION / CONSTRUCTION. SEE SHEET AD1.02FOR TEMPORARY CONSTRUCTION LAYOUT. FLOOR TILES TOBE TO BE REMOVED AS REQUIRED FOR NEW WORK. FLOORAREA TO BE LEVELED, PATCHED, & PREPED FOR NEW FLOORFINISH. COORDINATE PHASING REMOVAL WITH CM / OWNER.

4

5

6

7

8

9

11

DEMOLITION - KEYNOTES

12

13

14

15

16

17

19

18

440 BurroughsSt.Detroit, MI 48202ph. 313.486.1908

www.centricdesignstudio.com

Do Not Scale Drawings

Date

Drawn by

Checked by

Client:

Project:

Location:

Consultants:

Seal:

Sheet Title:

Patrick Thompson Design485 Milwaukee Ave. Ste. 100C Detroit, MI 48202

313.820.3268www.patrickthompsondesign.com

Ghafari Associates, LLC17101 Michigan Ave. Dearborn, MI 48126 USA

TEL +1.313.441.3000www.ghafari.com

Project number

JMS Engineering Services32401 West 8 Mile, Suite 2-5

Livonia, MI 48152 | 313.399.2932

2/28

/201

3 7:

34:1

2 PM

AD1.01

First Floor DemolitionPlan

02/22/13CM

D. Thomas

12-29

TechTown First FloorRenovation

440 Burroughs St. - Detroit, MI

1/8" = 1'-0"A5.051 FIRST FLOOR DEMOLITION PLAN

1/18/2013 QUALITY REVIEW2/22/2013 PERMITS/BIDS

Date: Submitted for:

NOTE TO CONTRACTOR

THIS IS A HISTORICALLY DESIGNATED BUILDING. WINDOWS ARE TO REMAINAS IS. CONTACT ARCHITECT FOR ORIGINAL BUILDING DOCUMENTS ANDSTATE HISTORIC PRESERVATION OFFICE DOCUMENTS, IF REQUIRED.

REFERENCE SHEETS AD3.01 & AD3.02 FOR FURTHER CLARITY OFDEMOLITION SCOPE.

SEE SHEET A1.01, MECH & ELEC DRAWINGS FOR REQUIRED FLOOR SAW CUTLOCATIONS.

Page 5: TechTown 1st Floor Renovation

UP

Tectonic Copyright 2007

UP

UPDN

T

T

T

T

G.4

G

F.4

F

E.4

E

D.4

D

A.7

B

B.5

C.5

C

765432

A.9

G.2

1 8

H

A

A.8

3.6

G.5

1' - 6"

RELOCATION OFEXISTING MAILBOXESFOR TEMPORARYCONSTRUCTION(TYP)

EXIST SERVICE/SECURITY DESK

EXISTVESTIBULE

EXISTSERVICE/SECURITY

DESK

EXIST STAIRNO 2

EXIST ELEVNO 2

PRIOR TO DEMOKEEP EXISTING BACKWALL (V.I.F.)

31' - 1"

15' -

2"

A

A

A

A

PROVIDE TEMPORARY HEATING AND COOLING FOR TEMPORARYRECEPTION/ ELEVATOR AREA DURING CONSTRUCTION.

PROVIDE TEMPORARY DATA AND TELEPHONE FOR TEMPORARYRECEPTION/ ELEVATOR LOBBY DURING CONSTRUCTION.

PROVIDE TEMPORARY ELECTRIC AND LIGHTING WITH LOCALSWICTH WITH ADEQUATE ILLUMINATION FOR OWNER USE OFTEMPORARYRECEPTION/ EVEVATOR AREA DURINGCONSTRUCTION.

TEMPORARY CONSTRUCTION DRAWINGS SHOW GENERAL INTENTAND AREA. EXACT EXTENT IS TO BE DETERMINED BY FIELDVERIFICATION AND COORDINATION WITH THE CONTRACTDOCUMENTS. ALL CONDITIONS SHALL BE FIELD VERIFIED DURINGBID PROCESS. NOTIFY ARCHITECT AND/OR CONSTRUCTIONMANAGER OF ALL CONDITIONS AFFECTING INTENT OF TEMPORARYCONSTRUCTION RECEPTION / ELEVATOR LOBBY.

ALL TEMPORARY CONSTRUCTION ITEMS TO REMAIN SHALL BECLEANED, INSPECTED AND VERIFIED OF WORKING ORDER. NOTIFYARCHITECT / ENGINEER AND OWNER'S REPRESENTATIVE IF ANYITEM IS NOT IN WORKING ORDER.

REUSE EXISTING FIRE EXIT SIGNS, STROBES, HORNS,AND SMOKE DETECTORS.

PROVIDE DUST FREE PARTITIONS AND TRAFFIC AREA INTEMPORARY RECEPTION/ ELEVATOR LOBBY DURINGCONSTRUCTION.

REUSE OF EXISTING OWNER'S MAILBOXES IS TWO PHASED-PHASE 1- TEMPORARY CONSTRUCTION AREA - RECEPTION/ELEVATOR LOBBY.PHASE 2 - FINAL LAYOUT- MAILBOXES ROOM #118

TEMPORARY CONSTRUCTION -GENERAL NOTES

1.

2.

3.

4.

5.

6.

7.

8.

440 BurroughsSt.Detroit, MI 48202ph. 313.486.1908

www.centricdesignstudio.com

Do Not Scale Drawings

Date

Drawn by

Checked by

Client:

Project:

Location:

Consultants:

Seal:

Sheet Title:

Patrick Thompson Design485 Milwaukee Ave. Ste. 100C Detroit, MI 48202

313.820.3268www.patrickthompsondesign.com

Ghafari Associates, LLC17101 Michigan Ave. Dearborn, MI 48126 USA

TEL +1.313.441.3000www.ghafari.com

Project number

JMS Engineering Services32401 West 8 Mile, Suite 2-5

Livonia, MI 48152 | 313.399.2932

3/1/

2013

12:

10:5

5 PM

AD1.02

TemporaryConstruction Plan

02/22/13CM

S.LITTLE

12-29

TechTown First FloorRenovation

440 Burroughs St. - Detroit, MI

1/8" = 1'-0"A5.051 FIRST FLOOR TEMPORARY CONSTRUCTION PLAN

Date: Submitted for:

2/22/2013 PERMITS/BIDS

NOTE TO CONTRACTOR

TEMPORARY CONSTRUCTION PLAN TO BE VERIFY BYCONSTRUCTION MANAGER AND SUBCONTRACTORS.

THE INTENT OF THE TEMPORARY CONSTRUCTION PLANIS TO GIVE THE CONTRACTOR A BASIS TO PRICE ANDCONSTRUCT TEMPORARY PARTITIONS TO ALLOWBUILDING ACCESS FOR THE TENANTS OF THE BUILDINGON THE UPPER FLOORS, TENANTS MAIL BOX ACCESSAND RECEPTION DESK FUNCTIONS. PARTITION LAYOUT,EGRESS ACCESS, CONTRACTOR ACCESS POINTS ARETO BE VERIFIED WITH CONSTRUCTION MANAGER ANDBUILT TO STATE CODES.

NOTE TO CONTRACTOR

LAYOUT MUST ACCOMMODATE (19) EXISTINGRELOCATED MAILBOXES- TEMPORARY CONSTRUCTIONLAYOUT SHOW FOR PRICING ONLY.

Page 6: TechTown 1st Floor Renovation

G.4

G

F.4

F

E.4

E

D.4

D

A.7

B

B.5

C.5

C

765432

A.9

G.2

1 8

H

A

A.8

3.6

G.5

EXISTMAINTENANCE

OFFICE

EXISTLOADING

DOCK

EXISTSTORAGE

EXISTSTORAGE

EXIST ELEVMACHINE

ROOMEXIST ELEV

NO 3

EXIST STAIRNO 3

EXISTGENERATOR

ROOM

EXIST BOILERROOM

EXIST ELEVNO 1 EXIST STAIR

NO 1

EXIST MEN

EXIST WOMEN

EXISTJC

EXIST STAIRNO 2

EXIST ELEVNO 2

EXIST PUMPROOM

EXIST IT

EXISTSTORAGE

EXISTSTORAGE

EXIST CONF

EXISTOFFICE

EXIST PRE FUNCTION

EXISTMAILBOXES

EXIST CONF

EXIST CONF EXIST CONF EXIST CONFEXIST OFFICE EXIST OFFICE EXIST OFFICE EXIST OFFICE EXIST OFFICE

EXIST CAFE

EXIST SERVICE

EXIST COPYROOM

EXIST OPENOFFICE

EXISTSERVICE/SECURITY

DESK

EXIST OFFICE

EXIST OFFICE

EXISTSTORAGE

EXIST OFFICE

EXISTCORRIDOR

EXISTKITCHEN

EXIST LUNCH

EXIST MECH

EXIST OFFICEEXIST OFFICE

EXIST OFFICE

EXIST CONF EXIST CONF

EXISTSTORAGE

EXISTSTORAGE EXIST OFFICE

EXIST CONF

EXIST OFFICE EXIST OFFICE EXIST OFFICE EXIST OFFICE

EXIST OFFICE

EXIST OPENOFFICE

EXIST OFFICE

EXISTOFFICE

EXIST OFFICEEXIST OFFICE

EXISTVESTIBULE

EXISTMAINTENANCE

OFFICE

EXISTMAINTENANCE

OFFICE

EXISTLOADING

DOCK

EXISTSTORAGE

EXISTSTORAGE

EXIST ELEVMACHINE

ROOMEXIST ELEV

NO 3

EXIST STAIRNO 3

EXISTCORRIDOR

EXISTGENERATOR

ROOM

EXIST BOILERROOM

EXIST ELEVNO 1 EXIST STAIR

NO 1

EXIST MEN

EXIST WOMEN

EXISTJC

EXIST STAIRNO 2

EXIST ELEVNO 2

EXISTVESTIBULE

EXIST PUMPROOM

EXIST IT

EXISTSTORAGE

EXISTSTORAGE EXIST

KITCHEN

EXIST CONF

EXISTOFFICE

EXIST PRE FUNCTION

EXISTMAILBOXES

EXIST CONF

EXIST CONF EXIST CONF EXIST CONFEXIST OFFICE EXIST OFFICE EXIST OFFICE EXIST OFFICE EXIST OFFICE

EXIST CAFE

EXIST SERVICE

EXIST KITCHEN

EXIST COPYROOM

EXIST OPENOFFICE

EXISTSERVICE/SECURITY

DESK

EXIST OFFICE

EXIST OFFICE

EXISTSTORAGE

EXIST OFFICE

EXISTCORRIDOR

EXISTKITCHEN

EXIST LUNCH

EXIST MECH

EXIST OFFICE EXIST OFFICEEXIST OFFICE

EXIST OFFICE

EXIST CONF EXIST CONF

EXIST CONF

EXISTSTORAGE

EXISTOFFICE

EXISTSTORAGE EXIST OFFICE

EXIST OFFICE

EXIST CONF

EXIST OFFICE EXIST OFFICE EXIST OFFICE EXIST OFFICE

EXIST OFFICE

EXIST OPENOFFICE

EXIST OFFICE

EXISTUNISEX

EXISTOFFICE

EXIST OFFICEEXIST OFFICE

EXISTCORRIDOR

EXISTVESTIBULE

EXISTMAINTENANCE

OFFICE

30' - 6" 31' - 0" 10' - 7" 9' - 11" 33' - 0" 20' - 6" 33' - 0" 20' - 0"

188' - 6"

10' -

8"

2' -

8"1'

- 2"

6' -

6"10

' - 1

0"10

' - 1

0"10

' - 1

0"10

' - 1

0"10

' - 1

0"10

' - 1

0"10

' - 1

0"10

' - 1

0"10

' - 1

0"10

' - 1

0"6'

- 0"

6' -

2"8'

- 6"

150'

- 0"

N.I.C

N.I.CN.I.C

N.I.CN.I.CN.I.CN.I.C

N.I.C

N.I.C

N.I.C. - NOT IN CONTRACT

7

4

4

7

11 TYP.TYP.

6

6TYP.

TYP.

8TYP.

6

6

6

6

3

3

5

66 TYP.

10

10

10

1 TYP.

1 TYP.

1 TYP.

7 TYP.

7 TYP.

9TYP.

9TYP.

9 TYP.

6

1 TYP.

1 TYP.

1 TYP.

1 TYP.

1 TYP.

1 TYP.

4444

4

4

4

44

4

4

4

1 TYP.

1 TYP.

1 TYP.

1 TYP.

1 TYP.

1 TYP.

1 TYP.

1 TYP.

8TYP.

8TYP.

8 TYP.

6 TYP.

2

9 TYP.

11

DEMOLITION CEILING LEGEND

RECESSED CANLIGHT FIXTURE

2X4 PARABOLIC(REUSE)

LINEAR SUSPENDED

REMOVE EXISTING LINEAR LIGHT FIXTURE ANDASSOCIATED COMPONENTS TO FACILITATE WORK.SALVAGE + COORDINATE STORAGE WITH OWNERFOR REUSE.

MAIN DUCT WORK RUNS TO REMAIN. COORDINATEWITH MECHANICAL DRAWINGS.

REMOVE EXISTING GYP. BD. CEILING, ANDASSOCIATED COMPONENTS REQUIRED TO FACILITATEWORK.

REMOVE EXISTING LAY-IN CEILING +GRID ANDASSOCIATED COMPONENTS REQUIRED TO FACILITATEWORK.

