Tecnologias e Serviços do Grupo Loesche
Dipl. – Ing. Taís Mazza
1
![Page 2: Tecnologias e Serviços do Grupo Loesche · Loesche Group in the Cement Industry Overview . 3 More than 100 years Loesche . More than 100 years Loesche 4 ~ 800 employees at 15 Loesche](https://reader030.vdocument.in/reader030/viewer/2022040115/5e85fca20ce01a000825362d/html5/thumbnails/2.jpg)
2
1. Loesche history
2. Loesche today
3. Loesche in brief
4. New Companies and Technologies in the Loesche Group
1. Loesche Automation GmbH
2. Thermal Applications – Hot Gas Generators and Burners
1. LOMA
2. ATEC Greco
3. Loesche ThermoProzess GmbH
3. Cement Pyroprocess and Process Optimization
1. ATEC
2. Aixergee
5. Loesche Group in the Cement Industry
Overview
![Page 3: Tecnologias e Serviços do Grupo Loesche · Loesche Group in the Cement Industry Overview . 3 More than 100 years Loesche . More than 100 years Loesche 4 ~ 800 employees at 15 Loesche](https://reader030.vdocument.in/reader030/viewer/2022040115/5e85fca20ce01a000825362d/html5/thumbnails/3.jpg)
3
More than 100 years Loesche
![Page 4: Tecnologias e Serviços do Grupo Loesche · Loesche Group in the Cement Industry Overview . 3 More than 100 years Loesche . More than 100 years Loesche 4 ~ 800 employees at 15 Loesche](https://reader030.vdocument.in/reader030/viewer/2022040115/5e85fca20ce01a000825362d/html5/thumbnails/4.jpg)
More than 100 years Loesche
4
![Page 5: Tecnologias e Serviços do Grupo Loesche · Loesche Group in the Cement Industry Overview . 3 More than 100 years Loesche . More than 100 years Loesche 4 ~ 800 employees at 15 Loesche](https://reader030.vdocument.in/reader030/viewer/2022040115/5e85fca20ce01a000825362d/html5/thumbnails/5.jpg)
~ 800 employees at 15 Loesche
subsidiaries worldwide
6
![Page 6: Tecnologias e Serviços do Grupo Loesche · Loesche Group in the Cement Industry Overview . 3 More than 100 years Loesche . More than 100 years Loesche 4 ~ 800 employees at 15 Loesche](https://reader030.vdocument.in/reader030/viewer/2022040115/5e85fca20ce01a000825362d/html5/thumbnails/6.jpg)
31 representative offices worldwide
7
![Page 7: Tecnologias e Serviços do Grupo Loesche · Loesche Group in the Cement Industry Overview . 3 More than 100 years Loesche . More than 100 years Loesche 4 ~ 800 employees at 15 Loesche](https://reader030.vdocument.in/reader030/viewer/2022040115/5e85fca20ce01a000825362d/html5/thumbnails/7.jpg)
~ 100 employees at 11 Loesche stakes
worldwide
8
![Page 8: Tecnologias e Serviços do Grupo Loesche · Loesche Group in the Cement Industry Overview . 3 More than 100 years Loesche . More than 100 years Loesche 4 ~ 800 employees at 15 Loesche](https://reader030.vdocument.in/reader030/viewer/2022040115/5e85fca20ce01a000825362d/html5/thumbnails/8.jpg)
Loesche vertical roller mills
- position in an integrated cement plant (1)
9
![Page 9: Tecnologias e Serviços do Grupo Loesche · Loesche Group in the Cement Industry Overview . 3 More than 100 years Loesche . More than 100 years Loesche 4 ~ 800 employees at 15 Loesche](https://reader030.vdocument.in/reader030/viewer/2022040115/5e85fca20ce01a000825362d/html5/thumbnails/9.jpg)
10
Loesche vertical roller mills
- position in an integrated cement plant (2)
![Page 10: Tecnologias e Serviços do Grupo Loesche · Loesche Group in the Cement Industry Overview . 3 More than 100 years Loesche . More than 100 years Loesche 4 ~ 800 employees at 15 Loesche](https://reader030.vdocument.in/reader030/viewer/2022040115/5e85fca20ce01a000825362d/html5/thumbnails/10.jpg)
