TENDER DOCUMENTS NOMINATED SUB-CONTRACT WORKS FOR BIOLOGICAL SEWAGE TREATMENT PLANT AND GREY WATER TREATMENT PLANT INSTALLATION FOR PSFSC FOR UPGRADING MAI PO NATURE RESERVE INFRASTRUCTURE AT MAI PO, SAN TIN, YUEN LONG, NEW TERRITORIES FOR WORLD WIDE FUND FOR NATURE HONG KONG PROJECT MANAGER Faithful + Gould ARCHITECT Thomas Chow Architects Limited ENGINEER Aurecon Hong Kong Limited SUSTAINABILITY CONSULTANT Ove Arup & Partners Hong Kong Limited QUANTITY SURVEYORS REF HK-4547/FP/STP NOV 2019

Upload: others

Post on 23-Jul-2020

1 views

Category:

Documents


1 download

TRANSCRIPT

Page 1: TENDER DOCUMENTS · schedule no. 1 – preliminaries sr1/1 – sr1 sum/1 schedule no. 2 – preambles sr2/1 – sr2/72 schedule no. 3 – sewage treatment plant system sr3/1 – sr3

TENDER DOCUMENTS

NOMINATED SUB-CONTRACT WORKS FOR

BIOLOGICAL SEWAGE TREATMENT PLANT AND

GREY WATER TREATMENT PLANT INSTALLATION

FOR PSFSC

FOR UPGRADING MAI PO NATURE RESERVE

INFRASTRUCTURE

AT MAI PO, SAN TIN, YUEN LONG, NEW

TERRITORIES

FOR WORLD WIDE FUND FOR NATURE HONG KONG

PROJECT MANAGER Faithful + Gould

ARCHITECT Thomas Chow Architects Limited

ENGINEER Aurecon Hong Kong Limited

SUSTAINABILITY CONSULTANT Ove Arup & Partners Hong Kong Limited

QUANTITY SURVEYORS

REF HK-4547/FP/STP NOV 2019

Page 2: TENDER DOCUMENTS · schedule no. 1 – preliminaries sr1/1 – sr1 sum/1 schedule no. 2 – preambles sr2/1 – sr2/72 schedule no. 3 – sewage treatment plant system sr3/1 – sr3

TENDER DOCUMENTS FOR

NOMINATED SUB-CONTRACT FOR BIOLOGICAL SEWAGE TREATMENT PLANT AND

GREY WATER TREATMENT PLANT INSTALLATION FOR PSFSC FOR

UPGRADING MAI PO NATURE RESERVE INFRASTRUCTURE AT

MAI PO, SAN TIN, YUEN LONG, NEW TERRITORIES

CONTENTS

HK-4547/FP TCK4:LWY22:TWT1:GT:M45042:(2.12.2019) - 1 - Arcadis Hong Kong Limited

PAGE 1. CONDITIONS OF TENDER CT/1 – CT/4

APPENDIX ‘A’ – LIST OF TENDER DRAWING CTA/1

APPENDIX ‘B’ – LIST OF REFERENCE DOCUMENT CTB/1

2. FORM OF TENDER FT/1 – FT/4

APPENDIX ‘A’ – SURETY BOND (SPECIMEN) FB/1 – FB/5

3. FORM OF WARRANTY TO BE GIVEN BY THE

NOMINATED SUB-CONTRACTOR TO THE EMPLOYER IN CONSIDERATION OF NOMINATION

FW/1 – FW/4

4. SPECIAL CONDITIONS OF SUB-CONTRACT i to ii,

SCC/B/1 – SCC/B/19 APPENDIX ‘A’ – SPECIAL CONDITIONS OF MAIN

CONTRACT i to ii,

SCC/1 – SCC/22 5. SPECIFICATION

SECTION A – GENERAL PRELIMINARIES i to iv, SA/1 – SA/48

SECTION B – PARTICULAR PRELIMINARIES i,

SB/1 – SB/5 SECTION C – PARTICULAR SPECIFICATION 85 Pages SECTION D – GUIDELINES FOR CONSULTANT AND

CONTRACTORS 10 Pages

Page 3: TENDER DOCUMENTS · schedule no. 1 – preliminaries sr1/1 – sr1 sum/1 schedule no. 2 – preambles sr2/1 – sr2/72 schedule no. 3 – sewage treatment plant system sr3/1 – sr3

TENDER DOCUMENTS FOR

NOMINATED SUB-CONTRACT FOR BIOLOGICAL SEWAGE TREATMENT PLANT AND

GREY WATER TREATMENT PLANT INSTALLATION FOR PSFSC FOR

UPGRADING MAI PO NATURE RESERVE INFRASTRUCTURE AT

MAI PO, SAN TIN, YUEN LONG, NEW TERRITORIES

CONTENTS (Cont’d)

HK-4547/FP TCK4:LWY22:TWT1:GT:M45042:(2.12.2019) - 2 - Arcadis Hong Kong Limited

PAGE 5. SPECIFICATION (Cont’d)

SECTION E – PENALTY CLAUSE FOR BREAKING THE RULES LISTED IN THE CODE OF CONDUCT STATED IN WWF GUIDELINES FOR CONSULTANT AND CONTRACTORS PRICING DOCUMENT

1 Page

6. SCHEDULE OF RATES

SCHEDULE NO. 1 – PRELIMINARIES SR1/1 – SR1 SUM/1 SCHEDULE NO. 2 – PREAMBLES SR2/1 – SR2/72 SCHEDULE NO. 3 – SEWAGE TREATMENT PLANT

SYSTEM SR3/1 – SR3 SUM/1

SCHEDULE NO. 4 – OPTIONAL TENDER FOR GREY

WATER TREATMENT PLANT SYSTEM

SR4/1 – SR4 SUM/1

SCHEDULE NO. 5 – OPTIONAL TENDER FOR

5-YEAR OPERATION AND MAINTENANCE PLAN FOR SEWAGE TREATMENT PLANT SYSTEM

SR5/1 – SR5 SUM/1

SCHEDULE NO. 6 – OPTIONAL TENDER FOR

5-YEAR OPERATION AND MAINTENANCE PLAN FOR GREY WATER TREATMENT PLANT SYSTEM

SR6/1 – SR6 SUM/1

Page 4: TENDER DOCUMENTS · schedule no. 1 – preliminaries sr1/1 – sr1 sum/1 schedule no. 2 – preambles sr2/1 – sr2/72 schedule no. 3 – sewage treatment plant system sr3/1 – sr3

TENDER DOCUMENTS FOR

NOMINATED SUB-CONTRACT FOR BIOLOGICAL SEWAGE TREATMENT PLANT AND

GREY WATER TREATMENT PLANT INSTALLATION FOR PSFSC FOR

UPGRADING MAI PO NATURE RESERVE INFRASTRUCTURE AT

MAI PO, SAN TIN, YUEN LONG, NEW TERRITORIES

CONTENTS (Cont’d)

HK-4547/FP TCK4:LWY22:TWT1:GT:M45042:(2.12.2019) - 3 - Arcadis Hong Kong Limited

PAGE 7. SUMMARY OF TENDER ST/1 – ST/4 8. DRAWINGS 5 PAGES 9. REFERENCE DOCUMENTS (NOT FORMING PART OF CONTRACT)

1 PAGE

Page 5: TENDER DOCUMENTS · schedule no. 1 – preliminaries sr1/1 – sr1 sum/1 schedule no. 2 – preambles sr2/1 – sr2/72 schedule no. 3 – sewage treatment plant system sr3/1 – sr3

CONDITIONS OF TENDER

Page 6: TENDER DOCUMENTS · schedule no. 1 – preliminaries sr1/1 – sr1 sum/1 schedule no. 2 – preambles sr2/1 – sr2/72 schedule no. 3 – sewage treatment plant system sr3/1 – sr3

CONDITIONS OF TENDER

HK-4547/FP TCK4:LWY22:TWT1:GT:M45042:(2.12.2019) - CT/1 - Arcadis Hong Kong Limited

1. The following is a list of Documents issued for Tender purposes :-

The tender document containing the following:-

(i) Conditions of Tender (ii) Form of Tender (iii) Special Conditions of Contract (iv) Specification:

(a) Section A – General Preliminaries (b) Section B – Particular Preliminaries (c) Section C – Particular Specification (d) Section D – Guidelines for Consultant and Contractor (e) Section E – Penalty Clause for Breaking the Rules Listed in the Code

of Conduct stated in WWF Guidelines for Consultant and Contractor (v) Schedule of Rates and Summary of Tender (vi) Tender Drawings as listed in the Appendix ‘A’ to Conditions of Tender (vii) Reference Documents (Not forming part of the Contract) as listed in the

Appendix ‘B’ to Conditions of Tender 2. One copy of the book AND one CD / DVD containing the scanned copy in pdf format

of the documents referred to in 1 above and 3 below shall be enclosed in a sealed envelope, endorsed “Nominated Sub-Contract Works for Biological Sewage Treatment Plant and Grey Water Treatment Plant Installation for PSFSC for Upgrading Mai Po Nature Reserve Infrastructure at Mai Po, San Tin, Yuen Long, New Territories” and be addressed to :-

Arcadis Hong Kong Limited 9/F, Assun Pacific Centre, 41 Tsun Yip Street, Kwun Tong, KOWLOON Attn : Ms. Mandy Lam / Mr. Regent Tsui

and be deposited there ON OR BEFORE THE TIME STATED IN THE EMAIL OF INVITATION TO TENDER.

3. The tenderer is to submit the following together with the tender :-

(a) The Form of Tender completed, signed, witnessed and dated and the Schedule of Quantities and Rates and Summary of Tender fully priced and totaled. The Sum shown in the Form of Tender must agree with the total of Summary of Tender.

(b) The Schedule of Quantities and Rates including the Summary of Tender fully priced in ink, extended, cast and totaled with the total amount properly transferred to the Form of Tender.

Page 7: TENDER DOCUMENTS · schedule no. 1 – preliminaries sr1/1 – sr1 sum/1 schedule no. 2 – preambles sr2/1 – sr2/72 schedule no. 3 – sewage treatment plant system sr3/1 – sr3

CONDITIONS OF TENDER (Cont’d)

HK-4547/FP TCK4:LWY22:TWT1:GT:M45042:(2.12.2019) - CT/2 - Arcadis Hong Kong Limited

3. The tenderer is to submit the following together with the tender :- (Cont’d)

(c) Construction methodology

(d) Proposed Site Boundary, Site Access Plan and Area for Work.

(e) Tentative programme for the completion of the Works including the breakdown of Works tasks and relevant statutory submissions etc.

(f) A tentative site layout plan showing the layout for storage, office, transportation and loading / unloading of plant and materials.

(g) Organization chart for the project.

(h) Resume for the full time Site Engineer with relevant experience in the Helping

Business Program (HBP) projects.

(i) List of past job reference of the company for the HBP projects.

(j) Valid certificate of the Licenser Plumber for this project.

(k) Current and anticipated work load for the coming 12 months.

(l) Statement of conviction under the Factories and Industrial Undertakings

Ordinance (Cap. 59) for last five years.

(m) Statement of conviction under the Employment Ordinance (Cap. 57) for last

five years.

(n) Statement of conviction under the Immigration Ordinance (Cap. 115) for last five years.

(o) Statement of involvement in arbitration or litigation in the last five years or

foreseeable in the next 12 months.

(p) Audited accounts for the last three years.

(q) Any other details and information for tender submission as required by the

Specification Section C – Technical Specification.

Page 8: TENDER DOCUMENTS · schedule no. 1 – preliminaries sr1/1 – sr1 sum/1 schedule no. 2 – preambles sr2/1 – sr2/72 schedule no. 3 – sewage treatment plant system sr3/1 – sr3

CONDITIONS OF TENDER (Cont’d)

HK-4547/FP TCK4:LWY22:TWT1:GT:M45042:(2.12.2019) - CT/3 - Arcadis Hong Kong Limited

4. The Summary of Tender is to be fully priced in ink, extended, cast and totalled and Form of Tender completed in ink, signed, witnessed and dated. The sum shown in the Form of Tender must agree with the total of the Summary of Tender. Any items which the tenderer considers to have no value shall have dashes or other suitable marks placed against them in the cash columns. The value of any items not priced shall be deemed to be included in the tender figure.

5. The tenderer’s priced Summary of Tender will be subject to scrutiny and arithmetical

check by the Quantity Surveyor.

Should the tenderer make any errors in his extensions and/or casts or in carrying forward to or in casts of a summary, such errors shall, before the signing of the Contract, be so rectified and adjusted that, when correctly calculated, the total of the Summary of Tender shall represent the same amount as that tendered in the Form of Tender. The net aggregate amount of such errors, whether a net deduction or a net addition, will be adjusted by one figure in the summary and no discount or premium will be applied to the valuation of additions to and omissions from the Contract.

6. Should the tenderer offer a lump sum discount to his tender which is not converted to a corresponding percentage discount to all unit rates throughout the Contract, the total amount of the lump sum discount shall be recovered in the interim payment valuation within the first 80% of the Contract Period based on an agreed schedule of deduction.

7. Firms tendering are informed that unauthorized alteration or erasure by them to the

text of the documents issued for tender purpose will not be allowed and, if such alteration or erasure shall have been made, the tender may not be considered.

8. The tenderer shall be required to check the numbers of the pages of the Tender

Documents, and should he find any missing, in duplicate, or indistinct, he must inform the Architect or the Quantity Surveyor at once and have the same rectified.

9. In the event of a tenderer discovering a genuine mistake in his tender after dispatch,

he may draw attention in writing to the errors and submit an amendment which may be accepted provided it is received before the time fixed for the receipt of tenders.

Should any errors, discrepancies or apparent underpricings be discovered by the Architect / Quantity Surveyor, he may query these in writing with the tenderer. Such query is not to indicate a proposal to change the tender price, the tenderer may offer only to stand by his tendered price or withdraw his tender. No query or series of queries shall be considered comprehensive.

Page 9: TENDER DOCUMENTS · schedule no. 1 – preliminaries sr1/1 – sr1 sum/1 schedule no. 2 – preambles sr2/1 – sr2/72 schedule no. 3 – sewage treatment plant system sr3/1 – sr3

CONDITIONS OF TENDER (Cont’d)

HK-4547/FP TCK4:LWY22:TWT1:GT:M45042:(2.12.2019) - CT/4 - Arcadis Hong Kong Limited

10. Tenderers are requested to raise any queries with the Project Manager, or Architect or Engineer or Quantity Surveyor (as appropriate) at least seven days before the date for submission of tenders. Only answers in writing addressed to all tenderers, by the Architect or Quantity Surveyor, shall be deemed to affect the Tender Documents in any way. Such letters will be bound in with, and shall become part of the Contract Documents.

Should the Tenderer for any reason whatsoever be in doubt about the precise meaning of any item or figure contained in the tender documents a query should be raised as described above.

11. The offer of an advantage or other inducement by any person with a view to influencing the placing of the Contract may be an offence under the Hong Kong Prevention of Bribery Ordinance but in any event such action will result in the rejection of the tender.

12. Tenderers are informed that the Main contractor, to whom the successful tenderer will

become a Nominated Sub-Contractor, has not yet been appointed. The submission of a tender for the Sub-Contract Works will be deemed to indicate the tenderer’s willingness to be nominated to any Main Contractor duly appointed by the Employer.

13. The tenderer shall treat all documents or information passed to him by the Employer

or the Project Manager / Architect / Engineers / Quantity Surveyor for the purpose of submitting a tender as private and confidential.

14. The Employer reserves the right to reject any tender where these Conditions of Tender

are not complied with. 15. The tender shall be in Hong Kong Dollars and no adjustment will be made for

fluctuation in exchange rates of currencies.

Firms tendering are to accept the fact that it is the Employer’s intention not to create any contractual relations in this invitation to tender until the award of the Contract and the Employer is not bound to accept the lowest or any tender which may be received.

16. The Employer shall not be responsible for any expense or loss which may be incurred

by the tenderer in the preparation of this tender. 17. Tender Assessment Criteria: 60% Technical and 40% Commercial Assessment.

Page 10: TENDER DOCUMENTS · schedule no. 1 – preliminaries sr1/1 – sr1 sum/1 schedule no. 2 – preambles sr2/1 – sr2/72 schedule no. 3 – sewage treatment plant system sr3/1 – sr3

APPENDIX ‘A’ TO CONDITIONS OF TENDER

LIST OF TENDER DRAWING

Page 11: TENDER DOCUMENTS · schedule no. 1 – preliminaries sr1/1 – sr1 sum/1 schedule no. 2 – preambles sr2/1 – sr2/72 schedule no. 3 – sewage treatment plant system sr3/1 – sr3

APPENDIX ‘A’ TO CONDITIONS OF TENDER

LIST OF TENDER DRAWINGS

HK-4547/FP TCK4:LWY22:TWT1:GT:M45042:(2.12.2019) - CTA/1 - Arcadis Hong Kong Limited

DRAWING NO. TITLE REVISION

SEWAGE TREATMENT PLANT AND GREY WATER TREATMENT PLANT SYSTEM

253876-DW-STP-001 SEWAGE TREATMENT PLANT & GREY WATER TREATMENT PLANT INSTALLATION SITE LOCATION PLAN

0

253876-DW-STP-201 SEWAGE TREATMENT PLANT & GREY WATER TREATMENT PLANT INSTALLATION G/F LAYOUT PLAN

0

253876-DW-STP-202 SEWAGE TREATMENT PLANT & GREY WATER TREATMENT PLANT INSTALLATION 1/F LAYOUT PLAN

0

253876-DW-STP-301 SEWAGE TREATMENT PLANT & GREY WATER TREATMENT PLANT INSTALLATION SCHEMATIC DIAGRAM FOR SEWAGE TREATMENT PLANT

0

253876-DW-STP-302 DRAINAGE SERVICES INSTALLATION SCHEMATIC DIAGRAM FOR GREYWATER TREATMENT PLANT

0

Page 12: TENDER DOCUMENTS · schedule no. 1 – preliminaries sr1/1 – sr1 sum/1 schedule no. 2 – preambles sr2/1 – sr2/72 schedule no. 3 – sewage treatment plant system sr3/1 – sr3

APPENDIX ‘B’ TO CONDITIONS OF TENDER

LIST OF REFERENCE DOCUMENTS

Page 13: TENDER DOCUMENTS · schedule no. 1 – preliminaries sr1/1 – sr1 sum/1 schedule no. 2 – preambles sr2/1 – sr2/72 schedule no. 3 – sewage treatment plant system sr3/1 – sr3

APPENDIX ‘B’ TO CONDITIONS OF TENDER

LIST OF REFERENCE DOCUMENTS

HK-4547/FP TCK4:LWY22:TWT1:GT:M45042:(2.12.2019) - CTB/1 - Arcadis Hong Kong Limited

TITLE PAGES

REFERENCE DOCUMENT (NOT FORMING PART OF THE CONTRACT)

TENTATIVE CONSTRUCTION PROGRAMME FOR PSFSC 1 PAGE

Page 14: TENDER DOCUMENTS · schedule no. 1 – preliminaries sr1/1 – sr1 sum/1 schedule no. 2 – preambles sr2/1 – sr2/72 schedule no. 3 – sewage treatment plant system sr3/1 – sr3

FORM OF TENDER

Page 15: TENDER DOCUMENTS · schedule no. 1 – preliminaries sr1/1 – sr1 sum/1 schedule no. 2 – preambles sr2/1 – sr2/72 schedule no. 3 – sewage treatment plant system sr3/1 – sr3

FORM OF TENDER

HK-4547/FP TCK4:LWY22:TWT1:GT:M45042:(2.12.2019) - FT/1 - Arcadis Hong Kong Limited

Tender for Nominated Sub-Contract Works for Biological Sewage Treatment Plant and Grey Water Treatment Plant Installation for PSFSC for Upgrading Mai Po Nature Reserve Infrastructure At Mai Po, San Tin, Yuen Long, New Territories From . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . NOTE : (1) If a tender is being submitted by a partnership or an unincorporated body, the

names and residential addresses of all partners shall be given in the spaces below.

(2) In all cases, the tenderer must give the number and the date of expiry of their

business registration certificate here :

Number . . . . . . . . . . . . . . . . . . . . . . . . . . Date of Expiry . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . To : World Wide Fund 15/F, Manhattan Centre 8 Kwai Cheong Road Kwai Chung New Territories, Hong Kong 1. I/We, having inspected the Site, examined the Conditions of Tender, General and Special Conditions of Contract, Drawings, Specification, Schedules of Rates and Summary of Tender for the Nominated Sub-Contract Works for Biological Sewage Treatment Plant and Grey Water Treatment Plant Installation for PSFSC for Upgrading Mai Po Nature Reserve Infrastructure at Mai Po, San Tin, Yuen Long, New Territories, Hong Kong do hereby offer to design the Works to the extent as required in the Contract Documents, execute, complete and maintain the whole of the Works (for all in accordance with the Tender Documents for the sum:

(a) Base Tender HONG KONG DOLLARS (HK$ )

Page 16: TENDER DOCUMENTS · schedule no. 1 – preliminaries sr1/1 – sr1 sum/1 schedule no. 2 – preambles sr2/1 – sr2/72 schedule no. 3 – sewage treatment plant system sr3/1 – sr3

FORM OF TENDER (Cont’d)

HK-4547/FP TCK4:LWY22:TWT1:GT:M45042:(2.12.2019) - FT/2 - Arcadis Hong Kong Limited

1. (Cont’d)

(b) Optional Tender – Grey Water Treatment Plant System HONG KONG DOLLARS (HK$ )

(c) Optional Tender – 5-year Operation and Maintenance Plan for Sewage Treatment Plant System HONG KONG DOLLARS (HK$ )

(d) Optional Tender – 5-year Operation and Maintenance Plan for Grey Water Treatment

Plant System HONG KONG DOLLARS (HK$ )

or such sums as may be ascertained in accordance with the relevant General and Special Conditions of Contract. 2. I/We undertake if my/our tender is accepted to commence the Works within 7 days of receipt of the Architect’s order to commence and to complete and deliver the Works comprised in the Contract within the time stated in the Appendix to the Conditions of Contract. 3. If my/our offer is accepted I/we will obtain the guarantee of an approved Bank or Insurance Company (to be approved by the Employer and the Architect prior to effecting the same) to be jointly and severally bound with me/us to the Employer in the sum equivalent to 10 % of the Sub-Contract Sum (rounded up to the nearest thousand dollars) for the due performance of the Contract under the terms of a Bond in accordance with Clause 31 of the Conditions of Contract. The wording of the Bond shall follow precisely the specimen attached as Appendix ‘A’ to this Form of Tender. 4. I/We agree to abide by this tender for a period of 180 days commencing from and including the day following the date fixed for receiving it and it shall remain binding upon me/us and may be accepted at any time before the expiration of that period. 5. If our tender is accepted, we agree to enter into a formal Sub-Contract for carrying out the said Sub-Contract works with the Main Contractor in the form described in the Tender Documents.

Page 17: TENDER DOCUMENTS · schedule no. 1 – preliminaries sr1/1 – sr1 sum/1 schedule no. 2 – preambles sr2/1 – sr2/72 schedule no. 3 – sewage treatment plant system sr3/1 – sr3

FORM OF TENDER (Cont’d)

HK-4547/FP TCK4:LWY22:TWT1:GT:M45042:(2.12.2019) - FT/3 - Arcadis Hong Kong Limited

6. I/We declare that all original pages of the Tender Documents are returned without unauthorized alteration or erasure made by us to the text/content of the documents. I/We agree that the original text/content of the Tender Documents shall prevail over any unauthorized alteration or erasure which may be detected at a later date. 7. Unless and until a formal Agreement is prepared and executed this tender together with your written acceptance thereof, subject to the provision of Clause 4 hereof, shall constitute a binding contract between us. I/We understand that the formal Agreement shall be executed under seal. 8. I/We understand that it is your intention not to create any contractual relations in this invitation to tender until the award of the Contract and you are not bound to accept the lowest or any tender that you may receive. 9. I/We confirm that my/our tender has incorporated all tender addendum / addenda (if any) to me/us during the tendering period. 10. I/We acknowledge and shall caution our staff that soliciting or accepting any advantages as defined in and prohibited by the Prevention of Bribery Ordinance in relation to the formation and implementation of this contract is not permitted. 11. I/We shall caution our staff against soliciting or accepting any excessive hospitality, entertainment or inducements which could impair their impartiality in relation to the contract.

Page 18: TENDER DOCUMENTS · schedule no. 1 – preliminaries sr1/1 – sr1 sum/1 schedule no. 2 – preambles sr2/1 – sr2/72 schedule no. 3 – sewage treatment plant system sr3/1 – sr3

FORM OF TENDER (Cont’d)

HK-4547/FP TCK4:LWY22:TWT1:GT:M45042:(2.12.2019) - FT/4 - Arcadis Hong Kong Limited

Signature in the capacity of duly authorized to sign tenders for and on behalf of ** Registered Address of Firm Date Signature of Witness Name in Block Letters Address Occupation Date ** In the case of a Limited Company, insert the name of the Company.

In the case of a partnership or unincorporated body the names of all partners must be inserted.

Name of Partners Residential Address of Partners

Page 19: TENDER DOCUMENTS · schedule no. 1 – preliminaries sr1/1 – sr1 sum/1 schedule no. 2 – preambles sr2/1 – sr2/72 schedule no. 3 – sewage treatment plant system sr3/1 – sr3

APPENDIX ‘A’ TO FORM OF TENDER

FORM OF BOND (SPECIMEN OF PERFORMANCE BOND)

Page 20: TENDER DOCUMENTS · schedule no. 1 – preliminaries sr1/1 – sr1 sum/1 schedule no. 2 – preambles sr2/1 – sr2/72 schedule no. 3 – sewage treatment plant system sr3/1 – sr3

APPENDIX ‘A’ TO FORM OF TENDER FORM OF BOND (SPECIMEN OF PERFORMANCE BOND)

HK-4547/FP TCK4:LWY22:TWT1:GT:M45042:(2.12.2019) - FB/1 - Arcadis Hong Kong Limited

BY THIS BOND, we

<trading as > (Note 1)

[whose registered office is] at (Note 2)

(hereinafter called “the Nominated Sub-Contractor”) and

whose registered office is at

(hereinafter called “the Surety”) are

held and firmly bound unto

(hereinafter called “the Employer”) in

the sum of Hong Kong Dollars

(HK$ )

for the payment of which sum the Nominated Sub-Contractor and the Surety bind

themselves, their successors and assigns, jointly and severally by these presents.

Sealed with our respective seals/signed and sealed respectively * (Note 3) and dated

this ........................................ day of ................................................ 20 ................................

WHEREAS by a **[Sub-Contract dated the ..................... day of ........................ 20 .............

made between the Nominated Sub-Contractor of the one part and the Main Contractor of the

other part] / **[Letter of Acceptance issued from the Main Contractor to the Nominated Sub-

Contractor dated .................. day of ............................ 20 .............] (Note 4) (hereinafter

called the Sub-Contract), the Nominated Sub-Contractor has entered into a Sub-Contract

with the Main Contractor.

Page 21: TENDER DOCUMENTS · schedule no. 1 – preliminaries sr1/1 – sr1 sum/1 schedule no. 2 – preambles sr2/1 – sr2/72 schedule no. 3 – sewage treatment plant system sr3/1 – sr3

APPENDIX ‘A’ TO FORM OF TENDER FORM OF BOND (SPECIMEN OF PERFORMANCE BOND) (Cont’d)

HK-4547/FP TCK4:LWY22:TWT1:GT:M45042:(2.12.2019) - FB/2 - Arcadis Hong Kong Limited

(Supplemental to a Contract between the Main Contractor on the one part and the Employer

on the other part for the )

for the as therein mentioned in conformity with the

provisions of the Contract and whereas the Nominated Sub-Contractor is required to furnish

the Employer with this present Bond as security for the good performance on the part of the

Nominated Sub-Contractor of his obligations under the said Sub-Contract and also of his

obligations under a Form of Warranty dated ....................................... given by the Sub-

Contractor to the Employer in respect of the said Sub-Contract works (hereinafter called the

Warranty).

NOW THE CONDITION of the above-written Bond is such that if the Nominated Sub-

Contractor shall duly perform and observe all the terms, provisions, conditions and

stipulations of the Sub-Contract and the Warranty on the Nominated Sub-Contractor’s part to

be performed and observed according to the true purport intent and meaning thereof or if on

default by the Nominated Sub-Contractor the Surety shall satisfy and discharge the

damages sustained by the Employer thereby up to the amount of the above-written Bond

then this obligation shall be null and void but otherwise shall be and remain in full force and

effect but no alterations in terms of the Sub-Contract or the Warranty or in the extent or

nature of works to be executed and completed thereunder and no allowance of time by the

Architect to the Contract under the Sub-Contract nor any forbearance or forgiveness in or in

respect of any matter or thing concerning the Sub-Contract on the part of the Employer or

the said Architect shall in any way release the Surety from any liability under the above-

written Bond.

Page 22: TENDER DOCUMENTS · schedule no. 1 – preliminaries sr1/1 – sr1 sum/1 schedule no. 2 – preambles sr2/1 – sr2/72 schedule no. 3 – sewage treatment plant system sr3/1 – sr3

APPENDIX ‘A’ TO FORM OF TENDER FORM OF BOND (SPECIMEN OF PERFORMANCE BOND) (Cont’d)

HK-4547/FP TCK4:LWY22:TWT1:GT:M45042:(2.12.2019) - FB/3 - Arcadis Hong Kong Limited

This Bond shall remain valid for receipt of claims as aforesaid until the date of issue of the

Certificate of Practical Completion by the Architect to the Contract (as evidenced to the

Surety by presentation to him by the Nominated Sub-Contractor of a copy of the Certificate

of Practical Completion bearing the signed statement of the issuing party that he is the

Architect to the Contract) after which date the Bond shall become null and void and must be

returned to the Surety for cancellation.

This Bond shall be governed and construed in accordance with the laws of the Hong Kong

Special Administrative Region and the Surety hereby agrees to the non-exclusive jurisdiction

of the Courts of the Hong Kong Special Administrative Region.

Page 23: TENDER DOCUMENTS · schedule no. 1 – preliminaries sr1/1 – sr1 sum/1 schedule no. 2 – preambles sr2/1 – sr2/72 schedule no. 3 – sewage treatment plant system sr3/1 – sr3

APPENDIX ‘A’ TO FORM OF TENDER FORM OF BOND (SPECIMEN OF PERFORMANCE BOND) (Cont’d)

HK-4547/FP TCK4:LWY22:TWT1:GT:M45042:(2.12.2019) - FB/4 - Arcadis Hong Kong Limited

SIGNED, SEALED AND DELIVERED by the Nominated ) (Note 5) ) Sub-Contractor in the presence of :- ) ) ) ) witness ) OR THE COMMON SEAL of the Nominated Sub-Contractor ) (Note 6) ) was hereunto affixed in the presence of :- ) ) ) ) witness ) OR SIGNED, SEALED AND DELIVERED for and on behalf ) (Note 7) ) of and as lawful attorney of the Nominated ) ) Sub-Contractor under Power of Attorney dated ) ) by ) ) ) ) in the presence of :- ) ) ) ) witness ) THE COMMON SEAL of the Surety was hereunto ) (Note 6) ) affixed in the presence of :- ) ) ) ) witness ) OR

Page 24: TENDER DOCUMENTS · schedule no. 1 – preliminaries sr1/1 – sr1 sum/1 schedule no. 2 – preambles sr2/1 – sr2/72 schedule no. 3 – sewage treatment plant system sr3/1 – sr3

APPENDIX ‘A’ TO FORM OF TENDER FORM OF BOND (SPECIMEN OF PERFORMANCE BOND) (Cont’d)

HK-4547/FP TCK4:LWY22:TWT1:GT:M45042:(2.12.2019) - FB/5 - Arcadis Hong Kong Limited

SIGNED, SEALED AND DELIVERED for and ) (Note 7) ) on behalf of and as lawful attorney of the ) ) Surety under Power of Attorney dated ) ) )

) by ) ) in the presence of :- ) ) ) ) witness )

Notes (1) Delete content in < > where the Nominated Sub-Contractor is a limited

company. (2) Delete content in [ ] where the Nominated Sub-Contractor is a firm. (3) * Delete as appropriate. Delete “Sealed with our respective seals” in the case of a

firm. Delete “Signed and sealed respectively” in the case of a limited company. (4) + Delete/amend contents in [ ] as appropriate. Delete reference to Sub-

Contract and dates if the Sub-Contract Documents are not signed; modify the Letter of Acceptance to Letter of Intent, etc. as appropriate. Delete reference to Letter of Acceptance and date if the Sub-Contractor Documents are already signed.

(5) For use in the case of a sole proprietor or where all partners of a firm execute. (6) For use in the case of a limited company executing under its common seal. (7) For use in the case of a firm or a limited company executing through an attorney. (8) Alter “Practical Completion” (in second line, first paragraph page FB/3) to

“Completion of Making Good Defects” if the client insists on extending the period of bond to cover the Defects Liability Period.

Page 25: TENDER DOCUMENTS · schedule no. 1 – preliminaries sr1/1 – sr1 sum/1 schedule no. 2 – preambles sr2/1 – sr2/72 schedule no. 3 – sewage treatment plant system sr3/1 – sr3

FORM OF WARRANTY TO BE GIVEN BY THE NOMINATED SUB-CONTRACTOR TO

THE EMPLOYER IN CONSIDERATION OF NOMINATION

Page 26: TENDER DOCUMENTS · schedule no. 1 – preliminaries sr1/1 – sr1 sum/1 schedule no. 2 – preambles sr2/1 – sr2/72 schedule no. 3 – sewage treatment plant system sr3/1 – sr3

FORM OF WARRANTY TO BE GIVEN BY THE NOMINATED SUB-CONTRACTOR TO THE EMPLOYER IN CONSIDERATION OF NOMINATION

HK-4547/FP TCK4:LWY22:TWT1:GT:M45042:(2.12.2019) - FW/1 - Arcadis Hong Kong Limited

To

(the Employer) in respect of

(the Main Contract Works) which is to be carried out by a Main Contractor under the terms of

the Standard Agreement and Schedule of Conditions of Building Contract for use in the

Hong Kong Special Administrative Region, Private Edition - Without Quantities, 2006 Edition

as amended and providing for payment by the Main Contractor of liquidated and ascertained

damages for delay; and

In respect of our Tender for

(the Sub-Contract Works) which is intended to form part of the Main Contract Works as a

Nominated Sub-Contract,

We

(The Sub-Contractor) warrant that in consideration of your nominating us as Sub-Contractor

for the Sub-Contract Works :-

(a) We will carry out complete and maintain the Sub-Contract Works in accordance with

the terms of the Sub-Contract.

(b) We have exercised and will exercise all reasonable skill and care in the design of the

Sub-Contract Works insofar as the Sub-Contract Works have been or will be

designed by us.

(c) We have ensured and will ensure the selection of materials and goods for the Sub-

Contract Works insofar as such materials and goods have been or will be selected by

us must be fit for the intended purpose stated in the Contract.

Page 27: TENDER DOCUMENTS · schedule no. 1 – preliminaries sr1/1 – sr1 sum/1 schedule no. 2 – preambles sr2/1 – sr2/72 schedule no. 3 – sewage treatment plant system sr3/1 – sr3

FORM OF WARRANTY (Cont’d)

HK-4547/FP TCK4:LWY22:TWT1:GT:M45042:(2.12.2019) - FW/2 - Arcadis Hong Kong Limited

(d) We will comply with and satisfy the performance specification or requirement insofar

as such performance specification or requirement is included or referred to in the

tender documents and/or our Tender as part of the description of the Sub-Contract

Works.

(e) We will, save insofar as we are delayed by the event described or referred to in

Clause 25.1(3) of the Form of Sub-Contract for use in Hong Kong where the Sub-

Contractor is nominated under the Standard Form of Building Contract for use in

Hong Kong, Private Edition (Without Quantities), 2006 Edition :-

(1) so supply the Architect and/or Main Contractor with such information as either

may reasonably require; and

(2) so perform the Sub-Contract Works that the Main Contractor shall not

become entitled to an extension of time under Clause 25 of the Main Contract

by the failure of us so to supply such information or by delay on our part

provided always that no liability shall arise in respect of such delay on our part

until we have accepted the Main Contractor’s order in respect of the Sub-

Contract Works.

(f) Nothing in our Tender shall operate to exclude or limit our liability for breach of the

warranties set out herein.

(g) We will obtain a suitable performance bond (terms to be in accordance with the

specimen attached as Appendix ‘A’ to Form of Tender) in favour of the Employer.

This bond shall be duly executed under seal by an approved Insurance Company or

Bank, acknowledging that the Insurance Company or the Bank is jointly and severally

bound with us to the Employer in the sum of 10% of Sub-Contract Sum (rounded up

to the nearest thousand dollars) against breach of the warranties hereof. The

performance bond shall be extended if the Contract Period of the Main Contract is

extended or a delay occurs. The said

Page 28: TENDER DOCUMENTS · schedule no. 1 – preliminaries sr1/1 – sr1 sum/1 schedule no. 2 – preambles sr2/1 – sr2/72 schedule no. 3 – sewage treatment plant system sr3/1 – sr3

FORM OF WARRANTY (Cont’d)

HK-4547/FP TCK4:LWY22:TWT1:GT:M45042:(2.12.2019) - FW/3 - Arcadis Hong Kong Limited

Insurance Company or Bank shall be released from the Bond on the issue, under the

Main Contract, of the Certificate of Substantial Completion.

SIGNED, SEALED AND DELIVERED by the Nominated ) ) Sub-Contractor in the presence of :- (Note 1) ) ) witness ) OR THE COMMON SEAL of the Nominated Sub-Contractor ) ) was hereunto affixed in the presence of :- (Note 2) ) ) witness ) OR SIGNED, SEALED AND DELIVERED for and on behalf ) ) of and as lawful attorney of the Nominated ) ) Sub-Contractor under Power of Attorney dated ) ) by ) ) ) ) in the presence of :- (Note 3) ) ) witness ) Name of Witness in Block Letters : Address : Description :

Page 29: TENDER DOCUMENTS · schedule no. 1 – preliminaries sr1/1 – sr1 sum/1 schedule no. 2 – preambles sr2/1 – sr2/72 schedule no. 3 – sewage treatment plant system sr3/1 – sr3

FORM OF WARRANTY (Cont’d)

HK-4547/FP TCK4:LWY22:TWT1:GT:M45042:(2.12.2019) - FW/4 - Arcadis Hong Kong Limited

Notes (1) For use in the case of a sole proprietor or where all partners of a firm execute. (2) For use in the case of a limited company executing under its common seal. (3) For use in the case of a firm or a limited company executing through an attorney.

Page 30: TENDER DOCUMENTS · schedule no. 1 – preliminaries sr1/1 – sr1 sum/1 schedule no. 2 – preambles sr2/1 – sr2/72 schedule no. 3 – sewage treatment plant system sr3/1 – sr3

SPECIAL CONDITIONS OF SUB-CONTRACT

Page 31: TENDER DOCUMENTS · schedule no. 1 – preliminaries sr1/1 – sr1 sum/1 schedule no. 2 – preambles sr2/1 – sr2/72 schedule no. 3 – sewage treatment plant system sr3/1 – sr3

SPECIAL CONDITIONS OF SUB-CONTRACT (FOR USE WITH THE HKIA/HKIS STANDARD FORM OF

NOMINATED SUB-CONTRACT 2005 EDITION)

Index

HK-4547/FP TCK4:LWY22:TWT1:GT:M45042:(2.12.2019) - i - Arcadis Hong Kong Limited

- General SCC-1 Interpretation and definitions SCC-3 Sub-Contractor’s Obligations SCC-6 Documents forming the Sub-Contract SCC-7 Statutory Obligations SCC-8 Materials, goods, workmanship and work SCC-12 Architect’s representative SCC-13 Variations, Provisional Quantities, Provisional Items and Provisional Sums SCC-14 Sub-Contract Bills SCC-18 Partial Possession by Employer SCC-19 Assignment and sub-letting SCC-21 Insurance against injury to persons or property SCC-22 Insurance of the Works SCC-25 Extension of time for Sub-Contract Works to be completed by the Sub-Contract

Completion Date SCC-26 Extension of time for Sub-Contract Works to be completed at the same time as the

Works SCC-27 Delay recovery measures SCC-28 Direct loss and/or expense SCC-33 Certificates and Payments SCC-34 Surety Bond SCC-36 Determination by Contractor SCC-37 Determination by Sub-Contractor SCC-39 Fluctuations

Page 32: TENDER DOCUMENTS · schedule no. 1 – preliminaries sr1/1 – sr1 sum/1 schedule no. 2 – preambles sr2/1 – sr2/72 schedule no. 3 – sewage treatment plant system sr3/1 – sr3

SPECIAL CONDITIONS OF SUB-CONTRACT (FOR USE WITH THE HKIA/HKIS STANDARD FORM OF

NOMINATED SUB-CONTRACT 2005 EDITION)

Index

HK-4547/FP TCK4:LWY22:TWT1:GT:M45042:(2.12.2019) - ii - Arcadis Hong Kong Limited

SCC-40 Notices, certificates and other communications SCC-42 Settlement of disputes SCC-43 Contracting out of the Contracts (Rights of Third Parties) Ordinance

Page 33: TENDER DOCUMENTS · schedule no. 1 – preliminaries sr1/1 – sr1 sum/1 schedule no. 2 – preambles sr2/1 – sr2/72 schedule no. 3 – sewage treatment plant system sr3/1 – sr3

SPECIAL CONDITIONS OF SUB-CONTRACT (FOR USE WITH THE HKIA/HKIS STANDARD FORM OF

NOMINATED SUB-CONTRACT 2005 EDITION)

HK-4547/FP TCK4:LWY22:TWT1:GT:M45042:(2.12.2019) - SCC/B/1 - Arcadis Hong Kong Limited

Contract Clause

Reference

Amendment Reference

Special Conditions of Sub-Contract

Context General A. These Special Conditions of Sub-Contract are to be read in

conjunction with the Conditions of Sub-Contract which shall be the General Conditions contained in the “Agreement and Schedule of Conditions of Nominated Sub-Contract for use in the Hong Kong Special Administrative Region, 2005 Edition” published by the Hong Kong Institute of Architects, the Hong Kong Institute of Construction Managers and the Hong Kong Institute of Surveyors (hereinafter “the General Conditions”). Wherever these Special Conditions vary from the General Conditions the terms of the Special Conditions shall take precedence.

B. Typographical Errors The following typographical errors in the Conditions shall be

corrected :- Clause 36.4(7) first line, the comma after the word

“equipment” shall be deleted.

C. Clause Numbering Each SCC Clause number matches the clause number of

the General Conditions clause to be amended. Therefore the SCC numbers may not run in sequence.

Page 34: TENDER DOCUMENTS · schedule no. 1 – preliminaries sr1/1 – sr1 sum/1 schedule no. 2 – preambles sr2/1 – sr2/72 schedule no. 3 – sewage treatment plant system sr3/1 – sr3

SPECIAL CONDITIONS OF SUB-CONTRACT (FOR USE WITH THE HKIA/HKIS STANDARD FORM OF

NOMINATED SUB-CONTRACT 2005 EDITION) (Cont’d)

HK-4547/FP TCK4:LWY22:TWT1:GT:M45042:(2.12.2019) - SCC/B/2 - Arcadis Hong Kong Limited

Contract Clause

Reference

Amendment Reference

Special Conditions of Sub-Contract

SCC-1 Interpretation and definitions

1/1 Delete sub-clause (vii) in clause 1.6 under the “Variation” sub-heading on Page 15 and replace with the following sub-clause:-

“(vii) the sequence or timing of carrying out or completing work;”

SCC-3 3/1 Delete clause 3.1(2) on Page 18 and replace with the

following :- Sub-Contractor’s obligations

“(2) Where the Sub-Contract requires the

Sub-Contractor to carry out the design or the development of the design of the whole or a part of the Sub-Contract Works, the design or the development of the design shall be carried out with reasonable skill and care and shall be fit for the purpose and the Sub-Contractor shall be responsible to the Contractor and the Employer for such work.

Such design work:

⚫ shall constitute part of the Works; ⚫ shall, if appropriate, include selection of

proprietary articles; ⚫ fit for intended purpose; ⚫ shall be carried out in due time by a trained and

experienced person competent in the relevant field; and

⚫ shall follow the relevant Standard Codes of Practices and/or good practice, to meet conditions imposed by the Specification, the environment, the expected life of the building and other relevant factors.

The Sub-Contractor warrants each and every such design

accordingly. A review by the Architect of the visual intent of the design of permanent work and its compliance with the contract terms shall be obtained, but this shall not constitute any waiver of the design responsibility of the Sub-Contractor, or of any actual or implied warranty of the Sub-Contractor or the supplier to him of any proprietary article.”

Page 35: TENDER DOCUMENTS · schedule no. 1 – preliminaries sr1/1 – sr1 sum/1 schedule no. 2 – preambles sr2/1 – sr2/72 schedule no. 3 – sewage treatment plant system sr3/1 – sr3

SPECIAL CONDITIONS OF SUB-CONTRACT (FOR USE WITH THE HKIA/HKIS STANDARD FORM OF

NOMINATED SUB-CONTRACT 2005 EDITION) (Cont’d)

HK-4547/FP TCK4:LWY22:TWT1:GT:M45042:(2.12.2019) - SCC/B/3 - Arcadis Hong Kong Limited

Contract Clause

Reference

Amendment Reference

Special Conditions of Sub-Contract

SCC-3 Sub-Contractor’s obligations (Cont’d)

(3) Where the Sub-Contract requires the Sub-Contractor to prepare details, or shop drawings or installation drawings, the details, or shop drawings or installation drawings shall be carried out with reasonable skill and care and the Sub-Contractor shall be responsible to the Contractor and the Employer for such work.”

3/2 Delete lines 1 and 2 of clause 3.4(1) on Page 18 and replace

with the following :-

“(1) The Sub-Contractor shall as soon as practicable but in any event within 30 days after his receipt of any of the following documents carefully check and inform the Contractor and the Architect if the Sub-Contractor finds any ambiguity or discrepancy in or divergence between the following documents:”

3/3 Add the following as new clause 3.4(3) on Page 19 :- “(3) If in the opinion of the Architect (which shall not be

exercised unreasonably) any discrepancy or divergence is one which should have been apparent to a reasonably competent sub-contractor and notified by the Sub-Contractor in compliance with clause 3.4(1) and if such discrepancy or divergence was not in fact notified by the Sub-Contractor; then, in determining the entitlement of the Sub-Contractor to any extension of time or any direct loss and/or expense to which the Sub-Contractor would otherwise be entitled in consequence of an instruction issued by the Contractor under this clause, the Architect and the Contractor shall exclude from such extension or direct loss and/or expense (as applicable) any delay or direct loss and/or expense which could reasonably have been avoided had the discrepancy or divergence been notified in accordance with clause 3.4(1) and the Sub-Contractor’s entitlements shall be limited accordingly.”

Page 36: TENDER DOCUMENTS · schedule no. 1 – preliminaries sr1/1 – sr1 sum/1 schedule no. 2 – preambles sr2/1 – sr2/72 schedule no. 3 – sewage treatment plant system sr3/1 – sr3

SPECIAL CONDITIONS OF SUB-CONTRACT (FOR USE WITH THE HKIA/HKIS STANDARD FORM OF

NOMINATED SUB-CONTRACT 2005 EDITION) (Cont’d)

HK-4547/FP TCK4:LWY22:TWT1:GT:M45042:(2.12.2019) - SCC/B/4 - Arcadis Hong Kong Limited

Contract Clause

Reference

Amendment Reference

Special Conditions of Sub-Contract

SCC-6 6/1 Delete clause 6.1(2) on Page 21 and replace with the

following:- Documents forming the Sub-Contract

“(2) The order of precedence of the documents forming

the Sub-Contract shall be as listed in paragraphs (a) to (e) above and for all purposes the Sub-Contract Drawings and the Specification shall take precedence over the Sub-Contract Bills.”

6/2 Delete clause 6.8(1) on Page 22 and replace with the

following :- “(1) The Sub-Contractor shall submit to the Contractor 2

copies of the as-built drawings which are required by the Sub-Contract within 45 days of the date when, in the Architect’s opinion, substantial completion of any particular trade or portion of the Sub-Contract Works occurred.”

SCC-7 7/1 Delete clause 7.1 on Page 23 and replace with the

following:- Statutory Obligations

“7.1 The Sub-Contractor shall comply with and give the

notices required by any Ordinance, regulation, rule, order or by-law applicable to the Sub-Contract Works and any changes thereto upto and including the Date of Substantial Completion of the Works (“the Statutory Requirements”).”

Page 37: TENDER DOCUMENTS · schedule no. 1 – preliminaries sr1/1 – sr1 sum/1 schedule no. 2 – preambles sr2/1 – sr2/72 schedule no. 3 – sewage treatment plant system sr3/1 – sr3

SPECIAL CONDITIONS OF SUB-CONTRACT (FOR USE WITH THE HKIA/HKIS STANDARD FORM OF

NOMINATED SUB-CONTRACT 2005 EDITION) (Cont’d)

HK-4547/FP TCK4:LWY22:TWT1:GT:M45042:(2.12.2019) - SCC/B/5 - Arcadis Hong Kong Limited

Contract Clause

Reference

Amendment Reference

Special Conditions of Sub-Contract

SCC-8 8/1 Add the following as new clause 8.1(7) to clause 8.1 on

Page 24 :- Materials, goods, workmanship and work

“(7) Without prejudice to the generality of the foregoing,

the Sub-Contractor shall carry out the Works : (a) using materials which are new, free of

defects and of good quality; (b) using methods of construction which are in

accordance with sound practice and which are not likely to endanger any existing structures or finishes, adjacent property or the safety of the public; and

(c) in a good and workmanlike manner.”

8/2 Add the following as new clause 8.2(4) to clause 8.2 on

Page 24 :- “(4) Where the Specification requires any item of work

to be inspected prior to being covered up, then the Sub-Contractor shall notify the Architect and the Contractor in writing before work is covered up and give them at least 2 full working days’ notice to inspect. Should any work be covered up without the required notice being given then, whether or not the work is in accordance with the Sub-Contract, the Sub-Contractor will be responsible for all costs of the testing, opening up for inspection, and any consequential making good and the Sub-Contractor shall not be entitled to any extensions of time or to any adjustment of the Sub-Contract Sum or other additional monetary compensation in respect of any delay or disruption caused thereby any such entitlement being hereby irrevocably waived.”

8/3 Delete the word “individual” in the first line of clause 8.7 on

Page 25 and replace with the words “person or persons”.

Page 38: TENDER DOCUMENTS · schedule no. 1 – preliminaries sr1/1 – sr1 sum/1 schedule no. 2 – preambles sr2/1 – sr2/72 schedule no. 3 – sewage treatment plant system sr3/1 – sr3

SPECIAL CONDITIONS OF SUB-CONTRACT (FOR USE WITH THE HKIA/HKIS STANDARD FORM OF

NOMINATED SUB-CONTRACT 2005 EDITION) (Cont’d)

HK-4547/FP TCK4:LWY22:TWT1:GT:M45042:(2.12.2019) - SCC/B/6 - Arcadis Hong Kong Limited

Contract Clause

Reference

Amendment Reference

Special Conditions of Sub-Contract

SCC-12 Architect’s representative

12/1 Delete the words “to be resident on the Site” in the third line of clause 12(1) on Page 26 and replace with the following :- “who may or may not be resident on the Site”.

12/2 Add the following as new Clause 12(3) to clause 12 on Page

27 :- 12(3) No act or omission by the Architect’s representative

in the performance of any of his duties or exercise of any of his powers under the Main Contract shall in any way operate to relieve the Sub-Contractor of any of the duties, responsibilities, obligations or liabilities imposed upon him by any of the provisions of the Sub-Contract.”

SCC-13 13/1 Delete clause 13.1(1) on Page 27 and replace with the

following:- Variations, Provisional Quantities, Provisional Items and Provisional Sums

“(1) The Architect may issue an instruction requiring a Variation to the Sub-Contractor.”

13/2 Add the following new clause 13.4(1)(v) on Page 28:-

“(v) For work which is to be the subject of a fair valuation

under clause 13.4(1) (iii), the Sub-Contractor shall obtain, if so requested by the Quantity Surveyor, three competitive tenders, and the fair valuation shall be based upon the most competitive tender so received by the Sub-Contractor together with an adjustment for the Sub-Contractor’s profit and overheads as may be agreed with the Quantity Surveyor.”

Page 39: TENDER DOCUMENTS · schedule no. 1 – preliminaries sr1/1 – sr1 sum/1 schedule no. 2 – preambles sr2/1 – sr2/72 schedule no. 3 – sewage treatment plant system sr3/1 – sr3

SPECIAL CONDITIONS OF SUB-CONTRACT (FOR USE WITH THE HKIA/HKIS STANDARD FORM OF

NOMINATED SUB-CONTRACT 2005 EDITION) (Cont’d)

HK-4547/FP TCK4:LWY22:TWT1:GT:M45042:(2.12.2019) - SCC/B/7 - Arcadis Hong Kong Limited

Contract Clause

Reference

Amendment Reference

Special Conditions of Sub-Contract

SCC-13 Variations, Provisional Quantities, Provisional Items and Provisional Sums (Cont’d)

13/3 Add the following to the end of clause 13.4(3)(b) on Page 29:- “Provided that no such adjustments shall be made if the omission of work is due to omission of work which is included in or covered by any Provisional Quantities, Provisional Items or Provisional Sums.”

13/4 Add the following new clause at the end of clause 13.4 on

Page 30:- “(10) If required by the Architect the Sub-Contractor shall

within fourteen (14) days of the Architect’s written request submit a detailed estimate of the value of any variation.”

SCC-14

14/1 Delete clause 14.1 on Page 30 and replace with the following:-

Sub-Contract Bills

“14.1 If Sub-Contract Bills are included in the Tender

Documents, the quality and quantity of the work included in the Sub-Contract Sum stated in Article 2 shall be deemed to be that which is set out in the Sub-Contract Bills which shall be read in conjunction with the Specification and Sub-Contract Drawings to amplify and supplement the descriptions in the Sub-Contract Bills.”

14/2 Insert the words “or as part of the relevant bill item

descriptions or headings” between the words “Bills” and ‘and” in the third line of clause 14.2(2) on Page 30.

Page 40: TENDER DOCUMENTS · schedule no. 1 – preliminaries sr1/1 – sr1 sum/1 schedule no. 2 – preambles sr2/1 – sr2/72 schedule no. 3 – sewage treatment plant system sr3/1 – sr3

SPECIAL CONDITIONS OF SUB-CONTRACT (FOR USE WITH THE HKIA/HKIS STANDARD FORM OF

NOMINATED SUB-CONTRACT 2005 EDITION) (Cont’d)

HK-4547/FP TCK4:LWY22:TWT1:GT:M45042:(2.12.2019) - SCC/B/8 - Arcadis Hong Kong Limited

Contract Clause

Reference

Amendment Reference

Special Conditions of Sub-Contract

SCC-14 14/3 Add the following clauses at the end of clause 14 on Page

31:- Sub-Contract Bills (Cont’d) “14.4 Any correction made in accordance with clause

14.3 shall not entitle the Sub-Contractor to any extension of time under the provisions of clause 25 unless the correction results in an increase in the work to be carried out of sufficient magnitude to cause delay and provided that the error in description was not apparent from the Sub-Contract Drawings.”

14.5 Any correction made in accordance with clause

14.3 shall not entitle the Sub-Contractor to any loss and/or expense under the provisions of clause 28 unless the correction results in an increase in the work to be carried out of sufficient magnitude to cause delay or disruption and provided that the error in description was not apparent from the Sub-Contract Drawings.

SCC-18 18/1 Delete clause 18(1) and replace with the following :- Partial possession by Employer

“(1) Under clause 18 of the Main Contract Conditions, the Employer may take possession of a part of the Works or where sectional completion is provided for in the Main Contract a part of a Section before Substantial Completion if the Architect considers such part of the Works or part of a Section is capable of occupation or use by the Employer and that part of the Works or part of a Section shall be referred to as a Relevant Part.”

SCC-19 19/1 Add the following as new clause 19.2(g) to clause 19.2 on

Page 35 :- Assignment and sub-letting

“(g) it shall be a condition in any sub-letting which may

occur that the employment of the sub-sub-contractor under the sub-sub-contract shall determine immediately upon the determination (for any reason) of the Sub-Contractor’s employment under this Sub-Contract.”

Page 41: TENDER DOCUMENTS · schedule no. 1 – preliminaries sr1/1 – sr1 sum/1 schedule no. 2 – preambles sr2/1 – sr2/72 schedule no. 3 – sewage treatment plant system sr3/1 – sr3

SPECIAL CONDITIONS OF SUB-CONTRACT (FOR USE WITH THE HKIA/HKIS STANDARD FORM OF

NOMINATED SUB-CONTRACT 2005 EDITION) (Cont’d)

HK-4547/FP TCK4:LWY22:TWT1:GT:M45042:(2.12.2019) - SCC/B/9 - Arcadis Hong Kong Limited

Contract Clause

Reference

Amendment Reference

Special Conditions of Sub-Contract

SCC-21 Insurance against injury to persons or property

21/1 Insert the words “the Employer,” after the words “names of” in the third line of clause 21.1(1) on Page 35.

21/2 Delete the words “the Contractor’s or any sub-contractor’s of

all tiers employees” of clause 21.1(1) on Page 35 and replace with “employees of the Contractor or any sub-contractor of all tiers”

21/3 Add the following as clause 21.1(4) on Page 36:- “(4) The Employer shall not be liable for or in respect of

any damages or compensation payable at law in respect of or in consequence of any accident or injury to any workman or other person whether in the employment of the Contractor or his sub-contractors (including the Sub-Contractor) and their respective sub-contractors of any tier and the Sub-Contractor shall indemnify and keep indemnified the Employer against all such damages or compensation and against all claims, demands, proceedings, costs, charges and expenses whatsoever in respect thereof or in relation thereto.”

21/4 Add the following new clause at the end of clause 21.2:- (5) “The Sub-Contractor’s attention is drawn to clause 20

which sets out his contractual obligations to indemnify the Contractor against certain damage, expense, liability or loss in respect of any claim or proceedings. If the Sub-Contractor considers the limit of indemnity referred to in clause 21.2(4) for any one occurrence or series of occurrence of loss or damage to be inadequate to cover these contractual obligations he is at liberty to take out a policy with an increased limit of indemnity but any additional premium or differential in premium shall be at his own expense.”

Page 42: TENDER DOCUMENTS · schedule no. 1 – preliminaries sr1/1 – sr1 sum/1 schedule no. 2 – preambles sr2/1 – sr2/72 schedule no. 3 – sewage treatment plant system sr3/1 – sr3

SPECIAL CONDITIONS OF SUB-CONTRACT (FOR USE WITH THE HKIA/HKIS STANDARD FORM OF

NOMINATED SUB-CONTRACT 2005 EDITION) (Cont’d)

HK-4547/FP TCK4:LWY22:TWT1:GT:M45042:(2.12.2019) - SCC/B/10 - Arcadis Hong Kong Limited

Contract Clause

Reference

Amendment Reference

Special Conditions of Sub-Contract

SCC-22 Insurance of the Works

22/1 Add the words “(less only any amount included for the professional fee as stated in clause 22.2(b) of the Main Contract Conditions)” after the words “of the Works” in the third line of clause 22.4(1) on Page 38.

22/2 Add the words “(less only any amount included for the

professional fee as stated in clause 22.2(b) of the Main Contract)” to the end of clause 22.4(2) on Page 38.

22/4 Add the following as new clause 22.5 to clause 22 on Page

38 where clause 22B or 22C of the Main Contract Conditions is applicable to the Main Contract :-

“22.5 (a) Where insurance policies are effected and

maintained by the Employer as referred to in clauses 21.2, 22B or 22C of the Main Contract Conditions as appropriate, the Sub-Contractor shall be deemed to have examined such insurance policies effected and maintained and to have made allowance in his tender for any insufficiencies for which he may consider additional cover is required. The Sub-Contractor shall conform to the conditions of the insurance policies and all requirements of the insurer in connection with the prevention of accidents, the recovery of losses and the settlement of claims and shall bear at his own expense all consequences of any failure to do so.

(b) The Sub-Contractor shall be liable for all

excesses (deductibles) contained in the policies and all exclusions or limitations under the said policies (insofar as they concern risks for which he is responsible under the terms of the Sub-Contract).

(c) In the event of any claims under the

insurances, insofar as excesses are concerned they shall be recoverable from the Sub-Contractor by the Employer and/or the Contractor as a debt.

(d) If the Sub-Contractor requires that the

excesses (deductibles) be reduced to lesser amounts, then the Sub-Contractor shall bear any additional premium payable entirely at his own expense.”

Page 43: TENDER DOCUMENTS · schedule no. 1 – preliminaries sr1/1 – sr1 sum/1 schedule no. 2 – preambles sr2/1 – sr2/72 schedule no. 3 – sewage treatment plant system sr3/1 – sr3

SPECIAL CONDITIONS OF SUB-CONTRACT (FOR USE WITH THE HKIA/HKIS STANDARD FORM OF

NOMINATED SUB-CONTRACT 2005 EDITION) (Cont’d)

HK-4547/FP TCK4:LWY22:TWT1:GT:M45042:(2.12.2019) - SCC/B/11 - Arcadis Hong Kong Limited

Contract Clause

Reference

Amendment Reference

Special Conditions of Sub-Contract

SCC-25 25/1 Delete clauses 25.1(3)(b), 25.1(3)(c), 25.1(3)(i), 25.1(3)(l),

25.1(3)(m) and 25.1(3)(s) on Pages 41 and 42. Extension of

time for Sub-Contract to be completed

25/2 Delete the words “but in any case within 60 days of” in the second and third line of clause 25.3(2) on Page 44 and replaced with the words “after the”.

by the

Sub-Contract Completion Date

25/3 Delete the words “but in any case within 60 days of” in the second line of clause 25.3(3)(a) on Page 44 and replace with the words “after the”.

25/4 Add the following as new clause 25.6 on Page 45 :-

“Condition precedent to Contractor’s entitlement to extension of time It shall be a condition precedent to the Contractor’s entitlement to extension of time that the Contractor shall comply with the provisions of clauses 25.1 and 25.2.

SCC-26 Extension of time for Sub-Contract Works to be completed at the same time as the Works

26/1 Add the following as new clause 26.3 on Page 46 :- “Condition precedent to Contractor’s entitlement to extension of time It shall be a condition precedent to the Contractor’s entitlement to extension of time that the Contractor shall comply with the provisions of clauses 26.1.

Page 44: TENDER DOCUMENTS · schedule no. 1 – preliminaries sr1/1 – sr1 sum/1 schedule no. 2 – preambles sr2/1 – sr2/72 schedule no. 3 – sewage treatment plant system sr3/1 – sr3

SPECIAL CONDITIONS OF SUB-CONTRACT (FOR USE WITH THE HKIA/HKIS STANDARD FORM OF

NOMINATED SUB-CONTRACT 2005 EDITION) (Cont’d)

HK-4547/FP TCK4:LWY22:TWT1:GT:M45042:(2.12.2019) - SCC/B/12 - Arcadis Hong Kong Limited

Contract Clause

Reference

Amendment Reference

Special Conditions of Sub-Contract

SCC-27 Delay recovery measures

27/1 A full stop shall be added after the words “Contractor’s Proposal” in the second line of clause 27.1(4) on Page 47 and the word “or” in the second line of clause 27.1(4) on Page 47 shall be deleted and replaced by the following :- “Unless it is provided for otherwise in the terms of the agreement, in the event that the delay targeted for recovery stated in the agreement cannot be fully recovered due to any act, omission or default of the Contractor, the additional payment to the Contractor for carrying out the delay recovery measures as stipulated in the agreement shall be subject to a discount factor which bears the same ratio as the actual delay recovered to the targeted delay recovery.”

27/2 The words “if the Architect” in the second line of clause

27.1(4) on Page 47 shall be deleted and replaced by the words “If the Architect”.

SCC-28 28/1 Delete clauses 28.1(2)(d) and 28.1(2)(g) on Page 48. Direct loss and/or expense

SCC-33 Certificates and Payments

33/1 Insert the following words at the beginning of clauses 33.1(1), 33.1(5) and 33.1(6) on Page 53:- “Provided the Contractor complies with the requirements of clause 32.1(4) of the Main Contract Conditions then”

33/2 Insert the words “with copies to the Architect and the

Engineer as appropriate” after the words “Quantity Surveyor” in the second line of clause 33.1(4) on Page 53.

33/3 Add the following words to the end of clause 33.1(5) on

Page 53:- “or such other time as may be agreed between the Architect and the Quantity Surveyor provided always that the Quantity Surveyor shall submit the valuation prior to the Architect’s due date under clause 32.1(1) of the Main Contract Conditions.

Page 45: TENDER DOCUMENTS · schedule no. 1 – preliminaries sr1/1 – sr1 sum/1 schedule no. 2 – preambles sr2/1 – sr2/72 schedule no. 3 – sewage treatment plant system sr3/1 – sr3

SPECIAL CONDITIONS OF SUB-CONTRACT (FOR USE WITH THE HKIA/HKIS STANDARD FORM OF

NOMINATED SUB-CONTRACT 2005 EDITION) (Cont’d)

HK-4547/FP TCK4:LWY22:TWT1:GT:M45042:(2.12.2019) - SCC/B/13 - Arcadis Hong Kong Limited

Contract Clause

Reference

Amendment Reference

Special Conditions of Sub-Contract

SCC-33 33/4 Add the following to the end of clause 33.3 on Page 55 : Certificates and Payments (Cont'd)

“When the value of off-site materials or goods is to be included in an Interim Certificate, the following conditions shall apply:-

(a) such materials or goods must be intended for

inclusion in the Sub-Contract Works; (b) such materials or goods must be in accordance with

the Sub-Contract;” (c) the Sub-Contractor must furnish with the Quantity

Surveyor reasonable proof that the premises where the materials or goods have been assembled or stored are owned or leased by the Sub-Contractor;

(d) such materials or goods must have been set apart at

the premises where they have been assembled or stored, and have been clearly and visibly marked, individually or in sets, so as to identify:

(i) the person to whose order they are held, and (ii) their destination as being the Sub-Contract

Works; (e) the Sub-Contractor must furnish with the Quantity

Surveyor evidence that such materials or goods are insured against the perils set out in clause 22 of the Main Contract Conditions;

(f) the Sub-Contractor must furnish with the Quantity

Surveyor reasonable proof that the property in such materials or goods lies with the Sub-Contractor and that the conditions set out in paragraphs (a) to (e) of this sub-clause have been complied with.”

Page 46: TENDER DOCUMENTS · schedule no. 1 – preliminaries sr1/1 – sr1 sum/1 schedule no. 2 – preambles sr2/1 – sr2/72 schedule no. 3 – sewage treatment plant system sr3/1 – sr3

SPECIAL CONDITIONS OF SUB-CONTRACT (FOR USE WITH THE HKIA/HKIS STANDARD FORM OF

NOMINATED SUB-CONTRACT 2005 EDITION) (Cont’d)

HK-4547/FP TCK4:LWY22:TWT1:GT:M45042:(2.12.2019) - SCC/B/14 - Arcadis Hong Kong Limited

Contract Clause

Reference

Amendment Reference

Special Conditions of Sub-Contract

SCC-33 Certificates and Payments (Cont'd)

33/5 Delete the words “14 days after Substantial Completion” in the third line of clause 33.5(2) on Page 55 and replace with the words “within 14 days after the issue of the Substantial Completion Certificate”.

33/6 Delete the words “signed by the Quantity Surveyor and the

Sub-Contractor” of clause 33.6(5) on Page 56 and replaced with the words “prepared by the Quantity Surveyor”.

33/7 Delete the words “signed final account” of clause 33.8(1)

line 3 and 4 on Page 57 and replace with the words “final account prepared by the Quantity Surveyor”.

33/8 Delete clause 33.9(1)(a) on Page 58.

SCC-34 Surety Bond

34/1 Delete the word “Contractor” in line 2 of clause 34(1) on Page 59 and replace with the word “Employer”.

34/2 Delete the word “Contractor” in line 3 of clause 34(1) on

Page 57 and replace with the word “Employer”.

34/3 Delete the words “or, if not set out in either of those

documents, in the form set out in Schedule 1 of the Sub-Contract Conditions,” in clause 34(3) on Page 60.

Page 47: TENDER DOCUMENTS · schedule no. 1 – preliminaries sr1/1 – sr1 sum/1 schedule no. 2 – preambles sr2/1 – sr2/72 schedule no. 3 – sewage treatment plant system sr3/1 – sr3

SPECIAL CONDITIONS OF SUB-CONTRACT (FOR USE WITH THE HKIA/HKIS STANDARD FORM OF

NOMINATED SUB-CONTRACT 2005 EDITION) (Cont’d)

HK-4547/FP TCK4:LWY22:TWT1:GT:M45042:(2.12.2019) - SCC/B/15 - Arcadis Hong Kong Limited

Contract Clause

Reference

Amendment Reference

Special Conditions of Sub-Contract

SCC-34 Surety Bond

34/4 Delete the words “the Defects Liability Certificate” in line 2 of clause 5 of Schedule 1 on Page 75 and replace with “the Substantial Completion Certificate”.

(Cont’d) Delete the word “Contractor” in line 3 of clause 34(5) on

Page 60 and replace with: “or the issue of the Substantial Completion Certificate for the

Works, whichever occurs first,”.

34/5 Delete the word “Contractor” in line 1 of clause 34(5) on

Page 60 and replace by the word “Employer”.

34/6 Add the following at the end of clause 34(5) on Page 60:- ”The amount so withheld shall be held upon trust by the

Employer for the Sub-Contractor (without obligation to invest) subject to the rights of the Employer to have recourse to it for payment of any amounts which he is entitled to under the Sub-Contract or at law or to deduct from it any sum owed to him by the Sub-Contractor.”

SCC-36 36/1 Add the following as clause 36.1(f) on Page 60:- Determination by Contractor

“(f) persistently or significantly breaching his obligations under this Sub-Contract to the material detriment of the Employer and/or the Contractor.”

36/2 Delete the word “or” from clause 36.1(d) on Page 60.

36/3 Delete the full stop “.” at the end of clause 36.1(e) on Page

60 and replace with the word “;or”.

Page 48: TENDER DOCUMENTS · schedule no. 1 – preliminaries sr1/1 – sr1 sum/1 schedule no. 2 – preambles sr2/1 – sr2/72 schedule no. 3 – sewage treatment plant system sr3/1 – sr3

SPECIAL CONDITIONS OF SUB-CONTRACT (FOR USE WITH THE HKIA/HKIS STANDARD FORM OF

NOMINATED SUB-CONTRACT 2005 EDITION) (Cont’d)

HK-4547/FP TCK4:LWY22:TWT1:GT:M45042:(2.12.2019) - SCC/B/16 - Arcadis Hong Kong Limited

Contract Clause

Reference

Amendment Reference

Special Conditions of Sub-Contract

SCC-36 36/4 Renumber clause 36.7 on Page 63 as clause 36.8 and add

the following as clause 36.7 on Page 63:- Determination by Contractor (Cont’d)

“36.7 In addition to the grounds for determination given in

clause 36 of the Conditions, the Contractor shall be entitled to immediately, without notice, determine the employment of the Sub-Contractor under this Sub-Contract and the Sub-Contractor shall be liable to forfeit the sum of money stated in clause 33.4 to be the Retention and in addition to pay to the Employer and the Contractor the amount of any loss to the Employer and/or the Contractor resulting from such determination, if the Sub-Contractor shall have offered, given or agreed to give to any person any bribe, gift, loan or advantage of any kind as defined in the Prevention of Bribery Ordinance, Cap 201 as an inducement or reward for doing or forbearing to do so or for having done or forborne to do any action in relation to the obtaining or execution of this Sub-Contract or any other contract with the Employer or the Contractor, or for showing or any forbearing to show favour or disfavour to any person in relation to this Sub-Contract or other contract with the Employer or the Contractor, or if the like acts shall have been done by any person employed by the Sub-Contractor or acting on his behalf whether with or without the knowledge of the Sub-Contractor.”

36/5 Delete the clause reference “36.6” in the first line of the

renumbered clause 36.8 and replaced by the clause reference “36.7”.

Page 49: TENDER DOCUMENTS · schedule no. 1 – preliminaries sr1/1 – sr1 sum/1 schedule no. 2 – preambles sr2/1 – sr2/72 schedule no. 3 – sewage treatment plant system sr3/1 – sr3

SPECIAL CONDITIONS OF SUB-CONTRACT (FOR USE WITH THE HKIA/HKIS STANDARD FORM OF

NOMINATED SUB-CONTRACT 2005 EDITION) (Cont’d)

HK-4547/FP TCK4:LWY22:TWT1:GT:M45042:(2.12.2019) - SCC/B/17 - Arcadis Hong Kong Limited

Contract Clause

Reference

Amendment Reference

Special Conditions of Sub-Contract

SCC-37 Determination

37/1 Delete clause 37.1(1)(a) on Page 64 and replace with the following:-

by Sub-Contractor

(1) (a) Completely or substantially suspending the carrying out of the Works without good cause, unless notice of the suspension is given in the Sub-Contract or the Contract, or the instruction of Stop Construction during Bird Season or Bird Break from mid-October to mid-April as per discretion of the Employer is given in the Sub-Contract or the Contract or after award of Sub-Contract or Contract;

SCC-39 Fluctuations

39/1 For the avoidance of doubt it is confirmed that clause 39 on Page 67shall not be applicable to this Sub-Contract. No adjustment to the Sub-Contract Sum shall be made for any rises or falls in the cost of labour or materials, fluctuations in exchange rates, freight charges, insurance premium or for any other reasons whatsoever.

Page 50: TENDER DOCUMENTS · schedule no. 1 – preliminaries sr1/1 – sr1 sum/1 schedule no. 2 – preambles sr2/1 – sr2/72 schedule no. 3 – sewage treatment plant system sr3/1 – sr3

SPECIAL CONDITIONS OF SUB-CONTRACT (FOR USE WITH THE HKIA/HKIS STANDARD FORM OF

NOMINATED SUB-CONTRACT 2005 EDITION) (Cont’d)

HK-4547/FP TCK4:LWY22:TWT1:GT:M45042:(2.12.2019) - SCC/B/18 - Arcadis Hong Kong Limited

Contract Clause

Reference

Amendment Reference

Special Conditions of Sub-Contract

SCC-40 40/1 Delete clause 40(3) on Page 67 and replace with the

following :- Notices, certificates and other communications

“(3) Any notice, certificate or other communication to be given or made under the Sub-Contract shall be deemed to have been delivered : ● in the case of delivery by electronic mail

immediately following transmission (provided that the correct response is received by the sender); or,

● in the case of delivery by facsimile machine

immediately following transmission; or, ● in the case of a document sent by post two days

after the document has been posted in the case of a recipient in Hong Kong (irrespective of whether ordinary or registered post or recorded delivery is used) or seven days after the document has been posted in the case of an overseas recipient (irrespective of whether standard airmail, speedpost or any other form of airmail is used); or,

● in the case of a document delivered by hand or

courier, at the time of delivery.”

Page 51: TENDER DOCUMENTS · schedule no. 1 – preliminaries sr1/1 – sr1 sum/1 schedule no. 2 – preambles sr2/1 – sr2/72 schedule no. 3 – sewage treatment plant system sr3/1 – sr3

SPECIAL CONDITIONS OF SUB-CONTRACT (FOR USE WITH THE HKIA/HKIS STANDARD FORM OF

NOMINATED SUB-CONTRACT 2005 EDITION) (Cont’d)

HK-4547/FP TCK4:LWY22:TWT1:GT:M45042:(2.12.2019) - SCC/B/19 - Arcadis Hong Kong Limited

Contract Clause

Reference

Amendment Reference

Special Conditions of Sub-Contract

SCC-42 42/1 In clauses 42.3(2) and 42.4(2) on Pages 68 and 69 delete

the words:- Settlement of disputes

“the Hong Kong Institute of Architects co-jointly with the”. Delete clause 42.4(3) on Page 69 and replace with the

following:- “The President or Vice-President referred to in clause

42.4(2) may, at his discretion, request the Hong Kong International Arbitration Centre to appoint the arbitrator, by letter to the Chairman of that organization.”

Delete clause 42.4(4) on Page 69.

SCC-43 Contracting out of the Contracts (Rights of Third Parties) Ordinance

43/1 Nothing in this Sub-Contract confers or purports to confer on any third party any benefit or any right pursuant to the Contracts (Rights of Third Parties) Ordinance (Cap. 623) to enforce any term of this Sub-Contract.

Page 52: TENDER DOCUMENTS · schedule no. 1 – preliminaries sr1/1 – sr1 sum/1 schedule no. 2 – preambles sr2/1 – sr2/72 schedule no. 3 – sewage treatment plant system sr3/1 – sr3

APPENDIX ‘A’ TO SPECIAL CONDITIONS OF SUB-CONTRACT

SPECIAL CONDITIONS OF MAIN CONTRACT

Page 53: TENDER DOCUMENTS · schedule no. 1 – preliminaries sr1/1 – sr1 sum/1 schedule no. 2 – preambles sr2/1 – sr2/72 schedule no. 3 – sewage treatment plant system sr3/1 – sr3

SPECIAL CONDITIONS OF CONTRACT

Index

HK-4547/FP TCK4:LWY22:TWT1:GT:M45042:(2.12.2019) - i - Arcadis Hong Kong Limited

- General SCC-1 Interpretation and definitions SCC-2 Contractor’s obligations SCC-3 Master programme SCC-5 Documents forming the Contract and other documents SCC-6 Statutory obligations SCC-8 Materials, goods, workmanship and work SCC-12 Architect’s representative SCC-13 Variations, Provisional Quantities, Provisional Items and Provisional Sums SCC-17 Substantial Completion and defects liability SCC-18 Partial possession by Employer SCC-19 Assignment and sub-letting SCC-21 Insurance against injury to persons or property SCC-22 Insurance of the Works SCC-24 Damages for non-completion SCC-25 Extension of time SCC-26 Delay recovery measures SCC-27 Direct loss and/or expense SCC-29 Nominated Sub-Contractors and Nominated Suppliers

Page 54: TENDER DOCUMENTS · schedule no. 1 – preliminaries sr1/1 – sr1 sum/1 schedule no. 2 – preambles sr2/1 – sr2/72 schedule no. 3 – sewage treatment plant system sr3/1 – sr3

SPECIAL CONDITIONS OF CONTRACT

Index (Cont’d)

HK-4547/FP TCK4:LWY22:TWT1:GT:M45042:(2.12.2019) - ii - Arcadis Hong Kong Limited

SCC-32 Certificates and payments SCC-33 Surety Bond SCC-35 Determination by Employer SCC-36 Determination by Contractor SCC-38 Fluctuations SCC-39 Notices, certificates and other communications SCC-41 Settlement of disputes SCC-42 Contracting out of the Contracts (Rights of Third Parties) Ordinance

Page 55: TENDER DOCUMENTS · schedule no. 1 – preliminaries sr1/1 – sr1 sum/1 schedule no. 2 – preambles sr2/1 – sr2/72 schedule no. 3 – sewage treatment plant system sr3/1 – sr3

SPECIAL CONDITIONS OF CONTRACT

HK-4547/FP TCK4:LWY22:TWT1:GT:M45042:(2.12.2019) - SCC/1 - Arcadis Hong Kong Limited

Contract Clause

Reference

Amendment Reference

Special Conditions of Contract

General A. Context These Special Conditions of Contract are to be read in

conjunction with the Conditions of Contract which shall be the General Conditions contained in the “Agreement and Schedule of Conditions of Building Contract for use in the Hong Kong Special Administrative Region, Private Edition - Without Quantities, 2006 Edition” published by the Hong Kong Institute of Architects, the Hong Kong Institute of Construction Managers and the Hong Kong Institute of Surveyors (hereinafter “the General Conditions”). Wherever these Special Conditions vary from the General Conditions the terms of the Special Conditions shall take precedence.

B. Rectial Delete recital (2B) and (2C) on Page 6.

C. Typographical Errors The following typographical errors in the Conditions shall be

corrected :- (a) Clause 13.4(1)(a) on Page 31, add the word “or” at the

end of the clause. (b) Clause 35.4(8) on Page 76 first line, the comma after

the word “equipment” shall be deleted. (c) Clause 40(2) on Page 85 second line “40.1(1)” shall be

changed to “40(1)”.