REMOVE EXISTING ACOUSTICAL PANEL CEILINGCLOUD AND ASSOCIATED COMPONENTS REQUIREDTO FACILITATE WORK.

STORE EXISTING RECESSED CAN LIGHT FIXTURE FORRECYCLING /SALVAGE + COORDINATE STORAGE WITHOWNER FOR REUSE.

REMOVE EXISTING ACOUSTICAL LAY-IN CLOUD ANDASSOCIATED COMPONENTS.

EXISTING 2X4 PARABOLIC FIXTURE RECESSED.SALVAGE + COORDINATE STORAGE WITH OWNER.

EXISTING LIGHT FIXTURE TO REMAIN. CONTRACTORTO CLEAN FIXTURE AND/OR LENS COVERS AFTERCONSTRUCTION.

EXISTING CEILING TO REMAIN.

REMOVE EXISTING TRACK LIGHTING.

1

2

3

4

5

6

7

8

9

CEILING DEMOLITION - KEYNOTES

10

11

ALL WALLS, CEILINGS, DOORS AND FLOOR FINISHESSHALL BE REMOVED UNLESS NOTED OTHERWISE ORSHOWN AS REMAINING.

SEE MECH AND ELEC DEMO DRAWINGS FOR ADDITIONALDEMO WORK AND FOR SERVICES THAT MUST REMAINACTIVE.

SAWCUT AND REMOVE FLOOR SLAB AS REQUIRED FORUTILITIES. COORDINATE WITH MECH AND ELEC DRAWINGS.

PATCH AND REPAIR ALL EXISTING MATERIALSTO REMAIN AS NEEDED WHERE REMOVAL OF EXISTINGCONSTRUCTION OR WHERE THE REQUIRED OF NEWCONSTRUCTION, ALTERS THE EXISTING MATERIALS.

DEMO DRAWINGS SHOW GENERAL INTENT AND AREA.EXACT EXTENT IS TO BE DETERMINED BY FIELDVERIFICATION AND COORDINATION WITH THE CONTRACTDOCUMENTS. REFER TO PROJECT MANUAL FORADDITIONAL REQUIREMENTS. ALL CONDITIONS SHALLBE FIELD VERIFIED DURING BID PROCESS. NOTIFYARCHITECT AND/OR CONSTRUCTION MANAGER OF ALLCONDITIONS AFFECTING INTENT OF NEW CONSTRUCTION.

ALL DOOR HARDWARE TO BE REMOVED AND SALVAGED.TURN OVER TO OWNER'S REPRESENTATIVE UPONCOMPLETION OF DEMOLITION PHASE.

ALL ITEMS TO REMAIN SHALL BE CLEANED, INSPECTEDAND VERIFIED OF WORKING ORDER. NOTIFY ARCHITECT /ENGINEER AND OWNER'S REPRESENTATIVE IF ANY ITEMIS NOT IN WORKING ORDER.

CONTRACTOR TO LOCATE ON SITE INDIVIDUAL DUMPSTERFOR RECYCLE DEMOLITION ITEMS PER N.I.H. REGULATIONS.COORDINATE FINAL LOCATIONS WITH OWNER'SREPRESENTATIVE.

EXISTING FIRE EXIT SIGNS, STROBES, HORNS,SPEAKER AND SMOKE DETECTORS. SEE ARCHITECTURAL +ELECTRICAL DRAWINGS.

CONTRACTOR TO REMOVE ALL FURNITURE, FILE CABINETSAND STORAGE UNITS UNLESS OTHERWISE NOTED.

CONTRACTOR TO REMOVE ALL ART WORK, SIGNAGE,MARKER BOARDS, TACK BOARDS, PROJECTION SCREENSAND CLOCKS. SALVAGE AND COORDINATE STORAGE WITHOWNER FOR REUSE. SEE ARCHITECTURAL FOR REUSELOCATION.

ALL WORK TO CONFORM TO THE REQUIREMENTS OF THELOCAL AND STATE CODES.

SEE MECHANICAL, AND ELECTRICAL DEMOLITION DRAWINGSFOR ADDITIONAL SCOPE OF DEMOLITION AND NEW WORK.

DEMOLITION - GENERAL NOTES1.

2.

3.

4.

5.

6.

7.

8.

9.

10.

11.

12.

13.

440 BurroughsSt.Detroit, MI 48202ph. 313.486.1908

www.centricdesignstudio.com

Do Not Scale Drawings

Date

Drawn by

Checked by

Client:

Project:

Location:

Consultants:

Seal:

Sheet Title:

Patrick Thompson Design485 Milwaukee Ave. Ste. 100C Detroit, MI 48202

313.820.3268www.patrickthompsondesign.com

Ghafari Associates, LLC17101 Michigan Ave. Dearborn, MI 48126 USA

TEL +1.313.441.3000www.ghafari.com

Project number

JMS Engineering Services32401 West 8 Mile, Suite 2-5

Livonia, MI 48152 | 313.399.2932

2/28

/201

3 7:

35:4

3 PM

AD2.01

First Floor DemolitionReflected Ceiling Plan

02/22/13C.M

S. LITTLE

12-29

TechTown First FloorRenovation

440 Burroughs St. - Detroit, MI

1/8" = 1'-0"A5.051 DEMOLITION FIRST FLOOR REFLECTED CEILING PLAN

1/18/2013 QUALITY REVIEW2/22/2013 PERMITS/BIDS

Date: Submitted for:

NOTE TO CONTRACTOR:

196 REUSED LENIAR LIGHTING FIXTURES. SAVE 20% FOR PARTS USEDFOR RETROFITTING FIXTURES. CONTRACTOR TO FEILD VERIFY LIGHTINGFIXTURE COUNT.

Page 7: TechTown 1st Floor Renovation

10

1

2

3

REMOVE EXISTING PARTITION, DOORS AND ASSOCIATEDCOMPONENTS.

REMOVE PORTION OF WALL AND ASSOCIATED COMPONENTSAS REQUIRED FOR NEW OPENING.

REMOVE PLUMBING FIXTURES, SEE MECH FOR ADDITIONALSCOPE.

RECEPTION DESK TO REMAIN FOR PRECONSTRUCTIONPHASE- REMOVAL, DEMOLITION TO BE COORDINATED WITHCONSTRUCTION MANAGER.

REMOVE SIDE LITE, GLASS AND ASSOCIATEDCOMPONENTS.

REMOVE CARPET TILE FLOOR AS REQUIRED FOR WORK.SALVAGE FOR RECYCLING + COORDINATE STORAGE WITHOWNER.

REMOVE TILE FLOORING IN CAFE.

REMOVE EXISTING MILLWORK/CASEWORK AND ASSOCIATEDCOMPONENTS TO FACILITATE WORK.

REMOVE EXISTING EXHAUST FAN VENT FROM EXISTINGWINDOW PANE. SEE SHEET AD1.01 & MECH. FOR ADDITIONALSCOPE.

REMOVE EXISTING MAILBOXES AND ASSOCIATEDCOMPONENTS TO FACILITATE WORK. SALVAGE ANDCOORDINATE STORAGE WITH OWNER FOR REUSE. SEE A1.01FOR REUSE LOCATION.

REMOVE EXISTING DOOR, FRAME AND ASSOCIATEDCOMPONENTS TO FACILITATE WORK. (RECYLE DOORS).COORDINATE WITH CM/OWNER FOR STORAGE.

REMOVE EXISTING ACOUSTICAL PANEL AND ASSOCIATEDCOMPONENTS. EXISTING STUD FRAMING, GYP. BD. SOFFITAND GYP. BD. ON KITCHEN SIDE TO REMAIN.

REMOVE EXISTING EQUIPMENT.

REMOVE EXISTING ELECTRICAL EQUIPMENT. SEE ELEC. FORADDITIONAL SCOPE.

REMOVE ROLLER SHADES AND SALVAGE FOR REUSE.COORDINATE STORAGE WITH CM/ OWNER.

REMOVE EXISTING TUBE STEEL COLUMN AND HEADERPATCH / REPAIR FLOOR AS NEEDED TO FACILITATE NEWWORK.

REMOVE REACH-IN COOLER- STORE FOR REUSE-COORDINATE WITH CM/ OWNER.

EXISTING CARPET TILES TO REMAIN DURING 1ST PHASE OFDEMOLITION / CONSTRUCTION. TILE TO BE REMOVED ASREQUIRED FOR WORK. SALVAGE FOR REYCLING,COORDINATE STORAGE WITH OWNER. SEE SHEET AD1.02FOR TEMPORARY CONSTRUCTION LAYOUT. COORDINATEPHASING REMOVAL WITH CM / OWNER.

EXISTING CERAMIC FLOOR TILES TO REMAIN DURING 1STPHASE OF DEMOLITION / CONSTRUCTION. SEE SHEET AD1.02FOR TEMPORARY CONSTRUCTION LAYOUT. FLOOR TILES TOBE TO BE REMOVED AS REQUIRED FOR NEW WORK. FLOORAREA TO BE LEVELED, PATCHED, & PREPED FOR NEW FLOORFINISH. COORDINATE PHASING REMOVAL WITH CM / OWNER.

4

5

6

7

8

9

11

DEMOLITION - KEYNOTES

12

13

14

15

16

17

19

18

1

11

1

1

11

1

13

3

3

33

3 3

8

8

13

13

8

8

8

8

10 1010

1

8

8

4

8

1211

11

1111

17

14

1

11

1

PICTURES TAKEN @ EXISTING CAFE ENTRY

PICTURES TAKEN @ RECEPTION AREA PICTURES TAKEN EXISTINGLUNCH ROOM AREA

PICTURES TAKEN @ MAILROOM AREA

PICTURES TAKEN OF TYPICAL DEMOLITION CONDITIONS

PICTURES TAKEN @ EXISTING CAFE KITCHEN PICTURES TAKEN @EXISTING CAFE RESTROOM

9

15

15

5

15

181818

440 BurroughsSt.Detroit, MI 48202ph. 313.486.1908

www.centricdesignstudio.com

Do Not Scale Drawings

Date

Drawn by

Checked by

Client:

Project:

Location:

Consultants:

Seal:

Sheet Title:

Patrick Thompson Design485 Milwaukee Ave. Ste. 100C Detroit, MI 48202

313.820.3268www.patrickthompsondesign.com

Ghafari Associates, LLC17101 Michigan Ave. Dearborn, MI 48126 USA

TEL +1.313.441.3000www.ghafari.com

Project number

JMS Engineering Services32401 West 8 Mile, Suite 2-5

Livonia, MI 48152 | 313.399.2932

2/28

/201

3 7:

36:0

9 PM

AD3.01

Demolition Photos

02/22/13SR

S. LITTLE

12-29

TechTown First FloorRenovation

440 Burroughs St. - Detroit, MI

1/18/2013 QUALITY REVIEW

2/22/2013 PERMITS/BIDS

Date: Submitted for:

Page 8: TechTown 1st Floor Renovation

REMOVE EXISTING LINEAR LIGHT FIXTURE ANDASSOCIATED COMPONENTS TO FACILITATE WORK.SALVAGE + COORDINATE STORAGE WITH OWNERFOR REUSE.

MAIN DUCT WORK RUNS TO REMAIN. COORDINATEWITH MECHANICAL DRAWINGS.

REMOVE EXISTING GYP. BD. CEILING, ANDASSOCIATED COMPONENTS REQUIRED TO FACILITATEWORK.

REMOVE EXISTING LAY-IN CEILING +GRID ANDASSOCIATED COMPONENTS REQUIRED TO FACILITATEWORK.

REMOVE EXISTING ACOUSTICAL PANEL CEILINGCLOUD AND ASSOCIATED COMPONENTS REQUIREDTO FACILITATE WORK.

STORE EXISTING RECESSED CAN LIGHT FIXTURE FORRECYCLING /SALVAGE + COORDINATE STORAGE WITHOWNER FOR REUSE.

REMOVE EXISTING ACOUSTICAL LAY-IN CLOUD ANDASSOCIATED COMPONENTS.

EXISTING 2X4 PARABOLIC FIXTURE RECESSED.SALVAGE + COORDINATE STORAGE WITH OWNER.

EXISTING LIGHT FIXTURE TO REMAIN. CONTRACTORTO CLEAN FIXTURE AND/OR LENS COVERS AFTERCONSTRUCTION.

EXISTING CEILING TO REMAIN.

REMOVE EXISTING TRACK LIGHTING.