14
Services
![Page 11: Tecnologias e Serviços do Grupo Loesche · Loesche Group in the Cement Industry Overview . 3 More than 100 years Loesche . More than 100 years Loesche 4 ~ 800 employees at 15 Loesche](https://reader030.vdocument.in/reader030/viewer/2022040115/5e85fca20ce01a000825362d/html5/thumbnails/11.jpg)
Services
15
![Page 12: Tecnologias e Serviços do Grupo Loesche · Loesche Group in the Cement Industry Overview . 3 More than 100 years Loesche . More than 100 years Loesche 4 ~ 800 employees at 15 Loesche](https://reader030.vdocument.in/reader030/viewer/2022040115/5e85fca20ce01a000825362d/html5/thumbnails/12.jpg)
Products
16
![Page 13: Tecnologias e Serviços do Grupo Loesche · Loesche Group in the Cement Industry Overview . 3 More than 100 years Loesche . More than 100 years Loesche 4 ~ 800 employees at 15 Loesche](https://reader030.vdocument.in/reader030/viewer/2022040115/5e85fca20ce01a000825362d/html5/thumbnails/13.jpg)
Mills for Cement Raw Meal
17
![Page 14: Tecnologias e Serviços do Grupo Loesche · Loesche Group in the Cement Industry Overview . 3 More than 100 years Loesche . More than 100 years Loesche 4 ~ 800 employees at 15 Loesche](https://reader030.vdocument.in/reader030/viewer/2022040115/5e85fca20ce01a000825362d/html5/thumbnails/14.jpg)
Mills for Cement Raw Meal
18
![Page 15: Tecnologias e Serviços do Grupo Loesche · Loesche Group in the Cement Industry Overview . 3 More than 100 years Loesche . More than 100 years Loesche 4 ~ 800 employees at 15 Loesche](https://reader030.vdocument.in/reader030/viewer/2022040115/5e85fca20ce01a000825362d/html5/thumbnails/15.jpg)
Mills for Cement and Granulated Blast
Furnace Slag
19
![Page 16: Tecnologias e Serviços do Grupo Loesche · Loesche Group in the Cement Industry Overview . 3 More than 100 years Loesche . More than 100 years Loesche 4 ~ 800 employees at 15 Loesche](https://reader030.vdocument.in/reader030/viewer/2022040115/5e85fca20ce01a000825362d/html5/thumbnails/16.jpg)
Mills for Solid Fuels
20
![Page 17: Tecnologias e Serviços do Grupo Loesche · Loesche Group in the Cement Industry Overview . 3 More than 100 years Loesche . More than 100 years Loesche 4 ~ 800 employees at 15 Loesche](https://reader030.vdocument.in/reader030/viewer/2022040115/5e85fca20ce01a000825362d/html5/thumbnails/17.jpg)
Classifier
23
![Page 18: Tecnologias e Serviços do Grupo Loesche · Loesche Group in the Cement Industry Overview . 3 More than 100 years Loesche . More than 100 years Loesche 4 ~ 800 employees at 15 Loesche](https://reader030.vdocument.in/reader030/viewer/2022040115/5e85fca20ce01a000825362d/html5/thumbnails/18.jpg)
Automation Technology
24
![Page 19: Tecnologias e Serviços do Grupo Loesche · Loesche Group in the Cement Industry Overview . 3 More than 100 years Loesche . More than 100 years Loesche 4 ~ 800 employees at 15 Loesche](https://reader030.vdocument.in/reader030/viewer/2022040115/5e85fca20ce01a000825362d/html5/thumbnails/19.jpg)
Our Priorities in
Process Automation:
Basic- und Detail-Engineering
Software Development
Visualisation of Automation Systems
Installation & Commissioning
Consulting & Process Optimisation
Customer Trainings
Loesche Automation GmbH
Automation department of Loesche GmbH in
Düsseldorf: 19 employees
Loesche Automation GmbH in Lünen: 32
employees
51 employees