D. Clause Numbering Each SCC Clause number matches the clause number of

the General Conditions clause to be amended. Therefore the SCC numbers may not run in sequence.

Page 56: TENDER DOCUMENTS · schedule no. 1 – preliminaries sr1/1 – sr1 sum/1 schedule no. 2 – preambles sr2/1 – sr2/72 schedule no. 3 – sewage treatment plant system sr3/1 – sr3

SPECIAL CONDITIONS OF CONTRACT (Cont’d)

HK-4547/FP TCK4:LWY22:TWT1:GT:M45042:(2.12.2019) - SCC/2 - Arcadis Hong Kong Limited

Contract Clause

Reference

Amendment Reference

Special Conditions of Contract

SCC-1 Interpretation and definitions

1/1 Delete sub-clause (vii) in clause 1.6 under the “Variation” sub-heading on Page 14 and replace with the following sub-clause:-

“(vii) the sequence or timing of carrying out or completing work;”

SCC-2 2/1 Delete clause 2.1(2) on Page 17 and replace with the following

clause 2.1(2) and add a new clause 2.1(3) :- Contractor’s obligations

“(2) Where the Contract requires the Contractor to carry

out the design or the development of the Architect’s design, the design or the development of the Architect’s design shall be carried out with reasonable skill and care and the Contractor shall be responsible to the Employer for such work.

Such design work:

⚫ shall constitute part of the Works; ⚫ shall, if appropriate, include selection of

proprietary articles; ⚫ fit for intended purpose; ⚫ shall be carried out in due time by a trained and

experienced person competent in the relevant field; and

⚫ shall follow the relevant Standard Codes of Practices and/or good practice, to meet conditions imposed by the Specification, the environment, the expected life of the building and other relevant factors.

The Contractor warrants each and every such design

accordingly. A review by the Architect of the visual intent of the design of permanent work and its compliance with the contract terms shall be obtained, but this shall not constitute any waiver of the design responsibility of the Contractor, or of any actual or implied warranty of the Contractor or the supplier to him of any proprietary article.”

Page 57: TENDER DOCUMENTS · schedule no. 1 – preliminaries sr1/1 – sr1 sum/1 schedule no. 2 – preambles sr2/1 – sr2/72 schedule no. 3 – sewage treatment plant system sr3/1 – sr3

SPECIAL CONDITIONS OF CONTRACT (Cont’d)

HK-4547/FP TCK4:LWY22:TWT1:GT:M45042:(2.12.2019) - SCC/3 - Arcadis Hong Kong Limited

Contract Clause

Reference

Amendment Reference

Special Conditions of Contract

SCC-2 Contractor’s obligations (Cont'd)

(3) Where the Contract requires the Contractor to prepare details, or shop drawings or installation drawings, the details, or shop drawings or installation drawings shall be carried out with reasonable skill and care and the Contractor shall be responsible to the Employer for such work.”

2/2 Delete lines 1 and 2 of clause 2.4(1) on Page 17 and replace

with the following :- “(1) The Contractor shall as soon as practicable but in

any event within 30 days after his receipt of any of the following documents carefully check and inform the Architect if the Contractor finds any ambiguity or discrepancy in or divergence between the following documents:”

2/3 Add the following as new clause 2.4(3) on Page 17 :- “(3) If in the opinion of the Architect (which shall not be

exercised unreasonably) any discrepancy or divergence is one which should have been apparent to a reasonably competent contractor and notified by the Contractor in compliance with clause 2.4(1) and if such discrepancy or divergence was not in fact notified by the Contractor; then, in determining the entitlement of the Contractor to any extension of time or any direct loss and/or expense to which the Contractor would otherwise be entitled in consequence of an instruction issued by the Architect under this clause, the Architect shall exclude from such extension or direct loss and/or expense (as applicable) any delay or direct loss and/or expense which could reasonably have been avoided had the discrepancy or divergence been notified in accordance with clause 2.4(1) and the Contractor’s entitlements shall be limited accordingly.”

Page 58: TENDER DOCUMENTS · schedule no. 1 – preliminaries sr1/1 – sr1 sum/1 schedule no. 2 – preambles sr2/1 – sr2/72 schedule no. 3 – sewage treatment plant system sr3/1 – sr3

SPECIAL CONDITIONS OF CONTRACT (Cont’d)

HK-4547/FP TCK4:LWY22:TWT1:GT:M45042:(2.12.2019) - SCC/4 - Arcadis Hong Kong Limited

Contract Clause

Reference

Amendment Reference

Special Conditions of Contract

SCC-2 2/4 Add the following as new clause 2.4(4) on Page 17 :- Contractor’s obligations (Cont'd)

“(4)(a) The Contractor shall in the course of carrying out the Works take full responsibility for the adequate stability and safety of all operations on the Site other than those of persons for whom the Employer is responsible under clause 30.1 and have full regard for the safety of all persons on the Site.

(b) The Contractor shall comply with the Building

Ordinance, the Construction Site (Safety) Regulations, all Labour Department Regulations, all Electrical and Mechanical Services Department Regulations, the Factories and Industrial Undertakings (Safety Officers and Safety Supervisors) Regulations and all other statutory requirements regarding safety on construction sites.

(c) The Contractor shall employ at least the number of

safety officers and safety supervisors prescribed by the Factories and Industrial Undertakings (Safety Officers and Safety Supervisors) Regulations for the time being in force as at the date of the Contract. The Safety Officers shall be registered by the Commissioner for Labour under the Factories and Industrial Undertakings (Safety Officers and Safety Supervisors) Regulations and shall be employed on a full-time basis to undertake all duties entailed by the Factories and Industrial Undertakings (Safety Officers and Safety Supervisors) Regulations and any additional duties as specified in the Contract.

Cont’d on next page

Page 59: TENDER DOCUMENTS · schedule no. 1 – preliminaries sr1/1 – sr1 sum/1 schedule no. 2 – preambles sr2/1 – sr2/72 schedule no. 3 – sewage treatment plant system sr3/1 – sr3

SPECIAL CONDITIONS OF CONTRACT (Cont’d)

HK-4547/FP TCK4:LWY22:TWT1:GT:M45042:(2.12.2019) - SCC/5 - Arcadis Hong Kong Limited

Contract Clause

Reference

Amendment Reference

Special Conditions of Contract

SCC-2 Contractor’s obligations (Cont'd)

Cont’d from previous page None of the requirements of this clause shall in any

way relieve the Contractor of his obligations under clause 6 of the Conditions. In particular, the Contractor shall not be relieved of his obligations to employ Safety Supervisors, any additional Safety Officers and/or any other safety personnel in excess of the number required by this clause as may be separately required by any Act or Ordinance of Government, instrument, rule, order, regulation or by-law as may be in force at any time during the progress and continuance of the Works.”

SCC-3 3/1 Renumber existing clause 3.3 on Page 19 as clause 3.4 and

add the following new clause 3.3 on Page 19 :- Master programme

3.3 “Response to Contractor’s non-compliance

If the Contractor does not comply with the provisions of clauses 3.1 or 3.2 to the satisfaction of the Architect, the Employer may employ and pay others to carry out such programming activities as, in the Architect’s opinion, are sufficient for the Architect to monitor, update and forecast the Contractor’s progress on site. All costs incurred in connection therewith shall be recoverable from the Contractor by the Employer as a debt or may be deducted by the Employer from any monies due or to become due to the Contractor under the Contract.”

Page 60: TENDER DOCUMENTS · schedule no. 1 – preliminaries sr1/1 – sr1 sum/1 schedule no. 2 – preambles sr2/1 – sr2/72 schedule no. 3 – sewage treatment plant system sr3/1 – sr3

SPECIAL CONDITIONS OF CONTRACT (Cont’d)

HK-4547/FP TCK4:LWY22:TWT1:GT:M45042:(2.12.2019) - SCC/6 - Arcadis Hong Kong Limited

Contract Clause

Reference

Amendment Reference

Special Conditions of Contract

SCC-5 5/1 Delete clause 5.12(1) on Page 23 and replace with the

following :- Documents forming the Contract and other documents

“(1) The Contractor shall submit to the Architect 2

copies of the as-built drawings which are required by the Contract, Nominated Sub-Contracts or Nominated Supply Contracts within 60 days of the date when, in the Architect’s opinion, substantial completion of any particular trade or portion of the Works occurred.”

SCC-6 6/1 Delete clause 6.1 on Page 24 and replace with the

following:- Statutory obligations

“6.1 The Contractor shall comply with and give the notices

required by any Ordinance, regulation, rule, order or by-law applicable to the Works and any changes thereto upto and including the Date of Substantial Completion of the Works (“the Statutory Requirements”).”

Delete clause 6.3(1) on Page 24 and replace with the

following :- “(1) The Contractor shall pay and indemnify the

Employer against liability in respect of all fees or charges legally demandable or which shall become legally demandable during the course of the Works under the Statutory Requirements.”

Delete clause 6.3(2) on Page 24.

On the sixth line of clause 6.4(1) on Page 24 after “legally demandable” insert “or which shall become legally demandable”.

Page 61: TENDER DOCUMENTS · schedule no. 1 – preliminaries sr1/1 – sr1 sum/1 schedule no. 2 – preambles sr2/1 – sr2/72 schedule no. 3 – sewage treatment plant system sr3/1 – sr3

SPECIAL CONDITIONS OF CONTRACT (Cont’d)

HK-4547/FP TCK4:LWY22:TWT1:GT:M45042:(2.12.2019) - SCC/7 - Arcadis Hong Kong Limited

Contract Clause

Reference

Amendment Reference

Special Conditions of Contract

SCC-8 8/1 Add the following as new clause 8.1(7) to clause 8.1 on Page

26 :- Materials, goods, workmanship and work

“(7) Without prejudice to the generality of the foregoing, the Contractor shall carry out the Works :

(a) using materials which are new, free of

defects and of good quality; (b) using methods of construction which are in

accordance with sound practice and which are not likely to endanger any existing structures or finishes, adjacent property or the safety of the public; and

(c) in a good and workmanlike manner.”

8/2 Add the following as new clause 8.2(4) to clause 8.2 on Page

26 :- “(4) Where the Specification requires any item of work

to be inspected prior to being covered up, then the Contractor shall notify the Architect in writing before work is covered up and give him at least 1 week notice to inspect. Should any work be covered up without the required notice being given then, whether or not the work is in accordance with the Contract, the Contractor will be responsible for all costs of the testing, opening up for inspection, and any consequential making good and the Contractor shall not be entitled to any extensions of time or to any adjustment of the Contract Sum or other additional monetary compensation in respect of any delay or disruption caused thereby any such entitlement being hereby irrevocably waived.”

8/3 Delete the word “individual” in the first line of clause 8.5 on

Page 27 and replace with the words “person or persons”.

Page 62: TENDER DOCUMENTS · schedule no. 1 – preliminaries sr1/1 – sr1 sum/1 schedule no. 2 – preambles sr2/1 – sr2/72 schedule no. 3 – sewage treatment plant system sr3/1 – sr3

SPECIAL CONDITIONS OF CONTRACT (Cont’d)

HK-4547/FP TCK4:LWY22:TWT1:GT:M45042:(2.12.2019) - SCC/8 - Arcadis Hong Kong Limited

Contract Clause

Reference

Amendment Reference

Special Conditions of Contract

SCC-12 Architect’s representative

12/1 Delete the words “to be resident on the Site” in the second line of the first paragraph of clause 12.1 on Page 29 and replace with the following :- “who may or may not be resident on the Site”.

12/2 Add the following as new clause 12.4 to clause 12 on Page

29 :- 12.4 “Contractor not relieved of obligations by any act of

Architect’s Representative No act or omission by the Architect’s representative in the performance of any of his duties or exercise of any of his powers under the Contract shall in any way operate to relieve the Contractor of any of the duties, responsibilities, obligations or liabilities imposed upon him by any of the provisions of the Contract.”

SCC-13 13/1 Delete clause 13.1(1) on Page 29 and replace with the

following:- Variations, Provisional Quantities, Provisional Items and Provisional Sums

“(1) The Architect may issue an instruction requiring a Variation.”

13/2 Add the following clause 13.4(1)(v) on Page 31:-

“(v) For work which is to be the subject of a fair

valuation under clause 13.4(1) (iii), the Contractor shall obtain, if so requested by the Quantity Surveyor, three competitive tenders, and the fair valuation shall be based upon the most competitive tender so received by the Contractor together with an adjustment for the Contractor’s profit and overheads as may be agreed with the Quantity Surveyor.”

Page 63: TENDER DOCUMENTS · schedule no. 1 – preliminaries sr1/1 – sr1 sum/1 schedule no. 2 – preambles sr2/1 – sr2/72 schedule no. 3 – sewage treatment plant system sr3/1 – sr3

SPECIAL CONDITIONS OF CONTRACT (Cont’d)

HK-4547/FP TCK4:LWY22:TWT1:GT:M45042:(2.12.2019) - SCC/9 - Arcadis Hong Kong Limited

Contract Clause

Reference

Amendment Reference

Special Conditions of Contract

SCC-13 13/3 Add the following to the end of clause 13.4(3)(b) on Page

32:- Variations, Provisional Quantities, Provisional Items and Provisional Sums (Cont’d)

“Provided that no such adjustments shall be made if the

omission of work is due to omission of work which is included in or covered by any Provisional Quantities, Provisional Items or Provisional Sums.”

13/4 Add the following new clause at the end of clause 13.4 on

Page 32 :- “(10) If required by the Architect, Project Manager or

Quantity Surveyor, the Contractor shall within fourteen (14) days of the Architect’s written request submit a detailed estimate of the value of any variation.”

SCC-17 17/1 Delete clause 17.1 on Page 34 and replace with the

following:- Substantial Completion and defects liability

“17.1 The Architect shall issue the Substantial

Completion Certificate for the Works when he is satisfied that the Works have been substantially completed and have passed the inspections and tests that are required by the Contract to be carried out and completed before Substantial Completion and that any approvals, permits or temporary permits, BEAM Plus submission, testing and commissioning records required by the Contract have been issued by the relevant authorities or, if any such approval, permit or temporary permit, BEAM Plus submission, testing and commissioning records remains unissued it is not as a consequence of any default of the Contractor and that (subject to any written undertaking the Architect may require) all unfinished items of work shall be completed as soon as practicable after the issue of the Substantial Completion Certificate, or as instructed by the Architect, and in any case before the expiry of the Defects Liability Period.”

Page 64: TENDER DOCUMENTS · schedule no. 1 – preliminaries sr1/1 – sr1 sum/1 schedule no. 2 – preambles sr2/1 – sr2/72 schedule no. 3 – sewage treatment plant system sr3/1 – sr3

SPECIAL CONDITIONS OF CONTRACT (Cont’d)

HK-4547/FP TCK4:LWY22:TWT1:GT:M45042:(2.12.2019) - SCC/10 - Arcadis Hong Kong Limited

Contract Clause

Reference

Amendment Reference

Special Conditions of Contract

SCC-17 17/2 Delete clause 17.3(5) on Page 35 and replace with the

following:- Substantial Completion and defects liability (Cont'd)

“(5) The Architect may instruct the Contractor not to rectify some or all of the defects specified in the schedules of defects, in which case the Quantity Surveyor shall assess a fair value for defects not rectified and reduce the Contract Sum accordingly.”

17/3 Delete the word “and” at the end of clause 17.4(b) on Page

35. Delete “ . ” at the end of clause 17.4(c) on Page 35 and add

“ ; and” at the end of clause 17.4(c) on Page 35. Add the following sub-clause to the end of clause 17.4 on

Page 35 :- “(d) the Contractor (or the relevant Nominated

Sub-Contractors/Suppliers) has submitted all specified guarantees and warranties as required by the Contract and all such guarantees and warranties have been approved by the Architect.”

SCC-18 18/1 Delete clause 18.1(1) on Page 36 and replace with the

following :- Partial possession by Employer

“(1) The Employer may take possession of a part of the Works or where sectional completion is provided for in the Contract a part of a Section before Substantial Completion if the Architect considers such part of the Works or part of a Section is capable of occupation or use by the Employer and that part of the Works or part of a Section shall be referred to as a Relevant Part.”

Page 65: TENDER DOCUMENTS · schedule no. 1 – preliminaries sr1/1 – sr1 sum/1 schedule no. 2 – preambles sr2/1 – sr2/72 schedule no. 3 – sewage treatment plant system sr3/1 – sr3

SPECIAL CONDITIONS OF CONTRACT (Cont’d)

HK-4547/FP TCK4:LWY22:TWT1:GT:M45042:(2.12.2019) - SCC/11 - Arcadis Hong Kong Limited

Contract Clause

Reference

Amendment Reference

Special Conditions of Contract

SCC-19 Assignment and sub-letting

19/1 Delete the words “giving prior notice to the Employer” in the first line of clause 19.1(4) on Page 37 and replace with “the Employer’s consent.”

19/2 Add the following as new clause 19.2(g) to clause 19.2 on

Page 38 :- “(g) it shall be a condition in any sub-letting which may

occur that the employment of the sub-contractor under the sub-contract shall determine immediately upon the determination (for any reason) of the Contractor’s employment under this Contract.”

SCC-21 Insurance against injury to persons or property

21/1 Insert the words “the Employer,” after the words “names of” in the third line of clause 21.1(1) on Page 38.

21/2 Delete the words “the Contractor’s or any sub-contractor’s of

all tiers employees” and replace with “employees of the Contractor or any sub-contractor of all tiers” in the fifth line of clause 21.1(1) on Page 38.

21/3 Add the following as clause 21.1(4) on Page 38 :- “(4) The Employer shall not be liable for or in respect of

any damages or compensation payable at law in respect of or in consequence of any accident or injury to any workman or other person whether in the employment of the Contractor or his sub-contractors and their respective sub-contractors of any tier and the Contractor shall indemnify and keep indemnified the Employer against all such damages or compensation and against all claims, demands, proceedings, costs, charges and expenses whatsoever in respect thereof or in relation thereto.”

Page 66: TENDER DOCUMENTS · schedule no. 1 – preliminaries sr1/1 – sr1 sum/1 schedule no. 2 – preambles sr2/1 – sr2/72 schedule no. 3 – sewage treatment plant system sr3/1 – sr3

SPECIAL CONDITIONS OF CONTRACT (Cont’d)

HK-4547/FP TCK4:LWY22:TWT1:GT:M45042:(2.12.2019) - SCC/12 - Arcadis Hong Kong Limited

Contract Clause

Reference

Amendment Reference

Special Conditions of Contract

SCC-21 21/4 Add the following new sub-clause at the end of Clause 21.2

on Page 39 :- Insurance against injury to persons or property (Cont’d)

“(4) The Contractor’s attention is drawn to clause 20 which sets out his contractual obligations to indemnify the Employer against certain damage, expense, liability or loss in respect of any claim or proceedings. If the Contractor considers the limit of indemnity referred to in clause 21.2(3)(c) for any one occurrence or series of occurrence of loss or damage to be inadequate to cover these contractual obligations he is at liberty to take out a policy with an increased limit of indemnity but any additional premium or differential in premium shall be at his own expense.”

21/5 In clause 21.2(1)(b)(ii) on Page 39 replace the “,” with “; or”

SCC-22 Insurance of the Works

22/1 Add the following words at the beginning of the second sentence of clause 22.4(1) on Page 42 :

“Subject to clause 22.4(4),”

and the following word “The” shall be replaced by the word “the”.

22/2 Add the following as new sub-clause 22.4(4) to clause 22.4

on Page 42 :- “(4) The Contractors’ All Risks Insurance Policy shall

be extended beyond the period of 14 days after the issue of the Substantial Completion Certificate required under clause 22.4(1) above to extend the period of cover to include the carrying out of unfinished items of work and works of repair or maintenance etc. by the Contractor, his sub-contractors and their sub-contractors of all tiers during the Defects Liability Period”.

Page 67: TENDER DOCUMENTS · schedule no. 1 – preliminaries sr1/1 – sr1 sum/1 schedule no. 2 – preambles sr2/1 – sr2/72 schedule no. 3 – sewage treatment plant system sr3/1 – sr3

SPECIAL CONDITIONS OF CONTRACT (Cont’d)

HK-4547/FP TCK4:LWY22:TWT1:GT:M45042:(2.12.2019) - SCC/13 - Arcadis Hong Kong Limited

Contract Clause

Reference

Amendment Reference

Special Conditions of Contract

SCC-22 Insurance of the Works (Cont’d)

22/3 Add the words “(less only any amount included for the professional fee as stated in clause 22.2(b))” after the words “of the Works” in the third line of clause 22.6 on Page 43.

22/4 Add the following as new clause 22.8 to clause 22 on Page

43 where clause 22B or 22C is applicable to the Contract :-

“22.8 (a) Where insurance policies are effected and maintained by the Employer as referred to in clauses 21.2, 22B or 22C as appropriate, the Contractor shall be deemed to have examined such insurance policies effected and maintained and to have made allowance in his tender for any insufficiencies for which he may consider additional cover is required. The Contractor shall conform to the conditions of the insurance policies and all requirements of the insurer in connection with the prevention of accidents, the recovery of losses and the settlement of claims and shall bear at his own expense all consequences of any failure to do so.

(b) The Contractor shall be liable for all

excesses (deductibles) contained in the policies and all exclusions or limitations under the said policies (insofar as they concern risks for which he is responsible under the terms of the Contract).

(c) In the event of any claims under the

insurances, insofar as excesses are concerned they shall be recoverable from the Contractor by the Employer as a debt.

(d) If the Contractor requires that the excesses

(deductibles) be reduced to lesser amounts, then the Contractor shall bear any additional premium payable entirely at his own expense.”

Page 68: TENDER DOCUMENTS · schedule no. 1 – preliminaries sr1/1 – sr1 sum/1 schedule no. 2 – preambles sr2/1 – sr2/72 schedule no. 3 – sewage treatment plant system sr3/1 – sr3

SPECIAL CONDITIONS OF CONTRACT (Cont’d)

HK-4547/FP TCK4:LWY22:TWT1:GT:M45042:(2.12.2019) - SCC/14 - Arcadis Hong Kong Limited

Contract Clause

Reference

Amendment Reference

Special Conditions of Contract

SCC-24 Damages for non-completion

24/1 In Clause 24.2(1) on Page 45 delete the words “between the Completion Date and the Date of Substantial Completion” in the last line and replace with the words “commencing from the date by which the Architect certified the Works or Section ought to have been completed under Clause 24.1(1) upto and including the date by which they were ultimately completed as certified under the Substantial Completion Certificate”.

SCC-25 25/1 Delete clauses 25.1(3)(b), 25.1(3)(c), 25.1(3)(i), 25.1(3)(m),

25.1(3)(n) and 25.1(3)(t) on Pages 46, 47 and 48. Extension of

time 25/2 Delete the words “but in any case within 60 days” in the

second line of clause 25.3(2) on Page 49.

25/3 Delete the words “but in any case within 60 days of” in the

second line of clause 25.3(3)(a) on Page 49 and replace with the words “after the”.

25/4 Add the following as new clause 25.7 on Page 51 :-

“Condition precedent to Contractor’s entitlement to extension of time It shall be a condition precedent to the Contractor’s entitlement to extension of time that the Contractor shall comply with the provisions of clauses 25.1 and 25.2.

Page 69: TENDER DOCUMENTS · schedule no. 1 – preliminaries sr1/1 – sr1 sum/1 schedule no. 2 – preambles sr2/1 – sr2/72 schedule no. 3 – sewage treatment plant system sr3/1 – sr3

SPECIAL CONDITIONS OF CONTRACT (Cont’d)

HK-4547/FP TCK4:LWY22:TWT1:GT:M45042:(2.12.2019) - SCC/15 - Arcadis Hong Kong Limited

Contract Clause

Reference

Amendment Reference

Special Conditions of Contract

SCC-26 Delay recovery measures

26/1 Add the following to the end of clause 26.3(1) on Page 52 :- “Unless it is provided for otherwise in the terms of the agreement, in the event that the delay targeted for recovery stated in the agreement cannot be fully recovered due to any act, omission or default of the Contractor, the additional payment to the Contractor for carrying out the delay recovery measures as stipulated in the agreement shall be subject to a discount factor which bears the same ratio as the actual delay recovered to the targeted delay recovery.”

SCC-27 27/1 Delete clauses 27.1(2)(d) and 27.1(2)(h) on Pages 53 and

54. Direct loss and/or expense

SCC-29 Nominated Sub-Contractors and Nominated Suppliers

29/1 Delete clause 29.2(1)(c) on Page 57.

29/2 Delete clause 29.2(7) on Page 58.

SCC-32 Certificates and payments

32/1 Insert the following words at the beginning of clauses 32.1(1) and at 32.1(5) on Pages 64 and 65:- “Provided the Contractor complies with the requirements of Clause 32.1(4) then”

32/2 Insert the words “with copies to the Architect and the

Engineer as appropriate” after the words “Quantity Surveyor” in the first line of clause 32.1(4) on Page 64.

Page 70: TENDER DOCUMENTS · schedule no. 1 – preliminaries sr1/1 – sr1 sum/1 schedule no. 2 – preambles sr2/1 – sr2/72 schedule no. 3 – sewage treatment plant system sr3/1 – sr3

SPECIAL CONDITIONS OF CONTRACT (Cont’d)

HK-4547/FP TCK4:LWY22:TWT1:GT:M45042:(2.12.2019) - SCC/16 - Arcadis Hong Kong Limited

Contract Clause

Reference

Amendment Reference

Special Conditions of Contract

SCC-32 Certificates and payments (Cont'd)

32/3 Add the following words to the end of clause 32.1(5) on Page 65:- “or such other time as may be agreed between the Architect and the Quantity Surveyor provided always that the Quantity Surveyor shall submit the valuation prior to the Architect’s due date under Clause 32.1(1).

32/4 Add the following to the end of clause 32.3 on Page 67 : “When the value of off-site materials or goods is to be

included in an Interim Certificate, the following conditions shall apply:-

(a) such materials or goods must be intended for

inclusion in the Works; (b) such materials or goods must be in accordance with

the Contract;” (c) the Contractor must furnish to the Quantity

Surveyor reasonable proof that the premises where the materials or goods have been assembled or stored are owned or leased by the Contractor;

(d) such materials or goods must have been set apart

at the premises where they have been assembled or stored, and have been clearly and visibly marked, individually or in sets, so as to identify:

(i) the person to whose order they are held, and (ii) their destination as being the Works; (e) the Contractor must furnish to the Quantity

Surveyor evidence that such materials or goods are insured against the perils set out in clause 22 of these Conditions;

(f) the Contractor must furnish to the Quantity

Surveyor reasonable proof that the property in such materials or goods lies with the Contractor and that the conditions set out in paragraphs (a) to (e) of this sub-clause have been complied with.”

Page 71: TENDER DOCUMENTS · schedule no. 1 – preliminaries sr1/1 – sr1 sum/1 schedule no. 2 – preambles sr2/1 – sr2/72 schedule no. 3 – sewage treatment plant system sr3/1 – sr3

SPECIAL CONDITIONS OF CONTRACT (Cont’d)

HK-4547/FP TCK4:LWY22:TWT1:GT:M45042:(2.12.2019) - SCC/17 - Arcadis Hong Kong Limited

Contract Clause

Reference

Amendment Reference

Special Conditions of Contract

SCC-32 Certificates and payments (Cont'd)

32/5 Delete the words “14 days after Substantial Completion” in the third line of clause 32.5(2) on Page 68 and replace with the words “within 14 days after the issue of the Substantial Completion Certificate”.

32/6 Delete the words “signed by the Quantity Surveyor and the

Contractor” in clause 32.6(5) on Page 69 and replaced with the words “prepared by the Quantity Surveyor”.

32/7 Delete clause 32.7(3)(h)(i) on Page 70.

32/8 Delete the words “signed final account” in clause 32.8(1) line

4 on Page 71 and replace with the words “final account prepared by the Quantity Surveyor”.

32/9 Insert the word “within” before the words “28 days” in the

third line of clause 32.8(4) on Page 71.

32/10 Delete clause 32.9(1)(a) on Page 71.

Page 72: TENDER DOCUMENTS · schedule no. 1 – preliminaries sr1/1 – sr1 sum/1 schedule no. 2 – preambles sr2/1 – sr2/72 schedule no. 3 – sewage treatment plant system sr3/1 – sr3

SPECIAL CONDITIONS OF CONTRACT (Cont’d)

HK-4547/FP TCK4:LWY22:TWT1:GT:M45042:(2.12.2019) - SCC/18 - Arcadis Hong Kong Limited

Contract Clause

Reference

Amendment Reference

Special Conditions of Contract

SCC-33 Surety Bond

33/1 Delete the word “Architect” in line 2 of clause 33.1(1) on Page 73 and replace with the word “Employer”.

33/2 Delete the words “or, if not set out in either of those

documents, in the form set out in Schedule 1 of the Conditions,” in clause 33.1(3) on Page 73.

33/3 Delete the words “the Defects Liability Certificate” in line 2

of clause 5 in Schedule 1 on Page 91 and replace with “the Substantial Completion Certificate”.

Insert the following words in clause 33.3 in line 3 on Page

73 between the words “Employer” and “,at”: “or the issue of the Substantial Completion Certificate for the

Works, whichever occurs first,”.

33/4 Add the following at the end of clause 33.3 on Page 73:- “The amount so withheld shall be held upon trust by the

Employer for the Contractor (without obligation to invest) subject to the rights of the Employer to have recourse to it for payment of any amounts which he is entitled to under the Contract or at law or to deduct from it any sum owed to him by the Contractor, provided that the Employer gives notice to the Contractor in accordance with clause 32.1(6).

The above principles shall also apply to any Nominated Sub-

Contract where the Nominated Sub-Contractor is required to provide a specific Surety Bond to the Employer under the Form of Warranty to be given by the Nominated Sub-Contractor to the Employer in consideration of nomination.”

Page 73: TENDER DOCUMENTS · schedule no. 1 – preliminaries sr1/1 – sr1 sum/1 schedule no. 2 – preambles sr2/1 – sr2/72 schedule no. 3 – sewage treatment plant system sr3/1 – sr3

SPECIAL CONDITIONS OF CONTRACT (Cont’d)

HK-4547/FP TCK4:LWY22:TWT1:GT:M45042:(2.12.2019) - SCC/19 - Arcadis Hong Kong Limited

Contract Clause

Reference

Amendment Reference

Special Conditions of Contract

SCC-35 35/1 Delete the word “or” from clause 35.1(d) on Page 73.

Determination by Employer 35/2 Delete the full stop “.” at the end of clause 35.1(e) on Page

73 and replace with the word “;or”.

35/3 Add the following as clause 35.1(f) on Page 73 :- “(f) persistently or significantly breaching his

obligations under this Contract to the material detriment of the Employer.”

35/4 Renumber clause 35.8 on Page 78 as clause 35.9 and add

the following as clause 35.8 on Page 78 :-

35.8 “Employer’s right to determine in case of bribery In addition to the grounds for determination given in clause 35 of the Conditions, the Employer shall be entitled to immediately, without notice, determine the employment of the Contractor under this Contract and the Contractor shall pay to the Employer the amount of any loss to the Employer resulting from such determination, if the Contractor shall have offered, given or agreed to give to any person any bribe, gift, loan or advantage of any kind as defined in the Prevention of Bribery Ordinance, Cap 201 as an inducement or reward for doing or forbearing to do so or for having done or forborne to do any action in relation to the obtaining or execution of this Contract or any other contract with the Employer, or for showing or any forbearing to show favour or disfavour to any person in relation to this Contract or other contract with the Employer, or if the like acts shall have been done by any person employed by the Contractor or acting on his behalf whether with or without the knowledge of the Contractor.”

Page 74: TENDER DOCUMENTS · schedule no. 1 – preliminaries sr1/1 – sr1 sum/1 schedule no. 2 – preambles sr2/1 – sr2/72 schedule no. 3 – sewage treatment plant system sr3/1 – sr3

SPECIAL CONDITIONS OF CONTRACT (Cont’d)

HK-4547/FP TCK4:LWY22:TWT1:GT:M45042:(2.12.2019) - SCC/20 - Arcadis Hong Kong Limited

Contract Clause

Reference

Amendment Reference

Special Conditions of Contract

SCC-36

36/1 Delete clause 36.1(1)(e) on Page 78 and replace with the following:-

Determination by Contractor

(1) (e) Causing the carrying out of the whole of the Works or substantially the whole of the Works to be suspended for a continuous period of 120 days or more due to an Architect’s instruction under clause 23.3 unless notice of the suspension is given in the Contract, or the instruction of Stop Construction during Bird Season or Bird Break from mid-October to mid-April as per discretion of the Employer is given in the Contract or after award of Contract, or the suspension was caused by a breach of contract, or other default of the Contractor or any person for whom the Contractor is responsible.

SCC-38 Fluctuations

38/1 For the avoidance of doubt it is confirmed that clause 38 on Page 84 shall not be applicable to this Contract. No adjustment to the Contract Sum shall be made for any rises or falls in the cost of labour or materials, fluctuations in exchange rates, freight charges, insurance premium or for any other reasons whatsoever.

Page 75: TENDER DOCUMENTS · schedule no. 1 – preliminaries sr1/1 – sr1 sum/1 schedule no. 2 – preambles sr2/1 – sr2/72 schedule no. 3 – sewage treatment plant system sr3/1 – sr3

SPECIAL CONDITIONS OF CONTRACT (Cont’d)

HK-4547/FP TCK4:LWY22:TWT1:GT:M45042:(2.12.2019) - SCC/21 - Arcadis Hong Kong Limited

Contract Clause

Reference

Amendment Reference

Special Conditions of Contract

SCC-39 39/1 Delete clause 39(3) on Page 85 and replace with the

following :- Notices, certificates and other communications

“(3) Any notice, certificate or other communication to be given or made under the Contract shall be deemed to have been delivered : ● in the case of delivery by electronic mail

immediately following transmission (provided that the correct response is received by the sender); or,

● in the case of delivery by facsimile machine

immediately following transmission; or, ● in the case of a document sent by post two days

after the document has been posted in the case of a recipient in Hong Kong (irrespective of whether ordinary or registered post or recorded delivery is used) or seven days after the document has been posted in the case of an overseas recipient (irrespective of whether standard airmail, speedpost or any other form of airmail is used); or,

● in the case of a document delivered by hand or

courier, at the time of delivery.”

Page 76: TENDER DOCUMENTS · schedule no. 1 – preliminaries sr1/1 – sr1 sum/1 schedule no. 2 – preambles sr2/1 – sr2/72 schedule no. 3 – sewage treatment plant system sr3/1 – sr3

SPECIAL CONDITIONS OF CONTRACT (Cont’d)

HK-4547/FP TCK4:LWY22:TWT1:GT:M45042:(2.12.2019) - SCC/22 - Arcadis Hong Kong Limited

Contract Clause

Reference

Amendment Reference

Special Conditions of Contract

SCC-41 41/1 In clauses 41.3(2) and 41.4(2) on Page 86 delete the words:- Settlement of disputes

“the President or Vice-President for the time being of The Hong Kong Institute of Architects co-jointly with”.

Delete clause 41.4(3) on Page 86 and replace with the

following:- “The President or Vice-President referred to in clause

41.4(2) may, at his discretion, request the Hong Kong International Arbitration Centre to appoint the arbitrator, by letter to the Chairman of that organization.”

Delete clause 41.4(4) on Page 86.

41/2 Delete the words “Chapter 341” in clause 41.4(5) on Page

86 and replace with the words “Chapter 609”.

SCC-42 Contracting out of the Contracts (Rights of Third Parties) Ordinance

42/1 Nothing in this Contract confers or purports to confer on any third party any benefit or any right pursuant to the Contracts (Rights of Third Parties) Ordinance (Cap. 623) to enforce any term of this Contract.

Page 77: TENDER DOCUMENTS · schedule no. 1 – preliminaries sr1/1 – sr1 sum/1 schedule no. 2 – preambles sr2/1 – sr2/72 schedule no. 3 – sewage treatment plant system sr3/1 – sr3

SPECIFICATION

Page 78: TENDER DOCUMENTS · schedule no. 1 – preliminaries sr1/1 – sr1 sum/1 schedule no. 2 – preambles sr2/1 – sr2/72 schedule no. 3 – sewage treatment plant system sr3/1 – sr3

SPECIFICATION

SECTION A – GENERAL PRELIMINARIES SECTION B – PARTICULAR PRELIMINARIES SECTION C – PARTICULAR SPECIFICATION SECTION D – GUIDELINES FOR CONSULTANT AND

CONTRACTORS SECTION E – PENALTY CLAUSE FOR BREAKING THE

RULES LISTED IN THE CODE OF CONDUCT STATED IN WWF GUIDELINES FOR CONSULTANT AND CONTRACTORS PRICING DOCUMENT

Page 79: TENDER DOCUMENTS · schedule no. 1 – preliminaries sr1/1 – sr1 sum/1 schedule no. 2 – preambles sr2/1 – sr2/72 schedule no. 3 – sewage treatment plant system sr3/1 – sr3

SECTION A – GENERAL PRELIMINARIES

Page 80: TENDER DOCUMENTS · schedule no. 1 – preliminaries sr1/1 – sr1 sum/1 schedule no. 2 – preambles sr2/1 – sr2/72 schedule no. 3 – sewage treatment plant system sr3/1 – sr3

SECTION A – GENERAL PRELIMINARIES

INDEX

HK-4547/FP TCK4:LWY22:TWT1:GT:M45042:(2.12.2019) - i - Arcadis Hong Kong Limited

1. DEFINITIONS AND INTERPRETATION 1.1 Definitions and Interpretation 1.2 Calculation of Periods 1.3 Metrication 2. SITE AND WORKS 2.1 Site and Description of the Main Contract Works 2.2 Site Conditions 2.3 Scope of Sub-Contract Works 2.4 Builder’s Works 2.5 Painting to Plant, Equipment and Pipework, etc. 2.6 Provision of Everything Necessary 3. TENDER AND SUB-CONTRACT 3.1 Form of Sub-Contract 3.2 Lump Sum Tender and Fixed Price 3.3 Method of Measurement 3.4 Schedule of Rates 3.5 Implication of Specification Clauses 3.6 Industrial Training and Pneumoconiosis Levies 3.7 Sub-Contract Drawings 3.8 Discrepancies 3.9 Builder’s Work Drawings 3.10 Shop Drawings and Calculations

Page 81: TENDER DOCUMENTS · schedule no. 1 – preliminaries sr1/1 – sr1 sum/1 schedule no. 2 – preambles sr2/1 – sr2/72 schedule no. 3 – sewage treatment plant system sr3/1 – sr3

SECTION A – GENERAL PRELIMINARIES (Cont’d)

INDEX (Cont’d)

HK-4547/FP TCK4:LWY22:TWT1:GT:M45042:(2.12.2019) - ii - Arcadis Hong Kong Limited

3. TENDER AND SUB-CONTRACT (Cont’d) 3.11 As Built Drawings 3.12 Site Records 3.13 Copyright 3.14 Time Allowed 3.15 Programme 3.16 Schedule of Submissions 3.17 Execution of Works 3.18 Order of Work 3.19 Vesting of Plant and Equipment 3.20 Advertising and Publicity 3.21 Defects Liability Period 3.22 Guarantee 3.23 Daywork Claims 3.24 Sub-Contractor’s Claims for Extras 3.25 List of Instructions with Financial Implications 3.26 Sub-Contractor’s Expenses in Connection with Variations and Settlement of

Accounts 3.27 Delay by Sub-Contractor 3.28 Completion 3.29 Preliminary Items 3.30 Provisional Items etc. 3.31 Prime Cost Rate Items

Page 82: TENDER DOCUMENTS · schedule no. 1 – preliminaries sr1/1 – sr1 sum/1 schedule no. 2 – preambles sr2/1 – sr2/72 schedule no. 3 – sewage treatment plant system sr3/1 – sr3

SECTION A – GENERAL PRELIMINARIES (Cont’d)

INDEX (Cont’d)

HK-4547/FP TCK4:LWY22:TWT1:GT:M45042:(2.12.2019) - iii - Arcadis Hong Kong Limited

3. TENDER AND SUB-CONTRACT (Cont’d) 3.32 Adjustment of Provisional Sums 3.33 Contingencies 3.34 Optional Works Items 3.35 Stop Work Instructions 4. LABOUR, MATERIALS AND WORKMANSHIP 4.1 Site Management Team and Workers 4.2 No Employment of Illegal Immigrants 4.3 Workers Living on Site - Not Allowed 4.4 Statutory Obligations, Regulations and Specification 4.5 Safety Precautions 4.6 Samples 4.7 Proprietary Materials or Goods 4.8 Cost-saving Proposals of Alternative Materials or Goods 4.9 Sample Area 4.10 Tests 4.11 Rejection of Unsuitable Materials, Goods, etc. 4.12 Packing and Protection 4.13 Responsibility 4.14 Test Certificates 4.15 Sub-Contractor’s Warranties

Page 83: TENDER DOCUMENTS · schedule no. 1 – preliminaries sr1/1 – sr1 sum/1 schedule no. 2 – preambles sr2/1 – sr2/72 schedule no. 3 – sewage treatment plant system sr3/1 – sr3

SECTION A – GENERAL PRELIMINARIES (Cont’d)

INDEX (Cont’d)

HK-4547/FP TCK4:LWY22:TWT1:GT:M45042:(2.12.2019) - iv - Arcadis Hong Kong Limited

5. TEMPORARY WORKS 5.1 Site Accommodation 5.2 Site Facilities and Storage Areas 6. GENERAL OBLIGATIONS 6.1 Sub-Contractor’s Office and Site Organisation 6.2 Setting Out the Sub-Contract Works 6.3 Ordering Materials and Equipment and Site Measurements 6.4 Delivery and Storage 6.5 Protection of the Sub-Contract Works 6.6 Co-ordination with Other Trades 6.7 Damages to Other Trades and Adjoining Property 6.8 Hong Kong Construction Sites (Safety) Regulations 6.9 Fire Hazard 6.10 Overtime 6.11 Invoices 6.12 Clearing away Rubbish during the Progress of the Sub-Contract Works 6.13 Special Arrangements for Phased Completion 6.14 Clearing up on Completion 6.15 Compliance with BEAM Plus Requirements 6.16 Penalty for Non-compliance with Guidelines for Consultant and Contractor

Page 84: TENDER DOCUMENTS · schedule no. 1 – preliminaries sr1/1 – sr1 sum/1 schedule no. 2 – preambles sr2/1 – sr2/72 schedule no. 3 – sewage treatment plant system sr3/1 – sr3

SECTION A – GENERAL PRELIMINARIES

HK-4547/FP TCK4:LWY22:TWT1:GT:M45042:(2.12.2019) - SA/1 - Arcadis Hong Kong Limited

1. DEFINITIONS AND INTERPRETATION 1.1 Definitions and Interpretation

(a) Employer Wherever the term Employer is used it refers to World Wide Fund for Nature Hong Kong.

(b) Architect Wherever the term Architect is used it refers to Thomas Chow Architects Limited.

(c) Landscape Architect Wherever the term Landscape Architect is used it refers to Urbis Limited.

(d) Structural Engineer Wherever the term Structural Engineer is used it refers to AECOM Asia Co Ltd.

(e) M&E Engineer/ Building Services Engineer

Wherever the term Engineer is used it refers to Aurecon Hong Kong Limited.

(f) Quantity Surveyor Wherever the term Quantity Surveyor is used it refers to Arcadis Hong Kong Limited.

(g) Resident Engineer/ Clerk of Works

Wherever the term Resident Engineer or Clerk of Works is used it refers to such representative on Site as may be appointed by the Employer.

(h) Project Manager Wherever the term Project Manager is used it refers to Faithful + Gould.

(i) Main Contractor/ Contractor

Wherever the term Main Contractor/ Contractor is used it refers to the person or company so named in the Articles of Agreement of the Main Contract, including any of his representatives, who is employed by the Employer to execute and complete the Main Contract Works.

Page 85: TENDER DOCUMENTS · schedule no. 1 – preliminaries sr1/1 – sr1 sum/1 schedule no. 2 – preambles sr2/1 – sr2/72 schedule no. 3 – sewage treatment plant system sr3/1 – sr3

SECTION A – GENERAL PRELIMINARIES (Cont’d)

HK-4547/FP TCK4:LWY22:TWT1:GT:M45042:(2.12.2019) - SA/2 - Arcadis Hong Kong Limited

1. DEFINITIONS AND INTERPRETATION (Cont’d) 1.1 Definitions and Interpretation (Cont’d)

j) Nominated Sub-Contractor/ Sub-Contractor

Wherever the term Nominated Sub-Contractor/Sub-Contractor is used it refers to the person or company so nominated by the Architect and accepted by the Main Contractor for the design (to the extent as required by the Sub-Contract), execution and completion of the whole of the Biological Sewage Treatment Plant and Grey water Treatment Plant Installation.

(k) Specialist Contractor Wherever the term Specialist Contractor is used it refers to the person or company directly employed by the Employer.

(l) Site The land and other places on, under, in or through which the Main Contract Works are to be executed and any other areas designated as storage or work areas.

(m) Sub-Contract Works The design to the extent as required by the Sub-Contract, design, supply and installation, setting to work, testing and handing over in good working order of the complete Biological Sewage Treatment Plant and Grey Water Treatment Plant Installation as required by this Sub-Contract and whether specifically identified in or which should be properly inferred from the Sub-Contract or implied by the operation of any ordinance, regulation or law.

(n) Main Contract Works The work briefly described in the Appendix and the Main Contract Articles of Agreement and shown upon, described by or referred to in the Main Contract including the Sub-Contract Works and including any change made to the work in accordance with the Main Contract.

Page 86: TENDER DOCUMENTS · schedule no. 1 – preliminaries sr1/1 – sr1 sum/1 schedule no. 2 – preambles sr2/1 – sr2/72 schedule no. 3 – sewage treatment plant system sr3/1 – sr3

SECTION A – GENERAL PRELIMINARIES (Cont’d)

HK-4547/FP TCK4:LWY22:TWT1:GT:M45042:(2.12.2019) - SA/3 - Arcadis Hong Kong Limited

1. DEFINITIONS AND INTERPRETATION (Cont’d) 1.1 Definitions and Interpretation (Cont’d)

(o) Specification The Specification – General Preliminaries, Particular Preliminaries and any Technical Performance or other Specification attached hereto and any further specifications furnished to the Sub-Contractor as the Sub-Contract Works proceed.

(p) Drawings/ Sub-Contract Drawings

The drawings as listed in Appendix ‘A’ to the Conditions of Tender except those drawings marked as Reference Drawings, together with any modifications of such drawings and any such other drawings as may from time to time be furnished by or approved in writing by the Architect through the Contractor.

(q) Main Contract Conditions

The Articles of Agreement, the Conditions and Special Conditions of Contract and its Appendix for the Main Contract.

(r) Approved/Approval Approved or Approval means the endorsement in writing by the Architect. Under no circumstances shall any approval relieve the Sub-Contractor of his responsibilities or obligations as set out in the Sub-Contract.

(s) B.S. Reference to British Standards (B.S.) in the Sub-Contract Documents are to the latest Standards published by the British Standards Institution, 389 Chiswick High Road, London W4 4AL United Kingdom.

(t) C.P. The latest British Standard Code of Practice at the time of tendering, including any amendments thereto, and as issued by the Council for Codes of Practice for Building, of Lambeth Bridge Road, London, S.E.1.

Page 87: TENDER DOCUMENTS · schedule no. 1 – preliminaries sr1/1 – sr1 sum/1 schedule no. 2 – preambles sr2/1 – sr2/72 schedule no. 3 – sewage treatment plant system sr3/1 – sr3

SECTION A – GENERAL PRELIMINARIES (Cont’d)

HK-4547/FP TCK4:LWY22:TWT1:GT:M45042:(2.12.2019) - SA/4 - Arcadis Hong Kong Limited

1. DEFINITIONS AND INTERPRETATION (Cont’d) 1.1 Definitions and Interpretation (Cont’d)

(u) Month The term “month” shall be regarded as

meaning a calendar month.

(v) Day The term “day” shall be regarded as meaning a calendar day.

(w) Hong Kong Government/ Government

Hong Kong Government or Government shall mean the Government of the Hong Kong Special Administrative Region.

(x) All instructions, approvals and other communications between the Architect and the Sub-Contractor as stated in this Specification shall be held to mean instructions, approvals and other communications between the Architect and the Sub-Contractor through the Contractor.

(y) Where the context requires, words importing the singular only also include

the plural and vice versa. (z) Where the context requires, words importing the male only shall also

include female and neuter. (aa) Where the Particular Preliminaries vary from the General Preliminaries, the

Particular Preliminaries shall take precedence.

(ab) Without prejudice his authorities and responsibilities under this Sub-Contract, the term “Architect” and “Project Manager” shall be interchangeable.

1.2 Calculation of Periods Where any periods or days are mentioned in these documents, it shall be taken to

mean calendar days inclusive of all statutory holidays, Sundays and days of typhoon and inclement weather.

1.03 Metrication

Conversion of metric to imperial units and vice versa will be carried out in accordance with the conversion factors in BS 350 Pt. 1 and 2 and British Standards Institute Publications P.D. 6031 and P.D. 6203.

Page 88: TENDER DOCUMENTS · schedule no. 1 – preliminaries sr1/1 – sr1 sum/1 schedule no. 2 – preambles sr2/1 – sr2/72 schedule no. 3 – sewage treatment plant system sr3/1 – sr3

SECTION A – GENERAL PRELIMINARIES (Cont’d)

HK-4547/FP TCK4:LWY22:TWT1:GT:M45042:(2.12.2019) - SA/5 - Arcadis Hong Kong Limited

2. SITE AND WORKS 2.1 Site and Description of the Main Contract Works The Site of the Main Contract Works is at Peter Scott Field Studies Centre, Mai Po

Nature Reserve, Mai Po, San Tin, Yuen Long, New Territories. 2.2 Site Conditions

(a) The Sub-Contractor shall be deemed to have inspected, at the offices of the Architect, drawings showing the extent of the Site and type of building to be erected on that Site and to have visited the Site so as to satisfy himself as to the local conditions, access and the extent and character of the Main Contract Works and Sub-Contract Works. No subsequent claim as a result of the Sub-Contractor failing to implement this clause will be entertained.

(b) The Sub-Contractor’s employees and workers shall observe all rules and

regulations of the Government, the Employer, or the Contractor, in regard to access to the Site, security thereof, issuing of passes and the like.

(c) Restrictions as to the hours of delivery and access to the Site may be

imposed by the Government and the Sub-Contractor is to abide by these.

2.3 Scope of Sub-Contract Works

The Sub-Contract Works under this Sub-Contract comprise of the following parts:

1. Major Works (Base Tender) for Sewage Treatment System;

2. Optional Works (Optional Tender) for Grey Water Treatment System

3. Optional Works (Optional Tender) for 5-year Operation and Maintenance Plan for Sewage Treatment System; and

4. Optional Works (Optional Tender) for 5-year Operation and Maintenance

Plan for Grey Water Treatment System The Sub-Contract Works required under this Sub-Contract comprise, but not

limited to the following :-

(a) Design, manufacture, supply and installation of biological sewage treatment system and biological grey water treatment system including all interconnecting pipes, pipework, fittings, valves and accessories within sewage treatment plant (STP) and grey water treatment plant (GWTP);

Page 89: TENDER DOCUMENTS · schedule no. 1 – preliminaries sr1/1 – sr1 sum/1 schedule no. 2 – preambles sr2/1 – sr2/72 schedule no. 3 – sewage treatment plant system sr3/1 – sr3

SECTION A – GENERAL PRELIMINARIES (Cont’d)

HK-4547/FP TCK4:LWY22:TWT1:GT:M45042:(2.12.2019) - SA/6 - Arcadis Hong Kong Limited

2. SITE AND WORKS (Cont’d) 2.3 Scope of Sub-Contract Works (Cont’d)

(b) Design, supply and installation of indication signal transmitting for monitoring the normal operation of STP and/or GWTP;

(c) Design, supply and installation of all electrical works associated to the

completion of STP and GWTP with specified total equipment load, including but not limited to motor control panels, instrumentations, distribution systems, connection to terminal trips and isolators, etc.;

(d) Design, supply and installation for the following, including all necessary

design proposals, approval, work drawings, etc.

(i) All associated temporary works, unless provided by the Main Contractor, including scaffolding, temporary platform, etc. in related to the completion of the Works. The Sub-Contractor shall be responsible to all cost for supply of materials, erection, dismantling, mobilization for the temporary works;

(ii) Stainless steel grade 316 supporting frameworks for the equipment

installation and fixing; and

(iii) Associated builder works

(e) Supply and install the followings for STP and/or GWTP, including all necessary pipework, conduit works, wiring works, accessories, ancillaries, grade 316 stainless steel guiderails:

(i) Submersible sewage treatment pumps (duty and standby); (ii) Effluent transfer pump (duty and standby); (iii) Air diffuser and air blower (duty and standby); (iv) Surplus sludge discharge pumps (duty and standby); (v) Ultra-violet disinfection system (duty and standby); (vi) Reverse osmosis system; (vii) Electromagnetic flowmeter;

Page 90: TENDER DOCUMENTS · schedule no. 1 – preliminaries sr1/1 – sr1 sum/1 schedule no. 2 – preambles sr2/1 – sr2/72 schedule no. 3 – sewage treatment plant system sr3/1 – sr3

SECTION A – GENERAL PRELIMINARIES (Cont’d)

HK-4547/FP TCK4:LWY22:TWT1:GT:M45042:(2.12.2019) - SA/7 - Arcadis Hong Kong Limited

2. SITE AND WORKS (Cont’d) 2.3 Scope of Sub-Contract Works (Cont’d)

(e) Supply and install the followings for STP and/or GWTP, including all necessary pipework, conduit works, wiring works, accessories, ancillaries, grade 316 stainless steel guiderails (Cont’d):

(viii) Membrane biological reactor modules including the membrane

modules;

(ix) Grade 316 stainless steel aerobic tanks;

(x) Automatic electrical actuator valve screen system;

(xi) Backwash pump and chemical storage tank;

(xii) Control and commissioning system;

(xiii) pH adjustment system with pH meter and dosing pump for aerobic tank; and

(xiv) Hydrostatic level sensor

(f) Preparation and submission of design drawings, working drawings,

operation and maintenance manuals (O&M Manuals), with all necessary supporting documents, materials, plants and equipment, calculations, as-built drawings, etc.;

(g) Preparation, submission and provision of sample tests including laboratory

reports; (h) Provision of the noise level measurement before construction and after

completion of the Works for STP and GWTP as specified by BEAM Plus and/or EPD requirements;

(i) Provision of monthly inspection on STP and GWTP including submission

of monthly inspection report; (j) Provision of bi-weekly meeting including submission of bi-weekly progress

reports;

Page 91: TENDER DOCUMENTS · schedule no. 1 – preliminaries sr1/1 – sr1 sum/1 schedule no. 2 – preambles sr2/1 – sr2/72 schedule no. 3 – sewage treatment plant system sr3/1 – sr3

SECTION A – GENERAL PRELIMINARIES (Cont’d)

HK-4547/FP TCK4:LWY22:TWT1:GT:M45042:(2.12.2019) - SA/8 - Arcadis Hong Kong Limited

2. SITE AND WORKS (Cont’d) 2.3 Scope of Sub-Contract Works (Cont’d)

(k) Provision of training to the Employer / Employer’s Representative / Employer’s staff on the operation and maintenance of the plants;

(l) Provision of full-time site staff to coordinate the Works with other parties

including all parties responsible by the Employer in related to the completion of the Works;

(m) Provision of samples and spare parts as required in Drawings and

Specification; (n) Provision of guarantees and/or warranties as stated in Specification; (o) Provision of emergency repair as specified in Specification; (p) Submissions to statutory authorities, including but not limited to documents,

approvals, etc. (q) Testing and commissioning for the STP and GWTP to complete the whole

system; and (r) Other works for the completion of Works, including but not limited to

access panels, openings, interfacing works and coordination works with others, etc.

At the Employer’s discretion, the Optional Works may be wholly or partially carried out within the Contract Period. Should any of the Optional Works to be carried out, it will be notified to you by Architect’s Instruction and the Contract Sum will be adjusted by the respective amount(s). There shall be no time / cost claim by the Sub-Contractor in respect to the inclusion of the Optional Works to his construction programme or construction activities. The scope of the Sub-Contract Works described in the Specification shall not be treated as exhaustive and the Sub-Contractor shall study all relevant documents and satisfy himself as to the full extent, character and nature of the Sub-Contract Works. No claims for additional payment or extension of time resulting from failure to do so will be entertained.

Page 92: TENDER DOCUMENTS · schedule no. 1 – preliminaries sr1/1 – sr1 sum/1 schedule no. 2 – preambles sr2/1 – sr2/72 schedule no. 3 – sewage treatment plant system sr3/1 – sr3

SECTION A – GENERAL PRELIMINARIES (Cont’d)

HK-4547/FP TCK4:LWY22:TWT1:GT:M45042:(2.12.2019) - SA/9 - Arcadis Hong Kong Limited

2. SITE AND WORKS (Cont’d) 2.4 Builder’s Works

The Sub-Contractor shall be responsible for the following works:-

(a) Provision of all sleeves, anchor bolts, anchor plates, fixing brackets, cast-in items, etc. where required;

(b) Cutting of all necessary holes, chases, recesses, etc. to works other than

concrete works; (c) Fireproofing and/or waterproofing to floor, wall and beam penetrations as

necessary; (d) Painting of all equipment and materials as necessary; and (e) Any other builder’s works required for this Sub-Contract as per

Specification Section C – Particular Specification

However, the following works in connection with the Sub-Contract shall be done by the Main Contractor :-

(a) Provision of all necessary holes (other than drill holes for plugs), chases,

recesses, etc. in the concrete works for the installation of the Sub-Contract Works including grouting and making good around holes, chases, recesses, etc. after completion of the installation work by the Sub-Contractor;

(b) Setting in sleeves, anchor bolts, fixing brackets, etc. in the concrete works

(sleeves, anchor bolts, fixing brackets, etc. are supplied by the Sub-Contractor);

(c) Provision of plinths, structural bases and/or foundations required for the

installation; (d) Drainage works from Building Services Works; (e) Concrete underground sludge holding tank; (f) Concrete underground grey water retention tank; (g) Concrete underground retention tank.

Page 93: TENDER DOCUMENTS · schedule no. 1 – preliminaries sr1/1 – sr1 sum/1 schedule no. 2 – preambles sr2/1 – sr2/72 schedule no. 3 – sewage treatment plant system sr3/1 – sr3

SECTION A – GENERAL PRELIMINARIES (Cont’d)

HK-4547/FP TCK4:LWY22:TWT1:GT:M45042:(2.12.2019) - SA/10 - Arcadis Hong Kong Limited

2. SITE AND WORKS (Cont’d) 2.4 Builder’s Works (Cont’d)

The Sub-Contractor shall give the Contractor advance notice of any builder’s works required to enable the Contractor to make suitable preparation and provision.

The Sub-Contractor shall accurately mark and set out on Site the position of all holes, chases, recesses, inserts, anchors, fixing brackets, etc. and shall provide supervision on Site to ensure that the builder’s works executed by the Contractor are carried out to his requirements. Commencement of the installation work shall constitute acceptance by the Sub-Contractor that the builder’s works are correct. No claims from the Sub-Contractor at later stages that the builder’s works are incorrect will be entertained and the Sub-Contractor shall rectify all the incorrectly constructed or unsatisfactory work at his own expenses.

Cutting away and making good shall be kept to a minimum and to be approved by the Architect, and the Sub-Contractor shall bear the cost of any abortive work, alterations or making good executed by others and caused directly or indirectly by errors or omissions on his part. Should the tenderer consider that extra builder’s work or deviation to the above is required, he should state so in his tender. Any other items of work or facilities not so stated shall be deemed to be included in the Tender.

Page 94: TENDER DOCUMENTS · schedule no. 1 – preliminaries sr1/1 – sr1 sum/1 schedule no. 2 – preambles sr2/1 – sr2/72 schedule no. 3 – sewage treatment plant system sr3/1 – sr3

SECTION A – GENERAL PRELIMINARIES (Cont’d)

HK-4547/FP TCK4:LWY22:TWT1:GT:M45042:(2.12.2019) - SA/11 - Arcadis Hong Kong Limited

2. SITE AND WORKS (Cont’d) 2.5 Painting to Plant, Equipment and Pipework, etc.

It is deemed that the Sub-Contractor shall allow for painting of all plant, equipment and pipeworks including, but not limited to, motors, hangers, brackets, supports, etc., provided under this Sub-Contract to the approval of the Architect to comply with statutory requirements and make consistent with interior finishes works. In particular, all equipment, steelwork, etc. shall be painted after erection.

2.6 Provision of Everything Necessary

(a) The Specification and the Drawings are to be used jointly and anything not specifically mentioned in either but necessary for the fulfilment of the guarantees and requirements called for in the Sub-Contract, or necessary for the proper execution and completion of the Sub-Contract Works to the satisfaction of the Architect and the Government Departments is to be provided under the Sub-Contract.

(b) In the event of any discrepancy between the Drawings and the

Specification, this shall be referred to the Architect whose decision as to which shall be followed shall be final.

(c) The Sub-Contract Sum is deemed to have included for all works and

facilities necessary but not stated in this Specification to be done or provided by others or not so stated prior to acceptance of tender.

Page 95: TENDER DOCUMENTS · schedule no. 1 – preliminaries sr1/1 – sr1 sum/1 schedule no. 2 – preambles sr2/1 – sr2/72 schedule no. 3 – sewage treatment plant system sr3/1 – sr3

SECTION A – GENERAL PRELIMINARIES (Cont’d)

HK-4547/FP TCK4:LWY22:TWT1:GT:M45042:(2.12.2019) - SA/12 - Arcadis Hong Kong Limited

3. TENDER AND SUB-CONTRACT 3.1 Form of Sub-Contract

The “Standard Conditions of Nominated Sub-Contract” means the Agreement & Schedule of Conditions of Nominated Sub-Contract for use in the Hong Kong Special Administrative Region together with its Appendices and Schedules, 2005 Edition, issued under the sanction of the Hong Kong Institute of Architects, the Hong Kong Institute of Construction Managers and the Hong Kong Institute of Surveyors, together with the Special Conditions hereinbefore enclosed.

The Sub-Contractor must acquaint himself with these Conditions as neglect or failure on his part to do so will not relieve him from complying with the said Conditions or any part thereof.

The Appendix to the General Conditions of Sub-Contract shall be filled in as follows:-

Particulars of the Works: Design, supply and install biological sewage

treatment plant and grey water treatment plant installation works at Peter Scott Field Studies Centre at Mai Po Nature Reserve, Mai Po, San Tin, Yuen Long, New Territories

Clause 23.1 Date of commencement of the Sub-Contract Works

7 days from the Main Contractor’s written notification

Clause 23.2 The Sub-Contract Works are to be carried out at the same as the Works with no separate completion date

To suit the Main Contractor’s programme

Clause 33.4 Sub-Contract Retention Percentage %

10% of Certified Value of Sub-Contractor’s Work

Limit of Sub-Contract Retention

5% of Sub-Contract Sum (Rounded up to the nearest thousand dollars)

Clause 34 Amount of Surety Bond

10% of the Sub-Contract Sum (rounded up to the nearest thousand dollars)

Clause 39 Fluctuations No applicable

Page 96: TENDER DOCUMENTS · schedule no. 1 – preliminaries sr1/1 – sr1 sum/1 schedule no. 2 – preambles sr2/1 – sr2/72 schedule no. 3 – sewage treatment plant system sr3/1 – sr3

SECTION A – GENERAL PRELIMINARIES (Cont’d)

HK-4547/FP TCK4:LWY22:TWT1:GT:M45042:(2.12.2019) - SA/13 - Arcadis Hong Kong Limited

3. TENDER AND SUB-CONTRACT (Cont’d) 3.1 Form of Sub-Contract (Cont’d)

The Appendix to the Standard Conditions of Main Contract shall be filled in as follows:-

Clause Clause Time for submission of master programme

3.1 Liquidated and ascertained damages

24.2

Within 14 days of acceptance of the Contractor’s tender

HK$28,000.00 per day

Defects Liability Period 17.3 Period of Interim Payment 32.1 12 months from Substantial Completion of the Works, a Section or a Relevant Part

2 weeks

Limit of indemnity to third party liability insurance against injury or death to any person

21.2 Period for payment of certificates

32.1

HK$50,000,000.00 Within 60 days from the date

of presentation of invoice with the certificate

Limit of indemnity to third party liability insurance against injury or damage to real or personal property

21.2 Retention Percentage 32.4

HK$50,000,000.00 10% of Certified Value

excluding Certified Value for Nominated Sub-Contractors / Suppliers plus Retention held in respect of Nominated Sub-Contractors / Suppliers

Page 97: TENDER DOCUMENTS · schedule no. 1 – preliminaries sr1/1 – sr1 sum/1 schedule no. 2 – preambles sr2/1 – sr2/72 schedule no. 3 – sewage treatment plant system sr3/1 – sr3

SECTION A – GENERAL PRELIMINARIES (Cont’d)

HK-4547/FP TCK4:LWY22:TWT1:GT:M45042:(2.12.2019) - SA/14 - Arcadis Hong Kong Limited

3. TENDER AND SUB-CONTRACT (Cont’d) 3.1 Form of Sub-Contract (Cont’d)

Clause Clause Insurance of the Works 22.1 Limit of Retention 32.4

Clause 22A applies 5% of Contract Sum excluding Prime Cost Sums

for Nominated Sub- Percentage to cover professional fees

22.2 Contractors and Nominated Suppliers’ Works(rounded up to nearest thousand

5% of Contract Sum (rounded up to nearest thousand dollars)

dollars) plus the Retention held in respect of

Nominated Sub-Contractors and Nominated Suppliers

Date for Possession of the Site 23.1 Period for completion of

the final account 32.6

Subject to Employer’s notice (Tentatively on 9 August 2020)

Within 12 months from Substantial Completion of the whole of the Works

Commencement Date 23.2 Amount of surety bond 33.1 Subject to Employer’s notice (Tentatively on 15 August 2020)

10% of the Contract Sum (rounded up to the nearest thousand dollars)

Completion Date 23.2 Release of insurance

company or bank 33.2

685 days from and including the Date for Possession of the Site (Tentatively on 30 June 2022)

Clause 33.2A applies

Fluctuations 38 Not Applicable

Page 98: TENDER DOCUMENTS · schedule no. 1 – preliminaries sr1/1 – sr1 sum/1 schedule no. 2 – preambles sr2/1 – sr2/72 schedule no. 3 – sewage treatment plant system sr3/1 – sr3

SECTION A – GENERAL PRELIMINARIES (Cont’d)

HK-4547/FP TCK4:LWY22:TWT1:GT:M45042:(2.12.2019) - SA/15 - Arcadis Hong Kong Limited

3. TENDER AND SUB-CONTRACT (Cont’d) 3.2 Lump Sum Tender and Fixed Price

The Tender shall be “lump sum tender” for executing the Sub-Contract Works in accordance with the Sub-Contract Documents. The Sub-Contract Sum will only be adjusted in the case of adjustments to provisional sums or for variations and any other adjustments provided for under the Sub-Contract.

The Sub-Contractor’s prices shall be deemed to include for the cost of all labour, materials, incidentals of labour and materials, all cutting and waste, fixing, duties, royalties, packing, freight, transport by sea and/or land, insurances, unloading, godown and/or other temporary off-site storage costs, delivery to Site, hoisting and fixing in the required positions, lowering, multi-handling charges, scaffolding and staging, plant, supervision, all on or off site management costs, risk, overheads, profit and all things and matters necessary for the carrying out of all the Sub-Contract Conditions and for the timely and satisfactory completion of the entire Sub-Contract Works.

The Sub-Contract shall be on the basis of a “fixed price” which will not be adjusted for any variation in the cost of freight, landing charges, storage, insurance, labour or materials or currency fluctuations occurring after the date for submission of tenders.

3.3 Method of Measurement

Schedule of Rates are measured in accordance with the principles of the “Hong Kong Standard Method of Measurement of Building Works – Fourth Edition Revised 2018” published by the Hong Kong Institute of Surveyors. Where any departures from the Standard Method of Measurement are made, these are either set out in detail in the Preambles of the Bill No. 2 or self-explanatory in the relevant bill items. All such departures shall be accepted by the Sub-Contractor and the bill items shall be priced according to the methods of measurement adopted. No claims in respect of any departures from the Standard Method of Measurement will be entertained. Wherever the Special Preambles vary from the Preambles, the Special Preambles shall prevail. The method of measurement adopted in the preparation of Schedule of Rates shall be applied equally to the measurement and/or remeasurement of finished works.

Page 99: TENDER DOCUMENTS · schedule no. 1 – preliminaries sr1/1 – sr1 sum/1 schedule no. 2 – preambles sr2/1 – sr2/72 schedule no. 3 – sewage treatment plant system sr3/1 – sr3

SECTION A – GENERAL PRELIMINARIES (Cont’d)

HK-4547/FP TCK4:LWY22:TWT1:GT:M45042:(2.12.2019) - SA/16 - Arcadis Hong Kong Limited

3. TENDER AND SUB-CONTRACT (Cont’d) 3.4 Schedule of Rates

The Schedule of Rates shall be read in conjunction with the Articles of Agreement, Conditions and Special Conditions of Sub-Contract, Conditions of Tender, Form of Tender, Specification and the Sub-Contract Drawings. The Schedule of Rates shall not be subject to remeasurement or adjustment whatsoever otherwise than in accordance with the expressed provisions of the Conditions and Special Conditions of Sub-Contract. The quantities in the Schedule of Rates shall be for reference only and shall not form part of the Sub-Contract. The Schedule of Rates shall not be regarded as a complete statement of the Works included in the Sub-Contract. In the absence of any items in the Schedule of Rates for works shown on the Drawings or described in the Specification, any monetary cost and tie attributable thereto share be deemed to have been included elsewhere in the Contract Sum. The Contract Sum shall be deemed to include for all works shown or described in the Contract Documents as a whole for the complete and proper execution of the Works. The preceding paragraphs shall not apply to items or sections specifically marked as “PROVISIONAL”. The quantities for items or sections marked as “PROVISIONAL” will be remeasured and paid for at the rate submitted against each individual item. No alteration, addition or omission to these quantities or the item description by the tenderer will be allowed. The prices and/or the rates in the Schedule of Rates shall, in accordance with the expressed provisions of the Conditions of Sub-Contract, be used for the valuation of variations which may be ordered by the Project Manager / Architect.

3.5 Implication of Specification Clauses

Unless otherwise stated in the Drawings or Specification, all clauses specifying materials, fittings, etc. are to be read as implying that such materials, fittings etc. are to be supplied and fixed by the Sub-Contractor.

3.6 Industrial Training and Pneumoconiosis Levies

The Sub-Contractor’s attention is drawn to his obligations under the Industrial Training (Construction Industry) Ordinance and the Pneumoconiosis (Compensation) Ordinance and the Sub-Contract Sum shall include the amounts payable in respect of these levies. The Contractor will pay these levies in respect of the Sub-Contract Works and the Sub-Contractor shall reimburse the Contractor for the amounts paid by him in respect of the Sub-Contract Works within twenty-one (21) days of receipt by the Sub-Contractor of the Contractor’s accounts for monies paid.

Page 100: TENDER DOCUMENTS · schedule no. 1 – preliminaries sr1/1 – sr1 sum/1 schedule no. 2 – preambles sr2/1 – sr2/72 schedule no. 3 – sewage treatment plant system sr3/1 – sr3

SECTION A – GENERAL PRELIMINARIES (Cont’d)

HK-4547/FP TCK4:LWY22:TWT1:GT:M45042:(2.12.2019) - SA/17 - Arcadis Hong Kong Limited

3. TENDER AND SUB-CONTRACT (Cont’d) 3.7 Sub-Contract Drawings

The drawings issued for tendering purpose, as listed out in Appendix ‘A’ to the Conditions of Tender, are general arrangement drawings and are provided for the Sub-Contractor’s guidance and information when tendering. Should the arrangement and dimensions shown be inadequate for the Sub-Contractor to properly carry out the installation as specified, he shall draw the Architect’s attention to the fact at the time of submitting his tender, together with details of amendment required. Should the Sub-Contractor fail to implement this clause, the additional cost of any variations required after acceptance of tender shall be at the Sub-Contractor’s sole expense.

After the acceptance of the tender, the Sub-Contractor is responsible for preparing the Shop Drawings, Penetration Drawings, Builder’s Work Drawings and As-built Drawings all in accordance with the Specification and to the satisfaction of the Architect / Engineer / M&E Engineer / Project Manager. The Sub-Contractor is to be responsible for checking through the Specification and Drawings to ensure that they contain sufficient information and details for the execution and completion of the Sub-Contract Works. Should the Sub-Contractor discover that additional information or drawings is necessary, he is to inform the Architect within 14 days after the award of this Sub-Contract of any such information or drawings required stating the likely dates that such information would be required as no claims for delay or whatever will be entertained due to the non-availability of the information or drawings in time for the execution of the Sub-Contract Works on account of the Sub-Contractor’s failure so to inform the Architect / Engineer / M&E Engineer / Project Manager.

3.8 Discrepancies

All items of the Sub-Contract Works shown on the Sub-Contract Drawings or described in the Specification are taken to be included in the Sub-Contract.

The Sub-Contractor shall verify all dimensions shown on the Sub-Contract Drawings and other documents before use. Any discrepancy which occurs in any of these documents shall immediately be brought to the attention of the Architect who shall give instruction to the Sub-Contractor to resolve the discrepancy.

Page 101: TENDER DOCUMENTS · schedule no. 1 – preliminaries sr1/1 – sr1 sum/1 schedule no. 2 – preambles sr2/1 – sr2/72 schedule no. 3 – sewage treatment plant system sr3/1 – sr3

SECTION A – GENERAL PRELIMINARIES (Cont’d)

HK-4547/FP TCK4:LWY22:TWT1:GT:M45042:(2.12.2019) - SA/18 - Arcadis Hong Kong Limited

3. TENDER AND SUB-CONTRACT (Cont’d) 3.9 Builder’s Work Drawings

The Sub-Contractor shall submit drawings showing details of builder’s works required in connection with the Sub-Contract Works to the Architect for approval. In case where preliminary builder’s works information has already been given on the Sub-Contract Drawings such information is to be checked by the Sub-Contractor and incorporated in his own shop drawings.

It is the intention that all holes, chases, etc. shall be left in the structural building work as it proceeds and not cut out subsequently, except insofar as may be necessary due to subsequent authorised variations to the scheme. The Sub-Contractor shall, therefore, acquaint himself throughout the period of the Sub-Contract Works with the Contractor’s detailed construction programme and shall prepare the builder’s work drawings in such order and at such times as to enable them to be checked and approved and subsequently issued to the Contractor in good time before the actual construction is planned to take place.

3.10 Shop Drawings and Calculations

The Sub-Contractor shall submit shop drawings and calculations in accordance with the approved Schedule of Submissions, which illustrate the works and the manner in which they are to be installed, or the requirements laid down in the Particular Specification. Each drawing shall be prepared accurately to scale and locating all components and shall take into account of the requirements of co-ordination and ease of future maintenance. The Architect may reject, approve or amend such shop drawings and calculations. If the shop drawings and calculations are rejected, the Sub-Contractor shall revise them according to the Architect’s comments and resubmit the revised shop drawings and calculations for approval at the time as directed by the Architect. No claim for extra payment and extension of time will be accepted for disapproval or amendment by the Architect (See also Clause 3.15 of the General Preliminaries). No works shall be carried out prior to the approval of the relevant shop drawings. However, the submission to and approval of the Architect of such shop drawings and calculations (and revisions if applicable) shall not relieve the Sub-Contractor of any of his duties or responsibilities under the Sub-Contract. Unless otherwise specified, four copied of the approved shop drawings are to be supplied by the Sub-Contractor without additional charge.

Page 102: TENDER DOCUMENTS · schedule no. 1 – preliminaries sr1/1 – sr1 sum/1 schedule no. 2 – preambles sr2/1 – sr2/72 schedule no. 3 – sewage treatment plant system sr3/1 – sr3

SECTION A – GENERAL PRELIMINARIES (Cont’d)

HK-4547/FP TCK4:LWY22:TWT1:GT:M45042:(2.12.2019) - SA/19 - Arcadis Hong Kong Limited

3. TENDER AND SUB-CONTRACT (Cont’d) 3.11 As Built Drawings

After completion and before the acceptance of the installation, the Sub-Contractor shall provide five copies as built drawings and one electronic copy of the whole installation, incorporating all amendments made during the course of the Sub-Contract.

3.12 Site Records

(a) The Sub-Contractor is to arrange for a full set of white prints to be kept on the Site showing the progress of all work in connection with this Sub-Contract. Such prints must be kept up-to-date and all works are to be recorded on the drawings as they are installed.

(b) The Sub-Contractor shall enter all Architect’s instructions and verbal site

instructions given to him or his foreman by the Architect or Clerk-of-Works through the Contractor in a special daily diary, recording a description of such work ordered together with the daily progress of the Sub-Contract Works. The Sub-Contractor shall obtain against each entry the initials of the Architect or Clerk-of-Works, and the Contractor on the day that such instructions are given and shall allow such diary to be inspected at all reasonable times when required by the Architect. The Clerk-of-Works is empowered to stop, through the Contractor, all work not in accordance with the Sub-Contract.

3.13 Copyright

The copyright of all drawings, reports, calculations and other similar documents provided by the Sub-Contractor in connection with the Sub-Contract Works shall remain vested in the Sub-Contractor, but the Employer, the Contractor and their successors in title shall have an irrevocable licence to use and reproduce such drawings and other documents for any purpose related to the Sub-Contract Works including, inter alia, construction, maintenance, reinstatement, rebuilding, improvement, betterment, letting, promotion, advertisement of the Sub-Contract Works or any part thereof. The Sub-Contractor undertakes to procure that there shall be granted to the Employer, the Contractor and their successors in title an irrevocable licence as referred to in the preceding paragraph in relation to any documents of the same nature as the above mentioned documents provided by any party other than the Sub-Contractor for any purpose related to the Sub-Contract Works including, inter alia, construction, maintenance, reinstatement, rebuilding, improvement, betterment, letting, promotion, advertisement of the Sub-Contract Works or any part thereof.

Page 103: TENDER DOCUMENTS · schedule no. 1 – preliminaries sr1/1 – sr1 sum/1 schedule no. 2 – preambles sr2/1 – sr2/72 schedule no. 3 – sewage treatment plant system sr3/1 – sr3

SECTION A – GENERAL PRELIMINARIES (Cont’d)

HK-4547/FP TCK4:LWY22:TWT1:GT:M45042:(2.12.2019) - SA/20 - Arcadis Hong Kong Limited

3. TENDER AND SUB-CONTRACT (Cont’d) 3.14 Time Allowed

The Sub-Contractor shall arrange his work to suit the programme of works to be executed by the Contractor, other Sub-Contractors and Specialist Contractors which may be revised from time to time and to the satisfaction of the Architect.

The Sub-Contractor shall commence work immediately he is called upon to do so and proceed and complete the Sub-Contract Works in accordance with the programme so as not to cause any delay to the Main Contract Works or the works of other Sub-Contractors, Specialist Contractors, statutory undertakers or utility companies. The programme of Sub-Contract’s material delivery and installation works shall be strictly in compliance with Main Contractor’s Master Programme which Main Contractor reserves the right to prepare, amend and update as he sees fit to suit site conditions and project requirements from time to time. In order to comply with Master Programme, the Sub-Contractor should submit Sub-Contract Programme in due course and amend it whenever directed by the Main Contractor or so required by the changed circumstances. In addition the Sub-Contractor shall liaise with the Main Contractor for the latest Master Programme to ascertain the details to suit the Sub-Contract Works. The Sub-Contractor shall be held responsible for all consequences arising from any delay to the Main Contractor’s programme caused by poor performance and/or failure to obtain necessary materials for the execution of the Sub-Contract Works and shall comply and perform strictly in accordance with the Main Contractor instructions.