1

2

3

4

5

6

7

8

9

CEILING DEMOLITION - KEYNOTES

10

11

12

11 12

92

7

3

63

6

4

8

5

6

1

7

4

8

TECHTOWN GENERAL LIGHTING CONDITIONS

440 BurroughsSt.Detroit, MI 48202ph. 313.486.1908

www.centricdesignstudio.com

Do Not Scale Drawings

Date

Drawn by

Checked by

Client:

Project:

Location:

Consultants:

Seal:

Sheet Title:

Patrick Thompson Design485 Milwaukee Ave. Ste. 100C Detroit, MI 48202

313.820.3268www.patrickthompsondesign.com

Ghafari Associates, LLC17101 Michigan Ave. Dearborn, MI 48126 USA

TEL +1.313.441.3000www.ghafari.com

Project number

JMS Engineering Services32401 West 8 Mile, Suite 2-5

Livonia, MI 48152 | 313.399.2932

2/28

/201

3 7:

36:2

8 PM

AD3.02

Demolition Photos

02/22/13SR

S. LITTLE

12-29

TechTown First FloorRenovation

440 Burroughs St. - Detroit, MI

1/18/2013 QUALITY REVIEW2/22/2013 PERMITS/BIDS

Date: Submitted for:

Page 9: TechTown 1st Floor Renovation

UP

UP

UPDN

T

T

T

T

UP

UP

G.4

G

F.4

F

E.4

E

D.4

D

A.7

B

B.5

C.5

C

765432

A.9

G.2

6' -

0"

ELEC109

1 8

H

A

A.8

3.6

G.5

RECEPTION/SECURITYDESK129

STORAGE A107

TECH TOWNMANAGEMENT

103

STORAGE B120

A5.08

KRESGECONNECT VIDEOCONFERENCING

108

EVENTSPACE 2

125

EVENTSPACE 1

126

CONFERENCEROOM 1

127 CONFERENCEROOM 2

128

CONFROOM 5

124

TECH TOWNCONF RM

105

DIRECTORSOFFICE

104

COPYCENTER

137

A5.014

A5.034

COORIDOR 4119

ELEVATORLOBBY

102

MEETINGRM 4117

MTGRM 3116

MTGRM 2115

MEETINGRM 1114

A5.033

EXISTMAINTENANCE

OFFICE

EXISTLOADING

DOCK

EXISTSTORAGE

EXISTSTORAGE

EXIST ELEVMACHINE

ROOMEXIST ELEV

NO 3

EXIST STAIRNO 3

EXISTCORRIDOR

EXISTGENERATOR

ROOM

EXIST BOILERROOM

EXIST STAIRNO 1

EXIST MEN

EXIST WOMEN

EXISTJC

EXIST STAIRNO 2

EXIST ELEVNO 2

EXISTINGFIRE PUMP

ROOMEXIST IT

COPIER/PRINTER

CO-WORKINGAREA - A

136

COORIDOR 1110

PHONE132

PHONE133

PHONE134

CO-WORKINGAREA - B

130

CO-WORKINGCONFERNCE

135

EXIST MECHROOM

COORIDOR 2111

TRAINING/ACCELERATION112

KITCHENETTE B013 KITCHEN

AREA131

5' -

6"8'

- 0"

5' -

6"5'

- 10

"8'

- 0"

5' -

10"

A5.036

3A5.10

6' -

2"

17' - 6"

A5.032

A5.011

30' - 6" 31' - 0" 10' - 7" 9' - 11" 33' - 0" 20' - 6" 33' - 0" 20' - 0"

188' - 6"

10' -

8"

2' -

8"1'

- 2"

6' -

6"10

' - 1

0"10

' - 1

0"10

' - 1

0"10

' - 1

0"10

' - 1

0"10

' - 1

0"10

' - 1

0"10

' - 1

0"10

' - 1

0"10

' - 1

0"6'

- 0"

6' -

2"8'

- 6"

150'

- 0"

KITCHENETTE A106

B

A1

A1

A1

A1

A1

A1A1

B

B

A1

A

A1

A5.082

A6.011

WOOD BENCH

LOCKERS

B

A

A

C

A

B

B

A1 A1

A1

A1

1A5.10

A1

A1

A1

A1

A1

C

A1

B

126A

125A

124123122

120

105

104

102

127

126B

128

125B

139

132 133 134109

117

114

126C

125C

VESTIBULE101

13' - 0"

10' -

11"

+/-

5

1

A5.08

6

A5.087

A5.08

9

A5.0910

A5.08

10

8

A5.09 7

13' -

4" +

/-

EQ EQ

12' -

6"

42' -

6"

15' -

0"

5' -

3"

EQEQ

44' - 11"

A5.035

19' -

2"

6' -

11"

14' -

4"

5' -

3"

A5.015

1' - 3"

LINE OF RECEPTION/SECURITY DESK. SEEA5.01

A6.012

A6.016

A6.014

A5.05

1

116115

A5.012

A5.031

A5.038

103

108

112

15' - 0" 14' - 5" 15' - 0"

CONFROOM 4

123

CONFROOM 3

122

A5.10

7

4A5.10

MAINTENANCEROOM

139

CLEAR OPENING

16' - 10"

CLEAR OPENING

20' - 0"

OPERABLEPARTITION

1' -

4"

1' -

7"

LINE OFOVERHEAD DOORABOVE (TYP)

A6.013

A6.013

Sim

OPERABLEPARTITION

A6.013

Sim

108A108B108C

A

A1

REPAIR EXISTFLOOR TO MATCH

A5.09

A5.09

11

17' -

8"

140

28' -

1"

A

A

E

A

6" S

TUD

5' -

2"

8'-6" TALL GYP BDON METAL STUDPARTITION

A5.09

8

FEC

FEC

FEC

FEC

C

FEC

7' -

6"

A5.09

14

A5.09

15

A5.10

5

2A5.10

A5.09

15Sim

12 A5.09 12

Sim

A6.021

Sim

A6.021

Sim

A1

ALIGN EXISTAND NEWPARTITIONS

PARTITION TOBE 6" STUD

FRO

M D

ESK

6' -

6" C

LEAR

VIDEO CONF. TVOF/CI

A5.054

A5.05 5

6

6" STUDPARTITION

VIDEO CONF.TV OF/CI

VIDEOCONF.TVOF/CI

N.I.C. - NOT IN CONTRACT

A6.0213

ESTIMATED AREAS OF EXIST.CONC. SLAB TO BE CUT ANDPATCHED FOR NEWUNDERGROUND UTILITIES.COORDINATE WITHMECHANICAL ANDELECTRICAL SHEETS FOREXACT LOCATIONS (TYP.)

CLEAR

9' - 2" 12' - 8"

A5.09

8 Sim

A1

A1

ALIG

NR

ECEP

TIO

N D

ESK

WIT

H P

ARTI

TIO

N

A6.0212

EXISTING DOOR, SEEDOOR SCHEDULESHEET A7.01

141

COORIDOR 3121

MAIL BOXES118

SAW CUT FLOOR AREAS FORUNDERGROUND UTILITIES

11' - 11"

10' - 7"

REMOVE EXISTING PANICDOOR HARDWARE. PROVIDENEW DELAYED EGRESS PANICHARDWARE PER BASIS OFDESIGN DETEX DE EasyKit

IT SHALL BE EACH TRADE CONTRACTORSRESPONSIBILITY TO VISIT THE SITE AND FAMILIARIZEHIMSELF/ HERSELF WITH ALL EXISTING CONDITIONS.EACH CONTRACTOR SHALL TAKE ALL NECESSARY FIELDMEASUREMENTS AND OTHERWISE VERIFY ALLDIMENSIONS AND EXISTING CONSTRUCTION CONDITIONSINDICATED AND/ OR SHOWN ON THE DRAWINGS. SHOULDANY ERROR OR INCONSISTENCY EXIST, THE CONTRACTORSHALL NOT PROCEED WITH THE WORK AFFECTEDTHEREBY UNTIL REPORTING THE SAME TO THEARCHITECT AND OWNER REPRESENTATIVE FORCLARIFICATION AND/ OR CORRECTION.

DIMENSIONS FOLLOWED BY +/- SHALL BE REVIEWEDAND ALL NECESSARY ADJUSTMENTS MADE PRIOR TOFABRICATION AND/OR INSTALLATION OF ANYDISCREPANCIES BEFORE PROCEEDING WITH THE WORK.NOTIFY ARCHITECT/ENGINEER OF ANY DISCREPANCIESBEFORE PROCEEDING WITH THE WORK.

VERIFY QUANTITY, SIZE AND LOCATION OF ALL FLOORAND WALL OPENINGS FOR MECHANICAL AND ELECTRICALWORK WITH THE APPROPRIATE TRADE. PROVIDE ALLOPENINGS SHOWN OR REQUIRED FOR COMPLETION OFWORK.

PROVIDE FIRE WATCH DURING FIELD CUTTING ANDWELDING OPERATIONS MEETING OWNERS REQUIRED.

THE CONTRACTOR SHALL VERIFY THE EXISTENCE ANDLOCATION OF ALL UTILITIES IN WORK AREAS PRIOR TOPROCEEDING WITH CONSTRUCTION. ALL DISCREPANCIESSHALL BE DOCUMENTED AND FORWARDED TO ARCHITECTAND OWNER REPRESENTATIVE OF ACTION.

IT IS THE CONTRACTOR RESPONSIBILITY TO INVESTIGATEFIELD CONDITIONS AND PROVIDE AS NEEDED TEMPORARYSUPPORTS, SHORING AND STRUCTURES ANDUNDERGROUND UTILITIES DURING EXECUTION ALLPHASES OF WORK.

RELEVANT DIMENSIONS AND ELEVATIONS FOREQUIPMENT INSTALLATIONS SHALL BE VERIFIED AGAINSTMANUFACTURES CERTIFIED EQUIPMENT DRAWINGS.

ALL NEW GYPSUM BOARD CONSTRUCTION TO BE PRIMEDAND PAINTED TO MATCH THE EXISTING ADJACENTCONSTRUCTION. VERIFY EXTEND OF PAINTING WITHARCHITECT AND OWNER REPRESENTATIVE FORCLARIFICATION AND/ OR ACTION. PROVIDE NEW WB-1 ATNEWLY CREATED ROOMS PARTITIONS AND EXISTINGEXTERIOR CONCRETE WALLS (SEE 8.02 FOR FINISHES).

DO NOT SCALE DRAWINGS TO DETERMINE SIZES ANDDIMENSIONS. USE FIGURED DIMENSIONS ONLY.DIMENSIONS ARE TO FINISHEDFACE OF WALLS UNLESS OTHERWISE NOTED. ALLPERIMETER DIMENSION ARE FROM FACE OF PERIMETERWALLS.

ALL PENETRATIONS TO RATED FLOORS, CEILINGS ANDWALLS SHALL BE SEALED AND FIRE STOPPED TO FIRERATING EQUAL TO THE CONSTRUCTION BEINGPENETRATED.

NEW WORK SHALL ALIGN TO MATCH EXISTING WORKUNLESS NOTED OTHERWISE.

SEE SHEET A6.01 FOR WALL TYPE DETAILS.

ALL WORK TO CONFORM TO REQUIREMENTS OF THELOCAL AND STATE CODES.

CONSTRUCTION - GENERAL NOTES1.

2.

3.

4.

5.

6.

7.

8.

9.

10.

11.

12.

13.

440 BurroughsSt.Detroit, MI 48202ph. 313.486.1908

www.centricdesignstudio.com

Do Not Scale Drawings

Date

Drawn by

Checked by

Client:

Project:

Location:

Consultants:

Seal:

Sheet Title:

Patrick Thompson Design485 Milwaukee Ave. Ste. 100C Detroit, MI 48202

313.820.3268www.patrickthompsondesign.com

Ghafari Associates, LLC17101 Michigan Ave. Dearborn, MI 48126 USA

TEL +1.313.441.3000www.ghafari.com

Project number

JMS Engineering Services32401 West 8 Mile, Suite 2-5

Livonia, MI 48152 | 313.399.2932

3/1/

2013

12:

09:4

5 PM

A1.01

First Floor Plan

02/22/13CM

Checker

12-29

TechTown First FloorRenovation

440 Burroughs St. - Detroit, MI

1/8" = 1'-0"A5.051 FIRST FLOOR PLAN

NOTE TO CONTRACTOR

THIS IS A HISTORICALLY DESIGNATED BUILDING.WINDOWS ARE TO REMAIN AS IS. CONTACTARCHITECT FOR ORIGINAL BUILDING DOCUMENTSAND STATE HISTORIC PRESERVATION OFFICEDOCUMENTS, IF REQUIRED.

1/18/2013 QUALITY REVIEW2/22/2013 PERMITS/BIDS

S. LITTLE

Date: Submitted for:

D. THOMAS

Page 10: TechTown 1st Floor Renovation

G.4

G

F.4

F

E.4

E

D.4

D

A.7

B

B.5

C.5

C

765432

A.9

G.2

1 8

H

A

A.8

3.6

G.5

TECH TOWNMANAGEMENT

103DIRECTORS

OFFICE104

TECH TOWNCONF RM

105

STORAGE A107

CONFROOM 5

124

??