![Page 20: Tecnologias e Serviços do Grupo Loesche · Loesche Group in the Cement Industry Overview . 3 More than 100 years Loesche . More than 100 years Loesche 4 ~ 800 employees at 15 Loesche](https://reader030.vdocument.in/reader030/viewer/2022040115/5e85fca20ce01a000825362d/html5/thumbnails/20.jpg)
Common Controllers used by Loesche Automation GmbH Standard Controllers Safety based Controllers
S7-xxx Series S7-xxx-F Series alternatively: alternatively:
ControlLogix Series HIMatrix Series
Loesche Automation GmbH
![Page 21: Tecnologias e Serviços do Grupo Loesche · Loesche Group in the Cement Industry Overview . 3 More than 100 years Loesche . More than 100 years Loesche 4 ~ 800 employees at 15 Loesche](https://reader030.vdocument.in/reader030/viewer/2022040115/5e85fca20ce01a000825362d/html5/thumbnails/21.jpg)
29
Hardware
On Site & Services
High voltage Low voltage Control systems Drives Instrumentation
Site Management Installation Commissioning
Control Systems
Process Control System Software, Visualization Optimization
Engineering
Project Management Basic Engineering Detail Electrical planning
Scope of supply
Loesche Automation GmbH
![Page 22: Tecnologias e Serviços do Grupo Loesche · Loesche Group in the Cement Industry Overview . 3 More than 100 years Loesche . More than 100 years Loesche 4 ~ 800 employees at 15 Loesche](https://reader030.vdocument.in/reader030/viewer/2022040115/5e85fca20ce01a000825362d/html5/thumbnails/22.jpg)
Loesche Automation Products
Loesche Automation GmbH
![Page 23: Tecnologias e Serviços do Grupo Loesche · Loesche Group in the Cement Industry Overview . 3 More than 100 years Loesche . More than 100 years Loesche 4 ~ 800 employees at 15 Loesche](https://reader030.vdocument.in/reader030/viewer/2022040115/5e85fca20ce01a000825362d/html5/thumbnails/23.jpg)
Thermal Applications
31
Main Features:
Hot-gas generator with steel
combustion Chamber (LOMA Heater)
No refractory linings.
Energy-efficient process.
Alternative fuels.
Burner systems (MLB):
Outputs from 0.1 to 60 MW.
More than 600 reference plants
in cement, power generation,
steel, minerals, ore, timber,
animal feed and chemical
industry.
![Page 24: Tecnologias e Serviços do Grupo Loesche · Loesche Group in the Cement Industry Overview . 3 More than 100 years Loesche . More than 100 years Loesche 4 ~ 800 employees at 15 Loesche](https://reader030.vdocument.in/reader030/viewer/2022040115/5e85fca20ce01a000825362d/html5/thumbnails/24.jpg)
Hot Gas Generator Design - LOMA
32
1 Burner
2 Muffle
3 Spiral Housing
4 Ring Slots
5 Protective Sheath
6 Perforated Jacket
7 Hot Gas Outlet
![Page 25: Tecnologias e Serviços do Grupo Loesche · Loesche Group in the Cement Industry Overview . 3 More than 100 years Loesche . More than 100 years Loesche 4 ~ 800 employees at 15 Loesche](https://reader030.vdocument.in/reader030/viewer/2022040115/5e85fca20ce01a000825362d/html5/thumbnails/25.jpg)
LOMA - Spiral Casing, Burning Chamber
33
Tubarao 3 (Brazil)
LF 25, Stainless Steel
Blast Furnace Gas
![Page 26: Tecnologias e Serviços do Grupo Loesche · Loesche Group in the Cement Industry Overview . 3 More than 100 years Loesche . More than 100 years Loesche 4 ~ 800 employees at 15 Loesche](https://reader030.vdocument.in/reader030/viewer/2022040115/5e85fca20ce01a000825362d/html5/thumbnails/26.jpg)
LOMA References
35