Availability of the relevant areas for commencement of installation for the Sub-Contract Works may be in sections depending on the actual construction progress on Site and the Sub-Contractor is deemed to have allowed in his tender for all extra costs and expenses to comply with the above. In the event of any dispute between the Sub-Contractor and the Contractor regarding the conditions of the areas handed over or to be handed over by the Contractor to the Sub-Contractor, such matters shall be referred to the Architect whose decision shall be final and binding on both parties. The anticipated Commencement Date, Date for Possession of the Site and Completion Date of the Main Contract Works are :-

(i) Commencement Date 15 August 2020 (ii) Date for Possession of the Site 9 August 2020 (iii) Completion Date 30 June 2022

Page 104: TENDER DOCUMENTS · schedule no. 1 – preliminaries sr1/1 – sr1 sum/1 schedule no. 2 – preambles sr2/1 – sr2/72 schedule no. 3 – sewage treatment plant system sr3/1 – sr3

SECTION A – GENERAL PRELIMINARIES (Cont’d)

HK-4547/FP TCK4:LWY22:TWT1:GT:M45042:(2.12.2019) - SA/21 - Arcadis Hong Kong Limited

3. TENDER AND SUB-CONTRACT (Cont’d) 3.14 Time Allowed (Cont’d)

The Commencement Date and Date for Possession of the Site are given in good faith but without guarantee that it can be met and is to be taken as a guideline only for the Sub-Contractor’s programming purpose. The Sub-Contractor will be informed of the exact Completion Date of the Main Contract Works after the award of the Main Contract. The Sub-Contractor is deemed to have allowed in his tender for all extra costs and expenses that may be incurred due to early or delayed completion of the individual stages or of the whole development. If during the course of the Sub-Contract Works or award of the Sub-Contract, the Employer requires imposition of Bird Break from October to April; the Sub-contractor is deemed to have allowed in his tender for all extra costs and expenses that may be incurred due to early or delayed completion of the individual stages or of the whole development. No time and cost claims, by reason of, in connection with or caused by such imposition of Bird Break shall be entertained.

3.15 Programme

The Sub-Contractor shall submit to the Architect, within 14 days of award of the Sub-Contract, a realistic and detailed programme of works showing his intended method, stages and order of proceeding with the works, together with the period of time he has estimated for each and every stage of progress and the time required for obtaining approval and consent from the relevant Government Departments. This programme shall be prepared in accordance with the Contractor’s building construction programme which may be revised from time to time. The programme shall be subject to the approval of the Architect and such approval, however, shall not relieve the Sub-Contractor of any of his duties or responsibilities under this Sub-Contract. If during the course of the Sub-Contract Works special circumstances should arise which in the opinion of the Architect warrant or necessitate a revision or departure from the order of procedure as shown in the approved programme, then the Sub-Contractor shall accordingly so revise his programme as the Architect may require.

If during the course of the Sub-Contract Works or award of the Sub-Contract, the Employer requires imposition of Bird Break from October to April; the Sub-contractor shall accordingly so revise his programme as the Architect / M&E Engineer / Project Manager may require.

The Sub-Contractor shall closely co-ordinate his programme with that of the Contractor including providing all information required to enable the Contractor to prepare and to update his construction programme.

Page 105: TENDER DOCUMENTS · schedule no. 1 – preliminaries sr1/1 – sr1 sum/1 schedule no. 2 – preambles sr2/1 – sr2/72 schedule no. 3 – sewage treatment plant system sr3/1 – sr3

SECTION A – GENERAL PRELIMINARIES (Cont’d)

HK-4547/FP TCK4:LWY22:TWT1:GT:M45042:(2.12.2019) - SA/22 - Arcadis Hong Kong Limited

3. TENDER AND SUB-CONTRACT (Cont’d) 3.15 Programme (Cont’d)

Notwithstanding the Date of Commencement and Date of Completion for the Works and Optional Works, the Contractor shall comply with and complete the particular activities in accordance with the Key Dates below: Description of the Particular Activities

Key Dates

Supply of Sewage Treatment Plant (and Grey Water Treatment Plant) including all associated works

On or before 1st August 2021

Installation of Sewage Treatment Plant (and Grey Water Treatment Plant) including all associated works, testing and commissioning, etc.

On or before 1st December 2021

The Contractor shall include the abovementioned Key Dates in his planning on construction programme, construction sequence, method statement, resources, etc. No additional time claim would be entertained. The tender sum is deemed to include all associated cost resulted from the Key Dates, and no additional cost claim would be entertained. “

Page 106: TENDER DOCUMENTS · schedule no. 1 – preliminaries sr1/1 – sr1 sum/1 schedule no. 2 – preambles sr2/1 – sr2/72 schedule no. 3 – sewage treatment plant system sr3/1 – sr3

SECTION A – GENERAL PRELIMINARIES (Cont’d)

HK-4547/FP TCK4:LWY22:TWT1:GT:M45042:(2.12.2019) - SA/23 - Arcadis Hong Kong Limited

3. TENDER AND SUB-CONTRACT (Cont’d) 3.16 Schedule of Submissions

Without prejudice to the requirements of contract submission as stated in the Particular Specification, the Sub-Contractor shall submit within 14 days after the award of this Sub-Contract, schedule of submissions to the Architect for approval showing :

(a) Proposed list of shop drawings, penetration drawings and builder’s work

drawings with proposed submission dates and deadline for approval clearly indicated.

(b) Proposed list of samples and specimens of finishes to be submitted with

proposed submission dates and deadline for approval clearly indicated.

The Sub-Contractor shall allow in the schedule sufficient time for a minimum of one resubmission of all shop drawings, penetration drawings, builder’s work drawings, samples and specimens of finishes. No extensions of time will be granted for all consequential delays due to the Sub-Contractor’s failure to have shop drawings, penetration drawings, builder’s work drawings, samples and specimens of finishes submitted in ample time to allow for processing. Should the Contractor be delayed or incur additional costs due to the said failure of the Sub-Contractor, then any expense arising shall be the liability of the Sub-Contractor.

The submission to and approval by the Architect of such schedule (and revisions if applicable) shall not relieve the Sub-Contractor of any of his duties or responsibilities under this Sub-Contract.

Page 107: TENDER DOCUMENTS · schedule no. 1 – preliminaries sr1/1 – sr1 sum/1 schedule no. 2 – preambles sr2/1 – sr2/72 schedule no. 3 – sewage treatment plant system sr3/1 – sr3

SECTION A – GENERAL PRELIMINARIES (Cont’d)

HK-4547/FP TCK4:LWY22:TWT1:GT:M45042:(2.12.2019) - SA/24 - Arcadis Hong Kong Limited

3. TENDER AND SUB-CONTRACT (Cont’d) 3.17 Execution of Works

(a) The Sub-Contractor shall commence the Sub-Contract Works immediately he is called upon to do so and shall proceed with the same with all speed and in such a manner and in such order as to conform to the Construction Programme of the Contractor. The Sub-Contractor is notified that time is of prime importance and that he will be required to adhere strictly to the programme laid down by the Contractor (and Architect as necessary).

(b) No undertaking is given that the Sub-Contractor will necessarily be able to

proceed continuously with the Sub-Contract Works and no claim will be entertained for discontinuity of work due to the necessity to conform to the Construction Programme of the Contractor.

(c) The Sub-Contractor is to collaborate at all stages with the Contractor,

other Sub-Contractors and Specialist Contractors; he shall prepare, and submit to the Architect for approval detailed programme and time schedules for all portions of the Sub-Contract Works, taking into account of the requirements of all other contractors hereinbefore mentioned.

(d) In the event of any dispute regarding the co-ordination and execution of

works, such matters shall be referred to the Architect whose decision shall be final and binding on all parties. The Architect’s decisions shall not be considered as variations and any claim for loss and expense or extension of time on such grounds shall not be entertained.

3.18 Order of Work

The Sub-Contractor shall be guided by the Architect in arranging the order of work with a view to avoiding delay or to expediting the completion of the Sub-Contract or to making up for time lost as ascertained by reference to programmes and progress schedules prepared under this Specification and agreed between the Architect and the Sub-Contractor from time to time.

3.19 Vesting of Plant and Equipment

All materials, plant and equipment supplied for the installation under this Sub-Contract shall become the property of the Employer upon delivery to the Site.

However, the Sub-Contractor shall be responsible for any damage or loss of his tools, equipment and constructional plant during the progress of the Sub-Contract Works and shall take out his own insurance to cover the said risks.

No materials, plant or equipment shall be removed from the Site without the prior written consent of the Employer and / or Architect.

Page 108: TENDER DOCUMENTS · schedule no. 1 – preliminaries sr1/1 – sr1 sum/1 schedule no. 2 – preambles sr2/1 – sr2/72 schedule no. 3 – sewage treatment plant system sr3/1 – sr3

SECTION A – GENERAL PRELIMINARIES (Cont’d)

HK-4547/FP TCK4:LWY22:TWT1:GT:M45042:(2.12.2019) - SA/25 - Arcadis Hong Kong Limited

3. TENDER AND SUB-CONTRACT (Cont’d) 3.20 Advertising and Publicity

The Sub-Contractor shall not, without written permission of the Employer or Architect, advertise or cause to be advertised the Sub-Contract Works or any part of the Sub-Contract Works including goods, equipment, materials and labour supplied and methods of installation used, in any pamphlet, newsletter, journal, magazine, newspaper or in any other form.

In addition, without the written permission of the Employer or Architect the Sub-Contractor shall not let the suppliers and manufacturers of the equipment or their agents take any photographs of the Sub-Contract Works or the equipment on Site.

No signs are to be affixed anywhere on the Site or building without approval of the Architect.

3.21 Defects Liability Period

The Defects Liability Period shall be as set out in the Appendix to the Main Contract Conditions. The Sub-Contractor should note that such Defects Liability Period will commence from the Date of Substantial Completion of the Main Contract Works. During the Defects Liability period the Sub-Contractor shall at his own cost remedy and make good with all possible speed any faults or defects in the Sub-Contract Works due, in the opinion of the Architect, to faulty materials, equipments, workmanship or design (insofar as the Sub-Contract Works have been designed by the Sub-Contractor) and, shall indemnify the Employer and/or the Contractor against any damage or injury to the building contents and/or occupants arising as a result of such faults or defects. The Sub-Contractor shall have the right of access at all reasonable times, at his own risk and responsibility, for the purpose of inspecting the installations and of making notes or records thereof. Sufficient stocks of spare materials, goods and equipments shall be held by the Sub-Contractor for the timely replacement of any defective work during the Defects Liability Period.

Page 109: TENDER DOCUMENTS · schedule no. 1 – preliminaries sr1/1 – sr1 sum/1 schedule no. 2 – preambles sr2/1 – sr2/72 schedule no. 3 – sewage treatment plant system sr3/1 – sr3

SECTION A – GENERAL PRELIMINARIES (Cont’d)

HK-4547/FP TCK4:LWY22:TWT1:GT:M45042:(2.12.2019) - SA/26 - Arcadis Hong Kong Limited

3. TENDER AND SUB-CONTRACT (Cont’d) 3.22 Guarantee

The Sub-Contractor in quoting for a specific product, equipment or apparatus, whether specified herein by name or whether of a make selected by the Sub-Contractor, shall be deemed to warrant its satisfactory performance under normal working and climatic conditions which may be encountered. The Sub-Contractor shall at his sole expense provide all written guarantees against defects or failure due to faulty materials, equipments, workmanship or design for specified period of time (guarantee period) as required by the Particular Specification. The wording and format of the guarantees shall be to the approval of the Employer. The Sub-Contractor shall assign the guarantees provided to him by the respective manufacturers or suppliers of all major product and equipment to the Employer upon the Substantial Completion of the Main Contract Works. The assignment of the guarantees shall not relieve the Sub-Contractor of his responsibilities under this Sub-Contract.

3.23 Daywork Claims

When the Sub-Contractor intends to make a claim for daywork under Clause 13 of the Main Contract Conditions, he shall give the Architect / Project Manager at least seven days’ notice of this intention before carrying out the work. The giving of this notice shall not bind the Architect to value the work on such basis.

The Sub-Contractor shall furnish to the Architect such receipts or other vouchers as may be necessary to prove the amounts paid and before ordering materials shall submit to the Architect quotations for the same for his approval.

In respect of all work executed on a daywork basis the Sub-Contractor shall during the continuance of such work deliver each day to the Architect an exact list in duplicate of the names, occupation and time of all workmen employed on such work and a statement, also in duplicate, showing the description and quantity of all materials and plant used thereon or therefor. One copy of each list and statement will, if correct or when agreed, be signed by the Architect and returned to the Sub-Contractor.

The Sub-Contractor shall afford to the Architect every facility for checking on the ground all time and materials for which he proposes to charge.

Page 110: TENDER DOCUMENTS · schedule no. 1 – preliminaries sr1/1 – sr1 sum/1 schedule no. 2 – preambles sr2/1 – sr2/72 schedule no. 3 – sewage treatment plant system sr3/1 – sr3

SECTION A – GENERAL PRELIMINARIES (Cont’d)

HK-4547/FP TCK4:LWY22:TWT1:GT:M45042:(2.12.2019) - SA/27 - Arcadis Hong Kong Limited

3. TENDER AND SUB-CONTRACT (Cont’d) 3.24 Sub-Contractor’s Claims for Extras

The Sub-Contractor shall send to the Contractor (copied to the Architect, M&E Engineer and Quantity Surveyor) once in every month an account giving particulars (as full and detailed as possible) of all claims for any extension of time or additional expense to which the Sub-Contractor may consider himself entitled and of all extra or additional work contained in Architect’s Instructions issued during the preceding month.

No consideration will be given to any claim for extension of time or for payment for any such additional expense or extra or additional work which has not been made within a reasonable time to enable the circumstances and reasons for extensions or the additional expense to be ascertained and evaluated.

3.25 List of Instructions with Financial Implications

The Sub-Contractor shall submit once a month a list of instructions received showing the changes of the Sub-Contract Works and the financial implications of all Architect’s Instructions, confirmation of the verbal instructions, verbal instructions, site instructions, etc. to the Architect and Quantity Surveyor.

3.26 Sub-Contractor’s Expenses in Connection with Variations and Settlement of

Accounts

The Employer or the Contractor will not be liable for any expense incurred by the Sub-Contractor in connection with the measurement of variations or the adjustment and settlement of accounts.

3.27 Delay by Sub-Contractor

The Sub-Contractor’s attention is drawn to Clause 24 of the General Conditions of Sub-Contract ‘Completion’ and is informed that the amount of Liquidated and Ascertained Damages for the Main Contract is applicable to this Sub-Contract.

Should the Contractor become liable to pay Liquidated and Ascertained Damages to the Employer partly or wholly due to delay caused by the Sub-Contract Works, the Architect shall certify the period of delay so caused and the Sub-Contractor shall reimburse the Contractor accordingly, failing which it shall be recoverable from the Sub-Contractor by the Contractor as a debt or the Contractor may deduct such sum from any monies due or to become due to the Sub-Contractor under this Sub-Contract.

Page 111: TENDER DOCUMENTS · schedule no. 1 – preliminaries sr1/1 – sr1 sum/1 schedule no. 2 – preambles sr2/1 – sr2/72 schedule no. 3 – sewage treatment plant system sr3/1 – sr3

SECTION A – GENERAL PRELIMINARIES (Cont’d)

HK-4547/FP TCK4:LWY22:TWT1:GT:M45042:(2.12.2019) - SA/28 - Arcadis Hong Kong Limited

3. TENDER AND SUB-CONTRACT (Cont’d) 3.28 Completion

The Sub-Contractor shall arrange through the Architect for the Government Departments to carry out inspection and testing of the installation. The term ‘Completion’ shall be defined as the issue of the necessary certificates by the Government Departments and Architect’s certification of satisfactory completion of the Main Contract Works.

3.29 Preliminary Items

The Preliminary items included in the Schedule of Rates apply to the whole of the Sub-Contract Works carried out under this Sub-Contract and the amounts and/or rates inserted by the Sub-Contractor shall be deemed to include any additions or omissions which may be ordered by the Architect under the Conditions of Sub-Contract and cover the complete requirements of the Conditions of Sub-Contract, Special Conditions of Sub-Contract, Specification and Sub-Contract Drawings together with all general risks, liabilities and obligations set forth or implied in the Sub-Contract. Where a lump sum only has been inserted in respect of the Schedule No. 1 – Preliminaries, the Sub-Contractor will be required to provide an itemised breakdown of the amount so included. Where an abnormally high amount has been inserted against an item in the Schedule No. 1 – Preliminaries for which substantial payment would normally be made at the outset of the Sub-Contract, payment shall be made at the outset for such portion as the Sub-Contractor may substantiate and payment of the remaining amount effected over the period of the Sub-Contract. It should be noted that the payment provisions in the preceding paragraph do not apply to amounts inserted against items relating to Insurances, Surety Bonds and the like. These amounts will always be paid for over the period of the Sub-Contract notwithstanding payment by the Sub-Contractor of the entire premium at the beginning of the Sub-Contract. Where no amount or an insufficient amount has been inserted by the Sub-Contractor in respect of an item in the Schedule No. 1 – Preliminaries, the value or additional value thereof will be deemed to have been included in the Sub-Contract Sum and no separate amounts whatsoever will be certified for payment.

Page 112: TENDER DOCUMENTS · schedule no. 1 – preliminaries sr1/1 – sr1 sum/1 schedule no. 2 – preambles sr2/1 – sr2/72 schedule no. 3 – sewage treatment plant system sr3/1 – sr3

SECTION A – GENERAL PRELIMINARIES (Cont’d)

HK-4547/FP TCK4:LWY22:TWT1:GT:M45042:(2.12.2019) - SA/29 - Arcadis Hong Kong Limited

3. TENDER AND SUB-CONTRACT (Cont’d) 3.30 Provisional Items etc.

Where “Provisional” items appear in the Schedules of Rates, except those “Allow” items which are at the risk of the Sub-Contractor and not subject to remeasurement, all amounts against such items will be deducted in full from the Sub-Contract Sum and all Sub-Contract Works carried out under such items, if any, will be valued in accordance with Clause 11(4) of the Main Contract Conditions and added to the Sub-Contract Sum. The works which are the subject of the provisional quantities will be measured as constructed and paid for at the rates contained in the Summary of Tender. The quantities of such items are subject to remeasurement upon completion of the Sub-Contract Works. The provisional quantities are estimates only and no responsibility can be taken for their accuracy. They shall not be held to gauge or limit the amount of work to be executed. No adjustment will be made to the contract rates used for pricing the remeasurement schedules nor extension allowed to the Sub-Contract Period should the final quantities differ from the original provisional quantities. Should any or all of the items, measured as “Provisional”, not be required to be executed at all, then the items shall be deleted from the Sub-Contract Sum in their entirely with no claim for loss or profit, overheads, etc. being permitted to the Sub-Contractor. The Sub-Contractor is deemed to have made all due allowance for this in the Sub-Contract Sum.

Page 113: TENDER DOCUMENTS · schedule no. 1 – preliminaries sr1/1 – sr1 sum/1 schedule no. 2 – preambles sr2/1 – sr2/72 schedule no. 3 – sewage treatment plant system sr3/1 – sr3

SECTION A – GENERAL PRELIMINARIES (Cont’d)

HK-4547/FP TCK4:LWY22:TWT1:GT:M45042:(2.12.2019) - SA/30 - Arcadis Hong Kong Limited

3. TENDER AND SUB-CONTRACT (Cont’d) 3.31 Prime Cost Rate Items

Where P.C. supply and installation rates are quoted for finishings or any items of work in the Schedule of Rates three items, (i) Supply and Installation, (ii) allowance for the Sub-Contractor for profit (including all financing charges and other costs) and (iii) allowance for the Sub-Contractor for providing general attendance in accordance with the Specification Preliminaries upon the firm undertaking the Supply and Installation works. (Refer to the Preambles for details) Works subject to P.C. supply and installation rates will be selected by the Architect at a price agreed between the Architect and the firms undertaking the Supply and Installation works after deduction of all discounts. Such firms shall be employed by the Sub-Contractor on the terms approved by the Architect and shall be deemed to be direct sub-contractors of the Sub-Contractor. Immediately after the Architect’s selection, the Sub-Contractor shall quantify and place orders for the Supply and Installation works. The ordering and accounting for proper quantities is a matter solely between the Sub-Contractor and the firms undertaking the Supply and Installation works.

In the Final Account, adjustment will only be made for the following :- (i) the net difference between the P.C. supply and installation rate stated in

the Contract and the actual supply and installation rate applied to the net quantity of the particular item measured in accordance with the Standard Method of Measurement and Preambles.

(ii) the unit rates for the profit item should be adjusted by timesing the actual

supply and installation rate and divided by the P.C. supply and installation rate stated in the Contract, i.e. :

Adjusted rate = rate for profit in the x actual supply and installation rate Summary of Tender/ P.C. supply and installation rate Schedule of Rates (iii) No adjustment shall be made to the unit rates for general attendance item.

Page 114: TENDER DOCUMENTS · schedule no. 1 – preliminaries sr1/1 – sr1 sum/1 schedule no. 2 – preambles sr2/1 – sr2/72 schedule no. 3 – sewage treatment plant system sr3/1 – sr3

SECTION A – GENERAL PRELIMINARIES (Cont’d)

HK-4547/FP TCK4:LWY22:TWT1:GT:M45042:(2.12.2019) - SA/31 - Arcadis Hong Kong Limited

3. TENDER AND SUB-CONTRACT (Cont’d) 3.32 Adjustment of Provisional Sums

Where Provisional Sums (other than Provisional Sums for “Disbursements”) are included in the Summary of Tender for works to be carried out by the Sub-Contractor which have not been specified in detail at the time of tendering, these sums shall be deducted from the Sub-Contract and the works carried out shall be measured and valued in accordance with the Conditions of Sub-Contract and the value added to the Sub-Contract Sum. Where Provisional Sums for disbursements for insurances, lithography charges, Government or Utility Company connections and the like, these sums shall be deducted from the Sub-Contract and the net amount paid by the Sub-Contractor shall be added to the Sub-Contract Sum, no entitlement to profit, overheads or attendance will accrue.

3.33 Contingencies

Where Contingencies are included in the Summary of Tender for works to be carried out by the Sub-Contractor which have not been specified in detail at the time of tendering, these sums shall be deducted from the Sub-Contract and the works carried out shall be measured and valued in accordance with the Conditions of Sub-Contract and the value added to the Sub-Contract Sum. The expenditure of Contingencies shall be solely at the discretion of the Architect.

3.34 Optional Works Items

The Architect and Project Manager has the sole right to issue Instruction to proceed with the optional works as per tender offer or delete any part or the whole of the optional works from the Sub-Contract. The issuance of the Instruction for the optional works shall not vitiate the Sub-Contract. For the optional works items which form part of the Sub-Contract Sum, the Architect may order Instruction that the optional works omitted as a variation under the Conditions of Sub-Contract clause 13.1 be carried out by another contractor. The sum to be deducted from the Sub-Contract Sum as a result of such omission shall be valued in accordance with the provisions in the Sub-Contract Documents. No loss of profit, by reason of, in connection with or caused by such omission shall be entertained.

3.35 Stop Work Instructions

The Architect, Project Manager, Resident Engineer and Clerk of Works are empowered to stop all Works or any part of the Works, if such works is not in accordance with the Specification, Drawings and instructions and/or if such work contradicts the Building Regulations and/or is causing or is likely to cause danger to the Works, the general public, the Employer or surrounding properties.

Page 115: TENDER DOCUMENTS · schedule no. 1 – preliminaries sr1/1 – sr1 sum/1 schedule no. 2 – preambles sr2/1 – sr2/72 schedule no. 3 – sewage treatment plant system sr3/1 – sr3

SECTION A – GENERAL PRELIMINARIES (Cont’d)

HK-4547/FP TCK4:LWY22:TWT1:GT:M45042:(2.12.2019) - SA/32 - Arcadis Hong Kong Limited

4. LABOUR, MATERIALS AND WORKMANSHIP 4.1 Site Management Team and Workers

The Sub-Contractor shall provide and employ on the Site in connection with the execution and maintenance of the Sub-Contract Works:

(a) Only such technical assistants as are skilled and experienced in their

respective callings and such sub-agents, foremen and leading hands as are competent to give proper supervision to the Sub-Contract Works they are required to supervise. In particular, all electrical works shall be carried out by qualified electricians as laid down in the Electricity (Registration) Regulations 1990; and

(b) Such skilled, semi-skilled and unskilled workers as is necessary for the

proper and timely execution and maintenance of the Sub-Contract Works.

The Architect shall be at liberty to object to and require the Sub-Contractor to remove forthwith from the Sub-Contract Works any person employed by the Sub-Contractor who in the opinion of the Architect misconducts himself or is incompetent or negligent in the proper performance of his duties or whose employment is otherwise considered by the Architect to be undesirable and such person shall not be again employed upon the Sub-Contract Works without the written permission of the Architect. Any person so removed from the Sub-Contract Works shall be replaced as soon as possible by a competent substitute approved by the Architect. The Sub-Contractor shall assign an authorized representative to attend all the meetings (e.g. site meeting, co-ordination meeting, safety meeting, progress meeting, etc.) arranged by the Main Contractor and be responsible for the co-ordination and implementation of instruction given by the Main Contractor from time to time during the Contract Period.

4.2 No Employment of Illegal Immigrants

The Sub-Contractor and all persons employed by him on the Site are to comply in every respect with the provisions of latest Immigration Ordinance.

The Sub-Contractor shall not employ any person who is not lawfully employable under the Immigration Ordinance. The Sub-Contractor is to note that if he employs illegal immigrants, he will breach the contract and receive no further work from the Contractor or the Employer. The Sub-Contractor must keep a full list of workers’ names and identity card numbers which must be sent to the Contractor’s site office daily.

Page 116: TENDER DOCUMENTS · schedule no. 1 – preliminaries sr1/1 – sr1 sum/1 schedule no. 2 – preambles sr2/1 – sr2/72 schedule no. 3 – sewage treatment plant system sr3/1 – sr3

SECTION A – GENERAL PRELIMINARIES (Cont’d)

HK-4547/FP TCK4:LWY22:TWT1:GT:M45042:(2.12.2019) - SA/33 - Arcadis Hong Kong Limited

4. LABOUR, MATERIALS AND WORKMANSHIP (Cont’d) 4.3 Workers Living on Site - Not Allowed

The Sub-Contractor shall not allow the workers to live on the Site at any time throughout the Sub-Contract nor to trespass beyond the limits of the Site, and the building under construction will not be permitted to be used for this purpose.

4.4 Statutory Obligations, Regulations and Specification

The whole of the Sub-Contract Works shall be in accordance with the rules and regulations of the Buildings Department, the Fire Services Department, the Electrical and Mechanical Services Department, the Electricity Supply Company, the Water Supplies Department and all other relevant Government Departments and utility companies. The Sub-Contractor shall give to the appropriate authorities all notices as required by law relative to the work in his charge; obtain all official permits, licenses, etc., and pay all fees levied.

Wherever applicable and without conflict with the above, the Sub-Contract Works shall also comply with the relevant “British Standard Specifications” and the “British Standard Codes of Practice” together with any amendments made thereto. The Sub-Contractor shall accept the risk of any impending legislation, new provisions, amendments to existing regulations and requirements and all other conditions which may alter his obligations as no claims or compensation whatsoever will be entertained in this respect.

Page 117: TENDER DOCUMENTS · schedule no. 1 – preliminaries sr1/1 – sr1 sum/1 schedule no. 2 – preambles sr2/1 – sr2/72 schedule no. 3 – sewage treatment plant system sr3/1 – sr3

SECTION A – GENERAL PRELIMINARIES (Cont’d)

HK-4547/FP TCK4:LWY22:TWT1:GT:M45042:(2.12.2019) - SA/34 - Arcadis Hong Kong Limited

4. LABOUR, MATERIALS AND WORKMANSHIP (Cont’d) 4.5 Safety Precautions

The Sub-Contractor shall be responsible for the safety of all persons engaged in the execution of the Sub-Contract Works and co-operate with the Contractor to comply with any safety and emergency procedures in case of fire, typhoon, rainstorms, etc. set out by the Contractor. The Sub-Contractor is to provide and enforce the wearing of suitable safety helmets, and where necessary, masks, goggles, ear protectors, protective boots, protective and waterproof clothing, safety harnesses and other personal protection equipment for all persons employed by him. The Sub-Contractor and all persons employed by him on the Site shall comply in every respect with the provisions of any relevant statutory requirements as may be considered applicable to the Sub-Contract Works or any temporary works being executed.

4.6 Samples

The quality of materials and articles supplied for any purpose are to be approved prior to their use in the Sub-Contract Works. Wherever practicable samples are to be submitted for approval before proceeding with any manufacturing work or ordering in bulk. Samples, and any packing for same, are to be provided free of charge by the Sub-Contractor.

All approved samples are to be kept on Site and all materials and articles to be incorporated in the permanent works should not deviate in quality from these samples unless instructed otherwise by the Architect.

Page 118: TENDER DOCUMENTS · schedule no. 1 – preliminaries sr1/1 – sr1 sum/1 schedule no. 2 – preambles sr2/1 – sr2/72 schedule no. 3 – sewage treatment plant system sr3/1 – sr3

SECTION A – GENERAL PRELIMINARIES (Cont’d)

HK-4547/FP TCK4:LWY22:TWT1:GT:M45042:(2.12.2019) - SA/35 - Arcadis Hong Kong Limited

4. LABOUR, MATERIALS AND WORKMANSHIP (Cont’d) 4.7 Proprietary Materials or Goods

The Sub-Contractor is to check and report the availability of any proprietary materials or goods well in advance to allow sufficient time for the Architect to issue instructions for approval of alternatives where necessary. The insertion of the name of any company or proprietary materials or goods specified in the tender documents is to be read as an indication of the class or quality of the materials, goods and workmanship required; materials, goods or workmanship of equal quality may be obtained from any other company, subject to the approval of the Architect. During the course of the Sub-Contract, the Sub-Contractor shall be allowed to propose alternative materials or goods different from those specified in the Sub-Contract when: a) the specified materials or goods are out of production or not available

within the necessary time frame; b) the specified materials or goods have been prohibited from installation by

the relevant departments; c) the specified materials or goods have been modified by the

suppliers/manufacturers which may no longer comply with the Sub-Contract requirement;

d) the suppliers or manufacturers are in difficulty, financially, legally, or

otherwise and valid doubts exist regarding the supply of the products/materials, the reliability of guarantees, warranties, etc. and the continuity of supply for spare parts.

Supporting information and substantiation on prices of the proposed alternative and the specified materials or goods shall be submitted to the Architect for checking. The Sub-Contractor may request the Architect through the Contractor to issue an instruction to confirm the alternative materials or goods and the cost will be valued in accordance with the Conditions of Sub-Contract. The Architect’s decision as to whether the alternative materials or goods and workmanship are equal to those originally specified shall be final. Notwithstanding the above, it is the Sub-Contractor’s responsibility to ensure that all materials or goods proposed by him and approved by the Architect can be delivered to the Site in accordance with his programme of work. Any delay in the delivery will not be considered as a ground for extension of time or for the Employer to accept further alternative materials or goods offered by the Sub-Contractor.

Page 119: TENDER DOCUMENTS · schedule no. 1 – preliminaries sr1/1 – sr1 sum/1 schedule no. 2 – preambles sr2/1 – sr2/72 schedule no. 3 – sewage treatment plant system sr3/1 – sr3

SECTION A – GENERAL PRELIMINARIES (Cont’d)

HK-4547/FP TCK4:LWY22:TWT1:GT:M45042:(2.12.2019) - SA/36 - Arcadis Hong Kong Limited

4. LABOUR, MATERIALS AND WORKMANSHIP (Cont’d) 4.8 Cost-saving Proposals of Alternative Materials or Goods

During the course of Sub-Contract, the Sub-Contractor may propose alternative materials or goods different from those specified in the Sub-Contract when: (a) under certain circumstances, the Architect may request the Sub-

Contractor to propose alternative materials or goods; (b) there are new materials or goods available in the market which will benefit

the Sub-Contract Works, in terms of quality, time and/or cost.

Supporting information and substantiation on prices of the proposed alternative and the specified materials or goods shall be submitted to the Architect for checking. In the event that the alternative materials or goods approved are lower in cost, corresponding reductions to the Sub-Contract Sum shall be made by the Quantity Surveyor to reflect the saving made. The Sub-Contractor shall be allowed the cost for sourcing and administration involved but not exceeding 15% of the amount saved.

Should the alternative materials or goods approved be more expensive, no adjustment will be made to the Sub-Contract Sum.

The Architect’s decision as to whether the alternative materials or goods and workmanship are equal to those originally specified shall be final. Notwithstanding the above, it is the Sub-Contractor’s responsibility to ensure that all the materials or goods proposed by him and approved by the Architect can be delivered to the Site in accordance with his programme of work. Any delay in the delivery will not be considered as a ground for extension of time or for the Employer to accept further alternative materials or goods offered by the Sub-Contractor.

Page 120: TENDER DOCUMENTS · schedule no. 1 – preliminaries sr1/1 – sr1 sum/1 schedule no. 2 – preambles sr2/1 – sr2/72 schedule no. 3 – sewage treatment plant system sr3/1 – sr3

SECTION A – GENERAL PRELIMINARIES (Cont’d)

HK-4547/FP TCK4:LWY22:TWT1:GT:M45042:(2.12.2019) - SA/37 - Arcadis Hong Kong Limited

4. LABOUR, MATERIALS AND WORKMANSHIP (Cont’d) 4.9 Sample Area

The Sub-Contractor is to note that the Contractor is required under the Main Contract to finish and complete a sample area at location as designated by the Architect plus one staircase leading from ground level to the sample area prior to commencement of finishes, built-in fittings and E&M installation works whichever is the earliest. The sample area shall not be regarded as complete until accepted in writing by the Architect. Following acceptance of the sample area, all subsequent area will be required to be completed to the same or higher standards. Any subsequent work and materials which, in the opinion of the Architect, fall below the previously accepted standards shall be taken down and redone without extra payment or time implications.

The Sub-Contractor shall allow for early delivery of all necessary materials and early completion of the works in the above areas all in accordance with Contractor’s programme of work.

The completion and acceptance by the Architect of the sample area shall not be regarded as a sectional completion of the Sub-Contract Works. The completed sample area shall be maintained, cleaned and kept in good condition throughout the Contract Period of the Main Contract Works to the satisfaction of the Architect.

Page 121: TENDER DOCUMENTS · schedule no. 1 – preliminaries sr1/1 – sr1 sum/1 schedule no. 2 – preambles sr2/1 – sr2/72 schedule no. 3 – sewage treatment plant system sr3/1 – sr3

SECTION A – GENERAL PRELIMINARIES (Cont’d)

HK-4547/FP TCK4:LWY22:TWT1:GT:M45042:(2.12.2019) - SA/38 - Arcadis Hong Kong Limited

4. LABOUR, MATERIALS AND WORKMANSHIP (Cont’d) 4.10 Tests

The Sub-Contractor is deemed to have allowed in the Sub-Contract Sum for all tests that are called for in the Sub-Contract Documents and any other tests that may be required by relevant authorities including all costs associated with the carrying out of the tests, whether they are successful or not, and all other costs and expenses in connection with any tests such as additional material and labour, transport to laboratory, reports and other documents, etc. All tests shall be carried out by an approved laboratory. The Architect may direct for random samples to be chosen from materials delivered on Site and be tested by independent laboratories for compliance with specified standards. The Sub-Contractor is to allow for small quantities of materials for use on this basis. The Sub-Contractor is also deemed to allow in the Tender for the cost of laboratory tests of such random samples.

4.11 Rejection of Unsuitable Materials, Goods, etc.

All materials, products or equipment, incorporated in permanent works are to be new unless otherwise specified and of the best quality obtainable. The whole of the materials, goods and workmanship shall be consistent with good practice in Hong Kong and in compliance with the relevant standards, codes of practice and Government or statutory documents. Materials or goods shall be handled and fixed in accordance with manufacturer’s recommendations and Architect’s instructions. The manufacturer’s recommendations shall be submitted to the Architect before the relevant works commence. The Architect shall be at liberty to reject any plant, materials, goods, etc. and workmanship not complying with the requirements of this Specification or which are in any way unsuitable and to order the removal and replacement, without extra cost to the Employer, of any faulty materials or inferior work. The above shall apply notwithstanding that the Architect may have previously nominated a particular make or type of plant, material or good. The Architect’s decision as to what constitutes compliance with requirements and suitability shall be final and binding; the true intent and meaning of the Sub-Contract being that the whole of the Sub-Contract Works shall be completed to the satisfaction of the Architect so as to be perfect in all their parts. No rejection of item shall be considered as a reason for failure to complete the Sub-Contract Works within the completion period or any extended completion period.

Page 122: TENDER DOCUMENTS · schedule no. 1 – preliminaries sr1/1 – sr1 sum/1 schedule no. 2 – preambles sr2/1 – sr2/72 schedule no. 3 – sewage treatment plant system sr3/1 – sr3

SECTION A – GENERAL PRELIMINARIES (Cont’d)

HK-4547/FP TCK4:LWY22:TWT1:GT:M45042:(2.12.2019) - SA/39 - Arcadis Hong Kong Limited

4. LABOUR, MATERIALS AND WORKMANSHIP (Cont’d) 4.12 Packing and Protection

(a) All plant, equipment, apparatus, materials, goods and parts shall be delivered to the Site in a new condition, properly packed and protected against damage due to handling, adverse weather or other circumstances and, as far as is practicable, they shall be kept in the packing cases or under protective coverings until required for use.

(b) Any items suffering damage in transit or on the Site shall be rejected and

replaced without extra cost to the Employer. No item so rejected will be considered as a reason for failure to complete the Sub-Contract Works within the completion period or any extended completion period.

(c) In the case of items of equipment and materials which originated outside

Hong Kong:- (i) All items of equipment and materials shall be adequately and

securely packed for safe transportation with due regard to the climatic conditions encountered in transit and on arrival.

(ii) British Standard 1133 and Supplements, or other comparable and

acceptable code, shall be used as a guide for the standard of packing and package required. All bright, polished or plated parts shall be treated with suitable rust preventative.

(iii) The Sub-Contractor shall, at the time of shipping each

consignment of materials and accessories provide to the Architect in triplicate, packing lists and Bills of Lading which shall contain full statements of the packages consigned, with particulars of the dimensions, weights, contents, shipping marks and approximate value of each package.

Page 123: TENDER DOCUMENTS · schedule no. 1 – preliminaries sr1/1 – sr1 sum/1 schedule no. 2 – preambles sr2/1 – sr2/72 schedule no. 3 – sewage treatment plant system sr3/1 – sr3

SECTION A – GENERAL PRELIMINARIES (Cont’d)

HK-4547/FP TCK4:LWY22:TWT1:GT:M45042:(2.12.2019) - SA/40 - Arcadis Hong Kong Limited

4. LABOUR, MATERIALS AND WORKMANSHIP (Cont’d) 4.13 Responsibility

The Sub-Contractor shall be responsible for the proper execution and completion of the Sub-Contract Works to meet the requirements set out in the Sub-Contract Documents to the complete satisfaction of the Architect and shall be responsible for compliance with all tests called for herein or required by the Government or the Architect. In the event of anything described in the Specification or shown on the Drawings being, in the Sub-Contractor’s opinion, unsuitable or inconsistent with his guarantees or responsibilities, the Sub-Contractor shall draw the attention of the Architect to these matters at the time of tendering. All shop and field materials and workmanship shall be subject to inspection by the Architect at all times. These inspections shall not relieve the Sub-Contractor from the obligation to provide materials conforming to all requirements of the Sub-Contract and matching approved samples. The Sub-Contractor shall promptly correct any deficiencies reported and shall carry out his own control measures for all materials whether inspected or not.

4.14 Test Certificates

The Sub-Contractor shall furnish to the Architect copies, in triplicate, of test certificates in respect of the Sub-Contract Works and all plant, equipment and materials, showing compliance with tests to British Standard, or any other comparable and acceptable Standard approved by the Architect, and with any additional tests specifically called for herein.

4.15 Sub-Contractor’s Warranties

The Sub-Contractor shall assign to the Employer through the Contractor (so far as he is lawfully able to do so) the benefits of all manufacturers’, sub-sub-contractors’ and suppliers’ warranties, guarantees or other ancillary agreement for materials, goods or work relating to the Sub-Contract Works within 50 days after the issue of the Substantial Completion Certificate of the Main Contract Works. The precise wording of the guarantees/warranties will be subject to the approval of the Architect. The period of guarantees/warranties commence from the Date of Substantial Completion of the Main Contract Works.

Page 124: TENDER DOCUMENTS · schedule no. 1 – preliminaries sr1/1 – sr1 sum/1 schedule no. 2 – preambles sr2/1 – sr2/72 schedule no. 3 – sewage treatment plant system sr3/1 – sr3

SECTION A – GENERAL PRELIMINARIES (Cont’d)

HK-4547/FP TCK4:LWY22:TWT1:GT:M45042:(2.12.2019) - SA/41 - Arcadis Hong Kong Limited

5. TEMPORARY WORKS 5.1 Site Accommodation

The Sub-Contractor shall provide offices, workshops and storage sheds for his own use in areas allocated by the Contractor. He shall also allow for moving such offices, workshops and storage sheds and also his plant, etc. from time to time as may be required to enable the Contractor and other trades to proceed with their works in accordance with the programme. The offices, workshops and storage sheds are to be kept in good order to the satisfaction of the Architect, removed on completion of the Sub-Contract Works and the locations made good.

5.2 Site Facilities and Storage Areas

In addition to the works to be carried out by him under the General Preliminaries Clause 2.4 of this Specification, the Contractor will provide free of charge to the Sub-Contractor all usual site facilities and services, including the following:-

(a) The free use of any scaffolding or working platforms already erected on

Site for the Contractor’s own use.

Should the Sub-Contractor by reason of failure to proceed with the Sub-Contract Works with due speed or diligence or similar reason cause any scaffolding to remain erected for an unreasonable period, or necessitate its dismantling and re-erection to allow due progress by other trades, the extra costs arising shall be chargeable to the Sub-Contractor. Any additional scaffolding or working platforms not provided by the Contractor but necessary for the proper execution of the Sub-Contract Works shall be provided by the Sub-Contractor at Sub-Contractor’s own expense and remove on completion.

(b) The reasonable use of any hoisting facilities already erected on Site for

the Contractor’s own use. Where the Contractor’s hoisting facilities are insufficient for the Sub-Contractor’s use, the Sub-Contractor shall provide adequate hoisting facilities at his own expense and remove on completion.

(c) Artificial lighting necessary for the proper execution of the Sub-Contract

Works during the general working hours of the Site from time to time, together with supplies of electricity for power tools of a type and size which can be served from lighting circuits. Temporary central power supply point will be provided by the Contractor at each floor level and the Sub-Contractor shall at his own expense provide any necessary cabling, etc. from the Contractor’s intake point required in connection with welding, workshops or similar purposes.

Page 125: TENDER DOCUMENTS · schedule no. 1 – preliminaries sr1/1 – sr1 sum/1 schedule no. 2 – preambles sr2/1 – sr2/72 schedule no. 3 – sewage treatment plant system sr3/1 – sr3

SECTION A – GENERAL PRELIMINARIES (Cont’d)

HK-4547/FP TCK4:LWY22:TWT1:GT:M45042:(2.12.2019) - SA/42 - Arcadis Hong Kong Limited

5. TEMPORARY WORKS (Cont’d) 5.2 Site Facilities and Storage Areas (Cont’d)

(d) Watching and protective lighting. (e) Supply of water up to the supply points as designated by the Contractor.

The Sub-Contractor shall at his own expense provide any necessary distribution hoses, etc.

(f) The use of mess rooms, latrines and the usual conveniences of a building

site.

(g) The provision of electric power for testing and commissioning of the Sub-Contract Works. Distribution cabling, etc. as mentioned in (c) above shall be provided at the Sub-Contractor’s expense.

(h) Reasonable space on Site or in the building under construction for the

erection by the Sub-Contractor of his own office and storage accommodation and for working space, in relation to the limitations imposed by the nature of the Site, programme and the requirements of other trades and services.

Page 126: TENDER DOCUMENTS · schedule no. 1 – preliminaries sr1/1 – sr1 sum/1 schedule no. 2 – preambles sr2/1 – sr2/72 schedule no. 3 – sewage treatment plant system sr3/1 – sr3

SECTION A – GENERAL PRELIMINARIES (Cont’d)

HK-4547/FP TCK4:LWY22:TWT1:GT:M45042:(2.12.2019) - SA/43 - Arcadis Hong Kong Limited

6. GENERAL OBLIGATIONS 6.1 Sub-Contractor’s Office and Site Organisation

Immediately the Sub-Contractor is advised that his tender is to be accepted, and before a formal contract may have been entered into, he shall designate a senior member of his office staff to be the Sub-Contractor’s representative. Such representative shall be fully experienced in the types of work to be carried out under this Sub-Contract, English speaking and resident in Hong Kong, and shall be competent and duly authorised to co-ordinate the works in the Sub-Contractor’s office, between his office and the Site and between the Sub-Contractor and his sub-contractors and suppliers; also to maintain liaison with the Architect, Contractor and other parties, to attend liaison and progress meetings and generally to represent the Sub-Contractor on all aspects of this Sub-Contract. A copy of curriculum vitae of the proposed representative shall be submitted to the Architect for approval.

In particular, the representative shall be available for communication 24 hours throughout every day and shall attend at the office of the Architect, as and when required, and shall collaborate with him in the finalizing of the drawings of the development as a whole so far as concerns the installation in this Sub-Contract. It is an essential condition that such collaboration shall commence at the earliest possible date and that it shall be continuous and speedy during the whole period of the Sub-Contract Works. Should the Architect or the Contractor decide that the representative so offered by the Sub-Contractor fails to comply with the above requirements then the Sub-Contractor is to replace the representative by another member of his staff to the approval of the Architect.

Page 127: TENDER DOCUMENTS · schedule no. 1 – preliminaries sr1/1 – sr1 sum/1 schedule no. 2 – preambles sr2/1 – sr2/72 schedule no. 3 – sewage treatment plant system sr3/1 – sr3

SECTION A – GENERAL PRELIMINARIES (Cont’d)

HK-4547/FP TCK4:LWY22:TWT1:GT:M45042:(2.12.2019) - SA/44 - Arcadis Hong Kong Limited

6. GENERAL OBLIGATIONS (Cont’d) 6.2 Setting Out the Sub-Contract Works

(a) The Contractor will provide reference points to the Sub-Contractor for the setting out by him of the Sub-Contract Works.

(b) The Sub-Contractor shall set out the Sub-Contract Works and take all

necessary site dimensions and shall be responsible for the accuracy of same.

(c) The Sub-Contractor shall at his own cost rectify any errors arising from

inaccurate setting-out unless the Architect shall decide otherwise. (d) The Sub-Contractor is to check the setting out of the building works before

commencement of his work and shall report to the Architect and the Contractor any errors found in that setting out. In event of the Sub-Contractor failing to observe this requirement, any of the works under this Sub-Contract incorrectly constructed as a result of such errors in the building works shall, if so required by the Architect be taken down and reinstalled or any necessary remedial work carried out, at the expense of the Sub-Contractor.

6.3 Ordering Materials and Equipment and Site Measurements

Immediately on his appointment the Sub-Contractor shall obtain approval of all particulars and details necessary for the placing of orders and thereafter shall, as soon as possible, place orders for all materials and equipment. In placing such orders it shall be the Sub-Contractor’s responsibility to ensure that his suppliers are fully acquainted with, and work strictly to, the requirements and time limits of the Sub-Contract.

The Sub-Contractor should note that he should not order materials and equipment or commence work based on quantities or sizes stated in the Schedule of Rates without reference to the Specification, Drawings and site measurements. The Employer shall not be liable for any expense or delays incurred by the Sub-Contractor in connection with wrong items or abortive work which would have been apparent had the Specification, Drawings and site measurements been checked.

At the time of checking measurements, the Sub-Contractor shall co-ordinate with the Contractor, other Sub-Contractors and Specialist Contractors and carefully examine the existing conditions, and report to the Architect any work performed by others or planned by others which prevents him from execution of his work as required under the Sub-Contract and obtain the Architect’s final decision and instructions before proceeding.

Page 128: TENDER DOCUMENTS · schedule no. 1 – preliminaries sr1/1 – sr1 sum/1 schedule no. 2 – preambles sr2/1 – sr2/72 schedule no. 3 – sewage treatment plant system sr3/1 – sr3

SECTION A – GENERAL PRELIMINARIES (Cont’d)

HK-4547/FP TCK4:LWY22:TWT1:GT:M45042:(2.12.2019) - SA/45 - Arcadis Hong Kong Limited

6. GENERAL OBLIGATIONS (Cont’d) 6.4 Delivery and Storage

The Sub-Contractor shall deliver the goods to the Site at the times and in the quantities in accordance with the approved programmes and time schedule as specified in General Preliminaries Clause 3.15 of this Specification to suit the progress of the Main Contract Works. Every necessary precaution shall be taken to avoid premature or late delivery of the goods.

Should the goods be delivered to Hong Kong prior to the scheduled time and no storage space on site is available, the Sub-Contractor shall arrange for proper storage of the goods and shall pay for all costs incurred including transportation costs, storage charges, insurance premiums, etc.

The Contractor and Architect shall have the right to make all necessary adjustment to the approved programmes and time schedules to suit the progress of the Main Contract Works at no extra costs to the Employer so far as reasonable. The Sub-Contractor shall give adequate notice at reasonable times to the Contractor of the actual delivery of the goods to Site so that sufficient time is available for arranging the storage space on Site. If site storage space cannot be arranged due to adequate notice not being given by the Sub-Contractor, the Sub-Contractor shall be solely responsible for all costs in respect of godown charges, multi-handling, etc. and no payment shall be released until the goods are finally delivered and stored on Site.

The proposed delivery routing of the goods shall be submitted to the Architect for approval.

6.5 Protection of the Sub-Contract Works

(a) The Sub-Contractor shall suitably protect, encase, cover up, etc. as may be appropriate, all works carried out by him against damage due to building operations, adverse weather or other causes up to the Date of Substantial Completion of the Main Contract Works and shall make good any damage at his own expense and hand over the entire works in a new and perfect condition to the satisfaction of the Architect. The Sub-Contractor shall submit detailed proposals for the protection of the Sub-Contract Works for the Architect’s approval and such approval, however, shall not relieve the Sub-Contractor of his responsibility under this clause.

(b) During the progress of the Sub-Contract Works all open ends of pipes,

conduits, ducts, etc. shall be suitably capped to prevent the ingress of foreign matter.

Page 129: TENDER DOCUMENTS · schedule no. 1 – preliminaries sr1/1 – sr1 sum/1 schedule no. 2 – preambles sr2/1 – sr2/72 schedule no. 3 – sewage treatment plant system sr3/1 – sr3

SECTION A – GENERAL PRELIMINARIES (Cont’d)

HK-4547/FP TCK4:LWY22:TWT1:GT:M45042:(2.12.2019) - SA/46 - Arcadis Hong Kong Limited

6. GENERAL OBLIGATIONS (Cont’d) 6.6 Co-ordination with Other Trades

The Sub-Contractor shall liaise with the Contractor, other sub-contractors and Specialist Contractors whose works interface with the Sub-Contract Works, prior to the commencement of the actual installation, so as to ensure that the work of all trades will be fully co-ordinated. The Sub-Contractor shall be responsible for the cost of taking down installed work, refix or relocation etc. as a result of his lack of and/or improper co-ordination and co-operation with other trades.

6.7 Damages to Other Trades and Adjoining Property

The Sub-Contractor will be required to make good at his own expenses any undue damage to works of other trades and any damage to adjoining property caused by his workmen, plant or transport whether such be within his control or not.

6.8 Hong Kong Construction Sites (Safety) Regulations

The Sub-Contractor shall comply with all aspects of the Regulations insofar as they are applicable to the Sub-Contract Works and shall afford every assistance and/or co-operation where appropriate to the Contractor in connection with the prevention of accidents, the giving of notifications to the appropriate authority, etc., as are necessary for the Contractor to fulfil his responsibilities under the Regulations, and shall bear all consequences of any failure to do so.

6.9 Fire Hazard

Where it is necessary for the Sub-Contractor to use any naked flame in the carrying out of his work, adequate protection shall be given to all other materials and to the structure. Suitable fire extinguishers shall be made readily available at the position where such work is proceeding.

6.10 Overtime

The Sub-Contractor shall at his own expense supply all necessary and additional labour for night work and overtime including all artificial light for his workpeople as may be required to comply with the Contractor’s programme and to complete the Sub-Contract Works so as not cause any delay to the Main Contract Works or the works of other Sub-Contractors, Specialist Contractors, statutory undertakers or utility companies.

Page 130: TENDER DOCUMENTS · schedule no. 1 – preliminaries sr1/1 – sr1 sum/1 schedule no. 2 – preambles sr2/1 – sr2/72 schedule no. 3 – sewage treatment plant system sr3/1 – sr3

SECTION A – GENERAL PRELIMINARIES (Cont’d)

HK-4547/FP TCK4:LWY22:TWT1:GT:M45042:(2.12.2019) - SA/47 - Arcadis Hong Kong Limited

6. GENERAL OBLIGATIONS (Cont’d) 6.11 Invoices

The Sub-Contractor shall produce all original invoices, vouchers or receipted accounts for any materials if called upon to do so.

6.12 Clearing away Rubbish during the Progress of the Sub-Contract Works

The Sub-Contractor shall be responsible for the daily clearing of his rubbish arising during the execution of work to a central collection point for removal by the Contractor.

6.13 Special Arrangements for Phased Completion

Phased Completion is not required by this Sub-Contract, however the Sub-Contractor shall deliver the goods to the Site and complete the Sub-Contract Works in accordance with Key Dates as specified in General Preliminaries Clause 3.15 of this Specification to suit the progress of the Main Contract Works.

6.14 Clearing up on Completion

(a) On completion of the Sub-Contract Works, the Sub-Contractor is to clear away all temporary plant, materials and rubbish and to make good or reimburse the Contractor for any damage caused to the building fabric or services during the execution of the Sub-Contract Works.

(b) The Sub-Contractor shall be responsible for reinstating at his own cost

any structural or superficial damage to the Contractor’s or other Sub-Contractors’ and Specialist Contractors’ works caused by the Sub-Contract Works under this Sub-Contract. This reinstatement of damaged work will be carried out from time to time as required by the Architect to co-ordinate with other contracts. If this work is of a specialised nature, the Architect may instruct the Contractor to carry out the remedial measures and a contra charge made to the Sub-Contractor.

(c) The Sub-Contractor shall remain fully liable for the conditions of the Sub-

Contract Works until the Date of Substantial Completion of the Main Contract Works, and the Sub-Contractor shall carry out any subsequent final cleaning necessary to ensure that the whole of the Sub-Contract Works are handed over to the Employer in a clean, sound and perfect condition on the Completion Date of the Main Contract Works.

Page 131: TENDER DOCUMENTS · schedule no. 1 – preliminaries sr1/1 – sr1 sum/1 schedule no. 2 – preambles sr2/1 – sr2/72 schedule no. 3 – sewage treatment plant system sr3/1 – sr3

SECTION A – GENERAL PRELIMINARIES (Cont’d)

HK-4547/FP TCK4:LWY22:TWT1:GT:M45042:(2.12.2019) - SA/48 - Arcadis Hong Kong Limited

6. GENERAL OBLIGATIONS (Cont’d) 6.15 Compliance with BEAM Plus Requirements

The Sub-Contractor is to note that the building(s) to be constructed under this development shall be subject to environmental and sustainability performance assessment under the Hong Kong Building Environmental Assessment Method (BEAM Plus) – Version 1.2 for New Buildings (Note (b)). The Targeted Overall Assessment Grade for this project is “Platinum” (Note (c)). The standards cover the planning, design, construction, commissioning, operation, management and maintenance of buildings. The achievement of the Targeted Overall Assessment Grade requires the joint efforts of the Employer, the Architect, the Engineer, the Main Contractor and the Sub-contractor. In the Main Contractor’s and Sub-contractor’s domain this effort would involve, inter alia, site management, emissions from the site (noise, dust, water, light etc.), selection of materials, efficient use of materials, waste disposal and recycling, etc. Details of the requirements are set out in the Particular Specifications. The Sub-Contractor shall fully comply with requirements and the Architect is empowered to stop works on site if the Sub-Contractor fails to comply with any of these requirements. The consequences of such stoppage of works shall be borne wholly by the Sub- Contractor. The Sub-Contractor undertakes to indemnify the Employer against all losses, expenses and damages in the event that the Targeted Overall Assessment Grade is not achieved to the extent that such non-achievement is attributable to default on the part of the Sub-Contractor. The Sub-Contractor shall be deemed to have allowed in his tender for the time and cost implications of compliance with the HK-BEAM requirements.

6.16 Penalty for Non-compliance with Guidelines for Consultant and Contractor The Sub-Contractor shall fully comply with those requirements as stated in the Guidelines for Consultant and Contractor in Specification Section D. In case the Sub-Contractor fails to do so, there will be a penalty per accident. The Penalty Clause for breaking the rules listed in the Code of Conduct stated in WWF Guidelines for Consultant and Contractor is attached in the Specification Section E.

Page 132: TENDER DOCUMENTS · schedule no. 1 – preliminaries sr1/1 – sr1 sum/1 schedule no. 2 – preambles sr2/1 – sr2/72 schedule no. 3 – sewage treatment plant system sr3/1 – sr3

SECTION B – PARTICULAR PRELIMINARIES

Page 133: TENDER DOCUMENTS · schedule no. 1 – preliminaries sr1/1 – sr1 sum/1 schedule no. 2 – preambles sr2/1 – sr2/72 schedule no. 3 – sewage treatment plant system sr3/1 – sr3

SECTION B – PARTICULAR PRELIMINARIES INDEX

HK-4547/FP TCK4:LWY22:TWT1:GT:M45042:(2.12.2019) - i - Arcadis Hong Kong Limited

1. SITE AND WORKS 1.1 Builder’s Works 1.2 Free Service and Maintenance 2. TENDER AND SUB-CONTRACT 2.1 Building Services Co-ordinator Provided by the Main Contractor 2.2 Nameplates 2.3 Maintenance and Operation Manual 3. LABOUR, MATERIALS AND WORKMANSHIP 3.1 Electric Wiring 3.2 Power Factor 3.3 Tropicalization 3.4 Silence of Operation 4. GENERAL OBLIGATIONS 4.1 Protection of the Sub-Contract Works 4.2 Sizes and Weights of Equipment 4.3 Commissioning 4.4 Training of Employer’s Staff

Page 134: TENDER DOCUMENTS · schedule no. 1 – preliminaries sr1/1 – sr1 sum/1 schedule no. 2 – preambles sr2/1 – sr2/72 schedule no. 3 – sewage treatment plant system sr3/1 – sr3

SECTION B – PARTICULAR PRELIMINARIES

HK-4547/FP TCK4:LWY22:TWT1:GT:M45042:(2.12.2019) - SB/1 - Arcadis Hong Kong Limited

1. SITE AND WORKS 1.1 Builder’s Works

In addition to that provided in General Preliminaries Clause 2.4, the Sub-Contractor shall also be responsible for the following works:- (a) Provision and fixing of all supporting steelwork such as steel beams, bed

plates, bearing plates, etc. for the proposed equipment; (b) Provision of conduits, cable ducts and trunking, etc. complete with

draw-wires; (c) Provision of labels; and (d) Provision and pointing with silicon sealant at junction of sanitary fittings with

walls, floors, countertops and any abutting surfaces.

However, the following work in connection with the Sub-Contract shall be done by the Main Contractor :-

(a) Excavation, backfilling and disposal of surplus excavated materials for

underground pipes and beds under; and (b) Construction of concrete manholes, sump pits, grease interceptors, etc.

1.2 Free Service and Maintenance

The Sub-Contractor shall provide service and comprehensive maintenance to the plumbing and drainage installation without charge to the Employer for materials and/or labour for a period of 12 months. The service and maintenance work shall include systematic examination, adjustment and lubrication of the equipment, and also the repairing and replacement of the parts etc. whenever it is required. Immediate attendance shall be provided on a 24 hours on call basis upon notification of breakdown or hazardous situation or condition with respect to the plant and equipment. The free maintenance period shall commence from the Date of Practical Completion of the Main Contract Works. The Sub-Contractor is to ensure that sufficient spare items of the specified materials and goods are available to allow for the timely replacement of any defective ones.

Page 135: TENDER DOCUMENTS · schedule no. 1 – preliminaries sr1/1 – sr1 sum/1 schedule no. 2 – preambles sr2/1 – sr2/72 schedule no. 3 – sewage treatment plant system sr3/1 – sr3

SECTION B – PARTICULAR PRELIMINARIES

HK-4547/FP TCK4:LWY22:TWT1:GT:M45042:(2.12.2019) - SB/2 - Arcadis Hong Kong Limited

2. TENDER AND SUB-CONTRACT 2.1 Building Services Co-ordinator Provided by the Main Contractor

The Sub-Contractor is to note that the Main Contractor will provide an approved professionally qualified and experienced services engineer full-time on Site to act as a co-ordinator to co-ordinate the design and installation of all building services installation executed by himself and other Nominated Sub-Contractors. The aforesaid term “co-ordinate” shall be deemed to include (but not limited to) :

(a) The acquisition and checking of all design drawings from the Architect and

those to be provided under any Sub-Contract or Contract for Specialist work for the compatible integration of all the work, including recommending to the Architect for approval design solutions to eliminate any conflict between the positioning of any work, and to provide adequate space for the routing of all such work and for subsequent maintenance of the various installations in accordance with good practice.

(b) In conjunction with the Sub-Contractors, the production and provision of

master co-ordinated services drawings incorporating all design solutions approved by the Architect and showing the integration of all services to be executed by himself and his Sub-Contractors.

(c) The establishment of a detailed sequence of work to enable the expeditious

completion of the Works and all Specialist works. In connection with the above the Sub-Contractor shall be required to co-operate with the Building Services Co-ordinator in every respect to enable the speedy and effective execution and completion of the Works. The Sub-Contractor shall be responsible for the cost of taking down installed work, refix or relocation etc. as a result of his lack of and/or improper co-ordination and co-operation with the Main Contractor, other Sub-Contractors and Specialist Contractors.

Page 136: TENDER DOCUMENTS · schedule no. 1 – preliminaries sr1/1 – sr1 sum/1 schedule no. 2 – preambles sr2/1 – sr2/72 schedule no. 3 – sewage treatment plant system sr3/1 – sr3

SECTION B – PARTICULAR PRELIMINARIES

HK-4547/FP TCK4:LWY22:TWT1:GT:M45042:(2.12.2019) - SB/3 - Arcadis Hong Kong Limited

2. TENDER AND SUB-CONTRACT (Cont’d) 2.2 Nameplates

No nameplates or other advertising matter may be attached to the equipment without the permission of the Architect. This prohibition does not apply to maker’s standard rating plates on such equipment as motors, compressors, fans, etc. nor does it apply to nameplates of reasonable design and dimension fixed inside switchboard cubicles.

2.3 Maintenance and Operation Manual

Within 14 days from the completion of the installation, four sets of Maintenance and Operation Manuals (in English) are to be provided by the Sub-Contractor, bound in suitable hard covers, properly labelled and identified; they shall be prepared in accordance with BSRIA’s technical notes and contain the following :- (a) Description of all systems and equipment. (b) Maintenance schedule describing the detail and frequency of maintenance

(including replacement items). (c) List of spares. (d) Method of operation of all systems. (e) Equipment schedules. (f) Catalogues and performance data on all items of equipment. (g) Method of maintaining and overhauling all equipment. (h) Testing and commissioning results. (i) Trouble shooting for all systems and equipment. (j) Certificate of Origin, Test Certificate, guarantee, etc.

Page 137: TENDER DOCUMENTS · schedule no. 1 – preliminaries sr1/1 – sr1 sum/1 schedule no. 2 – preambles sr2/1 – sr2/72 schedule no. 3 – sewage treatment plant system sr3/1 – sr3

SECTION B – PARTICULAR PRELIMINARIES

HK-4547/FP TCK4:LWY22:TWT1:GT:M45042:(2.12.2019) - SB/4 - Arcadis Hong Kong Limited

3. LABOUR, MATERIALS AND WORKMANSHIP 3.1 Electric Wiring

All wiring shall be carried out in accordance with the current edition of I.E.E. Regulations for Electrical Equipment of Building and the regulations and supply rules of the Hong Kong Electric Co., Ltd./China Light & Power Co. Ltd. unless otherwise specified.

3.2 Power Factor

The equipment shall be guaranteed of having a power factor in compliance with the Hong Kong Electric Co., Ltd.’s and/or China Light & Power Co. Ltd.’s rules and regulations.

3.3 Tropicalization

Unless otherwise specified, all equipment offered shall be “tropicalized” designed for use in conditions from -5℃ to 40℃ ambient air temperature and 100% relative humidity and climatic condition in Hong Kong.

3.4 Silence of Operation

The Sub-Contract Works as installed shall be reasonably silent in operation having regard to the conditions under and locations in which they will be called upon to operate and in any case, shall be such that no unreasonable noise or vibration is discernible outside the plant rooms or similar space in which the equipment is housed. The Sub-Contractor shall take all necessary steps to ensure that the equipment supplied by him is silent as specified and shall include for such sound absorbing, or anti-vibration, material or devices as are necessary to ensure a satisfactory degree of silence and absence of vibration in the structure of the building. The Architect’s decision as to what constitutes satisfaction in this respect shall be final. If on completion the system is not, in the Architect’s opinion, sufficiently silent, the Sub-Contractor shall, without additional charge, carry out such modifications or additions as may be required, until the system is made silent to the Architect’s satisfaction.

Page 138: TENDER DOCUMENTS · schedule no. 1 – preliminaries sr1/1 – sr1 sum/1 schedule no. 2 – preambles sr2/1 – sr2/72 schedule no. 3 – sewage treatment plant system sr3/1 – sr3

SECTION B – PARTICULAR PRELIMINARIES

HK-4547/FP TCK4:LWY22:TWT1:GT:M45042:(2.12.2019) - SB/5 - Arcadis Hong Kong Limited

4. GENERAL OBLIGATIONS 4.1 Protection of the Sub-Contract Works

In addition to the requirements in General Preliminaries Clause 6.5, the Sub-Contractor shall provide the following protection to the Sub-Contract Works :- (a) Fittings shall be properly protected from damage during the construction

period, and shall be cleaned in accordance with the manufacturer’s directions.

4.2 Sizes and Weights of Equipment

The Sub-Contractor shall demonstrate that his proposed equipment is attainable to the duties required in the Specification. Physical sizes of all equipment shall be suitable for the spaces allocated for the accommodation of such equipment, taking into account the requirement of access for maintenance purposes. The Sub-Contractor shall, before ordering equipment, provide the Architect with full details of the weights of the equipment for purposes of determining floor loadings, etc.

4.3 Commissioning

The Sub-Contractor having set to work, adjusted and himself tested the installation or any part thereof, shall then demonstrate to the satisfaction of the Employer and Architect that the installation which has been set to work complies with the specification requirements as set out herein.

4.4 Training of Employer’s Staff

The Sub-Contractor is responsible to arrange tutorial to train the Employer’s property management staff how to operate and maintain the Sub-Contract Works at any time within the Free Maintenance Period as ordered by the Employer.

Page 139: TENDER DOCUMENTS · schedule no. 1 – preliminaries sr1/1 – sr1 sum/1 schedule no. 2 – preambles sr2/1 – sr2/72 schedule no. 3 – sewage treatment plant system sr3/1 – sr3

SECTION C – PARTICULAR SPECIFICATION

Page 140: TENDER DOCUMENTS · schedule no. 1 – preliminaries sr1/1 – sr1 sum/1 schedule no. 2 – preambles sr2/1 – sr2/72 schedule no. 3 – sewage treatment plant system sr3/1 – sr3

PARTICULAR SPECIFICATION

WWF STP & GWTP P.S.

PARTICULAR SPECIFICATION

FOR

NOMINATED SUB-CONTRACT WORKS FOR

BIOLOGICAL SEWAGE TREATMENT PLANT AND

GREY WATER TREATMENT PLANT INSTALLATION

FOR PSFSC

Page 1 of 85

Page 141: TENDER DOCUMENTS · schedule no. 1 – preliminaries sr1/1 – sr1 sum/1 schedule no. 2 – preambles sr2/1 – sr2/72 schedule no. 3 – sewage treatment plant system sr3/1 – sr3

PARTICULAR SPECIFICATION

WWF STP & GWTP P.S. 1

SECTION 1: SYSTEM DESCRIPTION

1.0 General

1.0.1. This specification describes the design, supply, installation, testing,

commissioning and maintenance for the entire Biological Sewage Treatment

Plants (hereinafter referred as “BSTP”) to be constructed at:-

(a) One (1) sewage treatment plant and One (1) grey water treatment plant at Peter

Scott Field Studies Centre, Mai Po

1.0.2. The works shall be carried out in a manner consistent with good practice in Hong

Kong and shall ensure that all Works are designed and installed in compliance

with all statutory requirements and to meet all relevant Authorities approval and

licensing requirements.

1.0.3. The Sewage and Grey Water Treatment Plant Sub-Contractor shall be described as

hereinafter as “The Sub-Contractor”.

1.0.4. The Sub-Contractor shall take into account of the marine environment with

antirust design and site conditions in their equipment selection.

1.0.5. The Sub-Contractor shall take into account of the convenience for future

maintenance.

1.0.6. Biological Sewage Treatment Plant (BSTP) shall be also described as Sewage

Treatment Plant (STP) and/or Grey Water Treatment Plant (GWTP) herein.

Particular Specification to the Project

➢ The Works under this section covers the design, supply and installation of a

sewage treatment plant with capacity of 24m3 per day (max.) for the STP with

peak flow of 72m3 per day, and a grey water treatment plant with capacity of 5m3

per day (max.) with peak flow of 15m3 per day for the GWTP at Peter Scott Field

Studies Centre, Mai Po, both employing membrane biological reactor (MBR). The

treated effluent after treatment from the GWTP shall be sterilized by UV

disinfection and then re-used for toilet flushing purpose and the treated effluent

after treatment from the STP shall be sterilized by UV disinfection and then

discharged into the soakaway pit.

Page 2 of 85

Page 142: TENDER DOCUMENTS · schedule no. 1 – preliminaries sr1/1 – sr1 sum/1 schedule no. 2 – preambles sr2/1 – sr2/72 schedule no. 3 – sewage treatment plant system sr3/1 – sr3

PARTICULAR SPECIFICATION

WWF STP & GWTP P.S. 2

➢ The STP shall treat all soil and waste water generated from the development

including all sanitary fitments and the kitchen. And, the GWTP shall treat the

waste water from the sanitary fitments of guest room excluding the water closets.

➢ The Works shall include associated electrical and mechanical installations and

builder’s works within the sewage treatment plant and grey water treatment plant.

The sewage and grey water treatment system shall fit the site conditions.

➢ The Sub-Contractor shall base on the estimated usage as provided to evaluate the

quantities of influent substances e.g. daily flow rate, suspended solids, 5-day

Biochemical Oxygen Demand (BOD5) and Chemical Oxygen Demand (COD) etc.

The MBR provided shall be able to treat the daily quantity of waste and waste

water generated in not more than 6 hours.

➢ The MBR shall be designed to treat the sewage / grey water without dilution to

comply with the concentration limits prescribed in Water Control Zone in

Technical Memorandum of “Standard for Effluents Discharged into Drainage and

Sewerage Systems, Inland and Coastal Waters” by Environmental Protection

Department and other requirements of relevant Authorities in order to fully

comply with the requirements of relevant authorities for the following parameters

but not limit to:-

• pH value

• Total suspended solids (TSS)

• 5-day Biochemical Oxygen Demand (BOD5)

• Chemical Oxygen Demand (COD)

• Escherichia Coli (E-coli)

• Total residual chlorine

• Dissolved oxygen

• Colour

• Turbidity

• Threshold odour number (TON)

• Ammoniacal nitrogen

• Synthetic detergents

The limits of each parameter will be further elaborated in the later sections of this

Specification.

Page 3 of 85

Page 143: TENDER DOCUMENTS · schedule no. 1 – preliminaries sr1/1 – sr1 sum/1 schedule no. 2 – preambles sr2/1 – sr2/72 schedule no. 3 – sewage treatment plant system sr3/1 – sr3

PARTICULAR SPECIFICATION

WWF STP & GWTP P.S. 3

➢ The water quality of the treated effluent from the STP shall comply with the

standards as stipulated in Table 3 “Standards for effluents discharged into Group

A inland waters” in the Technical Memorandum Standard for Effluents

Discharged into Drainage and Sewerage Systems, Inland and Coastal Waters and

the water quality of the treated effluent from the GWTP shall comply with Water

Supplies Department (WSD) standards for treated grey water in accordance with

WSD’s Technical Specifications on Grey Water Reuse and Rainwater Harvesting,

latest edition or the environmental license issued by EPD.

➢ The MBR shall be designed with adequate capacity for handling sewage / grey

water generated from the intended use.

➢ Waste sludge generated from the system shall be tanking away by the

Sub-Contractor during the defects liability period.

➢ The Sub-Contractor shall be responsible for design, supply, installation, testing,

commissioning of the intelligent remote monitoring system for the entire STP and

the entire GWTP, which integrate with building automation system.

1.1 Scope of Works

1.1.1. The scope of the works shall comprise the design, manufacture, supply and install

a complete biological sewage treatment system and a complete biological grey

water treatment system including, but not limited to the provision of labour,

materials, equipment, transportation and all necessary resources and conduction of

all tests, adjustments and commissioning of the completed systems. It shall include

the complete supply and installation of all major items of plant and equipment and

incidental sundry components necessary for the complete execution of the works

whether or not these sundry components are mentioned in detail in this Particular

Specification.

A. Complete design, supply and installation of the biological sewage treatment

system and the biological grey water treatment system including ordering,

manufacture, shipment, transportation to site, unpacking, erection, painting,

labeling, testing and commissioning, etc.

B. All the interconnecting piping within the STP and the GWTP, including pipework,

fittings, valves and necessary accessories.

Page 4 of 85

Page 144: TENDER DOCUMENTS · schedule no. 1 – preliminaries sr1/1 – sr1 sum/1 schedule no. 2 – preambles sr2/1 – sr2/72 schedule no. 3 – sewage treatment plant system sr3/1 – sr3

PARTICULAR SPECIFICATION

WWF STP & GWTP P.S. 4

C. Supply and installation of submersible sewage transfer pumps (Duty and Standby)

for pumping the sewage from the underground equalization/retention tank in the

vicinity of the sewage treatment plant and the grey water treatment plant including

all necessary pipe works, conduit works, wiring works, accessories, ancillaries,

stainless steel (S.S.) 316 guiderail etc for the satisfactory completion of the Works.

D. Supply and installation of effluent transfer pumps (Duty and Standby) for

transferring the treated effluent from the aerobic tank to the ground floor mixing

tank via the disinfection system including all necessary pipe works, conduit works,

wiring works, accessories, ancillaries, etc for the satisfactory completion of the

Works for grey water treatment system.

E. Supply and installation of effluent transfer pumps (Duty and Standby) for

transferring the treated effluent from the aerobic tank to the underground

soakaway pit via the disinfection system including all necessary pipe works,

conduit works, wiring works, accessories, ancillaries, etc for the satisfactory

completion of the Works for sewage treatment system.

F. Supply and installation of one set air diffuser and air blower (Duty and Standby)

with acoustic enclosure for supplying air to the membrane modules in the aerobic

tank including all necessary pipe works, conduit works, wiring works, accessories,

ancillaries, etc for the satisfactory completion of the Works for the STP and the

GWTP.

G. Supply and installation of surplus sludge discharge pumps (Duty and Standby)

including all necessary pipe works, conduit works, wiring works, accessories,

ancillaries, etc for the satisfactory completion of the Works for the STP and the

GWTP..

H. Supply and installation of ultra-violet (UV) (Duty and Standby) disinfection

system including all necessary pipe works, conduit works, wiring works,

accessories, ancillaries, etc for the satisfactory completion of the Works for the

STP and the GWTP.

I. Supply and installation of reverse osmosis system including all necessary pipe

works, conduit works, wiring works, accessories, ancillaries, etc for the

satisfactory completion of the Works for the STP and the GWTP.

Page 5 of 85

Page 145: TENDER DOCUMENTS · schedule no. 1 – preliminaries sr1/1 – sr1 sum/1 schedule no. 2 – preambles sr2/1 – sr2/72 schedule no. 3 – sewage treatment plant system sr3/1 – sr3

PARTICULAR SPECIFICATION

WWF STP & GWTP P.S. 5

J. Supply and installation of electromagnetic flowmeter to monitor the sludge

discharge rate (Duty and Standby) including all necessary pipe works, conduit

works, wiring works, accessories, ancillaries, etc for the satisfactory completion of

the Works for the STP and the GWTP.

K. Supply and installation of membrane biological reactor modules in the aerobic

tank including the membrane modules, with treatment capacity of not less than 24

m3 per day for the STP and with the treatment capacity of not less than 5 m3 per

day for the GWTP at Peter Scott Field Studies Centre, Mai Po, and all necessary

pipe works, accessories, ancillaries, etc for the satisfactory completion of the

Works.

L. Supply and installation of stainless steel 316 stainless steel aerobic tank for

organic pollutants removal including all necessary pipe works, accessories,

ancillaries, etc for the satisfactory completion of the Works for the STP and the

GWTP.

M. Supply and installation of automatic electrical actuator valve screen system

including all necessary pipe works, conduit works, wiring works, accessories,

ancillaries, etc for the satisfactory completion of the Works for the STP and the

GWTP. The screen shall be of adequate mesh size and the electrical plug valve

shall be DN50 with stainless steel 316 body.

N. Supply and installation of one set of backwash pump and one set of chemical

storage tank including all necessary pipe works, conduit works, wiring works,

accessories, ancillaries, etc for the satisfactory completion of the Works for the

STP and the GWTP.

O. Supply and installation of control and monitoring system which shall comprise all

control panels, control equipment, controllers, sensors, control wirings, conduits,

hardware, software, accessories and ancillaries necessary for the automatic control

and monitoring, and safe operation of the treatment plants for the STP and the

GWTP.

P. Indication signal transmitting from the BSTP to the Sub-Contractor’s office for

monitoring the normal operation of BSTP, via telephone line or auto dialer. Real

time default signal shall be automatically sent to the Sub-Contractor’s office and

the office of Peter Scott Field Studies Centre for the BSTP, in case of any

Page 6 of 85

Page 146: TENDER DOCUMENTS · schedule no. 1 – preliminaries sr1/1 – sr1 sum/1 schedule no. 2 – preambles sr2/1 – sr2/72 schedule no. 3 – sewage treatment plant system sr3/1 – sr3

PARTICULAR SPECIFICATION

WWF STP & GWTP P.S. 6

breakdown of plant or its components(s) which affect the function and

performance of the BSTP and quality of effluence. This shall be programmable so

that the office can be reset upon Employer’s request. The Sub-Contractor shall

also provide a computer in the Employer’s office for performance data display

including, but not limited to the volume waste and waste water generated, the

volume of treated volume, the parameters of the effluent quality. The performance

data shall also be capable for the graphical display on the screen. The

Sub-Contractor shall be responsible for providing the all interfacing points at the

office at 1/F for the performance data to integrate with the building automation

system with all necessary conduits, wiring works and the accessories for the

completion of the Works for the STP and the GWTP.

Q. All electrical works associated with the system including:-

➢ All motor control panels in the plant rooms including cable/busbar interfaces.

Cables/busbar shall be brought into the plant room and in close proximity to one

of the panels. The system shall include the connection of incoming supply

termination to all the panels necessary for the plants.

➢ All motor starter, instrumentation, controls necessary for the system.

➢ Distribution systems from the motor control panels to all equipments including

all necessary cables, switchgears, distribution boards, cable containments and

accessories.

➢ Provision of all necessary E&M works within the sewage treatment plant and

grey water treatment plant, temporary or permanent, whether specified

explicitly in the Specification that are necessary for the satisfactory and safe

operation, maintenance and functioning of the works.

➢ Connection to the terminal strips of the earthing system for the entire

installation.

➢ The total equipment load of the STP shall not be more than 63A, 380V, 3-phase,

50Hz and the total equipment load of the GWTP shall not be more than 32A,

380V, 3-phase, 50Hz.

Page 7 of 85

Page 147: TENDER DOCUMENTS · schedule no. 1 – preliminaries sr1/1 – sr1 sum/1 schedule no. 2 – preambles sr2/1 – sr2/72 schedule no. 3 – sewage treatment plant system sr3/1 – sr3

PARTICULAR SPECIFICATION

WWF STP & GWTP P.S. 7

R. Supply and installation of pH adjustment system with pH meter and dosing pump

for the aerobic tank including all necessary pipe works, conduit works, wiring

works, accessories, ancillaries, etc for the satisfactory completion of the Works for

the STP and the GWTP.