ELEC109

EVENTSPACE 2

125

EVENTSPACE 1

126

CONFERENCEROOM 1

127

CONFERENCEROOM 2

128

RECEPTION/SECURITYDESK129

VESTIBULE101

COPYCENTER

137

KRESGECONNECT VIDEOCONFERENCING

108

STORAGE B120

CO-WORKINGAREA - B

130

MEETINGRM 1114

MTGRM 2115

MTGRM 3116

MEETINGRM 4117

COORIDOR 1110

CO-WORKINGAREA - A

136

PHONE132

PHONE133

PHONE134

CO-WORKINGCONFERNCE

135

COORIDOR 2111

ELEVATORLOBBY

102

COORIDOR 4119

EXISTMAINTENANCE

OFFICE

EXISTLOADING

DOCK

EXISTSTORAGE

EXISTSTORAGE

EXIST ELEVMACHINE

ROOMEXIST ELEV

NO 3

EXIST STAIRNO 3

EXISTCORRIDOR

EXISTGENERATOR

ROOM

EXIST BOILERROOM

EXIST STAIRNO 1

EXIST MEN

EXIST WOMEN

EXISTJC

EXIST STAIRNO 2

EXIST ELEVNO 2

EXIST PUMPROOM

EXIST IT

EXISTMAINTENANCE

ROOM

EXIST MECHROOM

30' - 6" 31' - 0" 10' - 7" 9' - 11" 33' - 0" 20' - 6" 33' - 0" 20' - 0"

188' - 6"

10' -

8"

2' -

8"1'

- 2"

6' -

6"10

' - 1

0"10

' - 1

0"10

' - 1

0"10

' - 1

0"10

' - 1

0"10

' - 1

0"10

' - 1

0"10

' - 1

0"10

' - 1

0"10

' - 1

0"6'

- 0"

6' -

2"8'

- 6"

150'

- 0"

CONFROOM 3

122

CONFROOM 4

123

6' -

1"

8' - 0"8' - 0"8' - 0"

8' - 6"

8' - 6"8' - 6"

8' - 0"

7' - 6"

7' - 6"

7' - 6"

8' - 0" 8' - 0" 8' - 0"

8' - 0"

8' - 0"

8' - 6"

A6.034

3' - 0" 14' - 0"

CENTER LINE

3' -

0"12

' - 0

"

7' -

5"7'

- 5"

1' -

8"

8' - 0" 8' - 0"

12' -

0"

1' -

8"

14' - 0" 4' - 7" 14' - 0" 7' - 5"

23' -

11"

11' - 9"

23' - 0"11

' - 6

"6'

- 5"

17' - 9"

8' -

0"

17' - 10"

8' -

0"

38' - 0"

14' -

0"

6' -

0"6'

- 0"

A6.0215

7' - 6"

A6.034

Sim

4' -

0"6'

- 0"

4' -

0"4'

- 0"

6' -

0"4'

- 0"

0' - 6"

38' - 0" 0' - 6"

0' - 6" 38' - 0" 0' - 6"

PROJECTORMOUNTED TOUNDERSIDE OFSTRUCTUREOF/CI (TYP.)

RETRACTABLE PROJECTOR OF/CI

EXISTING CEILING &LIGHT FIXTURES

2x2 LAY-INACOUSTICCEILINGCLOUD(TYP.)

EXISTING CEILINGTO REMAIN

2X2ACOUSTICLAY-INCEILING

2X2 ACOUSTIC LAY-INCEILING CLOUD. CENTERIN ROOM (AT EVENTSPACE 1 & 2 AND CONF.ROOMS 1 & 2

EQ EQ

11' - 3" 11' - 3" 11' - 3" 5' - 8"

14' -

0" (

TYP.

)7'

- 8"

8' - 6"

8' - 0"

8' - 0"

4' -

8"4'

- 8"

4' -

8"4'

- 8"

LIGHTS TO BECENTERED ABOVEISLAND

ALIG

N

A6.036

5' - 0" 5' - 0" 5' - 0" 5' - 0" 5' - 0" 5' - 0"

5' -

0"5'

- 0"

5' -

0"5'

- 0"

5' -

0"5'

- 0"

2' -

6"

6' - 1"

3' - 10"3' - 10"

HIDDEN LINE OFGYP. BD. CEILINGABOVE. SEE A5.03

17A6.02

17A6.02

Sim

EXPOSEDCEILING

EXPOSEDCEILING

CEILING PLAN LEGEND

LINEAR SUSPENDED

LINEAR SUSPENDED(4) COMBINED IN'X' FORMATION(REUSE)

FABRIC CORD PENDANTLIGHT (GROUP OF 5 LIGHTS)

LINEAR SUSPENDED(REUSE)

2X4 PARABOLIC (REUSE)

SUPPLY AIR DIFFUSER

2'X4' RECESSED LIGHTFIXTURE

4' LINEAR PENDANT LIGHT

WALL SCONCE

RECESSED DOWNLIGHT

2'X2' LAY-IN ORACOUSTICAL CLOUD

GYPSUM BOARD CEILING

PENDANT LIGHT (8" & 14")

RETURN AIR DIFFUSER

EXIT SIGN

N.I.C. - NOT IN CONTRACT

REFER TO SHEET AG.02 FOR FIRE RATED WALLLOCATIONS.

REFER TO SHEET A1.01 FOR WALL TYPES.

REFER TO ROOM FINISH SCHEDULE FOR PAINTINGREQUIREMENTS.

REFER TO SHEET A8.03 FOR FURNITURE INFORMATION.

PROVIDE CEILING COORDINATION SHOP DRAWINGS FORARCHITECT APPROVAL.

PATCH, REPAIR, CLEAN AND PREP CONCRETE CEILINGAND DUCTWORK FOR PAINT.

CEILING IS EXPOSED TO EXISTING CONCRETESTRUCTURE AND PAINTED EXCEPT WHERE INDICATED.

COORDINATE ALL LIGHTING FIXTURES, POWER/DATAOUTLETS, SWITCHES, PANELS, EQUIPMENT, ANDASSOCIATED COMPONENTS WITH ELECTRICALDRAWINGS. REFER TO ELECTRICAL DRAWINGS FORADDITIONAL SCOPE.

COORDINATE ALL MECHANICAL DIFFUSERS,EQUIPMENT, FIRE PROTECTION AND ASSOCIATEDCOMPONENTS WITH MECHANICAL DRAWINGS. REFERTO MECHANICAL DRAWINGS FOR ADDITIONAL SCOPE.

COORDINATE ALL EGRESS, FIRE ALARM, STROBES,EXIT SIGNS, PULL BOXES WITH FIRE PROTECTION ANDELECTRICAL DRAWINGS.

ALL WORK TO CONFORM TO THE REQUIREMENTS OFTHE LOCAL AND STATE CODES.

CEILING GENERAL NOTES

1.

2.

3.

4.

5.

6.

7.

8.

9.

10.

11.

440 BurroughsSt.Detroit, MI 48202ph. 313.486.1908

www.centricdesignstudio.com

Do Not Scale Drawings

Date

Drawn by

Checked by

Client:

Project:

Location:

Consultants:

Seal:

Sheet Title:

Patrick Thompson Design485 Milwaukee Ave. Ste. 100C Detroit, MI 48202

313.820.3268www.patrickthompsondesign.com

Ghafari Associates, LLC17101 Michigan Ave. Dearborn, MI 48126 USA

TEL +1.313.441.3000www.ghafari.com

Project number

JMS Engineering Services32401 West 8 Mile, Suite 2-5

Livonia, MI 48152 | 313.399.2932

2/28

/201

3 7:

27:2

9 PM

A2.02

First Floor ReflectedCeiling Plan

02/22/13CM

Checker

12-29

TechTown First FloorRenovation

440 Burroughs St. - Detroit, MI

1/8" = 1'-0"A5.051 FIRST FLOOR REFLECTED PLAN

NOTE TO CONTRACTOR:

PROVIDE CEILING COORDINATIONSHOP DRAWING FOR ARCHITECTAPPROVAL INCLUDE ALL MECHANICAL/ELECTRICAL RUNS.

S. LITTLE

Date: Submitted for:

1/18/2013 QUALITY REVIEW2/22/2013 PERMITS/BIDS

NOTE TO CONTRACTOR:

EXISTING CONCRETE BEAMS + STRUCTURE PAINT PER FINISH SCHEDULE.

EXPOSED DUCTWORK IS REMOVED FROM ELEVATIONS (FOR CLARITY) PAINT TOMATCH EXIST STRUCTURE ABOVE (SEE FINISH SCHEDULE).

LIGHTING REMOVED FROM ELEVATIONS (FOR CLARITY).

STOREFRONT SYSTEM GLASS TO BE TEMPERED (TYP.).

Page 11: TechTown 1st Floor Renovation
Page 12: TechTown 1st Floor Renovation
Page 13: TechTown 1st Floor Renovation

T

T

B

C

3

A5.092

1' - 5" 4' - 11" 3' - 5"

A6.015

6

A5.091

1' -

6"8'

- 9"

A5.09

5

EQ EQ

3

4

10' - 6"

9A6.02

5A6.02

15' -

10"

3' - 4"

RELOCATEDMAILBOXES (TYP.) COUNTER

TOP

COUNTERTOP

C

43.6

MEETINGRM 4117

MTGRM 2115

MTGRM 3116

11' - 11"

EQ EQ

14' -

4"

6' -

11"

FEC

A5.09

16

A5.09

16Sim

SEE SHEET A5.06FOR ELEVATIONS &MILLWORK

E

4

ELEC109

1' -

1"6'

- 5"

A5.08

3

6' -

1"

EXISTINGTRANSFORMER(ABOVE)

LINE OF CEILINGABOVE. SEE A2.02

ALIG

N

11'-11" ALIGN WITH IT WALL

INFORMATION KIOSKAREA, MILLWORKTO BE DETERMINEDBY OWNER

4

H

VESTIBULE101

4' -

11"

ALIG

N

EXISTING GYP BDWALLS TO REMAIN(PAINT PER FINISH SCHEDULE)SHEET A8.02.

F

E.4

E

32

KRESGECONNECT VIDEOCONFERENCING

108

A5.10

7

A6.018

A

AA

A

D

10' - 8" 17' - 6" 7' - 6"

EQEQ

0' - 5"

CEN

TER

PAR

TITI

ON

TO

RO

OM

12' -

8"

CENTERLINE

2' -

0"

2' -

0"

CLOSET SHELF, MOUNTEDWITH METAL ROD

COUNTERTOP ONBASE CABINETS

1' - 0"3

A6.02

LINE OF GYP. BD. CEILINGABOVE. COORDINATE WITHSHEET A2.02 & SECTION 4ON SHEET A5.10

AUDIO VISUALEQUIPMENT CLOSET

E

7 8

ALIG

N

EQ EQ EQ

A6.021

7' -

6"

1' - 4"

1' -

4"

SS-1 SHELF@ 20" A.F.F.(TYP.)

H

COPYCENTER

137

A6.022

ALIG

N

A5.054

A5.05 5

COPIER EQUIPMENT.OF/CI

2' - 0" 5' - 0" 4' - 0" 4' -

0"10

' - 0

"

LINE OF CEILINGCLOUD ABOVE.SEE SHEET A2.02

WALL CABINETS ABOVE

COPY CENTERISLAND. SEE5/A5.05

BASE CABINETCOUNTER TOP.SEE 4/A5.05

440 BurroughsSt.Detroit, MI 48202ph. 313.486.1908

www.centricdesignstudio.com

Do Not Scale Drawings

Date

Drawn by

Checked by

Client:

Project:

Location:

Consultants:

Seal:

Sheet Title:

Patrick Thompson Design485 Milwaukee Ave. Ste. 100C Detroit, MI 48202

313.820.3268www.patrickthompsondesign.com

Ghafari Associates, LLC17101 Michigan Ave. Dearborn, MI 48126 USA

TEL +1.313.441.3000www.ghafari.com

Project number

JMS Engineering Services32401 West 8 Mile, Suite 2-5

Livonia, MI 48152 | 313.399.2932

2/28

/201

3 7:

28:2

9 PM

A5.03

Enlarged Plans

02/22/13D. Thomas

Checker

12-29

TechTown First FloorRenovation

440 Burroughs St. - Detroit, MI

1/4" = 1'-0"A1.014 ENLARGED PLAN - MAIL BOXES

1/4" = 1'-0"A1.013 ENLARGED PLAN - MEETING ROOMS

1/4" = 1'-0"A1.012 ENLARGED PLAN - INFORMATION/BULLITEN

1/4" = 1'-0"A1.011 ENLARGED PLAN - VESTIBULE

1/4" = 1'-0"A1.018

ENLARGED PLAN -KRESGE CONNECT - VIDEO CONFERNCING

1/4" = 1'-0"A1.015 ENLARGED PLAN - PHONE BOOTHS

1/4" = 1'-0"A1.016 ENLARGED PLAN - COPY CENTER

S. LITTLE

Date: Submitted for:

1/18/2013 QUALITY REVIEW

2/22/2013 BIDS/PERMITS

Page 14: TechTown 1st Floor Renovation
Page 15: TechTown 1st Floor Renovation
Page 16: TechTown 1st Floor Renovation

43.6

8' -

0"

2' -

2"

ELECTRONICEQUIPMENTTO BEDETERMINEDBY OWNER

GYP. BD.HANGINGSOFFIT

INFORMATIONKIOSK AREA,MILLWORK TOBE DETERMINEDBY OWNER

CORRIDOR 2 CORRIDOR 1

D C.5 C

20' - 2"

GLASS + ALUM.STOREFRONT SYSTEM.ALL GLASS TO BETEMPERED (SEE A7.01)

7' -

2"

EQEQ

EQEQ

17' - 0" (5 EQUAL SPACES)DOOR OPENING

E.4ED.4DB.5 C.5C EXISTING GYPSUMBOARD FOR FINISHESSEE: SCHEDULE

WOOD SLIDING DOOR WITH GLASS(EXPOSED DOOR HARDWARE CLEARANODIZED FINISH)

EXIST IT ROOM DOOR

FLOATING GYP. BD.SOFFIT SUSPENDEDFROM STRUCTUREABOVE

WALL BASE PER SCHEDULE

NEW GYP. BD.GYP. BD. CONTROLJOINT BETWEEN NEW+ EXISTING GYP. BD.

