Temporary Works CapabilityA guide to assist with engaging INNOVIS

Page 2: Temporary Works Capability · • Access Systems (Scaffold,, Swing Stages, Temporary Abseil points, Fall Restraint systems, Alimak and Hoist setup. • Modularisation. • Precast

Vision.Calibration.

Optimisation.

High Performance Consultancyemploying anagile, outcomes oriented, client focused,collaborative approach to fruition of vision.

Page 3: Temporary Works Capability · • Access Systems (Scaffold,, Swing Stages, Temporary Abseil points, Fall Restraint systems, Alimak and Hoist setup. • Modularisation. • Precast

Contents

1. Executive summary2. The INNOVIS approach3. How we add value4. Demonstrated expertise5. Capabilities

a. Erection engineering

b. Modularisation

c. Access systemsd. Precast design

e. Crane design

f. Crane equipmentg. General construction, demolition, site establishment and demobilisation

h. Formwork

i. Associated services

6. Next steps...

Page 4: Temporary Works Capability · • Access Systems (Scaffold,, Swing Stages, Temporary Abseil points, Fall Restraint systems, Alimak and Hoist setup. • Modularisation. • Precast

1. Executive summary

Over the past two years INNOVIS has grown into a firm with multiple specialist capabilities. Its

foremost capability being in the delivery of temporary works engineering. With experience across

projects both small and large there is little INNOVIS has not come across or cannot develop an

optimised solution for.

The intent of this document is to inform the reader of INNOVIS’ capability with the goal of

removing any barriers to engagement.

INNOVIS have prepared a document that covers their capability in two key ways:

1. What INNOVIS is capable of undertaking, and

2. What INNOVIS has undertaken.

The following presentation will leave you with the confidence that INNOVIS is capable of fulfilling

the crucial role of maintaining safety on all worksites for temporary works requirements in a

multitude of circumstances both complex and simple.

INNOVIS’ objective is to continually build its relationship with your company such that the

partnership derives optimised outcomes in the safest way possible.

Page 5: Temporary Works Capability · • Access Systems (Scaffold,, Swing Stages, Temporary Abseil points, Fall Restraint systems, Alimak and Hoist setup. • Modularisation. • Precast

2. The INNOVIS approach

Key Notes

1. Early Engagement.

2. Engagement with the right senior staff

throughout the process.

3. Experience in delivery of all forms of

temporary works with a solutions and

constructability focused approach.

What can we be engaged for?

• Concept development• Detailed design• Independent review• Proof engineering• Audit• Inspection services

Page 6: Temporary Works Capability · • Access Systems (Scaffold,, Swing Stages, Temporary Abseil points, Fall Restraint systems, Alimak and Hoist setup. • Modularisation. • Precast

Calibration and Optimisation are ongoing processes not destinations. They are mindsets and high-performance practises that positively influence time, cost and quality for all parties.

Calibration

To Calibrate we must understand the vision and related stakeholders. People create, and to be successful in that pursuit they must effectively communicate. The role of a consultant should – in its purest form – be to translate client vision into project scope, universally understood by all required disciplines so that their delivery is driven by high-performance expectations and criteria.

Optimisation

To Optimise we must design, procure and construct with the calibrated understanding of client vision. This may include research and development, additional specialist consultant involvement or other processes to ensure a granular rather than superficial approach to problem solving and delivery.

3. How we add value

Page 7: Temporary Works Capability · • Access Systems (Scaffold,, Swing Stages, Temporary Abseil points, Fall Restraint systems, Alimak and Hoist setup. • Modularisation. • Precast

INNOVIS has demonstrated competency in the following areas of temporary works engineering

both in design and independent review

• Erection engineering (construction methodology, staged erection stress analysis (simple and advanced), modularisation, stability design, prop design).

• Access Systems (Scaffold,, Swing Stages, Temporary Abseil points, Fall Restraint systems, Alimak and Hoist setup.

• Modularisation.

• Precast design (propping, lift assessments, erection methodologies, specialised systems).

• Crane design (tower and mobile, crane setup and site planning, base and tie design, heavy lift assessments.

• Crane lifting equipment design (stillages, lifting lugs, lift assessments, custom lifting equipment, spreader beams, etc).