S. Supply and installation of one set hydrostatic level sensor for measuring and

control the water level inside the MBR reactor including all necessary conduit

works, wiring works, accessories, ancillaries, etc for the satisfactory completion of

the Works for the STP and the GWTP.

T. Provision of the noise level measurement before construction and after completion

of the Works. The Sub-Contractor shall be responsible to provide necessary works

to ensure the noise level meets the EPD requirements after completion of the

Works for the STP and the GWTP.

U. Preparation and submission of design and working drawings with all necessary

supporting materials and calculations, as-built drawings, operation and

maintenance manuals.

V. Provision of sample tests including laboratory reports of influent and effluent

water on monthly basis after date of completion for 12 months.

W. Provision of training to the Employer’s staff on the operation and maintenance of

the plants.

X. All submissions to relevant Authorities, including all payment for obtaining of

relevant certificates. The Sub-Contractor shall be responsible to liaise with all

relevant Authorities for the permissions and approvals for the Works.

Y. Provision of full time site staff to co-ordinate with the other trades in relation to

the construction of the sewage treatment plant and the grey water treatment plant.

Z. Provision of scaffolding works, which including all materials, erection and

dismantling of scaffolding or movable platform necessary for the works, to be

provided by the Sub-Contractor at his own costs.

AA. Design, supply and installation stainless steel 316 supporting frameworks for the

equipment installation and fixing.

Page 8 of 85

Page 148: TENDER DOCUMENTS · schedule no. 1 – preliminaries sr1/1 – sr1 sum/1 schedule no. 2 – preambles sr2/1 – sr2/72 schedule no. 3 – sewage treatment plant system sr3/1 – sr3

PARTICULAR SPECIFICATION

WWF STP & GWTP P.S. 8

BB. Provision of samples and spares as required.

CC. To obtain the discharge license from relevant authorities before Substantial

Completion.

DD. Provision of operation and maintenance personnel, equipment and material etc. for

the 12 months Defects Liability Period (DLP), including cost for comprehensive

O&M works.

EE. To coordinate with the Main Contractor on their work programme and work

schedule to facilitate the obtaining of occupation permit

FF. Provision of monthly inspection on the sewage treatment plant and the grey water

treatment plant, and submission of monthly inspection report.

GG. Within the DLP, the Sub-Contractor shall attend emergency repair in case of

breakdown of plant within 12 hours after receiving the default signal or

notification by the Employer.

HH. After DLP, a joint inspection and handover to be carried out between the

Sub-Contractor and Employer or his representatives. Any defect shall be remedied

within 4 weeks to final handover.

1.2 Works by Main Contractor

The following works is not included by this Sub-Contractor:

➢ Concrete plinth/support for entire BSTP and underground equalization/retention

tank for waste / grey water storage, manhole frames and covers, grading, cat

ladders platform.

➢ All building work such as opening through structures and the making good.

➢ Provision of approved protection coating materials to concrete.

➢ Provision of isolator for power supply to the system.

➢ The treated water mixing tank.

Page 9 of 85

Page 149: TENDER DOCUMENTS · schedule no. 1 – preliminaries sr1/1 – sr1 sum/1 schedule no. 2 – preambles sr2/1 – sr2/72 schedule no. 3 – sewage treatment plant system sr3/1 – sr3

PARTICULAR SPECIFICATION

WWF STP & GWTP P.S. 9

➢ Mechanical ventilation system inside the sewage treatment plant room and the

grey water treatment plant room.

➢ Lifting hook.

➢ Fire services equipment for biological sewage treatment plant.

1.3 Operation and Maintenance Manuals

1.3.1 Draft operation and maintenance manuals (referred as “manual” hereinafter)

complete with provisional record drawings, software listing (if any), operation and

maintenance procedures, shall be made available at least one month before the

programmed date for on site testing to enable the Employer’s staff to familiarize

themselves with the installation. These draft manuals shall be of the same format

as the final manuals but with temporary insertion for items which cannot be

finalized until the Works are completed, tested and accepted.

1.3.2 Prior to submitting the draft manuals, preliminary manuals shall be submitted at

least one month in advance for the Architect’s or his representatives’ comments.

The preliminary manuals shall show the general approach in preparing the final

manuals.

Extra Five (5) copies of the manual in printed copies and CD copies shall be

submitted to the Employer or his representatives. All drawings shall be produced

in AutoCAD format.

1.3.3 Finalized and approved manuals shall be provided not later than 6 weeks after

commencement of the Maintenance Period. All manuals and instructions shall be

printed in both English and Chinese. At least one master copy of the manuals shall

be provided and all catalogue contained in this copy shall be original printings and

not photocopies of catalogues.

1.3.4 Manuals shall be bound in good quality hard cover binders which shall allow the

manuals to be updated should any plant modifications occur.

1.3.5 Manuals shall be adequately indexed and plastic section divider sheets shall be

incorporated to facilities the use of manuals.

Page 10 of 85

Page 150: TENDER DOCUMENTS · schedule no. 1 – preliminaries sr1/1 – sr1 sum/1 schedule no. 2 – preambles sr2/1 – sr2/72 schedule no. 3 – sewage treatment plant system sr3/1 – sr3

PARTICULAR SPECIFICATION

WWF STP & GWTP P.S. 10

1.3.6 One separate volume shall be allocated for each system to minimize the number of

pages for each volume and give a clear indication and easy reference for users.

1.3.7 The manual should be prepared in both English and Chinese with contingency

plans.

1.3.8 In general each manual shall consist of but not limit to, the following sections:-

a. General

This Section shall include the purpose of the manual and brief description to

the directory of the manual.

b. System Description

This Section shall include the following as a minimum:-

i. Each individual system shall be described separately indicating the details

of how the system can be adjusted, controlled, monitored and regulated.

ii. Size and capacity of all the major equipment and components of the

system.

iii. Full technical/calculations support for all major equipment selection

including pumps, tanks, etc.

iv. The proposed initial setting of protective devices and other adjustable

components of the system. Space shall be reserved for the insertion of final

commissioned and approval settings.

v. Normal sequence of equipment and plant operation and alternative

sequence to maintain operation of part of the total facilities during

abnormal circumstances.

vi. A full description of all electrical supply, electrical panels and control

panels.

c. Technical Specification

This Section shall include the technical description and function of all

equipment and components. The presentation shall generally be similar to

Page 11 of 85

Page 151: TENDER DOCUMENTS · schedule no. 1 – preliminaries sr1/1 – sr1 sum/1 schedule no. 2 – preambles sr2/1 – sr2/72 schedule no. 3 – sewage treatment plant system sr3/1 – sr3

PARTICULAR SPECIFICATION

WWF STP & GWTP P.S. 11

the Specification but shall relate to the actual equipment supplied and

installed, including:-

i. Technical description of all systems and equipment

ii. Piping and wiring diagrams

iii. Plant details

iv. Manufacturer’s drawing on all proprietary equipment. Exploded views

showing locations of components shall be provided where required by the

Architect or his representatives.

v. Equipment list, stating the make, model, serial number, and approved

settings (after commissioning).

vi. Catalogues, certificates, work test reports and performance data sheets on

all items of equipment.

d. Maintenance

This Section shall include the required operation and maintenance

procedures of all the equipment. This shall include the following as a

minimum:-

i. Inspection manual for all system

ii. Operation manual for all system

iii. Procedure of changing components of equipment requiring regular

replacement.

iv. Maintenance instructions, calibration procedures and fault finding

instructions for all systems down to printed circuit board component level.

v. Precautions when carrying out operation and maintenance procedures.

vi. Storage and inventory systems.

vii. Procedures for system fault finding.

Page 12 of 85

Page 152: TENDER DOCUMENTS · schedule no. 1 – preliminaries sr1/1 – sr1 sum/1 schedule no. 2 – preambles sr2/1 – sr2/72 schedule no. 3 – sewage treatment plant system sr3/1 – sr3

PARTICULAR SPECIFICATION

WWF STP & GWTP P.S. 12

viii. Recommended maintenance schedule detailing frequency of servicing,

overhaul, replacement etc.

ix. Water test log chart and format.

e. Safety

This Section shall include the following as a minimum:-

i. Proper procedure of equipment operation

ii. General description of plant hazards, where appreciate

➢ Protection against electrical hazards

➢ Protection against mechanical and physical hazards

➢ Protection against fire and explosion hazards

➢ Protection against chemical hazards

➢ Protection during fuel and chemical handling

➢ First aid and accident reporting

f. Directory of Suppliers

This Section shall list the name of suppliers and agents of each type of

equipment, materials and accessories. Correspondence address and

telephone numbers shall be included.

g. Spares and Maintenance Tools

This Section shall list all the spares and maintenance tools provided to the

Employer. Recommended list of spare parts and list of special tools shall

also be included.

h. All testing and commissioning records

i. Statutory Approvals Record, Certificates and Licenses

1.3.9 For any installation or control system using software, a dedicated manual shall be

provided including the following:-

a. Printout of the listing

Page 13 of 85

Page 153: TENDER DOCUMENTS · schedule no. 1 – preliminaries sr1/1 – sr1 sum/1 schedule no. 2 – preambles sr2/1 – sr2/72 schedule no. 3 – sewage treatment plant system sr3/1 – sr3

PARTICULAR SPECIFICATION

WWF STP & GWTP P.S. 13

b. Flow chart, data flow diagrams and program descriptions

c. Instruction on the use of diagnostic software and tools

d. Programming and system user manual

e. Application source software, special tools and utility software to enable the

Employer to modify or further develop the software

1.3.10 The manuals shall be prepared on A4 size paper of good quality and adequate

thickness for frequent handling, with clear reproduction of text, sketches, etc., and

shall have stiff covers and spine suitably protected by plastic or other material to

prevent undue deterioration by frequent handling in dirty situations. They shall

preferably have a binding of the peg or ring type with locking of the pegs or rings

to avoid loss of pages during rough handling. Spring back bindings will not be

accepted. The binding arrangement must be such as to permit the book to be laid

that when open at a page. A pocket shall be provided in the back of the book to

contain loose drawings which may be added later by others. Spare pages for notes

by maintenance staff shall be provided.

1.3.11 Diagrams shall be drawn on paper having vertical and horizontal grid margins

(actual grid lines being omitted), preferably marked alphabetically in one direction

and numerically in the other. Any inter-relation of separate diagram sheets shall be

shown on all relevant sheets.

1.3.12 Control diagrams shall be clearly drawn showing the operation of the equipment

in simple functional form, on “schematic” type diagrams and separately on

“connection” type diagrams, the latter showing the location and connection of

components, pipes and forms in their relative positions within the enclosures. All

control diagrams shall contain, or refer to, a comprehensive legend to identify

components and contacts, showing their locations on the diagrams by grid

references, indicating special features, i.e. flow and current rating, coil voltage,

adjustment settings, etc., and relating relay contacts to operating coils, particular

functions belong indicated by appropriate reference in the legend.

1.3.13 Diagrams showing connections between equipment, i.e. transferred from one sheet

to another or identifying interconnection pipes or cables, shall clearly show the

reference of the associated diagrams and the identify of interconnecting pipes or

cables.

Page 14 of 85

Page 154: TENDER DOCUMENTS · schedule no. 1 – preliminaries sr1/1 – sr1 sum/1 schedule no. 2 – preambles sr2/1 – sr2/72 schedule no. 3 – sewage treatment plant system sr3/1 – sr3

PARTICULAR SPECIFICATION

WWF STP & GWTP P.S. 14

1.3.14 Diagrams of equipment layouts shall carry the same identification keys as the

diagrams and shall be drawn so that all items are identified by location and type.

1.3.15 The set of manuals shall also include a similarly bound list of all “as-built”

drawings, listed under headings of type of plant. Drawings which are common to

more than one part of the plant shall be listed under each appropriate section of

plant.

1.3.16 Where appropriate, standard documentation and project documentation submitted

and approved during the designs and working drawings submission period may be

included in the final system manuals. Effort may therefore be saved, and

familiarity with the presentation of information maintained , by writing such

documentation issued during the Contract Period in a form suitable for inclusion

in the relevant final manuals. Manufacturer’s data and handbooks for individual

items of equipment or plant that are a sub-component of the overall systems may

be used, provided they meet the intent of the Specification, and are integrated into

the description of the equipment, and are indexed accordingly. All such

documentation shall be contained in similar binders.

Page 15 of 85

Page 155: TENDER DOCUMENTS · schedule no. 1 – preliminaries sr1/1 – sr1 sum/1 schedule no. 2 – preambles sr2/1 – sr2/72 schedule no. 3 – sewage treatment plant system sr3/1 – sr3

PARTICULAR SPECIFICATION

WWF STP & GWTP P.S. 15

SECTION 2: GENERAL REQUIREMENTS

2.0 Definitions and Abbreviations

2.0.1 Definitions

For the purpose of this Particular Specification, all definitions contained and

hereinafter shall be applicable.

a. “Specification” shall mean this Particular Specification

b. “Drawings” shall mean the drawings attached with the Specification

c. “Furnish” or ”Provide” shall mean design, supply, installation and connect up.

Complete and ready for safe and regular operation of particular work referred

to, unless otherwise specially specified.

d. “Installation” shall mean to erect, mount and connect complete with related

accessories, test and commission.

e. “Supply” shall mean to purchase/procure, acquire and deliver complete with

related accessories.

f. “Similar” or “Equal” in material, weight, size, design and efficiency of specified

product.

g. “Works” shall mean all works of design, production, construction inspection

and test to be executed by the Sub-Contractor under this Contract and all other

works, materials, services and other matters to be undertaken and provided in

relation thereto and shall include all temporary and permanent works necessary

to complete all installations in accordance with this Contract.

h. “Building” shall mean the development of Peter Scott Field Studies Centre

including the biological sewage treatment plant and grey water treatment plant.

i. “Site” shall mean the development of Peter Scott Field Studies Centre, Mai Po

j. “Main Contractor” shall mean the building contractor for the development

Page 16 of 85

Page 156: TENDER DOCUMENTS · schedule no. 1 – preliminaries sr1/1 – sr1 sum/1 schedule no. 2 – preambles sr2/1 – sr2/72 schedule no. 3 – sewage treatment plant system sr3/1 – sr3

PARTICULAR SPECIFICATION

WWF STP & GWTP P.S. 16

k. “Sub-Contractor” shall mean the Sewage and Grey Water Treatment Plant

Sub-Contractor.

l. “Architect” shall mean the Supervising Officer as defined in the Conditions of

Contract.

m. “Date of Completion” shall mean the date of issue of discharge license by

Environmental Protection Department.

2.0.2 Abbreviations

For the purpose of this specification, abbreviations shall be as follows:-

AC - Alternating Current

ACB - Air Circuit Breaker

ASME - American Society of Mechanical Engineers (USA)

ANSI - American National Standards Institute (USA)

ASTA - Association of Short-circuit Testing Authorities (UK)

ASTM - American Society for Testing and Materials (USA)

BASEC - British Approval Services for Electric Cables

BA - Building Authority

BS - British Standard

BSCP - British Standard Code of Practice

CIBSE - Chartered Institution of Building Services Engineers (UK)

CMCS - Central Monitoring and Control System

CP - Code of Practice

CLP - China Light & Power Co., Ltd

COP-EL - Code of Practice Electrical (Wiring), Regulation, 2009 Edition

Issued by EMSD (HK)

CSD - Combined Services Drawing

CT - Current Transformer

DC - Direct Current

DSD - Drainage Services Department (HK)

DFT - Dry Film thickness of paint

E&M - Electrical and Mechanical

EMSD - Electrical & Mechanical Services Department (HK)

EPD - Environmental Protection Department

FAT - Factory Acceptance Test

Page 17 of 85

Page 157: TENDER DOCUMENTS · schedule no. 1 – preliminaries sr1/1 – sr1 sum/1 schedule no. 2 – preambles sr2/1 – sr2/72 schedule no. 3 – sewage treatment plant system sr3/1 – sr3

PARTICULAR SPECIFICATION

WWF STP & GWTP P.S. 17

FBA - Factory-Built Assembles

FEHD - Food and Environmental Hygiene Department

FM - Factor Mutual (USA)

FOC/LPC - Fire Office’s Committee (Loss Prevention Council) (UK)

FSD - Fire Services Department (HK)

HRC - High Rupturing Capacity

HV - High Voltage

IEC - International Electro Technical Commission (Geneva,

Switzerland)

IEE - Institution of Electrical Engineers (UK)

IEEE - Institute of Electrical and Electronic Engineers (USA)

IP - Index of Protection

JIS - Japanese Industrial Standards (Japan)

LMCP - Local Motor Control Panel

LSOH - Low Smoke/Halogen Free

LV - Low voltage

MCB - Miniature Circuit Breaker

MCC - Motor Control Centre

MDF - Main Distribution Board

MTBF - Mean Time Before Failure

MTTR - Mean Time to Repair

MVAC - Mechanical Ventilation and Air Conditioning

NC - Noise Criteria

NFPA - National Fire Protection Association (USA)

O&M - Operation and Maintenance

PA - Public Address

PABX - Private Automatic Branch Exchange

PVC - Polyvinyl Chloride

SAT - Site Acceptance Test

SMACNA - Sheet Metal and Air Conditioning Contractors National

Association Inc. (USA)

SPL - Sound Pressure Level

SWA - Steel Wire Armoured

TEFC - Totally Enclosed Fan Cooled

UL - Underwrites Laboratories (USA)

UPS - Uninterruptible Power Supply

USSG - United States Standard Gauge

VCB - Vacuum Circuit Breaker

Page 18 of 85

Page 158: TENDER DOCUMENTS · schedule no. 1 – preliminaries sr1/1 – sr1 sum/1 schedule no. 2 – preambles sr2/1 – sr2/72 schedule no. 3 – sewage treatment plant system sr3/1 – sr3

PARTICULAR SPECIFICATION

WWF STP & GWTP P.S. 18

WA/WWO - Water Authority/Water Works Office

XLPE - Cross Linked Polyethylene

2.1 ELECTRICITY SUPPLY

2.1.1 Unless otherwise specified hereinafter, all electrical equipment and installation

shall be rated at the voltage level stated below:

Voltage : 380V for 3-phase equipment ( Subject to CLP’s provision)

or

220V for single phase equipment

Frequency : 50Hz

2.1.2 In addition to the above, the electrical equipment shall also be suitable for

operation with limits stated below without compromising its performance, unless

otherwise specified elsewhere in this specification:

Voltage fluctuation : +/- 6% of nominal value

Frequency fluctuation : +/- 2% of nominal value

2.2 Sub-Contractor’s Responsibility

The Sub-Contractor shall carefully examine the Drawings and Specification, and

must design the Works to meet the requirements set out in this Specification,

Drawings and all other relevant criteria whichever is more stringent. The

serviceable life of equipment, when completed, will meet the Specification and

Drawings and will be and remain fit in all respects for the purpose disclosed

therein for a period of not less than 10 years of full scale operation.

2.3 Sub-Contractor’s Programming

2.3.1 The Sub-Contractor shall submit a programme for approval by the Architect or his

representatives.

2.3.2 The Sub-Contractor shall coordinate with the programme of other trades and

incorporate the site possession dates, scheduled dates for equipment approval,

shop drawing approval, manufacture, factory acceptance tests, delivery, site

Page 19 of 85

Page 159: TENDER DOCUMENTS · schedule no. 1 – preliminaries sr1/1 – sr1 sum/1 schedule no. 2 – preambles sr2/1 – sr2/72 schedule no. 3 – sewage treatment plant system sr3/1 – sr3

PARTICULAR SPECIFICATION

WWF STP & GWTP P.S. 19

acceptance test etc. and any variations to the foregoing as may be agreed by the

Architect or his representatives. The Sub-Contractor is required to update his

programme and time schedules for all portions of his works, taking into account of

the requirements of other contractors as made known to him from time to time.

2.3.3 The Sub-Contractor shall submit bi-weekly four copies of progress reports to the

Architect or his representatives.

2.3.4 Prepare and submit each month to the Architect or his representatives four copies

of a time-related bar chart showing in detail all activities which are in progress or

will start within the following month. The activities shown on the bar shall be in

amplification of the activities in the network analysis and shall be compatible in

respects with latest update or revision of the network.

2.3.5 Compliance with this Clause or approval by the Architect or his representatives of

any programme shall NOT relieve the Sub-Contractor of any of his obligations

and responsibilities under the Contract.

2.4 Co-ordination

2.4.1 The Sub-Contractor shall co-ordinate with all other contractors employed by the

Employer in association with works. The co-ordination shall include the exchange

with and obtaining from such other contractors employed by the Employer of all

applicable data, criteria, standards and information necessary for the efficient and

expeditious construction of the Works.

2.4.2 The Sub-Contractor shall attend all site coordination meeting as may be required.

2.4.3 The coordination meetings shall be at least once a month or as frequent as required

by the Architect.

2.4.4 The Sub-Contractor’s representatives at any of the above meetings with the

Architect or his representatives shall be fully authorized to represent and commit

as the Sub-Contractor in respect of programmes and coordination with other

contractors employed by the Employer.

Page 20 of 85

Page 160: TENDER DOCUMENTS · schedule no. 1 – preliminaries sr1/1 – sr1 sum/1 schedule no. 2 – preambles sr2/1 – sr2/72 schedule no. 3 – sewage treatment plant system sr3/1 – sr3

PARTICULAR SPECIFICATION

WWF STP & GWTP P.S. 20

2.4.5 Nothing contained in this Clause shall relieve the Sub-Contractor from his

obligation to monitor the progress of the works or reduce any of his obligations

under the Contract.

2.5 Tender Submission

2.5.1 All sewage treatment plant and grey water treatment plant installation works shall

be supplied and installed by the Sub-Contractor with proven experiences in

design, build and installation of similar sewage treatment plant and grey water

treatment plant.

2.5.2 Biological Sewage Treatment Plant Sub-Contractor shall be included in the

Drainage Services Department Sewage Treatment Divisions Contractor List in the

category of Minor Electrical and Mechanical Engineering works for Sewage

Treatment. Copy of approval letter shall be submitted with the tender and is

essential for assessment. Late submission shall not be considered.

2.5.3 Biological Sewage Treatment Plant Sub-Contractor shall have the proven

experience in operation, design, operation and maintenance of similar MBR

sewage treatment plant with at least FIVE (5) “Testing & Commissioning”

completed job references in Hong Kong. Job references shall be submitted with

the tender and is essential for assessment. Late submission shall not be considered.

2.5.4 The drawings issued at the time of tender are only for the guidance of the

Sub-Contractor in producing his design for the equipment and systems. Five (5)

sets of drawings shall indicate the basic principles of the Sub-Contractor’s design.

The Sub-Contractor shall develop the detailed design of the equipment and shall

produce all drawings with detail design computations to meet the effluent

requirements, detailed process flow and design in the tender submission. The

Sub-Contractor shall carry out his own inspection, survey, checking and, if

necessary, testing of site conditions and environment to identify the extent and

amount of works to be done and the working methods necessary for the execution

and completion of the works.

Page 21 of 85

Page 161: TENDER DOCUMENTS · schedule no. 1 – preliminaries sr1/1 – sr1 sum/1 schedule no. 2 – preambles sr2/1 – sr2/72 schedule no. 3 – sewage treatment plant system sr3/1 – sr3

PARTICULAR SPECIFICATION

WWF STP & GWTP P.S. 21

2.5.5 The Sub-Contractor is required to submit the following documents in the tender

submission: -

a. Master programme from award of tender to practical completion.

b. Schematic diagram of the STP and the GWTP.

c. On scale layout plant of the STP and the GWTP to suit the designated area and

adequate maintenance access/space should be also indicated.

d. Equipment schedule for major equipment which indicates the brand, model,

country of origin, compliance with relevant standards.

e. Job reference, both local and overseas.

f. Schematic and layout of web-based alarm logging system

g. Resume of system designer, full time on-site staff

h. Sub-Contractor’s project organization chart

i. Design calculation for the size of underground equalization/retention tank for the

STP and the GWTP

j. Design calculation for the size of sludge holding tank for the STP and the

GWTP

k. Design calculation for the size of aerobic tank and membrane surface

requirements.

l. Interfacing schedule with building automation system

The Sub-Contractor shall complete the Tender Submission Checklist. Late and

incomplete submission shall not be considered.

2.6 Sub-Contractor’s Design and Drawing Submissions

2.6.1 General

The Sub-Contractor shall submit to the Architect for approval for his designs,

proposal and shop drawings for plant and equipment within 21 days from the

award of the Contract. The Sub-Contractor shall ensure that all his designs and

drawings including all necessary calculations, proposals, documentation and

information necessary are submitted. The Sub-Contractor shall make due

allowance in this programme for the drawings, calculations. Proposals,

documentation and information to be checked, and the time taken for resubmission

after making all necessary amendments. The Architect or his representatives

normally requires three weeks from receipt of each submission to comment or

Page 22 of 85

Page 162: TENDER DOCUMENTS · schedule no. 1 – preliminaries sr1/1 – sr1 sum/1 schedule no. 2 – preambles sr2/1 – sr2/72 schedule no. 3 – sewage treatment plant system sr3/1 – sr3

PARTICULAR SPECIFICATION

WWF STP & GWTP P.S. 22

approve the submission. The approval by the Architect or his representatives of

any works or drawings shall not relieve the Sub-Contractor from his statutory

obligations nor obligations and liabilities under this Contract.

2.6.2 Standard Compliance

The Sub-Contractor shall submit complete catalogue information, shop drawings

and certificates for all material, plant and equipment to be supplied under this

Contract. Where process design, equipment or materials are specified to conform

the requirements of following, but not limit to,

a. Statutory regulations

b. The latest edition of General Specification for Electrical and Mechanical

Sewage Facility Installations published by Drainage Services Department,

HKSAR.

c. The latest edition of General Specification for Plumbing Installation in

Government Buildings of the Hong Kong Special Administrative Region

published by Architectural Services Department, HKSAR

d. The latest edition of General Specification for Drainage Installation in

Government Buildings of the Hong Kong Special Administrative Region

published by Architectural Services Department, HKSAR

e. The latest edition of General Specification for Electrical Installation in

Government Buildings of the Hong Kong Special Administrative Region

published by Architectural Services Department, HKSAR

f. The Guidelines for the Design of Small Sewage Treatment Plants published by

Environmental Protection Department, HKSAR.

g. British Standards,

h. Technical Specifications on Grey Water Reuse and Rainwater Harvesting

issued by WSD, the latest edition,

i. Or other standards of organization such as ANSI, ASME, UL and IEE,

evidence of such conformance shall be submitted for record purposes.

Such evidence shall include written certificate and full testing report from an

approved recognized testing organization, adequately equipped and competent to

perform such services, stating that the items have been tested and that the units

conform to the specified standard.

Page 23 of 85

Page 163: TENDER DOCUMENTS · schedule no. 1 – preliminaries sr1/1 – sr1 sum/1 schedule no. 2 – preambles sr2/1 – sr2/72 schedule no. 3 – sewage treatment plant system sr3/1 – sr3

PARTICULAR SPECIFICATION

WWF STP & GWTP P.S. 23

2.6.3 Designs and Drawings

2.6.3.1 Installation working drawings including builder’s working drawings shall be

submitted for approval for all areas within the scope of this Contract showing all

equipment, piping, electrical wiring, ductwork and appurtenances required. These

drawings shall include plans, elevations, and sections showing locations of

accessories, lifting hooks, inserts, cutouts, penetrations, interface with other

building services installation by the Main Contractor and other details necessary

for a complete installation. All shop drawings shall be submitted for approval

within one month after award of this Contract.

2.6.3.2 All drawings shall be titled, numbered uniquely and dated in an approved manner

and where applicable shall incorporate a graphical scale. When schematics or

diagrams are submitted, they shall be accompanied by all necessary supplementary

information to describe the function and operation of the equipment. These will

generally be approved only in principle at the time of submission and shall be

subject to final acceptance by the Architect or his representatives.

2.6.3.3 Should any drawing to part of a drawing not be approved, the Sub-Contractor shall

amend the drawing according to the comments made on the disapproved drawing

and shall re-submit it until it is approved. The Sub-Contractor shall then supply

Five (5) number of prints.

2.6.3.4 In addition to installation drawings, submission shall be made for all plant,

equipment, materials and appurtenances proposed. The following information

shall be included in each submission for identification proposed:-

a. Contract title and contract number

b. Sub-Contractor’s name

c. Drawing and/or specification reference by Clause

d. The date of submission

For ease in handling and processing, similar equipment should be submitted

together. Individual submissions should cover only one type of product or

equipment.

2.6.3.5 Each submission of design or drawings shall be accompanied by a request for

approval form giving such information as:

Page 24 of 85

Page 164: TENDER DOCUMENTS · schedule no. 1 – preliminaries sr1/1 – sr1 sum/1 schedule no. 2 – preambles sr2/1 – sr2/72 schedule no. 3 – sewage treatment plant system sr3/1 – sr3

PARTICULAR SPECIFICATION

WWF STP & GWTP P.S. 24

a. Contract title and contract number

b. Drawing number including current revision letter or number

c. Drawing title

d. The date of submission

e. A description of the latest revision in adequate detail. Terms such as ‘general

revision’ or ‘revised as per consultant’s comments’ will not be acceptable.

2.6.3.6 Approval of the Sub-Contractor’s design , drawing, plant, or equipment shall not

relieve the Sub-Contractor of any of his obligations nor liabilities under the

Contract nor his responsibility for ensuring that the work is satisfactory and that

all operational requirements are met.

2.6.3.7 The Sub-Contractor’s design and drawings submission shall include, but not be

limited to, the following general requirements together with any other particular

requirements are met.

a. All builder’s works requirements, including location and size of openings,

sleeves, pipes, chases, foundations etc. All other builder’s works requirements

must be submitted timely to process effectively.

b. Major plant and equipment proposed, justification of equipment selection,

rating, size, performance, surface treatment, maintenance and replacement,

installation method etc.

c. Schematic on interconnection between items of plant and interfacing

requirements between various building services installation.

d. Equipment and plants layout, services routing etc. Access space required for

servicing at all equipment and plants shall be shown and in dotted lines so as to

avoid confusion with other lines.

e. Routes for delivery of major items of plant.

f. Power requirement of major items of plant.

g. Cabling requirements.

h. Fixing details of plant and equipment onto structures.

Page 25 of 85

Page 165: TENDER DOCUMENTS · schedule no. 1 – preliminaries sr1/1 – sr1 sum/1 schedule no. 2 – preambles sr2/1 – sr2/72 schedule no. 3 – sewage treatment plant system sr3/1 – sr3

PARTICULAR SPECIFICATION

WWF STP & GWTP P.S. 25

i. Sectional elevations through plant room.

j. Revised areas on any drawing to be clearly “clouded” with revision number.

Revision tables shall be filled out completely and the description of the revision

shall be specific and concise.

k. The interfaces between various trades clearly shown on schematic drawings and

scale layout.

l. Equipment approval and delivery schedule to be submitted by the

Sub-Contractor within one month from award of Contract and to be updated

monthly using the standard form contained in Appendix A to this Specification.

2.6.3.8 Equipment submission by the Sub-Contractor shall follow the standard form

contained in Appendix B to this Specification.

2.7 Obtaining Approvals

The Sub-Contractor shall be responsible for obtaining all necessary approvals,

licenses and the like as may be required for the equipment supplied under this

contract. The costs of any tests associated with obtaining such approvals are

included by this Contract. No claim for extension of time or additional costs will be

entertained in respect of the Sub-Contractor not having obtained the necessary

approvals.

2.8 Quality of Material and Workmanship

2.8.1 Qualification of Manufacturers

All materials and equipment to be provided under this Contract shall be of proven

design and furnished by a manufacturer who has made such materials and

equipment for a period of at least five (5) years, unless otherwise approved.

2.8.2 Application codes and standards and local ordinances

2.8.2.1 Codes and standards listed in the Specification shall be the latest revision at the

time of award of the Contract.

Page 26 of 85

Page 166: TENDER DOCUMENTS · schedule no. 1 – preliminaries sr1/1 – sr1 sum/1 schedule no. 2 – preambles sr2/1 – sr2/72 schedule no. 3 – sewage treatment plant system sr3/1 – sr3

PARTICULAR SPECIFICATION

WWF STP & GWTP P.S. 26

2.8.2.2 Rules and Regulations

All works and materials shall comply with the latest statutory obligations, regulations,

specifications and codes of practice of the following:-

(a) Local government’s ordinances and regulations

(b) The latest Edition of General Specification of General Specification for Electrical

and Mechanical Sewerage Facility Installations published by Drainage Services

Department, Hong Kong Special Administrative Region (HKSAR)

(c) The Guidelines for the Design of Small Sewage Treatment Plants published by

Environmental Protection Department, Hong Kong Special Administrative

Region.

(d) General Specification for Electrical Installation in Government Buildings of the

Hong Kong Special Administrative Region, the latest edition

(e) General Specification for Plumbing Installation in Government Buildings of the

Hong Kong Special Administrative Region, the latest edition

(f) General Specification for Drainage Installation in Government Buildings of the

Hong Kong Special Administrative Region, the latest edition

(g) Testing and Commissioning Procedure for Electrical Installation in Government

Buildings of the Hong Kong Special Administrative Region, the latest Edition

(h) Testing and Commissioning Procedure for Plumbing Installation in Government

Buildings of the Hong Kong Special Administrative Region, the latest Edition

(i) Testing and Commissioning Procedure for Drainage Installation in Government

Buildings of the Hong Kong Special Administrative Region, the latest Edition

(j) Code of Practice for the Electricity (Wiring) Regulations, the latest edition and all

associated regulations and requirements issued by Electrical and Mechanical

Services Department, The Government of the Hong Kong Special Administrative

Region.

Page 27 of 85

Page 167: TENDER DOCUMENTS · schedule no. 1 – preliminaries sr1/1 – sr1 sum/1 schedule no. 2 – preambles sr2/1 – sr2/72 schedule no. 3 – sewage treatment plant system sr3/1 – sr3

PARTICULAR SPECIFICATION

WWF STP & GWTP P.S. 27

(k) Code of Practice for Energy Efficiency of Lighting Installations, the latest edition

issued by Electrical and Mechanical Services Department, The Government of the

Hong Kong Special Administrative Region.

(l) Code of Practice for Minimum Fire Service Installation and Equipment and

Inspection, Testing and Maintenance of Installations and Equipment published by

Fire Services Department.

(m) Code of Practice for Energy Efficiency of Building Services Installation (BEC),

the latest edition

(n) BS 7671 (the latest I.E.E. Wiring Regulations – “Regulations for Electrical

Installation”)

(o) Supply Authority’s Regulations

(p) Construction Site (Safety) Regulations.

(q) Factory and Industrial Undertaking (Lifting Appliance and Lifting Gear)

Regulations

(r) Factory and Industrial Undertaking (Guarding and Operation of Machinery)

Regulations.

(s) Noise Control Ordinance

(t) Air Pollution Control Ordinance

(u) Electricity Ordinance and Electricity (Registration) Regulation

(v) Water Pollution Control Ordinance

2.8.2.3 Where no standards are stated in the Specification, all details, materials,

equipment and workmanship shall be in accordance with the relevant British

Standards.

2.8.2.4 Alternatively, international recognized standards such as IEC, ASTM, NEMA and

JIS may be approved for manufacture of equipment provided that all parameters

Page 28 of 85

Page 168: TENDER DOCUMENTS · schedule no. 1 – preliminaries sr1/1 – sr1 sum/1 schedule no. 2 – preambles sr2/1 – sr2/72 schedule no. 3 – sewage treatment plant system sr3/1 – sr3

PARTICULAR SPECIFICATION

WWF STP & GWTP P.S. 28

specified in the specification can be met documentation in English, indicating the

deviations between the proposed and the specified standards, shall be submitted

for approval prior to the placement of order for that particular equipment.

2.8.2.5 The Works shall conform to IEE Wiring Regulations and all statutory ordinances,

codes of practice and regulations. Where the design or choice of plant, materials or

equipment is affected by the ordinances or regulations, the plant, materials, or

equipment supplied shall comply with all relevant sections of such ordinances,

codes of practice or regulations, even though no particular reference may be

mentioned in this Specification.

2.8.2.6 In the event of conflict between any of the technical requirements of the above, the

order of the precedence shall be:

(a) Local government’s ordinances and regulations

(b) The latest Edition of General Specification of General Specification for Electrical

and Mechanical Sewerage Facility Installations published by Drainage Services

Department, HKSAR

(c) The Guidelines for the Design of Small Sewage Treatment Plants published by

Environmental Protection Department, Hong Kong Special Administrative

Region.

(d) The specification and drawings under this Contract

(e) Codes of practices for the utilities companies and statutory authorities

(f) General specifications issued by Architectural Services Department

(g) International standards and regulations

2.8.3 Materials and Workmanship

2.8.3.1 Unless otherwise specifically provided in this specification, all equipment,

material and articles incorporated in the Works covered by this specification are to

be new, standard line, catalogued products and of the most suitable grade to be the

purpose intended. Unless otherwise specification, reference to any equipment,

Page 29 of 85

Page 169: TENDER DOCUMENTS · schedule no. 1 – preliminaries sr1/1 – sr1 sum/1 schedule no. 2 – preambles sr2/1 – sr2/72 schedule no. 3 – sewage treatment plant system sr3/1 – sr3

PARTICULAR SPECIFICATION

WWF STP & GWTP P.S. 29

material, article, or patented process by trade name, make or catalogue number

shall be regarded as establishing a standard of quality only and shall not be

construed as limiting competition.

2.8.3.2 All equipment and material of the same type shall be the products of the same

manufacturer.

2.8.3.3 All similar items of plant and their component part shall be completely

interchangeable. Spare parts shall be manufactured from materials similar to the

originals and shall fit all similar items of plant. Where machining may be needed

before fitting renewable parts, the machining fits with their tolerance shall be

shown on the drawings accompanying the instruction manuals.

2.8.3.4 All revolving parts shall be truly balanced both statically and dynamically so that

when running at normal speed and any load up to the maximum there shall be no

significant vibration due to lack of balance.

2.8.3.5 All parts which can be worn or damaged by dust shall be totally enclosed in

dust-proof housings.

2.8.3.6 As far as practicable the use of electrically dissimilar metals in contact shall be

avoided, but, where unavoidable, these metals shall be so selected that the

electro-chemical potential difference between them does not exceed 250mV. If

this is not possible, the contact surface of one or both of the metals shall be

electroplated or otherwise finished in such a manner that the potential difference is

reduced to within the required limits or the two metals shall be insulated from

each other by an approved method.

2.8.3.7 All work under this Contract shall be performed in skillful and workmanlike

manner, in accordance with the best workshop practice.

2.8.3.8 All components shall be easily accessible for easy maintenance/ replacement.

2.9 Sample Submission

2.9.1 Two sets of samples of materials shall be submitted for the Architect’s or his

representatives’ approval at appropriate stages of the Works in accordance with

Appendix C contained in this Specification. Samples shall be properly mounted on

Page 30 of 85

Page 170: TENDER DOCUMENTS · schedule no. 1 – preliminaries sr1/1 – sr1 sum/1 schedule no. 2 – preambles sr2/1 – sr2/72 schedule no. 3 – sewage treatment plant system sr3/1 – sr3

PARTICULAR SPECIFICATION

WWF STP & GWTP P.S. 30

sample boards or packed properly and legible labeled in both cases such that they

are readily for inspection by the Architect or his representatives.

2.9.2 All samples must be new products.

2.9.3 The Sub-Contractor shall replace at his own costs any samples rejected by the

Architect or his representatives until the Architect or his representatives is

satisfied that the samples comply with the Specification and are of satisfactory

quality.

2.9.4 Other samples shall be submitted upon the request of the Architect or his

representatives for approval.

2.10 Packing and Protection of the Works

2.10.1 All equipment shall be delivered to the Site in a new condition, properly packed

and protected against damage due to handling, adverse weather or other

circumstances and, as far as practicable, shall be kept in packing cases and/or

under protective coverings until required for use.

2.10.2 Any items suffering damage in transit or on the Site would be rejected and

replaced at no extra cost to the Employer. No rejection of such items will be

considered as grounds for granting an extension of time for completion.

2.10.3 In the case of items of equipment which originate outside the Territory of Hong

Kong:-

(a) All items of equipment shall be adequately and securely packed for safe

transportation with due regard to the climatic conditions encountered in transit

and on arrival.

(b) The Sub-Contractor shall, at the time of shipping each consignment of

equipment, provided the Architect or his representatives, in triplicate, packing

lists and Bills of Lading which shall contain full statements of the packages

consigned with particulars of the dimensions, weights, contents, shipping

marks and approximate value of each package.

Page 31 of 85

Page 171: TENDER DOCUMENTS · schedule no. 1 – preliminaries sr1/1 – sr1 sum/1 schedule no. 2 – preambles sr2/1 – sr2/72 schedule no. 3 – sewage treatment plant system sr3/1 – sr3

PARTICULAR SPECIFICATION

WWF STP & GWTP P.S. 31

(c) BS 1133 ad supplements, or other comparable and acceptable codes shall be

used as a guide for the standard of packing and package required. All bright,

polished or plated parts shall be treated with suitable rust preventative.

2.11 Inspection and Testing

2.11.1 General

(a) The tests stipulated below are only indicative minimum. The Sub-Contractor

shall submit the detailed testing procedures, schedules and format of the test

report at least one (1) month for the Employer or his representatives’ approval

before commencing testing and commissioning.

(b) Inspection and testing shall be carried out as specified herein and relevant

section of the Specification.

2.11.1.1 The inspection and tests will be divided into five basic stages :

(a) Type Tests

(b) Factory Acceptance Tests (FAT), carried out before shipment of plant and

equipment.

(c) Contactor’s Initial on-site testing and commissioning

(d) Site Acceptance Tests (SAT) carried out after installation and initial

commissioning of the plant, equipment and systems

(e) Process commissioning of the STP and the GWTP

2.11.1.2 The full cost of providing all facilities, labour, consumable stores and

appliances required in the connection with all inspection and testing shall be

deemed to be included in this Contract.

2.11.1.3 The inspection and passing of work or equipment by the Employer or his

representatives shall not relieve the Sub-Contractor from liability to complete

the works in accordance with contract nor relieve him of any of his obligations

under the Contract.

Page 32 of 85

Page 172: TENDER DOCUMENTS · schedule no. 1 – preliminaries sr1/1 – sr1 sum/1 schedule no. 2 – preambles sr2/1 – sr2/72 schedule no. 3 – sewage treatment plant system sr3/1 – sr3

PARTICULAR SPECIFICATION

WWF STP & GWTP P.S. 32

2.11.2 Type Tests

(a) All plant and equipment shall be subjected to inspection and the witnessing of

tests by the Employer or his representatives. This requirement will be waived

provided that sufficient documentation can be furnished to the Employer or his

representatives that the plant and equipment in question has been satisfactorily

type tested.

(b) The type tests for each major item of equipment or sub-assembly shall be in

accordance with the test procedures of relevant standards, the specification or

the test procedures submitted by the Sub-Contractor and approved by the

Architect or his representatives.

(c) Nothing in this specification shall prevent the Architect or his representatives

from call for extra tests should be deem it necessary and/or should be find the

test results being not to his satisfaction.

2.11.3 Factory Acceptance Tests (FAT)

(a) The Sub-Contractor shall submit a detailed list of all tests for the sewage

pumps, LMCP and general descriptions of each of the tests indicating the way

in which these tests will be conducted and the estimated testing time required

for each of these tests. Such time estimates shall not limit in any way the

Sub-Contractor’s obligations to complete each and all tests as specified and

necessary to demonstrate the satisfactory performance of the system. No

deviations shall be allowed without the prior approval of the Architect or his

representatives.

(b) The Sub-Contractor shall submit for the Architect’s or his representatives’

approval all detailed test procedures and final schedules for the tests at least

one month prior to the scheduled commencement of Factory Acceptance Tests.

(c) The Sub-Contractor shall group the tests to minimize travel expenses if the

Employer or his representatives wish to witness or participate in any of the

tests.

(d) Factory acceptance tests shall be conducted under the direction of an approved

engineer employed by the Sub-Contractor.

(e) The Sub-Contractor shall be responsible for undertaking and recording the

tests and four (4) copies of typed or printed formal test certificates and charts

shall be supplied for the Architect or his representative approval within 14

days after completion of the tests. If required by the Architect or his

representatives, a manuscript copy of the test record shall be made at the test

and given to the Employer or his representatives at the time or at the earliest

opportunity of the test has not been witnessed. When the Architect or his

representatives has received the results and is satisfied that the plant has

passed the tests, he shall write to that effect and the Sub-Contractor may then

ship the plant.

Page 33 of 85

Page 173: TENDER DOCUMENTS · schedule no. 1 – preliminaries sr1/1 – sr1 sum/1 schedule no. 2 – preambles sr2/1 – sr2/72 schedule no. 3 – sewage treatment plant system sr3/1 – sr3

PARTICULAR SPECIFICATION

WWF STP & GWTP P.S. 33

(f) Should a defect be found during one of the tests, the nature of the defect shall

be explained in detail to the Architect or his representatives who shall decide

what portion of the test or tests must be re-run after the fault has been rectified.

(g) All expenses and costs incurred by the Architect or his representatives and his

representatives arising from such re-test shall be borne by the Sub-Contractor.

(h) If the Architect or his representatives decides that the plant is not in

accordance with the Contract, he may reject the plant, and he shall inform the

Sub-Contractor of the reasons in writing within a reasonable time.

2.11.4 On-site testing and commissioning

(a) Testing of the complete equipment and all ancillaries installed and connected

in final working arrangements shall be made on Site. These tests shall be

arranged to prove that equipment has been properly installed and adjusted.

Testing may be proceeded in stages as the work allows, but check testing of

the full equipment in operation mode shall be made to show that work

subsequent to stage testing has not affected the performance of previous work.

In the event of any part of the equipment failing these tests, further tests shall

be made after rectification of the fault, over at least two successive and

separate periods with no further fault occurring. All expenses and costs

incurred to the Architect or his representatives arising from such further tests

shall be borne by the Sub-Contractor.

(b) Suitable test equipment instruments and layout for the purpose of the tests or

rectification of faults found during testing shall be provided by the

Sub-Contractor and shall be deemed to be covered by the tender price. All

instruments shall be to the approval of the Architect or his representatives and,

if required by the Employer or his representatives, they shall be calibrated

before and after tests. If required, their accuracy shall be tested and certified by

an approved laboratory.

(c) All consumable parts, replacements, etc., required during the tests shall be

supplied and fitted by the Sub-Contractor.

(d) At least four (4) weeks in advance of any particular Site Testing, the

Sub-Contractor shall submit to the Architect or his representatives for his

approval detail of the test equipment he proposes to use for that testing. He

shall at all times, during the execution of the Works on Site, provide for the

exclusive use of the Architect of his representatives on Site and in a sound

working order, one of each type of suitable instruments for the checking of

current, voltage, resistance and insulation within the ranges and impedance

levels required for the safe testing of the equipment.

(e) All tests for statutory requirements and insurances including arrangements for

such tests, inspections by authorized bodies, persons or insurers, as may be

necessary and the provision of certificates in the prescribed and approves

Page 34 of 85

Page 174: TENDER DOCUMENTS · schedule no. 1 – preliminaries sr1/1 – sr1 sum/1 schedule no. 2 – preambles sr2/1 – sr2/72 schedule no. 3 – sewage treatment plant system sr3/1 – sr3

PARTICULAR SPECIFICATION

WWF STP & GWTP P.S. 34

forms necessary to enable plant and equipment to be put into service, shall be

made by the Sub-Contractor.

2.11.5 Site Acceptance Tests (SAT)

2.11.5.1 General

The Site Acceptance Tests shall be conducted under the direction of the

Architect or his representatives and shall begin after all on site commissioning

tests have been satisfactorily completed and all defects found during the test

have been rectified to the satisfaction of the Architect or his representatives.

The purpose of the SAT is to demonstrate that the complete installation is fully

complied with the technical and operational requirements specified.

2.11.5.2 On completion of the installation of the equipment, the Sub-Contractor shall

notify the Architect or his representative and submit testing procedures at least

four (4) weeks prior to the scheduled SATs so that the Architect or his

representatives may witness the tests.

2.11.5.3 A qualified installation engineer shall be present to carry out the installation,

inspection and operational testing of the equipment. The qualification and

experience of the qualified installation engineer shall be submitted at least four

(4) weeks prior to the scheduled SATs for the Architect or his representatives’

approval. The SATs shall be conducted in accordance with the submitted and

approved procedures. The functional test for each individual item of equipment

shall be carried out.

2.11.5.4 The Sub-Contractor shall carry out all necessary Site Acceptance Tests (SATs)

in accordance with the requirements specified in this Specification, and as

necessary for the safe, reliable and satisfactory operation of the system and

equipment installed. No equipment shall be shipped until Factory Tests have

been completed and the Architect or his representatives has approved the

Sub-Contractor to do so.

2.11.5.5 The Sub-Contractor shall test all the equipment and systems provided under this

Contract to the satisfaction of the Architect or his representatives. This shall

include the necessary adjustments and settings of all controls, the checking of

the operation of all protection and safety devices and the commissioning of the

complete installation.

Page 35 of 85

Page 175: TENDER DOCUMENTS · schedule no. 1 – preliminaries sr1/1 – sr1 sum/1 schedule no. 2 – preambles sr2/1 – sr2/72 schedule no. 3 – sewage treatment plant system sr3/1 – sr3

PARTICULAR SPECIFICATION

WWF STP & GWTP P.S. 35

2.11.5.6 The Sub-Contractor shall provide facilities and instruments for all tests and

adjustments after installation and shall bear all the cost incurred in testing and

commissioning. The Sub-Contractor shall prove the accuracy of the

instruments to be used in the testing and commissioning by the submission of

calibration certificates as required by the Architect or his representatives. The

calibration certificates shall be issued by an authority approved by the Architect

or his representatives.

2.11.5.7 The completion of the testing and commissioning (excluding the process

commissioning of the sewage collection, transfer and treatment system) of the

works shall be completion of all the tests for the system/equipment as a whole,

instead of individual components, to the satisfaction of the Architect or his

representatives.

2.11.5.8 All the defects of materials, workmanship or design shall be rectified by the

Sub-Contractor at his own expenses.

2.11.5.9 Detailed testing standards, testing procedures and testing record format shall be

submitted for the Employer or his representatives’ approval at least one (1)

month before the intended date for carrying out the Site Acceptance Tests

(SATs). The Employer or his representatives has the right to re-schedule the

time for the test.

2.11.5.10 The Sub-Contractor shall provide all necessary labour, materials and

instruments as required for carrying out efficiently all tests, calibrations and

adjustments during SATs. All costs involved for these tests shall be borne by

the Sub-Contractor.

2.11.5.11 Prior to commencement of any tests on the equipment provided under this

Contract, it is important that appropriate safety precautions should have been

taken in compliance with the relevant British Standards, laws, ordinances and

regulations enforced by the local authorities so that no person will be exposed

to danger. Appropriate information and instructions on safety shall be

provided and included in the equipment submission.

2.11.5.12 The Sub-Contractor shall provide a full record of all tests and commissioning

results indicating clearly the performance of the each individual equipment

Page 36 of 85

Page 176: TENDER DOCUMENTS · schedule no. 1 – preliminaries sr1/1 – sr1 sum/1 schedule no. 2 – preambles sr2/1 – sr2/72 schedule no. 3 – sewage treatment plant system sr3/1 – sr3

PARTICULAR SPECIFICATION

WWF STP & GWTP P.S. 36

and the whole system to be installed, modified or relocated under this

Contract.

2.11.5.13 Should the results of any test show that any system fails to perform to the

efficiencies or duties as specified in the Contract; the Sub-Contractor shall

adjust, modify and if necessary replace the associated equipment at no

additional cost and time to the Employer in order that the required

performance of the system can be achieved.

2.11.5.14 Upon completion of the SATs, the Sub-Contractor shall submit five (5) sets of

Operation and Maintenance (O&M) Manuals incorporated with all the testing

results, as-built drawings and all necessary certifications for the Employer or

his representatives’ approval

2.11.5.15 All equipment shall be demonstrated to work/operate functionally as required

in this Specification. Site acceptance tests shall show, inter alia, that –

i. System capacity complying with the requirements as stipulated in the

Specification.

ii. Noise level complying with the statutory requirements and the requirements as

stipulated in the Specification.

iii. All equipment cabling, distribution, etc. is electrically and mechanically safe.

iv. All interlocks, isolators, doors and covers securing mechanism are properly

fitted and adjusted.

v. All exposed metal work is properly bonded and earthed in accordance with the

latest edition of IEE Wiring Regulations, relevant British Standards, Code of

Practice and statutory requirements and that all connections and points required

to be earthed for safety and satisfactory operation are properly earthed in

accordance with the manufacturer’s requirements.

vi. All cables, core and termination are properly made off, secure, properly

supported and correctly identified and coloured.

vii. All phases, polarities, neutral and common connections are correctly switched

as required, power is correctly available at all points and voltage and frequency

at all equipment are correct and in accordance with requirements for correction

operation.

viii. All supplies are properly fused, or otherwise protected to give satisfactory

discrimination and safe disconnection under fault conditions.

Page 37 of 85

Page 177: TENDER DOCUMENTS · schedule no. 1 – preliminaries sr1/1 – sr1 sum/1 schedule no. 2 – preambles sr2/1 – sr2/72 schedule no. 3 – sewage treatment plant system sr3/1 – sr3

PARTICULAR SPECIFICATION

WWF STP & GWTP P.S. 37

ix. All contacts are properly aligned and not subject to excessive wear or erosion.

x. All protective covers are properly fitted. Warning and designating labels are

correct and in position.

xi. Insulation resistance of all cabling and equipment is not less than required by

the latest Building Service and IEE Wiring Regulations.

xii. All fault indications and alarms are working correctly.

xiii. All essential equipment fed by emergency power supply shall continue to

function correctly and without any disturbance during supply failure,

restoration and standby sequences.

xiv. In addition to all operational tests required for satisfactory completion, the

operation of all interlocks, sequences and protection not utilized in normal

operations shall be checked to the satisfaction of the Employer or his

representatives.

xv. All safety devices shall be inspected and tested.

2.11.5.16 Additional tests shall be performed to verify that the complete installation

meets the requirements as stated in this Specification, for example,

measurement of resistance to prove the effectiveness of the earthing systems,

operation of automatic control system, etc.

2.11.5.17 All electrical wiring/circuits shall be inspected and tested in accordance with

the Code of Practice for Electricity (Wiring) Regulations and the 16th edition

of IEE Wiring Regulations. The required tests shall be carried out with

witness of the Architect or his representatives.

2.11.5.18 The Sub-Contractor shall provide all necessary labour, materials and

consumables including temporary electricity necessary to carry out the SATs

including all repeated tests until the SATs are completed satisfactorily meeting

all performance and operational requirements.

2.11.5.19 Process Commissioning of the Sewage Treatment Plant and Grey Water

Treatment Plant

(a) After satisfactory completion of the testing and commissioning as specified,

the Sub-Contractor shall immediately commence the process commissioning

for the sewage treatment plant and grey water treatment plant.

(b) The Sub-Contractor shall submit the full commissioning procedures to the

Architect or his representatives for approval six (6) weeks before

commencement of the process commissioning. The commissioning procedures

shall comprise, but not be limited to, step-by-step method statements, overall

programme, laboratory and site testing schedules, manpower and labour

Page 38 of 85

Page 178: TENDER DOCUMENTS · schedule no. 1 – preliminaries sr1/1 – sr1 sum/1 schedule no. 2 – preambles sr2/1 – sr2/72 schedule no. 3 – sewage treatment plant system sr3/1 – sr3

PARTICULAR SPECIFICATION

WWF STP & GWTP P.S. 38

schedules, consumable items schedule, etc, necessary for the process

commissioning of the sewage treatment plant.

(c) The Sub-Contractor shall carry out “on-site” tests in respect of all static system

to ensure safe and proper operation as conforming to the design intent. Such

tests shall include pressure tests on the hydraulic systems.

(d) The process commissioning shall include, but not be limited to, seeded process

start-up for the establishment of the sewage treatment process and the grey

water treatment process in the BSTP and to demonstrate the standard of

effluent complies with the requirements as specified in the discharge license

and this Particular Specification. Despite that all necessary sludge seeding and

stabilization to establish, the sewage treatment process of the BSTP shall not

form part of the seven (7) consecutive-day commissioning tests period, the

Sub-Contractor shall conduct in-house daily influent and effluent sampling and

analyses, as approved by the Architect or his representatives, to monitor the

status of the process commissioning, as soon as the treatment process reaches

steady conditions, the Sub-Contractor shall carry out the sampling and analysis

during the commissioning tests in accordance with the following requirements

for seven (7) consecutive days.

(e) Sampling and Analysis

1 The sampling method, sampling handling, preservation and analytical

procedure for determining the BOD, TSS, TCOD, E. Coli, Total Nitrogen,

synthetic detergents, and other parameters, as required of influent and

effluent shall be in accordance with “standard methods for the examination

of water and wastewater” 23rd edition, prepared and published by

American Public Health Association, et al in 2017 or equivalent standards

and statutory requirements.

2 One (1) daily influent composite sample and one (1) daily effluent

composite sample shall be collected for each day during the seven (7)

consecutive-day commissioning tests period.

3 The following parameters shall be analyzed:-

(a) TSS,BOD, TCOD ammoniacal nitrogen, synthetic detergents, total

residual chlorine of the influents composite.

(b) TSS, BOD, TCOD, E. Coil, Total Nitrogen of the effluents composite,

the parameters for water quality of Group A inland waters from EPD

and the parameters for water quality for grey water reuse as stipulated

Page 39 of 85

Page 179: TENDER DOCUMENTS · schedule no. 1 – preliminaries sr1/1 – sr1 sum/1 schedule no. 2 – preambles sr2/1 – sr2/72 schedule no. 3 – sewage treatment plant system sr3/1 – sr3

PARTICULAR SPECIFICATION

WWF STP & GWTP P.S. 39

in the WSD’s Technical Specifications on Grey Water Reuse and

Rainwater Harvesting.

(c) MLSS of the SBR Basin mixed liquor grab sample.

(d) Grab sampling shall be applied in analyzing E. Coli of the effluent.

4 The sampling location of all types of samples shall be proposed by the

Sub-Contractor and approved by the Architect or his representatives before

sampling. Each sample collected in the presence of the Architect or his

representatives shall be assigned with a unique identification number. The

sample size shall be sufficient for the sample analysis to ve carried out by

the independent laboratory.

5 The Sub-Contractor shall employ an independent laboratory to analyze all

the samples collected during the seven (7) consecutive-day commissioning

tests period. The independent laboratory shall be on the list of Hong Kong

Laboratory Accreditation Scheme qualified for water/sewage sampling and

sampling and samples analysis for the parameters concerned. The

Sub-Contractor shall provide all necessary labours, instruments and

accessories for sample collection, transportation, preservation and analysis.

6 The Sub-Contractor shall submit the following items of information, for

approval, fourteen (14) calendar days before carrying out any sampling or

analysis:-

(a) Name of the independent laboratory and supporting documents;

(b) Sampling procedures;

(c) Samples preservation method:

(d) Samples analysis method.

7 The Sub-Contractor shall submit a draft report on the samples collected

within ten (10) calendar days from the date of collection of samples. The

draft report shall contain the following items of information:-

(a) all analyzed results;

(b) identified number(s) of the sample(s);

(c) information of the samples collected (including, but not limited to,

Page 40 of 85

Page 180: TENDER DOCUMENTS · schedule no. 1 – preliminaries sr1/1 – sr1 sum/1 schedule no. 2 – preambles sr2/1 – sr2/72 schedule no. 3 – sewage treatment plant system sr3/1 – sr3

PARTICULAR SPECIFICATION

WWF STP & GWTP P.S. 40

type of samples, date of collection, place of collection).

8 After the sewage treatment plant and the grey water treatment plant have

been satisfactorily commissioned, the Sub-Contractor shall continue the

operation and maintenance of the plant in the remaining time of 12 months

guarantee period.

9 All labour, consumable items, spares, tools, special tools, equipment,

instruments, chemicals, laboratory testing services, utilities services, power,

fees, services, transportation, resources, etc. necessary for the 12 months

operation and maintenance of the treatment plants shall be included in the

Contract.

10 During the 12 months Maintenance Period, the Sub-Contractor shall take

samples for water quality test on bi-monthly basis to confirm the

performance stability of the treatment plants. Test reports shall be

submitted to the Employer or his representatives within two weeks after

taking the samples. All costs involved for these tests shall be borne by the

Sub-Contractor. Should the results of any test show that any system fails to

perform to the efficiencies or duties as specified in the Contract; the

Sub-Contractor shall adjust, modify and if necessary replace the associated

equipment at no additional cost and time to the Employer in order that the

required performance of the system can be achieved.

11 At the end of Maintenance Period, a further on-site test ensuring the

performance of the installation shall be carried out by the Sub-Contractor

and any defect found shall be rectified by the Sub-Contractor at his own

cost.

2.12 Training

2.12.1 The Sub-Contractor shall provide training facilities and training courses as

described herein to ensure that the Employer’s staff associated with the project

may acquire full knowledge and appreciation of all aspects of the design, day to

day operation, breakdown and routine maintenance, and fault diagnosis of all plant,

equipment, systems supplies and the user interface application under this Contract.

2.12.2 Training shall be held as appropriate at the Sub-Contractor’s or manufacturer’s

premises and on site. A detailed syllabus for each of the training courses specified

for proposed and the timing of the courses shall be submitted for approval. The

Sub-Contractor shall recommend the desirable qualifications and experience of the

trainees to optimally benefit from the courses.

Page 41 of 85

Page 181: TENDER DOCUMENTS · schedule no. 1 – preliminaries sr1/1 – sr1 sum/1 schedule no. 2 – preambles sr2/1 – sr2/72 schedule no. 3 – sewage treatment plant system sr3/1 – sr3

PARTICULAR SPECIFICATION

WWF STP & GWTP P.S. 41

2.12.3 The Sub-Contractor shall nominate qualified instructors for each of the training

courses and the instructors’ qualifications shall be subject to the prior approval of

the Architect or his representatives.

2.12.4 The Employer will nominated members of his staff or representatives, who will

attend the training courses, and the Sub-Contractor shall allow them reasonable

access to design information, and draft documentation as it becomes available and

shall explain this information and documentation to allow them to become fully

conversant with all aspects of the system.

2.12.5 The Sub-Contractor may use, as may be agreed, plant and equipment being

erected, tested or commissioned for the training of the Employer’s staff. In general,

he shall not use spare parts for this purpose. The Sub-Contractor shall provide

such written or printed matter, functional equipment, samples, models, cut-away

equipment, slides, films and other instructional material as may be necessary for

training. Such equipment and material shall remain the property of the Employer

and shall be sufficient both for the persons trained by the Sub-Contractor and for

those to be subsequently trained by the Employer’s instructors.

2.12.6 The Sub-Contractor shall be deemed to have included the cost of provision of

training facilities as specified in the Contract. However, incidentals such as airfare

and hotel accommodation for the trainees shall be excluded from the Tender Price.

2.13 Spares and Tools

2.13.1 The Sub-Contractor shall arrange to make available for prompt delivery to the Site

before the commencement of the Defect Liability Period such spares and

replacements to ensure continued satisfactory operation of the equipment without

degradation of performance or reliability. The list of major spares and tools is

Appendix D.

2.13.2 In addition to the above, the Sub-Contractor shall submit to the Architect or his

representatives a list describing such other spares and special tools, their number,

price and where appropriate the anticipated frequency of replacement as soon as is

practicable. The list shall be sent in sufficient tie for the Architect or his

representatives to consider and instruct the Sub-Contractor to provide all or part of

such spares and special tools to be available on site before the commencement of

the Maintenance Period. The Architect or his representatives will instruct the

Page 42 of 85

Page 182: TENDER DOCUMENTS · schedule no. 1 – preliminaries sr1/1 – sr1 sum/1 schedule no. 2 – preambles sr2/1 – sr2/72 schedule no. 3 – sewage treatment plant system sr3/1 – sr3

PARTICULAR SPECIFICATION

WWF STP & GWTP P.S. 42

Sub-Contractor as to which of the recommended spares and special tools will be

required and payment will be made separately.

2.13.3 The spares and special tools order shall be, as far as practicable, manufactured at

the same time as the plant. All spares shall be manufactured, works tested

calibrated suitably packed and labeled and delivered to the Site by the

Sub-Contractor.

2.13.4 All special tools or instruments required for the maintenances of the equipment

shall be supplied by the Sub-Contractor in a suitable fitted metal box, with

padlocking facilities, unless otherwise approved by the Architect or his

representatives.

2.14 Defect Liability Period

During the 12 months of Defect Liability Period, the Sub-Contractor shall provide,

without charge, labour and materials for rectifying any defects during this period. The

Sub-Contractor shall dispatch skilled labour to attend the defective equipment with 12

hours. The Sub-Contractor shall provide without charge, routine operation and

maintenance services within this period.

Page 43 of 85

Page 183: TENDER DOCUMENTS · schedule no. 1 – preliminaries sr1/1 – sr1 sum/1 schedule no. 2 – preambles sr2/1 – sr2/72 schedule no. 3 – sewage treatment plant system sr3/1 – sr3

PARTICULAR SPECIFICATION

WWF STP & GWTP P.S. 43

SECTION 3: TECHNICAL REQUIREMENTS FOR SEWAGE

TREATMENT PLANT

3.1 General

3.1.1 The Sub-Contractor shall provide a sewage treatment plant and a grey water

treatment plant include but not limited to collection, transfer and treatment system

with membrane biological reactors with equalization tank, aerobic tank,

disinfection system, backwash system, chemical dosing systems, sludge holding

tank, aeration equipments and all necessary ancillaries / accessories capable of

treating the sewage of 24 m3 per day for the STP and the waste water of 5 m3 per

day for the GWTP at Peter Scott Field Studies Centre, Mai Po. The treated

effluent from the STP shall be transferred to the soakaway pit. And, the treated

effluent from the GWTP shall be reused for flushing purpose. Excess effluent

from the GWTP shall be discharged to the STP.

The quality of the effluent of the sewage treatment system shall meet the

beneficial use of abstraction for potable water supply with flow rate less than or

equal to 100 m3/day and the following minimum requirements:

Parameters Criteria

pH value 6.5 – 8.5

Suspended solids ≤ 10 mg/L

Biological Oxygen Demand ≤ 10 mg/L

Chemical Oxygen Demand ≤ 50 mg/L

Total Residual Chlorine ≤ 1 mg/L

Surfactants (total) ≤ 5 mg/L

E. coli < 100 count /100mL

Oil and grease ≤ 10 mg/L

The quality of the effluent of the grey water treatment system shall meet the water

quality standards for treated grey water effluent as indicated on Technical

Specifications on Grey Water Reuse and Rainwater Harvesting issued by WSD,

2015. The water quality standards for all parameters shall be applied at the

point-of-use of the system.

Page 44 of 85

Page 184: TENDER DOCUMENTS · schedule no. 1 – preliminaries sr1/1 – sr1 sum/1 schedule no. 2 – preambles sr2/1 – sr2/72 schedule no. 3 – sewage treatment plant system sr3/1 – sr3

PARTICULAR SPECIFICATION

WWF STP & GWTP P.S. 44

3.1.2 The sewage and grey water collection, transfer and treatment systems shall be

designed for unmanned operation and shall be able to operate continuously; that is,

24 hours a day and seven (7) days a week. The system shall be designed for at

least ten (10) years’ operating life.

3.1.3 All equipment and materials shall be brand new, of sound workmanship and

robust field-proven design and, as far as practicable, from standard production.

3.1.4 The general mechanical and electrical design of the equipment and particularly

that of the bearings, contacts, and wearing parts shall allow long periods of service

without frequent maintenance and attention being necessary. For the purpose of

this Clause, long periods shall mean a period of not less than 1 year.

3.1.5 The system shall be supplied with an automatic integrated process control system,

which shall comprise, but not be limited to, a PLC-based control system, sensors,

wirings, emergency stop system, automated process optimization system and other

accessories / ancillaries necessary for the control of the sewage and grey water

collection, transfer and treatment processes.

3.1.6 All necessary holding down bolts and other fixings for the installation of the

equipment shall be provided and installed under this Contract. The Sub-Contractor

shall take all necessary site dimensions and shall prepare dimensioned general

arrangement and shop drawings for the each equipment of the sewage treatment

plant for the Employer or his representatives’ approval.

3.1.7 The ingress of protection of the motors to be used in outdoor environment shall be

of at least IP54.

3.2 Sewage and Grey Water Collection

3.2.1 The Sub-Contractor shall provide two (2) sets of submersible sewage transfer

pumps (one-duty-one-standby basis) and two (2) sets of submersible grey water

transfer pumps (one-duty-one-standby basis), an automatic electrical actuator

valve screen system and all associated pipeworks / accessories / ancillaries

necessary for the satisfactory completion of the works to collect sewage from the

underground equalization/retention tank to the sewage treatment plant via the

automatic electrical actuator valve.

Page 45 of 85

Page 185: TENDER DOCUMENTS · schedule no. 1 – preliminaries sr1/1 – sr1 sum/1 schedule no. 2 – preambles sr2/1 – sr2/72 schedule no. 3 – sewage treatment plant system sr3/1 – sr3

PARTICULAR SPECIFICATION

WWF STP & GWTP P.S. 45

3.2.2 The pumps, screen system and blowers shall have adequate capacity to meet the

actual system requirements.

3.2.3 The Sub-Contractor shall submit detailed calculations on the actual required duty

of each pump and the required effective volume of the equalization/retention tank

within TWO (2) weeks from the Date of Commencement of the Works for the

Employer or his representatives’ approval.

3.3 Sewage and Grey Water Treatment

3.3.1 Influent Submersible Pump

(a) The Sub-Contractor shall provide two (2) numbers of influent pumps for the

sewage treatment and two (2) numbers of influent pumps for the grey water

treatment. The pumps shall be suitable for sewage and grey water application

and shall be completed with all pipeworks, stainless steel 316 guiderail, valves

and fittings necessary for the safe operation and maintenance of the pump.

(b) The pumps shall be centrifugal type, complete with its own driven motor. The

pump shall have stable, non-overloading and non-clogging characteristics. The

pump shall be suitable for continuous running with great variation in level of

the tank.

(c) The material of the components of the pumps shall be as follows:

Components Materials

Casing Cast iron to BS EN 1564:2011 Grade 220

Impeller Cast stainless steel Grade 316

Shaft Cast stainless steel Grade 316

Bearing Ball/Ball, no regreasing shall be required until after

3 years of continuous operation

Seals Double mechanical seals in oil bath

Bolt and nuts

Base plate

Stainless steel Grade 316

Steel

Page 46 of 85

Page 186: TENDER DOCUMENTS · schedule no. 1 – preliminaries sr1/1 – sr1 sum/1 schedule no. 2 – preambles sr2/1 – sr2/72 schedule no. 3 – sewage treatment plant system sr3/1 – sr3

PARTICULAR SPECIFICATION

WWF STP & GWTP P.S. 46

(d) The Sub-Contractor shall check and submit the detail calculations on the

actual required duty of each pump within TWO (2) weeks from the Date of

Commencement of the works for the Employer or his representatives’

approval.

(e) Mechanical seals shall be provided to seal off the leakage of sewage from the

pump to the motor

(f) The motor of the pump shall comply with BS 4999 and shall be operated at

the power supply of 3-phase/380V/50Hz.

(g) The motor of the pump shall have its own built-in cooling system which shall

enable the motor to operate continuously at its rated current regardless of

whether the electric motor is above or below the surface of the liquid.

(h) The motor of the pump shall be of squirrel cage, totally enclosed type with

insulation of Class “F" to IEC 60085 : 2007. Enclosure type of IP 68 to IEC

60529:2013 shall be used.

(i) The motor of the pump shall be capable of providing its rated output at rated

speed at any voltage in the range from 95% to 105% of the nominal voltage

and operating continuously at its rated duty without excess temperature rise in

the said range.

(j) The motor of the pump shall also be capable of tolerating a maximum

continuous starting frequency of 12 times per hour without overheating.

3.3.2 Screening

(a) The Sub-Contractor shall provide one set of automatic screening system

completed with electrical actuator plug valve and all associated pipeworks /

accessories / ancillaries necessary for the satisfactory completion of the works

for screening out any coarse solids from the raw sewage and from the grey

water.

(b) The automatic screening system shall be an enclosed system to ensure no

emission of odour from sewage / grey water.

Page 47 of 85

Page 187: TENDER DOCUMENTS · schedule no. 1 – preliminaries sr1/1 – sr1 sum/1 schedule no. 2 – preambles sr2/1 – sr2/72 schedule no. 3 – sewage treatment plant system sr3/1 – sr3

PARTICULAR SPECIFICATION

WWF STP & GWTP P.S. 47

(c) At least THREE (3) successful job references for this type of screen shall be

provided in the tender submission documents.

3.3.3 Membrane Bioreactor System

(d) The Sub-Contractor shall provide of one (1) number of MBR system which

shall comprise one (1) number of aerobic tank, one (1) set of membrane

module, one (1) set of air diffusion system, two (2) numbers of air blowers

(one-duty-one-standby basis) and all associated pipeworks / accessories /

ancillaries necessary for the satisfactory completion of the works.

(e) The Sub-Contractor shall submit detailed calculations on the required

effective volume of the aerobic tank within TWO (2) weeks from the Date of

Commencement of the works for the Employer or his representatives’

approval.

(f) The membrane of the module shall be flat-sheet type and supplied by a

Sub-Contractor supplier who has at least Five (5) years successful experience

in supplying flat-sheet membrane modules for full scale MBR plants

worldwide.

(g) The material of membrane module’s frame shall be made up of (PE)

Polyethylene while diffuser and permeate water manifold shall be Polyvinyl

Chloride (PVC) or lateral reinforced material. The material of membrane shall

be Polyether Sulfone (PES) with 0.04m pore size and suitable for the design

environment without damage.

(h) In order to save energy, the aeration diffuser associated with the proposed

membrane module shall be the medium pore size diffuser with the specific

aeration capacity of 0.4 – 0.6m3/m2/hr. No additional diffuser is required for

biological degradation.

(i) The Design Operating Flux of membrane module shall be in the range of

8-15L/m2/hr. and max. flux shall not be larger than 25L/m2/hr.

Page 48 of 85

Page 188: TENDER DOCUMENTS · schedule no. 1 – preliminaries sr1/1 – sr1 sum/1 schedule no. 2 – preambles sr2/1 – sr2/72 schedule no. 3 – sewage treatment plant system sr3/1 – sr3

PARTICULAR SPECIFICATION

WWF STP & GWTP P.S. 48

3.3.4 Effluent Pump

(a) The Sub-Contractor shall provide two (2) numbers of effluent pumps for the

STP and two (2) numbers of effluent pumps for the GWTP. The pumps shall

be suitable for transferring treated sewage and grey water application and shall

be completed with all pipeworks, valves and fittings necessary for the safe

operation and maintenance of the pump.

(b) The pumps shall be centrifugal type, complete with its own driven motor. The

pumps shall have stable, non-overloading and non-clogging characteristics.

The pumps shall be suitable for continuous running with great variation in

level of the tank.

(c) The Sub-Contractor shall check and submit the detail calculations on the actual

required duty of each pump within TWO (2) weeks from the Date of

Commencement of the works for the Employer or his representatives’

approval.

(d) Mechanical seals shall be provided to seal off the leakage of treated sewage

from the pump to the motor

(e) The motor of the pump shall also be capable of tolerating a maximum

continuous starting frequency of 12 times per hour without overheating.

3.3.5 Air Blowers

(a) The Sub-Contractor shall provide two (2) sets of air blowers (on

one-duty-one-standby basis) for supplying air to the membrane modules for

the STP and the GWTP.

(b) Each air blower supplied and installed under this Contract shall be suitable for

sewage and grey water applications and shall be complete with motor, air

compressor, variable speed drives, inlet & outlet silencers, check valve, safety

valve, pressure gauge, acoustic & weather closure etc. all pipeworks, valves

and fittings necessary for the safe operation and maintenance of the blower.

Page 49 of 85

Page 189: TENDER DOCUMENTS · schedule no. 1 – preliminaries sr1/1 – sr1 sum/1 schedule no. 2 – preambles sr2/1 – sr2/72 schedule no. 3 – sewage treatment plant system sr3/1 – sr3

PARTICULAR SPECIFICATION

WWF STP & GWTP P.S. 49

(c) Each air blowers shall have capacity and head to provide sufficient delivery air

for the MBR system.

(d) The air blower shall be of three-lobed type, air-cooled, rotary type and

automatic operation.

(e) Each air blower shall be suitable for 24-hours operation and shall be operated

at 3-phase/380V/ 50Hz.

(f) The air blower shall be capable of providing sufficient free air delivery for the

process requirements and with sufficient pressure to cater for the total friction

loss of the system. The Sub-Contractor shall check and submit the detailed

calculations on the required capacity of each air blower within two (2) weeks

from the Date of Commencement of the works for the Employer or his

representatives’ approval.

(g) The air blowers shall be provided with a stainless steel 316 enclosure with

internal acoustic lining. The noise level measured at 1m away from the air

blower shall not exceed 50 dB(A).

3.3.6 pH Adjustment System

(a) The pH adjustment system shall be completed with one (1) number of

chemical storage tank, online pH meter, two (2) set of chemical dosing pumps

(on one-duty-one-standby basis) and all associated pipeworks / accessories /

ancillaries necessary for the satisfactory completion of the works for the STP

and the GWTP.

3.3.7 Surplus Sludge Pumps

(a) The Sub-Contractor shall provide Two (2) numbers of surplus sludge

discharge pumps for transferring the surplus activated from the STP and the

GWTP. The Sub-Contractor shall check and submit the detail calculations on

the actual required duty of each pump within TWO (2) weeks from the Date of

Commencement of the works for the Employer or his representatives’

approval.

Page 50 of 85

Page 190: TENDER DOCUMENTS · schedule no. 1 – preliminaries sr1/1 – sr1 sum/1 schedule no. 2 – preambles sr2/1 – sr2/72 schedule no. 3 – sewage treatment plant system sr3/1 – sr3

PARTICULAR SPECIFICATION

WWF STP & GWTP P.S. 50

(b) The sludge holding tank and all associated pipeworks / accessories / ancillaries

necessary for the satisfactory completion of the works.

(c) The sludge transfer pump shall be suitable for sludge transfer applications and

the Sub-Contractor shall check and submit the detailed ca1culations on the

actual required duty of each sludge transfer pump within two (2) weeks from

the Date of Commencement of the works for the Employer or his

representatives’ approval.

3.3.8 Sludge Holding Tank

(a) The Sub-Contractor shall provide one (1) number of sludge holding tank for

holding of surplus sludge and all associated pipeworks / accessories /

ancillaries necessary for the satisfactory completion of the works.

(b) The underground sludge holding tank shall be done by the Main Contractor.

3.3.9 Disinfection System

(a) The Sub-Contractor shall provide two (2) sets of Ultra Violet (UV)

disinfection system and all associated pipeworks / accessories / ancillaries

necessary for the satisfactory completion of the Works for the STP and the

GWTP.

(b) The UV disinfection system shall be enclosed pressurized pipe type. The

effluent will be treated by the UV light as it passes through AFP (Advanced

Fluoropolymer) tubing within the unit. The UV system shall comprise of UV

chamber, mercury vapor lamps, hour meter and all necessary controls.

Failure of any individual lamp shall not affect the operation of the other lamps.

The UV chamber shall contain AFP tubes and all wetted parts shall be

non-degardable ABS/PVC.

(c) No ozone shall be generated during the operation of the UV disinfection

system.

(d) The UV disinfection system shall be suitable to operate with 220v/380v, 50Hz

power supply.

Page 51 of 85

Page 191: TENDER DOCUMENTS · schedule no. 1 – preliminaries sr1/1 – sr1 sum/1 schedule no. 2 – preambles sr2/1 – sr2/72 schedule no. 3 – sewage treatment plant system sr3/1 – sr3

PARTICULAR SPECIFICATION

WWF STP & GWTP P.S. 51

(e) A visual alarm signal shall be displayed on the control panel of the STP the

GWTP and a SMS signal shall be generated in case of failure of UV

disinfection system.

(f) One duty and one standby UV disinfection system with automatic changeover

upon unit failure shall be provided.

3.3.10 Clean in Place System

(a) The clean in place system shall comprise one (1) set of backwash pumps, one

(1) number of chemical storage tank and all associated pipeworks / accessories

/ ancillaries necessary for the satisfactory completion of the Works for STP

and the GWTP.

