temporary irradiation facility at the cngs beam d. mcfarlane, t. wijnands,

16
Temporary irradiation facility at the CNGS beam D. Mcfarlane, T. Wijnands,

Upload: maud-annabel-lawrence

Post on 04-Jan-2016

217 views

Category:

Documents


2 download

TRANSCRIPT

Page 1: Temporary irradiation facility at the CNGS beam D. Mcfarlane, T. Wijnands,

Temporary irradiation facility at the CNGS beam

D. Mcfarlane, T. Wijnands,

Page 2: Temporary irradiation facility at the CNGS beam D. Mcfarlane, T. Wijnands,

Motivation to test equipment on site

• Exposure to LHC like radiation field• Short turn around• Pre selection of components facilitated• Complete systems tests (crates) before installation• RP issues

Page 3: Temporary irradiation facility at the CNGS beam D. Mcfarlane, T. Wijnands,

MC simulations

• ARC per Gy– 1 x 108 to 1 x 1010 n > 100 keV– 2 x 108 to 4 x 109 n > 20 MeV– 2 x 108 to 2 x 109 n > 100 MeV

• CNGS per Gy– 1 x 1010 n > 100 keV– 5 x 109 n > 20 MeV

Dose rates :

CNGS : 1 to 150 Gy per week

ARC-DS : 1 to 200 Gy per year

Page 4: Temporary irradiation facility at the CNGS beam D. Mcfarlane, T. Wijnands,

CNGS Radiation Test facility

• 5 x WorldFIP Cable – 1 of which is for the RadMon installation

• 4 x Profibus Cable• 8 x NE48 Cable

– Cable request given to TS/EL (8th Feb 2008)

• 2 x (6x monomode fibre optic tubes)– Request given to TS/EL/CF (12th Feb 2008)

• 4 x SubD Cables• 4 x Patch panel (test area)

• 1 x Rack (repeater station)

• 2 x Rack (Control room)Length of each cable is approx 1.2km (Around 28km in total)

Page 5: Temporary irradiation facility at the CNGS beam D. Mcfarlane, T. Wijnands,

Layout of facility

Control room Area

Signal repeater area

Test area

Page 6: Temporary irradiation facility at the CNGS beam D. Mcfarlane, T. Wijnands,

Readout electronics in Bat 921-2001

Page 7: Temporary irradiation facility at the CNGS beam D. Mcfarlane, T. Wijnands,

Signal repeaters

Signal repeater area

Page 8: Temporary irradiation facility at the CNGS beam D. Mcfarlane, T. Wijnands,

CNGS underground

Location of Radmondosimeters

Radiation test area

Page 9: Temporary irradiation facility at the CNGS beam D. Mcfarlane, T. Wijnands,

CNGS – 17 October 2007

23 January 2008 TS-LEA group meeting 9

TS Radiation Monitors

Page 10: Temporary irradiation facility at the CNGS beam D. Mcfarlane, T. Wijnands,

Location of RadMon devices

(1)

(2) (3)

(4) (5)

(6)

Page 11: Temporary irradiation facility at the CNGS beam D. Mcfarlane, T. Wijnands,

Location Signal Patch Panels

PatchPanel 1

PatchPanel 2

PatchPanel 3

PatchPanel 4

Page 12: Temporary irradiation facility at the CNGS beam D. Mcfarlane, T. Wijnands,

Signal Cables

• 4 Patch panels• Per Panel

– 2 x WorldFIP (1 for RadMon)– 1 x Profibus– 2 x “Burndy” NE48– 1 x SubD 9 Connector– 6 x fiber optic connections (Only on Patch panel 1 and 2)– 2 x 3 phase power supply– 1 x multi-socket single phase

Page 13: Temporary irradiation facility at the CNGS beam D. Mcfarlane, T. Wijnands,

Patch Panels

Page 14: Temporary irradiation facility at the CNGS beam D. Mcfarlane, T. Wijnands,

Patch Panels

Page 15: Temporary irradiation facility at the CNGS beam D. Mcfarlane, T. Wijnands,

Miniracks

Page 16: Temporary irradiation facility at the CNGS beam D. Mcfarlane, T. Wijnands,

Candidate equipment for testing in 2008

• LHC power converter electronics (RR’s & UJ76)• QPS electronics