![Page 27: Tecnologias e Serviços do Grupo Loesche · Loesche Group in the Cement Industry Overview . 3 More than 100 years Loesche . More than 100 years Loesche 4 ~ 800 employees at 15 Loesche](https://reader030.vdocument.in/reader030/viewer/2022040115/5e85fca20ce01a000825362d/html5/thumbnails/27.jpg)
36
Founded in 1966 – Uni. Prof. Clemento Greco
Since more than 10 years around 300pc. installed burners
Since 2010 part of the A TEC Group
Since 2012 integrated in
8 worldwide offices
NEW: Solid Alternative Fuel Handling System
![Page 28: Tecnologias e Serviços do Grupo Loesche · Loesche Group in the Cement Industry Overview . 3 More than 100 years Loesche . More than 100 years Loesche 4 ~ 800 employees at 15 Loesche](https://reader030.vdocument.in/reader030/viewer/2022040115/5e85fca20ce01a000825362d/html5/thumbnails/28.jpg)
38
![Page 29: Tecnologias e Serviços do Grupo Loesche · Loesche Group in the Cement Industry Overview . 3 More than 100 years Loesche . More than 100 years Loesche 4 ~ 800 employees at 15 Loesche](https://reader030.vdocument.in/reader030/viewer/2022040115/5e85fca20ce01a000825362d/html5/thumbnails/29.jpg)
39
![Page 30: Tecnologias e Serviços do Grupo Loesche · Loesche Group in the Cement Industry Overview . 3 More than 100 years Loesche . More than 100 years Loesche 4 ~ 800 employees at 15 Loesche](https://reader030.vdocument.in/reader030/viewer/2022040115/5e85fca20ce01a000825362d/html5/thumbnails/30.jpg)
40
TECHNICAL DATA:
Thermal HGG power: 3 – 60 MW
HGG outlet temperature: 150-1000 C
Vertical design
Ash removal system
FUELS:
Coal / Petcoke
Oil
Gas
Alternative Fuels (wood, animal meal…)
![Page 31: Tecnologias e Serviços do Grupo Loesche · Loesche Group in the Cement Industry Overview . 3 More than 100 years Loesche . More than 100 years Loesche 4 ~ 800 employees at 15 Loesche](https://reader030.vdocument.in/reader030/viewer/2022040115/5e85fca20ce01a000825362d/html5/thumbnails/31.jpg)
Loesche ThermoProzess GmbH
45
• Establishment in April 2012 in Düsseldorf,
out of the company Küppersbusch, founded in
1875
• 41 employees
• In July 2012: move into the new office and
production facilities
(in Gelsenkirchen)
• Certified to DIN EN ISO 9001 and ISO 14001
production and office space:
1.492 m² production
400 m² office
![Page 32: Tecnologias e Serviços do Grupo Loesche · Loesche Group in the Cement Industry Overview . 3 More than 100 years Loesche . More than 100 years Loesche 4 ~ 800 employees at 15 Loesche](https://reader030.vdocument.in/reader030/viewer/2022040115/5e85fca20ce01a000825362d/html5/thumbnails/32.jpg)
Loesche ThermoProzess GmbH
46
Special burner systems
for low calorific gases
until 3 MJ/Nm³
![Page 33: Tecnologias e Serviços do Grupo Loesche · Loesche Group in the Cement Industry Overview . 3 More than 100 years Loesche . More than 100 years Loesche 4 ~ 800 employees at 15 Loesche](https://reader030.vdocument.in/reader030/viewer/2022040115/5e85fca20ce01a000825362d/html5/thumbnails/33.jpg)
Loesche ThermoProzess GmbH
47
High-impulse self-
cooling burners
Multilance burners for
special applications
e.g. Syngas
![Page 34: Tecnologias e Serviços do Grupo Loesche · Loesche Group in the Cement Industry Overview . 3 More than 100 years Loesche . More than 100 years Loesche 4 ~ 800 employees at 15 Loesche](https://reader030.vdocument.in/reader030/viewer/2022040115/5e85fca20ce01a000825362d/html5/thumbnails/34.jpg)
Process optimization (ATEC + Aixergee)
52
Motivation:
• Cost pressure and ever changing
requirements force cement plants to
continuously modify & optimize their
production process.