3.3.11 Electromagnetic Flowmeter

(a) The electromagnetic flowmeter shall be complete with a sensor tube, a

transmitter unit, an electrode cleaning unit and all other ancillary equipment

including power and signal cabling, etc for the STP and the GWTP.

(b) The stainless steel protection flange shall be installed upstream of the sensor

tube for protection of liners against damage and for grounding the system.

(c) The transmitter shall be protected to IP67 and shall give analogue current

output signals of 4-20 mA. The transmitter shall have pulse output for the

connection of flow counters. It shall indicate zero or have its output to

remain at 4 mA on the occurrence of a reverse flow.

(d) Operation of the cleaning unit shall not affect the output of the flowmeter.

(e) The sensor tube shall be supplied and installed complete with necessary

pipework and fittings. Independent supporting cradles shall be provided for

the sensor tube and flange adapters shall be fitted to facilitate the removal of

the sensor tube from the pipeline concerned.

Page 52 of 85

Page 192: TENDER DOCUMENTS · schedule no. 1 – preliminaries sr1/1 – sr1 sum/1 schedule no. 2 – preambles sr2/1 – sr2/72 schedule no. 3 – sewage treatment plant system sr3/1 – sr3

PARTICULAR SPECIFICATION

WWF STP & GWTP P.S. 52

3.3.12 Hydrostatic level sensor

(a) The measuring range shall cover to max. water depth for the application of

STP and the GWTP/

(b) The hydrostatic level sensor shall be suitable for application in contaminated

floodwater and sewage and shall be able to operate normally even after being

maintained in dry conditions for a long time. Each set of the sensor shall

comprise one sensor and one transmitter.

(c) The design of the hydrostatic level sensor shall allow for maintenance staff to

lift the sensor body/head for calibration, cleansing and maintenance.

(d) The sensor probe shall be complete with stainless steel 316 body and extension

tube, probe head/holder and all other ancillary fittings. A rigid plastic tube

shall be provided to protect and hold the sensor body.

(e) The sensor body, tube and its holder shall form a rigid structure such that

turbulence in the water will not affect the measurement.

(f) The whole installation shall be suitable for the applications where large ripples

are present on the water surface or the flow is extremely turbulent.

(g) The transmitter shall have an analogue signal transmission of current outptut

(4-20 mA) proportional to the water level and the output signal shall be

transmitted to PLC or other control systems.

(h) The transmitter shall have a digital display to indicate the current water level

in mPD. The transmitter shall also have diagnostic facilities to detect the

failure of the sensor and the transmitter itself.

(i) The transmitter shall have at least IP65 protection.

3.3.13 Pipework, Fittings and Valves

(a) All pipeworks, fittings and valves shall be constructed of stainless steel 316 if

they directly contact with the raw sewage. The Sub-Contractor shall submit

the details including the sizing calculations of pipeworks, fittings and valves

Page 53 of 85

Page 193: TENDER DOCUMENTS · schedule no. 1 – preliminaries sr1/1 – sr1 sum/1 schedule no. 2 – preambles sr2/1 – sr2/72 schedule no. 3 – sewage treatment plant system sr3/1 – sr3

PARTICULAR SPECIFICATION

WWF STP & GWTP P.S. 53

within two (2) weeks from the Date for Commencement of the works for the

Employer or his representatives’ approval.

(b) Other pipeworks, fittings and valves shall be UPVC, galvanized steel or other

materials as approved by the Employer or his representatives. The pipeworks,

fittings and valves used under this Contract shall also be suitable for treated

sewage and grey water applications. The Sub-Contractor shall submit the

details including the sizing calculations of pipeworks, fittings and valves

within two (2) weeks from the Date for Commencement of the works for the

Employer or his representatives’ approval.

(c) Flexible joints shall be provided at appropriate locations for ease of assembly

and future maintenance. Each flexible coupling shall be provided with flanged

spigot and stainless steel tie bars.

(d) The Sub-Contractor shall provide adequate supports, fixing and anchorage

system for all pipeworks under this Contract to the satisfaction of the

Employer or his representatives. All pipe supports and anchorage system shall

be made of hot dipped mild steel.

(e) All drainpipes shall be completed with appropriate rating isolation valve for

maintenance purposes.

(f) The Sub-Contractor shall conduct site hydrostatic test for the effluent re-use

distribution system in the presence of the Employer or his representatives’

representatives.

3.3.14 Control and Monitoring system of the sewage treatment plant and the grey water

treatment plant

(a) The Sub-Contractor shall provide a complete set of control system which shall

comprise all control panels, control equipment, controllers, sensors, flow

meters, control wirings, cables, conduits, hardware, software, accessories and

ancillaries necessary for the automatic control and monitoring, and safe

operation of the equipment supplied and installed under this Contract. The

control system for the sewage treatment plant and the grey water treatment

plant shall be completed with programmable logic controllers (PLCs) with the

input/output points necessary for the automatic control and safe operation of

Page 54 of 85

Page 194: TENDER DOCUMENTS · schedule no. 1 – preliminaries sr1/1 – sr1 sum/1 schedule no. 2 – preambles sr2/1 – sr2/72 schedule no. 3 – sewage treatment plant system sr3/1 – sr3

PARTICULAR SPECIFICATION

WWF STP & GWTP P.S. 54

the treatment plants. The Sub-Contractor shall design and submit the control

logics as well as the control circuitry of all the equipment for the sewage

treatment plant and the grey water treatment plant one month from the Date for

Commencement of the works for the Employer or his representatives’

approval.

(b) The Programmable Logic Controller (PLC) in the MBR control panel shall be

complete with main isolation switch, motor starters, human-machine

interfacing panel and other necessary control and monitoring devices. The

construction of the control panel shall be hair-lined stainless steel grade 316

with 1.5 mm in thickness and have protection to IP 55 or above. The MBR

control panel shall be equipped with necessary instrumentations, such as

buzzer, indication lamp, lamp test button, overflow alarms/high level alarms

for all tanks, meters to indicate the current/voltage, other essential operating

and warning/alarm status of the plant and etc. All signals and status shall be

able to record for future retrieval. The control panel shall be able to display all

signals and status. A Human-man-interface (HMI) color touch screen shall

be installed on the control panel for ease of changing of system parameters.

(c) All SMS Signals shall be sent back to the Sub-Contractor office and

monitored/recorded by sophisticated web-based software with data logging

capability.

(d) The on-line instruments to monitor the plant operation shall include level

sensor, pH meter, trans-membrane pressure meter…etc.

(e) Sufficient interfacing points shall be provided for the building automation

system integration. The interfacing points shall include, but not limited to the

status of the plant operation, the volume of waste and waste water generated,

the volume of effluent generated from the plants, the performance data, the

parameters of the effluents quality. The performance data shall be capable for

graphic display in the screen.

Page 55 of 85

Page 195: TENDER DOCUMENTS · schedule no. 1 – preliminaries sr1/1 – sr1 sum/1 schedule no. 2 – preambles sr2/1 – sr2/72 schedule no. 3 – sewage treatment plant system sr3/1 – sr3

PARTICULAR SPECIFICATION

WWF STP & GWTP P.S. 55

SECTION FOUR: TECHNICAL REQUIREMENTS FOR THE ELECTRICAL

WORKS

4.1 General

(a) The electrical installation shall comply with General Specification for

Electrical Installation in Government Buildings of the Hong Kong Special

Administrative Region, the latest edition, and IEE Wiring Regulations. If the

existing power supply is not suitable, the Sub-Contractor shall modify the

circuits at no extra cost to suit equipment offer.

(b) All the equipment supplied shall be suitable for operation on electrical supply

of 380V, 3-phase, 4 wire at 50Hz or 220V, single phase, 50Hz. All electrical

installations including electric motor and controls shall be suitable for use with

the aforesaid electricity supply. Supply and installation of all necessary

accessories including cables, MCB distribution boards, MCBs, starters,

contactors, junction box, etc. required for the connection of the equipment to

the power supply points shall be provided by the Sub-Contractor.

(c) All electrical testing of the installation shall be carried out by the

Sub-Contractor and witnessed by the Employer or his representatives. Any

material or workmanship found not comply with the regulations specified

above shall be rectified and completed in a satisfactory manner by the

Sub-Contractor at no extra cost to the Employer.

(d) All components, including all terminals on switchgear and motors shall be

fully labeled in both English and Chinese to provide positive identification to

the approval of the Employer or his representatives.

(e) All terminal boxes shall be fully sealed and cable entries to and from these

terminals shall be effectively sealed.

(f) Power & control cables shall be of XLPE/SWA/PVC copper and PVC/PVC

copper types with approved gland terminals and shall be supported by

galvanized perforated cable trays or trunking fixed onto the walls or floors.

(g) All wiring shall be run in conduits/trunking. Conduits / trunking shall be

installed in such a way as not to cause obstruction to water pipes, drainage

Page 56 of 85

Page 196: TENDER DOCUMENTS · schedule no. 1 – preliminaries sr1/1 – sr1 sum/1 schedule no. 2 – preambles sr2/1 – sr2/72 schedule no. 3 – sewage treatment plant system sr3/1 – sr3

PARTICULAR SPECIFICATION

WWF STP & GWTP P.S. 56

pipes and other services. Cable routes shall be approved by the Employer or

his representatives.

(h) Electrical supply and distribution system shall comply with IEE Wiring

Regulations, Electricity Ordinance, Supply Rules and Installation Guide Book

of the power supply company. In particular, it shall conform to the latest

edition of the General Specification for Electrical Installation in Government

Buildings of the Hong Kong Special Administrative Region published by the

Architectural Services Department.

(i) The Sub-Contractor shall submit the electrical loading requirements of all the

equipment/facilities to be supplied and installed under this Contract within two

weeks from the Date for Commencement of the works. The Sub-Contractor

shall provide all cablings, wirings, earthing, busbar chambers, control gears,

switchgears, MCCB / fuseswitch / switchfuse / isolator / MCB / RCCB units,

switchboards and distribution boards of suitable ratings for the connection of

supply to the all equipment and facilities supplied and installed under this

Contract.

(j) The Sub-Contractor shall be provided permanent electricity power supplies

necessary for the operation of the equipment/facilities provided under this

Contract from the power company. The Sub-Contractor shall closely

coordinate with all relevant parties for the corresponding installation to the full

satisfaction of the Employer or his representatives.

(k) All wirings and cables shall have their respective insulation be properly

coloured in accordance with IEE Wiring Regulations, to facilitate the ease of

identification of the corresponding phases, functions or ways. Similarly,

suitable permanent labels shall be provided on all light switches and power

points for the phase identifications.

(l) The Sub-Contractor shall supply and installation all switchgears, bus bar

chambers (BBC), MCCB boards, MCB boards, contactors and other

components necessary for the completion of the distribution system. The

interconnecting PVC cables between all the switchgears, BBC boards and

other components for the electricity supply to all loading as specified in the

Specification and shown on the Drawings shall be supplied and installed by

the Sub-Contractor.

Page 57 of 85

Page 197: TENDER DOCUMENTS · schedule no. 1 – preliminaries sr1/1 – sr1 sum/1 schedule no. 2 – preambles sr2/1 – sr2/72 schedule no. 3 – sewage treatment plant system sr3/1 – sr3

PARTICULAR SPECIFICATION

WWF STP & GWTP P.S. 57

4.2 Moulded Case Circuit Breaker (MCCB) and MCCB Distribution Board

(a) The MCCB shall be of four pole, triple pole or double pole as indicated in the

Drawings.

(b) The MCCB shall be totally enclosed in a moulded casing formed from an

insulating material. The construction of the casing shall be capable of

withstanding the appropriate rated short circuit current and reasonably rough

use without fracture or distortion. The moulded casing shall have an ingress of

protection not less than IP30.

(c) The enclosure of the MCCB Distribution Board shall be constructed from steel

sheet having a thickness of not less than 1.5mm.

(d) The MCCB Distribution Board shall each be provided with a moulded-case

isolating switch having a current rating not less than that of the supply side

protection device.

4.3 Miniature Circuit Breaker (MCB) and MCB Distribution Board

(a) The MCB shall be of four pole, triple pole, double pole or single pole as

indicated in the Drawings.

(b) The MCB shall be totally enclosed in a moulded insulating case for safe use by

unskilled people and also designed to be maintenance free.

(c) Overall dimensions and fixing centres for the same range of MCB shall be

identical and suitable for fixing individually to a metal back plate or directly

mounted inside a manufacturer’s designed distribution metal box.

(d) Cable terminals of the MCB shall be at top and bottom of the units with access

from front, and suitable for terminating the size of solid or stranded conductor

in accordance with Table 5 of IEC 60898-1 : 2015 / Corr 1:2015.

(e) MCB with current carrying contacts of plug-in type shall not be acceptable.

(f) Contacts of the MCB shall be of non-weld type.

Page 58 of 85

Page 198: TENDER DOCUMENTS · schedule no. 1 – preliminaries sr1/1 – sr1 sum/1 schedule no. 2 – preambles sr2/1 – sr2/72 schedule no. 3 – sewage treatment plant system sr3/1 – sr3

PARTICULAR SPECIFICATION

WWF STP & GWTP P.S. 58

(g) The enclosure of a MCB distribution board shall be constructed from sheet

steel having a thickness of not less than 1.2mm. The ingress of protection for

the enclosure with the functional units and blanking plates fitted shall be at

least IP41.

4.4 Residual Current Operated Circuit Breaker (RCCB)

(a) RCCB shall be of double pole or four pole, type tested to IEC 61008-1:2006.

Unless otherwise specified, the rated residual operating current shall be 30mA,

and the minimum rated short circuit breaking capacity shall be 3kA. The rated

continuous current shall be at least 80A.

(b) The casing of an RCCB shall be formed from insulating material designed to

withstand reasonable rough usage.

4.5 Switch, Fuseswitches, Switchfuses and Disconnectors

(a) Switches, fuseswitches, switchfuses and disconnectors shall comply with and

be tested to IEC 947-3 and shall have rating not less than those shown in the

Drawings or as specified. They shall be of four pole type capable of carrying

continuously and making and breaking their rated current without overheating

or damaging. They shall also have air-break type contacts which are designed

for uninterrupted duties.

(b) Switches and disconnectors shall be of the quick make and quick break type.

The switching mechanism shall be of independent manual operation with

suitable means such as accelerating springs.

(c) The enclosure shall be of totally enclosed type, made of heavy gauge sheet

metal, adequately rust and dust protected, and finished in enamel. An earthing

terminal shall be provided. The front cover shall be mechanically interlocked

to prevent any possible access to the interior parts of the unit when the

contacts are in the closed position, and to prevent the contacts from being

switched to close when the front cover is opened. However, facilities shall be

provided to allow the checking of the contact alignments. The fasterning

devices for the front cover shall be of captive type. The contacts shall be

self-aligning so that contact pressure can be maintained at all times. All live

parts shall be adequately shielded from the front of the unit but easily

Page 59 of 85

Page 199: TENDER DOCUMENTS · schedule no. 1 – preliminaries sr1/1 – sr1 sum/1 schedule no. 2 – preambles sr2/1 – sr2/72 schedule no. 3 – sewage treatment plant system sr3/1 – sr3

PARTICULAR SPECIFICATION

WWF STP & GWTP P.S. 59

accessible for maintenance by using a tool.

(d) Fuses shall be of the HRC type to BS 88, Utilization Category gG. The

dimension of the fuse links shall be standardized in accordance with Table 2 of

BS88: Part 2.

4.6 Metering and Current Transformers

(a) Instruments and meters shall be provided as shown in the Drawings, as

specified, or where necessary for the proper operation and maintenance of the

system.

(b) Instruments and meters shall be of the flush mounted pattern, with bezels black

finished, positioned on the front of the penal.

(c) Ammeter and voltmeter shall be of moving iron type, moving magnet type or

moving coil with transducer type complying with the relevant parts of IEC

60051 series (including IEC 60051-1:1997 to IEC

60051-9:1988/ADM2:1995). The accuracy class shall be 2.5 or better in

accordance with the relevant parts of IEC 60051 series. The dial shall have a

nominal diameter of 100mm and shall have a total scale of deflection of 240O

for ammeter and voltmeter.

(d) Current transformers for measurement shall comply with IEC 61869-2:2012.

The accuracy class shall be 1 in accordance with IEC 60044-1:2003.

4.7 Cabling

(a) Power cables shall be of XLPE insulated with steel wire armoured, PVC

sheathed, copper cable, to BS 5476. The Sub-Contractor shall submit the

information of the power cables for the Employer or his representatives’

approval.

(b) All power cables shall be installed properly with the appropriate configuration,

spacing, bending radii, etc. All power cables shall be fixed with cable cleats or

saddles and labelled. All power cables shall be terminated properly with

suitable termination kits. All power cables shall be properly protected from

mechanical damage and other environmental effect.

Page 60 of 85

Page 200: TENDER DOCUMENTS · schedule no. 1 – preliminaries sr1/1 – sr1 sum/1 schedule no. 2 – preambles sr2/1 – sr2/72 schedule no. 3 – sewage treatment plant system sr3/1 – sr3

PARTICULAR SPECIFICATION

WWF STP & GWTP P.S. 60

(c) Instrumentation cables shall be PVC insulated copper cables in multi-core and

multi-pair construction, with screens, with or without single wire armour as

appropriate. Instrumentation cables shall comply with BS 5308. Minimum

conductor size shall be 1.5 mm2.

4.8 Consumer Unit

(a) The consumer unit shall be constructed from sheet steel having thickness of

not less than 1.2 mm, intended for use in installations with a total capacity of

not greater than 100A single phase and neutral. It shall be suitable for

assembly of one or more MCB, RCCB or all insolating switch.

(b) The consumer unit shall comply with BS5486 : Part 13.

(c) The ingress of protection for the enclosure shall be at least IP41 with all

functional units and blanking plates fitted.

4.9 Contactors and Motor Starters

(a) Contactors shall be electromagnetically controlled, double air-break type with

four pole, triple pole, double pole or single pole contacts. They shall comply

with and be type tested to IEC 60947-4-1

(b) Motor starter shall be of air-break triple pole electromagnetic type and shall

also comply with IEC 60947-4-1:2009 or IEC 62271-106:2011/CORR 1:2014.

(c) Each starter shall comprise an isolating device, a thermal overload protective

device, main and auxiliary contacts, on / off controls and indicators.

(d) The motor starter shall be direct-on-line type for motor having a nominal

rating of 3kW or below. Star-delta or other approved type assist-started motor

starter shall be used for motor having a rating greater than 3kW or where

stipulated in the Specification.

(e) Apart from the starting contactors, each motor starter/starting circuit shall

include, but not be limited to, the following –

Page 61 of 85

Page 201: TENDER DOCUMENTS · schedule no. 1 – preliminaries sr1/1 – sr1 sum/1 schedule no. 2 – preambles sr2/1 – sr2/72 schedule no. 3 – sewage treatment plant system sr3/1 – sr3

PARTICULAR SPECIFICATION

WWF STP & GWTP P.S. 61

i. Auto/Off/Manual control lockable key selector switch,

ii. Push buttons for manual 'start' and 'stop' control and 'fault reset'

iii. "Running', 'Stop' and 'Fault' indication lamps;

iv. Hour-run indicator;

v. Thermal overload units complete with ambient temperature compensation

and phase failure protection with manual reset push button;

vi. Positive temperature coefficient thermistor associated control relay;

vii. Moisture detector control relay;

viii. Adjustable timers labelled with designed time settings for control;

ix. Panel heater and thermostat;

x. “240 degree” deflection voltmeters complete with selector switch, control

fuses and associated wirings to facilitate direct reading of phase voltages and

line voltages; and

xi. “240 degree” deflection ammeter with maximum deflection indicator

complete with selector switch and associated wirings for reading the phase

current directly.

(f) Each starter shall be housed in a separate compartment or enclosure and be

completely isolated by means of an isolating switch interlocked with the starter

door or cover to allow access only when the isolator is open. The isolating

switch shall be operated by means of an external handle and shall have

provision for padlocking in the `OFF' position.

(g) Individual motor start/stop control circuit shall be powered from the

downstream of the isolator for the relevant pump whereas the control circuit

for the relevant pump will be dead when the corresponding isolator is switched

off. Any components/terminals remain live after this switch, even when this

switch has been opened, shall be adequately shrouded and have warning labels

attached thereto.

(h) The isolator shall be capable of carrying normal continuous full load current of

the contactor and shall be rated for breaking stalled motor current duty as

specified in IEC 60947-4-1:2009 or IEC 62271-106:2011/CORR 1:2014.

(i) Suitably rated HBC fuses (to BS 88) and/or other short circuit protective

devices (SCPD) shall be provided with the starter to limit the fault let through

to a value within the rating of the starter components and any other protective

overload devices shall be arranged to ensure that any such fault is cleared by

Page 62 of 85

Page 202: TENDER DOCUMENTS · schedule no. 1 – preliminaries sr1/1 – sr1 sum/1 schedule no. 2 – preambles sr2/1 – sr2/72 schedule no. 3 – sewage treatment plant system sr3/1 – sr3

PARTICULAR SPECIFICATION

WWF STP & GWTP P.S. 62

the SCPD. Coordination of the starter with the SCPD shall be type "b" as

defined in Appendix C of BS EN 60947-4-1. All SCPD shall be suitable for a

prospective short circuit current of 43.1 kA at 380V.

(j) Each starter shall be provided with an adjustable motor overload protection

device suitable for the motor load and having manual resetting facilities. The

manual reset shall be via a button mounted on the front of the panel. For

motors rated 50 kW and above, protective relays shall be provided to protect

the motor against damage when subjected to overload, single phasing or phase

unbalance conditions and earth fault condition.

(k) The relays shall have ambient temperature compensation. For motors provided

with thermistors, one thermistor control relay shall be provided which shall

lock out on occurrence of a fault, and be connected to the associated alarm and

indication system of the starter. Reset facilities shall also be provided. Under

voltage release shall be provided where this is not inherent in the control

circuit.

(l) Anti-condensation heaters shall be provided and wired from terminals in

conjunction with the compartment heater and motor contactor auxiliary

contacts such that the heaters shall be off when the motor is running and on

when the motor is stopped.

(m) Visual indicators mounted on the front of each starter shall be provided for the

following –

(n) Ammeter for loads over 7.5 kW with suitable current transformers and phase

selection switch.

(o) A cyclometer type `hours run' indicator having a 4 digit flush fascia driven by

a synchronous motor to show the hours run by the drive motor.

(p) "Supply On" (Green), "Motor Running" (Green), "Motor Stop" (Red) and

"Motor Tripped" (Amber) lamps.

Page 63 of 85

Page 203: TENDER DOCUMENTS · schedule no. 1 – preliminaries sr1/1 – sr1 sum/1 schedule no. 2 – preambles sr2/1 – sr2/72 schedule no. 3 – sewage treatment plant system sr3/1 – sr3

PARTICULAR SPECIFICATION

WWF STP & GWTP P.S. 63

4.10 Labelling

(a) The Sub-Contractor shall be responsible for providing all necessary labels and

permanent instructions for any equipment and system supplied and installed

under this Contract.

(b) The labels shall be of the laminated Traffolyte type engraved in English and

the local language. Identification shall comply with BS 1710:1971. The format

and the material used for the labels shall be approved by the Employer or his

representatives.

Page 64 of 85

Page 204: TENDER DOCUMENTS · schedule no. 1 – preliminaries sr1/1 – sr1 sum/1 schedule no. 2 – preambles sr2/1 – sr2/72 schedule no. 3 – sewage treatment plant system sr3/1 – sr3

PARTICULAR SPECIFICATION

WWF STP & GWTP P.S. 64

SECTION FIVE : GENERAL REQUIREMENTS FOR WORKS

5.1 Unless otherwise stated, all metal part of the equipment in contact with sewage

and/or screenings/grit shall be made of stainless steel 316. Notwithstanding this, all

metal parts of the equipment not in contact with sewage/screenings/grit but forming

the same functional piece/integral part of the equipment in contact with or in close

proximity to sewage/screenings/grit shall also be of stainless steel 316.

5.2 All electrical and mechanical safety devices and the corresponding circuits such as

alarm/trip circuits for overload, overspeed, high temperature, high pressure etc.

Recommended by the equipment manufacturers shall be provided by the

Sub-Contractor.

5.3 All cables, including those in trenches, not enclosed inducts or conduits shall be

clipped on cable trays except cables in special situations and approved by the

Architect or his representatives.

5.4 All junction boxes shall be of the weatherproof type.

5.5 Surface Treatment and Painting of Metalwork.

5.5.1 Protection Against Corrosion

(a) All steelwork except stainless steel 316 supplied in this Contract shall be

protected against corrosion unless otherwise specified. The protective

treatment shall be in accordance with the recommendations of the relevant

British Standards and as specified in this Clause unless otherwise specified.

(b) Steel surfaces except stainless steel 316 shall be blast cleaned to first quality to

BS 7079: Part A1. This shall be followed by a coat of suitable etching primer

of thickness 30 micros, one heavy duty undercoat and two appropriate top

coats to be approved by the Architect or his representatives. The total dry film

thickness of the undercoat and top coat shall not be less than 0.3mm. The

Sub-Contractor shall provide all necessary instruments for the measurement of

coating thickness.

(c) When two dissimilar metals, one electro-negative to the other, are placed in

contact and exposed to moisture, a suitable in contact and exposed to moisture,

Page 65 of 85

Page 205: TENDER DOCUMENTS · schedule no. 1 – preliminaries sr1/1 – sr1 sum/1 schedule no. 2 – preambles sr2/1 – sr2/72 schedule no. 3 – sewage treatment plant system sr3/1 – sr3

PARTICULAR SPECIFICATION

WWF STP & GWTP P.S. 65

a suitable insulating material shall be placed between these two metals to

prevent corrosion arising from galvanic action.

(d) Surfaces of casting, steelwork, piping and plant which are to be in direct and

permanent contact with concrete shall be left unpainted or covered, prior to

dispatch from the Sub-Contractor’s premised, with a substantial coating of

Portland cement wash or other approved proprietary coating plus a lapping of

impregnated paper/Hessian tape as agreed and approved by the Architect or his

representatives.

(e) Steelwork enclosed in brickwork shall be wire-brushed and given at least two

coats of bitumen or tar paint with a minimum total dry film thickness of

125um. This also applies to steelwork that is encased in boarding, plaster of

other materials in such a way as to leave a space around it.

(f) Contact surfaces of joints made with friction grip bolts shall be left unpainted.

Any paint that has previously been applied shall be removed by blast cleaning.

When painted fabricated materials are stored before erection, they shall be kept

clear of the ground and be laid out or stacked in and orderly manner that will

ensure that no pools of water can accumulate on the surfaces. Suitable packing

shall be laid between the layers of stacked materials. When temporary covers

arc used, proper ventilation shall be provided.

(g) Any deterioration or damage to the protective coatings and/or previous paints

during transportation, handling, storage, assembly or erection shall be made

good to the satisfaction of the Architect or his representatives.

5.5.2 Protective Coating System

(a) All steel surface shall be properly treated prior to coating application. For the

steel work to be hot-dip galvanized, it shall be properly degreased, pickled and

pro-fluxed before hot-dip galvanizing. For the steel work to be zinc sprayed, it

shall be sand-blasted to minimum Sa 2 1/2 before zinc spraying. The surface

treatment shall conform, but not limited, to the followings:-

BS5493 - Code of Practice for Protective Coating of Iron and Steel

Structure against corrosion

Page 66 of 85

Page 206: TENDER DOCUMENTS · schedule no. 1 – preliminaries sr1/1 – sr1 sum/1 schedule no. 2 – preambles sr2/1 – sr2/72 schedule no. 3 – sewage treatment plant system sr3/1 – sr3

PARTICULAR SPECIFICATION

WWF STP & GWTP P.S. 66

BS729 - Hot-dip Galvanized Coatings on Iron and Steel Articles

BS7079 - Preparation of steel substrates before application of paints

and related products.

BS3900 - Determination of Dry Film Part 5 Thickness Articles

(b) The coating system to be selected shall be appropriate to the prevailing critical

conditions and circumstances and shall be in accordance with the

recommendations in BS5493.

(c) The Sub-Contractor shall submit to the Architect or his representatives for

approval frill details of the protective systems he proposes to use. The details

shall include:-

i. Surface treatment before painting (for example, zinc spray details);

ii. Name and place of manufacturer of paint;

iii. Method of application of each coat (i.e. brush, roller, spray etc.);

iv. Conditions under which paint will be applied i.e. shop or site, and

overcoating times;

v. Manufacturer’s data sheet giving type and composition of each paint, and

giving any additional requirements e.g. pot life storage requirements. A

sample painted steel panel not less than 200mm x 200mm shall be submitted

to the Architect or his representatives for approval before any paint is applied.

The approved sample(s) will be retained by the Architect or his

representatives for comparison with the painted steelwork. Any steel surface

not painted to the requirement specified when compared with the given

sample shall be remedied to the satisfaction of the Architect or his

representatives.

(d) The temperature and relative humidity for painting shall lie within the range

recommended by the paint manufacturer. A protective coating shall not be

applied to surfaces bearing atmospheric corrosion products, other chemicals,

metallic dust or particles of grit. These contaminants, which include any

remaining after surface preparation, any while rust of zinc on coated surface

preparation, and produced by welding, shall be cleaned off to an extent agreed

by the Architect or his representatives.

Page 67 of 85

Page 207: TENDER DOCUMENTS · schedule no. 1 – preliminaries sr1/1 – sr1 sum/1 schedule no. 2 – preambles sr2/1 – sr2/72 schedule no. 3 – sewage treatment plant system sr3/1 – sr3

PARTICULAR SPECIFICATION

WWF STP & GWTP P.S. 67

(e) All colours shall be a standard range and shall be chosen and applied in

accordance with BS4800 to the requirements of the Architect or be applied

late.

(f) Welded spatter shall be cleaned off surfaces and paint films shall be free of

embedded foreign metallic particles. Deposits of concrete or other adherent

matter shall be washed or cleaned off immediately and if necessary the surface

shall be made good to the satisfaction of the Architect or his representatives.

(g) Upon request in writing by the Architect or his representatives, a

paint-application procedure trial shall be conducted at the expense of the

Sub-Contractor.

(h) The coating thickness shall be determined by the use of properly calibrated

dry-film thickness gauge, The Sub-Contractor shall keep at least one thickness

gauge on the job at all times, with calibration equipment, for use by the

Architect or his representatives.

5.5.3 Pipe work and Valves

(a) The Sub-Contractor shall provide pipes, fittings, valves, non-return valves,

flanged adapters, puddle flanges and all other items necessary for the proper

functioning of the system

(b) Installation of piecework shall comply with BS8010 Section 2.1, the

Sub-Contractor shall conduct site hydrostatic test in the presence of the

Architect or his representatives.

(c) Unless otherwise specified, all pipes and fittings for handing sewage and

sludge shall be made of either stainless steel 316 or ductile iron. The ductile

iron pipe shall be lined internally with sulphate resistant cement and externally

coated with zinc coating followed by a bituminous layer or coal tar epoxy in

accordance with BS 4772. The metallic zinc in accordance with BS 4772 prior

to bitumen or coal tar epoxy coating.

(d) The gate valves shall have stem made of stainless steel to BS970 part 1 grade

431S29. Sealing of the valve shall be by means of packed gland stiffing box

seals.

Page 68 of 85

Page 208: TENDER DOCUMENTS · schedule no. 1 – preliminaries sr1/1 – sr1 sum/1 schedule no. 2 – preambles sr2/1 – sr2/72 schedule no. 3 – sewage treatment plant system sr3/1 – sr3

PARTICULAR SPECIFICATION

WWF STP & GWTP P.S. 68

(e) Where end flanges are existing, the Sub-Contractor shall be responsible for

connecting the supply for all necessary jointing gasket, bolts and nuts. The

bolts and nuts shall be made of stainless steel. The Sub-Contractor shall also

provide flange adaptors to cater for the misalignment of the end flanges.

5.5.4 Cabling and Cable Trays

(a) All cable trays, support channel sections, couplers, fittings and cable trunking

shall be in galvanized steel.

(b) Cable trays shall have returned edges and complete with fittings such as 45°,

90°, bends, tees, reducers, etc. Cable trays shall be set off from the walls by

cable tray support channel sections. Trays on floor shall not be less than

150mm from the finished floor level.

(c) Cables shall be laid flat and straight and shall be properly dressed into position

and clipped to the tray by PVC covered metal clips or cleat bolted to the tray at

intervals not greater than 1m.

(d) Care shall be taken to space the cables to allow adequate cooling and not more

than seven cables shall be embraced by on clip and not more than two layers of

cables shall be run on one tray. Fasteners shall not present any obstruction on

the tray. Capacity amounting to 25% usable tray area shall be left spare.

(e) Cable trays shall be adequately provided inside cable trenches and galleries to

facilitate easy identification and replacement of cables. The Sub-Contractor

shall provide all necessary support, fixing and anchor bolts and all associated

materials for the installation work. For cables larger than 150 sq. mm in size,

cable cleats shall be used.

5.5.5 Earthing

(a) The Sub-Contractor shall provide and equipotential bonding system for all

exposed and extraneous conductive metalwork installed under this Contract

including handrailing, metal platforms, poles brackets, etc.

(b) All other earthing shall be provided as appropriate according to the IEE

Page 69 of 85

Page 209: TENDER DOCUMENTS · schedule no. 1 – preliminaries sr1/1 – sr1 sum/1 schedule no. 2 – preambles sr2/1 – sr2/72 schedule no. 3 – sewage treatment plant system sr3/1 – sr3

PARTICULAR SPECIFICATION

WWF STP & GWTP P.S. 69

Regulations, the General Specifications and the GSEI. In case of conflicts

found in the above standards and specifications, the IEE Regulations shall

prevail the others.

(c) The steel armour of power cables shall not be used as earthing conductors and

separate conductor shall be provided. However, the steel armour shall be

bonded to the earthing conductors.

(d) Bare earth conductors, if any, shall be tinned.

Page 70 of 85

Page 210: TENDER DOCUMENTS · schedule no. 1 – preliminaries sr1/1 – sr1 sum/1 schedule no. 2 – preambles sr2/1 – sr2/72 schedule no. 3 – sewage treatment plant system sr3/1 – sr3

PARTICULAR SPECIFICATION

WWF STP & GWTP P.S.

EQUIPMENT SUBMISSION & DELIVERY SCHEDULE

(For Sewage Treatment Plant)

Project : Quotation No.: Date :

Item Description Model Expected

Date of

Submission

1st

Submission

Date

2nd

Submission

Date

3rd

Submission

Date

Expected

Approval

Date

Actual

Approval

Date

Expected

Delivery

Date

Order

Date

Actual

Delivery

Date

Remark

Submitted Submitted Submitted

Appendix A

Page 71 of 85

Page 211: TENDER DOCUMENTS · schedule no. 1 – preliminaries sr1/1 – sr1 sum/1 schedule no. 2 – preambles sr2/1 – sr2/72 schedule no. 3 – sewage treatment plant system sr3/1 – sr3

PARTICULAR SPECIFICATION

WWF STP & GWTP P.S.

EQUIPMENT SUBMISSION & DELIVERY SCHEDULE

(For Grey Water Treatment Plant)

Project : Quotation No.: Date :

Item Description Model Expected

Date of

Submission

1st

Submission

Date

2nd

Submission

Date

3rd

Submission

Date

Expected

Approval

Date

Actual

Approval

Date

Expected

Delivery

Date

Order

Date

Actual

Delivery

Date

Remark

Submitted Submitted Submitted

Appendix A

Page 72 of 85

Page 212: TENDER DOCUMENTS · schedule no. 1 – preliminaries sr1/1 – sr1 sum/1 schedule no. 2 – preambles sr2/1 – sr2/72 schedule no. 3 – sewage treatment plant system sr3/1 – sr3

PARTICULAR SPECIFICATION

WWF STP & GWTP P.S.

SUB-CONTRACTOR’S EQUIPMENT

SUBMISSION FORM FOR APPROVAL

(For Sewage Treatment Plant)

Project :

Quotation No.:

Submission Date : Page of

A. SUMBMISSION CONTENT

A.1. Submission No. : Revision No. 1st 2nd 3rd 4th

A.2 Equipment Originally Offered Equipment Offered

Type : Type :

Origin : Origin :

Model No. : Model No. :

A.3 Reasons for change if any :

(Equipment will be rejected

Without detailed substantiation)

Attached Details

Manufacturer Catalogue/Date Equipment Schedule

Certificate/Approval Letter Installation Detail

B. Architect

B.1. Recommendation Approved

Approved with qualifications, as commented below

Submission incomplete, resubmit as commented below

Submission rejected, resubmit immediately without delay

B.2. Comments

Date :

Architect / Architect’s Representative

Appendix B

Page 73 of 85

Page 213: TENDER DOCUMENTS · schedule no. 1 – preliminaries sr1/1 – sr1 sum/1 schedule no. 2 – preambles sr2/1 – sr2/72 schedule no. 3 – sewage treatment plant system sr3/1 – sr3

PARTICULAR SPECIFICATION

WWF STP & GWTP P.S.

SUB-CONTRACTOR’S EQUIPMENT

SUBMISSION FORM FOR APPROVAL

(For Grey Water Treatment Plant)

Project :

Quotation No.:

Submission Date : Page of

C. SUMBMISSION CONTENT

A.1. Submission No. : Revision No. 1st 2nd 3rd 4th

A.2 Equipment Originally Offered Equipment Offered

Type : Type :

Origin : Origin :

Model No. : Model No. :

A.3 Reasons for change if any :

(Equipment will be rejected

Without detailed substantiation)

Attached Details

Manufacturer Catalogue/Date Equipment Schedule

Certificate/Approval Letter Installation Detail

D. Architect

B.1. Recommendation Approved

Approved with qualifications, as commented below

Submission incomplete, resubmit as commented below

Submission rejected, resubmit immediately without delay

B.2. Comments

Date :

Architect / Architect’s Representative

Appendix B

Page 74 of 85

Page 214: TENDER DOCUMENTS · schedule no. 1 – preliminaries sr1/1 – sr1 sum/1 schedule no. 2 – preambles sr2/1 – sr2/72 schedule no. 3 – sewage treatment plant system sr3/1 – sr3

PARTICULAR SPECIFICATION

WWF STP & GWTP P.S.

SAMPLE SUBMISSION

A Pipe Accessories

One sample shall be provided for each type of pipe material, fitting, mounting

bracket, valves, expansion joint, etc.

B Wiring Accessories

One sample shall be provided for each type of wiring accessories. Where

applicable, the sample shall be complete with conduit outlet box (surface and/or

concealed type as relevant to the actual installation.

C Installation Accessories

One sample each of the following items shall be provided.

(a) Pipework and Accessories

i. One 500mm straight length of 50mm dia. Pipe complete with sockets,

elbow and hangers. The pipe shall have the colour band for

identification of grade and the B.S. marking.

ii. Short pieces of 100mm length pipes of different materials pipe size

80mm dia. and above shall complete with rolled grove for dresser

coupling.

iii. One groved dresser coupling and one mechanical tee fixed on a short

piece of pipework.

(b) Conduit and Conduit Accessories

i. One 300mm straight length of 25mm dia. rigid steel conduit complete

with spacing saddle, socket and male bush at both ends. The conduit

shall have the marking ‘BD4568 Class 4’ indelibly stamped on it.

ii. One 300mm length of 25mm dia. flexible steel conduit complete with

socket and male bush at both ends. The conduit shall have the marking

of ‘BS731’ indelibly stamped on it.

Appendix C

Page 75 of 85

Page 215: TENDER DOCUMENTS · schedule no. 1 – preliminaries sr1/1 – sr1 sum/1 schedule no. 2 – preambles sr2/1 – sr2/72 schedule no. 3 – sewage treatment plant system sr3/1 – sr3

PARTICULAR SPECIFICATION

WWF STP & GWTP P.S.

iii. One 100mm x 100mm x 50mm and one 150mm x 150mm x 75mm

adaptable box. The adaptable boxes shall be completed with covers.

iv. One shallow pattern and one deep pattern BESA boxes complete with

dome covers.

(c) Trunking and Trunking Accessories

i. Two pieces of 100mm x 100mm straight length trunking complete with

covers and connected together. Each length of trunking shall be 200mm and

shall have the marking ‘BS4678 Class 3’ and thickness of the sheet metal

indelibly stamped on it.

ii. One piece of 100mm x 100mm standard bend.

iii. One piece of 100mm x 100mm standard tee.

(d) Cable tray and Accessories

i. Two pieces of 300mm (W) straight cable tray connected together with

external coupler.

ii. One piece of 300mm (W) standard bend.

(e) Cable and Cable Accessories

i. One sample of a particular size of each of the following types of cable shall

be provided. Each sample shall have the manufacturer’s name, BASEC

mark and voltage rating indelibly stamped on its oversheath. In addition,

each concentric layer of the sample shall be exposed for inspection.

1. XLPE/SWA/PVC copper cable

2. MICS cable (2/C)

3. PVC copper cable (1/C)

ii. One sample of termination kit (gland, lugs and accessories) for each of

the cable types (a), (b) as specified in C.1 above shall be provided.

Page 76 of 85

Page 216: TENDER DOCUMENTS · schedule no. 1 – preliminaries sr1/1 – sr1 sum/1 schedule no. 2 – preambles sr2/1 – sr2/72 schedule no. 3 – sewage treatment plant system sr3/1 – sr3

PARTICULAR SPECIFICATION

WWF STP & GWTP P.S.

D Others

One sample each of the following items shall be provided.

(a) Level switches.

(b) One for each type of labels

F All samples of materials specified shall be properly mounted as required and

submitted in duplication for the Architect and his Representative’s approval.

Page 77 of 85

Page 217: TENDER DOCUMENTS · schedule no. 1 – preliminaries sr1/1 – sr1 sum/1 schedule no. 2 – preambles sr2/1 – sr2/72 schedule no. 3 – sewage treatment plant system sr3/1 – sr3

PARTICULAR SPECIFICATION

WWF STP & GWTP P.S.

SCHEDULE OF SPARES AND TOOLS

(For Sewage Treatment Plant)

The following spares and tools shall be provided before the commencement of the

Maintenance Period:

A The following spares for pumps:

(a) One set of bearings, mechanical seal, oil seal and packing o-ring for each type of

pumps.

(b) One set adjustable spanners which can fit all the screws and nuts of all pumps

(c) One set of cartridge fuses and control fuses for each starter in LMCP

(d) Two no. of push buttons.

(e) Two set of indication lamp

B One set of UV lamp

C The Sub-Contractor shall propose additional spares specified elsewhere in this

Appendix D

Page 78 of 85

Page 218: TENDER DOCUMENTS · schedule no. 1 – preliminaries sr1/1 – sr1 sum/1 schedule no. 2 – preambles sr2/1 – sr2/72 schedule no. 3 – sewage treatment plant system sr3/1 – sr3

PARTICULAR SPECIFICATION

WWF STP & GWTP P.S.

SCHEDULE OF SPARES AND TOOLS

(For Grey Water Treatment Plant)

The following spares and tools shall be provided before the commencement of the

Maintenance Period:

A The following spares for pumps:

(a) One set of bearings, mechanical seal, oil seal and packing o-ring for each type of

pumps.

(b) One set adjustable spanners which can fit all the screws and nuts of all pumps

(c) One set of cartridge fuses and control fuses for each starter in LMCP

(d) Two no. of push buttons.

(e) Two set of indication lamp

B One set of UV lamp

C The Sub-Contractor shall propose additional spares specified elsewhere in this

Appendix D

Page 79 of 85

Page 219: TENDER DOCUMENTS · schedule no. 1 – preliminaries sr1/1 – sr1 sum/1 schedule no. 2 – preambles sr2/1 – sr2/72 schedule no. 3 – sewage treatment plant system sr3/1 – sr3

PARTICULAR SPECIFICATION

WWF STP & GWTP P.S.

SCHEDULE OF MAINTENANCE WORK

(For Sewage Treatment Plant)

The following maintenance work shall be provided during the Maintenance Period:

Scheduled works Weekly Monthly Bi-

monthly

Quarterly Every

half

year

Annual Once

every

2

years

Once

every

5

years

Site System Check

and record

Water Sampling

(frequency depends

on EPD license

requirements)

Chemicals

replenishment

Air blower

lubrication

Membrane cleansing √

Instrument

calibration

Surplus sludge

removal and disposal

Cleansing of

equalization tank

Replacement of

instrument

sensor/probe

Air blower belt

replacement

Air blower lubricant

replacement

UV lamp replacement √

RO Membrane

replacement

MBR Membrane

replacement

Appendix D

Page 80 of 85

Page 220: TENDER DOCUMENTS · schedule no. 1 – preliminaries sr1/1 – sr1 sum/1 schedule no. 2 – preambles sr2/1 – sr2/72 schedule no. 3 – sewage treatment plant system sr3/1 – sr3

PARTICULAR SPECIFICATION

WWF STP & GWTP P.S.

SCHEDULE OF MAINTENANCE WORK

(For Grey Water Treatment Plant)

The following maintenance work shall be provided during the Maintenance Period:

Scheduled works Weekly Monthly Bi-

monthly

Quarterly Every

half

year

Annual Once

every

2

years

Once

every

5

years

Site System Check

and record

Water Sampling

(frequency depends

on EPD license

requirements)

Chemicals

replenishment

Air blower

lubrication

Membrane cleansing √

Instrument

calibration

Surplus sludge

removal and disposal

Cleansing of

equalization tank

Replacement of

instrument

sensor/probe

Air blower belt

replacement

Air blower lubricant

replacement

UV lamp replacement √

RO Membrane

replacement

MBR Membrane

replacement

Page 81 of 85

Page 221: TENDER DOCUMENTS · schedule no. 1 – preliminaries sr1/1 – sr1 sum/1 schedule no. 2 – preambles sr2/1 – sr2/72 schedule no. 3 – sewage treatment plant system sr3/1 – sr3

PARTICULAR SPECIFICATION

WWF STP & GWTP P.S.

TENDER SUBMISSION CHECKLIST

(For Sewage Treatment Plant)

Project :

Quotation No.:

Tender Price (HKD):

Submission Date : Page of

Description Please tick if

submitted

Master programme from award of tender to practical completion

Schematic diagram of the sewage treatment plant

On scale layout plant of the sewage treatment plant to suit the

designated area and adequate maintenance access / space should be

indicated

Equipment schedule for major equipment which indicate the brand,

model, country of origin, compliance with relevant standards

Job reference, both local and overseas

Schematic and layout of web-based alarm logging system

Resume of system designer and full time on-site staff

Sub-Contractor’s project organization chart

Design calculation for the size of underground equalization/retention

tank

Design calculation for the size of sludge holding tank

Design calculation for the size of aerobic tank and membrane surface

requirements

Interfacing schedule with building automation system

Note:

This checklist shall be completed and submitted with relevant supporting

documents. Late and incomplete submission will not be considered.

Page 82 of 85

Page 222: TENDER DOCUMENTS · schedule no. 1 – preliminaries sr1/1 – sr1 sum/1 schedule no. 2 – preambles sr2/1 – sr2/72 schedule no. 3 – sewage treatment plant system sr3/1 – sr3

PARTICULAR SPECIFICATION

WWF STP & GWTP P.S.

TENDER SUBMISSION CHECKLIST

(For Grey Water Treatment Plant) (Optional Item)

Project :

Quotation No.:

Tender Price (HKD):

Submission Date : Page of

Description Please tick if

submitted

Master programme from award of tender to practical completion

Schematic diagram of the grey water treatment plant

On scale layout plant of the grey water treatment plant to suit the

designated area and adequate maintenance access / space should be

indicated

Equipment schedule for major equipment which indicate the brand,

model, country of origin, compliance with relevant standards

Job reference, both local and overseas

Schematic and layout of web-based alarm logging system

Resume of system designer and full time on-site staff

Sub-Contractor’s project organization chart

Design calculation for the size of underground equalization/retention

tank

Design calculation for the size of sludge holding tank

Design calculation for the size of aerobic tank and membrane surface

requirements

Interfacing schedule with building automation system

Note:

This checklist shall be completed and submitted with relevant supporting

documents. Late and incomplete submission will not be considered.

Page 83 of 85

Page 223: TENDER DOCUMENTS · schedule no. 1 – preliminaries sr1/1 – sr1 sum/1 schedule no. 2 – preambles sr2/1 – sr2/72 schedule no. 3 – sewage treatment plant system sr3/1 – sr3

PARTICULAR SPECIFICATION

WWF STP & GWTP P.S.

OPERATION AND MAINTENANCE COST

(AFTER DEFECT LIABILITY PERIOD)

(For Sewage Treatment Plant)

HKD

1ST YEAR

2ND YEAR

3RD YEAR

4TH YEAR

5TH YEAR

Note:

1. The operation and maintenance cost shall include all costs for labour,

inspection, repairing, attendance for the emergency case, sampling and analysis

of the effluent to the satisfactory operation of the sewage treatment plant.

2. The Sub-Contractor shall submit the periodic operation and maintenance works

schedule in this tender submission for consideration.

Page 84 of 85

Please refer toSchedule of Rates

Please refer toSchedule of Rates

Please refer toSchedule of Rates

Please refer toSchedule of Rates

Please refer toSchedule of Rates

Page 224: TENDER DOCUMENTS · schedule no. 1 – preliminaries sr1/1 – sr1 sum/1 schedule no. 2 – preambles sr2/1 – sr2/72 schedule no. 3 – sewage treatment plant system sr3/1 – sr3

PARTICULAR SPECIFICATION

WWF STP & GWTP P.S.

OPERATION AND MAINTENANCE COST

(AFTER DEFECT LIABILITY PERIOD)

(For Grey Water Treatment Plant) (Optional Item)

HKD

1ST YEAR

2ND YEAR

3RD YEAR

4TH YEAR

5TH YEAR

Note:

1. The operation and maintenance cost shall include all costs for labour,

inspection, repairing, attendance for the emergency case, sampling and analysis

of the effluent to the satisfactory operation of the sewage treatment plant.

2. The Sub-Contractor shall submit the periodic operation and maintenance works

schedule in this tender submission for consideration.

Page 85 of 85

Please refer toSchedule of Rates

Please refer toSchedule of Rates

Please refer toSchedule of Rates

Please refer toSchedule of Rates

Please refer toSchedule of Rates

Page 225: TENDER DOCUMENTS · schedule no. 1 – preliminaries sr1/1 – sr1 sum/1 schedule no. 2 – preambles sr2/1 – sr2/72 schedule no. 3 – sewage treatment plant system sr3/1 – sr3

SECTION C – GUIDELINES FOR CONSULTANT AND CONTRACTOR

D

Page 226: TENDER DOCUMENTS · schedule no. 1 – preliminaries sr1/1 – sr1 sum/1 schedule no. 2 – preambles sr2/1 – sr2/72 schedule no. 3 – sewage treatment plant system sr3/1 – sr3

Mai Po Infrastructure Upgrade Project / 20160915

WWF Hong Kong Mai Po Infrastructure Upgrade Project

Guidelines for Consultant and Contractor

Mai Po Nature Reserve is a restricted area and any individual needs a valid entry permit which issued by AFCD to entry the reserve. To ensure a smooth operation and safe working environment, please note the guidelines as follows:

(1) WWF Working hour and emergency contact: • The working hour of Mai Po Nature Reserve is from 8:30 a.m. to 5:30 p.m. from Monday to Sunday.

However, contractor should NOT carry out any work on Sunday except permission is granted by WWF.

• The Mai Po Visitor Centre provides supporting service for all visitors. If you have any enquiry, please calling us at telephone number at 2471 6212.

(2) STEPS to entry Mai Po Nature Reserve: � STEP ONE

All consultant or workers should fill in the LOG BOOK which placed at the visitor centre when he / she arrives / departs the reserve. Please refer to attachment 1 for the log book sample.

� STEP TWO Any individual MUST register at the AFCD Warden Post (see the attachment 2 for the location). If you carry a work permit, AFCD may request you to complete the form (see attachment 3) and submit 2 copies of the form. The office hour of AFCD Warden Post is from 8:15 a.m. to 6:00 p.m., Monday to Sunday. You are not require to clock out when depart the nature reserve.

� If you want to delivery materials by vehicle inside the Mai Po Nature Reserve, written permission must be sought from WWF-Hong Kong in advanced. There are private roads to access bird hide and education centre for materials delivery only (see attachment 2).

(3) Be properly equipped: � Bring insect repellent, sterilizing gel, hat, raincoat / umbrella, personal medical if needed

� Do not wear outfit in bright colour

� Take UV protective measures

� WWF strongly encourages waste reduction, please bring enough drinking water, or bring a bottle to refill water. Supporting facilities for visitor can be found at:

Toilet

Visitor Centre and Education Centre

Rubbish bin

Water filter for drinking water Water tap for work

First aid materials

Soft-drink vending machines

Visitor Centre

(4) Code of conduct in the reserve: � As the Nature Reserve is a restricted area, it is forbidden to take or damage animals and plants in the Nature

Reserve. It is illegal to hurt any wild animals within the Reserve. Picking plants without prior permission is also illegal.

� Do not touch any wild birds or their droppings.

� No fire shall be used in carrying out the works and all necessary precaution shall be taken to prevent fires.

� No smoking, fishing or swimming in the Nature Reserve.

� No litter shall be left behind. Please take away all waste and do not leave them in the Reserve.

� Do not interfere with private property. Do not interfere with, deface or damage WWF property.

� In the bird watching hides, please manage your noise level so as not to disturb the wildlife. Doors and windows should be closed quietly when you leave.

(5) Recording of the activities: • Recording of visit and facilities management activities, either via video, audio or both is restricted unless

written permission is granted by WWF-Hong Kong in advanced.

Page 227: TENDER DOCUMENTS · schedule no. 1 – preliminaries sr1/1 – sr1 sum/1 schedule no. 2 – preambles sr2/1 – sr2/72 schedule no. 3 – sewage treatment plant system sr3/1 – sr3

Mai Po Infrastructure Upgrade Project / 20160915

Attachment 1: WWF-HK Mai Po Infrastructure Upgrade Project –

Consultant / Worker Log Book

日期日期日期日期

Date

負責人名稱負責人名稱負責人名稱負責人名稱

Name of

In Charge

Person

人數人數人數人數

No. of

People

公司名稱公司名稱公司名稱公司名稱

Company Name

到達時間到達時間到達時間到達時間

Arrival

Time

離開時間離開時間離開時間離開時間

Departure

Time

簽名簽名簽名簽名

Signature

This log book is placed at WWF Visitor Centre.

Page 228: TENDER DOCUMENTS · schedule no. 1 – preliminaries sr1/1 – sr1 sum/1 schedule no. 2 – preambles sr2/1 – sr2/72 schedule no. 3 – sewage treatment plant system sr3/1 – sr3

Mai Po Infrastructure Upgrade Project / 20160915

Attachment 2: Map of Mai Po Nature Reserve

0 500 Meters

斯科特野外研習中心

Peter Scott Field Study Centre

漁農自然護理員站

AFCD Nature Park Warden

米埔自然保護區教育中心

Mai Po Wildlife Education Centre

基圍博物館

Gei Wai Museum

水禽飼養池

Waterfowl Collection

觀鳥屋

Bird-watching Hide

觀鳥屋號瑪

Bird-watching Hide Number

6 基圍號碼 Gei Wai Number

木橋 Boardwalk

小徑 Footpath

Road for 5.5 tonne truck

or lighter vehicle

Bird Hide 1

EC

Bird Hide 2

PSFSC

AFCD

Foot path

Page 229: TENDER DOCUMENTS · schedule no. 1 – preliminaries sr1/1 – sr1 sum/1 schedule no. 2 – preambles sr2/1 – sr2/72 schedule no. 3 – sewage treatment plant system sr3/1 – sr3

Mai Po Infrastructure Upgrade Project / 20160915

Attachment 3

Wild Animals Protection Ordinance, Cap. 170

Appendix to Mai Po Marsh Entry Permit FCA:______________

In connection with Mai Po Marshes Entry Permit No. GP/___________________________

issued under Section 13 of Wild Animals Protection Ordinance Cap. 170,

the following persons are authorized to enter the Mai Po Marshes Restricted Area

subject to the conditions stipulated on the aforesaid Permit:

Identiy Card/ Identiy Card/

Name Passport No. Name Passport No.

1. 16.

2. 17.

3. 18.

4. 19.

5. 20.

6. 21.

7. 22.

8. 23.

9. 24.

10. 25.

11. 26.

12. 27.

13. 28.

14. 29.

15. 30.

This authorization is valid on _________________ and between_________ and__________ only.

Original: to Permit

Holder

Duplicate: to AFCD Endorsement

Note: This name list must be endorsed by the Nature Warden on duty and should be used in conjunction with the

aforesaid Mai Po Entry Permit

Page 230: TENDER DOCUMENTS · schedule no. 1 – preliminaries sr1/1 – sr1 sum/1 schedule no. 2 – preambles sr2/1 – sr2/72 schedule no. 3 – sewage treatment plant system sr3/1 – sr3

Mai Po Infrastructure Upgrade Project / 20160915

Attachment 4 Vehicle Access to Mai Po Nature Reserve

Application Form

Date of application:

Applicant name:

Telephone number:

Email address:

Company name:

Access

Date and Time

Purpose Vehicle type and plate number

Contact person name and phone number

Remark: 1. Mai Po Nature Reserve is a restricted area, any visitor should carry a valid permit issued by AFCD.

2. Some of the road section at fishpond is privately owned. Advanced approval from WWF Hong Kong is

required.

3. As the access road at the fish pond and inside nature reserve is narrow, the size of the lorry should be

less than 5.5 tonne truck or lighter vehicle.

4. The completed form should be sent to F+G project manager and WWF Mai Po staff at

[[email protected]] 2 working days before you entry the nature reserve.

Page 231: TENDER DOCUMENTS · schedule no. 1 – preliminaries sr1/1 – sr1 sum/1 schedule no. 2 – preambles sr2/1 – sr2/72 schedule no. 3 – sewage treatment plant system sr3/1 – sr3

Mai Po Infrastructure Upgrade Project / 20160915

世界自然基金會世界自然基金會世界自然基金會世界自然基金會

米埔自然保護區設施改善計劃米埔自然保護區設施改善計劃米埔自然保護區設施改善計劃米埔自然保護區設施改善計劃

顧問公司及承辦商顧問公司及承辦商顧問公司及承辦商顧問公司及承辦商人員人員人員人員守則守則守則守則

米埔自然保護區屬於禁區範圍米埔自然保護區屬於禁區範圍米埔自然保護區屬於禁區範圍米埔自然保護區屬於禁區範圍,,,,任何人等均須持有由漁農自然護理署發出之有效許可證任何人等均須持有由漁農自然護理署發出之有效許可證任何人等均須持有由漁農自然護理署發出之有效許可證任何人等均須持有由漁農自然護理署發出之有效許可證,,,,方可進入米埔自然方可進入米埔自然方可進入米埔自然方可進入米埔自然保護區保護區保護區保護區。。。。為確保活動及工程能順利進行為確保活動及工程能順利進行為確保活動及工程能順利進行為確保活動及工程能順利進行,,,,務請務請務請務請顧問公司及承辦商人員顧問公司及承辦商人員顧問公司及承辦商人員顧問公司及承辦商人員注意以下守則注意以下守則注意以下守則注意以下守則::::

(1) 辦公時間及緊急聯絡電話辦公時間及緊急聯絡電話辦公時間及緊急聯絡電話辦公時間及緊急聯絡電話 :

• 米埔自然保護區的辦公時間為星期一至日,早上 8:30 分至下午 5:30 分。除非事先獲得世界自然基金會書面批准,顧問公司及承辦商人員不可以在星期日進行工程。

• 米埔訪客中心及教育中心為訪客提供各項支援服務。如顧問公司及承辦商人員遇有任何問題,請致電2471 6212與本會聯絡。

(2) 進入進入進入進入米埔自然保護區程序米埔自然保護區程序米埔自然保護區程序米埔自然保護區程序:

� 程序一程序一程序一程序一 : 顧問公司及承辦商人員進入及離開米埔自然保護區時,必須在米埔訪客中心填寫登記表。有關登記表之樣本請參閱附頁一。

� 程序二程序二程序二程序二 : 任何人等在進入米埔自然保護區前均須前往漁農自然護理員站登記(有關位置請參閱附頁二)。如你持有由漁農自然護理署發出之工作許可證,漁農自然護理署或會要求你填寫及遞交附頁三之表格(一式兩份)。漁農自然護理員站的辦公時間為星期一至日,早上 8:15 分至下午 6:00 時。當你離開米埔自然保護區時,你無須辦理任何手續。

� 如需要駕駛並運送貨物前往米埔自然保護區,顧問公司及承辦商人員必須提前向世界自然基金會申請書面批准。在保護區內有私家小路前往觀鳥屋及教育中心,但該路段只供車輛運送貨物使用(參閱附頁二)。

(3) 裝備及設施裝備及設施裝備及設施裝備及設施 :

� 帶備防蚊用品、消毒洗手液/手巾、帽、雨衣/雨傘、個人藥物等。

� 切勿穿著色彩鮮豔的衣服。

� 採取防曬措施。

� 本會鼓勵源頭減廢,參加者請儘量自備水樽或飲品。

� 如需要使用以下設施,請前往: 洗手間 米埔訪客中心及教育中心

垃圾箱 淨水機 - 飲用水 水喉 - 工作用之淡水 急救用品

飲品售賣機 米埔訪客中心

(4) 米埔自然保護區內一般守則米埔自然保護區內一般守則米埔自然保護區內一般守則米埔自然保護區內一般守則:

� 米埔自然保護區屬於禁區範圍,嚴禁傷害任何野生生物或採摘任何植物。傷害或捕捉任何野生生物屬非法行為,未獲批准而胡亂採摘任何植物也屬違法。

� 請勿接觸任何雀鳥及其排泄物。

� 嚴禁在保護區內生火。所有顧問公司及承辦商人員應採取必要的預防措施,以防止火災發生。

� 嚴禁在保護區內吸煙、釣魚及游泳。

� 敬請將所有垃圾帶離開保護區範圍。

� 不准干擾私人產業。不可擅自移動、損毀及破壞世界自然基金會的財產。

� 在觀鳥屋內必須保持安靜,以免騷擾野生生物,離開前切記安靜地關上所有門窗。

(5) 工程進行期間錄影及工程進行期間錄影及工程進行期間錄影及工程進行期間錄影及/或錄音事項或錄音事項或錄音事項或錄音事項:

• 除非事先獲得世界自然基金會書面批准,於活動或工程進行期間錄影錄影錄影錄影及/或錄音錄音錄音錄音均受限制。

Page 232: TENDER DOCUMENTS · schedule no. 1 – preliminaries sr1/1 – sr1 sum/1 schedule no. 2 – preambles sr2/1 – sr2/72 schedule no. 3 – sewage treatment plant system sr3/1 – sr3

Mai Po Infrastructure Upgrade Project / 20160915

附頁一附頁一附頁一附頁一 : 米埔自然保護區設施改善計劃米埔自然保護區設施改善計劃米埔自然保護區設施改善計劃米埔自然保護區設施改善計劃

顧問公司及承辦商人員顧問公司及承辦商人員顧問公司及承辦商人員顧問公司及承辦商人員登記表登記表登記表登記表

日期日期日期日期

Date

負責人名稱負責人名稱負責人名稱負責人名稱

Name of

In Charge

Person

人數人數人數人數

No. of

People

公司名稱公司名稱公司名稱公司名稱

Company Name

到達時間到達時間到達時間到達時間

Arrival

Time

離開時間離開時間離開時間離開時間

Departure

Time

簽名簽名簽名簽名

Signature

此登記表設於米埔訪客中心

Page 233: TENDER DOCUMENTS · schedule no. 1 – preliminaries sr1/1 – sr1 sum/1 schedule no. 2 – preambles sr2/1 – sr2/72 schedule no. 3 – sewage treatment plant system sr3/1 – sr3

Mai Po Infrastructure Upgrade Project / 20160915

附頁附頁附頁附頁二二二二 : 米埔自然保護區米埔自然保護區米埔自然保護區米埔自然保護區地圖地圖地圖地圖

0 500 Meters

斯科特野外研習中心

Peter Scott Field Study Centre

漁農自然護理員站

AFCD Nature Park Warden

米埔自然保護區教育中心

Mai Po Wildlife Education Centre

基圍博物館

Gei Wai Museum

水禽飼養池

Waterfowl Collection

觀鳥屋

Bird-watching Hide

觀鳥屋號瑪

Bird-watching Hide Number

6 基圍號碼 Gei Wai Number

木橋 Boardwalk

小徑 Footpath

Road for 5.5 tonne truck

or lighter vehicle

Bird Hide 1

EC

Bird Hide 2

PSFSC

AFCD

Foot path

Page 234: TENDER DOCUMENTS · schedule no. 1 – preliminaries sr1/1 – sr1 sum/1 schedule no. 2 – preambles sr2/1 – sr2/72 schedule no. 3 – sewage treatment plant system sr3/1 – sr3

Mai Po Infrastructure Upgrade Project / 20160915

附頁三附頁三附頁三附頁三 (只有英文版本)

Wild Animals Protection Ordinance, Cap. 170

Appendix to Mai Po Marsh Entry Permit FCA:______________

In connection with Mai Po Marshes Entry Permit No. GP/___________________________

issued under Section 13 of Wild Animals Protection Ordinance Cap. 170,

the following persons are authorized to enter the Mai Po Marshes Restricted Area

subject to the conditions stipulated on the aforesaid Permit:

Identiy Card/ Identiy Card/

Name Passport No. Name Passport No.

1. 16.

2. 17.

3. 18.

4. 19.

5. 20.

6. 21.

7. 22.

8. 23.

9. 24.

10. 25.

11. 26.

12. 27.

13. 28.

14. 29.

15. 30.

This authorization is valid on _________________ and between_________ and__________ only.

Original: to Permit

Holder

Duplicate: to AFCD Endorsement

Note: This name list must be endorsed by the Nature Warden on duty and should be used in conjunction with the

aforesaid Mai Po Entry Permit

Page 235: TENDER DOCUMENTS · schedule no. 1 – preliminaries sr1/1 – sr1 sum/1 schedule no. 2 – preambles sr2/1 – sr2/72 schedule no. 3 – sewage treatment plant system sr3/1 – sr3

Mai Po Infrastructure Upgrade Project / 20160915

附頁附頁附頁附頁四四四四: 車輛車輛車輛車輛進入進入進入進入米埔自然保護區米埔自然保護區米埔自然保護區米埔自然保護區

申請申請申請申請表表表表

申請申請申請申請日期日期日期日期:

申請申請申請申請人人人人姓名姓名姓名姓名:

聯絡聯絡聯絡聯絡電話電話電話電話:

電電電電郵郵郵郵地址地址地址地址:

公司公司公司公司名稱名稱名稱名稱 :

前前前前往往往往日期日期日期日期及及及及時間時間時間時間

原因原因原因原因 車輛車輛車輛車輛類型類型類型類型及及及及 車車車車牌牌牌牌

車輛車輛車輛車輛聯絡聯絡聯絡聯絡人人人人姓名姓名姓名姓名及及及及 電話電話電話電話

備註備註備註備註:

1. 米埔自然保護區屬於禁區範圍,任何人等均須持有由漁農自然護理署發出之有效許可證,方可進入米埔自然保護區。

2. 保護區及魚塘內的小路為私家路段,顧問公司及承辦商人員必須提前向世界自然基金會申請書面批准。

3. 保護區及魚塘內的私家路段為狹窄小路,只供私家車輛及 5.5噸貨車使用。

4. 請把已填妥的申請表,於 2個工作天前電郵至 F+G項目經理及世界自然基金會職員 ([email protected])。

Page 236: TENDER DOCUMENTS · schedule no. 1 – preliminaries sr1/1 – sr1 sum/1 schedule no. 2 – preambles sr2/1 – sr2/72 schedule no. 3 – sewage treatment plant system sr3/1 – sr3

SECTION E – PENALTY CLAUSE FOR BREAKING THE RULES

LISTED IN THE CODE OF CONDUCT

STATED IN WWF GUIDELINES

FOR CONSULTANT AND CONTRACTOR

Page 237: TENDER DOCUMENTS · schedule no. 1 – preliminaries sr1/1 – sr1 sum/1 schedule no. 2 – preambles sr2/1 – sr2/72 schedule no. 3 – sewage treatment plant system sr3/1 – sr3

Hoarding and Demolition Works for the Upgrading Mai Po Nature Infrastructure at

Mai Po, San Tin, Yuen Long, New Territories

Penalty Clause for breaking the rules listed in the Code of Conduct stated in WWF

Guidelines for Consultant and Contractor

Item Penalty (HKD) per accident

a. As the Nature Reserve is a restricted area, it is forbidden to take or damage animals and plants in the Nature Reserve. It is illegal to hurt any wild animals within the Reserve. Picking plants without prior permission is also illegal.

2,000

b. Do not touch any wild birds or their droppings. 2,000

c. No fire shall be used in carrying out the works and all necessary precaution shall be taken to prevent fires.

2,000

d. No smoking, fishing or swimming in the Nature Reserve.

2,000

e. No litter shall be left behind. Please take away all waste and do not leave them in the Reserve.

2,000

f. Do not interfere with private property. Do not interfere with, deface or damage WWF property.

2,000

g. In the bird watching hides, please manage your noise level so as not to disturb the wildlife. Doors and windows should be closed quietly when you leave.

2,000

Contract Works for Underground Street Fire Hydrant Installation for PSFSCFor Upgrading Mai Po Nature Reserve InfrastructureAt Mai Po, San Tin, Yuen Long, New TerritoriesFor World Wide Fund for Nature Hong Kong

Nominated Sub-Contract for Biological Sewage Treatment Plant andGreywater Treatment Plant Installation for PSFSCAt Mai Po, San Tin, Yuen Long, New TerritoriesFor World Wide Fund for Nature Hong Kong

Page 238: TENDER DOCUMENTS · schedule no. 1 – preliminaries sr1/1 – sr1 sum/1 schedule no. 2 – preambles sr2/1 – sr2/72 schedule no. 3 – sewage treatment plant system sr3/1 – sr3

SCHEDULE OF RATES

Page 239: TENDER DOCUMENTS · schedule no. 1 – preliminaries sr1/1 – sr1 sum/1 schedule no. 2 – preambles sr2/1 – sr2/72 schedule no. 3 – sewage treatment plant system sr3/1 – sr3

SCHEDULE NO. 1 – PRELIMINARIES

Page 240: TENDER DOCUMENTS · schedule no. 1 – preliminaries sr1/1 – sr1 sum/1 schedule no. 2 – preambles sr2/1 – sr2/72 schedule no. 3 – sewage treatment plant system sr3/1 – sr3

NOMINATED SUB-CONTRACT WORKS

FOR SEWAGE TREATMENT AND GREY WATER TREATMENT PLANT FOR PSFSC

FOR UPGRADING MAI PO NATURE RESERVE INFRASTRUCTURE

AT MAI PO, SAN TIN, YUEN LONG, NEW TERRITORIES

Schedule No. 1 - Preliminaries

Item HK$

PRELIMINARIES

General Notes:

A The Preliminary Items included hereunder apply to the whole of the Works

contained in these Schedule of Rates and the amounts and/ or rates

inserted by the Sub-Contractor shall be deemed to apply to the whole of

the Works carried out under this Sub-Contract, including any additions or

omissions which may be ordered by the Project Manager / Architect

under the Conditions of Sub-Contract.

B Where an abnormally high amount has been inserted against an item in

this Schedule for which substantial payment would normally be made

at the outset of the Sub-Contract, payment shall be made at the outset for

such portion as the Sub-Contractor may substantiate and payment of the

remaining amount effected over the period of the Sub-Contract.

C Where a lump sum only has been inserted in respect of this Schedule No.

1, the Sub-Contractor will be required to provide an itemized breakdown

of the amount to be included.

D It should be noted that the payment provisions in the preceding paragraph

do not apply to amounts inserted against items relating to Insurances,

Surety Bond and the like. These amounts will always be paid for over the

period of the Sub-Contract notwithstanding payment by the

Sub-Contractor of the entire premium at the beginning of the

Sub-Contract.

E Where no amount or an insufficient amount has been inserted by the

Sub-Contractor in respect of an item in this Schedule, the value or

additional value thereof will be deemed to have been included in the unit

rates for measured work contained in the Schedule of Rates hereinafter

following and no separate amounts whatsoever will be certified for

payment.

To Collection

Description

HK-4547/FP

Arcadis SR1 / 1

Page 241: TENDER DOCUMENTS · schedule no. 1 – preliminaries sr1/1 – sr1 sum/1 schedule no. 2 – preambles sr2/1 – sr2/72 schedule no. 3 – sewage treatment plant system sr3/1 – sr3

NOMINATED SUB-CONTRACT WORKS

FOR SEWAGE TREATMENT AND GREY WATER TREATMENT PLANT FOR PSFSC

FOR UPGRADING MAI PO NATURE RESERVE INFRASTRUCTURE

AT MAI PO, SAN TIN, YUEN LONG, NEW TERRITORIES

Schedule No. 1 - Preliminaries

Item HK$Description

PRELIMINARIES (Cont'd)

Conditions of Sub-Contract

A The Articles of Agreement and Conditions of Sub-Contract shall be

"Agreement and Schedule of Conditions of Nominated Sub-Contract for

use in the Hong Kong Special Administrative Region together with its

Appendices and Schedules, 2005 Edition, issued under of sanction of

the Hong Kong Institute of Architects, the Hong Kong Institute of

Construction Managers and the Hong Kong Institute of Surveyors,

together with the Special Conditions hereinbefore enclosed.

B A tabulated list of Clauses in the Conditions and Special Conditions of

Sub-Contract designated by the number of the Clause and the marginal

description and the Appendix to the Conditions of Sub-Contract are given

hereunder so that the Sub-Contractor may have the opportunity of

pricing such of them as he may deem necessary.

C The Sub-Contractor shall be deemed to have taken consideration of the

full contact of the Conditions and Special Conditions of Contract.

General Conditions

D 1 Interpretation and definitions

E 2 Sub-Contractor to comply with the provisions of the Main

Contract that relate to the Sub-Contract

F 3 Sub-Contractor's obligations

G 4 Care of Sub-Contract Works

H 5 Contractor's Instructions

I 6 Documents forming the Sub-Contract and other documents

J 7 Statutory obligations

K 8 Materials, goods, workmanship and work

L 9 Intellectual property rights

M 10 Sub-Contractor's site management team

N 11 Access for Contractor and Architect to the Sub-Contract Works

O 12 Architect's representative

P 13 Variations, Provisional Quantities, Provisional Items and

Provisional Sums

Q 14 Sub-Contract Bills

To Collection

HK-4547/FP

Arcadis SR1 / 2

Page 242: TENDER DOCUMENTS · schedule no. 1 – preliminaries sr1/1 – sr1 sum/1 schedule no. 2 – preambles sr2/1 – sr2/72 schedule no. 3 – sewage treatment plant system sr3/1 – sr3

NOMINATED SUB-CONTRACT WORKS

FOR SEWAGE TREATMENT AND GREY WATER TREATMENT PLANT FOR PSFSC

FOR UPGRADING MAI PO NATURE RESERVE INFRASTRUCTURE

AT MAI PO, SAN TIN, YUEN LONG, NEW TERRITORIES

Schedule No. 1 - Preliminaries

Item HK$Description

PRELIMINARIES (Cont'd)

General Conditions (Cont'd)

A 15 Sub-Contract Sum

B 16 Material and goods for the Sub-Contract Works on or off-site

C 17 Substantial Completion and defects liability

D 18 Partial possession by Employer

E 19 Assignment and sub-letting

F 20 Injury to persons and property and indemnity to Contractor

G 21 Insurance against injury to persons or property

H 22 Insurance of the Works

I 23 Possession, commencement and completion

J 24 Failure of Sub-Contractor to complete on time

K 25 Extension of time for the Sub-Contract Works to be completed

by the Sub-Contract Completion Date

L 26 Extension of time for the Sub-Contract Works to be completed

at the same time as the Works

M 27 Delay recovery measures

N 28 Direct loss and/or expense

O 29 Notice of claims for additional payment

P 30 Nominated Suppliers

Q 31 Other sub-contractors, statutory undertakers, utility companies

and Specialist Contractors

R 32 General attendance

S 33 Certificates and payments

T 34 Surety bond

U 35 Benefits under Main Contract

To Collection

HK-4547/FP

Arcadis SR1 / 3

Page 243: TENDER DOCUMENTS · schedule no. 1 – preliminaries sr1/1 – sr1 sum/1 schedule no. 2 – preambles sr2/1 – sr2/72 schedule no. 3 – sewage treatment plant system sr3/1 – sr3

NOMINATED SUB-CONTRACT WORKS

FOR SEWAGE TREATMENT AND GREY WATER TREATMENT PLANT FOR PSFSC

FOR UPGRADING MAI PO NATURE RESERVE INFRASTRUCTURE

AT MAI PO, SAN TIN, YUEN LONG, NEW TERRITORIES

Schedule No. 1 - Preliminaries

Item HK$Description

PRELIMINARIES (Cont'd)

General Conditions (Cont'd)

A 36 Determination by Contractor

B 37 Determination by Sub-Contractor

C 38 Determination of the Contractor's employment under the

Main Contract

D 39 Fluctuations Not applicable

E 40 Notices, certificates and other communications

F 41 Recovery of money due to the Contractor

G 42 Settlement of disputes

H 43 Contractor to join with the Sub-Contractor in arbitration

proceedings

APPENDIX

I The Appendix to the Conditions of Sub-Contract shall refer to clause

3.1 of Section A - Preliminaries of the Specification.

Special Conditions of Sub-Contract

- General Not applicable

J SCC-1 Interpretation and definitions

K SCC-3 Sub-Contractor's obligations

L SCC-6 Documents forming the Sub-Contract

M SCC-7 Statutory Obligations

N SCC-8 Materials, goods, workmanship and work

O SCC-12 Architect's representative

P SCC-13 Variations, Provisional Quantities, Provisional Items and

Provisional Sums

Q SCC-14 Sub-Contract Bills

R SCC-18 Partial Possession by Employer

To Collection

HK-4547/FP

Arcadis SR1 / 4

Page 244: TENDER DOCUMENTS · schedule no. 1 – preliminaries sr1/1 – sr1 sum/1 schedule no. 2 – preambles sr2/1 – sr2/72 schedule no. 3 – sewage treatment plant system sr3/1 – sr3

NOMINATED SUB-CONTRACT WORKS

FOR SEWAGE TREATMENT AND GREY WATER TREATMENT PLANT FOR PSFSC

FOR UPGRADING MAI PO NATURE RESERVE INFRASTRUCTURE

AT MAI PO, SAN TIN, YUEN LONG, NEW TERRITORIES

Schedule No. 1 - Preliminaries

Item HK$Description

PRELIMINARIES (Cont'd)

Special Conditions of Sub-Contract (Cont'd)

A SCC-19 Assignment and sub-letting

B SCC-21 Insurance against injury to persons or property

C SCC-22 Insurance of the Works

D SCC-25 Extension of time for Sub-Contract Works to be completed by

the Sub-Contract Completion Date

E SCC-26 Extension of time for Sub-Contract Works to be completed at

the same time as the Works

F SCC-27 Delay recovery measures

G SCC-28 Direct loss and/or expense

H SCC-33 Certificates and Payments

I SCC-34 Surety Bond

J SCC-36 Determination by Contractor

K SCC-37 Determination by Sub-Contractor

L SCC-39 Fluctuations Not applicable

M SCC-40 Notices, certificates and other communications

N SCC-42 Settlement of disputes

O SCC-43 Contracting out of the Contracts (Rights of Third Parties)

Ordinance

Specification

P The Sub-Contractor is directed to examine the Specification issued by the

Architect, M&E Engineer together with the Drawings which is attached

to these Schedules.

Q With the exceptions hereinafter following the clauses and descriptions

contained in the Specification and Drawings which are applicable to this

Contract are referred to in the preambles and/or items of trades or

sections of these Schedule of Rates.

R The following Specification Preliminaries Clauses, not referred to

elsewhere in these Schedules, are relevant to this Sub-Contract and

are set out hereunder so that the Contractor may have the opportunity

of pricing such of them as he may deem necessary.