• Demolition design (propping, sequencing).

• General construction & demolition design and load assessments.

• Site establishment & demobilisation, temporary gantries, hoarding design, site fences and gate designs.

• Formwork, reshoring, stripping and backprop design.

• Dilapidation reporting, including special access requirements, drone surveys, condition audits.

• Expert witness and design advisory services, including for variation and EOT claim assessments (both in defence and in support), insurance claims and dispute resolution.

• Solutions engineering.

• More detailed descriptions and activities against each of these items is outlined in the following documents slides.

4. Demonstrated expertise

Page 8: Temporary Works Capability · • Access Systems (Scaffold,, Swing Stages, Temporary Abseil points, Fall Restraint systems, Alimak and Hoist setup. • Modularisation. • Precast

INNOVIS are experts in erection engineering. Our focus is simple solutions supported by advanced analysis techniques. Our core services in this space include

• Construction methodology development, verification and documentation.

• Staged erection stress analysis (simple and advanced).

• Modularisation.• Stability design and assessment.• Prop design.

Project Examples:

• ANI Shipyard Project (Building 20 - two 140m x 45m x 15m high sheds and Building 21 - 160m x 50m x 30m high)

• Wilderness School – retention of first floor slab whilst removing 90% of all supporting columns

• Rooty Hill Performing Arts Centre – 2000 seat proscenium arch theatre

• Star Sovereign Resort• Quay Quarter Tower• Adelaide Airport

5a. Erection engineering

CASE STUDYWestern Sydney Performing Arts Centre (Rooty Hill)

• INNOVIS was engaged to undertake full erection stress analysis for the steel structure, however provided a number of supplementary scopes of works, including design of a temporary bridge for support of cranes and access equipment.

• As can be seen from the adjacent image, severe access challenges were presented for this long span and high structure.

Temporary bridge structure supporting access equipment

Page 9: Temporary Works Capability · • Access Systems (Scaffold,, Swing Stages, Temporary Abseil points, Fall Restraint systems, Alimak and Hoist setup. • Modularisation. • Precast

ANI Staged Erection (Ctrl + Left Click For Video)

CASE STUDYOsborne Naval Shipbuilding Precinct – Buildings 20 and 21 Sequence Analysis

INNOVIS’ primary scope of work included development of the steelwork erection methodology and staged erection analysis for seven structures.

INNOVIS undertook advanced staged erection analysis assessing each structure at each stage of construction for stability and overstress. Analysis for the most complex structure included assessment of over 8000 members under 1500 conditions.

INNOVIS developed and documented the erection methodology on behalf of Samaras Structural Engineers.

Scope included

• Prop design.• Heavy lift design and lift point engineering, lifting beams

etc.• Mobile tower crane design.• Fence and gate design & inspection.• Civil pit design and lift analysis.• Crane Installation (including 200T girder cranes spanning

48m).

Page 10: Temporary Works Capability · • Access Systems (Scaffold,, Swing Stages, Temporary Abseil points, Fall Restraint systems, Alimak and Hoist setup. • Modularisation. • Precast

INNOVIS understands modularisation of structures and the efficiency that it can

bring to projects.

INNOVIS also understands that modularisation for the sake of modularisation

does not always bring the efficiencies that may be desired.

For Example

INNOVIS undertook a design review into modularization of the Building 21 at ANI

and a fully modularized erection sequence was of value for initial site setup,

however modularization of erection for subsequent bays was not desirable, due

to limitations in transport, work zone and the more expensive cranage solution

required.

ANI Modular Lift (20T lift)

5b. ModularisationCASE STUDYAdelaide Airport Terminal Expansion (TEx)

• INNOVIS designed and documented a modular pedestrian protective gantry structure to be erected within the Virgin terminal within the WATPAC site.

• Designed for construction equipment and works to continue above unimpeded.

• Required to be fully constructed within a 3 hour overnight shutdown window, necessitating modular construction.

• Creative solution for manual handling of modules.

Page 11: Temporary Works Capability · • Access Systems (Scaffold,, Swing Stages, Temporary Abseil points, Fall Restraint systems, Alimak and Hoist setup. • Modularisation. • Precast

CASE STUDIES

Calvary HospitalClient - John Holland GroupMultiple scopes of work, including

• Design, review and safety audit of scaffold systems on site.