• Specific optimization is necessary for:
• Process
• Equipment
• Operation
![Page 35: Tecnologias e Serviços do Grupo Loesche · Loesche Group in the Cement Industry Overview . 3 More than 100 years Loesche . More than 100 years Loesche 4 ~ 800 employees at 15 Loesche](https://reader030.vdocument.in/reader030/viewer/2022040115/5e85fca20ce01a000825362d/html5/thumbnails/35.jpg)
Cement Pyroprocess
53
![Page 36: Tecnologias e Serviços do Grupo Loesche · Loesche Group in the Cement Industry Overview . 3 More than 100 years Loesche . More than 100 years Loesche 4 ~ 800 employees at 15 Loesche](https://reader030.vdocument.in/reader030/viewer/2022040115/5e85fca20ce01a000825362d/html5/thumbnails/36.jpg)
54
most economic pressure
drop reduction for existing
cyclone
30% guaranteed pressure
drop reduction between cyclone
inlet and cyclone outlet
best efficiency for low loaded gases
most economic combination of
pressure drop reduction and separation
efficiency
less space requirement
the world‘s most economic cyclone
Dip tube add on
Energy saving, more Efficiency
Efficient Cylones
![Page 37: Tecnologias e Serviços do Grupo Loesche · Loesche Group in the Cement Industry Overview . 3 More than 100 years Loesche . More than 100 years Loesche 4 ~ 800 employees at 15 Loesche](https://reader030.vdocument.in/reader030/viewer/2022040115/5e85fca20ce01a000825362d/html5/thumbnails/37.jpg)
Combustion Chamber for AF
55
State of the art pre-combustion chambers for
difficult to burn fuels
Combustion takes place in a high oxygen
atmosphere
Reliable operation
![Page 38: Tecnologias e Serviços do Grupo Loesche · Loesche Group in the Cement Industry Overview . 3 More than 100 years Loesche . More than 100 years Loesche 4 ~ 800 employees at 15 Loesche](https://reader030.vdocument.in/reader030/viewer/2022040115/5e85fca20ce01a000825362d/html5/thumbnails/38.jpg)
Feeding and Dosing for AF
56
Reliable feeding devices for secondary fuels
![Page 39: Tecnologias e Serviços do Grupo Loesche · Loesche Group in the Cement Industry Overview . 3 More than 100 years Loesche . More than 100 years Loesche 4 ~ 800 employees at 15 Loesche](https://reader030.vdocument.in/reader030/viewer/2022040115/5e85fca20ce01a000825362d/html5/thumbnails/39.jpg)
LEUBE ZEMENTWERK GMBH
59
Actual Situation
Operation with two kiln lines
Both kilns without tertiary air duct, both kilns four stage Preheater
Limited in alternative fuel usage & both kilns are more than 40 years in operation
Targets of the project
Usage of 80 % alternative fuels
Improvement of Clinker quality
Reduction of dust emissions, NOx and SO2
Flexibility of product arrangement
Reduction of energy consumption
Modernization without long stops
Arrangements for CO2 reductions
Best econcomic solution
![Page 40: Tecnologias e Serviços do Grupo Loesche · Loesche Group in the Cement Industry Overview . 3 More than 100 years Loesche . More than 100 years Loesche 4 ~ 800 employees at 15 Loesche](https://reader030.vdocument.in/reader030/viewer/2022040115/5e85fca20ce01a000825362d/html5/thumbnails/40.jpg)
The Aixergee Approach
60
![Page 41: Tecnologias e Serviços do Grupo Loesche · Loesche Group in the Cement Industry Overview . 3 More than 100 years Loesche . More than 100 years Loesche 4 ~ 800 employees at 15 Loesche](https://reader030.vdocument.in/reader030/viewer/2022040115/5e85fca20ce01a000825362d/html5/thumbnails/41.jpg)