To Collection

HK-4547/FP

Arcadis SR1 / 5

Page 245: TENDER DOCUMENTS · schedule no. 1 – preliminaries sr1/1 – sr1 sum/1 schedule no. 2 – preambles sr2/1 – sr2/72 schedule no. 3 – sewage treatment plant system sr3/1 – sr3

NOMINATED SUB-CONTRACT WORKS

FOR SEWAGE TREATMENT AND GREY WATER TREATMENT PLANT FOR PSFSC

FOR UPGRADING MAI PO NATURE RESERVE INFRASTRUCTURE

AT MAI PO, SAN TIN, YUEN LONG, NEW TERRITORIES

Schedule No. 1 - Preliminaries

Item HK$Description

PRELIMINARIES (Cont'd)

Specification (Cont'd)

A The Sub-contractor shall be deemed to have taken consideration of the

full context of the listed Specification Clauses as included in Section A -

Preliminaries of the Specification.

Specification Clauses

B 1.1 Definitions and Interpretation

C 1.2 Calculation of Periods

D 1.3 Metrication

E 2.1 Site and Description of the Main Contract Works

F 2.2 Site Conditions

G 2.3 Scope of Sub-Contract Works

H 2.4 Builder's Works

I 2.5 Painting to Plant, Equipment and Pipework, etc.

J 2.6 Provision of Everything Necessary

K 3.1 Form of Sub-Contract

L 3.2 Lump Sum Tender and Fixed Price

M 3.3 Method of Measurement

N 3.4 Schedule of Rates

O 3.5 Implication of Specification Clauses

P 3.6 Industrial Training and Pneumoconiosis Levies

Q 3.7 Sub-Contract Drawings

R 3.8 Discrepancies

S 3.9 Builder's Work Drawings

T 3.10 Shop Drawings and Calculations

To Collection

HK-4547/FP

Arcadis SR1 / 6

Page 246: TENDER DOCUMENTS · schedule no. 1 – preliminaries sr1/1 – sr1 sum/1 schedule no. 2 – preambles sr2/1 – sr2/72 schedule no. 3 – sewage treatment plant system sr3/1 – sr3

NOMINATED SUB-CONTRACT WORKS

FOR SEWAGE TREATMENT AND GREY WATER TREATMENT PLANT FOR PSFSC

FOR UPGRADING MAI PO NATURE RESERVE INFRASTRUCTURE

AT MAI PO, SAN TIN, YUEN LONG, NEW TERRITORIES

Schedule No. 1 - Preliminaries

Item HK$Description

PRELIMINARIES (Cont'd)

Specification Clauses (Cont'd)

A 3.11 As Built Drawings

B 3.12 Site Records

C 3.13 Copyright

D 3.14 Time Allowed

E 3.15 Programme

F 3.16 Schedule of Submissions

G 3.17 Execution of Works

H 3.18 Order of Work

I 3.19 Vesting of Plant and Equipment

J 3.20 Advertising and Publicity

K 3.21 Defects Liability Period

L 3.22 Guarantee

M 3.23 Daywork Claims

N 3.24 Sub-Contractor's Claims for Extras

O 3.25 List of Instructions with Financial Implications

P 3.26 Sub-Contractor's Expenses in Connection with Variations and

Settlement of Accounts

Q 3.27 Delay by Sub-Contractor

R 3.28 Completion

S 3.29 Preliminary Items

T 3.30 Provisional Items, etc.

U 3.31 Prime Cost Rate Items

V 3.32 Adjustment of Provisional Sums

W 3.33 Contingencies

To Collection

HK-4547/FP

Arcadis SR1 / 7

Page 247: TENDER DOCUMENTS · schedule no. 1 – preliminaries sr1/1 – sr1 sum/1 schedule no. 2 – preambles sr2/1 – sr2/72 schedule no. 3 – sewage treatment plant system sr3/1 – sr3

NOMINATED SUB-CONTRACT WORKS

FOR SEWAGE TREATMENT AND GREY WATER TREATMENT PLANT FOR PSFSC

FOR UPGRADING MAI PO NATURE RESERVE INFRASTRUCTURE

AT MAI PO, SAN TIN, YUEN LONG, NEW TERRITORIES

Schedule No. 1 - Preliminaries

Item HK$Description

PRELIMINARIES (Cont'd)

Specification Clauses (Cont'd)

A 3.34 Optional Works Items

B 3.35 Stop Work Instructions

C 4.1 Site Management Team and Workers

D 4.2 No Employment of Illegal Immigrants

E 4.3 Workers Living on Site - Not Allowed

F 4.4 Statutory Obligations, Regulation and Specification

G 4.5 Safety Precautions

H 4.6 Samples

I 4.7 Proprietary Materials or Goods

J 4.8 Cost-saving Proposals of Alternative Materials or Goods

K 4.9 Sample Area

L 4.10 Tests

M 4.11 Rejection of Unsuitable Materials, Goods, etc.

N 4.12 Packing and Protection

O 4.13 Responsibility

P 4.14 Test Certificates

Q 4.15 Sub-Contractor's Warranties

R 5.1 Site Accommodation

S 5.2 Site Facilities and Storage Areas

T 6.1 Sub-Contractor's Office and Site Organization

U 6.2 Setting Out the Sub-Contract Works

V 6.3 Ordering Materials and Equipment and Site Measurements

W 6.4 Delivery and Storage

To Collection

HK-4547/FP

Arcadis SR1 / 8

Page 248: TENDER DOCUMENTS · schedule no. 1 – preliminaries sr1/1 – sr1 sum/1 schedule no. 2 – preambles sr2/1 – sr2/72 schedule no. 3 – sewage treatment plant system sr3/1 – sr3

NOMINATED SUB-CONTRACT WORKS

FOR SEWAGE TREATMENT AND GREY WATER TREATMENT PLANT FOR PSFSC

FOR UPGRADING MAI PO NATURE RESERVE INFRASTRUCTURE

AT MAI PO, SAN TIN, YUEN LONG, NEW TERRITORIES

Schedule No. 1 - Preliminaries

Item HK$Description

PRELIMINARIES (Cont'd)

Specification Clauses (Cont'd)

A 6.5 Protection of the Sub-Contract Works

B 6.6 Co-ordination with Other Trades

C 6.7 Damages to Other Trades and Adjoining Property

D 6.8 Hong Kong Construction Sites (Safety) Regulations

E 6.9 Fire Hazard

F 6.10 Overtime

G 6.11 Invoices

H 6.12 Clearing away Rubbish during the Progress of the Sub-Contract

Works

I 6.13 Special Arrangements for Phased Completion

J 6.14 Clearing up on Completion

K 6.15 Compliance with BEAM Plus Requirements

L 6.16 Penalty for Non-compliance with Guidelines for Consultant

and Contractor

To Collection

HK-4547/FP

Arcadis SR1 / 9

Page 249: TENDER DOCUMENTS · schedule no. 1 – preliminaries sr1/1 – sr1 sum/1 schedule no. 2 – preambles sr2/1 – sr2/72 schedule no. 3 – sewage treatment plant system sr3/1 – sr3

NOMINATED SUB-CONTRACT WORKS

FOR SEWAGE TREATMENT AND GREY WATER TREATMENT PLANT FOR PSFSC

FOR UPGRADING MAI PO NATURE RESERVE INFRASTRUCTURE

AT MAI PO, SAN TIN, YUEN LONG, NEW TERRITORIES

Schedule No. 1 - Preliminaries

Item HK$Description

PRELIMINARIES (Cont'd)

Others

Allow for any other items not included in the foregoing but required

by the Sub-Contract. Please specify.

To Collection

HK-4547/FP

Arcadis SR1 / 10

Page 250: TENDER DOCUMENTS · schedule no. 1 – preliminaries sr1/1 – sr1 sum/1 schedule no. 2 – preambles sr2/1 – sr2/72 schedule no. 3 – sewage treatment plant system sr3/1 – sr3

NOMINATED SUB-CONTRACT WORKS

FOR SEWAGE TREATMENT AND GREY WATER TREATMENT PLANT FOR PSFSC

FOR UPGRADING MAI PO NATURE RESERVE INFRASTRUCTURE

AT MAI PO, SAN TIN, YUEN LONG, NEW TERRITORIES

HK$

PRELIMINARIES

Collection

From page SR1/1

From page SR1/2

From page SR1/3

From page SR1/4

From page SR1/5

From page SR1/6

From page SR1/7

From page SR1/8

From page SR1/9

From page SR1/10

TO SUMMARY OF TENDER

Item Description

Schedule No. 1 - Preliminaries

HK-4547/FP

Arcadis SR1 SUM / 1

Page 251: TENDER DOCUMENTS · schedule no. 1 – preliminaries sr1/1 – sr1 sum/1 schedule no. 2 – preambles sr2/1 – sr2/72 schedule no. 3 – sewage treatment plant system sr3/1 – sr3

SCHEDULE NO. 2

PREAMBLES

Page 252: TENDER DOCUMENTS · schedule no. 1 – preliminaries sr1/1 – sr1 sum/1 schedule no. 2 – preambles sr2/1 – sr2/72 schedule no. 3 – sewage treatment plant system sr3/1 – sr3

PART A – GENERAL

Page 253: TENDER DOCUMENTS · schedule no. 1 – preliminaries sr1/1 – sr1 sum/1 schedule no. 2 – preambles sr2/1 – sr2/72 schedule no. 3 – sewage treatment plant system sr3/1 – sr3

Bill No. 2 PART A – GENERAL

HK-4547/FP TCK4:LWY22:TWT1:GT:M45042:(28.2.2020) - SR2/1 - Arcadis Hong Kong Limited

For Use With HKSMM4

A These Preambles are for use with the “Hong Kong Standard Method of Measurement of Building Works, Fourth Edition Revised 2018, Incorporating Corrigenda 1” published by the Hong Kong Institute of Surveyors.

B All descriptions in these Schedules of Rates will be deemed to have been read in

conjunction with the Preamble Clauses hereunder which are relevant, where applicable, to the whole of the Works contained in this Contract.

C The Units of Measurement, Pricing etc. is described as being to :-

(i) Items given by weight - Kilogrammes (KG) (ii) Items given cube - cubic metres (CUBE) (iii) Items given super - square metres (SUPER) (iv) Items given run - linear metres (RUN) (v) Items enumerated - numbers (NO)

Where items are described in these Schedules of Rates in stages such as “1.50 –

3.00 m deep” or “100 – 200 mm girth” such descriptions shall be understood to mean respectively “exceeding 1.50 m and not exceeding 3.00 m deep” or “exceeding 100 mm and not exceeding 200 mm girth”.

D All materials and workmanship shall be, unless otherwise described, in accordance

with the relevant Specification Clauses, which term shall be deemed to include any relevant Specification notes on the Drawings. The rates for items in the Schedules of Rates shall include for works being executed in accordance with the relevant Specification Clauses as though all such Specification Clauses were fully set out in the Contract Bills.

Page 254: TENDER DOCUMENTS · schedule no. 1 – preliminaries sr1/1 – sr1 sum/1 schedule no. 2 – preambles sr2/1 – sr2/72 schedule no. 3 – sewage treatment plant system sr3/1 – sr3

PART A – GENERAL

HK-4547/FP TCK4:LWY22:TWT1:GT:M45042:(28.2.2020) - SR2/2 - Arcadis Hong Kong Limited

For Use With HKSMM4

A In addition to the General Principles stated in SMM4 Section II Clause 11, the rates for items in all Work Sections are, unless otherwise stated, to include for :-

(i) Executing the work in large or small quantities;

(ii) All planning/programming of work stages, liaison with other contractors

and/or trades, preparation of detailed design drawings, shop drawings, contractors working drawings, builders work drawings, “as fitted” drawings and all routing schedules and drawings;

(iii) All protection of materials for incorporation into the works, protection of the

works and cleaning up on completion;

(iv) All associated works required as part of normal good installation practice whether or not specifically mentioned on the Drawings, Specification, Preambles or item descriptions.

Page 255: TENDER DOCUMENTS · schedule no. 1 – preliminaries sr1/1 – sr1 sum/1 schedule no. 2 – preambles sr2/1 – sr2/72 schedule no. 3 – sewage treatment plant system sr3/1 – sr3

PART A – GENERAL

HK-4547/FP TCK4:LWY22:TWT1:GT:M45042:(28.2.2020) - SR2/3 - Arcadis Hong Kong Limited

For Use With HKSMM4

A Where works of any Work Sections are described as “curved”, they will be measured as follows :-

(i) Curved to any radius; shall all mean true curve;

(ii) Curved (in segments) to any radius; shall mean not in true curve, but a curve

formed by straight segments.

The area measured shall be the finished surface. The radius of curve stated in the description shall refer to the inner face of the finished surface and be grouped together within the following limits and described as being to :- (i) Small radius – any radius not exceeding 300 millimetres;

(ii) Medium radius – any radius exceeding 300 millimetres but not exceeding

1.50 metres;

(iii) Large radius – any radius exceeding 1.50 metres. B Where any departures from SMM4 are made these will either be expressly stated in

the relevant Bill Items or set out in detail in the following Parts B and C and such departures shall be deemed to have been accepted by the Contractor.

C Where any details / particulars / information as required by SMM4 and the Preambles

but are not stated, given or included in the descriptions of the bill items, the Contractor shall refer to the Drawings and the Specification for these details / particulars / information and the cost of which shall be deemed to be included in the rates for these items in the Schedules of Rates for the Works.

D The term “Extra over” or “Extra over for” preceding any item description for fittings (e.g.

bends, tees and the like) shall mean that the rates for such fittings on pipes, trunkings, ducting, trays and the like are deemed to exclude the cost of the length of pipe, trunking, ducting, tray and the like which such fittings replace.

E The term “Fix Only” shall mean taking delivery, unloading, storing, returning the

packings (if necessary), handling, hoisting, supplying any necessary jointing materials, supports and fixing materials and fixing all in place.

F Whenever the work “Allow” occurs in these Bills the cost of the item is at the risk of the

Contractor and no adjustment will be made at the settlement of accounts except where such adjustment is expressly provided for in the contract documents.

G Words importing the singular only also include the plural and vice versa where the

context requires.

Page 256: TENDER DOCUMENTS · schedule no. 1 – preliminaries sr1/1 – sr1 sum/1 schedule no. 2 – preambles sr2/1 – sr2/72 schedule no. 3 – sewage treatment plant system sr3/1 – sr3

PART A – GENERAL

HK-4547/FP TCK4:LWY22:TWT1:GT:M45042:(28.2.2020) - SR2/4 - Arcadis Hong Kong Limited

For Use With HKSMM4

For Building Services Works Only :- A Building Services Works are measured in accordance with Section XVII – Mechanical

Installations, Section XVIII – Electrical Installations and Section XIX – Communications / Security / Control Systems of the Hong Kong Standard Method of Measurement of Building Works, Fourth Editions Revised 2018 (hereinafter referred to as “SMM4”).

B Notwithstanding the Classification shown in APPENDIX “A” to Section II – GENERAL

PRINCIPLES of SMM4, Building Services Works shall be classified into systems or installations and given under headings as stated in Annex “A” of this Preambles as appropriate.

C The quantities contained in the Schedules of Rates for Building Services Works are

measured from the Tender Drawings which indicate the design intent and the design intent routing of the services. The quantities are measured flat on plan from point to point as shown on the Tender Drawings and apart from service risers, the measurement does not take into account any additional service runs or fittings required to route locally around structural members or changes in levels etc., to suit the building structure or architectural details and these are required to be allowed for by the Contractor in his rates and prices.

Furthermore, due to the nature of the Tender Drawings many items of detail are not

shown and are required to be allowed for by the Contractor in his rates and prices. These items are further mentioned in these Preambles for Building Services.

D The Tender Drawings show only the design intent routings and position of Building

Services Works. The precise routing and location of all Building Services Works shall be determined by whichever the Contractor is, in accordance with his contractual obligations, is responsible for overall co-ordination of the Building Services and production of Co-ordination Drawings.

E The co-ordination of the Building Services Works shall take into consideration the

requirements of the individual Building Services Installations, based upon the detailed Building Services Installation Drawings, other contractors and specialists works, the spatial constraints of the various elements of the building structure and architectural details, etc. and is required to be carried out to the satisfaction of the Employer’s Representative, the Architect and M&E Engineer.

F No variation whatsoever will be ordered by the Architect in accordance with the

Conditions of Contract as a result of the Contractor being required to reposition or reroute services runs and components from those routes generally indicated on the Tender Drawings in order to comply with the Co-ordination Drawings and any additional costs arising as a result repositioning or rerouting shall be the sole responsibility of the Contractor and shall be deemed to be included in the Contractor’s rates and prices.

G Where reference is made to the terms “Contract” and “Contractor” in these Preambles

for Building Services Works, such terms shall be constructed as meaning “Subcontract” and “Subcontractor” respectively if and when the context so requires.

Page 257: TENDER DOCUMENTS · schedule no. 1 – preliminaries sr1/1 – sr1 sum/1 schedule no. 2 – preambles sr2/1 – sr2/72 schedule no. 3 – sewage treatment plant system sr3/1 – sr3

PART A – GENERAL

HK-4547/FP TCK4:LWY22:TWT1:GT:M45042:(28.2.2020) - SR2/5 - Arcadis Hong Kong Limited

For Use With HKSMM4

Notes on Prime Cost (P.C.) Supply Rates with the Contractor being responsible for fixing

A Where P.C. supply rates are quoted for finishings or any items of work in the

Schedules of Rates three items have been measured :-

(1) One item is for the Supply Only of the finishing materials or items such as tiles, slabs, blocks, sheeting, wall covering, sanitary fittings or ironmongeries etc. including delivery to the street level of the Site.

The quantities stated in the Schedules of Rates for all lineal and superficial items are measured as the net length or area covered over all joints and in accordance with the Standard Method of Measurement and these Preambles.

(2) One item is for the allowance for profit and wastage which shall include :- (i) Profit for the Contractor. (ii) All adjustments due to joint widths and additional quantities of

materials that need to be ordered due to the method of measurement, wastage, loss, provision of samples and sufficient stock of consistent colour tone for rectification works during the Defects Liability Period.

(iii) All financing charges and other costs that are not included in the rates

for item (1) above and item (3) below. (3) One item is for the allowance for Fix Only and/or Lay Only which shall

include :-

(i) taking delivery from the suppliers who shall deliver the material to street level of the Site, unloading or assist to unload, including using fork-lift lorries if necessary in the event delivery container trucks are unable to enter the Site, all further handling, storing and distributing about the Works and returning packing materials to the supplier (including paying transport charges and obtaining credits therefor).

(ii) Fix/Lay Only (or Fix Only or Lay Only) including the provision of all

ancillary materials required for fixing or connection, such as bedding, jointing and pointing materials, fixing devices, bonding agent, cables, conduits, pipes, screws, nuts, adaptors and all similar items of a like nature.

B Materials subject to P.C. supply rates will be selected by the Architect at a price

agreed between the Architect and the suppliers after deduction of all discounts. Such suppliers shall be employed by the Contractor under the terms approved by the Architect and shall be deemed to be domestic suppliers of the Contractor.

C Immediately after the Architect’s selection, the Contractor shall quantify and place

orders for the materials. The ordering of and accounting for proper quantities are matters solely between the Contractor and the designated supplier.

Page 258: TENDER DOCUMENTS · schedule no. 1 – preliminaries sr1/1 – sr1 sum/1 schedule no. 2 – preambles sr2/1 – sr2/72 schedule no. 3 – sewage treatment plant system sr3/1 – sr3

PART A – GENERAL

HK-4547/FP TCK4:LWY22:TWT1:GT:M45042:(28.2.2020) - SR2/6 - Arcadis Hong Kong Limited

For Use With HKSMM4

Notes on Prime Cost (P.C.) Supply Rates with the Contractor being responsible for fixing (Cont’d)

A In the Final Account, adjustments shall only be made for the following :-

(1) the net increase or decrease from the P.C. supply rate stated in the description of the P.C. Supply Only item as item SR2/5/A(1) aforementioned when compared with the actual supply rate determined under item SR2/5/B aforementioned, multiply by the net quantity of the corresponding item measured in accordance with the Standard Method of Measurement and these Preambles.

(2) the unit rates for the profit and wastage item defined under item SR2/5/A(2)

aforementioned shall be adjusted by multiplying the actual supply rate determined under item SR2/5/B aforementioned and divided by the P.C. supply rate stated in the description of the P.C. Supply Only item as item SR2/5/A(1) aforementioned, i.e. :

Adjusted rate = B.Q. rate for profit and wastage x actual supply rate for profit and P.C. supply rate wastage

No adjustment shall be made to the unit rate for Fix Only and/or Lay Only item defined under Item SR2/5/A(3) aforementioned.

Page 259: TENDER DOCUMENTS · schedule no. 1 – preliminaries sr1/1 – sr1 sum/1 schedule no. 2 – preambles sr2/1 – sr2/72 schedule no. 3 – sewage treatment plant system sr3/1 – sr3

PART A – GENERAL

HK-4547/FP TCK4:LWY22:TWT1:GT:M45042:(28.2.2020) - SR2/7 - Arcadis Hong Kong Limited

For Use With HKSMM4

Notes on Prime Cost (P.C.) Supply and Installation Rates A Where P.C. supply and installation rates are quoted for finishings or any items of work

in the Schedules of Rates three items have been measured :-

(1) One item is for the Supply and Installation of the relevant works such as suspended ceiling, specialised flooring, specialised surface treatment, proprietary doors and frames, sanitary fittings, ironmongery etc.

The quantities stated in the Schedules of Rates for all lineal and superficial items are measured as the net length or area covered over all joints and in accordance with the Standard Method of Measurement and these Preambles.

(2) One item is for the allowance for profit which shall include :-

(i) Profit for the Contractor. (ii) All financing charges and other costs that are not included in the rates

for item (1) above and item (3) below.

(3) One item is for the allowance for providing general attendance in accordance with the Specification Preliminaries upon the firm undertaking the Supply and Installation works.

B Works subject to P.C. supply and installation rates will be selected by the Architect at

a price agreed between the Architect and the firms undertaking the Supply and Installation works after deduction of all discounts. Such firms shall be employed by the Contractor under the terms approved by the Architect and shall be deemed to be domestic sub-contractors of the Contractor.

C Immediately after the Architect’s selection, the Contractor shall quantify and place

orders for the Supply and Installation works. The ordering and accounting for proper quantities is a matter solely between the Contractor and the firms undertaking the Supply and Installation works.

Page 260: TENDER DOCUMENTS · schedule no. 1 – preliminaries sr1/1 – sr1 sum/1 schedule no. 2 – preambles sr2/1 – sr2/72 schedule no. 3 – sewage treatment plant system sr3/1 – sr3

PART A – GENERAL

HK-4547/FP TCK4:LWY22:TWT1:GT:M45042:(28.2.2020) - SR2/8 - Arcadis Hong Kong Limited

For Use With HKSMM4

Notes on Prime Cost (P.C.) Supply and Installation Rates (Cont’d) A In the Final Account, adjustments shall only be made for the following :-

(1) the increase or decrease from the P.C. supply and installation rate stated in

the description of the P.C. Supply and Installation item as item SR2/7/A(1) aforementioned when compared with the actual supply and installation rate determined under item SR2/7/B aforementioned, multiply by the net quantity of the corresponding item measured in accordance with the Standard Method of Measurement and these Preambles.

(2) the unit rates for the profit item defined under item SR2/7/A(2)

aforementioned shall be adjusted by multiplying the actual supply and installation rate determined under item SR2/7/B aforementioned and divided by the P.C. supply and installation rate stated in the description of the P.C. Supply and Installation item as item SR2/7/A(1) aforementioned, i.e. :

Adjusted rate = B.Q. rate for profit x actual supply and installation rate for profit P.C. supply and installation rate

No adjustment shall be made to the unit rates for general attendance item defined under item SR2/7/A(3) aforementioned.

Page 261: TENDER DOCUMENTS · schedule no. 1 – preliminaries sr1/1 – sr1 sum/1 schedule no. 2 – preambles sr2/1 – sr2/72 schedule no. 3 – sewage treatment plant system sr3/1 – sr3

For Use With HKSMM4

PART B – BUILDING WORKS

Page 262: TENDER DOCUMENTS · schedule no. 1 – preliminaries sr1/1 – sr1 sum/1 schedule no. 2 – preambles sr2/1 – sr2/72 schedule no. 3 – sewage treatment plant system sr3/1 – sr3

PART B – BUILDING WORKS

HK-4547/FP TCK4:LWY22:TWT1:GT:M45042:(28.2.2020) - SR2/9 - Arcadis Hong Kong Limited

For Use With HKSMM4

DEMOLITIONS AND ALTERATIONS A The Preamble Clauses for ALL OTHER WORK SECTIONS apply equally to this

Work Section where relevant. B The Contractor will be deemed to have assessed for himself the scope of the

Demolition, Alteration and Spot Works and to have taken his own measurements and notes as necessary in order to price each item.

C Due allowance for the salvage value (if any) of old materials arising from demolitions

that become the property of the Contractor, etc. should be made in the space(s) provided in the Demolition Section of the Schedules of Rates unless specifically stated otherwise.

D In addition to the Coverage Rules stated in SMM4 Section IV (a) C.1 to C.4, (b) C.4

and C.5, the rates for all Demolition, Alteration and Spot Works are also to include for :-

(i) Executing the work in such a way as to ensure the safety of, and cause as

little inconvenience as possible to, adjoining properties and occupants, the public in general, passing vehicles and workmen;

(ii) Provision of all shoring, needling, strutting or other supports necessary for the

protection and safety of and upholding all portions of the building affected by the works including all necessary cutting away and making good after removal;

(iii) Provision of all necessary scaffolding, fans and wire mesh or matting

protective screens; (iv) Wedging and pinning up, cutting to line remaining portions, cutting back

reinforcement or cutting out cramps, making good any walling which collapses or is pulled down in excess of requirement, and preparing surfaces of floor slabs under, ceiling over, and abutting surfaces of columns or side walls to receive new finishes, facing up or flushing up existing surfaces after cutting to match the surrounding work and cutting back old plaster and pavings, etc. for joints with new;

Page 263: TENDER DOCUMENTS · schedule no. 1 – preliminaries sr1/1 – sr1 sum/1 schedule no. 2 – preambles sr2/1 – sr2/72 schedule no. 3 – sewage treatment plant system sr3/1 – sr3

PART B – BUILDING WORKS

HK-4547/FP TCK4:LWY22:TWT1:GT:M45042:(28.2.2020) - SR2/10 - Arcadis Hong Kong Limited

For Use With HKSMM4

DEMOLITIONS AND ALTERATIONS (Cont’d)

(v) Removing all old materials, debris and other arisings off Site to a store or dump to be provided by the Contractor and approved by Government including any additional costs involved should the site of the approved shoot, dump or tip be changed during the contract period.

The provisions of Excavation Preamble Clause D(i), (ii) and (iii) on Page

SR2/38 shall apply equally to this section of the Works; (vi) Providing all necessary dust screens and similar and watering debris as

necessary to reduce dust nuisance to a minimum; (vii) All other works necessary or implied to complete the Demolitions, Alterations

and Spot Works in a proper and workmanlike manner in accordance with the relevant Specification Clauses and Drawings.

A In addition to the Coverage Rules stated in SMM4 Section IV (a) C.1 to C.4, (b) C.4

and C.5, the rates for demolition, breaking up, taking down, etc. are also to include for :-

(i) Demolishing and removing all attached finishes, fittings, skirtings, etc. (ii) Relocating of services, conduits, pipes, etc. as necessary.

(iii) Taking down, setting aside, protecting, and refixing as appropriate all fixings

to be retained but which prevent demolition or removal works form being carried out.

(iv) Making good to surrounding finishes disturbed.

(v) Reinstating existing or re-laying with new wood block flooring to match

existing. B The term “making good” shall be understood as including all labours and materials

necessary to bring the disturbed area to the same face, colour, texture, etc., in the same materials as the surrounding work.

Page 264: TENDER DOCUMENTS · schedule no. 1 – preliminaries sr1/1 – sr1 sum/1 schedule no. 2 – preambles sr2/1 – sr2/72 schedule no. 3 – sewage treatment plant system sr3/1 – sr3

PART B – BUILDING WORKS

HK-4547/FP TCK4:LWY22:TWT1:GT:M45042:(28.2.2020) - SR2/11 - Arcadis Hong Kong Limited

For Use With HKSMM4

DEMOLITIONS AND ALTERATIONS (Cont’d)

A In addition to the Coverage Rules stated in SMM4 Section IV (a) C.1 to C.3, (b) C.4

and C.5, the rates for breaking up or otherwise blocking existing openings are also to include for the careful removal of any pavings and finishings to jambs and heads of the openings.

B In addition to the Coverage Rules stated in SMM4 Section IV (a) C.1 to C.3, (b) C.4

and C.5, the rates for removing existing joinery and metal fittings are also to include for cutting out all brackets, removing all screws, nails and other fixings, filling all holes, etc. resulting and preparing remaining surfaces for new finish or decoration.

C In addition to the Coverage Rules stated in SMM4 Section IV (a) C.1 to C.4, the rates

for removal of building elements containing asbestos shall also include for :-

(i) Carrying out by a Specialist Asbestos Removal Contractor such removal work in horizontal, vertical or any position at any height, and from different parts of the structures;

(ii) Setting up of and removing from Site all necessary plant; (iii) Removing all old materials, debris, contaminated waste and other arisings off

the Site to a dump provided by the Contractor and approved by Government including any additional costs involved should the Site of the approved shoot, dump or tip be changed during the Contract period;

(iv) Making good disturbed surfaces if required.

D In addition to the Coverage Rules stated in SMM4 Section IV (a) C.1 to C.3, (b) C.4

and C.5, the rates for hacking off existing pavings, skirtings, wall and ceiling plaster, tiling and similar are also to include for preparing the remaining surface to receive new finish.

E In addition to the Coverage Rules stated in SMM4 Section IV (a) C.1 to C.3, (b) C.4

and C.5, the rates for taking down plumbers pipework, drain pipes and sanitary fittings are to include for all cutting out of brackets and other fixings, removing sleeves, making good all disused holes or chases in or through floors, walls and similar, and making good any other damage to existing surfaces. Rates for taking out tubing and pipes are to include for sealing off remaining ends.

Page 265: TENDER DOCUMENTS · schedule no. 1 – preliminaries sr1/1 – sr1 sum/1 schedule no. 2 – preambles sr2/1 – sr2/72 schedule no. 3 – sewage treatment plant system sr3/1 – sr3

PART B – BUILDING WORKS

HK-4547/FP TCK4:LWY22:TWT1:GT:M45042:(28.2.2020) - SR2/12 - Arcadis Hong Kong Limited

For Use With HKSMM4

DEMOLITIONS AND ALTERATIONS (Cont’d) A In addition to the Coverage Rules stated in SMM4 Section IV (a) C.1 to C.3, (b) C.4

and C.5, the rates for items described as “set aside for re-use” are to include for carefully removing, disconnecting, dismantling and subsequently re-assembling if necessary, etc., cleaning the items or materials, oiling and adjusting if necessary, repairing any damage caused to the item during taking down, etc. and leaving safely stored on Site ready for subsequent re-use. Any repair required apart from making good damage caused during taking down, etc., and refixing in new positions, will be measured and paid for separately.

B Occasional touching up works like nailing in loose skirtings and edgings, bringing

forward indents with plaster or wood filler, and patching up painted surfaces etc. of a minor nature shall not measured but shall be held to be allowed for under the preliminaries or in the rates inserted against the relevant items in the Schedules of Rates.

C The following materials are permitted to be re-used in work measured as new. No

adjustment will be made to the measured quantities of new work in which such old materials are re-used.

Page 266: TENDER DOCUMENTS · schedule no. 1 – preliminaries sr1/1 – sr1 sum/1 schedule no. 2 – preambles sr2/1 – sr2/72 schedule no. 3 – sewage treatment plant system sr3/1 – sr3

PART B – BUILDING WORKS

HK-4547/FP TCK4:LWY22:TWT1:GT:M45042:(28.2.2020) - SR2/13 - Arcadis Hong Kong Limited

For Use With HKSMM4

EXCAVATION

A The term “Excavating with open cutting” shall mean excavation works follow the

design as shown in the drawings for the cutting profile at specified angles and volume of excavation shall follow the profile as shown in the drawings.

B Any Site levels, either spot or contour shown on the Drawings are, unless otherwise

stated, reduced to Principal Datum. If the Contractor is not satisfied with the accuracy of these levels, he must give written notice to the Architect before excavations are commenced, otherwise no claim in respect of the inaccuracy of levels will be entertained.

C All excavation has been and will be finally measured from the existing ground level or

the formation level, whichever is the lower, unless different commencement level is specially stated in the measured Bills. All excavations, backfilling and disposal will be measured on the same basis, i.e. of minimum excavation and filling works. The Contractor is, however, at liberty to carry out the works in any sequence provided that any extra costs arising out of any additional works required by the Contractor to suit his own construction requirements are deemed to have been allowed by him in his rates of the items affected.

D The Contractor will be deemed to have visited the Site and to have inspected any trial

holes that may exist and to have satisfied himself, before tendering, as to the nature of the Site, the ground to be excavated and the work required, and to have included in his tender for all types of excavation likely to be met with, and no claim will be allowed for him not having done so.

E The whole of the site formation works have been measured to finished levels as

shown on the drawings. Any additional earthworks required by the Contractor to suit his own construction requirements or to comply with the Architect’s requirements for phasing of the works, if required, shall be carried out at his own expense.

Page 267: TENDER DOCUMENTS · schedule no. 1 – preliminaries sr1/1 – sr1 sum/1 schedule no. 2 – preambles sr2/1 – sr2/72 schedule no. 3 – sewage treatment plant system sr3/1 – sr3

PART B – BUILDING WORKS

HK-4547/FP TCK4:LWY22:TWT1:GT:M45042:(28.2.2020) - SR2/14 - Arcadis Hong Kong Limited

For Use With HKSMM4

EXCAVATION (Cont’d) A It has been assumed, for measurement purposes only, that all excavated materials are

suitable for filling. The rates for filling are to include for provision of imported earth of approved quality obtained from the Contractor’s own source to substitute for any excavated material that may be found unsuitable for filling and for carting away unsuitable materials from site. No adjustment to the quantities will be made in this respect. The onus is on the tenderer to determine before submission of his tender the nature of the soil to be encountered and its suitability for filling. Imported earth for filling shall be measured only when the measured amount of filling exceeds the measured amount of excavation.

B The quantities of excavation etc. have been measured as accurately as possible from

the levels as shown on the drawings, interpolating levels between contours when necessary. It must be clearly understood that the printed quantities will be regarded as firm, except for “Provisional” items and will not be subject to remeasurement unless revised at a later date by Architect’s instructions.

C In addition to the Coverage Rules stated in SMM4 Section VI (a) C.3, the rates for

reduced level excavation into banks for the construction of retaining walls and similar are also to include for any extra excavation and filling or subsequent disposal of excavated materials where required for temporary shoring and supports.

Page 268: TENDER DOCUMENTS · schedule no. 1 – preliminaries sr1/1 – sr1 sum/1 schedule no. 2 – preambles sr2/1 – sr2/72 schedule no. 3 – sewage treatment plant system sr3/1 – sr3

PART B – BUILDING WORKS

HK-4547/FP TCK4:LWY22:TWT1:GT:M45042:(28.2.2020) - SR2/15 - Arcadis Hong Kong Limited

For Use With HKSMM4

EXCAVATION (Cont’d) D In addition to the Coverage Rules stated in SMM4 Section VI (a) C.3, the rates for

excavations are also to include for the following :-

(i) Executing and maintaining all banks, slopes and cuttings included in the

Contract, remove landslips and make good damage caused thereby during the Contract Period;

(ii) Setting out the profiles of slopes, cuttings or any portion of the Works and for setting out all curves as directed by the Architect;

(iii) Breaking up old brick, mass or reinforced concrete or stone slab foundations,

chunam surfacing, pavings, surface or subsurface mass or reinforced concrete slabs or walls and the like;

(iv) Providing and erecting all necessary and adequate shoring, sheeting, planking

and strutting, etc. to uphold and maintain the sides of all excavations, except that to excavations into banks which has been measured in accordance with SMM Section VI (a).5, whether existing or performed by the Contractor and for any extra excavation and subsequent return filling required therefor to the entire satisfaction of the Architect, and for the Contractor’s responsibility for the safety of all excavations and for upholding and maintaining the sides of earthwork by whatever means are considered necessary and where possible, without injuring new or old work, removing all temporary timbering, etc. such removal to be at the Contractor’s own risk;

(v) Upholding and supporting all services, pipes, cables, etc. encountered; (vi) Excavating by hand or taking such other precautions as are necessary to avoid

damage to piles or shoring and strutting; (vii) Taking reasonable care and precautions to prevent settlement due to the

excavation. In the event of any settlement appearing all work shall be stopped and the settlement reported to the Architect. The Contractor shall propose and execute all remedial work which must be approved by the Architect and Building Authority. No extension of time or increase in Contract Sum will be allowed due to settlement caused by the excavation.

(viii) Complying with all regulations, providing blasting screens and/or other

approved means of protection against damage or injury, where written permission for blasting has been given by the Architect.

Page 269: TENDER DOCUMENTS · schedule no. 1 – preliminaries sr1/1 – sr1 sum/1 schedule no. 2 – preambles sr2/1 – sr2/72 schedule no. 3 – sewage treatment plant system sr3/1 – sr3

PART B – BUILDING WORKS

HK-4547/FP TCK4:LWY22:TWT1:GT:M45042:(28.2.2020) - SR2/16 - Arcadis Hong Kong Limited

For Use With HKSMM4

EXCAVATION (Cont’d) A All excavation, (except excavating trenches for service pipes, cables, curbs, multiple

pipes and the like and excavating post holes ≤ 0.3m3), shall be measured CUBE irrespective of actual depth or thickness of the excavation. Excavation below formation levels for foundation trenches, roads, drains, basements and bulk excavation for future foundations shall be measured separately. Excavation to form cuttings shall be included with the excavation to reduced levels.

B All excavation, except over site to reduce levels and bulk excavation into banks,

excavating trenches for service pipes, cables, curbs, multiple pipes and the like and excavating post holes ≤ 0.3m3, shall be given by stating the maximum depth in the following categories instead of being given in successive stages of 1.50m :-

(i) 0 - 2.50m maximum depth (ii) 0 - 5.00m maximum depth (iii) and thereafter in 5.00m stages

C Working space shall not be measured and the rates for excavation and/or backfilling

as appropriate are to include for :-

(i) Additional excavation to provide working space where required for the erection of formwork and/or execution of work which requires workmen to operate from the outside.

(ii) Backfilling working space with approved selected excavated material and/or

approved imported filling material, and disposal of excavated material unsuitable for filling if working space is required.

D Excavating trenches for service pipes, cables, curbs, multiple pipes and cables and

the like shall be given RUN stating the average depth in the following categories :-

(i) not exceeding 1.00m (ii) 1.00 - 1.50m (iii) and thereafter in 0.50m stages

E In addition to the Coverage Rules stated in SMM4 Section VI (a) C.7, the rates for

filling are also to include for setting out profiles of slopes, cuttings or of any portion of the Works and for setting out all curves as directed by the Architect.

Page 270: TENDER DOCUMENTS · schedule no. 1 – preliminaries sr1/1 – sr1 sum/1 schedule no. 2 – preambles sr2/1 – sr2/72 schedule no. 3 – sewage treatment plant system sr3/1 – sr3

PART B – BUILDING WORKS

HK-4547/FP TCK4:LWY22:TWT1:GT:M45042:(28.2.2020) - SR2/17 - Arcadis Hong Kong Limited

For Use With HKSMM4

EXCAVATION (Cont’d) A In addition to the Coverage Rules stated in SMM4 Section VI (a) C.7, The rates for

filling on existing slopes where the gradient is steeper than 1:2 are also to include for cutting steps 1 200 mm high or as directed by the Architect including additional excavation, disposal and filling.

B The measurements for all earth and hardcore (which term shall be deemed to include

sand, coarse granite chips, crusher run granite aggregate, approved granular fill, gravel, approved graded filter material, reconstituted soil, and the like) filling and backfilling are those of the voids to be filled and the rates are to include for :-

(i) Filling, ramming and consolidating in layers; (ii) Any variation in bulk before and after compacting; (iii) Any additional material required to allow for consolidation; (iv) Temporary retaining boards to edges and slopes; (v) Any necessary handpacking at steppings, thickening under slabs, behind

walls and similar positions. C In addition to the Coverage Rules stated in SMM4 Section VI (a) C.7, the rates for

hardcore or granular filling are, in addition, to include for laying to falls and cambers where required.

D In addition to the Coverage Rules stated in SMM4 Section VI (a) C.7, the rates for

disposal of excavated material or importation of filling or hardcore which have to be transported along public roads are also to include for taking the following precautions to prevent the material being deposited on these roads during haulage :-

(i) All lorries must have tightly fitting and adequately secured sides and tail

boards; (ii) Earth or hardcore shall not be loaded into the lorry to a level higher than the

tail or side boards. Rocks shall be carefully and securely stacked on the vehicle to prevent any dislodging and falling onto the road during haulage;

(iii) During the period covered by the excavation works the Contractor shall

provide and employ at the Works Site, borrow site and dump site such unskilled labour as is necessary or as directed by the Architect for the purpose of keeping the wheels and undersides of lorries clean and free from earth prior to leaving the Works Site, borrow site or dump site and, after dumping and, for sweeping out all loose materials remaining in the vehicle. At the discretion of the Architect such labour shall be employed also in keeping clean the approach roads to Works Site, borrow site or dump site.

E In addition to the Coverage Rules stated in SMM4 Section VI(a) C.10, the rates for

Chunam surfacing slopes are to include for any necessary working platforms.

Page 271: TENDER DOCUMENTS · schedule no. 1 – preliminaries sr1/1 – sr1 sum/1 schedule no. 2 – preambles sr2/1 – sr2/72 schedule no. 3 – sewage treatment plant system sr3/1 – sr3

PART B – BUILDING WORKS

HK-4547/FP TCK4:LWY22:TWT1:GT:M45042:(28.2.2020) - SR2/18 - Arcadis Hong Kong Limited

For Use With HKSMM4

CONCRETE WORKS A In addition to the Coverage Rules stated in SMM4 Section VII (a) C.1 and C.2, the

rates for all concrete and reinforced concrete work are also to include for tamping around reinforcement, consolidating, vibrating, curing and protection etc.;

B Walls in general shall be given separately for structural walls and non-structural walls

(For concrete and formwork to wall faces only). Reinforcement for structural walls and non-structural walls shall not be measured separately. Structural walls are that which shown in the structural layout drawings.

C Reinforcing rods are measured in lengths not exceeding 12 metres long unless

otherwise stated.

Page 272: TENDER DOCUMENTS · schedule no. 1 – preliminaries sr1/1 – sr1 sum/1 schedule no. 2 – preambles sr2/1 – sr2/72 schedule no. 3 – sewage treatment plant system sr3/1 – sr3

PART B – BUILDING WORKS

HK-4547/FP TCK4:LWY22:TWT1:GT:M45042:(28.2.2020) - SR2/19 - Arcadis Hong Kong Limited

For Use With HKSMM4

CONCRETE WORKS (Cont’d)

A Rod reinforcement will be calculated and paid for at the following standard weights per linear metre (regardless of actual weight) :-

Diameter kg/m 6 mm 0.222 8 mm 0.395 10 mm 0.616 12 mm 0.888 16 mm 1.579 20 mm 2.466 25 mm 3.854 32 mm 6.313 40 mm 9.864

B Trimming bars around openings not exceeding 1.00m2 sectional area in concrete work

shall be given as an ITEM and the price for same shall be at the risk of the Contractor which shall not be subject to adjustment in the settlement of accounts.

C If reinforcement detailing is supplied in the form of computer print-out schedules, the

rates for reinforcement shall include for any extra costs and expenses in co-ordinating between drawings, standard details and the computer print-out schedules as to the exact number, lengths, type, sizing, spacing, shape, location, and bending dimensions of the reinforcement to be used; including the production of any working drawings the Contractor considers necessary. Samples of the computer print-out schedules may be inspected at the Engineer’s office during normal office hours. The Contractor is deemed to have inspected these schedules prior to the submission of his tender.

D No lap length shall be measured at the junctions between reinforcement bars where

couplers are used for connection. E Formwork to the following shall not be measured as separate items but held to be

included in the rates for formwork where the same are formed:-

(i) Forming holes for pipes. (ii) Boxings for openings.

(iii) Blockouts for recesses not exceeding 1.00m2 sectional area.

Page 273: TENDER DOCUMENTS · schedule no. 1 – preliminaries sr1/1 – sr1 sum/1 schedule no. 2 – preambles sr2/1 – sr2/72 schedule no. 3 – sewage treatment plant system sr3/1 – sr3

PART B – BUILDING WORKS

HK-4547/FP TCK4:LWY22:TWT1:GT:M45042:(28.2.2020) - SR2/20 - Arcadis Hong Kong Limited

For Use With HKSMM4

CONCRETE WORKS (Cont’d) A In addition to the Coverage Rules stated in SMM4 Section VII (d) C.1 to C.4, the rates

for slipformwork shall also include for finishing the surfaces of concrete with a sponge or rubber faced timber float as described/approved to produce a smooth even textured surface and for making good rippled or ridged surfaces or any other imperfections.

B In addition to the Coverage Rules stated in SMM4 Section VII (d) C.1 to C.4, the rates

for formwork are also to include for :-

(i) Straight, circular and raking cutting and waste, except for fillets planted on formwork to form ornamental features in self-finished concrete surfaces, all fillets for chases, drips, grooves, recesses, and the like, rebates, chamfered and rounded or moulded edges, splayed angles and the like and stops to chamfers and rounded or moulded edges;

(ii) Forming cavities and holes for pipes etc. for any diameter and openings not

exceeding 1.00 square metres sectional area; (iii) Obtaining and fixing in position all bolts, fixings, cores, pipes sleeves, or other

approved ferrules and any other inserts necessary (bolts, fixings, cores, pipes, sleeves, ferrules, etc. provided by other trades, Nominated Sub-Contractors or Specialist Contractors);

(iv) Shuttering simultaneously as many floors as may be necessary for the

continuous and expeditious progress of the work to the satisfaction of the Architect;

C Formwork with a strutting height exceeding 3.50m shall not be given separately. The rates for formwork to sides and soffits of beams, soffits of slabs, landing, soffits of coffered or troughed slabs and the like are to include for any strutting height.

D Formwork to sides and soffits of beams exceeding 1.00m deep (below soffit of slab)

shall not be given separately but grouped under formwork to sides and soffits of beams.

Page 274: TENDER DOCUMENTS · schedule no. 1 – preliminaries sr1/1 – sr1 sum/1 schedule no. 2 – preambles sr2/1 – sr2/72 schedule no. 3 – sewage treatment plant system sr3/1 – sr3

PART B – BUILDING WORKS

HK-4547/FP TCK4:LWY22:TWT1:GT:M45042:(28.2.2020) - SR2/21 - Arcadis Hong Kong Limited

For Use With HKSMM4

CONCRETE WORKS (Cont’d) A Wherever formwork is described as “to produce a fair face finish” such term shall be

held to include any smooth fair faced finish as specified. B Wherever formwork is described as “to produce a fair face finish” the rates are further

to include for forms to be close jointed to produce a smooth finished appearance in the concrete surface, free from board marks, voids, holes and other imperfections and any such marks are to be carefully rubbed down and any holes filled with filler as specified. Fillets or battens to form grooves, rebates, ribs, etc., as features in fair face concrete have been measured.

C Where steel forms are specifically required to be used in producing a fair face finish,

the rates are further to include for formwork of an approved material at margins or irregular shape or size such as at intersections with other concrete members, projections, voids, openings and the like.

D In addition to the Coverage Rules stated in SMM4 Section VII (e) C.1 and C.2, the

rates for precast concrete works and precast prestressed concrete works are also to include for finishing exposed surfaces with a self-finished concrete surface as herein previously described using additional cement, or leaving rough to receive finishings, the formation of all angles, mitres and ends and stoolings, etc. hoisting and building in, bedding and pointing in cement mortar, for all temporary supports, lifting devices and any additional reinforcement required for lifting.

E The rates for building paper, polythene sheeting or the like, are to include for all additional labour and material for lapping and sealing at joints and for turning up at edges.

Page 275: TENDER DOCUMENTS · schedule no. 1 – preliminaries sr1/1 – sr1 sum/1 schedule no. 2 – preambles sr2/1 – sr2/72 schedule no. 3 – sewage treatment plant system sr3/1 – sr3

PART B – BUILDING WORKS

HK-4547/FP TCK4:LWY22:TWT1:GT:M45042:(28.2.2020) - SR2/22 - Arcadis Hong Kong Limited

For Use With HKSMM4

BRICKWORK AND BLOCKWORK A In addition to the Coverage Rules stated in SMM4 Section VIII (a) C.1, the rates for all

brickwork, blockwork and facings are also to include for :-

(i) Joint reinforcement and bonding ties as required. (ii) Bonding at angles and intersections; (iii) Oversailing and receding courses; (iv) Rough relieving and discharging arches; (v) Wedging and pinning, up to undersides of beams or slabs and labour to

eaves filling; (vi) Raking out and enlarging joints if necessary for and pointing to turn-ins of

flashings and similar items; (vii) Parging and coring flues; (viii) Obtaining and building in position all fixings, cores, pipes, sleeves, or other

approved ferrules and any other inserts necessary (fixings, cores, pipes, sleeves, ferrules, etc. provided by other trades, Nominated Sub-Contractors and Specialist Contractors).

B In addition to the Coverage Rules stated in SMM4 Section VIII (a) C.1 and C.3, the

rates for all block walling are also to include for free ends, intersections, top edges, openings, etc. and for all necessary quarter, half and three-quarter length blocks and all other blocks either hollow or solid of special lengths and heights and for filling solid cavities of hollow blocks at ends and intersections with concrete where required as described.

C Dwarf walls supporting fittings, parapets and the like shall not be given separately but

grouped under walls of the same material and thickness.

Page 276: TENDER DOCUMENTS · schedule no. 1 – preliminaries sr1/1 – sr1 sum/1 schedule no. 2 – preambles sr2/1 – sr2/72 schedule no. 3 – sewage treatment plant system sr3/1 – sr3

PART B – BUILDING WORKS

HK-4547/FP TCK4:LWY22:TWT1:GT:M45042:(28.2.2020) - SR2/23 - Arcadis Hong Kong Limited

For Use With HKSMM4

DRAINAGE (Including Underground Pipe Ducts) A The Preamble Clauses for “EXCAVATION”, “CONCRETE WORKS”, “BRICKWORK

AND BLOCKWORK” and other work sections apply equally to this Work Section where relevant.

B Unless otherwise specified, excavating drain trenches / pipe ducts shall be given RUN

stating the average depth (between the 2 ends of a length of pipework) in the following categories :-

(i) not exceeding 1.50m (ii) 1.50 – 2.50m (iii) and thereafter in 1.00m stages

C In addition to the Coverage Rules stated in SMM4 Section IX C.1, the rates for drain

trenches / pipe ducts are, in addition to the “EXCAVATION” Preamble Clauses, also to include for :-

(i) the erection of proper sight rails, as the Contractor will be held responsible for

the accuracy of all levels; (ii) working space where required for concrete beds; (iii) Any holes in the excavation that may have been formed by accident or

caused by the removal of rock, cutting out soft spots or any case where the excavation is deeper than instructed for any reason including excavating deeper in lieu of trimming rock bottom to exact levels or falls, shall be made up with concrete mix 1:12 of coarse aggregate, or other mix or material as may be required by the Specification.

D In addition to the Coverage Rules stated in SMM4 Section VII (a) C.7 and C.8, the

rates for stormwater channels are also to include for excavation, backfilling with and including specified materials, removal of surplus excavated materials from Site, formwork and rendering.

Page 277: TENDER DOCUMENTS · schedule no. 1 – preliminaries sr1/1 – sr1 sum/1 schedule no. 2 – preambles sr2/1 – sr2/72 schedule no. 3 – sewage treatment plant system sr3/1 – sr3

PART B – BUILDING WORKS

HK-4547/FP TCK4:LWY22:TWT1:GT:M45042:(28.2.2020) - SR2/24 - Arcadis Hong Kong Limited

For Use With HKSMM4

DRAINAGE (Including Underground Pipe Ducts) (Cont’d) A In addition to the Coverage Rules stated in SMM4 Section IX C.3, the rates for drain

pipes are also to include for :- (i) Cutting and waste and jointing to drain pipes, gullies, etc.;

(ii) Connections to existing drains, pipes, manholes, catchpits, drawpits, channel,

and the like; (ii) Temporarily plugging open ends of pipes whenever work is suspended; (iii) The provision and fixing of all brackets required for pipes fixed to manhole

sides, walls, etc.; (iv) Building in and making good ends of pipes to manhole sides and jointing to

channels; (v) Cutting or forming perforations through brick and concrete walls and making

good including providing all necessary sleeves. B In addition to the Coverage Rules stated in SMM4 Section IX C.5 and C.6, the rates

for pipe fittings, gullies, traps and similar are also to include for the additional cutting on the pipe and all additional joints.

C All concrete beds, benchings and coverings shall be measured flat on plan and the

rates for same are to include for additional quantities required to execute the works with the same falls as the drains.

Page 278: TENDER DOCUMENTS · schedule no. 1 – preliminaries sr1/1 – sr1 sum/1 schedule no. 2 – preambles sr2/1 – sr2/72 schedule no. 3 – sewage treatment plant system sr3/1 – sr3

PART B – BUILDING WORKS

HK-4547/FP TCK4:LWY22:TWT1:GT:M45042:(28.2.2020) - SR2/25 - Arcadis Hong Kong Limited

For Use With HKSMM4

DRAINAGE (Including Underground Pipe Ducts) (Cont’d) A All drain pipes, except drop pipes, shall be measured flat on plan. Drain pipes

entering or egressing from manholes and the like shall be measured to or from the external wall face of the manholes and the like. The rates for drain pipes, except drop pipes, are to include for :-

(i) Additional length of pipework for laying the drains to falls as required. (ii) Additional length of pipework built in at inlets and outlets to manholes and the

like.

B Manholes and the like shall be ENUMERATED stating the internal size and depth

(measured from cover level to invert level or top of base slab, whichever is the lower) in the following categories :-

(i) not exceeding 1.50m deep (ii) exceeding 1.50m deep in stages of 1.00m All excavation, backfilling, disposal, concrete, formwork, reinforcement, brickwork, benchings, channels, rendering, step irons, covers, drop pipes, fittings including traps, painting, connection of drains and cutting etc. shall be held to be included in the item.

Page 279: TENDER DOCUMENTS · schedule no. 1 – preliminaries sr1/1 – sr1 sum/1 schedule no. 2 – preambles sr2/1 – sr2/72 schedule no. 3 – sewage treatment plant system sr3/1 – sr3

PART B – BUILDING WORKS

HK-4547/FP TCK4:LWY22:TWT1:GT:M45042:(28.2.2020) - SR2/26 - Arcadis Hong Kong Limited

For Use With HKSMM4

ROOFING AND WATERPROOFING A Section X and XII of the SMM4 is renamed as Roofing and Waterproofing. Besides

the works required to be measured under this Section in the SMM4, all types of applied waterproofing systems, no matter whether laid on roofs or elsewhere, shall be measured in this Section.

B Where roof screeds or toppings are of varying thickness in order to achieve the

designed falls, the thickness stated in the description is the MINIMUM thickness (and NOT the average thickness). The rates for same are therefore to include for the additional materials and labour required to increase the stated thicknesses to those required to achieve the designed falls.

C In addition to the Coverage Rules stated in SMM4 Section X (a) C.1 to C.6, the rates

for all asphalt work are also to include for :-

(i) Hacking concrete surfaces to form key; (ii) Rubbing surfaces of roofing with a wood float with clean sand if required; (iii) Working and making good asphalt to outlet pipes, dishing to gullies, forming

collars around pipes, sleeves, railing standards and the like including cleaning and priming the surfaces of those items with bitumen solution before executing the asphalt work.

Page 280: TENDER DOCUMENTS · schedule no. 1 – preliminaries sr1/1 – sr1 sum/1 schedule no. 2 – preambles sr2/1 – sr2/72 schedule no. 3 – sewage treatment plant system sr3/1 – sr3

PART B – BUILDING WORKS

HK-4547/FP TCK4:LWY22:TWT1:GT:M45042:(28.2.2020) - SR2/27 - Arcadis Hong Kong Limited

For Use With HKSMM4

ROOFING AND WATERPROOFING (Cont’d) A In addition to the Coverage Rules stated in SMM4 Section X (b) C.1 to C.6. the rates

for all Liquid Membrane Roofing and Waterproofing works are also to include for all additional labour and materials in connection with :

(i) Surface preparation of the substrate; (ii) Additional treatment as may be required at expansion joints, dishings to

outlets, collars to pipes, coves, upstands and the like including priming, sealing, waxing, etc.;

(iii) Maintaining the recommended temperature of the waterproofing materials

immediately prior to their use; (iv) Protection and curing; (v) All other requirements of the manufacturer’s instructions.

Corrugated and similar sheeting of asbestos cement, plastic, metal and the like. B In addition to the Coverage Rules stated in SMM4 Section X (d) C.1 to C.5, the rates

for all Sheet Roofing and Waterproofing works are also to include for additional labour and materials in connection with :-

(i) All cutting at square and raking abutments, top edges, verges and the like; (ii) Bedding and pointing eaves fillers, verges and the like; (iii) Cutting and fitting and making good around outlets, pipes and similar.

Page 281: TENDER DOCUMENTS · schedule no. 1 – preliminaries sr1/1 – sr1 sum/1 schedule no. 2 – preambles sr2/1 – sr2/72 schedule no. 3 – sewage treatment plant system sr3/1 – sr3

PART B – BUILDING WORKS

HK-4547/FP TCK4:LWY22:TWT1:GT:M45042:(28.2.2020) - SR2/28 - Arcadis Hong Kong Limited

For Use With HKSMM4

ROOFING AND WATERPROOFING (Cont’d)

Felt Roofing and Sheet Membrance Waterproofing

A In addition to the Coverage Rules stated in SMM4 Section X (c) C.1 to C.5, the rates

for all Felt Roofing and Sheet Membrance Waterproofing works and underlay are also to include for all additional labour and materials in connection with :-

(i) Surface preparation of the substrate; (ii) Laps in each layer and staggering laps of one layer to those of the preceding

layer; (iii) Tucking in, wedging and sealing to chases; (iv) Dressing to outlets, collars to pipes, balusters, standards and the like; (v) All angles, intersections, stops and the like to internal angle fillets, skirtings,

fascias, aprons, gutters, curbs, channels, eaves, verges, abutments and the like;

(vi) Protection until completed and tested.

Nuralite Laminated Sheet Roofing and Waterproofing B In addition to the Coverage Rules stated in SMM4 Section X (d) C.1 to C.5, the rates

for Nuralite Laminated Sheet Roofing and Waterproofing works are also to include for all additional labour and materials in connection with :-

(i) Surface preparation of the substrate; (ii) Laying to falls and currents; (iii) Welded edge joints, lap joints or butt joints with cover jointing strips as

recommended by the manufacturer; (iv) Cuttings, notchings, bending, turn-ins and the like.

Page 282: TENDER DOCUMENTS · schedule no. 1 – preliminaries sr1/1 – sr1 sum/1 schedule no. 2 – preambles sr2/1 – sr2/72 schedule no. 3 – sewage treatment plant system sr3/1 – sr3

PART B – BUILDING WORKS

HK-4547/FP TCK4:LWY22:TWT1:GT:M45042:(28.2.2020) - SR2/29 - Arcadis Hong Kong Limited

For Use With HKSMM4

ROOFING AND WATERPROOFING (Cont’d)

Sheet Membrane Roofing and Waterproofing

A In addition to the Coverage Rules stated in SMM4 Section X (d) C.1 to C.5, the rates

for all Sheet Membrane Roofing and Waterproofing works are also to include for all additional labour and materials in connection with :-

(i) Surface preparation of the substrate; (ii) Priming substrates with the recommended primers; (iii) Laps in each layer and staggering laps of one to those of the preceding layer; (iv) Trowelled mastic beads at edges; (v) Tucking in, wedging and sealing to chases; (vi) Dressing to outlets, collars to pipes, balusters, standards and the like and

mastic coating as recommended; (vii) All angles, intersections, stops and the like to internal angle fillets, skirtings,

fascias, gutters, curbs, channels, eaves, verges, abutments and the like; (viii) Protection until completed and tested.

Page 283: TENDER DOCUMENTS · schedule no. 1 – preliminaries sr1/1 – sr1 sum/1 schedule no. 2 – preambles sr2/1 – sr2/72 schedule no. 3 – sewage treatment plant system sr3/1 – sr3

PART B – BUILDING WORKS

HK-4547/FP TCK4:LWY22:TWT1:GT:M45042:(28.2.2020) - SR2/30 - Arcadis Hong Kong Limited

For Use With HKSMM4

ROOFING AND WATERPROOFING (Cont’d) Bituthene or Other Membrane Work

A In addition to the Coverage Rules stated in SMM4 Section X (d) C.1 to C.5, the rates

for all Bituthene or Other Membrane Work are to include for all additional labour and materials in connection with :-

(i) Surface preparing of the substrate;

(ii) Priming substrates with the recommended primers;

(iii) Laps in each layer and staggering laps of one to those of the preceding layer; (iv) Trowelled mastic beads at edges; (v) Cuttings, notchings, bending, turn-ins and the like; (vi) Tucking in, wedging and sealing to chases; (vii) Dressing to outlets, collars to pipes, balusters, standards and the like and

mastic coating as recommended; (viii) All angles, intersections, stops and the like to internal angle fillets, skirtings,

gutters, curbs, channels, abutments and the like; (ix) Protection until completed and tested.

Roofing Tiling B Section XII of the SMM4 – Roof tiling is also to be measured in this Section. In

addition to the Coverage Rules stated in SMM4 Section XII (a) C.1 to C.3, (b) C.1 to C.3, the rates for all Roof Tiling Work are to include for all additional labour and materials in connection with :-

(i) All laps.

Page 284: TENDER DOCUMENTS · schedule no. 1 – preliminaries sr1/1 – sr1 sum/1 schedule no. 2 – preambles sr2/1 – sr2/72 schedule no. 3 – sewage treatment plant system sr3/1 – sr3

PART B – BUILDING WORKS

HK-4547/FP TCK4:LWY22:TWT1:GT:M45042:(28.2.2020) - SR2/31 - Arcadis Hong Kong Limited

For Use With HKSMM4

STONE WORKS A In addition to the Coverage Rules stated in SMM4 Section XI (a) C.1 to C.3, the rates

for all Stone works are also to include for :- (i) Pointing and casing or protecting work with slurry, and cleaning off and

rubbing down on completion, if required;

(ii) Cutting, forming or leaving chases, grooves, notches, holes, mortices and similar for pipes, conduits and the like and grouting ends, pipes and similar and making good;

(iii) Wedging and pinning; (iv) Cutting and pinning ends and making good; (v) Obtaining and building in position all fixings, cores, pipes, sleeves, or other

approved ferrules and any other inserts necessary (fixings, cores, pipes, sleeves, ferrules, etc. provided by other trades, Nominated Sub-Contractors and Specialist Contractors).

B In addition to the Coverage Rules stated in SMM4 Section XI (b) C.1, the rates for cast

stone, marble, granite are also to include for:

(i) all dowels and cramps as described.

(ii) Plumbing and levelling.

(iii) rounded and polished nosing.

(iv) grouting joints of any width as required.

Page 285: TENDER DOCUMENTS · schedule no. 1 – preliminaries sr1/1 – sr1 sum/1 schedule no. 2 – preambles sr2/1 – sr2/72 schedule no. 3 – sewage treatment plant system sr3/1 – sr3

PART B – BUILDING WORKS

HK-4547/FP TCK4:LWY22:TWT1:GT:M45042:(28.2.2020) - SR2/32 - Arcadis Hong Kong Limited

For Use With HKSMM4

WOOD WORKS A All timber shall be wrot unless otherwise described. B All sizes are finished sizes, unless otherwise stated. C In addition to the Coverage Rules stated in SMM4 Section XIII (e) C.1, the rates for all

timberwork, plywood, chipboard and laminated plastic sheeting and other building boards are also to include for :-

(i) All glueing, arrises, chamfered edges, stops to labours and work across grain

and any other sundry items of a like nature; (ii) Punching in all nail and pin heads and covering heads with approved

matching wood filler where required; (iii) Nails, brads, tacks, steel screws and brass screws, wedges, pins, dowels,

glue, glass paper, white lead and other sundry jointing and fixing materials; (iv) Narrow widths, small quantities and short lengths;

(v) Rebates, grooves, mouldings and similar lineal items of a like nature are

described as “labours” and included in the descriptions. D In addition to the Coverage Rules stated in SMM4 Section XIII (a) C.1, the rates for all

Wood Works are also to include for countersinking screw and bolt heads and where necessary counterboring and covering the heads with wood pellets to match the timber, glasspapering and leaving clean ready for clear finishes.

E In addition to the Coverage Rules stated in SMM4 Section XIII (c) C.1 to C.3, the rates

for all timber floors wood block, wood strip or parquet are also to include for traversing and sanding for polishing or other clear finishes.

Page 286: TENDER DOCUMENTS · schedule no. 1 – preliminaries sr1/1 – sr1 sum/1 schedule no. 2 – preambles sr2/1 – sr2/72 schedule no. 3 – sewage treatment plant system sr3/1 – sr3

PART B – BUILDING WORKS

HK-4547/FP TCK4:LWY22:TWT1:GT:M45042:(28.2.2020) - SR2/33 - Arcadis Hong Kong Limited

For Use With HKSMM4

WOOD WORKS (Cont’d) A In addition to the Coverage Rules stated in SMM4 Section XIII (i) C.1 to C.4, the rates

for doors are also to include for :-

(i) Architraves, trims and the like. (ii) All necessary painting, surface finishes and decoration.

(Ironmongery measured separately)

Page 287: TENDER DOCUMENTS · schedule no. 1 – preliminaries sr1/1 – sr1 sum/1 schedule no. 2 – preambles sr2/1 – sr2/72 schedule no. 3 – sewage treatment plant system sr3/1 – sr3

PART B – BUILDING WORKS

HK-4547/FP TCK4:LWY22:TWT1:GT:M45042:(28.2.2020) - SR2/34 - Arcadis Hong Kong Limited

For Use With HKSMM4

WOOD WORKS (Cont’d) A All fittings and fixtures shall be ENUMERATED or given RUN as appropriate and

described. The description of fittings and fixtures indicates only the overall size, finishes, numbers of divisions, shelves, doors and drawers, method of fixing, etc.. The sizes of framings, thicknesses of members, etc., given in the Drawings and Specification shall be followed.

B In addition to the Coverage Rules stated in SMM4 Section XIII (k) C.1, the rates for

fittings and fixtures are also to include for :-

(i) All labour, materials and equipment required to design, supply and install the fittings and fixtures in accordance with the design intent;

(ii) Design, supply and install all hardwood, plywood and/or steel framing in

fittings and fixtures fixing in position in an approved manner including the provision of hardwood grounds, cement sand screed backing as required;

(iii) Beech, rimu, teak, maple or other solid wood edgings to exposed edges of

plywood, hardwood, etc. as required; (iv) Supply of all ironmongery to the specified standard and fixing them to timber,

building board, steel or glass, unless otherwise stated, including fitting, cutting, housing, sinking, boring, morticing, drilling and similar labours to timber or other surfaces to which the article is being fixed, the supply of matching screws and any bolts, nuts, washers, nails, pins or similar items required, all plugging to concrete, brickwork or other hard material, and oiling, easing and adjusting and leaving in working order on completion;

(v) All glass and mirrors of any shape and with bevelled edges as required; (vi) Applying two coats of wood preservative on woodwork in contact with

concrete or brickwork etc. before fixing; (vii) Applying priming coat to all unexposed surfaces of metalwork before fixing; (viii) Applying a skim coat of levelling gypsum plaster on plywood or gypsum board

surfaces which are to be finished with emulsion paint or other paint as specified;

Page 288: TENDER DOCUMENTS · schedule no. 1 – preliminaries sr1/1 – sr1 sum/1 schedule no. 2 – preambles sr2/1 – sr2/72 schedule no. 3 – sewage treatment plant system sr3/1 – sr3

PART B – BUILDING WORKS

HK-4547/FP TCK4:LWY22:TWT1:GT:M45042:(28.2.2020) - SR2/35 - Arcadis Hong Kong Limited

For Use With HKSMM4

WOOD WORKS (Cont’d)

(ix) All finishings, painting and decoration as described in the item descriptions, Specification and/or as shown on Drawings;

(x) Cutting and forming perforations in fittings and fixtures for services installation,

pointing junctions of wooden units and walls with silicone sealant as required; (xi) Connection to electrical and service mains/pipes as required; (xii) The provision of light fittings and associated wirings to a socket outlet as

required, unless specifically described as being “by others”.

The Contractor is deemed to have understood the full requirements of the Works with reference to the Drawings and Specification and no claim will be entertained for ignorance of these by the Contractor.

Page 289: TENDER DOCUMENTS · schedule no. 1 – preliminaries sr1/1 – sr1 sum/1 schedule no. 2 – preambles sr2/1 – sr2/72 schedule no. 3 – sewage treatment plant system sr3/1 – sr3

PART B – BUILDING WORKS

HK-4547/FP TCK4:LWY22:TWT1:GT:M45042:(28.2.2020) - SR2/36 - Arcadis Hong Kong Limited

For Use With HKSMM4

WOOD WORKS (Cont’d)

A The rates for drawers are to include for the provision of stops, stop-morticed and

tenoned joints at back and stop-morticed and tenoned or stop-dovetailed joints to fronts, grooving sides and front for bottom and glueing together.

B In addition to the Coverage Rules stated in SMM4 Section XIII (i) C.1, the rates for

doors and windows are also to include for splayed bottom edges to opening casements.

C The rates for plywood, softboard, hardboard, plastic sheeting and other building

boards are to include for lining up joints where required and for providing panels of the sizes indicated on the drawings.

D Where descriptions include “plugging” or “plugged” the rates are to include for

plugging and screwing to brickwork, masonry, concrete or other hard material with “Rawlplugs” or similar approved proprietary plugs and fixing with brass screws.

E In addition to the Coverage Rules stated in SMM4 Section XIII (e) C.1, the rates for

laminated plastic sheeting are also to include for fixing with adhesive F In addition to the Coverage Rules stated in SMM4 Section XIII (e) C.1, the rates for

sawn grounds, sawn partition and false ceiling framing and similar are also to include for planing one or more faces if necessary to obtain a level fixing surface.

G In addition to the Coverage Rules stated in SMM4 Section XIII (k) C.1, the rates for all

framed work and fittings are also to include for all mortice and tenon, housed, dovetailed and other framed joints and wedges and pins.

Page 290: TENDER DOCUMENTS · schedule no. 1 – preliminaries sr1/1 – sr1 sum/1 schedule no. 2 – preambles sr2/1 – sr2/72 schedule no. 3 – sewage treatment plant system sr3/1 – sr3

PART B – BUILDING WORKS

HK-4547/FP TCK4:LWY22:TWT1:GT:M45042:(28.2.2020) - SR2/37 - Arcadis Hong Kong Limited

For Use With HKSMM4

IRONMONGERY A In addition to the Coverage Rules stated in SMM4 Section XIV C.2, the rates for locks

are, in addition, to include for the provision of a metal edged card tab for each of the pair of keys supplied with each lock, with the number or name of the room written thereon, and for the provision of a temporary hardboard or plywood key board at handover, unless otherwise described in the Schedules of Rates.

Page 291: TENDER DOCUMENTS · schedule no. 1 – preliminaries sr1/1 – sr1 sum/1 schedule no. 2 – preambles sr2/1 – sr2/72 schedule no. 3 – sewage treatment plant system sr3/1 – sr3

PART B – BUILDING WORKS

HK-4547/FP TCK4:LWY22:TWT1:GT:M45042:(28.2.2020) - SR2/38 - Arcadis Hong Kong Limited

For Use With HKSMM4

STEEL AND METAL WORKS A In addition to the Coverage Rules stated in SMM4 Section XV (a) C.1, the rates for all

structural steelwork are also to include for rolling margin, all cutting and notching, scribing where required, drilling, countersinking, welding and weight of welds, and for steel being painted with one coat of red oxide primer at the Manufacturers’ works.

B In addition to the Coverage Rules stated in SMM4 Section XV (a) C.1, the rates for all

structural steelwork shall also include for the weight of galvanised coatings where the steelwork is described as galvanised.

C In addition to the Coverage Rules stated in SMM4 Section XV (e) C.1, the rates for all

steel and metal works are also to include for :-

(i) Notching and perforations; (ii) Assembling and framing together by welding or brazing, bolting or rivetting,

and the like where so described; (iii) Filing and cleaning off welds and irregularities, finishing cut edges straight

and true and slightly rounding all sharp edges and arrises; (iv) Hoisting and fixing into position including forming mortices for ends, grouting

and running in cement mortar and making good wherever applicable. D In addition to the Coverage Rules stated in SMM4 Section XV (e) C.2, the rates for

tubular handrails or balustrades are also to include for all fittings.

Page 292: TENDER DOCUMENTS · schedule no. 1 – preliminaries sr1/1 – sr1 sum/1 schedule no. 2 – preambles sr2/1 – sr2/72 schedule no. 3 – sewage treatment plant system sr3/1 – sr3

PART B – BUILDING WORKS

HK-4547/FP TCK4:LWY22:TWT1:GT:M45042:(28.2.2020) - SR2/39 - Arcadis Hong Kong Limited

For Use With HKSMM4

STEEL AND METAL WORKS (Cont’d) A Catladders, air grilles, access covers and the like shall be ENUMERATED and the

rates for same are to include for all components, fixings, fastenings, painting and ironmongery (if any).

B Metal doors shall be ENUMERATED and the rates for same are to include for :-

(i) Frames, architraves, trims, sills and the like.

(ii) All priming and surface finishes.

(iii) Bedding, packing or grouting behind frames with specified materials.

(iv) Pointing around frames with specified materials.

(v) Ironmongery unless otherwise stated.

(vi) Louvres and screens (if any). C The rates for all bolts, expanding bolts and anchors are to include for nuts and

washers. D In addition to the Coverage Rules stated in SMM4 Section XV (e) C.2, the rates for

mild steel and galvanized mild steel work are also to include for rolling margin and weight of welds.

E Where descriptions include “screwing” or “screwed”, the rates are to include for fixing

with screws of the same materials, unless otherwise described. F Where descriptions include “bolting” or “bolted”, the rates are to include for fixing with

all necessary bolts.

Page 293: TENDER DOCUMENTS · schedule no. 1 – preliminaries sr1/1 – sr1 sum/1 schedule no. 2 – preambles sr2/1 – sr2/72 schedule no. 3 – sewage treatment plant system sr3/1 – sr3

PART B – BUILDING WORKS

HK-4547/FP TCK4:LWY22:TWT1:GT:M45042:(28.2.2020) - SR2/40 - Arcadis Hong Kong Limited

For Use With HKSMM4

STEEL AND METAL WORKS (Cont’d) A Where descriptions include “plugging” or “plugged”, the rates are to include for

plugging and screwing to brickwork, masonry, concrete or other hard material with “Rawlplugs” or similar approved proprietary plugs and fixing with brass screws.

B The rates for expanding bolts or anchors are to include for drilling brickwork, masonry,

concrete or other hard material. C In addition to the Coverage Rules stated in SMM4 Section XV (e) C.2, the rates for all

stainless steel and non-ferrous metal work are also to include for all welds, joints, grinding edges and fine smooth polished finish on all exposed surfaces, joints and edges, unless otherwise described.

D In addition to the Coverage Rules stated in SMM4 Section XV (e) C.2, the rates for

galvanized metal work are also to include for treating cut edges and ends of galvanized sections with two coats of metallic zinc rich primer to B.S. 4652 Type 2.

E In addition to the Coverage Rules stated in SMM4 Section XV (e) C.2, the rates for

aluminium work are also to include for coating surfaces in contact with concrete, mortar, plaster or similar materials with bituminous paint or protective tape as required.

F In addition to the Coverage Rules stated in SMM4 Section XV (e) C.2, the rates for all

external metalwork shall be held to include for the provision of screw holes or other suitable connection points for the purposes of connection, by the Electrical Installation Contractor, of equipotential bonding conductors as required by the I.E.E. Wiring Regulations.

G In addition to the Coverage Rules stated in SMM4 Section XV (m) C.1 and C.2, the

rates for suspended ceiling systems are also to include for any depth of suspension from the structural soffits to the face of the ceiling and all necessary cuttings incidental to fitting the ceiling to the building and cutting and trimming as necessary for access panels, light fittings, air conditioning grilles, sprinklers and for hangers for partitions, signs, and the like.

Page 294: TENDER DOCUMENTS · schedule no. 1 – preliminaries sr1/1 – sr1 sum/1 schedule no. 2 – preambles sr2/1 – sr2/72 schedule no. 3 – sewage treatment plant system sr3/1 – sr3

PART B – BUILDING WORKS

HK-4547/FP TCK4:LWY22:TWT1:GT:M45042:(28.2.2020) - SR2/41 - Arcadis Hong Kong Limited

For Use With HKSMM4

PLASTERING AND PAVING (Including Wall and Ceiling Linings) A Work to ceilings and beams where the ceiling exceeds 3.50m from the floor shall not

be given separately and the rate for work to ceilings and beams are to include for any ceiling height above floor.

B With reference to the Measurement Rule stated in SMM4 Section XVI (c) M.2 and for

the avoidance of doubt, the term “structural walls” as stated in the Measurement Rule XVI (c) M.2 shall also include all kinds of walls such as concrete walls, brick walls, block walls, dry walls, panel wall partition, etc.

C With reference to the Definition Rule stated in SMM4 Section XVI (c) D.2 and for the

avoidance of doubt, the term “base” as stated in the Definition Rule XVI (c) D.2 besides referring to the structural background, metal lathing or plaster board, shall also refer to all kinds of background such as concrete walls, brick walls, block walls, dry walls, panel wall partition, etc.

D In addition to the Coverage Rules stated in SMM4 Section XVI (c) C.1, the rates for all

items are also to include for :-

(i) Bringing to a true and even surface; (ii) Finishing or cutting around holes and openings, etc.; (iii) Any other sundry items of a like nature.

E In addition to the Coverage Rules stated in SMM4 Section XVI (d) C.1, the rates for in-

situ finishes and screeds are in addition to include for :-

(i) Preparation of background to provide key as required including but not limited to raking out mortar joints in brickwork or blockwork, applying spatterdash, bonding agent and the like in any position and at any level.

(ii) A strip of lathing at junction of different background materials, over chased

areas for pipes, conduits, trunking and the like as required.

Page 295: TENDER DOCUMENTS · schedule no. 1 – preliminaries sr1/1 – sr1 sum/1 schedule no. 2 – preambles sr2/1 – sr2/72 schedule no. 3 – sewage treatment plant system sr3/1 – sr3

PART B – BUILDING WORKS

HK-4547/FP TCK4:LWY22:TWT1:GT:M45042:(28.2.2020) - SR2/42 - Arcadis Hong Kong Limited

For Use With HKSMM4

PLASTERING AND PAVING (Including Wall and Ceiling Linings) (Cont’d) (iii) Cleaning off and wetting surfaces and washing concrete surfaces with cement

grout if the concrete has hardened; (iv) “Dubbing out” of irregularities in the surface being covered and to form coves,

splays and the like; (v) All making good up to frames and metal work, around pipes, brackets and

similar items and dishings to outlets; (vi) Any other sundry labours of a like nature to the foregoing; (vii) Additional cement, if permitted by the Specification, for trowelling to a smooth

surface all pavings, rendering, etc. described as “steel trowelled smooth”; (viii) The extra cost of working at night if required where finishes or screeds are to

be applied monolithically to the concrete base whilst the concrete is still green or before its initial set.

A Where in-situ pavings and screeds are of varying thickness in order to achieve the

designed falls, the thickness stated in the description is the MINIMUM thickness (and NOT the average thickness). The rates for same are therefore to include for the additional materials and labour required to increase the stated thicknesses to those required to achieve the designed falls.

B The thickness of screeds (except screeds of varying thickness as stated in A above)

and floated backing shall be measured to the nearest 5mm. The Contractor is deemed to have allowed in his rates for the actual thickness required within this method of measurement.

C In addition to the Coverage Rules stated in SMM4 Section XVI (d) C.1, the rates for all

plaster and rendering are also to include for angle beads, stop beads and the like as required.