• Design and certification of Alimak hoist back-propping and tie details.

• Design and certification of 5 x swing stage rostrums for façade fin installation (pictured).

• Design and certification of site public access gantry structure.

Flinders University Pedestrian Bridge ScaffoldClient - BUILT

• Proof engineering (including independent calculations) of underslung bridge access scaffold

Australian Catholic University Mother Teresa BuildingClient - WATPAC

• Challenging site with 7 storey deep excavation for basement and very limited site access for equipment and vehicles.

• Temporary loading dock structure to be integrated into permanent works.

• INNOVIS completed full design of steel plunge piles, concept design for loading dock structure and development of design brief to permanent works designer for all required construction loading conditions.

INNOVIS is experienced with

Scaffold design and auditing

• Construction access systems, handrails and scaffold.• Public events, such as Clipsal 500, Tour Down Under.• Modular lift design.• Loading docks / ramps.• Swing stages / davit arms (access for façade

construction and maintenance).• Temporary abseil / fall arrest points.• Alimak and hoist setup - back propping & tie design.• Gantries.

Flinders University FootbridgeUnderslung Scaffold System

5c. Access systems

Australian Catholic UniversityLoading Dock

Calvary HospitalSwing Stage support Rostrum

Page 12: Temporary Works Capability · • Access Systems (Scaffold,, Swing Stages, Temporary Abseil points, Fall Restraint systems, Alimak and Hoist setup. • Modularisation. • Precast

INNOVIS is experienced with

• Panel design

• Propping design - precast panel propping and support. Our approach looks beyond the precast scope of works to integrate and optimise precast panel and propping design from a builders perspective, rather than limiting design approach to suit the subcontractor.

• Lift assessments – INNOVIS is experienced with design of lift hardware / inserts and panel strongbacks etc for early age lifting.

• Erection methodologies – our approach includes a comprehensive erection methodology and sequence aligned to the complexity of the methodology.

5d. Precast design

CASE STUDYAdelaide Airport Terminal Expansion (TEx)Client - WATPAC

• INNOVIS approached WATPAC with a concept for erection of precast cores (3 panels 18m high) to expedite steel construction and to mitigate 2 + weeks on critical path. This resulted in significant savings to project preliminaries and offset of project delays.

• Precast construction was critical path. Due to wet joint construction, panels were not stable or fit for steel erection until wet joints were poured and constructed.

• Design included construction of triple height panels without pour of wet joints and minimal panel connections.

Page 13: Temporary Works Capability · • Access Systems (Scaffold,, Swing Stages, Temporary Abseil points, Fall Restraint systems, Alimak and Hoist setup. • Modularisation. • Precast

INNOVIS is experienced in planning and design

associated with

• Tower cranes• Mobile cranes• Crane setup and site planning• Base and tie design• Heavy lift assessments

Tender Crane Assessment & Planning

Crane Grillage Design

5e. Crane design

CASE STUDYAustralian Catholic University (Victoria)Client - Watpac

• Challenging site with very limited access for setting up tower cranes.

• Tower cranes proposed to be set-up in the building construction zone on a suspended floor temporary loading platform (also designed by INNOVIS).

• Space constraints to construct dedicated tower crane foundations.

• Innovative approach – utilising the pile retention system along with concrete transfer beams integrated in the slab (allowing part demolition later) to support the tower cranes.

• Use of steel grillage tower crane foundation at other location.

• Tower crane interaction and lift study.

Page 14: Temporary Works Capability · • Access Systems (Scaffold,, Swing Stages, Temporary Abseil points, Fall Restraint systems, Alimak and Hoist setup. • Modularisation. • Precast

Innovis is experienced with design of

• Stillages• Lifting Lugs• Lift assessments• Custom lifting equipment• Spreader beams• Demolition lift assessments

Spreader Beam FEA

Break Press Tub GirderLift Analysis– FEAReinforcement cage lift

5f. Crane equipment

CASE STUDYThe Ribbon

Innovis designed the following items

• 20T stillage for steel erection• Lifting cleats and attachment points for approx. 30

different “standard” configurations• Tub Girder lift assessments• Spreader beam designs