61
The Aixergee Approach
![Page 42: Tecnologias e Serviços do Grupo Loesche · Loesche Group in the Cement Industry Overview . 3 More than 100 years Loesche . More than 100 years Loesche 4 ~ 800 employees at 15 Loesche](https://reader030.vdocument.in/reader030/viewer/2022040115/5e85fca20ce01a000825362d/html5/thumbnails/42.jpg)
62
The Aixergee Approach
![Page 43: Tecnologias e Serviços do Grupo Loesche · Loesche Group in the Cement Industry Overview . 3 More than 100 years Loesche . More than 100 years Loesche 4 ~ 800 employees at 15 Loesche](https://reader030.vdocument.in/reader030/viewer/2022040115/5e85fca20ce01a000825362d/html5/thumbnails/43.jpg)
Case 1 – Brown Clinker
63
Capacity: 2850 t/d
Preheater: 2 string, 4 stages without calciner
Kiln: KHD , Ø 5.3 m x 80 m (Year of commissioning 1972)
Cooler: rotary cooler, Ø 6.0/6.5 m x 52 m (Year of Construction 1985)
Secondary fuel rate: 65 – 75 %
Initial situation:
• Formation of brown clinker granules under high RDF
feeding rates
![Page 44: Tecnologias e Serviços do Grupo Loesche · Loesche Group in the Cement Industry Overview . 3 More than 100 years Loesche . More than 100 years Loesche 4 ~ 800 employees at 15 Loesche](https://reader030.vdocument.in/reader030/viewer/2022040115/5e85fca20ce01a000825362d/html5/thumbnails/44.jpg)
Case 1 – Brown Clinker –
Burner details
64
![Page 45: Tecnologias e Serviços do Grupo Loesche · Loesche Group in the Cement Industry Overview . 3 More than 100 years Loesche . More than 100 years Loesche 4 ~ 800 employees at 15 Loesche](https://reader030.vdocument.in/reader030/viewer/2022040115/5e85fca20ce01a000825362d/html5/thumbnails/45.jpg)
Case 1 – Brown Clinker –
Evaluation of flame position
65
![Page 46: Tecnologias e Serviços do Grupo Loesche · Loesche Group in the Cement Industry Overview . 3 More than 100 years Loesche . More than 100 years Loesche 4 ~ 800 employees at 15 Loesche](https://reader030.vdocument.in/reader030/viewer/2022040115/5e85fca20ce01a000825362d/html5/thumbnails/46.jpg)
Case 1 – Brown Clinker –
Impact of Pneumoswirl on coarse fraction
of the RDF
66
![Page 47: Tecnologias e Serviços do Grupo Loesche · Loesche Group in the Cement Industry Overview . 3 More than 100 years Loesche . More than 100 years Loesche 4 ~ 800 employees at 15 Loesche](https://reader030.vdocument.in/reader030/viewer/2022040115/5e85fca20ce01a000825362d/html5/thumbnails/47.jpg)
Case 2 – High Bypass
dust load
68
Capacity: 4000 t/d
Preheater: 1 string, 2 stages
Calciner: Polysius with Double Deflector and Combustion chamber Kiln: Polysius , Ø 4.3 m x 62 m (Year of commissioning 1999)
Cooler: Polysius Repol-RS with crusher
Calciner: Polysius 2-stage preheater with Combustion Chamber
Kiln Bypass System: For alkali reduction
Initial situation:
• Very high dust load in bypass gas
• Low chlorine concentration in bypass dust
• LOI in bypass dust indicates meal fall-though into
kiln inlet chamber as root cause for dust extraction
from kiln inlet chamber