D In addition to the Coverage Rules stated in SMM4 Section XVI (e) C.1 and C.2, the

rates for tile, slab and sheet finishes are, in addition, to include for :-

(i) Laying in colours and patterns as required and approved by the Architect and for all cutting and waste for equal margins;

(ii) Grouting joints of any width as required.

Page 296: TENDER DOCUMENTS · schedule no. 1 – preliminaries sr1/1 – sr1 sum/1 schedule no. 2 – preambles sr2/1 – sr2/72 schedule no. 3 – sewage treatment plant system sr3/1 – sr3

PART B – BUILDING WORKS

HK-4547/FP TCK4:LWY22:TWT1:GT:M45042:(28.2.2020) - SR2/43 - Arcadis Hong Kong Limited

For Use With HKSMM4

PLASTERING AND PAVING (Including Wall and Ceiling Linings) (Cont’d) A In addition to the Coverage Rules stated in SMM4 Section XVI (e) C.1 and C.2, the

rates for mosaic tiling are, in addition, to include for fair edges in bays and for laying single tiles at junctions of vertical and/or horizontal surfaces to form chamfered internal or external angles including all necessary dubbing and additional labour on screeds and renderings.

B In addition to the Coverage Rules stated in SMM4 Section XVI (b) C.1 and C.2, the

rates for all metal lathing, plaster board and similar sheet wall or ceiling linings are also to include for all cuttings and laps (if any) holes and notchings and any other sundry items of a like nature and making good

C In addition to the Coverage Rules stated in SMM4 Section XVI (d) C.1, the rates for

internal lime plastering are also to include for finishing all angles, except to soffits of beams, with returns 50 mm wide in Keene’s cement, on a Portland cement backing (1:3) with a slightly rounded arris.

D In addition to the Coverage Rules stated in SMM4 Section XVI (d) C.1, the rates for all

plasterwork and other floor, wall and ceiling finishes are also to include for sample panels set up for the Architect’s approval prior to the commencement of any work. (See also allowance for pricing samples in Bill No. 1 - Preliminaries).

E In addition to the Coverage Rules stated in SMM4 Section XVI (c) C.1 and C.2, the

rates for division and cover angles and strips at expansion joints to finishes and pavings are also to include for cutting to required lengths, splay cut ends, drilling, fixing with matching screws and for countersinking the heads of all exposed screws.

F In addition to the Coverage Rules stated in SMM4 Section XVI (c) C.1 and C.2, the

rates for floor finishes are also to include for division strips. G In addition to the Coverage Rules stated in SMM4 Section XVI (c) C.1 and C.2, the

rates for gypsum plaster board are also to include for all fixings, preparation of cut edges and forming scrimmed joints as described.

H In addition to the Coverage Rules stated in SMM4 Section XVI (c) C.1 and C.2, the

rates for mineral wool and fibreglass blankets are also to include for cutting to sizes, stiching up edges, hanging and overlapping.

I In addition to the Coverage Rules stated in SMM4 Section XVI (e) C.1 and C.2, the

rates for pre-cast wall linings are also to include for all dowels and cramps as described and plumbing and levelling.

Page 297: TENDER DOCUMENTS · schedule no. 1 – preliminaries sr1/1 – sr1 sum/1 schedule no. 2 – preambles sr2/1 – sr2/72 schedule no. 3 – sewage treatment plant system sr3/1 – sr3

PART B – BUILDING WORKS

HK-4547/FP TCK4:LWY22:TWT1:GT:M45042:(28.2.2020) - SR2/44 - Arcadis Hong Kong Limited

For Use With HKSMM4

GLAZING A In addition to the Coverage Rules stated in SMM4 Section XX (a) C.1, the rates for all

glazing are also to include for :-

(i) Risk of breakage, replacing all cracked or broken or scratched panes during the Contract, from whatever cause free of charge and also for cleaning and leaving in proper condition on completion;

(ii) Provision of setting and location blocks.

B In addition to the Coverage Rules stated in SMM4 Section XX (a) C.1, the rates for

glass louvre blades are also to include for ground and arrised edges.

C Where glass is measured super as provided in the SMM, it shall be given in the following stages :-

(i) not exceeding 1.00 m2 (ii) 1.00 m2 to 4.00 m2 (iii) exceeding 4.00 m2 and thereafter in successive stages of 1.00 square metre

Page 298: TENDER DOCUMENTS · schedule no. 1 – preliminaries sr1/1 – sr1 sum/1 schedule no. 2 – preambles sr2/1 – sr2/72 schedule no. 3 – sewage treatment plant system sr3/1 – sr3

PART B – BUILDING WORKS

HK-4547/FP TCK4:LWY22:TWT1:GT:M45042:(28.2.2020) - SR2/45 - Arcadis Hong Kong Limited

For Use With HKSMM4

PAINTING A In addition to the Coverage Rules stated in SMM4 Section XXI (a) C.1, (b) C.1, C.2

and C.3, the rates for paintwork, etc. are also to include for :-

(i) Applying priming coats on new work before the articles are fixed or built in; (ii) The cost of setting up tints and colours for approval, if required; (iii) The cost of analyses of paint, if required;

B In addition to the Coverage Rules stated in SMM4 Section XXI (a) C.1, the rates for

paintwork to wood sashes, wood casements, glazed wood screens and the like are, in addition, to include for painting on opening edges and all surfaces of frames, mullions, transomes, cills and the like.

C In addition to the Coverage Rules stated in SMM4 Section XXI (a) C.1, (e) C.1, the

rates for wall paper work are, in addition, to include for cutting and fitting paper around holes and openings, pipes, switches, brackets and the like.

D In addition to the Coverage Rules stated in SMM4 Section XXI (a) C.1, the rates for

paint work on radiators are, in addition, to include for painting to brackets and stays. E Work to ceilings and beams exceeding 3.50m from the floor shall not be given

separately and the rates for work to ceilings and beams are to include for the erection of special scaffolding, cradles, towers or the like required for the execution of work at any height.

Page 299: TENDER DOCUMENTS · schedule no. 1 – preliminaries sr1/1 – sr1 sum/1 schedule no. 2 – preambles sr2/1 – sr2/72 schedule no. 3 – sewage treatment plant system sr3/1 – sr3

PART B – BUILDING WORKS

HK-4547/FP TCK4:LWY22:TWT1:GT:M45042:(28.2.2020) - SR2/46 - Arcadis Hong Kong Limited

For Use With HKSMM4

LANDSCAPING A The rates for landscaping work are to include for :-

(i) Forking over, weeding, pruning, cutting grass, removing cuttings, rubbish, litter etc. as they accumulate and adjusting, repairing or replacing stakes, guys, ties, climbing wire etc. as necessary during the Maintenance Period;

(ii) Protecting the landscaped areas, controlling erosion and siltation, taking

precautions necessary to eradicate disease or insect attack, restoring or replacing grass, trees, shrubs or plants as directed by the Architect during the Maintenance Period.

B The rates for soiling for turfing or grass seeding are to include for :-

(i) All multi-handling on or off the Site to the final position;

(ii) Mixing, depositing, spreading, levelling and compaction. C The rates for turfing, broadcast seeding or grassed areas and hydroseeding for

grassed area are to include for :-

(i) Mixing, depositing, spreading, levelling and compaction;

(ii) All necessary pegging, netting, sheeting and biodegradable fabric. D In addition to the Coverage Rules stated in SMM4 Section XXII (c) C.1 to and C.6, the

rates for trees, shrubs and plants are also to include for :-

(i) Bringing to the Site, unloading, storing, distributing and protecting those items described as “Supplying Only”;

(ii) Excavating planting pits, backfilling with specified mixtures and soil

conditioners and removing surplus soil form the Site.

Page 300: TENDER DOCUMENTS · schedule no. 1 – preliminaries sr1/1 – sr1 sum/1 schedule no. 2 – preambles sr2/1 – sr2/72 schedule no. 3 – sewage treatment plant system sr3/1 – sr3

For Use With HKSMM4

PART C – BUILDING SERVICES WORKS

Page 301: TENDER DOCUMENTS · schedule no. 1 – preliminaries sr1/1 – sr1 sum/1 schedule no. 2 – preambles sr2/1 – sr2/72 schedule no. 3 – sewage treatment plant system sr3/1 – sr3

PART C - BUILDING SERVICES WORKS

HK-4547/FP TCK4:LWY22:TWT1:GT:M45042:(28.2.2020) - SR2/47 - Arcadis Hong Kong Limited

For Use With HKSMM4

MECHANICAL INSTALLATIONS

GENERALLY A Notwithstanding the requirements of the Measurement Rules M.5 of SMM4 Section

XVII (a), Building Services Works shall be classified into systems or installations and measured under appropriate headings as shown in Annex “A” of the Preambles.

B Notwithstanding the requirements of the Measurement Rules M.2 of SMM4 Section

XVII (a), work in Plant Rooms shall not be identified separately. Furthermore, works internally, externally and in plant rooms for Sundries of Mechanical Installations shall be grouped together and shall not be identified separately.

C In addition to the Coverage Rules stated in SMM4 Section XVII (a) C.1 to C.6, the

rates for items for Mechanical Installations shall include for: -

(i) Colour bands and colour identification work. (ii) Engraving and lettering for identification and signs, in both English and

Chinese. (iii) Priming and/or painting off Site and proprietary finishes or surface treatment

applied as part of the production process whether applied before or after fabrication and assembly.

(iv) Any kind of fixing.

Page 302: TENDER DOCUMENTS · schedule no. 1 – preliminaries sr1/1 – sr1 sum/1 schedule no. 2 – preambles sr2/1 – sr2/72 schedule no. 3 – sewage treatment plant system sr3/1 – sr3

PART C – BUILDING SERVICES WORKS

HK-4547/FP TCK4:LWY22:TWT1:GT:M45042:(28.2.2020) - SR2/48 - Arcadis Hong Kong Limited

For Use With HKSMM4

MECHANICAL INSTALLATIONS (Cont’d)

EQUIPMENT A In addition to the Coverage Rules stated in SMM4 Section XVII (b) C.1, the rates for

equipment shall further be deemed to include for the following :-

(i) All costs and charges in respect of supply and taking delivery;

(ii) Paying all customs charges, import taxes and the like;

(iii) All necessary protective and decorative painting or finishes;

(iv) All enclosures where required;

(v) Checking and repairing or replacing any damaged parts;

(vi) Inertia block and steel frame support and the like;

(vii) All attendance as required of the equipment manufacturers’ representative to assist in the installation and subsequent testing and commissioning of the equipment;

(viii) Connections between pipework and equipment including provision of flexible

connections, necessary joints, separate pipework fittings, all necessary accessories, jointing materials and the like whether or not those are specifically detailed in the Tender Drawings or specifically required in the Specification and insulation and/or protective coverings and finishings thereto where required;

(ix) Connections between ductwork and plant/equipment including provision of

flexible connections, necessary joints, transformation pieces and special duct fittings, all necessary accessories, jointing materials and the like whether or not those are specifically detailed in the Tender Drawings or specifically required in the Specification and insulation and/or protective coverings and finishings thereto where required.

SANITARY AND LABORATORY FITTINGS B In addition to the Coverage Rules stated in SMM4 Section XVII (c) C.1, the rates for

items for fittings and accessories shall include for jointing to services, overflow and soil and waste pipes.

Page 303: TENDER DOCUMENTS · schedule no. 1 – preliminaries sr1/1 – sr1 sum/1 schedule no. 2 – preambles sr2/1 – sr2/72 schedule no. 3 – sewage treatment plant system sr3/1 – sr3

PART C – BUILDING SERVICES WORKS

HK-4547/FP TCK4:LWY22:TWT1:GT:M45042:(28.2.2020) - SR2/49 - Arcadis Hong Kong Limited

For Use With HKSMM4

MECHANICAL INSTALLATIONS (Cont’d)

PIPEWORK A Unless otherwise described, the method of jointing, method of fixing and brackets and

methods of support shall be in accordance with the Specification and shall not be identified separately.

B Unless separate items are measured or given in the Schedules of Rates, the rates for

pipework shall be allowed for all alternative methods of jointing so described in the Specification.

C In addition to the Coverage Rules stated in SMM4 Section XVII (d) C.1, the rates for

pipework shall further be deemed to include for the following :-

(i) Physically checking, marking, modifying where required all drawings and sketches, to ensure satisfactory pipework installation and for the preparation of all shop drawings;

(ii) Inspection, check fit assembly, offering to equipment connections, adjusting

where necessary to obtain a good fit for all pipework;

(iii) Labelling and marking all spool pieces prior to erection;

(iv) Completing all preparation, welding, jointing and assembly operations as appropriate to achieve fabrication and/or erection for all piping either spools or site run;

(v) Formation of dirt pockets and the provision and installation of drain points

and drain cocks complete with hose union and test plugs as required whether such be shown on the drawings or not;

(vi) Provision and installation of expansion loops, compensators, expansion

joints, isolating flanges and, automatic/manual air vents, as required whether such be shown on the drawings or not;

Page 304: TENDER DOCUMENTS · schedule no. 1 – preliminaries sr1/1 – sr1 sum/1 schedule no. 2 – preambles sr2/1 – sr2/72 schedule no. 3 – sewage treatment plant system sr3/1 – sr3

PART C – BUILDING SERVICES WORKS

HK-4547/FP TCK4:LWY22:TWT1:GT:M45042:(28.2.2020) - SR2/50 - Arcadis Hong Kong Limited

For Use With HKSMM4

MECHANICAL INSTALLATIONS (Cont’d)

PIPEWORK (Cont’d) A In addition to the Coverage Rules stated in SMM4 Section XVII (d) C.1, the rates for

pipework shall further be deemed to include for the following :- (Cont’d)

(vii) Spring compensated components of pipework support;

(viii) Inspection doors, cleaning eyes and the like on pipes where required (ix) Composite support structures and proprietary or specialist support systems

and components where required;

(x) All short lengths including the provision of all sockets, connectors, loose collars, flanges, unions, couplings, cutting groove on pipework and perforating the pipework or flange and similar items where required and all jointing materials including gaskets, bolts and nuts for flanged pipes, welding consumables, jointing tapes and the like;

(xi) Provision of weatherproof aprons where pipework penetrates through the

roof slabs;

(xii) Wrapping pipes with protective tape where they pass through slabs, walls and beams where sleeves are not required;

(xiii) Capping open ends of pipework during the progress of the Works to avoid

ingress of dirt and water. B Notwithstanding the Coverage Rules stated in SMM4 Section XVII (d) C.1 (c), the

rates for pipework shall not include for connections of pipework to equipment. Connections of pipework to equipment shall be deemed to be included in the rates for equipment as stated in Item A (viii) of Page SR2/69 above.

Page 305: TENDER DOCUMENTS · schedule no. 1 – preliminaries sr1/1 – sr1 sum/1 schedule no. 2 – preambles sr2/1 – sr2/72 schedule no. 3 – sewage treatment plant system sr3/1 – sr3

PART C – BUILDING SERVICES WORKS

HK-4547/FP TCK4:LWY22:TWT1:GT:M45042:(28.2.2020) - SR2/51 - Arcadis Hong Kong Limited

For Use With HKSMM4

MECHANICAL INSTALLATIONS (Cont’d)

PIPEWORK (Cont’d) A Unless otherwise stated, the rates for pipework fittings shall be deemed to include

for :-

(i) The provision of bends or elbows as appropriate where “bends” are specified; and

(ii) The correct type and angle of any bend, tee junction, cross and the like as

required. B Notwithstanding the requirements of SMM4 Section XVII (d) 2 to 4, vent pipes,

overflow pipes, warning pipes, stilling pipes and drain pipes etc. for water tanks may alternatively be ENUMERATED stating the particulars of these pipes, such as sizes and materials.

C Notwithstanding the requirements of SMM4 Section XVII (d) 2 to 4, pipework for the

Unitary Air Conditioning System (such as VRV air conditioning system, split type air conditioning system, etc.) under different set of unitary air conditioning units shall be measured together irrespective of their sizes and sizes of pipework shall not be stated. Furthermore, pipework fittings shall be deemed to be included in the rates for pipework and shall not be measured separately.

D Notwithstanding the requirements of SMM4 Section XVII (d) 8, flexible connectors and

flexible and extensible pipework for connections between pipework shall be held to be included in the rates for pipework and shall not be measured separately.

E Notwithstanding the requirements of SMM4 Section XVII (d) 10, flow and return

header pipes may alternatively be measured in accordance with Section XVII (d) 2 to 4. F Notwithstanding the requirements of SMM4 Section XVII (d) 11, joints for pipes which

differ from those generally occurring in the running length or connections to pipes of a different profile or material unless otherwise stated, shall be deemed to be included in the rates for pipework and shall be not measured separately.

G Notwithstanding the requirements of SMM4 Section XVII (d) 12 to 15, screwed sockets,

tappings, bosses, test plugs and welding-necks welded to pipes or flanges, shall be deemed to be included in the rates for pipework and shall not be measured separately.

Page 306: TENDER DOCUMENTS · schedule no. 1 – preliminaries sr1/1 – sr1 sum/1 schedule no. 2 – preambles sr2/1 – sr2/72 schedule no. 3 – sewage treatment plant system sr3/1 – sr3

PART C – BUILDING SERVICES WORKS

HK-4547/FP TCK4:LWY22:TWT1:GT:M45042:(28.2.2020) - SR2/52 - Arcadis Hong Kong Limited

For Use With HKSMM4

MECHANICAL INSTALLATIONS (Cont’d)

PIPEWORK (Cont’d) A Unless otherwise stated, the rates for valves and the like shall include for stripping

down, repacking glands and preparing spindles, as appropriate, prior to installation. B Notwithstanding the requirements of SMM4 Section XVII (d) 16, checking and

calibration of instrumentation, as required, prior to installation, making holes, cutting and jointing the instrumentation to pipework including the provision of necessary separate fittings, weldolets, nipolets and the like shall be deemed to be included in the rates for instrumentation. Furthermore, the sizes of pipework being the instrumentation joined to shall not be stated.

GUTTERS C Notwithstanding the requirements of SMM4 Section XVII (e) 3, joints for gutters which

differ from those generally occurring in the running length or connections to gutters of a different profile or material unless otherwise stated, shall be held to be included in the rates for gutters and shall be not measured separately.

Page 307: TENDER DOCUMENTS · schedule no. 1 – preliminaries sr1/1 – sr1 sum/1 schedule no. 2 – preambles sr2/1 – sr2/72 schedule no. 3 – sewage treatment plant system sr3/1 – sr3

PART C – BUILDING SERVICES WORKS

HK-4547/FP TCK4:LWY22:TWT1:GT:M45042:(28.2.2020) - SR2/53 - Arcadis Hong Kong Limited

For Use With HKSMM4

MECHANICAL INSTALLATIONS (Cont’d)

DUCTWORK A Unless otherwise described, the method of jointing, method of fixing and brackets and

all methods of support and spring compensated components shall be in accordance with the Specification and shall not be separately identified.

B Notwithstanding the requirements of the Measurement Rules M.1 of SMM4 Section

XVII (f) 1, composite supports and proprietary or specialist support systems and components where required shall be deemed to be included in the rates for ductwork in which they occur.

C Notwithstanding the Coverage Rules stated in SMM4 Section XVII (f) C.1 (g), the rates

for all ductwork (rectangular, circular or oval in section) shall not include for flexible connections between ducts and plant/equipment including transformation pieces and special duct fittings. Flexible connections between ductwork and plant/equipment shall be deemed to be included in the rates for equipment including transformation pieces and special duct fittings as stated in Item A (ix) of Page SR2/69 above.

D The measurement of ductwork rectangular in section shall be the nett area of sheet

material fabricated, the rate for ductwork rectangular in section shall include for all extra material for seams, joints and the like.

E The requirements of the Measurement Rules M.2 of SMM4 Section XVII (f) 2 shall

also apply to Section XVII (f) 3. F Notwithstanding the requirements of SMM4 Section XVII (f) 5, splitter dampers shall

be deemed to be included in the rates for ductwork (rectangular, circular or oval in section) and shall not be measured separately.

Page 308: TENDER DOCUMENTS · schedule no. 1 – preliminaries sr1/1 – sr1 sum/1 schedule no. 2 – preambles sr2/1 – sr2/72 schedule no. 3 – sewage treatment plant system sr3/1 – sr3

PART C – BUILDING SERVICES WORKS

HK-4547/FP TCK4:LWY22:TWT1:GT:M45042:(28.2.2020) - SR2/54 - Arcadis Hong Kong Limited

For Use With HKSMM4

MECHANICAL INSTALLATIONS (Cont’d)

DUCTWORK (Cont’d) A Notwithstanding the requirements of the Measurement Rules M.5 of SMM4 Section

XVII (f) 6 and 7, the length of flexible and extensible ductwork shall be measured flat on plan from point to point as shown on the Tender Drawings.

B In addition to the Coverage Rules stated in SMM4 Section XVII (f) C.3, the rates for

diffusers, grilles, louvres and the like shall be deemed to include for decorative and protective finishes and painting as necessary.

C In addition to the SMM4 Section XVII (f) 5, linear diffusers shall be given RUN stating

the type and size or may alternatively be ENUMERATED stating the type and size. End caps as required for actual diffuser lengths and decorative and protective finishes and painting as necessary shall be deemed to be included. Capping or painted blank plates on dummy sections of slot diffusers, the provision of air boots, spigots, insulation, cutting and jointing to flexible ducts, shall also be deemed to be included in the rates for linear diffusers.

D Notwithstanding the requirements of SMM4 Section XVII (f) 5, plenums may

alternatively be given SUPER and the size of air plenum shall not be identified separately. No deduction shall be made for intersections or openings. Where air plenums are proprietary made and integrated with equipment, the air plenums together with the insulation where required shall be included in the items of equipment and stated in the description of the equipment.

Page 309: TENDER DOCUMENTS · schedule no. 1 – preliminaries sr1/1 – sr1 sum/1 schedule no. 2 – preambles sr2/1 – sr2/72 schedule no. 3 – sewage treatment plant system sr3/1 – sr3

PART C – BUILDING SERVICES WORKS

HK-4547/FP TCK4:LWY22:TWT1:GT:M45042:(28.2.2020) - SR2/55 - Arcadis Hong Kong Limited

For Use With HKSMM4

MECHANICAL INSTALLATIONS (Cont’d)

INSULATION A Notwithstanding the requirements of SMM4 Section XVII (g) 1, the method of

application for insulation shall not be identified separately. B Notwithstanding the requirements of SMM4 Section XVII (g) 2, insulation to pipework

for the Unitary Air Conditioning System (such as VRV air conditioning system, split type air conditioning system, etc.) under different set of unitary air conditioning units shall be measured together irrespective of their sizes of pipework and sizes of pipework shall not be stated.

C Notwithstanding the requirements of SMM4 Section XVII (g) 3 and 4, insulation to

pipework fittings shall not be measured separately and shall be deemed to be included in the rates for insulation to pipework in which they occur.

D In addition to the Coverage Rules stated in SMM4 Section XVII (g) C.2, the rates for

insulation to pipework shall be deemed to include working insulation around test points, cleaning eyes, access doors and the like.

E In addition to the Coverage Rules stated in SMM4 Section XVII (g) C.4 and C.5, the

rates for insulation to rectangular, circular or oval ductwork shall be deemed to include working insulation around test points, cleaning eyes, access doors and the like.

F Notwithstanding the requirements of SMM4 Section XVII (g) 9, insulation to ductwork

ancillaries except air plenums shall be deemed to be included in the rates for ancillaries and shall not be measured separately. In addition, the rates for insulation to ductwork ancillaries shall be deemed to include working insulation around ductwork ancillaries.

G Notwithstanding the requirements of SMM4 Section XVII (g) 10, insulation to

equipment shall not be measured separately and shall be deemed to be included in the rates for equipment in which they occur in accordance with the Specification and shall not be described.

Page 310: TENDER DOCUMENTS · schedule no. 1 – preliminaries sr1/1 – sr1 sum/1 schedule no. 2 – preambles sr2/1 – sr2/72 schedule no. 3 – sewage treatment plant system sr3/1 – sr3

PART C – BUILDING SERVICES WORKS

HK-4547/FP TCK4:LWY22:TWT1:GT:M45042:(28.2.2020) - SR2/56 - Arcadis Hong Kong Limited

For Use With HKSMM4

MECHANICAL INSTALLATIONS (Cont’d)

INSULATION (Cont’d) A Unless otherwise stated, working insulation around and providing insulation to

instrumentation such as gauges, thermometers, thermostats, pressure and temperature plugs, sensors, and the like thereto shall be deemed to be included with the insulation to ductwork or pipework concerned.

PROTECTIVE COVERINGS AND FINISHINGS B Notwithstanding the requirements of SMM4 Section XVII (h) 1, the method of

application for protective coverings and finishings to insulation shall not be identified separately.

C Notwithstanding the requirements of SMM4 Section XVII (h) 2, protective coverings

and finishings to insulation to pipework for the Unitary Air Conditioning System (such as VRV air conditioning system, split type air conditioning system, etc.) under different set of unitary air conditioning units shall be measured together irrespective of their sizes of pipework and sizes of pipework shall not be stated.

D Notwithstanding the requirements of SMM4 Section XVII (h) 3 and 4, protective

coverings and finishings to insulation to pipework fittings shall be deemed to be included in the rates for protective coverings and finishings to insulation to pipework in which they occur and shall not be measured separately.

E In addition to the Coverage Rules stated in SMM4 Section XVII (h) C.2, the rates for

protective coverings and finishings to insulation to pipework shall be deemed to include working insulation around test points, cleaning eyes, access doors and the like.

F In addition to the Coverage Rules stated in SMM4 Section XVII (h) C.4 and C.5, the

rates for protective coverings and finishings to insulation to rectangular, circular or oval ductwork shall be deemed to include working insulation around test points, cleaning eyes, access doors and the like.

Page 311: TENDER DOCUMENTS · schedule no. 1 – preliminaries sr1/1 – sr1 sum/1 schedule no. 2 – preambles sr2/1 – sr2/72 schedule no. 3 – sewage treatment plant system sr3/1 – sr3

PART C – BUILDING SERVICES WORKS

HK-4547/FP TCK4:LWY22:TWT1:GT:M45042:(28.2.2020) - SR2/57 - Arcadis Hong Kong Limited

For Use With HKSMM4

MECHANICAL INSTALLATIONS (Cont’d)

PROTECTIVE COVERINGS AND FINISHINGS (Cont’d) A Unless otherwise stated, protective coverings and finishings to insulation to ductwork

ancillaries except air plenums shall not be measured separately and shall be deemed to be included in the rates for ancillaries.

B Notwithstanding the requirements of SMM4 Section XVII (h) 9, protective coverings

and finishings to insulated equipment shall not be measured separately and shall be deemed to be included in the rates for items of equipment in which they occur and shall not be described.

PAINTING C Painting of pipes or tubing (such terms shall be synonymous for these rules of

measurement) shall be measured RUN stating the classification group as follows :-

(i) Small pipes (pipes not exceeding 55 millimetres diameter).

(ii) Large pipes (pipes exceeding 55 millimetres diameter but not exceeding 110 millimetres diameter).

(iii) Pipes exceeding 110 millimetres, size of pipes shall each be stated. D Painting to internal or external surfaces of rectangular ductwork shall be described

separately and given SUPER and shall be deemed to include for all painting around in-line fittings, accessories, ancillaries, instrumentation, test points and the like.

E Painting to internal or external surfaces of circular and oval ductwork shall each be

described separately and given RUN stating the size of ductwork and shall be deemed to include for all painting around in-line fittings, accessories, ancillaries, instrumentation, test points and the like.

Page 312: TENDER DOCUMENTS · schedule no. 1 – preliminaries sr1/1 – sr1 sum/1 schedule no. 2 – preambles sr2/1 – sr2/72 schedule no. 3 – sewage treatment plant system sr3/1 – sr3

PART C – BUILDING SERVICES WORKS

HK-4547/FP TCK4:LWY22:TWT1:GT:M45042:(28.2.2020) - SR2/58 - Arcadis Hong Kong Limited

For Use With HKSMM4

MECHANICAL INSTALLATIONS (Cont’d)

PAINTING (Cont’d) A Painting of pipework and ductwork supports, brackets, in-line fittings, accessories, and,

ancillaries shall be deemed to be included in the respective rates for pipework and ductwork.

B Priming and painting off site and proprietary finishes or surface treatments applied as

part of the production process shall be deemed to be included in the items concerned. C Unless separate items are measured or given in the Schedules of Rates, the rates for

painting shall be deemed to include for but not be restricted to the following :-

(i) All preparation of surfaces;

(ii) Rubbing down before each coat;

(iii) All multi-colour work and cutting to line;

(iv) Applying priming coats on new work before the articles are fixed or built in;

(v) The cost of setting up tints and colours for approval, if required;

(vi) The cost of analysis of paint, if required;

(vii) Painting beads, hinges and other fittings, brackets, stays, bolts, lugs and the like (unless detached from other paintwork);

(viii) Protecting all work, fittings etc. during the execution of the painting,

removing all splashes from walls, skirtings, floors, etc. and leaving clean and perfect on completion;

(ix) Removing all articles of hardware and the like before painting and replacing

after the painting is complete.

Page 313: TENDER DOCUMENTS · schedule no. 1 – preliminaries sr1/1 – sr1 sum/1 schedule no. 2 – preambles sr2/1 – sr2/72 schedule no. 3 – sewage treatment plant system sr3/1 – sr3

PART C – BUILDING SERVICES WORKS

HK-4547/FP TCK4:LWY22:TWT1:GT:M45042:(28.2.2020) - SR2/59 - Arcadis Hong Kong Limited

For Use With HKSMM4

MECHANICAL INSTALLATIONS (Cont’d)

SUNDRIES A Notwithstanding the requirements of the SMM4 Section XVII (i) 5, all necessary fuel in

connection with testing, setting to work and commissioning shall be deemed to be included in the rates for testing, setting to work and commissioning and shall not be measured separately.

B Notwithstanding the requirements of SMM4 Section XVII (i) 6 to 9 and 13, the number

of copies of drawings or documents required shall be in accordance with the Specification and shall not be separately identified.

C Notwithstanding the requirements of SMM4 Section XVII (i) 15 and 16, where pipes or

ducts pass through walls, floors, ceilings or beams, the supply and installation of all sleeves including pre-cut to lengths with square or splayed ends and sealing and fire proofing of all wall, floor, ceiling and beam openings and annular spaces between pipes or ducts and sleeves with approved fire proofing material as required, shall be deemed to be included in the rates for pipework or ductwork.

Page 314: TENDER DOCUMENTS · schedule no. 1 – preliminaries sr1/1 – sr1 sum/1 schedule no. 2 – preambles sr2/1 – sr2/72 schedule no. 3 – sewage treatment plant system sr3/1 – sr3

PART C – BUILDING SERVICES WORKS

HK-4547/FP TCK4:LWY22:TWT1:GT:M45042:(28.2.2020) - SR2/60 - Arcadis Hong Kong Limited

For Use With HKSMM4

ELECTRICAL INSTALLATIONS

GENERALLY A Notwithstanding the requirements of the Measurement Rules M.5 of SMM4 Section

XVIII (a), Building Services Works shall be classified into systems or installations and measured under appropriate headings as shown in Annex “A” of the Preambles.

B Notwithstanding the requirements of the Measurement Rules M.2 of SMM4 Section

XVIII (a), work in Plant Rooms shall not be separately identified. Furthermore, works internally, externally and in plant rooms for Earthing, Lightning Protection and Bonding and Sundries of Electrical Installations and Electrical and Control System for Mechanical Installations shall be grouped together and shall not be identified separately.

C In addition to the Coverage Rules stated in SMM4 Section XVIII (a) C.1 to C.6, the

rates for items for Electrical Installations shall include for: -

(i) All painting work (ii) Colour bands and colour identification work.

(iii) Engraving and lettering for identification and signs, in both English and

Chinese.

(iv) Priming and/or painting off Site and proprietary finishes or surface treatment applied as part of the production process whether applied before or after fabrication and assembly.

(v) Spring compensated, seismic restraints and isolated components (vi) Any kind of fixing. D Unless otherwise described, the method of fixing for items for Electrical Installations

shall not be described.

Page 315: TENDER DOCUMENTS · schedule no. 1 – preliminaries sr1/1 – sr1 sum/1 schedule no. 2 – preambles sr2/1 – sr2/72 schedule no. 3 – sewage treatment plant system sr3/1 – sr3

PART C – BUILDING SERVICES WORKS

HK-4547/FP TCK4:LWY22:TWT1:GT:M45042:(28.2.2020) - SR2/61 - Arcadis Hong Kong Limited

For Use With HKSMM4

ELECTRICAL INSTALLATIONS (Cont’d)

EQUIPMENT AND SWITCHGEAR A In addition to the Coverage Rules stated in SMM4 Section XVIII (b) 1, the rates for

equipment and switchgear shall further be deemed to include for the following :-

(i) All costs and charges in respect of supply and taking delivery;

(ii) Paying all customs charges, import taxes and the like;

(iii) All enclosures where required;

(iv) Checking and repairing or replacing any damaged parts;

(v) Spring compensated and seismic restraints and isolating components;

(vi) All attendance as required of the equipment manufacturers’ representative to assist in the installation and subsequent testing and commissioning of the equipment.

B In addition to the Coverage Rules stated in SMM4 Section XVIII (b) C.1, cable lugs

required for connecting cable ends or cable tails to equipment or switchgear shall be deemed to be included in the rates for the item to which they are connected.

C Unless otherwise described, provision of blank plates to the space ways of

MCB/MCCB boards shall be deemed to be included in the rates for item of MCB/MCCB boards.

Page 316: TENDER DOCUMENTS · schedule no. 1 – preliminaries sr1/1 – sr1 sum/1 schedule no. 2 – preambles sr2/1 – sr2/72 schedule no. 3 – sewage treatment plant system sr3/1 – sr3

PART C – BUILDING SERVICES WORKS

HK-4547/FP TCK4:LWY22:TWT1:GT:M45042:(28.2.2020) - SR2/62 - Arcadis Hong Kong Limited

For Use With HKSMM4

ELECTRICAL INSTALLATIONS (Cont’d)

CONDUIT (EXCEPT IN FINAL CIRCUITS) A Notwithstanding the requirements of SMM4 Section XVIII (c) 1, different methods of

fixing conduits shall not be separately identified. B Notwithstanding the requirements of SMM4 Section XVIII (c) 2.2 to 2.9, adaptable

boxes, floor trap boxes, purpose made boxes, junction boxes, boxes required for drawing in cables, flameproof boxes, expansion joints and pedestal boxes shall be deemed to be included in the rates for conduits and shall not be measured separately.

C Notwithstanding the requirements of Measurement Rules M.2 of SMM4 Section XVIII

(c) 3, the length of flexible conduits shall be measured flat on plan from point to point as shown on the Tender Drawings.

D Notwithstanding the requirements of SMM4 Section XVIII (c) 1, 2 and 3, conduits for

Electrical Work Associated with Other Services Installations (EOS) may be alternatively measured as points. One conduit point shall be counted for each outlet and the rates for conduit points shall include for conduits including flexible conduits and adapters, outlet boxes, including special boxes, adaptable boxes, floor trap boxes, purpose made boxes, rectangular junction boxes required for drawings in cables, flameproof boxes and expansion joints, all fixings, bending, cutting, screwing and jointing, draw wires and all earth continuity requirements. TRUNKING AND BUSBAR TRUNKING

E Notwithstanding the requirements of SMM4 Section XVIII (d) 1, the type of covers,

method of jointing and pin racks where required for trunking shall be in accordance with the Specification and shall not be described. The rates for trunking shall be deemed to include for these items.

F Notwithstanding the requirements of SMM4 Section XVIII (d) 2, trunking fittings

including bends, reducing bends, tees, reducing tees, crosses, reducing crosses, reducers, fire barriers and the like shall be deemed to be included in the rates for trunking and shall not be measured separately.

G Unless otherwise stated, expansion joints for trunking shall be deemed to be included

in the rates for trunking and shall not be measured separately.

Page 317: TENDER DOCUMENTS · schedule no. 1 – preliminaries sr1/1 – sr1 sum/1 schedule no. 2 – preambles sr2/1 – sr2/72 schedule no. 3 – sewage treatment plant system sr3/1 – sr3

PART C – BUILDING SERVICES WORKS

HK-4547/FP TCK4:LWY22:TWT1:GT:M45042:(28.2.2020) - SR2/63 - Arcadis Hong Kong Limited

For Use With HKSMM4

ELECTRICAL INSTALLATIONS (Cont’d) TRUNKING AND BUSBAR TRUNKING (Cont’d) A The rates for floor trunking shall be deemed to include for :

(i) All mounting clamps and screws necessary for the complete assembly and installation on site.

(ii) Earthing continuity and equipotential bonding cables complete with tinned

lugs/cable press joints for the complete floor trunking system. (iii) Cleaning of the floor trunking prior to commencement of any cabling works.

B The rates for “in-screed” or flush-floor” trunking shall be, in addition, deemed to include

for levelling the trunking prior to the laying of the surrounding screed by the Contractor. C Notwithstanding the requirements of SMM4 Section XVIII (d) 4.4, all expansion

fittings/units for busbar trunking shall be deemed to be included in the rates for busbar trunking and shall not be measured separately.

D Notwithstanding the requirements of SMM4 Section XVIII (d) 5.6, fire barriers shall be

deemed to be included in the rates for busbar trunking and shall not be measured separately.

Page 318: TENDER DOCUMENTS · schedule no. 1 – preliminaries sr1/1 – sr1 sum/1 schedule no. 2 – preambles sr2/1 – sr2/72 schedule no. 3 – sewage treatment plant system sr3/1 – sr3

PART C – BUILDING SERVICES WORKS

HK-4547/FP TCK4:LWY22:TWT1:GT:M45042:(28.2.2020) - SR2/64 - Arcadis Hong Kong Limited

For Use With HKSMM4

ELECTRICAL INSTALLATIONS (Cont’d)

TRAYS AND LADDERS A Notwithstanding the requirements of the SMM4 Section XVIII (e) 3 and 4, all fittings for

trays and ladders including stop ends, bends, tees, reducing tees, crosses, offsets, reducers and the like shall be deemed to be included in the rates for trays and ladders respectively and shall not be measured separately.

B Unless otherwise stated, expansion joints for trays and ladders shall be deemed to be

included in the rates for items for trays and ladders and shall not be measured separately. CABLES (EXCEPT IN FINAL CIRCUITS)

C Notwithstanding the requirements of SMM4 Section XVIII (f) 1, components for

supporting cables shall not be given in the description and the rates for components for supporting cables such as saddles, cable ties, cleats and the like shall be deemed to be included in the rates for cables.

D Notwithstanding the requirements of SMM4 Section XVIII (f) 7, 8 and 9, D-irons,

insulators and other components shall be deemed to be included in the rates for cables and shall not be measured separately.

E In addition to the Coverage Rules of SMM4 Section XVIII (f) C.5, conduit boxes,

adaptable boxes and the like used with cable-termination glands shall be deemed to be included in the rates for cable-termination glands.

Page 319: TENDER DOCUMENTS · schedule no. 1 – preliminaries sr1/1 – sr1 sum/1 schedule no. 2 – preambles sr2/1 – sr2/72 schedule no. 3 – sewage treatment plant system sr3/1 – sr3

PART C – BUILDING SERVICES WORKS

HK-4547/FP TCK4:LWY22:TWT1:GT:M45042:(28.2.2020) - SR2/65 - Arcadis Hong Kong Limited

For Use With HKSMM4

ELECTRICAL INSTALLATIONS (Cont’d)

CABLES (EXCEPT IN FINAL CIRCUITS) (Cont’d) A Notwithstanding the requirements of the SMM4 Section XVII (f), certain cables in Main

or Sub-Main Circuits etc. may be ENUMERATED stating the appropriate cable reference or the reference of the items of switchgears or distribution boards they connect to, and the size and type of cable where distribution diagrams and location drawings showing the positions of main and sub-main switchgears and distribution boards are provided. The rates shall be deemed to include cables, conduits, including flexible conduits and adaptors, outlet boxes, junction boxes, universal boxes, etc. as described in SMM4 Section XVIII (c), all fixings, screwing and jointing, termination glands and boxes, laying in trunkings or fixing to trays or ladders, and all earth continuity requirements. Cable trunkings, trays and ladders used in Main or Sub-Main Circuits, which are specifically detailed in the Tender Drawings or specifically required in the Specification, shall be measured separately under SMM4 Section XVIII (d) and (e). Cable trunkings, trays and ladders used in Main or Sub-Main Circuits which are not specifically so detailed or required, shall be deemed to be included in the rates.

B Unless otherwise stated, cable cover tiles for cables buried direct in ground shall be

measured run stating the type and size of the cover tiles.

FINAL CIRCUITS (CABLE, ETC. IN FINAL CIRCUITS)

C Notwithstanding the requirements of the Measurement Rules M.4 of SMM4 Section

XVIII (g) 2, final circuits are not grouped together under headings stating the distribution boards. The rates for final circuits shall be deemed to be included for termination glands and shrouds where required.

Page 320: TENDER DOCUMENTS · schedule no. 1 – preliminaries sr1/1 – sr1 sum/1 schedule no. 2 – preambles sr2/1 – sr2/72 schedule no. 3 – sewage treatment plant system sr3/1 – sr3

PART C – BUILDING SERVICES WORKS

HK-4547/FP TCK4:LWY22:TWT1:GT:M45042:(28.2.2020) - SR2/66 - Arcadis Hong Kong Limited

For Use With HKSMM4

ELECTRICAL INSTALLATIONS (Cont’d)

FITTINGS AND ACCESSORIES A In addition to the Coverage Rules stated in SMM4 Section XVIII (h) C.1, the rates for

fittings and accessories shall further be deemed to include for :-

(i) Provision of flush or surface metal clad boxes;

(ii) All cable terminations;

(iii) Packing out to final finished surfaces. B Notwithstanding the requirements of SMM4 Section XVIII (h), form of suspension or

support for fittings and accessories shall be in accordance with the Specification and shall not be described.

EARTHING, LIGHTNING PROTECTION AND BONDING C Notwithstanding the requirements of SMM4 Section XVIII (i) 2, the type and spacing of

saddles, cleats, clips, holdfasts and the like shall be in accordance with the Specification and shall not be separately identified.

D In addition to the Coverage Rules stated in SMM4 Section XVIII (i) C.2, the rates for

earth electrodes shall be deemed to include driving electrodes into ground. E Notwithstanding the requirements of SMM4 Section XVIII (i) 8.2 and 8.3, bonding

other than that defined in the Definition Rules D.1 of HKSMM4 Section XVIII (a) may be alternatively measured as an item. Tapes, cables, clamps, conduit, etc. shall be deemed to be included in the item.

Page 321: TENDER DOCUMENTS · schedule no. 1 – preliminaries sr1/1 – sr1 sum/1 schedule no. 2 – preambles sr2/1 – sr2/72 schedule no. 3 – sewage treatment plant system sr3/1 – sr3

PART C – BUILDING SERVICES WORKS

HK-4547/FP TCK4:LWY22:TWT1:GT:M45042:(28.2.2020) - SR2/67 - Arcadis Hong Kong Limited

For Use With HKSMM4

ELECTRICAL INSTALLATIONS (Cont’d)

SUNDRIES A Notwithstanding the requirements of SMM4 Section XVIII (j) 3, all necessary fuel in

connection with testing, setting to work and commissioning shall be deemed to be included in the rates for testing, setting to work and commissioning and shall not be measured separately.

B Notwithstanding the requirements of SMM4 Section XVIII (j) 4 to 7 and 11, the number

of copies of drawings or documents required shall be in accordance with the Specification and shall not be separately identified.

C Notwithstanding the requirements of SMM4 Section XVIII (j) 16 and 17, where

conduits, trunking, trays, ladders or cables pass through walls, floors, ceilings or beams, the supply and installation of all sleeves including pre-cut to length with square or splayed ends and sealing and fire proofing of all wall, floor, ceiling and beam openings and annular spaces between conduits, trunking, trays, ladders or cables and sleeves with approved fire proofing material as required, shall be deemed to be included in the rates for conduits, trunking, trays, ladders or cables.

Page 322: TENDER DOCUMENTS · schedule no. 1 – preliminaries sr1/1 – sr1 sum/1 schedule no. 2 – preambles sr2/1 – sr2/72 schedule no. 3 – sewage treatment plant system sr3/1 – sr3

PART C – BUILDING SERVICES WORKS

HK-4547/FP TCK4:LWY22:TWT1:GT:M45042:(28.2.2020) - SR2/68 - Arcadis Hong Kong Limited

For Use With HKSMM4

COMMUNICATIONS / SECURITY / CONTROL SYSTEMS

GENERALLY A Notwithstanding the requirements of the Measurement Rules M.3 of SMM4 Section

XIX (a), Building Services Works shall be classified into systems or installations and measured under appropriate headings as shown in Annex “A” of the Preambles.

B Notwithstanding the requirements of the Measurement Rules M.4 of SMM4 Section

XIX (a), work internally, externally or in plant rooms for Control System and Sundries of Communications / Security / Control Systems shall be grouped together and shall not be identified separately.

C In addition to the Coverage Rules stated in SMM4 Section XIX (a) C.3 and C.4, the

rates for items for Communications / Security / Control Systems shall include for :-

(i) Colour bands and colour identification work.

(ii) Engraving and lettering for identification and signs, in both English and Chinese.

(iii) Priming and/or painting off Site and proprietary finishes or surface treatment

applied as part of the production process whether applied before or after fabrication and assembly.

(iv) All painting work.

(v) Any kind of fixing.

DISTRIBUTION AND PRINCIPAL INTERCONNECTIONS D Notwithstanding the requirements of SMM4 Sections XIX (c), signal/control circuits,

including approved cable, conduit, trunking and accessories etc. may alternatively be ENUMERATED stating the appropriate cable reference of the items of peripheral equipment they connect to and the size and type of cable where distribution diagrams and location drawings showing the positions of central equipment and peripheral equipment are provided.

Page 323: TENDER DOCUMENTS · schedule no. 1 – preliminaries sr1/1 – sr1 sum/1 schedule no. 2 – preambles sr2/1 – sr2/72 schedule no. 3 – sewage treatment plant system sr3/1 – sr3

PART C – BUILDING SERVICES WORKS

HK-4547/FP TCK4:LWY22:TWT1:GT:M45042:(28.2.2020) - SR2/69 - Arcadis Hong Kong Limited

For Use With HKSMM4

COMMUNICATIONS/SECURITY/CONTROL SYSTEMS (Cont’d)

FINAL CIRCUIT POINTS

A In addition to the Coverage Rules stated in SMM4 Section XIX (d) C.1 and C.2, the rates for final circuits shall be deemed to include cable trunking, trays and ladders used in final circuits which are not specifically detailed in the Tender Drawings or specifically required in the Specification.

B Notwithstanding the requirements of SMM4 Section XIX (d) 1 and 4, B.M.S. final

circuits (control and monitoring circuits) for equipment from the DDC controllers, modules and the like shall be counted as one number irrespective of the number of field equipment or control and monitoring circuits connected thereto and the types of final circuit points shall not be separately measured and stated. The rates for B.M.S. final circuits (control and monitoring circuits) for each equipment shall be deemed to include all the field equipment such as sensors, control devices, actuators and the like as required in the Specification and Tender Drawings for controlling, monitoring, providing measurement functions, alarm provision, etc. of the equipment. All the field equipment shall not be separately measured unless otherwise stated. SUNDRIES

C Notwithstanding the requirements of SMM4 Section XIX (e) 3, all necessary fuel in

connection with testing, setting to work and commissioning shall be deemed to be included in the rates for testing, setting to work and commissioning and shall not be measured separately.

D Notwithstanding the requirements of SMM4 Section XIX (e) 4 to 7 and 11, the number

of copies of drawings or documents required shall be in accordance with the Specification and shall not be separately identified.

E Notwithstanding the requirements of SMM4 Section XIX (e) 13 and 14, where conduits,

trunking, trays, ladders or cables pass through walls, floors, ceilings or beams, the supply and installation of all sleeves including pre-cut to length with square or splayed ends and sealing and fire proofing of all wall, floor, ceiling and beam openings and annular spaces between conduits, trunking, trays, ladders or cables and sleeves with approved fire proofing material as required, shall be deemed to be included in the rates for conduits, trunking, trays, ladders or cables.

Page 324: TENDER DOCUMENTS · schedule no. 1 – preliminaries sr1/1 – sr1 sum/1 schedule no. 2 – preambles sr2/1 – sr2/72 schedule no. 3 – sewage treatment plant system sr3/1 – sr3

Annex “A”

HK-4547/FP TCK4:LWY22:TWT1:GT:M45042:(28.2.2020) - SR2/70 - Arcadis Hong Kong Limited

For Use With HKSMM4

Annex “A” - Classification of Systems for Building Services Works Building Services Works, together with their equipment, pipework, ductwork, insulation, cables, trunking, ducting, cable trays, conduits and sundries shall be classified into systems or installations as follows and given under appropriate headings. The wordings in this list are for reference only, and actual wording should follow those used in the Tender Drawings and Specification. PLUMBING AND DRAINAGE INSTALLATION - Rainwater Disposal System - Soil, Waste and Vent System - Sanitary and Laboratory Fittiings - Cold Water System - Hot Water System - Cleansing Water System - Flushing Water System - Irrigation System - Sub-soil Drain System - Electrical and Control - Sundries - (Other headings according to the

Specifications)

Electrical Installation - Incoming Main - Generator Sets - Main and Sub-main Distribution - Uninterruptible Power Suuply System - General Lighting and Power - Telephone and PABX System - Intercom System - Public Address System - CABD/SMATV Systems - Emergency Call Bell System - Staff Paging System - Nurse Call System - Security System - CCTV System - Automatic Carpark Control System - Trunking, Trays and Ladders - Electrical Work Associated with Other Services Installations (EOS) - Earthing, Lightning Protection and Bonding - Sundries - (Other headings according to the Specifications)

Page 325: TENDER DOCUMENTS · schedule no. 1 – preliminaries sr1/1 – sr1 sum/1 schedule no. 2 – preambles sr2/1 – sr2/72 schedule no. 3 – sewage treatment plant system sr3/1 – sr3

Annex “A”

HK-4547/FP TCK4:LWY22:TWT1:GT:M45042:(28.2.2020) - SR2/71 - Arcadis Hong Kong Limited

For Use With HKSMM4

Annex “A” - Classification of Systems for Building Services Works (Cont’d) Building Services Works, together with their equipment, pipework, ductwork, insulation, cables, trunking, ducting, cable trays, conduits and sundries shall be classified into systems or installations as follows and given under appropriate headings. The wordings in this list are for reference only, and actual wording should follow those used in the Tender Drawings and Specification. MECHANICAL VENTILATION AND AIR CONDITIONING INSTALLATION - Sea Water Cooling System - Chilled Water System - Condenser Water System - Condensate Drain System - Heating Water System - Mechanical Ventilation System - Kitchen Exhaust System - Car Parking Exhaust System - Smoke Extraction System - Staircase Pressurization System - Air Conditioning System - Unitary Air Conditioning System - Electrical and Control - Building Monitoring System - Sundries - (Other headings according to the Specifications)

Fire Services Installation - Incoming System - Fire Hydrant and Hosereel Systems - Street Fire Hydrant System - Automatic Sprinkler System - Pre-action System - Drencher System - Gaseous Extinguishing System - Audio/Visual Advisory System - Manual and Automatic Fire Alarm and Detection Systems - Portable Fire Fighting Appliances - Electrical and Control - Sundries - (Other headings according to the Specifications)

Page 326: TENDER DOCUMENTS · schedule no. 1 – preliminaries sr1/1 – sr1 sum/1 schedule no. 2 – preambles sr2/1 – sr2/72 schedule no. 3 – sewage treatment plant system sr3/1 – sr3

Annex “A”

HK-4547/FP TCK4:LWY22:TWT1:GT:M45042:(28.2.2020) - SR2/72 - Arcadis Hong Kong Limited

For Use With HKSMM4

Annex “A” - Classification of Systems for Building Services Works (Cont’d) Building Services Works, together with their equipment, pipework, ductwork, insulation, cables, trunking, ducting, cable trays, conduits and sundries shall be classified into systems or installations as follows and given under appropriate headings. The wordings in this list are for reference only, and actual wording should follow those used in the Tender Drawings and Specification. COMPRESSED AIR SYSTEM - Compressed Air System - Electrical and Control - Sundries - (Other headings according to the Specifications) STEAM BOILER SYSTEM - Steam Boiler System - Electrical and Control - Sundries - (Other headings according to the Specifications) LIQUEFIED PETROLEUM GAS INSTALLATION - Liquefied Petroleum Gas System - Electrical and Control - Sundries - (Other headings according to the Specifications)

FUEL SUPPLY SYSTEM - Fuel Supply System - Electrical and Control - Sundries - (Other headings according to the Specifications) SWIMMING POOL AND WATER FEATURE FILTRATION SYSTEM - Water Circulation and Filtration System - Compressed Air Supply and Backwashing System - Ozone Violet Disinfection System - Chemical Treatment - Mixed Oxidant Disinfection System - Underwater Lighting Installation - Electrical and Control - Sundries - (Other headings according to the Specifications) OTHERS SYSTEMS OR INSTALLATIONS ACCORDING TO THE SPECIFICATIONS

Page 327: TENDER DOCUMENTS · schedule no. 1 – preliminaries sr1/1 – sr1 sum/1 schedule no. 2 – preambles sr2/1 – sr2/72 schedule no. 3 – sewage treatment plant system sr3/1 – sr3

SCHEDULE NO. 3 – SEWAGE TREATMENT PLANT SYSTEM

Page 328: TENDER DOCUMENTS · schedule no. 1 – preliminaries sr1/1 – sr1 sum/1 schedule no. 2 – preambles sr2/1 – sr2/72 schedule no. 3 – sewage treatment plant system sr3/1 – sr3

NOMINATED SUB-CONTRACT WORKS

FOR SEWAGE TREATMENT AND GREY WATER TREATMENT PLANT FOR PSFSC

FOR UPGRADING MAI PO NATURE RESERVE INFRASTRUCTURE

AT MAI PO, SAN TIN, YUEN LONG, NEW TERRITORIES

Item Qty Unit Rate HK$

SEWAGE TREATMENT PLANT SYSTEM

SCREENING SYSTEM

Pipe and fittings

Provision of ductile iron sewage waste pipe from

interface point to screen and/or screen chamber;

including all necessary connections to existing,

extension of pipe, fixing accessories, etc.

A DN100; to manual coarse bar screen M

B DN100; to auto-mechanical ranked coarse bar M

screen

C overflow pipe NO

Valves and in-line equipment

D penstocks NO

E check valves NO

F gate valves NO

Equipment and ancillaries

G manual coarse bar screen SET

H auto-mechanical ranked coarse bar screen SET

I manual fine bar screen SET

J auto-mechanical ranked fine bar screen SET

K stainless steel motorized flow diverter SET

L level electrodes SET

M high level alarms NO

N waste chut with cover NO

O sampling points NO

P fine screen chamber NO

To Collection

Schedule No. 3 - Sewage Treatment Plant System

Item Description

HK-4547/FP

Arcadis SR3 / 1

Page 329: TENDER DOCUMENTS · schedule no. 1 – preliminaries sr1/1 – sr1 sum/1 schedule no. 2 – preambles sr2/1 – sr2/72 schedule no. 3 – sewage treatment plant system sr3/1 – sr3

NOMINATED SUB-CONTRACT WORKS

FOR SEWAGE TREATMENT AND GREY WATER TREATMENT PLANT FOR PSFSC

FOR UPGRADING MAI PO NATURE RESERVE INFRASTRUCTURE

AT MAI PO, SAN TIN, YUEN LONG, NEW TERRITORIES

Item Qty Unit Rate HK$

Schedule No. 3 - Sewage Treatment Plant System

Item Description

SEWAGE TREATMENT PLANT SYSTEM (Cont'd)

SCREENING SYSTEM (Cont'd)

Others

Allow for any other items not included in the foregoing

but required by the Sub-Contract. Please specify.

To Collection

HK-4547/FP

Arcadis SR3 / 2

Page 330: TENDER DOCUMENTS · schedule no. 1 – preliminaries sr1/1 – sr1 sum/1 schedule no. 2 – preambles sr2/1 – sr2/72 schedule no. 3 – sewage treatment plant system sr3/1 – sr3

NOMINATED SUB-CONTRACT WORKS

FOR SEWAGE TREATMENT AND GREY WATER TREATMENT PLANT FOR PSFSC

FOR UPGRADING MAI PO NATURE RESERVE INFRASTRUCTURE

AT MAI PO, SAN TIN, YUEN LONG, NEW TERRITORIES

Item Qty Unit Rate HK$

Schedule No. 3 - Sewage Treatment Plant System

Item Description

SEWAGE TREATMENT PLANT SYSTEM (Cont'd)

MEMBRANE BIOLOGICAL REACTOR SYSTEM

(MBR SYSTEM)

Pipe and fittings

Provision of ductile iron sludge waste pipe from

interface point to MBR System / MBR tank;

including all necessary connections to existing,

extension of pipe, fixing accessories, etc.

A DN100; from fine screen chamber M

B DN200; to sludge holding tank M

C DN200; to MBR tank M

Provision of stainless steel air pipe from

interface point to MBR System / MBR tank;

including all necessary connections to existing,

extension of pipe, fixing accessories, etc.

D DN100; from air blower M

Provision of PVC treated water pipe from

interface point to MBR System / MBR tank;

including all necessary connections to existing,

extension of pipe, fixing accessories, etc.

E DN100; to chemical storage tank M

F DN100; to permeate pump M

G ____________mm diameter drain pipe M

H overflow pipe NO

Valves and in-line equipment

To ductile iron pipe

I check valves NO

J gate valves NO

K solenoid valves NO

To stainless steel pipe

L reducers NO

M butterfly valves NO

To Collection

HK-4547/FP

Arcadis SR3 / 3

Page 331: TENDER DOCUMENTS · schedule no. 1 – preliminaries sr1/1 – sr1 sum/1 schedule no. 2 – preambles sr2/1 – sr2/72 schedule no. 3 – sewage treatment plant system sr3/1 – sr3

NOMINATED SUB-CONTRACT WORKS

FOR SEWAGE TREATMENT AND GREY WATER TREATMENT PLANT FOR PSFSC

FOR UPGRADING MAI PO NATURE RESERVE INFRASTRUCTURE

AT MAI PO, SAN TIN, YUEN LONG, NEW TERRITORIES

Item Qty Unit Rate HK$

Schedule No. 3 - Sewage Treatment Plant System

Item Description

SEWAGE TREATMENT PLANT SYSTEM (Cont'd)

MEMBRANE BIOLOGICAL REACTOR SYSTEM

(MBR SYSTEM) (Cont'd)

Valves and in-line equipment (Cont'd)

To PVC pipe

A check valves NO

B gate valves NO

C solenoid valves NO

D reducers NO

Equipment and ancillaries

E MBR membrane modules SET

F anoxic zone with dissolved oxygen sensor SET

G chemical dosing pump NO

H MBR tanks NO

I pH sensors NO

J level sensing equipment NO

K high level alarms NO

L low level alarms NO

M electromagnetic flowmeter NO

N hydrostatic level sensors NO

To Collection

HK-4547/FP

Arcadis SR3 / 4

Page 332: TENDER DOCUMENTS · schedule no. 1 – preliminaries sr1/1 – sr1 sum/1 schedule no. 2 – preambles sr2/1 – sr2/72 schedule no. 3 – sewage treatment plant system sr3/1 – sr3

NOMINATED SUB-CONTRACT WORKS

FOR SEWAGE TREATMENT AND GREY WATER TREATMENT PLANT FOR PSFSC

FOR UPGRADING MAI PO NATURE RESERVE INFRASTRUCTURE

AT MAI PO, SAN TIN, YUEN LONG, NEW TERRITORIES

Item Qty Unit Rate HK$

Schedule No. 3 - Sewage Treatment Plant System

Item Description

SEWAGE TREATMENT PLANT SYSTEM (Cont'd)

MEMBRANE BIOLOGICAL REACTOR SYSTEM

(MBR SYSTEM) (Cont'd)

Others

Allow for any other items not included in the foregoing

but required by the Sub-Contract. Please specify.

To Collection

HK-4547/FP

Arcadis SR3 / 5

Page 333: TENDER DOCUMENTS · schedule no. 1 – preliminaries sr1/1 – sr1 sum/1 schedule no. 2 – preambles sr2/1 – sr2/72 schedule no. 3 – sewage treatment plant system sr3/1 – sr3

NOMINATED SUB-CONTRACT WORKS

FOR SEWAGE TREATMENT AND GREY WATER TREATMENT PLANT FOR PSFSC

FOR UPGRADING MAI PO NATURE RESERVE INFRASTRUCTURE

AT MAI PO, SAN TIN, YUEN LONG, NEW TERRITORIES

Item Qty Unit Rate HK$

Schedule No. 3 - Sewage Treatment Plant System

Item Description

SEWAGE TREATMENT PLANT SYSTEM (Cont'd)

SUBMERSIBLE SEWAGE AND SEWAGE

RETENTION SYSTEM

Pipe and fittings

Provision of ductile iron sewage waste pipe from

interface point to underground retention tank

including all necessary connections to existing,

extension of pipe, fixing accessories, etc.

A DN100; to manual coarse bar screen M

B DN100; to auto-mechanical coarse bar screen M

Valves and in-line equipment

To ductile iron pipe

C check valves NO

D gate valves NO

E reducers NO

Equipment and ancillaries

F submersible sewage pump (1 duty and 1 stand-by) SET

G high level alarms NO

H low level alarms NO

I hydrostatic level sensors NO

To Collection

HK-4547/FP

Arcadis SR3 / 6

Page 334: TENDER DOCUMENTS · schedule no. 1 – preliminaries sr1/1 – sr1 sum/1 schedule no. 2 – preambles sr2/1 – sr2/72 schedule no. 3 – sewage treatment plant system sr3/1 – sr3

NOMINATED SUB-CONTRACT WORKS

FOR SEWAGE TREATMENT AND GREY WATER TREATMENT PLANT FOR PSFSC

FOR UPGRADING MAI PO NATURE RESERVE INFRASTRUCTURE

AT MAI PO, SAN TIN, YUEN LONG, NEW TERRITORIES

Item Qty Unit Rate HK$

Schedule No. 3 - Sewage Treatment Plant System

Item Description

SEWAGE TREATMENT PLANT SYSTEM (Cont'd)

SUBMERSIBLE SEWAGE AND SEWAGE

RETENTION SYSTEM (Cont'd)

Others

Allow for any other items not included in the foregoing

but required by the Sub-Contract. Please specify.

To Collection

HK-4547/FP

Arcadis SR3 / 7

Page 335: TENDER DOCUMENTS · schedule no. 1 – preliminaries sr1/1 – sr1 sum/1 schedule no. 2 – preambles sr2/1 – sr2/72 schedule no. 3 – sewage treatment plant system sr3/1 – sr3

NOMINATED SUB-CONTRACT WORKS

FOR SEWAGE TREATMENT AND GREY WATER TREATMENT PLANT FOR PSFSC

FOR UPGRADING MAI PO NATURE RESERVE INFRASTRUCTURE

AT MAI PO, SAN TIN, YUEN LONG, NEW TERRITORIES

Item Qty Unit Rate HK$

Schedule No. 3 - Sewage Treatment Plant System

Item Description

SEWAGE TREATMENT PLANT SYSTEM (Cont'd)

SLUDGE HOLDING SYSTEM

Pipe and fittings

Provision of ductile iron sludge waste pipe from

interface point to sludge holding tank

including all necessary connections to existing,

extension of pipe, fixing accessories, etc.

A DN200; from MBR tank M

B DN200; to tanker away collection point / disposal M

point

Valves and in-line equipment

To ductile iron pipe

C solenoid valves NO

Equipment and ancillaries

D sludge pump (1 duty and 1 stand-by) SET

E level sensing equipment NO

F hydrostatic level sensors NO

Others

Allow for any other items not included in the foregoing

but required by the Sub-Contract. Please specify.

To Collection

HK-4547/FP

Arcadis SR3 / 8

Page 336: TENDER DOCUMENTS · schedule no. 1 – preliminaries sr1/1 – sr1 sum/1 schedule no. 2 – preambles sr2/1 – sr2/72 schedule no. 3 – sewage treatment plant system sr3/1 – sr3

NOMINATED SUB-CONTRACT WORKS

FOR SEWAGE TREATMENT AND GREY WATER TREATMENT PLANT FOR PSFSC

FOR UPGRADING MAI PO NATURE RESERVE INFRASTRUCTURE

AT MAI PO, SAN TIN, YUEN LONG, NEW TERRITORIES

Item Qty Unit Rate HK$

Schedule No. 3 - Sewage Treatment Plant System

Item Description

SEWAGE TREATMENT PLANT SYSTEM (Cont'd)

AIR SUPPLY SYSTEM

Pipe and fittings

Provision of stainless steel air pipe from

interface point to MBR System / MBR tank;

including all necessary connections to existing,

extension of pipe, fixing accessories, etc.

A DN100; to MBR tank M

Valves and in-line equipment

To stainless steel pipe

B gate valves NO

C butterfly valves NO

D check valves NO

E flexible joints NO

Equipment and ancillaries

F air blower (1 duty and 1 stand-by) SET

G silencers NO

H variable speed drive NO

I pressure gauge with cock NO

J rotameter NO

K pressure relief valves NO

To Collection

HK-4547/FP

Arcadis SR3 / 9

Page 337: TENDER DOCUMENTS · schedule no. 1 – preliminaries sr1/1 – sr1 sum/1 schedule no. 2 – preambles sr2/1 – sr2/72 schedule no. 3 – sewage treatment plant system sr3/1 – sr3

NOMINATED SUB-CONTRACT WORKS

FOR SEWAGE TREATMENT AND GREY WATER TREATMENT PLANT FOR PSFSC

FOR UPGRADING MAI PO NATURE RESERVE INFRASTRUCTURE

AT MAI PO, SAN TIN, YUEN LONG, NEW TERRITORIES

Item Qty Unit Rate HK$

Schedule No. 3 - Sewage Treatment Plant System

Item Description

SEWAGE TREATMENT PLANT SYSTEM (Cont'd)

AIR SUPPLY SYSTEM (Cont'd)

Others

Allow for any other items not included in the foregoing

but required by the Sub-Contract. Please specify.

To Collection

HK-4547/FP

Arcadis SR3 / 10

Page 338: TENDER DOCUMENTS · schedule no. 1 – preliminaries sr1/1 – sr1 sum/1 schedule no. 2 – preambles sr2/1 – sr2/72 schedule no. 3 – sewage treatment plant system sr3/1 – sr3

NOMINATED SUB-CONTRACT WORKS

FOR SEWAGE TREATMENT AND GREY WATER TREATMENT PLANT FOR PSFSC

FOR UPGRADING MAI PO NATURE RESERVE INFRASTRUCTURE

AT MAI PO, SAN TIN, YUEN LONG, NEW TERRITORIES

Item Qty Unit Rate HK$

Schedule No. 3 - Sewage Treatment Plant System

Item Description

SEWAGE TREATMENT PLANT SYSTEM (Cont'd)

pH ADJUSTMENT SYSTEM

Pipe and fittings

Provision of pipework for pH Adjustment System

from interface point to MBR System / MBR tank;

including all necessary connections to existing,

extension of pipe, fixing accessories, etc.

A _____________mm diameter M

Valves and in-line equipment

Generally

B gate valves NO

C check valves NO

Equipment and ancillaries

D drip tray NO

E aerobic tanks NO

F chemical dosing pump NO

G low level alarm NO

H level sensing equipment NO

I sampling point NO

To Collection

HK-4547/FP

Arcadis SR3 / 11

Page 339: TENDER DOCUMENTS · schedule no. 1 – preliminaries sr1/1 – sr1 sum/1 schedule no. 2 – preambles sr2/1 – sr2/72 schedule no. 3 – sewage treatment plant system sr3/1 – sr3

NOMINATED SUB-CONTRACT WORKS

FOR SEWAGE TREATMENT AND GREY WATER TREATMENT PLANT FOR PSFSC

FOR UPGRADING MAI PO NATURE RESERVE INFRASTRUCTURE

AT MAI PO, SAN TIN, YUEN LONG, NEW TERRITORIES

Item Qty Unit Rate HK$

Schedule No. 3 - Sewage Treatment Plant System

Item Description

SEWAGE TREATMENT PLANT SYSTEM (Cont'd)

pH ADJUSTMENT SYSTEM (Cont'd)

Others

Allow for any other items not included in the foregoing

but required by the Sub-Contract. Please specify.

To Collection

HK-4547/FP

Arcadis SR3 / 12

Page 340: TENDER DOCUMENTS · schedule no. 1 – preliminaries sr1/1 – sr1 sum/1 schedule no. 2 – preambles sr2/1 – sr2/72 schedule no. 3 – sewage treatment plant system sr3/1 – sr3

NOMINATED SUB-CONTRACT WORKS

FOR SEWAGE TREATMENT AND GREY WATER TREATMENT PLANT FOR PSFSC

FOR UPGRADING MAI PO NATURE RESERVE INFRASTRUCTURE

AT MAI PO, SAN TIN, YUEN LONG, NEW TERRITORIES

Item Qty Unit Rate HK$

Schedule No. 3 - Sewage Treatment Plant System

Item Description

SEWAGE TREATMENT PLANT SYSTEM (Cont'd)

PERMEATE SYSTEM

Pipe and fittings

Provision of PVC treated water pipe from

interface point to permeate system / pump

including all necessary connections to existing,

extension of pipe, fixing accessories, etc.

A DN50; to permeate pump M

Provision of ductile iron treated water pipe from

interface point to permeate system / pump

including all necessary connections to existing,

extension of pipe, fixing accessories, etc.

B DN100; to permeate pump M

Valves and in-line equipment

To ductile iron pipe

C gate valves NO

D check valves NO

E flexible joints NO

To PVC pipe

F gate valves NO

Equipment and ancillaries

G flow measuring apparatus SET

H permeate pump (1 duty and 1 stand-by) SET

I variable speed drive NO

J pressure gauge with cock NO

K sampling points NO

L pressure gauge NO

M pressure transmitter NO

To Collection

HK-4547/FP

Arcadis SR3 / 13

Page 341: TENDER DOCUMENTS · schedule no. 1 – preliminaries sr1/1 – sr1 sum/1 schedule no. 2 – preambles sr2/1 – sr2/72 schedule no. 3 – sewage treatment plant system sr3/1 – sr3

NOMINATED SUB-CONTRACT WORKS

FOR SEWAGE TREATMENT AND GREY WATER TREATMENT PLANT FOR PSFSC

FOR UPGRADING MAI PO NATURE RESERVE INFRASTRUCTURE

AT MAI PO, SAN TIN, YUEN LONG, NEW TERRITORIES

Item Qty Unit Rate HK$

Schedule No. 3 - Sewage Treatment Plant System

Item Description

SEWAGE TREATMENT PLANT SYSTEM (Cont'd)

PERMEATE SYSTEM (Cont'd)

Others

Allow for any other items not included in the foregoing

but required by the Sub-Contract. Please specify.

To Collection

HK-4547/FP

Arcadis SR3 / 14

Page 342: TENDER DOCUMENTS · schedule no. 1 – preliminaries sr1/1 – sr1 sum/1 schedule no. 2 – preambles sr2/1 – sr2/72 schedule no. 3 – sewage treatment plant system sr3/1 – sr3

NOMINATED SUB-CONTRACT WORKS

FOR SEWAGE TREATMENT AND GREY WATER TREATMENT PLANT FOR PSFSC

FOR UPGRADING MAI PO NATURE RESERVE INFRASTRUCTURE

AT MAI PO, SAN TIN, YUEN LONG, NEW TERRITORIES

Item Qty Unit Rate HK$

Schedule No. 3 - Sewage Treatment Plant System

Item Description

SEWAGE TREATMENT PLANT SYSTEM (Cont'd)

CHEMICAL STORAGE SYSTEM

Pipe and fittings

Provision of PVC chemical pipe from

interface point to permeate system / pump

including all necessary connections to existing,

extension of pipe, fixing accessories, etc.

A DN20; to permeate pump M

Valves and in-line equipment

To PVC pipe

B ball valves NO

C reducers NO

Equipment and ancillaries

D drip tray NO

E chemical dosing pump NO

F chemical storage tank NO

G sampling points NO

H low level alarms NO

I hydrostatic levelling sensors NO

To Collection

HK-4547/FP

Arcadis SR3 / 15

Page 343: TENDER DOCUMENTS · schedule no. 1 – preliminaries sr1/1 – sr1 sum/1 schedule no. 2 – preambles sr2/1 – sr2/72 schedule no. 3 – sewage treatment plant system sr3/1 – sr3

NOMINATED SUB-CONTRACT WORKS

FOR SEWAGE TREATMENT AND GREY WATER TREATMENT PLANT FOR PSFSC

FOR UPGRADING MAI PO NATURE RESERVE INFRASTRUCTURE

AT MAI PO, SAN TIN, YUEN LONG, NEW TERRITORIES

Item Qty Unit Rate HK$

Schedule No. 3 - Sewage Treatment Plant System

Item Description

SEWAGE TREATMENT PLANT SYSTEM (Cont'd)

CHEMICAL STORAGE SYSTEM (Cont'd)

Others

Allow for any other items not included in the foregoing

but required by the Sub-Contract. Please specify.

To Collection

HK-4547/FP

Arcadis SR3 / 16

Page 344: TENDER DOCUMENTS · schedule no. 1 – preliminaries sr1/1 – sr1 sum/1 schedule no. 2 – preambles sr2/1 – sr2/72 schedule no. 3 – sewage treatment plant system sr3/1 – sr3

NOMINATED SUB-CONTRACT WORKS

FOR SEWAGE TREATMENT AND GREY WATER TREATMENT PLANT FOR PSFSC

FOR UPGRADING MAI PO NATURE RESERVE INFRASTRUCTURE

AT MAI PO, SAN TIN, YUEN LONG, NEW TERRITORIES

Item Qty Unit Rate HK$

Schedule No. 3 - Sewage Treatment Plant System

Item Description

SEWAGE TREATMENT PLANT SYSTEM (Cont'd)

UV STERILIZATION SYSTEM

Pipe and fittings

Provision of ductile iron treated water pipe from

interface point to ultraviolet (UV) sterilizer

including all necessary connections to existing,

extension of pipe, fixing accessories, etc.

A DN100; from permeate pump M

B DN100; from UV sterilizer M

Valves and in-line equipment

To ductile iron pipe

C ball valves NO

Equipment and ancillaries

D UV sterilizer (1 duty and 1 stand-by) SET

To Collection

HK-4547/FP

Arcadis SR3 / 17

Page 345: TENDER DOCUMENTS · schedule no. 1 – preliminaries sr1/1 – sr1 sum/1 schedule no. 2 – preambles sr2/1 – sr2/72 schedule no. 3 – sewage treatment plant system sr3/1 – sr3

NOMINATED SUB-CONTRACT WORKS

FOR SEWAGE TREATMENT AND GREY WATER TREATMENT PLANT FOR PSFSC

FOR UPGRADING MAI PO NATURE RESERVE INFRASTRUCTURE

AT MAI PO, SAN TIN, YUEN LONG, NEW TERRITORIES

Item Qty Unit Rate HK$

Schedule No. 3 - Sewage Treatment Plant System

Item Description

SEWAGE TREATMENT PLANT SYSTEM (Cont'd)

UV STERILIZATION SYSTEM (Cont'd)

Others

Allow for any other items not included in the foregoing

but required by the Sub-Contract. Please specify.

To Collection

HK-4547/FP

Arcadis SR3 / 18

Page 346: TENDER DOCUMENTS · schedule no. 1 – preliminaries sr1/1 – sr1 sum/1 schedule no. 2 – preambles sr2/1 – sr2/72 schedule no. 3 – sewage treatment plant system sr3/1 – sr3

NOMINATED SUB-CONTRACT WORKS

FOR SEWAGE TREATMENT AND GREY WATER TREATMENT PLANT FOR PSFSC

FOR UPGRADING MAI PO NATURE RESERVE INFRASTRUCTURE

AT MAI PO, SAN TIN, YUEN LONG, NEW TERRITORIES

Item Qty Unit Rate HK$

Schedule No. 3 - Sewage Treatment Plant System

Item Description

SEWAGE TREATMENT PLANT SYSTEM (Cont'd)

SODIUM HYPOCHLORITE DOSING SYSTEM

Pipe and fittings

Provision of uPVC chemical waste pipe from

interface point to sodium hypochlorite dosing system

including all necessary connections to existing,

extension of pipe, fixing accessories, etc.

A DN20; form sodium hypochlorite dosing tank M

B _________mm diameter effluent discharge pipe M

Provision of ductile iron treated water pipe from

interface point to permeate system / pump

including all necessary connections to existing,

extension of pipe, fixing accessories, etc.

C DN100; to effluent discharge pipe M

D DN100; to reverse osmosis M

E DN100; to treated water discharge point M

Valves and in-line equipment

To uPVC pipe

F ball valves NO

To ductile iron pipe

G gate valve NO

Equipment and ancillaries

H residue chlorine SET

I reverse osmosis SET

J sodium hypochlorite dosing tanks NO

K chemical dosing pump NO

L drip tray NO

M sampling points NO

N low level alarms NO

O hydrostatic levelling sensors NO

To Collection

HK-4547/FP

Arcadis SR3 / 19

Page 347: TENDER DOCUMENTS · schedule no. 1 – preliminaries sr1/1 – sr1 sum/1 schedule no. 2 – preambles sr2/1 – sr2/72 schedule no. 3 – sewage treatment plant system sr3/1 – sr3

NOMINATED SUB-CONTRACT WORKS

FOR SEWAGE TREATMENT AND GREY WATER TREATMENT PLANT FOR PSFSC

FOR UPGRADING MAI PO NATURE RESERVE INFRASTRUCTURE

AT MAI PO, SAN TIN, YUEN LONG, NEW TERRITORIES

Item Qty Unit Rate HK$

Schedule No. 3 - Sewage Treatment Plant System

Item Description

SEWAGE TREATMENT PLANT SYSTEM (Cont'd)

SODIUM HYPOCHLORITE DOSING SYSTEM

(Cont'd)

Others

Allow for any other items not included in the foregoing

but required by the Sub-Contract. Please specify.