HOLLOW METAL DOORAS SCHEDULED

INFORMATION KIOSKMILLWORK TO BEDETERMINED BY OWNER

F.4 F E.4

15' - 11" 17' - 10"

TECHTOWN MANAGEMENT KRESGE CONNECT

GLASS + ALUM.STOREFRONT WINDOWSYSTEM - ALL GLASSTO BE TEMPERED (SEESHEET A7.01)

GYP. BD. PAINTPER SCHEDULE

9' - 9" (3 EQUAL SPACES)

AS SCHEDULED

DOOR OPENING

AS SCHEDULED

DOOR OPNG. 14' - 8" (5 EQUAL SPACES)

7' -

2"

EQEQ

EQEQ

7' -

2"

EQEQ

EQEQ

5/8" EXISTING GYP. BD - PAINTPER FINISH SCHEDULE

EXISTING ENTRY +STOREFRONT TO REMAIN

2" BASE PERSCHEDULE

EXIST FIN TUBE TO REMAIN.PAINT TO MATCH CONCRETEWALL (SEE SCHEDULE)

GYP. BD. CONTROL JOINT

COPY CENTER ISLANDMILLWORK (SEE A5.05).

PT-1 FACE ANDUNDERSIDE OFGYP. BD. SOFFIT

EXIST ROLLINGSHADESREINSTALLED ATALL EXTERIORWINDOWS (TYP.)

GYP. BD. SOFFITSUSPENDED FROMSTRUCTURE ABOVE

LINE OF GYP. BD. CEILINGBEYOND

A6.0211

Sim

F E.4 E D.4 D B.5C.5 CEXISTING CONCRETEBEAM STRUCTURE +DUCTWORK

PT -1 @ FACE AND UNDERSIDE OFGYP. BD. SOFFIT. SEE A2.02 FORREFERENCE

GYP. BD. CONTROL JOINT@ ALIGNMENT IF EXISTING+ NEW GYP. BD.

2" BASE PER SCHEDULEEXISTING GYP. BD. PT-2

SLIDING WOOD DOORW/GLASS - EXPOSED ALUM.HARDWARE

EXIST. COLUMN

INFORMATION KIOSKMILLWORK TO BEDETERMINED BY OWNER

EXIST. COLUMN

8' -

0"

EXISTING COLUMN

GYP. BD. SOFFITSUSPENDED FROMSTRUCTURE ABOVE

A6.0210

A6.0211

6 5 4'x8' SHEETS OF BALTIC BIRCHPLYWOOD PRE-FINISHED WITHHIDDEN FASTENERS

CONFERENCE ROOM SIGNAGEOF/CI (TYP.)

WOOD DOOR W/ GLASS (SEE FLOOR PLAN ANDDOOR SCHEDULE FOR DOOR TYPES ANDADDITIONAL INFORMATION

654' x 8' SHEETS OF BALTICBIRCH PLYWOODPRE-FINISHED W/ HIDDENFASTENERS

EXTEND PLYWOOD TO UNDERSIDEOF DECK AND ABOVE DUCTWORK

GLASS + ALUM.STOREFRONT SYSTEM.SEE SHEET A7.01 FORADDITIONAL INFORMATION

CORRIDOR 1 KITCHEN

3/4" REVEAL 20' - 2" (6 EQUAL SPACES) 20' - 2" (6 EQUAL SPACES)

7' -

2"

EQEQ

EQEQ

----

4 3.6GYP. BD.CONTROL JOINT

FINISH OF EXISTINGGYP. BD. TO BEDETERMINED BYOWNER

7' - 0"(2 EQ. SPACES)

3' - 9"

SCHEDULED

DOOR ASGLASS + ALUM.STOREFRONT SYSTEM

EQEQ

EQEQ

7' -

2"

440 BurroughsSt.Detroit, MI 48202ph. 313.486.1908

www.centricdesignstudio.com

Do Not Scale Drawings

Date

Drawn by

Checked by

Client:

Project:

Location:

Consultants:

Seal:

Sheet Title:

Patrick Thompson Design485 Milwaukee Ave. Ste. 100C Detroit, MI 48202

313.820.3268www.patrickthompsondesign.com

Ghafari Associates, LLC17101 Michigan Ave. Dearborn, MI 48126 USA

TEL +1.313.441.3000www.ghafari.com

Project number

JMS Engineering Services32401 West 8 Mile, Suite 2-5

Livonia, MI 48152 | 313.399.2932

2/28

/201

3 7:

28:5

0 PM

A5.08

Interior Elevations

02/22/13C.M.

S. LITTLE

12-29

TechTown First FloorRenovation

440 Burroughs St. - Detroit, MI

1/4" = 1'-0"A5.033 ELEV OF KIOSK INFORMATION AREA

1/4" = 1'-0"A1.012 EXTERIOR ELEV OF TRAINING ROOM

1/4" = 1'-0"A1.015 WEST ELEV AT MEETING ROOMS

1/4" = 1'-0"A1.011 EXTERIOR ELEV AT TECH TOWN MANAGEMENT

1/4" = 1'-0"A1.016 ELEV AT COPY CENTER

1/4" = 1'-0"A1.017 ELEV AT EAST WALL OF MEETING ROOMS

1/4" = 1'-0"A1.019 ELEV AT COORIDOR 3 (LOOKING SOUTH)

1/4" = 1'-0"A1.0110 ELEV AT CONF ROOMS 1 & 2 (LOOKING NORTH)

1/4" = 1'-0"A1.018 ELEV AT ELEVATOR LOBBY

NOTE TO CONTRACTOR:

EXISTING CONCRETE BEAMS+ STRUCTURE PAINT PERFINISH SCHEDULE.

EXPOSED DUCTWORK ISREMOVED FROM ELEVATIONS(FOR CLARITY) PAINT TOMATCH EXIST STRUCTUREABOVE (SEE FINISH SCHEDULE).

LIGHTING REMOVED FROMELEVATIONS (FOR CLARITY).

STOREFRONT SYSTEM GLASSTO BE TEMPERED (TYP.).

Quality Review 1/18/2013

1/18/2013 QUALITY REVIEW

Date: Submitted for:

2/22/2013 BIDS/PERMITS

Page 17: TechTown 1st Floor Renovation

E.4 E D.4 D B.5C.5 C1

A5.10

4'x 8' SHEETS OF BALTIC BIRCHPLYWOOD PRE-FINISHEDWITH HIDDEN FASTENERS

WOOD DOOR WITHFULL GLASS (TYPICAL)+ ALUMINUM FRAME

OVERHEAD DOOR(HANGER STYLE)

EXISTING CONCRETEBEAM & STRUCTURE

CORRIDOR 3

RECEPTION

3/4" REVEAL AT BASE OFPLYWOOD PANELS

1A6.03

Sim

B.5

4" MTL STUD -SUPPORT (BEYOND)

COUNTER SS-1COUNTER SS-1

2" BASE ASSCHEDULED

RELOCATEDMAILBOXES

3' -

0"

B.5B.5

RELOCATEDMAIL BOXESCOUNTER

SS-1

A6.024

6' -

3"

2" BASE ASSCHEDULED

3

COUNTER SS-1

2" BASE ASSCHEDULED

GYP. BD. PAINT

RELOCATEDMAIL BOXESBEYOND

GYP. BD. PAINT

E.4ED.4DB.5 C.5C

CONFERENCE ROOMSIGNAGE OF/CI (TYP.)

BUTT SEAMS (NO EXPOSEDFASTENERS) TYPICAL

BALTIC BIRCH PLYWOOD TO UNDERSIDEOF DECK (ABOVE DUCTWORK)

CORRIDOR

3/4" REVEAL AT BASE OFPLYWOOD PANELS

RECEPTION

3

RELOCATEDMAILBOXES

EXIST CONCCOLUMN(BEYOND)

GYP. BD. PAINT

2" BASE TYP.

COUNTER SS-1

GYP. BD. PAINT

3

GYPSUM BOARDPAINT (TYPICAL)

EXISTINGCONCRETEBEAM +STRUCTURE

GYPSUM BOARDPAINT (TYPICAL)

2" BASE (TYP.)

GYP. BD. PAINT

DRY ERASE PAINT(THIS AREA)4'

- 0"

3' -

0"

10' - 3"

GYP. BD. PAINT

8' -

6"

EXISTING CONCRETEBEAM + STRUCTURE

KITCHEN MILLWORKSEE 5/A5.01

GYP. BD. PAINT

2" BASE (TYP.)

FREMOVE EXIST FILM COATINGFROM EXISTING GLAZING (TYP. ALL PANESIN OLD RESTROOM)

REMOVE EXISTING EXHAUST LOUVER.REPLACE W/GLAZING PANE TOMATCH EXIST

REMOVE EXIST PARTITIONS ANDCEILING. SEE AD1.01 & AD2.01 FORADDITIONAL SCOPE

REMOVE EXISTTOILET FIXTURESAND ACCESSORIES.SEE AD1.01 & MECH DWG FOR ADDITIONAL SCOPE

REMOVE EXIST MILLWORK. SEEAD1.01 FOR ADDITIONAL SCOPE

6

EXIST FIN TUBE TOREMAIN. PAINT TOMATCH CONCRETEWALL (SEE FINISHSCHEDULE)

(HISTORICAL)EXISTINGWINDOW.ROLLING SHADE(SEE FINISHSCHEDULE)

EXITING CONCRETE BEAM.PAINT (SEE SCHEDULE)

EXISTING GYP. BD..PAINT (SEE SCHEDULE)

EXISTINGCONCRETEBEAM +STRUCTURE

ACOUSTIC LAY-INCEILING CLOUDSUSPENDED FROM EXISTSTRUCTURE ABOVECENTER CLOUD INROOM.SEE A2.02

GYP. BD. - PAINT

2" BASE PER SCHEDULE

LIGHTING FIXTUREAS SCHEDULED(TYP.)

CONFERENCE ROOM 1

EXISTING COLUMN

8' -

6"

DRY ERASE PAINTTHIS AREA4'

- 0"

3' -

0"

B.5C

DRY ERASEPAINT THISAREA

2" BASE (TYP.)

2'X2' ACOUSTIC LAY-IN CEILINGSUSPENDED FROMSTRUCTURE ABOVE

GYP. BD. PAINT4' -

0"3'

- 0"

4 3.6

2" BASE ASSCHEDULED

EXISTCOLUMN

3' -

0"4'

- 0"

7' -

6"

DRY ERASEPAINT THISAREA

ACOUSTIC LAY-INCEILING SUSPENDEDFROM STRUCTUREABOVE

GYP. BD. -PAINT

440 BurroughsSt.Detroit, MI 48202ph. 313.486.1908

www.centricdesignstudio.com

Do Not Scale Drawings

Date

Drawn by

Checked by

Client:

Project:

Location:

Consultants:

Seal:

Sheet Title:

Patrick Thompson Design485 Milwaukee Ave. Ste. 100C Detroit, MI 48202

313.820.3268www.patrickthompsondesign.com

Ghafari Associates, LLC17101 Michigan Ave. Dearborn, MI 48126 USA

TEL +1.313.441.3000www.ghafari.com

Project number

JMS Engineering Services32401 West 8 Mile, Suite 2-5

Livonia, MI 48152 | 313.399.2932

2/28

/201

3 7:

29:0

5 PM

A5.09

Interior Elevations

02/22/13C.M / C.BS. LITTLE

12-29

TechTown First FloorRenovation

440 Burroughs St. - Detroit, MI

1/4" = 1'-0"A1.0110 ELEV AT EVENT SPACE 1 & 2 (LOOKING WEST)

1/4" = 1'-0"A5.031 ELEV AT MAIL BOX ISLAND (LOOKING WEST)

1/4" = 1'-0"A5.032 ELEV AT MAIL BOX AREA (LOOKING WEST)

1/4" = 1'-0"A5.036 ELEV AT MAIL BOX ISLAND (LOOKING EAST)

1/4" = 1'-0"A5.035 ELEV AT MAIL BOX ISLAND (LOOKING SOUTH)

1/4" = 1'-0"A1.017 ELEV AT EVENT SPACE (LOOKING EAST)

1/4" = 1'-0"A5.033 ELEV AT MAIL BOX (LOOKING SOUTH)

1/4" = 1'-0"A5.034 ELEV AT MAIL BOX (LOOKING NORTH)

1/18/2013 QUALITY REVIEW

1/4" = 1'-0"A1.0111 ELEV AT CONF 4

1/4" = 1'-0"A1.018 ELEV AT KITCHEN (LOOKING SOUTH)

1/4" = 1'-0"AD1.0113 ELEV AT EXIST RESTROOM/LOUNGE

1/4" = 1'-0"A1.0114 TYPICAL INTERIOR ELEV AT EXTERIOR WINDOW

1/4" = 1'-0"A1.0115 ELEV AT CONFERENCE ROOM 1

1/4" = 1'-0"A1.0112 ELEV AT CONF ROOM 3

1/4" = 1'-0"A5.0316 ELEV AT MEETING RM 4

Date: Submitted for:

2/22/2013 BIDS/PERMITS

NOTE TO CONTRACTOR:

EXISTING CONCRETE BEAMS+ STRUCTURE PAINT PERFINISH SCHEDULE.

EXPOSED DUCTWORK ISREMOVED FROM ELEVATIONS(FOR CLARITY) PAINT TOMATCH EXIST STRUCTUREABOVE (SEE FINISH SCHEDULE).

LIGHTING REMOVED FROMELEVATIONS (FOR CLARITY).

STOREFRONT SYSTEM GLASSTO BE TEMPERED (TYP.).

Page 18: TechTown 1st Floor Renovation

1ST LEVEL0' - 0"

2ND LEVEL13' - 0"

6 5

A6.032 VERTICAL OPERABLE

PARTITION POCKETENCLOSURE

STL SUPPORT (TYP)

EXISTING CONC BEAM(BEYOND)

1A6.03

EXISTING COLUMNEXISTING COLUMN

LOCATE GYP. BD. ACCESSPANELS AT OPERABLE PARTITIONMOTOR (TYP.)