Project ExampleMurray Bridge Waste-Water Treatment Plan

• Prefabricated reinforcement cage lift

Page 15: Temporary Works Capability · • Access Systems (Scaffold,, Swing Stages, Temporary Abseil points, Fall Restraint systems, Alimak and Hoist setup. • Modularisation. • Precast

INNOVIS is experienced with

Structural Capacity assessments for

• Stockpiles.• Demolition.• Construction equipment such as scissor lifts, spider cranes,

excavators, EWPs, mobile cranes, franna’s, stillages, bins etc.• Preston deck.• Early age concrete capacity.• Propping and back propping design associated with the

above to supplement existing capacity as required.• Temporary gantries.• Hoarding design.• Site fences and gate designs.• Screens.• Ramps.• Stairs.• Scaffolding.• Concrete boom.• Loading platforms / preston decks.• Crash barriers.

Example projects (major projects)

• SkyCity Casino (Adelaide) – Client: Hansen Yuncken – 30+ discrete packages of work

• Calvary Hospital (Adelaide) – Client: John Holland Group – 70+ discrete packages of work

5g. General construction, demolition, site establishment & demobilisation

CASE STUDYWilderness School RedevelopmentClient - Sarah Constructions

• Complex partial demolition project in which all vertical support columns were to be demolished, whilst retaining first floor structure. Simplified transfer propping using inclined props to avoid transfer propping over deep footing excavation for new column layout.

• Analysis of anticipated temporary movements

• Exploration of retention and underpinning options adjacent existing building for lift pit construction.

Page 16: Temporary Works Capability · • Access Systems (Scaffold,, Swing Stages, Temporary Abseil points, Fall Restraint systems, Alimak and Hoist setup. • Modularisation. • Precast

CASE STUDYSkyCity Casino HotelClient - Hansen Yuncken

INNOVIS undertook detailed design of back-propping configurations, including:

• Early removal of formwork to transfer floor, proposed to act as a jump Floor/ propping deck for ongoing construction.

• Redesign of typical floor to facilitate reduced back-propping requirements, including minor adjustments to reinforcement and use of higher early age concrete to remove multiple weeks from critical path activities.

• Independent 3rd party proof engineering design of ground floor transfer formwork –requirement to maintain access throughout formwork construction for 24/7 loading dock delivery to SkyCity casino and Adelaide Festival Centre (including semi-trailers), necessitating 17m clear span formwork support structure. Innovis undertook full independent modelling.

Innovis has experience with

• Formwork design.• Re-shore design.• Back-propping design.• Redesign of floor construction to achieve early formwork release• “jump floor” construction.

5h. Formwork

CASE STUDYCalvary Hospital

• INNOVIS undertook a detailed design and analysis of the post tensioned concrete slabs to accelerate formwork stripping and back propping removal, facilitating early stripping from typical floor and early removal of back-propping to transfer floor (concrete slab up to 1.8m thick), which then facilitated early access for following fit-out trades.

• In the course of undertaking the works, INNOVIS completed a peer review of the post tensioned concrete design and presented value management opportunities through an optimised design.

SkyCity Casino17m clear span formwork

support structure

Page 17: Temporary Works Capability · • Access Systems (Scaffold,, Swing Stages, Temporary Abseil points, Fall Restraint systems, Alimak and Hoist setup. • Modularisation. • Precast

INNOVIS can also assist with the following supplementary services,which can add significant value to your projects

• Dilapidation Reporting, including special access requirements, drone surveys, condition audits.

• Expert witness and design advisory services, including for variation and EOT claim assessments

(both in defence and in support), insurance claims and dispute resolution.

• Peer review, value management and alternative D&C design option study and development.

• Providing a “translation service” to talk “engineer” and assist with development and

acceptance of alternative solutions with design engineers and other consultants or trades.

5i. Associated services

Page 18: Temporary Works Capability · • Access Systems (Scaffold,, Swing Stages, Temporary Abseil points, Fall Restraint systems, Alimak and Hoist setup. • Modularisation. • Precast

Armed with the confidence that INNOVIS has the wisdom to efficiently and

effectively optimise outcomes, your next problem is best solved by contacting our

team as quickly as possible.

Thank you for the opportunity

to demonstrate our ability.