![Page 48: Tecnologias e Serviços do Grupo Loesche · Loesche Group in the Cement Industry Overview . 3 More than 100 years Loesche . More than 100 years Loesche 4 ~ 800 employees at 15 Loesche](https://reader030.vdocument.in/reader030/viewer/2022040115/5e85fca20ce01a000825362d/html5/thumbnails/48.jpg)
Case 2 – High Bypass
dust load
69
![Page 49: Tecnologias e Serviços do Grupo Loesche · Loesche Group in the Cement Industry Overview . 3 More than 100 years Loesche . More than 100 years Loesche 4 ~ 800 employees at 15 Loesche](https://reader030.vdocument.in/reader030/viewer/2022040115/5e85fca20ce01a000825362d/html5/thumbnails/49.jpg)
70
Case 2 – High Bypass
dust load
![Page 50: Tecnologias e Serviços do Grupo Loesche · Loesche Group in the Cement Industry Overview . 3 More than 100 years Loesche . More than 100 years Loesche 4 ~ 800 employees at 15 Loesche](https://reader030.vdocument.in/reader030/viewer/2022040115/5e85fca20ce01a000825362d/html5/thumbnails/50.jpg)
71
Meal from the open leg
Climafuel
Meal from the blocked leg
Coal
Case 2 – High Bypass
dust load
![Page 51: Tecnologias e Serviços do Grupo Loesche · Loesche Group in the Cement Industry Overview . 3 More than 100 years Loesche . More than 100 years Loesche 4 ~ 800 employees at 15 Loesche](https://reader030.vdocument.in/reader030/viewer/2022040115/5e85fca20ce01a000825362d/html5/thumbnails/51.jpg)
Case 3 – SNCR Optimization
72
Capacity: 2850 t/d
Preheater: 2 string, 4 stages
without calciner
Kiln: KHD , Ø 5.3 m x 80 m
(Year of commissioning 1972)
Cooler: rotary cooler, Ø 6.0/6.5 m x 52 m (Year of
Construction 1985)
Secondary fuel rate: 75 – 95 %
Initial situation:
• Frequent exception of the NOx limit value
(68 exception in daily limit values and 217 exceptions in
half hour limit values in 2008)
• High consumption of reduction agent
(700 k€ in 2008)
![Page 52: Tecnologias e Serviços do Grupo Loesche · Loesche Group in the Cement Industry Overview . 3 More than 100 years Loesche . More than 100 years Loesche 4 ~ 800 employees at 15 Loesche](https://reader030.vdocument.in/reader030/viewer/2022040115/5e85fca20ce01a000825362d/html5/thumbnails/52.jpg)
Case 3 – SNCR Optimization
73
• Approach:CFD-based engineering of optimal number, positions and orientations of the SNCR
lances
• Result: Implementation of 4 lances on two different levels with adapted flow rates
![Page 53: Tecnologias e Serviços do Grupo Loesche · Loesche Group in the Cement Industry Overview . 3 More than 100 years Loesche . More than 100 years Loesche 4 ~ 800 employees at 15 Loesche](https://reader030.vdocument.in/reader030/viewer/2022040115/5e85fca20ce01a000825362d/html5/thumbnails/53.jpg)
Case 3 – SNCR Optimization
74
![Page 54: Tecnologias e Serviços do Grupo Loesche · Loesche Group in the Cement Industry Overview . 3 More than 100 years Loesche . More than 100 years Loesche 4 ~ 800 employees at 15 Loesche](https://reader030.vdocument.in/reader030/viewer/2022040115/5e85fca20ce01a000825362d/html5/thumbnails/54.jpg)
Loesche Group in the Cement Industry
77
![Page 55: Tecnologias e Serviços do Grupo Loesche · Loesche Group in the Cement Industry Overview . 3 More than 100 years Loesche . More than 100 years Loesche 4 ~ 800 employees at 15 Loesche](https://reader030.vdocument.in/reader030/viewer/2022040115/5e85fca20ce01a000825362d/html5/thumbnails/55.jpg)
78
Thank you for your attention!