OVERHEADHANGING STYLEDOOR

VERTICAL OPERABLEPARTITION

CORRIDOR 2

CEILING HANGERS ASREQUIRED (TYP.)

CEILING ASSCHEDULED

1ST LEVEL0' - 0"

2ND LEVEL13' - 0"

E.4ED.4DB.5 C.5C

8' -

0"

OVERHEAD DOOROPENING BEYOND

EXIST COLUMN(BEYOND)

OPERABLEPARTITION

OVERHEAD DOORCONTROLLER(BEYOND)

OVERHEAD DOOROPENING BEYOND

DOOR BEYOND(TYP)

8' -

0"

A6.033

A7.0116

DOOR BEYOND

ACOUSTIC LAY-INCEILING

ACOUSTICAL LAY-INCEILING CLOUD

PROJECTOR MOUNTEDTO STRUCTURE ABOVEOF/CI

PROJECTOR MOUNTEDTO STRUCTURE ABOVEOF/CI

VERTICAL OPERABLEPARTITION CONTROLSWITCH. SEE SECTION2, THIS SHEET FORLOCATION DIMENSIONS

1ST LEVEL0' - 0"

2ND LEVEL13' - 0"

F E.4 E

RETRACTABLE CEILING MOUNTEDPROJECTOR WITH STL SUPPORTMOUNTED TO EXIST STRUCTUREABOVE. OF/CI

A6.026

A6.061

SIM.PARTITION BEYOND.SEE A1.01 FORPARTITION TYPES

EXISTING PARTITION

2X2 ACOUSTIC LAY-INCEILING. SEE A2.02

GYP. BD. CEILING SEE A2.02.ALIGN WITH PARTITIONBEYOND

8' -

6"

8' -

0"

PARTITION BEYONDA6.02

8

WALL MOUNTEDPROJECTIONSCREEN OF/CI

1ST LEVEL0' - 0"

2ND LEVEL13' - 0"

E D.4 D C.5 C

0' - 6" 0' - 6"

4' -

0"

VERTICAL OPERABLEPARTITION CONTROLSWITCH

CONFERENCE ROOM 3CONFERENCE ROOM 1 EVENT SPACE 1 EVENT SPACE 2

VERTICAL OPERABLE PARTITION

8' -

6"

8' -

6"

DOOR BEYOND DOOR BEYOND

WALL MOUNTEDPROJECTIONSCREEN OF/CI

WALL MOUNTEDPROJECTIONSCREEN OF/CI

ACOUSTICAL LAY-INCEILING CLOUD

ACOUSTICALLAY-IN CEILINGCLOUD

CEILING HANGERS ASREQUIRED (TYP.)

EXISTING CONCRETEBEAM + STRUCTURE

WALL MOUNTEDPROJECTION SCREENOF/CI

PROJECTOROF/CI

GYP. BD. PAINTPER SCHEDULE

2" BASE AS SCHEDULED

F.4

4' -

0"3'

- 0"

GYP. BD. PAINTPER SCHEDULE

DRY ERASE PAINT(THIS AREA)

2" BASE ASSCHEDULED

EXISTING CONCRETEBEAM + STRUCTURE

3 2

CEILING ASSCHEDULED

EXISTING CONCRETESTRUCTURE

2" BASE ASSCHEDULED

A6.027

8' -

0"

A6.027

Sim

(7) 30" BASE CABINETS = 17' - 6"

SS-1 COUNTER TOP WITH4" BACK SPLASH

BI-FOLD DOORS.SEE A1.01 ANDA7.01 FOR DOORTYPES (TYP.)

440 BurroughsSt.Detroit, MI 48202ph. 313.486.1908

www.centricdesignstudio.com

Do Not Scale Drawings

Date

Drawn by

Checked by

Client:

Project:

Location:

Consultants:

Seal:

Sheet Title:

Patrick Thompson Design485 Milwaukee Ave. Ste. 100C Detroit, MI 48202

313.820.3268www.patrickthompsondesign.com

Ghafari Associates, LLC17101 Michigan Ave. Dearborn, MI 48126 USA

TEL +1.313.441.3000www.ghafari.com

Project number

JMS Engineering Services32401 West 8 Mile, Suite 2-5

Livonia, MI 48152 | 313.399.2932

2/28

/201

3 7:

29:3

6 PM

A5.10

Interior Sections

02/22/13C.M / D.TS. LITTLE

12-29

TechTown First FloorRenovation

440 Burroughs St. - Detroit, MI

1/4" = 1'-0"A1.011 SECTION @ EVENT SPACE 2

1/4" = 1'-0"A1.013 SECTION THROUGH CONF ROOMS & EVENT SPACES

1/4" = 1'-0"A1.014 KRESGE CONNECT-VIDEO CONFERENCING

1/4" = 1'-0"A1.012 SECTION AT EVENT SPACES 1 & 2

1/4" = 1'-0"A1.015 ELEV AT TECHTOWN CONF ROOM (SOUTH WALL)

1/4" = 1'-0"A1.016 ELEV AT TECHTOWN CONF ROOM (EAST WALL)

1/4" = 1'-0"A1.017 ELEV AT KRESGE CONNECT-VIDEO CONFERENCING

Date: Submitted for:

NOTE TO CONTRACTOR:

EXISTING CONCRETE BEAMS+ STRUCTURE PAINT PERFINISH SCHEDULE.

EXPOSED DUCTWORK ISREMOVED FROM ELEVATIONS(FOR CLARITY) PAINT TOMATCH EXIST STRUCTUREABOVE (SEE FINISH SCHEDULE).

LIGHTING REMOVED FROMELEVATIONS (FOR CLARITY).

STOREFRONT SYSTEM GLASSTO BE TEMPERED (TYP.).

1/18/2013 QUALITY REVIEW

2/22/2013 BIDS/PERMITS

Page 19: TechTown 1st Floor Renovation

440 BurroughsSt.Detroit, MI 48202ph. 313.486.1908

www.centricdesignstudio.com

Do Not Scale Drawings

Date

Drawn by

Checked by

Client:

Project:

Location:

Consultants:

Seal:

Sheet Title:

Patrick Thompson Design485 Milwaukee Ave. Ste. 100C Detroit, MI 48202

313.820.3268www.patrickthompsondesign.com

Ghafari Associates, LLC17101 Michigan Ave. Dearborn, MI 48126 USA

TEL +1.313.441.3000www.ghafari.com

Project number

JMS Engineering Services32401 West 8 Mile, Suite 2-5

Livonia, MI 48152 | 313.399.2932

2/28

/201

3 8:

23:0

1 PM

A5.11

3-D Interior Views

02/22/13D.T

S. LITTLE

12-29

TechTown First FloorRenovation

440 Burroughs St. - Detroit, MI

1 VIEW LOOKING EAST FROM LOBBY2 VIEW FROM EVENT SPACE 2 LOOKING EAST

3 VIEW OF MAILBOX AREA

Date: Submitted for:

1/18/2013 QUALITY REVIEW

2/22/2013 BIDS/PERMITS

Page 20: TechTown 1st Floor Renovation

C

3

CAULK WHERE COL& WALL MEETCOUNTERTOP

WD BLOCKINGWHERE REQUIRED

CAULK WHEREGYP BD & COLUMNMEET (TYP)

GYP. BD. ON MTL STUDS@ 16" O.C. (TYP.)

ALIG

N

ALUM STOREFRONTSYSTEM

SS-1COUNTERTOP

EXIST RELOCATEDMAILBOXES ALIGN

EXIST COL

A

A

2' - 10"

WOOD TRIM

CONTINUOUS ACOUSTICSEALANT EACH SIDE

5/8" GYP BD

4" MTL STUD(6" METAL STUDWHERE NOTED ONPLAN).

CONTINUOUS ACOUSTICSEALANT EACH SIDE(TYPE A1)

0' - 5"

CEILING ASSCHEDULED

UNDERSIDE OFEXISTING CONC.STRUCTURE

ACOUSTICINSULATIONAT PARTITIONTYPE A1 ONLY

1/2" PLYWOODPANELSECURED W/HIDDENFASTENERS

4" MTL STUD

5/8" GYP BD

WALL BASERE: SCHEDULE

0' - 6"

ACOUSTICINSULATION

CEILING ASSCHEDULED

CONTINUOUS ACOUSTICSEALANT EACH SIDE

CONTINUOUS ACOUSTICSEALANT EACH SIDE

UNDERSIDEOF EXISTINGCONC.STRUCTURE

0'-5 1/2"

5

5/8" GYP BD (BOTH SIDES)(RE: PLAN FOR WALL TYPE)

0' - 5"0' - 5"

SEALANTBOTH SIDES (TYP)

ALUM STOREFRONTSYSTEM W/ FULL GLASS(TYP)

1' - 0"

1/2"

RE: ARCHITECTURAL PLANFOR WALL TYPE

E

5

CAULK AT COLUMN(TYP.)

WD BLOCKINGWHERE REQD(TYP)

GYP. BD. ONMTL STUDS @16" O.C. (TYP.)

EXIST CONC COLUMN

RE: ARCHITECTURALPLAN FORWALL TYPE

EVENT SPACE 1

CONFERENCEROOM 1

CONFERENCEROOM 2

D

6

OPE

RAB

LE P

ARTI

T IO

N

1' -

1" (T

YP.)

@

VIF

2' - 3"

VIF

2' - 0"

EXIST COL

OPERABLEPARTITION

WD BLOCKINGWHERE REQD

1' - 3"

5/8"GYP BDON 3 5/8" MTL STUD(BOTH SIDES)

B

D D

D

5

EXIST CONC COL

VIF

1' - 5"

VIF

1' - 5"

1' -

1"

EVENT SPACE 2

EVENT SPACE 1

CAULK AT COLUMN(TYP.)

D

D

F

3

CAULKTYPICALAT COLUMN

WD BLOCKINGWHERE REQD

GYP. BD. ONMTL STUDS @16" O.C. (TYP.)

D

D D

DEXIST COL

KRESGE CONNECTVIDEO CONFERENCING

5/8" TYPE XGYP BD

0' - 5"CEILING ASSCHEDULED

CONTINUOUSACOUSTICSEALANT EACHSIDE

GYP. BD.CLOSURE

UNDERSIDEOF EXISTINGCONC.STRUCTURE

4" MTL STUD

1 HOUR RATEDUL DESIGN U465

BASE ASSCHEDULED

5/8" GYP BD

4" MTL STUD0' - 5"

UNDERSIDEOF EXISTINGCONC STRUCTURE

CEILING ASSCHEDULED

CONTINUOUSACOUSTICSEALANTEACH SIDE

CONTINUOUSACOUSTIC SEALANTEACH SIDE

5/8" GYP BD

HORIZONTALMTL BRACING

ACOUSTICINSULATION 0' - 5"

1/2" FIRE RESISTANTPLYWOOD PAINTEDTO MATCH WALL TYPE. UNDERSIDE OF

EXISTING CONC.STRUCTURE

440 BurroughsSt.Detroit, MI 48202ph. 313.486.1908

www.centricdesignstudio.com

Do Not Scale Drawings

Date

Drawn by

Checked by

Client:

Project:

Location:

Consultants:

Seal:

Sheet Title:

Patrick Thompson Design485 Milwaukee Ave. Ste. 100C Detroit, MI 48202

313.820.3268www.patrickthompsondesign.com

Ghafari Associates, LLC17101 Michigan Ave. Dearborn, MI 48126 USA

TEL +1.313.441.3000www.ghafari.com

Project number

JMS Engineering Services32401 West 8 Mile, Suite 2-5

Livonia, MI 48152 | 313.399.2932

3/1/

2013

12:

10:0

0 PM

A6.01

Wall Types + InteriorPlan Details

02/22/13D. Thomas

S. Little

12-29

TechTown First FloorRenovation

440 Burroughs St. - Detroit, MI

1 1/2" = 1'-0"A5.035 PLAN DETAIL @ MAIL BOXES COUNTER

1 1/2" = 1'-0"A & A1 GYPSUM BOARD WALL

1 1/2" = 1'-0"B GYPSUM BOARD WALL WITH PLYWOOD PANELS

1 1/2" = 1'-0"A1.012 PLAN DETAIL @ CONF RM 1 & 2

1 1/2" = 1'-0"A1.011 PLAN DETAIL @ CONF RM 2

1 1/2" = 1'-0"A1.013 PLAN DETAIL @ CONF RM & EVENT SPACE 1

1 1/2" = 1'-0"A1.014 PLAN DETAIL @ OPERABLE PARTITION

1 1/2" = 1'-0"A1.016 PLAN DETIAL @ OPERABLE PARTITIONS

1 1/2" = 1'-0"A5.038 PLAN DEAIL @ KRESGE CONNECT

1 1/2" = 1'-0"C GYPSUM BOARD FIRE RATED WALL

1 1/2" = 1'-0"D GYPSUM BOARD WALL (1 SIDED)

1 1/2" = 1'-0"A5.01E GYPSUM BOARD CHASE WALL

1/18/2013 QUALITY REVIEW2/22/2013 PERMITS/BIDS

Date: Submitted for:

Page 21: TechTown 1st Floor Renovation

EXIST STEEL COLUMN 5/8" GYP BD ON METAL STUDS @ 16" O.C.SEE A1.01 FOR PARTITION TYPES

SEALANTBOTH SIDES

EXISTINGSTOREFRONT

8

VIF3 1/4"

EXISTING WINDOWMULLION

TAPE & FLOAT

5/8" GYP BDON METAL STUDS

NEOPRENE GASKETW/ ADHESIVE

PROVIDE ACOUSTICINSULATION BETWEENALUM. CHANNELS

.063 ALUM. ENCLOSUREFINISH TO MATCH ALUM.WINDOW - SET IN SEALANTAND SECURE TO WINDOWAND ALUM. CHANNEL WITHCOUNTERSUNK SCREWS@ 6" O.C.

90.0

FIXTURES TO CENTER

ARRANGE LIGHT

FIXTURES TO CENTER

ARRAGNGE LIGHT

NOTE:EXISTING FIXTURES ARRANGED INLAYOUT ABOVE AT AREAS SHOWN ONCEILING PLAN (A2.02). SEE DETAIL 16,THIS SHEET FOR ISOMETRIC VIEW ANDTYPICAL MOUNTING HEIGHTS

CONTRACTOR TO MOUNT LOWER FIXTUREAT 8'-0" FROM FINISHED FLOOR TO BOTT.OF LIGHT FIXTURE

CONTRACTOR TO MOUNT HIGHER FIXTUREAT 8'-6" FROM FINISHED FLOOR TO BOTT.OF LIGHT FIXTURE

VAR

EIS

SPACER(TYP)

LIGHT FIXTURE(TYP)

10' -

5 3

/4" +

/-

4' -

2"

0' -

8"

5'-6

" A.F

.F.

0' -

4"

1' - 4"

0' - 4"

0' -

3"

SOLID SURFACESHELF & BRACKET @36" O.C. MAX. PROVIDEBRACE @ EACH END

GYP. BD. ON METALSTUD. SEE SHEET A1.01FOR PARTITION TYPES

1 1/2" DIA. METAL ROAD W/END BRACKETS

WALL REINFORCEMENTSTUD FRAMING

1' - 6"

0' -

2"

3'-0

" A.F

.F.

SOLID SURFACEBRACKETS (3 EQUALLYSPACED)

SOLID SURFACECOUNTER TOP

WALL REINFORCEMENTSTUD FRAMING

SEALANT

4" MTL STUDWITH FRAMING@ 16" O.C. (TYP.)

5/8" GYP. BD. ONMETAL STUD (TYP.)

RELOCATEDMAILBOXES

1X2 WD TRIM (TYP.)

HORIZONTALBRACING

SLOPE

3/4" FIRE RESISTANTPLYWOOD PAINTEDTO MATCH WALL TYPE

3' - 3"

2' -

5"

VIF

3' -

2"

6' -

1"0'

- 3"

RELOCATEDMAILBOXES

GYP. BD. ON METALSTUD. SEE A1.01 FORPARTITION TYPES

1' - 6"

1' - 6"

WIRE HANGERS ASREQUIRED FORSUSPENDED CEILINGS

0' -

6"

SEE

PLAN

0' - 8"

CEILING AS SCHEDULED

5/8" GYP. BD.ON METAL STUDS@ 16" O.C. SECURETO STRUCTURE ABOVE

ALUM FRAMEEDGE WITHMATCHING FINISH

CORNER BEAD

0' - 6"

EXISTING PARTITIONSEE A1.01

WIRE HANGERS ASREQUIRED FORSUSPENDED CEILINGS

CEILING AS SCHEDULED

ALUM EDGE FRAMEWITH MATCHING FINISH

CEILING AS SCHEDULED

EXISTING WALL SEEA1.01 FOR PARTITION TYPES

ALUM EDGE FRAMEWITH MATCHING FINISH

AT GYP. BD.PROVIDE 1/4" JOINT

5/8" GYP. BD. ON METALSTUDS @ 16" O.C.

ALUM. TRIM. FINISHTO MATCH SOFFIT.

GYP. BD. PARTITIONSEE A1.01 FOR TYPE

WIRE SOFFIT HANGERAS REQUIRED (TYP.)

CORNER BEAD

NOTE:SEE DETAIL 10, THISSHEET FOR SIM NOTES& DIMENSIONS

ALUM STOREFRONT SYSTEM W/FULL GLASS (TYP)

ALIGN NEW PARTITION WITH EXIST.

GYP. BD. (BOTH SIDES) ONMETAL STUDS. SEE SHT.A1.01 FOR PARTITION TYPES

SEALANT BOTH SIDES

SEMI-RECESSED FIRERATED CABINET

NON-RATED WALLASSEMBLY, SEE PLANFOR TYPE

FEGYP. BD. CEILING HT.

8' - 6"

WIRE HANGER ASREQUIRED (TYP.)

5/8" GYP. BD. ON METALSTUDS @ 16" O.C.

CORNER BEAD

GYP. BD. PARTITIONSEE A1.01 FOR TYPE

EXISTING GYP. BD.PARTITION. SEE A1.01

440 BurroughsSt.Detroit, MI 48202ph. 313.486.1908

www.centricdesignstudio.com

Do Not Scale Drawings

Date

Drawn by

Checked by

Client:

Project:

Location:

Consultants:

Seal:

Sheet Title:

Patrick Thompson Design485 Milwaukee Ave. Ste. 100C Detroit, MI 48202

313.820.3268www.patrickthompsondesign.com

Ghafari Associates, LLC17101 Michigan Ave. Dearborn, MI 48126 USA

TEL +1.313.441.3000www.ghafari.com

Project number

JMS Engineering Services32401 West 8 Mile, Suite 2-5

Livonia, MI 48152 | 313.399.2932

2/28

/201

3 7:

32:3

2 PM

A6.02

Interior Details

02/22/13D.T / C.B

S. LITTLE

12-29

TechTown First FloorRenovation

440 Burroughs St. - Detroit, MI

1 1/2" = 1'-0"A5.032 PLAN DETAIL AT COPY CENTER

3" = 1'-0"A1.011 PLAN DETAIL@ WINDOW

3/8" = 1'-0"A2.0215 LIGHTING FIXTURE LAYOUT DETAIL

16 LIGHT FIXTURE ISOMETRIC VIEW

1/2" = 1'-0"14 TYPICAL PENDANT LIGHT FIXTURE

1 1/2" = 1'-0"A5.033 COAT ROD AND SHELF DETAIL

Date: Submitted for:

1 1/2" = 1'-0"A5.094 COUNTER DETIAL AT MAIL BOX

1/18/2013 QUALITY REVIEW

2/22/2013 BIDS/PERMITS

1" = 1'-0"A5.039 SECTION AT MAIL BOX ISLAND

1" = 1'-0"A5.035 SECTION THROUGH MAILBOX

NOTE:SEE DETAIL 9,THIS SHEET FORTYP. NOTES &DIMENSIONS

1 1/2" = 1'-0"A5.106 COMPOSITE CEILING DETAIL AT KRESGE CONNECT ROOM

1 1/2" = 1'-0"A5.107 CEILING EDGE DETAIL AT KRESGE CONNECT ROOM

1 1/2" = 1'-0"A5.108 EDGE CEILING DETAIL AT KRESGE CONNECT ROOM

1 1/2" = 1'-0"A5.0810 SOFFIT DETAIL AT PARTITION

1 1/2" = 1'-0"A5.0811 SOFFIT EDGE DETAIL

1 1/2" = 1'-0"A1.0112 PLAN DETAIL @ ELEVATOR LOBBY

1" = 1'-0"A1.0113 FIRE EXTINGUISHER DETAIL

1 1/2" = 1'-0"A2.0217 CEILING DETIAL AT KRESGE CONNECT

Page 22: TechTown 1st Floor Renovation

SEALANT

BENT ANGLEREFER TO STRUCTURALDRAWING FOR ADDITIONALSCOPE

HEADER

DOUBLE BULBSEAL

5/8" GYP. BD. ONMETAL STUDS

1/2" BALTIC BIRCHPLYWOODRE: ARCHITECTURAL PLAN

EXISTING CONCBEAM BEYOND

DOOR(OPEN POSITION)

D

18"x

18" G

YP .

BD

. AC

CES

S P A

NEL

1' -

7" S

TUD

SPA

CIN

G F

OR

VIF

1' -

8" +

/-1'

- 9"

6' - 1"

CEILING8' - 0"

(2) LAYERS 5/8"GYP. BD. (ACOUSTICBARRIER AS PER ASTME 557

EXISTING CONCBEAM

MOTOR(BEYOND)

SUSPENDED CEILINGGYP. BD. SOFFIT ONMETAL STUDS @ 16"O.C.

BATT INSULATION

DEFLECTION MATERIAL(TYP.)

DIAGONAL BRACINGAS REQUIRED (TYP.)

ELECTRICAL CONTROLBOX (PAINT TO MATCHSOFFIT)

5/8" GYP. BD. ON3 5/8" METALSTUD @ 16" O.C.(TYP.) ACOUSTIC OPERABLE

PARTITION PANEL

POCKET PANEL9' - 2"

VIF

1' -

5" +

/-

EXISTING COLUMNBEYOND

UNDERSIDE OFEXISTING STRUCTURE

NOTE:REFER TO STRUCTURALDRAWINGS FOR ADDITIONALSCOPE

1/2" PLYWOOD PANELON GYP. BD. ON METALSTUDS. SEE FINISHSCHEDULE FORPLYWOOD TYPE & SHEETA1.01 FOR PARTITIONTYPES

DOOR FRAME ASSEMBLY.SEE STRUCTURAL

OVERHEAD DOORASSEMBLY

STEEL ANGLESSEE STRUCTURAL

D

5

5A6.03

GYP. BD. SOFFITON METAL STUDS

OPERABLE PARTITIONPANEL

EXISTING COLUMN

5/8" GYP. BD.ON METALSTUDS

EXISTINGSTRUCTURAL BEAMABOVE (TYP.)

ALIG

NG

YP. B

D.

SOFF

ITW

ITH

GYP

. BD

.PA

RTI

TIO

N(T

YP.)

CEILING8' - 0"

DIAGONAL BRACINGAS REQUIRED

5/8" GYP. BD. SOFFITON METAL STUDS @16; O.C.

5/8" GYP. BD. ONMETAL STUDS@ 16" O.C.

CORNER BEAD

UNDERSIDE OF EXISTINGSTRUCTURE

F

5

2' - 4"

2' -

4"

EQ EQ EQ EQ

2' -

4"EQ

EQ

11' -

6"

23' - 0"

LIGHTING FIXTURE.SEE SHEET A2.02

EXISTING COLUMN

GYP. BD. CEILING CLOUD

8' - 0"

----11

A6.02SIM.A6.03

7

LIGHTING FIXTURE. SEE SHEETA2.02 & ELECTRICAL SHEETSFOR FIXTURE TYPE & ADDITIONALSCOPE (TYP.)

0' -

3"0'

- 4"

0' - 4"0' - 2"

0' - 4" 0' - 2"

0' -

5"0'

- 2"

USE DETAIL 6, THIS SHEETFOR LOCATION OF CENTERLIGHT FIXTURE #1. LOCATELIGHT FIXTURES #2 THRU #5USING DIMENSIONS SHOWNON THIS DETAIL

CENTER LIGHT FIXTURE #1

LIGHT FIXTURE #3

LIGHT FIXTURE #2LIGHTFIXTURE #5

LIGHTFIXTURE #4

440 BurroughsSt.Detroit, MI 48202ph. 313.486.1908

www.centricdesignstudio.com

Do Not Scale Drawings

Date

Drawn by

Checked by

Client:

Project:

Location:

Consultants:

Seal:

Sheet Title:

Patrick Thompson Design485 Milwaukee Ave. Ste. 100C Detroit, MI 48202

313.820.3268www.patrickthompsondesign.com

Ghafari Associates, LLC17101 Michigan Ave. Dearborn, MI 48126 USA

TEL +1.313.441.3000www.ghafari.com

Project number

JMS Engineering Services32401 West 8 Mile, Suite 2-5

Livonia, MI 48152 | 313.399.2932

2/28

/201

3 8:

21:0

8 PM

A6.03

Interior Details

02/22/13C.M

S. LITTLE

12-29

TechTown First FloorRenovation

440 Burroughs St. - Detroit, MI

1 1/2" = 1'-0"A5.102 SECTION DETAIL @ HEAD OVERHEAD DOOR

1 1/2" = 1'-0"A5.103 OPERABLE WALL DETAIL @ CEILING

1/18/2013 QUALITY REVIEW2/1/2013 PERMITS/BIDS

Date: Submitted for:

1 1/2" = 1'-0"A5.091 JAMB DETAIL OF OVERHEAD DOOR

1" = 1'-0"A2.024 CEILING PLAN DETAIL @ OPERABLE PARTITION

1 1/2" = 1'-0"A6.035 SECTION DETAIL AT SOFFIT

1/4" = 1'-0"A2.026 CEILING AT RECEPTION/SECURITY DESK

1" = 1'-0"A6.037 LIGHTING DETAIL

Page 23: TechTown 1st Floor Renovation
Page 24: TechTown 1st Floor Renovation
Page 25: TechTown 1st Floor Renovation

GF

CB D EA

6" W

DOOR WIDTH

6" W

DO

OR

HEI

GH

T

1'-0

" HG

T

SAFETYGLASSTYPE-1

ALUM. FRAME(TYP.)

5/8" GYP BDRE: ARCHITECTURALPLAN FOR WALL TYPE

5/8" GYP BDRE: ARCHITECTURALPLAN FOR WALL TYPE

ALUM. FRAME(TYP.)

EXISTING GYP BD.WALL

ALIGN

5/8" GYP BDRE: ARCHITECTURALPLAN FOR WALL TYPE

CAULKBOTH SIDES(TYP)

5/8" GYP BDRE: ARCHITECTURALPLAN FOR WALL TYPE

ALUM. FRAME(TYP.)

0' -

4"

5/8" GYP BDRE: ARCHITECTURALPLAN FOR WALL TYPE

5/8" GYP BD W/ PLYWDRE: ARCHITECTURALPLAN FOR WALL TYPE

20' - 2"DOOR WIDTH

DO

OR

HEI

GH

T

17' - 10"

DOOR WIDTH

DO

OR

HEI

GH

T

15' - 11"

H

DO

OR

HEI

GH

T

DOOR WIDTH

DOOR WIDTH

DO

OR

HEI

GH

T

7' - 0"

DOOR WIDTH

DO

OR

HEI

GH

T

20' - 2"

ABC

ALUMINUM STOREFRONT

WOOD - 5 PLY - FULL GLASS

WOOD - 5 PLY - FULL GLASS SLIDER

HOLLOW METAL

EXISTING HOLLOW METAL DOOR

WOOD BIFOLD DOOR

GLASS OVERHEAD DOOR- (HANGER - STYLE)

DE

F

G

DOOR TYPE - LABELS

5/8" GYPSUM BDRE: ARCHITECTURALPLAN FOR WALL TYPE

GLASS TYPE RE:SCHEDULE

ALUM. STOREFRONTSYSTEMALUM. CLOSURE

PIECE (TYP.)

CAULKBOTH SIDES(TYP)

ALUM. CLOSUREPIECE (TYP.)

2 1/2"

0' - 4"

5/8" GYP BDRE: ARCHITECTURALPLAN FOR WALL TYPE

SEALANTBOTH SIDES(TYP)

RE: ARCHITECTURALPLAN FORWALL TYPE

STOREFRONTFRAME W/FULL GLASS

EXISTCONC FLOOR

DOOR SCHEDULE INDICATES NEW DOORS ANDEXISTING DOORS REQUIRING MODIFICATIONS.CONTRACTOR SHALL COORDINATE THE KEYINGOF NEW, REWORKED AND EXISTING DOOR WITHOWNER'S REQUIREMENTS. ADDITIONAL DOORSDISCOVERED THAT REQUIRE MODIFICATION SHALLBE PROMPTLY REPORTED TO THE ARCHITECT.

LOCATION DOORS FRAMES A MINIMUM OF 4"FROM THE CORNER TO THE BACK OF FRAMEUNLESS OTHERWISE INDICATED

UNDERCUT DOORS AS REQUIRED TO CLEARFINISH FLOOR MATERIALS AND TO MAINTAIN FIRERATING.

DOORS SHALL BE SINGLE SWING. (UNLESSOTHER WISE NOTED)

SEE PROJECT MANUAL FOR DOOR HARDWARESETSSECTION 087100 DOOR HARDWARE.

REMARKS:WOOD TYPE DOOR TO BE ROTARY CUT WHITEBIRCH

GLASS TYPE- TYPE 1 - SAFETY GLASS(TEMPERED GLASS)

GENERAL NOTES - DOORS

1.

2.

3.

4.

5.

440 BurroughsSt.Detroit, MI 48202ph. 313.486.1908

www.centricdesignstudio.com

Do Not Scale Drawings

Date

Drawn by

Checked by

Client:

Project:

Location:

Consultants:

Seal:

Sheet Title:

Patrick Thompson Design485 Milwaukee Ave. Ste. 100C Detroit, MI 48202

313.820.3268www.patrickthompsondesign.com

Ghafari Associates, LLC17101 Michigan Ave. Dearborn, MI 48126 USA

TEL +1.313.441.3000www.ghafari.com

Project number

JMS Engineering Services32401 West 8 Mile, Suite 2-5

Livonia, MI 48152 | 313.399.2932

2/28

/201

3 7:

33:2

4 PM

A7.01

Door Schedule

02/22/13C.M

S. LITTLE

12-29

TechTown First FloorRenovation

440 Burroughs St. - Detroit, MI

Door ScheduleDoor

NumberDoor

Fire Rating HardwareFrame Frame Frame Frame Frame

CommentsWidth Height Thickness Material Finish Type Material Finish Jamb Head102 3' - 0" 7' - 0" 0' - 2 1/2" ALUM ANODIZE 4 3 ALUM ANODIZE 15/A7.01 14/A7.01 DOOR TYPE - A103 6' - 0" 7' - 0" 0' - 1 1/2" ALUM ANODIZE 5 5 ALUM ANODIZE 15/A7.01 14/A7.01 DOOR TYPE - H, DOUBLE DOOR104 3' - 0" 7' - 0" 0' - 1 3/4" WOOD STAIN 1 1 ALUM ANODIZE 8 & 9/A7.01 7/A7.01 DOOR TYPE - B105 3' - 0" 7' - 0" 0' - 1 3/4" WOOD STAIN 1 1 ALUM ANODIZE 8 & 9/A7.01 7/A7.01 DOOR TYPE - B108 3' - 0" 7' - 0" 0' - 2 1/2" ALUM ANODIZE 4 2 ALUM ANODIZE 15/A7.01 14/A7.01 DOOR TYPE - A108A 4' - 0" 7' - 0" 0' - 1 1/2" WOOD STAIN 7 DOOR TYPE - F, BI- FOLD DOOR, GYP. BD. FRAMELESS ENTYRY108B 4' - 0" 7' - 0" 0' - 1 1/2" WOOD STAIN 7 DOOR TYPE - F, BI- FOLD DOOR, GYP. BD. FRAMELESS ENTYRY108C 4' - 0" 7' - 0" 0' - 1 1/2" WOOD STAIN 7 DOOR TYPE - F, BI- FOLD DOOR, GYP. BD. FRAMELESS ENTYRY109 3' - 0" 7' - 0" 0' - 2 1/2" HM PAINT 1HR 6 EXIST. HM PAINT 12 &

13/A7.0110/A7.01 DOOR TYPE - D, COLOR SELECTION IN SHOP DWG

112 3' - 0" 7' - 0" 0' - 2 1/2" ALUM ANODIZE 4 1 ALUM ANODIZE 15/A7.01 14/A7.01 DOOR TYPE - A114 3' - 0" 7' - 0" 0' - 1 3/4" WOOD STAIN 1 6 ALUM ANODIZE 8 & 9/A7.01 7/A7.01 DOOR TYPE - B115 3' - 0" 7' - 0" 0' - 2" WOOD STAIN 3 1 DOOR TYPE - C, GYP. BD. FRAMELESS ENTRY116 3' - 0" 7' - 0" 0' - 2" WOOD STAIN 3 DOOR TYPE - C, GYP. BD. FRAMELESS ENTRY117 3' - 0" 7' - 0" 0' - 1 3/4" WOOD STAIN 1 ALUM ANODIZE 8 & 9/A7.01 7/A7.01 DOOR TYPE - B120 4' - 0" 6' - 8" 0' - 2" HM PAINT 6 1 HM PAINT 12 &

13/A7.0110/A6.03 DOOR TYPE - E, COLOR SELECTION IN SHOP DWG

122 3' - 0" 7' - 0" 0' - 1 3/4" WOOD STAIN 1 1 ALUM ANODIZE 8 & 9/A7.01 7/A7.01 DOOR TYPE - B123 3' - 0" 7' - 0" 0' - 1 3/4" WOOD STAIN 1 1 ALUM ANODIZE 8 & 9/A7.01 7/A7.01 DOOR TYPE - B124 3' - 0" 7' - 0" 0' - 1 3/4" WOOD STAIN 1 2 ALUM ANODIZE 8 & 9/A7.01 7/A7.01 DOOR TYPE - B125A 3' - 0" 7' - 0" 0' - 1 3/4" WOOD STAIN 1 1 ALUM ANODIZE 8 & 9/A7.01 7/A7.01 DOOR TYPE - B125B 3' - 0" 7' - 0" 0' - 1 3/4" WOOD STAIN 1 1 ALUM ANODIZE 8 & 9/A7.01 7/A7.01 DOOR TYPE - B125C 12' - 0" 8' - 0" 0' - 2" ALUM ANODIZE NONE ALUM ANODIZE 1/A6.03 2/A6.03 DOOR TYPE - G, OVERHEAD HANGER DOOR126A 3' - 0" 7' - 0" 0' - 1 3/4" WOOD STAIN 1 1 ALUM ANODIZE 8 & 9/A7.01 7/A7.01 DOOR TYPE - B126B 3' - 0" 7' - 0" 0' - 1 3/4" WOOD STAIN 1 1 ALUM ANODIZE 8 & 9/A7.01 7/A7.01 DOOR TYPE - B126C 12' - 0" 8' - 0" 0' - 2" ALUM ANODIZE NONE ALUM ANODIZE 1/A6.03 2/A6.03 DOOR TYPE - G, OVERHEAD HANGER DOOR127 3' - 0" 7' - 0" 0' - 1 3/4" WOOD STAIN 2 1 ALUM ANODIZE 8 & 9/A7.01 7/A7.01 DOOR TYPE - B128 3' - 0" 7' - 0" 0' - 1 3/4" WOOD STAIN 2 1 ALUM ANODIZE 8 & 9/A7.01 7/A7.01 DOOR TYPE - B132 3' - 0" 7' - 0" 0' - 1 3/4" WOOD STAIN 1 1 ALUM ANODIZE 8 & 9/A7.01 7/A7.01 DOOR TYPE - B133 3' - 0" 7' - 0" 0' - 1 3/4" WOOD STAIN 1 1 ALUM ANODIZE 8 & 9/A7.01 7/A7.01 DOOR TYPE - B134 3' - 0" 7' - 0" 0' - 1 3/4" WOOD STAIN 1 1 ALUM ANODIZE 8 & 9/A7.01 7/A7.01 DOOR TYPE - B139 4' - 0" 6' - 8" 0' - 2" HM PAINT 6 1 HM PAINT 12 &

13/A7.0110/A7.01 DOOR TYPE - E, REUSE OF EXISTING DOOR

1 1/2" = 1'-0"10 HM DOOR HEAD DETAIL

1 1/2" = 1'-0"7 WD DOOR HEAD DETAIL

1 1/2" = 1'-0"13 HM JAMB @ HINGE

1 1/2" = 1'-0"12 HM DOOR @ STRIKE

1 1/2" = 1'-0"8 WD DOOR DETAIL JAMB

1 1/2" = 1'-0"9 WD DOOR JAMB DETAIL @ STRIKE

1/4" = 1'-0"4 STOREFRONT GLAZING TYPE

1/4" = 1'-0"2

STOREFRONT FRAME KRESGE CONNECT VIDEOCONFERENCING

1/4" = 1'-0"5 TECH TOWN MANAGEMENT STOREFRONT TYPE 2

1/4" = 1'-0"3 STOREFRONT FRAME ELEVATOR LOBBY

1/4" = 1'-0"6 STOREFRONT FRAME TRAINING ROOM

1/4" = 1'-0"FRAME ELEVATION

1 1/2" = 1'-0"14 STOREFRONT DOOR HEAD DETAIL

1 1/2" = 1'-0"15 STOREFRONT DOOR JAMB DETAIL

1/18/2013 QUALITY REVIEW

1 1/2" = 1'-0"16 STOREFRONT SILL

2/22/2013 PERMITS/BIDS

Date: Submitted for:

NOTE:

STOREFRONT FRAME DIMENSIONS - SEE SHEET A5.08 - INTERIORELEVATIONS FOR THE DIMENSIONS FOR THE STOREFRONTFRAMING. ALL GLASS IS TO BE SAFETY GLASS TYPE GL - 1.

FLUSH METALDOOR (TYP)

SAFETYGLASSTYPE GL -1TYP. FORALUMDOORS

1

NOTE:DIMENSION S TYPICAL FORDOOR TYPES A, B AND C.

SAFETY GLASSTYPE GL-1(TYP.)

SAFETY GLASSTYPE GL-1(TYP.)

141 EXIST. EXIST. EXIST. EXIST. EXIST. 8 EXIST. EXIST. EXIST. DOOR TYPE - E, REUSE OF EXISTING DOOR

Page 26: TechTown 1st Floor Renovation
Page 27: TechTown 1st Floor Renovation
Page 28: TechTown 1st Floor Renovation
Page 29: TechTown 1st Floor Renovation

LC Skyfold wall

LC Skyfold wall

440 BurroughsSt.Detroit, MI 48202ph. 313.486.1908

www.centricdesignstudio.com

Do Not Scale Drawings

Date

Drawn by

Checked by

Client:

Project:

Location:

Consultants:

Seal:

Sheet Title:

Date: Submitted for:

440 Burroughs St.Detroit, MI 48202

12-29Project number

TechTown First FloorRenovations

JMS Engineering Services32401 West 8 Mile, Suite 2-5

Livonia, MI 48152 | 313.399.2932

Patrick Thompson Design485 Milwaukee Ave. Ste. 100C

Detroit, MI 48202 | 313.820.3268www.patrickthompsondesign.com

Ghafari Associates, LLC17101 Michigan Ave. Dearborn, MI 48126 USA

TEL +1.313.441.3000www.ghafari.com

S - 1

PARTITION SUPPORTFRAMING PLAN ANDDETAILS

DECEMBER, 2012JMSJMS

122112

2 / 22 / 2013 BIDS/PERMITS