To Collection

HK-4547/FP

Arcadis SR3 / 20

Page 348: TENDER DOCUMENTS · schedule no. 1 – preliminaries sr1/1 – sr1 sum/1 schedule no. 2 – preambles sr2/1 – sr2/72 schedule no. 3 – sewage treatment plant system sr3/1 – sr3

NOMINATED SUB-CONTRACT WORKS

FOR SEWAGE TREATMENT AND GREY WATER TREATMENT PLANT FOR PSFSC

FOR UPGRADING MAI PO NATURE RESERVE INFRASTRUCTURE

AT MAI PO, SAN TIN, YUEN LONG, NEW TERRITORIES

Item Qty Unit Rate HK$

Schedule No. 3 - Sewage Treatment Plant System

Item Description

SEWAGE TREATMENT PLANT SYSTEM (Cont'd)

ELECTRICAL AND CONTROL SYSTEM

Power supply cables; PVC-insulated; copper

conductors; drawn into and including conduit /

trunking; all necessary cabling facilities; fixing and

earth continuity

From sewage treatment plant control panel to

following:

A emergency stop button NO

B permeate pump NO

C chemical dosing pump NO

D sludge pump NO

E submersible sewage pump NO

F UV sterilizer NO

G reverse osmosis NO

H variable speed drive NO

I hydrostatic levelling sensors NO

J high level alarms NO

K low level alarms NO

L auto-mechanical ranked coarse bar screen NO

M auto-mechanical ranked fine bar screen NO

N anoxic zone with dissolved oxygen sensor NO

O pH sensors NO

P level sensing equipment NO

Q electromagnetic flowmeter NO

R hydrostatic level sensors NO

S air blower (1 duty and 1 stand-by) NO

T silencers NO

U rotameter NO

To Collection

HK-4547/FP

Arcadis SR3 / 21

Page 349: TENDER DOCUMENTS · schedule no. 1 – preliminaries sr1/1 – sr1 sum/1 schedule no. 2 – preambles sr2/1 – sr2/72 schedule no. 3 – sewage treatment plant system sr3/1 – sr3

NOMINATED SUB-CONTRACT WORKS

FOR SEWAGE TREATMENT AND GREY WATER TREATMENT PLANT FOR PSFSC

FOR UPGRADING MAI PO NATURE RESERVE INFRASTRUCTURE

AT MAI PO, SAN TIN, YUEN LONG, NEW TERRITORIES

Item Qty Unit Rate HK$

Schedule No. 3 - Sewage Treatment Plant System

Item Description

SEWAGE TREATMENT PLANT SYSTEM (Cont'd)

ELECTRICAL AND CONTROL SYSTEM

Power supply cables; PVC-insulated; copper

conductors; drawn into and including conduit /

trunking; all necessary cabling facilities; fixing and

earth continuity

From emergency stop button to following:

A permeate pump NO

B chemical dosing pump NO

C sludge pump NO

D submersible sewage pump NO

E UV sterilizer NO

F reverse osmosis NO

G variable speed drive NO

H auto-mechanical ranked coarse bar screen NO

I auto-mechanical ranked fine bar screen NO

J air blower (1 duty and 1 stand-by) NO

K silencers NO

L rotameter NO

To Collection

HK-4547/FP

Arcadis SR3 / 22

Page 350: TENDER DOCUMENTS · schedule no. 1 – preliminaries sr1/1 – sr1 sum/1 schedule no. 2 – preambles sr2/1 – sr2/72 schedule no. 3 – sewage treatment plant system sr3/1 – sr3

NOMINATED SUB-CONTRACT WORKS

FOR SEWAGE TREATMENT AND GREY WATER TREATMENT PLANT FOR PSFSC

FOR UPGRADING MAI PO NATURE RESERVE INFRASTRUCTURE

AT MAI PO, SAN TIN, YUEN LONG, NEW TERRITORIES

Item Qty Unit Rate HK$

Schedule No. 3 - Sewage Treatment Plant System

Item Description

SEWAGE TREATMENT PLANT SYSTEM (Cont'd)

ELECTRICAL AND CONTROL SYSTEM

Electrical control circuits; associated with sewage

treatment equipment; connections to control panels;

interconnecting wiring, cables, conduits, cabling

facilities; relays, contactors, sensors and control

devices; all necessary instrument and accessories;

earthing continuity

From sewage treatment plant control panel to

following:

A emergency stop button NO

B permeate pump NO

C chemical dosing pump NO

D sludge pump NO

E submersible sewage pump NO

F UV sterilizer NO

G reverse osmosis NO

H variable speed drive NO

I hydrostatic levelling sensors NO

J high level alarms NO

K low level alarms NO

L auto-mechanical ranked coarse bar screen NO

M auto-mechanical ranked fine bar screen NO

N anoxic zone with dissolved oxygen sensor NO

O pH sensors NO

P level sensing equipment NO

Q electromagnetic flowmeter NO

R hydrostatic level sensors NO

S air blower (1 duty and 1 stand-by) NO

T silencers NO

U rotameter NO

To Collection

HK-4547/FP

Arcadis SR3 / 23

Page 351: TENDER DOCUMENTS · schedule no. 1 – preliminaries sr1/1 – sr1 sum/1 schedule no. 2 – preambles sr2/1 – sr2/72 schedule no. 3 – sewage treatment plant system sr3/1 – sr3

NOMINATED SUB-CONTRACT WORKS

FOR SEWAGE TREATMENT AND GREY WATER TREATMENT PLANT FOR PSFSC

FOR UPGRADING MAI PO NATURE RESERVE INFRASTRUCTURE

AT MAI PO, SAN TIN, YUEN LONG, NEW TERRITORIES

Item Qty Unit Rate HK$

Schedule No. 3 - Sewage Treatment Plant System

Item Description

SEWAGE TREATMENT PLANT SYSTEM (Cont'd)

ELECTRICAL AND CONTROL SYSTEM

Electrical control circuits; associated with sewage

treatment equipment; connections to control panels;

interconnecting wiring, cables, conduits, cabling

facilities; relays, contactors, sensors and control

devices; all necessary instrument and accessories;

earthing continuity

From emergency stop button to following:

A permeate pump NO

B chemical dosing pump NO

C sludge pump NO

D submersible sewage pump NO

E UV sterilizer NO

F reverse osmosis NO

G variable speed drive NO

H auto-mechanical ranked coarse bar screen NO

I auto-mechanical ranked fine bar screen NO

J air blower (1 duty and 1 stand-by) NO

K silencers NO

L rotameter NO

To Collection

HK-4547/FP

Arcadis SR3 / 24

Page 352: TENDER DOCUMENTS · schedule no. 1 – preliminaries sr1/1 – sr1 sum/1 schedule no. 2 – preambles sr2/1 – sr2/72 schedule no. 3 – sewage treatment plant system sr3/1 – sr3

NOMINATED SUB-CONTRACT WORKS

FOR SEWAGE TREATMENT AND GREY WATER TREATMENT PLANT FOR PSFSC

FOR UPGRADING MAI PO NATURE RESERVE INFRASTRUCTURE

AT MAI PO, SAN TIN, YUEN LONG, NEW TERRITORIES

Item Qty Unit Rate HK$

Schedule No. 3 - Sewage Treatment Plant System

Item Description

SEWAGE TREATMENT PLANT SYSTEM (Cont'd)

ELECTRICAL AND CONTROL SYSTEM (Cont'd)

Local control panels; complete with control switches,

switchgears, starters, switch fuses, fuse switches,

relays, ammeters, voltmeters, current transformer,

contactors, selectors, MCCBs, changeover, meters,

buzzers, indicating lamps, push buttons and all

necessary accessories and equipment to enable

remote operation and monitoring od all plumbing and

drainage equipment; connection to power source

A for sewage treatment plant NO

Emergency stop buttons

B permeate pump NO

C chemical dosing pump NO

D sludge pump NO

E submersible sewage pump NO

F UV sterilizer NO

G reverse osmosis NO

H variable speed drive NO

I auto-mechanical ranked coarse bar screen NO

J auto-mechanical ranked fine bar screen NO

K air blower (1 duty and 1 stand-by) NO

L silencers NO

M rotameter NO

To Collection

HK-4547/FP

Arcadis SR3 / 25

Page 353: TENDER DOCUMENTS · schedule no. 1 – preliminaries sr1/1 – sr1 sum/1 schedule no. 2 – preambles sr2/1 – sr2/72 schedule no. 3 – sewage treatment plant system sr3/1 – sr3

NOMINATED SUB-CONTRACT WORKS

FOR SEWAGE TREATMENT AND GREY WATER TREATMENT PLANT FOR PSFSC

FOR UPGRADING MAI PO NATURE RESERVE INFRASTRUCTURE

AT MAI PO, SAN TIN, YUEN LONG, NEW TERRITORIES

Item Qty Unit Rate HK$

Schedule No. 3 - Sewage Treatment Plant System

Item Description

SEWAGE TREATMENT PLANT SYSTEM (Cont'd)

ELECTRICAL AND CONTROL SYSTEM (Cont'd)

Others

Allow for any other items not included in the foregoing

but required by the Sub-Contract. Please specify.

To Collection

HK-4547/FP

Arcadis SR3 / 26

Page 354: TENDER DOCUMENTS · schedule no. 1 – preliminaries sr1/1 – sr1 sum/1 schedule no. 2 – preambles sr2/1 – sr2/72 schedule no. 3 – sewage treatment plant system sr3/1 – sr3

NOMINATED SUB-CONTRACT WORKS

FOR SEWAGE TREATMENT AND GREY WATER TREATMENT PLANT FOR PSFSC

FOR UPGRADING MAI PO NATURE RESERVE INFRASTRUCTURE

AT MAI PO, SAN TIN, YUEN LONG, NEW TERRITORIES

Item Qty Unit Rate HK$

Schedule No. 3 - Sewage Treatment Plant System

Item Description

SEWAGE TREATMENT PLANT SYSTEM (Cont'd)

SUNDRIES

Spare Parts and Tools

Supply the following spares and tools after

Substantial Completion of the Sub-Contract Works

A bearings, mechanical seal, oil seal and packing SET

o-ring for each type of pumps

B adjustable spanners SET

C cartridge fuses for each starter in LMCP SET

D control fuses for each starter in LMCP SET

E UV lamp SET

F push buttons SET

G indication lamp SET

Others, please specify:

To Collection

HK-4547/FP

Arcadis SR3 / 27

Page 355: TENDER DOCUMENTS · schedule no. 1 – preliminaries sr1/1 – sr1 sum/1 schedule no. 2 – preambles sr2/1 – sr2/72 schedule no. 3 – sewage treatment plant system sr3/1 – sr3

NOMINATED SUB-CONTRACT WORKS

FOR SEWAGE TREATMENT AND GREY WATER TREATMENT PLANT FOR PSFSC

FOR UPGRADING MAI PO NATURE RESERVE INFRASTRUCTURE

AT MAI PO, SAN TIN, YUEN LONG, NEW TERRITORIES

Item Qty Unit Rate HK$

SEWAGE TREATMENT PLANT SYSTEM

Collection

From page SR3/1

From page SR3/2

From page SR3/3

From page SR3/4

From page SR3/5

From page SR3/6

From page SR3/7

From page SR3/8

From page SR3/9

From page SR3/10

From page SR3/11

From page SR3/12

From page SR3/13

From page SR3/14

From page SR3/15

From page SR3/16

From page SR3/17

From page SR3/18

From page SR3/19

From page SR3/20

From page SR3/21

From page SR3/22

From page SR3/23

From page SR3/24

Carried Forward

Schedule No. 3 - Sewage Treatment Plant System

Item Description

HK-4547/FP

Arcadis SR3 SUM / 1

Page 356: TENDER DOCUMENTS · schedule no. 1 – preliminaries sr1/1 – sr1 sum/1 schedule no. 2 – preambles sr2/1 – sr2/72 schedule no. 3 – sewage treatment plant system sr3/1 – sr3

NOMINATED SUB-CONTRACT WORKS

FOR SEWAGE TREATMENT AND GREY WATER TREATMENT PLANT FOR PSFSC

FOR UPGRADING MAI PO NATURE RESERVE INFRASTRUCTURE

AT MAI PO, SAN TIN, YUEN LONG, NEW TERRITORIES

Item Qty Unit Rate HK$

SEWAGE TREATMENT PLANT SYSTEM

Collection (Cont'd)

Brought Forward

From page SR3/25

From page SR3/26

From page SR3/27

TO SUMMARY OF TENDER

Schedule No. 3 - Sewage Treatment Plant System

Item Description

HK-4547/FP

Arcadis SR3 SUM / 2

Page 357: TENDER DOCUMENTS · schedule no. 1 – preliminaries sr1/1 – sr1 sum/1 schedule no. 2 – preambles sr2/1 – sr2/72 schedule no. 3 – sewage treatment plant system sr3/1 – sr3

SCHEDULE NO. 4 – OPTIONAL TENDER FOR GREYWATER TREATMENT PLANT SYSTEM

Page 358: TENDER DOCUMENTS · schedule no. 1 – preliminaries sr1/1 – sr1 sum/1 schedule no. 2 – preambles sr2/1 – sr2/72 schedule no. 3 – sewage treatment plant system sr3/1 – sr3

NOMINATED SUB-CONTRACT WORKS

FOR SEWAGE TREATMENT AND GREY WATER TREATMENT PLANT FOR PSFSC

FOR UPGRADING MAI PO NATURE RESERVE INFRASTRUCTURE

AT MAI PO, SAN TIN, YUEN LONG, NEW TERRITORIES

Item Qty Unit Rate HK$

GREY WATER TREATMENT PLANT SYSTEM

SCREENING SYSTEM

Pipe and fittings

Provision of ductile iron sewage waste pipe from

interface point to screen and/or screen chamber;

including all necessary connections to existing,

extension of pipe, fixing accessories, etc.

A DN100; to manual coarse bar screen M

B DN100; to auto-mechanical ranked coarse bar M

screen

C overflow pipe NO

Valves and in-line equipment

D penstocks NO

E check valves NO

F gate valves NO

Equipment and ancillaries

G manual coarse bar screen SET

H auto-mechanical ranked coarse bar screen SET

I manual fine bar screen SET

J auto-mechanical ranked fine bar screen SET

K stainless steel motorized flow diverter SET

L level electrodes SET

M high level alarms NO

N waste chut with cover NO

O sampling points NO

P fine screen chamber NO

To Collection

Schedule No. 4 - Optional Tender for Grey Water Treatment Plant System

Item Description

HK-4547/FP

Arcadis SR4 / 1

Page 359: TENDER DOCUMENTS · schedule no. 1 – preliminaries sr1/1 – sr1 sum/1 schedule no. 2 – preambles sr2/1 – sr2/72 schedule no. 3 – sewage treatment plant system sr3/1 – sr3

NOMINATED SUB-CONTRACT WORKS

FOR SEWAGE TREATMENT AND GREY WATER TREATMENT PLANT FOR PSFSC

FOR UPGRADING MAI PO NATURE RESERVE INFRASTRUCTURE

AT MAI PO, SAN TIN, YUEN LONG, NEW TERRITORIES

Item Qty Unit Rate HK$

Schedule No. 4 - Optional Tender for Grey Water Treatment Plant System

Item Description

GREY WATER TREATMENT PLANT SYSTEM

(Cont'd)

SCREENING SYSTEM (Cont'd)

Others

Allow for any other items not included in the foregoing

but required by the Sub-Contract. Please specify.

To Collection

HK-4547/FP

Arcadis SR4 / 2

Page 360: TENDER DOCUMENTS · schedule no. 1 – preliminaries sr1/1 – sr1 sum/1 schedule no. 2 – preambles sr2/1 – sr2/72 schedule no. 3 – sewage treatment plant system sr3/1 – sr3

NOMINATED SUB-CONTRACT WORKS

FOR SEWAGE TREATMENT AND GREY WATER TREATMENT PLANT FOR PSFSC

FOR UPGRADING MAI PO NATURE RESERVE INFRASTRUCTURE

AT MAI PO, SAN TIN, YUEN LONG, NEW TERRITORIES

Item Qty Unit Rate HK$

Schedule No. 4 - Optional Tender for Grey Water Treatment Plant System

Item Description

GREY WATER TREATMENT PLANT SYSTEM

(Cont'd)

MEMBRANE BIOLOGICAL REACTOR SYSTEM

(MBR SYSTEM)

Pipe and fittings

Provision of ductile iron sludge waste pipe from

interface point to MBR System / MBR tank;

including all necessary connections to existing,

extension of pipe, fixing accessories, etc.

A DN100; from fine screen chamber M

B DN200; to sludge holding tank M

C DN200; to MBR tank M

Provision of stainless steel air pipe from

interface point to MBR System / MBR tank;

including all necessary connections to existing,

extension of pipe, fixing accessories, etc.

D DN100; from air blower M

Provision of PVC treated water pipe from

interface point to MBR System / MBR tank;

including all necessary connections to existing,

extension of pipe, fixing accessories, etc.

E DN100; to chemical storage tank M

F DN100; to permeate pump M

G ____________mm diameter drain pipe M

H overflow pipe NO

Valves and in-line equipment

To ductile iron pipe

I check valves NO

J gate valves NO

K solenoid valves NO

To stainless steel pipe

L reducers NO

M butterfly valves NO

To Collection

HK-4547/FP

Arcadis SR4 / 3

Page 361: TENDER DOCUMENTS · schedule no. 1 – preliminaries sr1/1 – sr1 sum/1 schedule no. 2 – preambles sr2/1 – sr2/72 schedule no. 3 – sewage treatment plant system sr3/1 – sr3

NOMINATED SUB-CONTRACT WORKS

FOR SEWAGE TREATMENT AND GREY WATER TREATMENT PLANT FOR PSFSC

FOR UPGRADING MAI PO NATURE RESERVE INFRASTRUCTURE

AT MAI PO, SAN TIN, YUEN LONG, NEW TERRITORIES

Item Qty Unit Rate HK$

Schedule No. 4 - Optional Tender for Grey Water Treatment Plant System

Item Description

GREY WATER TREATMENT PLANT SYSTEM

(Cont'd)

MEMBRANE BIOLOGICAL REACTOR SYSTEM

(MBR SYSTEM) (Cont'd)

Valves and in-line equipment (Cont'd)

To PVC pipe

A check valves NO

B gate valves NO

C solenoid valves NO

D reducers NO

Equipment and ancillaries

E MBR membrane modules SET

F anoxic zone with dissolved oxygen sensor SET

G chemical dosing pump NO

H MBR tanks NO

I pH sensors NO

J level sensing equipment NO

K high level alarms NO

L low level alarms NO

M electromagnetic flowmeter NO

N hydrostatic level sensors NO

To Collection

HK-4547/FP

Arcadis SR4 / 4

Page 362: TENDER DOCUMENTS · schedule no. 1 – preliminaries sr1/1 – sr1 sum/1 schedule no. 2 – preambles sr2/1 – sr2/72 schedule no. 3 – sewage treatment plant system sr3/1 – sr3

NOMINATED SUB-CONTRACT WORKS

FOR SEWAGE TREATMENT AND GREY WATER TREATMENT PLANT FOR PSFSC

FOR UPGRADING MAI PO NATURE RESERVE INFRASTRUCTURE

AT MAI PO, SAN TIN, YUEN LONG, NEW TERRITORIES

Item Qty Unit Rate HK$

Schedule No. 4 - Optional Tender for Grey Water Treatment Plant System

Item Description

GREY WATER TREATMENT PLANT SYSTEM

(Cont'd)

MEMBRANE BIOLOGICAL REACTOR SYSTEM

(MBR SYSTEM) (Cont'd)

Others

Allow for any other items not included in the foregoing

but required by the Sub-Contract. Please specify.

To Collection

HK-4547/FP

Arcadis SR4 / 5

Page 363: TENDER DOCUMENTS · schedule no. 1 – preliminaries sr1/1 – sr1 sum/1 schedule no. 2 – preambles sr2/1 – sr2/72 schedule no. 3 – sewage treatment plant system sr3/1 – sr3

NOMINATED SUB-CONTRACT WORKS

FOR SEWAGE TREATMENT AND GREY WATER TREATMENT PLANT FOR PSFSC

FOR UPGRADING MAI PO NATURE RESERVE INFRASTRUCTURE

AT MAI PO, SAN TIN, YUEN LONG, NEW TERRITORIES

Item Qty Unit Rate HK$

Schedule No. 4 - Optional Tender for Grey Water Treatment Plant System

Item Description

GREY WATER TREATMENT PLANT SYSTEM

(Cont'd)

SUBMERSIBLE SEWAGE AND SEWAGE

RETENTION SYSTEM

Pipe and fittings

Provision of ductile iron sewage waste pipe from

interface point to underground retention tank

including all necessary connections to existing,

extension of pipe, fixing accessories, etc.

A DN100; to manual coarse bar screen M

B DN100; to auto-mechanical coarse bar screen M

Valves and in-line equipment

To ductile iron pipe

C check valves NO

D gate valves NO

E reducers NO

Equipment and ancillaries

F submersible sewage pump (1 duty and 1 stand-by) SET

G high level alarms NO

H low level alarms NO

I hydrostatic level sensors NO

To Collection

HK-4547/FP

Arcadis SR4 / 6

Page 364: TENDER DOCUMENTS · schedule no. 1 – preliminaries sr1/1 – sr1 sum/1 schedule no. 2 – preambles sr2/1 – sr2/72 schedule no. 3 – sewage treatment plant system sr3/1 – sr3

NOMINATED SUB-CONTRACT WORKS

FOR SEWAGE TREATMENT AND GREY WATER TREATMENT PLANT FOR PSFSC

FOR UPGRADING MAI PO NATURE RESERVE INFRASTRUCTURE

AT MAI PO, SAN TIN, YUEN LONG, NEW TERRITORIES

Item Qty Unit Rate HK$

Schedule No. 4 - Optional Tender for Grey Water Treatment Plant System

Item Description

GREY WATER TREATMENT PLANT SYSTEM

(Cont'd)

SUBMERSIBLE SEWAGE AND SEWAGE

RETENTION SYSTEM (Cont'd)

Others

Allow for any other items not included in the foregoing

but required by the Sub-Contract. Please specify.

To Collection

HK-4547/FP

Arcadis SR4 / 7

Page 365: TENDER DOCUMENTS · schedule no. 1 – preliminaries sr1/1 – sr1 sum/1 schedule no. 2 – preambles sr2/1 – sr2/72 schedule no. 3 – sewage treatment plant system sr3/1 – sr3

NOMINATED SUB-CONTRACT WORKS

FOR SEWAGE TREATMENT AND GREY WATER TREATMENT PLANT FOR PSFSC

FOR UPGRADING MAI PO NATURE RESERVE INFRASTRUCTURE

AT MAI PO, SAN TIN, YUEN LONG, NEW TERRITORIES

Item Qty Unit Rate HK$

Schedule No. 4 - Optional Tender for Grey Water Treatment Plant System

Item Description

GREY WATER TREATMENT PLANT SYSTEM

(Cont'd)

SLUDGE HOLDING SYSTEM

Pipe and fittings

Provision of ductile iron sludge waste pipe from

interface point to sludge holding tank

including all necessary connections to existing,

extension of pipe, fixing accessories, etc.

A DN200; from MBR tank M

B DN200; to tanker away collection point / disposal M

point

Valves and in-line equipment

To ductile iron pipe

C solenoid valves NO

Equipment and ancillaries

D sludge pump (1 duty and 1 stand-by) SET

E level sensing equipment NO

F hydrostatic level sensors NO

Others

Allow for any other items not included in the foregoing

but required by the Sub-Contract. Please specify.

To Collection

HK-4547/FP

Arcadis SR4 / 8

Page 366: TENDER DOCUMENTS · schedule no. 1 – preliminaries sr1/1 – sr1 sum/1 schedule no. 2 – preambles sr2/1 – sr2/72 schedule no. 3 – sewage treatment plant system sr3/1 – sr3

NOMINATED SUB-CONTRACT WORKS

FOR SEWAGE TREATMENT AND GREY WATER TREATMENT PLANT FOR PSFSC

FOR UPGRADING MAI PO NATURE RESERVE INFRASTRUCTURE

AT MAI PO, SAN TIN, YUEN LONG, NEW TERRITORIES

Item Qty Unit Rate HK$

Schedule No. 4 - Optional Tender for Grey Water Treatment Plant System

Item Description

GREY WATER TREATMENT PLANT SYSTEM

(Cont'd)

AIR SUPPLY SYSTEM

Pipe and fittings

Provision of stainless steel air pipe from

interface point to MBR System / MBR tank;

including all necessary connections to existing,

extension of pipe, fixing accessories, etc.

A DN100; to MBR tank M

Valves and in-line equipment

To stainless steel pipe

B gate valves NO

C butterfly valves NO

D check valves NO

E flexible joints NO

Equipment and ancillaries

F air blower (1 duty and 1 stand-by) SET

G silencers NO

H variable speed drive NO

I pressure gauge with cock NO

J rotameter NO

K pressure relief valves NO

To Collection

HK-4547/FP

Arcadis SR4 / 9

Page 367: TENDER DOCUMENTS · schedule no. 1 – preliminaries sr1/1 – sr1 sum/1 schedule no. 2 – preambles sr2/1 – sr2/72 schedule no. 3 – sewage treatment plant system sr3/1 – sr3

NOMINATED SUB-CONTRACT WORKS

FOR SEWAGE TREATMENT AND GREY WATER TREATMENT PLANT FOR PSFSC

FOR UPGRADING MAI PO NATURE RESERVE INFRASTRUCTURE

AT MAI PO, SAN TIN, YUEN LONG, NEW TERRITORIES

Item Qty Unit Rate HK$

Schedule No. 4 - Optional Tender for Grey Water Treatment Plant System

Item Description

GREY WATER TREATMENT PLANT SYSTEM

(Cont'd)

AIR SUPPLY SYSTEM (Cont'd)

Others

Allow for any other items not included in the foregoing

but required by the Sub-Contract. Please specify.

To Collection

HK-4547/FP

Arcadis SR4 / 10

Page 368: TENDER DOCUMENTS · schedule no. 1 – preliminaries sr1/1 – sr1 sum/1 schedule no. 2 – preambles sr2/1 – sr2/72 schedule no. 3 – sewage treatment plant system sr3/1 – sr3

NOMINATED SUB-CONTRACT WORKS

FOR SEWAGE TREATMENT AND GREY WATER TREATMENT PLANT FOR PSFSC

FOR UPGRADING MAI PO NATURE RESERVE INFRASTRUCTURE

AT MAI PO, SAN TIN, YUEN LONG, NEW TERRITORIES

Item Qty Unit Rate HK$

Schedule No. 4 - Optional Tender for Grey Water Treatment Plant System

Item Description

GREY WATER TREATMENT PLANT SYSTEM

(Cont'd)

pH ADJUSTMENT SYSTEM

Pipe and fittings

Provision of pipework for pH Adjustment System

from interface point to MBR System / MBR tank;

including all necessary connections to existing,

extension of pipe, fixing accessories, etc.

A ________________mm diameter M

Valves and in-line equipment

Generally

B gate valves NO

C check valves NO

Equipment and ancillaries

D drip tray NO

E aerobic tanks NO

F chemical dosing pump NO

G low level alarm NO

H level sensing equipment NO

I sampling point NO

To Collection

HK-4547/FP

Arcadis SR4 / 11

Page 369: TENDER DOCUMENTS · schedule no. 1 – preliminaries sr1/1 – sr1 sum/1 schedule no. 2 – preambles sr2/1 – sr2/72 schedule no. 3 – sewage treatment plant system sr3/1 – sr3

NOMINATED SUB-CONTRACT WORKS

FOR SEWAGE TREATMENT AND GREY WATER TREATMENT PLANT FOR PSFSC

FOR UPGRADING MAI PO NATURE RESERVE INFRASTRUCTURE

AT MAI PO, SAN TIN, YUEN LONG, NEW TERRITORIES

Item Qty Unit Rate HK$

Schedule No. 4 - Optional Tender for Grey Water Treatment Plant System

Item Description

GREY WATER TREATMENT PLANT SYSTEM

(Cont'd)

pH ADJUSTMENT SYSTEM (Cont'd)

Others

Allow for any other items not included in the foregoing

but required by the Sub-Contract. Please specify.

To Collection

HK-4547/FP

Arcadis SR4 / 12

Page 370: TENDER DOCUMENTS · schedule no. 1 – preliminaries sr1/1 – sr1 sum/1 schedule no. 2 – preambles sr2/1 – sr2/72 schedule no. 3 – sewage treatment plant system sr3/1 – sr3

NOMINATED SUB-CONTRACT WORKS

FOR SEWAGE TREATMENT AND GREY WATER TREATMENT PLANT FOR PSFSC

FOR UPGRADING MAI PO NATURE RESERVE INFRASTRUCTURE

AT MAI PO, SAN TIN, YUEN LONG, NEW TERRITORIES

Item Qty Unit Rate HK$

Schedule No. 4 - Optional Tender for Grey Water Treatment Plant System

Item Description

GREY WATER TREATMENT PLANT SYSTEM

(Cont'd)

PERMEATE SYSTEM

Pipe and fittings

Provision of PVC treated water pipe from

interface point to permeate system / pump

including all necessary connections to existing,

extension of pipe, fixing accessories, etc.

A DN50; to permeate pump M

Provision of ductile iron treated water pipe from

interface point to permeate system / pump

including all necessary connections to existing,

extension of pipe, fixing accessories, etc.

B DN100; to permeate pump M

Valves and in-line equipment

To ductile iron pipe

C gate valves NO

D check valves NO

E flexible joints NO

To PVC pipe

F gate valves NO

Equipment and ancillaries

G flow measuring apparatus SET

H permeate pump (1 duty and 1 stand-by) SET

I variable speed drive NO

J pressure gauge with cock NO

K sampling points NO

L pressure gauge NO

M pressure transmitter NO

To Collection

HK-4547/FP

Arcadis SR4 / 13

Page 371: TENDER DOCUMENTS · schedule no. 1 – preliminaries sr1/1 – sr1 sum/1 schedule no. 2 – preambles sr2/1 – sr2/72 schedule no. 3 – sewage treatment plant system sr3/1 – sr3

NOMINATED SUB-CONTRACT WORKS

FOR SEWAGE TREATMENT AND GREY WATER TREATMENT PLANT FOR PSFSC

FOR UPGRADING MAI PO NATURE RESERVE INFRASTRUCTURE

AT MAI PO, SAN TIN, YUEN LONG, NEW TERRITORIES

Item Qty Unit Rate HK$

Schedule No. 4 - Optional Tender for Grey Water Treatment Plant System

Item Description

GREY WATER TREATMENT PLANT SYSTEM

(Cont'd)

PERMEATE SYSTEM (Cont'd)

Others

Allow for any other items not included in the foregoing

but required by the Sub-Contract. Please specify.

To Collection

HK-4547/FP

Arcadis SR4 / 14

Page 372: TENDER DOCUMENTS · schedule no. 1 – preliminaries sr1/1 – sr1 sum/1 schedule no. 2 – preambles sr2/1 – sr2/72 schedule no. 3 – sewage treatment plant system sr3/1 – sr3

NOMINATED SUB-CONTRACT WORKS

FOR SEWAGE TREATMENT AND GREY WATER TREATMENT PLANT FOR PSFSC

FOR UPGRADING MAI PO NATURE RESERVE INFRASTRUCTURE

AT MAI PO, SAN TIN, YUEN LONG, NEW TERRITORIES

Item Qty Unit Rate HK$

Schedule No. 4 - Optional Tender for Grey Water Treatment Plant System

Item Description

GREY WATER TREATMENT PLANT SYSTEM

(Cont'd)

CHEMICAL STORAGE SYSTEM

Pipe and fittings

Provision of PVC chemical pipe from

interface point to permeate system / pump

including all necessary connections to existing,

extension of pipe, fixing accessories, etc.

A DN20; to permeate pump M

Valves and in-line equipment

To PVC pipe

B ball valves NO

C reducers NO

Equipment and ancillaries

D drip tray NO

E chemical dosing pump NO

F chemical storage tank NO

G sampling points NO

H low level alarms NO

I hydrostatic levelling sensors NO

To Collection

HK-4547/FP

Arcadis SR4 / 15

Page 373: TENDER DOCUMENTS · schedule no. 1 – preliminaries sr1/1 – sr1 sum/1 schedule no. 2 – preambles sr2/1 – sr2/72 schedule no. 3 – sewage treatment plant system sr3/1 – sr3

NOMINATED SUB-CONTRACT WORKS

FOR SEWAGE TREATMENT AND GREY WATER TREATMENT PLANT FOR PSFSC

FOR UPGRADING MAI PO NATURE RESERVE INFRASTRUCTURE

AT MAI PO, SAN TIN, YUEN LONG, NEW TERRITORIES

Item Qty Unit Rate HK$

Schedule No. 4 - Optional Tender for Grey Water Treatment Plant System

Item Description

GREY WATER TREATMENT PLANT SYSTEM

(Cont'd)

CHEMICAL STORAGE SYSTEM (Cont'd)

Others

Allow for any other items not included in the foregoing

but required by the Sub-Contract. Please specify.

To Collection

HK-4547/FP

Arcadis SR4 / 16

Page 374: TENDER DOCUMENTS · schedule no. 1 – preliminaries sr1/1 – sr1 sum/1 schedule no. 2 – preambles sr2/1 – sr2/72 schedule no. 3 – sewage treatment plant system sr3/1 – sr3

NOMINATED SUB-CONTRACT WORKS

FOR SEWAGE TREATMENT AND GREY WATER TREATMENT PLANT FOR PSFSC

FOR UPGRADING MAI PO NATURE RESERVE INFRASTRUCTURE

AT MAI PO, SAN TIN, YUEN LONG, NEW TERRITORIES

Item Qty Unit Rate HK$

Schedule No. 4 - Optional Tender for Grey Water Treatment Plant System

Item Description

GREY WATER TREATMENT PLANT SYSTEM

(Cont'd)

UV STERILIZATION SYSTEM

Pipe and fittings

Provision of ductile iron treated water pipe from

interface point to ultraviolet (UV) sterilizer

including all necessary connections to existing,

extension of pipe, fixing accessories, etc.

A DN100; from permeate pump M

B DN100; from UV sterilizer M

Valves and in-line equipment

To ductile iron pipe

C ball valves NO

Equipment and ancillaries

D UV sterilizer (1 duty and 1 stand-by) SET

To Collection

HK-4547/FP

Arcadis SR4 / 17

Page 375: TENDER DOCUMENTS · schedule no. 1 – preliminaries sr1/1 – sr1 sum/1 schedule no. 2 – preambles sr2/1 – sr2/72 schedule no. 3 – sewage treatment plant system sr3/1 – sr3

NOMINATED SUB-CONTRACT WORKS

FOR SEWAGE TREATMENT AND GREY WATER TREATMENT PLANT FOR PSFSC

FOR UPGRADING MAI PO NATURE RESERVE INFRASTRUCTURE

AT MAI PO, SAN TIN, YUEN LONG, NEW TERRITORIES

Item Qty Unit Rate HK$

Schedule No. 4 - Optional Tender for Grey Water Treatment Plant System

Item Description

GREY WATER TREATMENT PLANT SYSTEM

(Cont'd)

UV STERILIZATION SYSTEM (Cont'd)

Others

Allow for any other items not included in the foregoing

but required by the Sub-Contract. Please specify.

To Collection

HK-4547/FP

Arcadis SR4 / 18

Page 376: TENDER DOCUMENTS · schedule no. 1 – preliminaries sr1/1 – sr1 sum/1 schedule no. 2 – preambles sr2/1 – sr2/72 schedule no. 3 – sewage treatment plant system sr3/1 – sr3

NOMINATED SUB-CONTRACT WORKS

FOR SEWAGE TREATMENT AND GREY WATER TREATMENT PLANT FOR PSFSC

FOR UPGRADING MAI PO NATURE RESERVE INFRASTRUCTURE

AT MAI PO, SAN TIN, YUEN LONG, NEW TERRITORIES

Item Qty Unit Rate HK$

Schedule No. 4 - Optional Tender for Grey Water Treatment Plant System

Item Description

GREY WATER TREATMENT PLANT SYSTEM

(Cont'd)

SODIUM HYPOCHLORITE DOSING SYSTEM

Pipe and fittings

Provision of uPVC chemical waste pipe from

interface point to sodium hypochlorite dosing system

including all necessary connections to existing,

extension of pipe, fixing accessories, etc.

A DN20; form sodium hypochlorite dosing tank M

B __________mm diameter effluent discharge pipe M

Provision of ductile iron treated water pipe from

interface point to permeate system / pump

including all necessary connections to existing,

extension of pipe, fixing accessories, etc.

C DN100; to effluent discharge pipe M

D DN100; to reverse osmosis M

E DN100; to treated water discharge point M

Valves and in-line equipment

To uPVC pipe

F ball valves NO

To ductile iron pipe

G gate valve NO

Equipment and ancillaries

H residue chlorine SET

I reverse osmosis SET

J sodium hypochlorite dosing tanks NO

K chemical dosing pump NO

L drip tray NO

M sampling points NO

N low level alarms NO

O hydrostatic levelling sensors NO

To Collection

HK-4547/FP

Arcadis SR4 / 19

Page 377: TENDER DOCUMENTS · schedule no. 1 – preliminaries sr1/1 – sr1 sum/1 schedule no. 2 – preambles sr2/1 – sr2/72 schedule no. 3 – sewage treatment plant system sr3/1 – sr3

NOMINATED SUB-CONTRACT WORKS

FOR SEWAGE TREATMENT AND GREY WATER TREATMENT PLANT FOR PSFSC

FOR UPGRADING MAI PO NATURE RESERVE INFRASTRUCTURE

AT MAI PO, SAN TIN, YUEN LONG, NEW TERRITORIES

Item Qty Unit Rate HK$

Schedule No. 4 - Optional Tender for Grey Water Treatment Plant System

Item Description

GREY WATER TREATMENT PLANT SYSTEM

(Cont'd)

SODIUM HYPOCHLORITE DOSING SYSTEM

(Cont'd)

Others

Allow for any other items not included in the foregoing

but required by the Sub-Contract. Please specify.

To Collection

HK-4547/FP

Arcadis SR4 / 20

Page 378: TENDER DOCUMENTS · schedule no. 1 – preliminaries sr1/1 – sr1 sum/1 schedule no. 2 – preambles sr2/1 – sr2/72 schedule no. 3 – sewage treatment plant system sr3/1 – sr3

NOMINATED SUB-CONTRACT WORKS

FOR SEWAGE TREATMENT AND GREY WATER TREATMENT PLANT FOR PSFSC

FOR UPGRADING MAI PO NATURE RESERVE INFRASTRUCTURE

AT MAI PO, SAN TIN, YUEN LONG, NEW TERRITORIES

Item Qty Unit Rate HK$

Schedule No. 4 - Optional Tender for Grey Water Treatment Plant System

Item Description

GREY WATER TREATMENT PLANT SYSTEM

(Cont'd)

ELECTRICAL AND CONTROL SYSTEM

Power supply cables; PVC-insulated; copper

conductors; drawn into and including conduit /

trunking; all necessary cabling facilities; fixing and

earth continuity

From grey water treatment plant control panel to

following:

A emergency stop button NO

B permeate pump NO

C chemical dosing pump NO

D sludge pump NO

E submersible sewage pump NO

F UV sterilizer NO

G reverse osmosis NO

H variable speed drive NO

I hydrostatic levelling sensors NO

J high level alarms NO

K low level alarms NO

L auto-mechanical ranked coarse bar screen NO

M auto-mechanical ranked fine bar screen NO

N anoxic zone with dissolved oxygen sensor NO

O pH sensors NO

P level sensing equipment NO

Q electromagnetic flowmeter NO

R hydrostatic level sensors NO

S air blower (1 duty and 1 stand-by) NO

T silencers NO

U rotameter NO

To Collection

HK-4547/FP

Arcadis SR4 / 21

Page 379: TENDER DOCUMENTS · schedule no. 1 – preliminaries sr1/1 – sr1 sum/1 schedule no. 2 – preambles sr2/1 – sr2/72 schedule no. 3 – sewage treatment plant system sr3/1 – sr3

NOMINATED SUB-CONTRACT WORKS

FOR SEWAGE TREATMENT AND GREY WATER TREATMENT PLANT FOR PSFSC

FOR UPGRADING MAI PO NATURE RESERVE INFRASTRUCTURE

AT MAI PO, SAN TIN, YUEN LONG, NEW TERRITORIES

Item Qty Unit Rate HK$

Schedule No. 4 - Optional Tender for Grey Water Treatment Plant System

Item Description

GREY WATER TREATMENT PLANT SYSTEM

(Cont'd)

ELECTRICAL AND CONTROL SYSTEM

Power supply cables; PVC-insulated; copper

conductors; drawn into and including conduit /

trunking; all necessary cabling facilities; fixing and

earth continuity

From emergency stop button to following:

A permeate pump NO

B chemical dosing pump NO

C sludge pump NO

D submersible sewage pump NO

E UV sterilizer NO

F reverse osmosis NO

G variable speed drive NO

H auto-mechanical ranked coarse bar screen NO

I auto-mechanical ranked fine bar screen NO

J air blower (1 duty and 1 stand-by) NO

K silencers NO

L rotameter NO

To Collection

HK-4547/FP

Arcadis SR4 / 22

Page 380: TENDER DOCUMENTS · schedule no. 1 – preliminaries sr1/1 – sr1 sum/1 schedule no. 2 – preambles sr2/1 – sr2/72 schedule no. 3 – sewage treatment plant system sr3/1 – sr3

NOMINATED SUB-CONTRACT WORKS

FOR SEWAGE TREATMENT AND GREY WATER TREATMENT PLANT FOR PSFSC

FOR UPGRADING MAI PO NATURE RESERVE INFRASTRUCTURE

AT MAI PO, SAN TIN, YUEN LONG, NEW TERRITORIES

Item Qty Unit Rate HK$

Schedule No. 4 - Optional Tender for Grey Water Treatment Plant System

Item Description

GREY WATER TREATMENT PLANT SYSTEM

(Cont'd)

ELECTRICAL AND CONTROL SYSTEM

Electrical control circuits; associated with grey water

treatment equipment; connections to control panels;

interconnecting wiring, cables, conduits, cabling

facilities; relays, contactors, sensors and control

devices; all necessary instrument and accessories;

earthing continuity

From grey water treatment plant control panel to

following:

A emergency stop button NO

B permeate pump NO

C chemical dosing pump NO

D sludge pump NO

E submersible sewage pump NO

F UV sterilizer NO

G reverse osmosis NO

H variable speed drive NO

I hydrostatic levelling sensors NO

J high level alarms NO

K low level alarms NO

L auto-mechanical ranked coarse bar screen NO

M auto-mechanical ranked fine bar screen NO

N anoxic zone with dissolved oxygen sensor NO

O pH sensors NO

P level sensing equipment NO

Q electromagnetic flowmeter NO

R hydrostatic level sensors NO

S air blower (1 duty and 1 stand-by) NO

T silencers NO

U rotameter NO

To Collection

HK-4547/FP

Arcadis SR4 / 23

Page 381: TENDER DOCUMENTS · schedule no. 1 – preliminaries sr1/1 – sr1 sum/1 schedule no. 2 – preambles sr2/1 – sr2/72 schedule no. 3 – sewage treatment plant system sr3/1 – sr3

NOMINATED SUB-CONTRACT WORKS

FOR SEWAGE TREATMENT AND GREY WATER TREATMENT PLANT FOR PSFSC

FOR UPGRADING MAI PO NATURE RESERVE INFRASTRUCTURE

AT MAI PO, SAN TIN, YUEN LONG, NEW TERRITORIES

Item Qty Unit Rate HK$

Schedule No. 4 - Optional Tender for Grey Water Treatment Plant System

Item Description

GREY WATER TREATMENT PLANT SYSTEM

(Cont'd)

ELECTRICAL AND CONTROL SYSTEM

Electrical control circuits; associated with grey water

treatment equipment; connections to control panels;

interconnecting wiring, cables, conduits, cabling

facilities; relays, contactors, sensors and control

devices; all necessary instrument and accessories;

earthing continuity

From emergency stop button to following:

A permeate pump NO

B chemical dosing pump NO

C sludge pump NO

D submersible sewage pump NO

E UV sterilizer NO

F reverse osmosis NO

G variable speed drive NO

H auto-mechanical ranked coarse bar screen NO

I auto-mechanical ranked fine bar screen NO

J air blower (1 duty and 1 stand-by) NO

K silencers NO

L rotameter NO

To Collection

HK-4547/FP

Arcadis SR4 / 24

Page 382: TENDER DOCUMENTS · schedule no. 1 – preliminaries sr1/1 – sr1 sum/1 schedule no. 2 – preambles sr2/1 – sr2/72 schedule no. 3 – sewage treatment plant system sr3/1 – sr3

NOMINATED SUB-CONTRACT WORKS

FOR SEWAGE TREATMENT AND GREY WATER TREATMENT PLANT FOR PSFSC

FOR UPGRADING MAI PO NATURE RESERVE INFRASTRUCTURE

AT MAI PO, SAN TIN, YUEN LONG, NEW TERRITORIES

Item Qty Unit Rate HK$

Schedule No. 4 - Optional Tender for Grey Water Treatment Plant System

Item Description

GREY WATER TREATMENT PLANT SYSTEM

(Cont'd)

ELECTRICAL AND CONTROL SYSTEM (Cont'd)

Local control panels; complete with control switches,

switchgears, starters, switch fuses, fuse switches,

relays, ammeters, voltmeters, current transformer,

contactors, selectors, MCCBs, changeover, meters,

buzzers, indicating lamps, push buttons and all

necessary accessories and equipment to enable

remote operation and monitoring od all plumbing and

drainage equipment; connection to power source

A for grey water treatment plant NO

Emergency stop buttons

B permeate pump NO

C chemical dosing pump NO

D sludge pump NO

E submersible sewage pump NO

F UV sterilizer NO

G reverse osmosis NO

H variable speed drive NO

I auto-mechanical ranked coarse bar screen NO

J auto-mechanical ranked fine bar screen NO

K air blower (1 duty and 1 stand-by) NO

L silencers NO

M rotameter NO

To Collection

HK-4547/FP

Arcadis SR4 / 25

Page 383: TENDER DOCUMENTS · schedule no. 1 – preliminaries sr1/1 – sr1 sum/1 schedule no. 2 – preambles sr2/1 – sr2/72 schedule no. 3 – sewage treatment plant system sr3/1 – sr3

NOMINATED SUB-CONTRACT WORKS

FOR SEWAGE TREATMENT AND GREY WATER TREATMENT PLANT FOR PSFSC

FOR UPGRADING MAI PO NATURE RESERVE INFRASTRUCTURE

AT MAI PO, SAN TIN, YUEN LONG, NEW TERRITORIES

Item Qty Unit Rate HK$

Schedule No. 4 - Optional Tender for Grey Water Treatment Plant System

Item Description

GREY WATER TREATMENT PLANT SYSTEM

(Cont'd)

ELECTRICAL AND CONTROL SYSTEM (Cont'd)

Others

Allow for any other items not included in the foregoing

but required by the Sub-Contract. Please specify.

To Collection

HK-4547/FP

Arcadis SR4 / 26

Page 384: TENDER DOCUMENTS · schedule no. 1 – preliminaries sr1/1 – sr1 sum/1 schedule no. 2 – preambles sr2/1 – sr2/72 schedule no. 3 – sewage treatment plant system sr3/1 – sr3

NOMINATED SUB-CONTRACT WORKS

FOR SEWAGE TREATMENT AND GREY WATER TREATMENT PLANT FOR PSFSC

FOR UPGRADING MAI PO NATURE RESERVE INFRASTRUCTURE

AT MAI PO, SAN TIN, YUEN LONG, NEW TERRITORIES

Item Qty Unit Rate HK$

Schedule No. 4 - Optional Tender for Grey Water Treatment Plant System

Item Description

GREY WATER TREATMENT PLANT SYSTEM

(Cont'd)

SUNDRIES

Spare Parts and Tools

Supply the following spares and tools after

Substantial Completion of the Sub-Contract Works

C bearings, mechanical seal, oil seal and packing SET

o-ring for each type of pumps

D adjustable spanners SET

E cartridge fuses for each starter in LMCP SET

F control fuses for each starter in LMCP SET

G UV lamp SET

A push buttons SET

B indication lamp SET

Others, please specify:

To Collection

HK-4547/FP

Arcadis SR4 / 27

Page 385: TENDER DOCUMENTS · schedule no. 1 – preliminaries sr1/1 – sr1 sum/1 schedule no. 2 – preambles sr2/1 – sr2/72 schedule no. 3 – sewage treatment plant system sr3/1 – sr3

NOMINATED SUB-CONTRACT WORKS

FOR SEWAGE TREATMENT AND GREY WATER TREATMENT PLANT FOR PSFSC

FOR UPGRADING MAI PO NATURE RESERVE INFRASTRUCTURE

AT MAI PO, SAN TIN, YUEN LONG, NEW TERRITORIES

Item Qty Unit Rate HK$

OPTIONAL TENDER FOR

GREY WATER TREATMENT PLANT SYSTEM

Collection

From page SR4/1

From page SR4/2

From page SR4/3

From page SR4/4

From page SR4/5

From page SR4/6

From page SR4/7

From page SR4/8

From page SR4/9

From page SR4/10

From page SR4/11

From page SR4/12

From page SR4/13

From page SR4/14

From page SR4/15

From page SR4/16

From page SR4/17

From page SR4/18

From page SR4/19

From page SR4/20

From page SR4/21

From page SR4/22

From page SR4/23

From page SR4/24

Carried Forward

Schedule No. 4 - Optional Tender for Grey Water Treatment Plant System

Item Description

HK-4547/FP

ArcadisSR4 SUM / 1

Page 386: TENDER DOCUMENTS · schedule no. 1 – preliminaries sr1/1 – sr1 sum/1 schedule no. 2 – preambles sr2/1 – sr2/72 schedule no. 3 – sewage treatment plant system sr3/1 – sr3

NOMINATED SUB-CONTRACT WORKS

FOR SEWAGE TREATMENT AND GREY WATER TREATMENT PLANT FOR PSFSC

FOR UPGRADING MAI PO NATURE RESERVE INFRASTRUCTURE

AT MAI PO, SAN TIN, YUEN LONG, NEW TERRITORIES

Item Qty Unit Rate HK$

OPTIONAL TENDER FOR

GREY WATER TREATMENT PLANT SYSTEM

Collection (Cont'd)

Brought Forward

From page SR4/25

From page SR4/26

From page SR4/27

TO SUMMARY OF TENDER

Schedule No. 4 - Optional Tender for Grey Water Treatment Plant System

Item Description

HK-4547/FP

ArcadisSR4 SUM / 2

Page 387: TENDER DOCUMENTS · schedule no. 1 – preliminaries sr1/1 – sr1 sum/1 schedule no. 2 – preambles sr2/1 – sr2/72 schedule no. 3 – sewage treatment plant system sr3/1 – sr3

SCHEDULE NO. 5 – OPTIONAL TENDER FOR 5-YEAR OPERATION AND MAINTENANCE PLAN FOR

SEWAGE TREATMENT PLANT SYSTEM

Page 388: TENDER DOCUMENTS · schedule no. 1 – preliminaries sr1/1 – sr1 sum/1 schedule no. 2 – preambles sr2/1 – sr2/72 schedule no. 3 – sewage treatment plant system sr3/1 – sr3

NOMINATED SUB-CONTRACT WORKS

FOR SEWAGE TREATMENT AND GREY WATER TREATMENT PLANT FOR PSFSC

FOR UPGRADING MAI PO NATURE RESERVE INFRASTRUCTURE

AT MAI PO, SAN TIN, YUEN LONG, NEW TERRITORIES

Item Qty Unit Rate HK$

OPTIONAL TENDER FOR

5-YEAR OPERATION AND MAINTENANCE PLAN

FOR SEWAGE TREATMENT PLANT STSTEM

SPECIAL PREAMBLES

1 The operation and maintenance cost shall include all

cost for labour, inspection, repairing, attendance for

emergency case, sampling and analysis of the

effluent to the satisfactory operation of the sewage

treatment plant, etc.

MISCELLANEOUS

5-Year Operation and Maintenance Plan for

Sewage Treatment Plant System

1st Year Plan

To Collection

Schedule No. 5 - Optional Tender for 5-Year Operation and Maintenance Plan for

Item Description

Sewage Treatment Plant System

HK-4547/FP

Arcadis SR5 / 1

Page 389: TENDER DOCUMENTS · schedule no. 1 – preliminaries sr1/1 – sr1 sum/1 schedule no. 2 – preambles sr2/1 – sr2/72 schedule no. 3 – sewage treatment plant system sr3/1 – sr3

NOMINATED SUB-CONTRACT WORKS

FOR SEWAGE TREATMENT AND GREY WATER TREATMENT PLANT FOR PSFSC

FOR UPGRADING MAI PO NATURE RESERVE INFRASTRUCTURE

AT MAI PO, SAN TIN, YUEN LONG, NEW TERRITORIES

Item Qty Unit Rate HK$

Schedule No. 5 - Optional Tender for 5-Year Operation and Maintenance Plan for

Item Description

Sewage Treatment Plant System

OPTIONAL TENDER FOR

5-YEAR OPERATION AND MAINTENANCE PLAN

FOR SEWAGE TREATMENT PLANT STSTEM

(Cont'd)

SPECIAL PREAMBLES

1 The operation and maintenance cost shall include all

cost for labour, inspection, repairing, attendance for

emergency case, sampling and analysis of the

effluent to the satisfactory operation of the sewage

treatment plant, etc.

MISCELLANEOUS (Cont'd)

5-Year Operation and Maintenance Plan for

Sewage Treatment Plant System (Cont'd)

2nd Year Plan

To Collection

HK-4547/FP

Arcadis SR5 / 2

Page 390: TENDER DOCUMENTS · schedule no. 1 – preliminaries sr1/1 – sr1 sum/1 schedule no. 2 – preambles sr2/1 – sr2/72 schedule no. 3 – sewage treatment plant system sr3/1 – sr3

NOMINATED SUB-CONTRACT WORKS

FOR SEWAGE TREATMENT AND GREY WATER TREATMENT PLANT FOR PSFSC

FOR UPGRADING MAI PO NATURE RESERVE INFRASTRUCTURE

AT MAI PO, SAN TIN, YUEN LONG, NEW TERRITORIES

Item Qty Unit Rate HK$

Schedule No. 5 - Optional Tender for 5-Year Operation and Maintenance Plan for

Item Description

Sewage Treatment Plant System

OPTIONAL TENDER FOR

5-YEAR OPERATION AND MAINTENANCE PLAN

FOR SEWAGE TREATMENT PLANT STSTEM

(Cont'd)

SPECIAL PREAMBLES

1 The operation and maintenance cost shall include all

cost for labour, inspection, repairing, attendance for

emergency case, sampling and analysis of the

effluent to the satisfactory operation of the sewage

treatment plant, etc.

MISCELLANEOUS (Cont'd)

5-Year Operation and Maintenance Plan for

Sewage Treatment Plant System (Cont'd)

3rd Year Plan

To Collection

HK-4547/FP

Arcadis SR5 / 3

Page 391: TENDER DOCUMENTS · schedule no. 1 – preliminaries sr1/1 – sr1 sum/1 schedule no. 2 – preambles sr2/1 – sr2/72 schedule no. 3 – sewage treatment plant system sr3/1 – sr3

NOMINATED SUB-CONTRACT WORKS

FOR SEWAGE TREATMENT AND GREY WATER TREATMENT PLANT FOR PSFSC

FOR UPGRADING MAI PO NATURE RESERVE INFRASTRUCTURE

AT MAI PO, SAN TIN, YUEN LONG, NEW TERRITORIES

Item Qty Unit Rate HK$

Schedule No. 5 - Optional Tender for 5-Year Operation and Maintenance Plan for

Item Description

Sewage Treatment Plant System

OPTIONAL TENDER FOR

5-YEAR OPERATION AND MAINTENANCE PLAN

FOR SEWAGE TREATMENT PLANT STSTEM

(Cont'd)

SPECIAL PREAMBLES

1 The operation and maintenance cost shall include all

cost for labour, inspection, repairing, attendance for

emergency case, sampling and analysis of the

effluent to the satisfactory operation of the sewage

treatment plant, etc.

MISCELLANEOUS (Cont'd)

5-Year Operation and Maintenance Plan for

Sewage Treatment Plant System (Cont'd)

4th Year Plan

To Collection

HK-4547/FP

Arcadis SR5 / 4

Page 392: TENDER DOCUMENTS · schedule no. 1 – preliminaries sr1/1 – sr1 sum/1 schedule no. 2 – preambles sr2/1 – sr2/72 schedule no. 3 – sewage treatment plant system sr3/1 – sr3

NOMINATED SUB-CONTRACT WORKS

FOR SEWAGE TREATMENT AND GREY WATER TREATMENT PLANT FOR PSFSC

FOR UPGRADING MAI PO NATURE RESERVE INFRASTRUCTURE

AT MAI PO, SAN TIN, YUEN LONG, NEW TERRITORIES

Item Qty Unit Rate HK$

Schedule No. 5 - Optional Tender for 5-Year Operation and Maintenance Plan for

Item Description

Sewage Treatment Plant System

OPTIONAL TENDER FOR

5-YEAR OPERATION AND MAINTENANCE PLAN

FOR SEWAGE TREATMENT PLANT STSTEM

(Cont'd)

SPECIAL PREAMBLES

1 The operation and maintenance cost shall include all

cost for labour, inspection, repairing, attendance for

emergency case, sampling and analysis of the

effluent to the satisfactory operation of the sewage

treatment plant, etc.

MISCELLANEOUS (Cont'd)

5-Year Operation and Maintenance Plan for

Sewage Treatment Plant System (Cont'd)

5th Year Plan

To Collection

HK-4547/FP

Arcadis SR5 / 5

Page 393: TENDER DOCUMENTS · schedule no. 1 – preliminaries sr1/1 – sr1 sum/1 schedule no. 2 – preambles sr2/1 – sr2/72 schedule no. 3 – sewage treatment plant system sr3/1 – sr3

NOMINATED SUB-CONTRACT WORKS

FOR SEWAGE TREATMENT AND GREY WATER TREATMENT PLANT FOR PSFSC

FOR UPGRADING MAI PO NATURE RESERVE INFRASTRUCTURE

AT MAI PO, SAN TIN, YUEN LONG, NEW TERRITORIES

Item Qty Unit Rate HK$

OPTIONAL TENDER FOR

5-YEAR OPERATION AND MAINTENANCE PLAN

FOR SEWAGE TREATMENT PLANT STSTEM

Collection

From page SR5/1

From page SR5/2

From page SR5/3

From page SR5/4

From page SR5/5

TO SUMMARY OF TENDER

Schedule No. 5 - Optional Tender for 5-Year Operation and Maintenance Plan for

Item Description

Sewage Treatment Plant System

HK-4547/FP

Arcadis SR5 SUM / 1

Page 394: TENDER DOCUMENTS · schedule no. 1 – preliminaries sr1/1 – sr1 sum/1 schedule no. 2 – preambles sr2/1 – sr2/72 schedule no. 3 – sewage treatment plant system sr3/1 – sr3

SCHEDULE NO. 6 – OPTIONAL TENDER FOR 5-YEAR OPERATION AND MAINTENANCE PLAN FOR GREYWATER

TREATMENT PLANT SYSTEM

Page 395: TENDER DOCUMENTS · schedule no. 1 – preliminaries sr1/1 – sr1 sum/1 schedule no. 2 – preambles sr2/1 – sr2/72 schedule no. 3 – sewage treatment plant system sr3/1 – sr3

NOMINATED SUB-CONTRACT WORKS

FOR SEWAGE TREATMENT AND GREY WATER TREATMENT PLANT FOR PSFSC

FOR UPGRADING MAI PO NATURE RESERVE INFRASTRUCTURE

AT MAI PO, SAN TIN, YUEN LONG, NEW TERRITORIES

Item Qty Unit Rate HK$

OPTIONAL TENDER FOR

5-YEAR OPERATION AND MAINTENANCE PLAN

FOR GREY WATER TREATMENT PLANT STSTEM

SPECIAL PREAMBLES

1 The operation and maintenance cost shall include all

cost for labour, inspection, repairing, attendance for

emergency case, sampling and analysis of the

effluent to the satisfactory operation of the sewage

treatment plant, etc.

MISCELLANEOUS

5-Year Operation and Maintenance Plan for

Grey Water Treatment Plant System

1st Year Plan

To Collection

Schedule No. 6 - Optional Tender for 5-Year Operation and Maintenance Plan for

Grey Water Treatment Plant System

Item Description

HK-4547/FP

Arcadis SR6 / 1

Page 396: TENDER DOCUMENTS · schedule no. 1 – preliminaries sr1/1 – sr1 sum/1 schedule no. 2 – preambles sr2/1 – sr2/72 schedule no. 3 – sewage treatment plant system sr3/1 – sr3

NOMINATED SUB-CONTRACT WORKS

FOR SEWAGE TREATMENT AND GREY WATER TREATMENT PLANT FOR PSFSC

FOR UPGRADING MAI PO NATURE RESERVE INFRASTRUCTURE

AT MAI PO, SAN TIN, YUEN LONG, NEW TERRITORIES

Item Qty Unit Rate HK$

Schedule No. 6 - Optional Tender for 5-Year Operation and Maintenance Plan for

Grey Water Treatment Plant System

Item Description

OPTIONAL TENDER FOR

5-YEAR OPERATION AND MAINTENANCE PLAN

FOR GREY WATER TREATMENT PLANT STSTEM

(Cont'd)

SPECIAL PREAMBLES

1 The operation and maintenance cost shall include all

cost for labour, inspection, repairing, attendance for

emergency case, sampling and analysis of the

effluent to the satisfactory operation of the sewage

treatment plant, etc.

MISCELLANEOUS (Cont'd)

5-Year Operation and Maintenance Plan for

Grey Water Treatment Plant System (Cont'd)

2nd Year Plan

To Collection

HK-4547/FP

Arcadis SR6 / 2

Page 397: TENDER DOCUMENTS · schedule no. 1 – preliminaries sr1/1 – sr1 sum/1 schedule no. 2 – preambles sr2/1 – sr2/72 schedule no. 3 – sewage treatment plant system sr3/1 – sr3

NOMINATED SUB-CONTRACT WORKS

FOR SEWAGE TREATMENT AND GREY WATER TREATMENT PLANT FOR PSFSC

FOR UPGRADING MAI PO NATURE RESERVE INFRASTRUCTURE

AT MAI PO, SAN TIN, YUEN LONG, NEW TERRITORIES

Item Qty Unit Rate HK$

Schedule No. 6 - Optional Tender for 5-Year Operation and Maintenance Plan for

Grey Water Treatment Plant System

Item Description

OPTIONAL TENDER FOR

5-YEAR OPERATION AND MAINTENANCE PLAN

FOR GREY WATER TREATMENT PLANT STSTEM

(Cont'd)

SPECIAL PREAMBLES

1 The operation and maintenance cost shall include all

cost for labour, inspection, repairing, attendance for

emergency case, sampling and analysis of the

effluent to the satisfactory operation of the sewage

treatment plant, etc.

MISCELLANEOUS (Cont'd)

5-Year Operation and Maintenance Plan for

Grey Water Treatment Plant System (Cont'd)

3rd Year Plan

To Collection

HK-4547/FP

Arcadis SR6 / 3

Page 398: TENDER DOCUMENTS · schedule no. 1 – preliminaries sr1/1 – sr1 sum/1 schedule no. 2 – preambles sr2/1 – sr2/72 schedule no. 3 – sewage treatment plant system sr3/1 – sr3

NOMINATED SUB-CONTRACT WORKS

FOR SEWAGE TREATMENT AND GREY WATER TREATMENT PLANT FOR PSFSC

FOR UPGRADING MAI PO NATURE RESERVE INFRASTRUCTURE

AT MAI PO, SAN TIN, YUEN LONG, NEW TERRITORIES

Item Qty Unit Rate HK$

Schedule No. 6 - Optional Tender for 5-Year Operation and Maintenance Plan for

Grey Water Treatment Plant System

Item Description

OPTIONAL TENDER FOR

5-YEAR OPERATION AND MAINTENANCE PLAN

FOR GREY WATER TREATMENT PLANT STSTEM

(Cont'd)

SPECIAL PREAMBLES

1 The operation and maintenance cost shall include all

cost for labour, inspection, repairing, attendance for

emergency case, sampling and analysis of the

effluent to the satisfactory operation of the sewage

treatment plant, etc.

MISCELLANEOUS (Cont'd)

5-Year Operation and Maintenance Plan for

Grey Water Treatment Plant System (Cont'd)

4th Year Plan

To Collection

HK-4547/FP

Arcadis SR6 / 4

Page 399: TENDER DOCUMENTS · schedule no. 1 – preliminaries sr1/1 – sr1 sum/1 schedule no. 2 – preambles sr2/1 – sr2/72 schedule no. 3 – sewage treatment plant system sr3/1 – sr3

NOMINATED SUB-CONTRACT WORKS

FOR SEWAGE TREATMENT AND GREY WATER TREATMENT PLANT FOR PSFSC

FOR UPGRADING MAI PO NATURE RESERVE INFRASTRUCTURE

AT MAI PO, SAN TIN, YUEN LONG, NEW TERRITORIES

Item Qty Unit Rate HK$

Schedule No. 6 - Optional Tender for 5-Year Operation and Maintenance Plan for

Grey Water Treatment Plant System

Item Description

OPTIONAL TENDER FOR

5-YEAR OPERATION AND MAINTENANCE PLAN

FOR GREY WATER TREATMENT PLANT STSTEM

(Cont'd)

SPECIAL PREAMBLES

1 The operation and maintenance cost shall include all

cost for labour, inspection, repairing, attendance for

emergency case, sampling and analysis of the

effluent to the satisfactory operation of the sewage

treatment plant, etc.

MISCELLANEOUS (Cont'd)

5-Year Operation and Maintenance Plan for

Grey Water Treatment Plant System (Cont'd)

5th Year Plan

To Collection

HK-4547/FP

Arcadis SR6 / 5

Page 400: TENDER DOCUMENTS · schedule no. 1 – preliminaries sr1/1 – sr1 sum/1 schedule no. 2 – preambles sr2/1 – sr2/72 schedule no. 3 – sewage treatment plant system sr3/1 – sr3

NOMINATED SUB-CONTRACT WORKS

FOR SEWAGE TREATMENT AND GREY WATER TREATMENT PLANT FOR PSFSC

FOR UPGRADING MAI PO NATURE RESERVE INFRASTRUCTURE

AT MAI PO, SAN TIN, YUEN LONG, NEW TERRITORIES

Item Qty Unit Rate HK$

OPTIONAL TENDER FOR

5-YEAR OPERATION AND MAINTENANCE PLAN

FOR GREY WATER TREATMENT PLANT STSTEM

Collection

From page SR6/1

From page SR6/2

From page SR6/3

From page SR6/4

From page SR6/5

TO SUMMARY OF TENDER

Schedule No. 6 - Optional Tender for 5-Year Operation and Maintenance Plan for

Grey Water Treatment Plant System

Item Description

HK-4547/FP

Arcadis SR6 SUM / 1

Page 401: TENDER DOCUMENTS · schedule no. 1 – preliminaries sr1/1 – sr1 sum/1 schedule no. 2 – preambles sr2/1 – sr2/72 schedule no. 3 – sewage treatment plant system sr3/1 – sr3

SUMMARY OF TENDER

Page 402: TENDER DOCUMENTS · schedule no. 1 – preliminaries sr1/1 – sr1 sum/1 schedule no. 2 – preambles sr2/1 – sr2/72 schedule no. 3 – sewage treatment plant system sr3/1 – sr3

NOMINATED SUB-CONTRACT WORKS

FOR SEWAGE TREATMENT AND GREY WATER TREATMENT PLANT FOR PSFSC

FOR UPGRADING MAI PO NATURE RESERVE INFRASTRUCTURE

AT MAI PO, SAN TIN, YUEN LONG, NEW TERRITORIES

Item HK$

TENDER FOR NOMINATED SUB-CONTRACT WORKS

FOR SEWAGE TREATMENT AND GREY WATER TREATMENT PLANT

FOR PSFSC

FOR UPGRADING MAI PO NATURE RESERVE INFRASTRUCTURE

AT MAI PO, SAN TIN, YUEN LONG, NEW TERRITORIES

SUMMARY OF TENDER

Sch No.

CONFIRMED SCOPE

1 PRELIMINARIES

2 PREAMBLES

3 SEWAGE TREATMENT PLANT SYSTEM

Total Carried to 1. (a) Base Tender in "Form of Tender"

Signed by Tenderer:

Name of Tenderer:

Date:

(with Company's Chop)

Item Description Page Ref.

SR1 / SUM

SR3 / SUM

HK-4547/FP

Arcadis ST / 1

Page 403: TENDER DOCUMENTS · schedule no. 1 – preliminaries sr1/1 – sr1 sum/1 schedule no. 2 – preambles sr2/1 – sr2/72 schedule no. 3 – sewage treatment plant system sr3/1 – sr3

NOMINATED SUB-CONTRACT WORKS

FOR SEWAGE TREATMENT AND GREY WATER TREATMENT PLANT FOR PSFSC

FOR UPGRADING MAI PO NATURE RESERVE INFRASTRUCTURE

AT MAI PO, SAN TIN, YUEN LONG, NEW TERRITORIES

Item HK$Item Description Page Ref.

TENDER FOR NOMINATED SUB-CONTRACT WORKS

FOR SEWAGE TREATMENT AND GREY WATER TREATMENT PLANT

FOR PSFSC

FOR UPGRADING MAI PO NATURE RESERVE INFRASTRUCTURE

AT MAI PO, SAN TIN, YUEN LONG, NEW TERRITORIES

SUMMARY OF TENDER

Sch No.

OPTIONAL SCOPE

4 OPTIONAL TENDER - GREY WATER TREATMENT PLANT SYSTEM

Total Carried to 1. (b) Optional Tender - Grey Water Treatment Plant in "Form of Tender"

Signed by Tenderer:

Name of Tenderer:

Date:

SR4 / SUM

(with Company's Chop)

HK-4547/FP

Arcadis ST / 2

Page 404: TENDER DOCUMENTS · schedule no. 1 – preliminaries sr1/1 – sr1 sum/1 schedule no. 2 – preambles sr2/1 – sr2/72 schedule no. 3 – sewage treatment plant system sr3/1 – sr3

NOMINATED SUB-CONTRACT WORKS

FOR SEWAGE TREATMENT AND GREY WATER TREATMENT PLANT FOR PSFSC

FOR UPGRADING MAI PO NATURE RESERVE INFRASTRUCTURE

AT MAI PO, SAN TIN, YUEN LONG, NEW TERRITORIES

Item HK$Item Description Page Ref.

TENDER FOR NOMINATED SUB-CONTRACT WORKS

FOR SEWAGE TREATMENT AND GREY WATER TREATMENT PLANT

FOR PSFSC

FOR UPGRADING MAI PO NATURE RESERVE INFRASTRUCTURE

AT MAI PO, SAN TIN, YUEN LONG, NEW TERRITORIES

SUMMARY OF TENDER

Sch No.

OPTIONAL SCOPE

5 OPTIONAL TENDER - 5-YEAR OPERATION AND MAINTENANCE PLAN

FOR SEWAGE TREATMENT PLANT SYSTEM

Total Carried to 1. (c) Optional Tender - 5-Year Operation and Maintenance Plan for

Sewage Treatment Plant System 'in "Form of Tender"

Signed by Tenderer:

Name of Tenderer:

Date:

SR5 / SUM

(with Company's Chop)

HK-4547/FP

Arcadis ST / 3

Page 405: TENDER DOCUMENTS · schedule no. 1 – preliminaries sr1/1 – sr1 sum/1 schedule no. 2 – preambles sr2/1 – sr2/72 schedule no. 3 – sewage treatment plant system sr3/1 – sr3

NOMINATED SUB-CONTRACT WORKS

FOR SEWAGE TREATMENT AND GREY WATER TREATMENT PLANT FOR PSFSC

FOR UPGRADING MAI PO NATURE RESERVE INFRASTRUCTURE

AT MAI PO, SAN TIN, YUEN LONG, NEW TERRITORIES

Item HK$Item Description Page Ref.

TENDER FOR NOMINATED SUB-CONTRACT WORKS

FOR SEWAGE TREATMENT AND GREY WATER TREATMENT PLANT

FOR PSFSC

FOR UPGRADING MAI PO NATURE RESERVE INFRASTRUCTURE

AT MAI PO, SAN TIN, YUEN LONG, NEW TERRITORIES

SUMMARY OF TENDER

Sch No.

OPTIONAL SCOPE

6 OPTIONAL TENDER - 5-YEAR OPERATION AND MAINTENANCE PLAN

FOR GREY WATER TREATMENT PLANT SYSTEM

Total Carried to 1. (d) Optional Tender - 5-Year Operation and Maintenance Plan for

Grey Water Treatment Plant System 'in "Form of Tender"

Signed by Tenderer:

Name of Tenderer:

Date:

(with Company's Chop)

SR6 / SUM

HK-4547/FP

Arcadis ST / 4

Page 406: TENDER DOCUMENTS · schedule no. 1 – preliminaries sr1/1 – sr1 sum/1 schedule no. 2 – preambles sr2/1 – sr2/72 schedule no. 3 – sewage treatment plant system sr3/1 – sr3

DRAWINGS

Page 407: TENDER DOCUMENTS · schedule no. 1 – preliminaries sr1/1 – sr1 sum/1 schedule no. 2 – preambles sr2/1 – sr2/72 schedule no. 3 – sewage treatment plant system sr3/1 – sr3

竿洲

TAM KON CHAU

担竿洲路

B

U

I

L

T

O

V

E

R

A

R

E

A

LOT BOUNDARY

L i m i t e d

N

AutoCAD SHX Text
R
AutoCAD SHX Text
823090.0553 839560.9007
AutoCAD SHX Text
823082.3067 839535.1413
AutoCAD SHX Text
823113.8663 839505.8317
AutoCAD SHX Text
823150.3462 839540.8737
AutoCAD SHX Text
TAM KON CHAU ROAD
AutoCAD SHX Text
POND
AutoCAD SHX Text
POND
AutoCAD SHX Text
POND
AutoCAD SHX Text
POND
AutoCAD SHX Text
POND
AutoCAD SHX Text
POND
AutoCAD SHX Text
SITE LOCATION PLAN 1:500 @ A1 PLAN 1:500 @ A1500 @ A100 @ A1 @ A1
AutoCAD SHX Text
APPROVED BY
AutoCAD SHX Text
REV.
AutoCAD SHX Text
CHECKED BY
AutoCAD SHX Text
DATE
AutoCAD SHX Text
Project Ref
AutoCAD SHX Text
File Name :
AutoCAD SHX Text
Signature for Submission/Construction
AutoCAD SHX Text
Scale :
AutoCAD SHX Text
The copyright of this drawing remains with the Architect.
AutoCAD SHX Text
This drawing is not valid for construction purposes unless
AutoCAD SHX Text
F.S.D. Ref:
AutoCAD SHX Text
B.D. Ref:
AutoCAD SHX Text
Notes & Legend
AutoCAD SHX Text
Do not scale from drawings.
AutoCAD SHX Text
expressedly certified.
AutoCAD SHX Text
All measurements must be verified on site.
AutoCAD SHX Text
World Wide Fund for Nature Hong Kong
AutoCAD SHX Text
15/F, Manhattan Centre,
AutoCAD SHX Text
8 Kwai Cheong Road, Kwai Chung
AutoCAD SHX Text
New Territories, Hong Kong
AutoCAD SHX Text
TEL : 2526 1011
AutoCAD SHX Text
FAX : 2845 2764
AutoCAD SHX Text
Faithful and Gould
AutoCAD SHX Text
13/F, Wharf T&T Centre,
AutoCAD SHX Text
Tsim Sha Tsui,
AutoCAD SHX Text
Hong Kong
AutoCAD SHX Text
TEL : 2972 1118
AutoCAD SHX Text
FAX : 3827 7070
AutoCAD SHX Text
AECOM Asia Company Limited
AutoCAD SHX Text
20/F, Grand Central Plaza, Tower 2,
AutoCAD SHX Text
138 Shatin Rural Committee Road,
AutoCAD SHX Text
Shatin, Hong Kong
AutoCAD SHX Text
TEL : 3922 9000
AutoCAD SHX Text
FAX : 3922 9797
AutoCAD SHX Text
Urbis Limited
AutoCAD SHX Text
11/F Siu On Centre,
AutoCAD SHX Text
188 Lockhart Road,
AutoCAD SHX Text
Wan Chai, Hong Kong
AutoCAD SHX Text
TEL : 2802 3333
AutoCAD SHX Text
FAX : 2802 8662
AutoCAD SHX Text
Parsons Brinckerhoff (Asia) Limited
AutoCAD SHX Text
7/F One Kowloon,
AutoCAD SHX Text
1 Wang Yuen Street,
AutoCAD SHX Text
Kowloon Bay, Hong Kong
AutoCAD SHX Text
TEL : 2528 3031
AutoCAD SHX Text
FAX : 2268 3740
AutoCAD SHX Text
Thomas Chow Architects Limited
AutoCAD SHX Text
Rm 1311, Eastern Harbour Centre
AutoCAD SHX Text
28 Hoi Chak Street, Quarry Bay
AutoCAD SHX Text
Hong Kong
AutoCAD SHX Text
TEL : 2527 8108
AutoCAD SHX Text
FAX : 2527 8813
AutoCAD SHX Text
Lead Design Consultant
AutoCAD SHX Text
Client
AutoCAD SHX Text
Project Manager
AutoCAD SHX Text
Civil, Structural, Geotechnical Engineering Consultant
AutoCAD SHX Text
Landscape Design Consultant
AutoCAD SHX Text
AV / ICT / Security System Consultant
AutoCAD SHX Text
Aurecon Hong Kong Limited
AutoCAD SHX Text
Building Services Engineering Consultant
AutoCAD SHX Text
Firefly Lighting Design (China) Ltd
AutoCAD SHX Text
Unit B, 17/F, Kay Kwong Commercial Building,
AutoCAD SHX Text
332-334 Lockhart Road,
AutoCAD SHX Text
Wan Chai, Hong Kong
AutoCAD SHX Text
TEL : 2528 3031
AutoCAD SHX Text
FAX : 2268 3740
AutoCAD SHX Text
Interior & Exterior Lighting Design Consultant
AutoCAD SHX Text
mksA (HK) Ltd
AutoCAD SHX Text
8/F Yick Shing Building
AutoCAD SHX Text
238 Lockhart Rd,
AutoCAD SHX Text
Wanchai, Hong Kong
AutoCAD SHX Text
TEL : 2528 3031
AutoCAD SHX Text
FAX : 2268 3740
AutoCAD SHX Text
Acoustic Consultant
AutoCAD SHX Text
2205-2206, 22/F Island Place Tower,
AutoCAD SHX Text
510 King's Road,
AutoCAD SHX Text
North Point, Hong Kong
AutoCAD SHX Text
TEL : 3664 6888
AutoCAD SHX Text
FAX : 3664 6999
AutoCAD SHX Text
MAI PO NATURE RESERVE INFRASTRUCTURE UPGRADE PROJECT PROPOSED PETER SCOTT FIELD STUDIES CENTRE AT D.D. 101, MAI PO (FACILITY OUTSIDE NATURE RESERVE)
AutoCAD SHX Text
253876
AutoCAD SHX Text
SITE
AutoCAD SHX Text
BUILT OVER AREA
AutoCAD SHX Text
0
AutoCAD SHX Text
02-2020
AutoCAD SHX Text
SP
AutoCAD SHX Text
FL
AutoCAD SHX Text
MAI PO NATURE RESERVE INFRASTRUCTURE UPGRADE PROJECT PROPOSED PETER SCOTT FIELD STUDIES CENTRE AT D.D. 101, MAI PO (FACILITY OUTSIDE NATURE RESERVE)
AutoCAD SHX Text
SEWAGE TREATMENT PLANT & GREY WATER TREATMENT PLANT INSTALLATION SITE LOCATION PLAN
AutoCAD SHX Text
253876-DW-STP-001
AutoCAD SHX Text
253876
AutoCAD SHX Text
1:500@A1
Page 408: TENDER DOCUMENTS · schedule no. 1 – preliminaries sr1/1 – sr1 sum/1 schedule no. 2 – preambles sr2/1 – sr2/72 schedule no. 3 – sewage treatment plant system sr3/1 – sr3

L i m i t e d

AutoCAD SHX Text
B6
AutoCAD SHX Text
B5
AutoCAD SHX Text
B4
AutoCAD SHX Text
B2
AutoCAD SHX Text
B1
AutoCAD SHX Text
A4
AutoCAD SHX Text
A5
AutoCAD SHX Text
A7
AutoCAD SHX Text
A6
AutoCAD SHX Text
B3
AutoCAD SHX Text
A3
AutoCAD SHX Text
A2
AutoCAD SHX Text
A1
AutoCAD SHX Text
A8
AutoCAD SHX Text
EXIT
AutoCAD SHX Text
OPEN SHELF FOR RETURN
AutoCAD SHX Text
017
AutoCAD SHX Text
RECYCLING STATION
AutoCAD SHX Text
1792374
AutoCAD SHX Text
EX. 5.44
AutoCAD SHX Text
EX. 5.41
AutoCAD SHX Text
EX. 5.33
AutoCAD SHX Text
EX. 5.59
AutoCAD SHX Text
EX. 5.24
AutoCAD SHX Text
EX. 5.27
AutoCAD SHX Text
EX. 5.29
AutoCAD SHX Text
EX. 5.22
AutoCAD SHX Text
EX. 5.17
AutoCAD SHX Text
EX. 5.03
AutoCAD SHX Text
EX. 4.98
AutoCAD SHX Text
EX. 5.03
AutoCAD SHX Text
EX. 5.06
AutoCAD SHX Text
EX. 4.92
AutoCAD SHX Text
EX. 5.60
AutoCAD SHX Text
EX. 6.03
AutoCAD SHX Text
EX. 5.64
AutoCAD SHX Text
EX. 5.62
AutoCAD SHX Text
EX. 5.68
AutoCAD SHX Text
EX. 5.58
AutoCAD SHX Text
EX. 5.74
AutoCAD SHX Text
EX. 5.16
AutoCAD SHX Text
EX. 4.83
AutoCAD SHX Text
EX. 3.85
AutoCAD SHX Text
EX. 3.93
AutoCAD SHX Text
EX. 3.94
AutoCAD SHX Text
EX. 4.17
AutoCAD SHX Text
EX. 4.47
AutoCAD SHX Text
EX. 3.78
AutoCAD SHX Text
EX. 3.91
AutoCAD SHX Text
EX. 4.24
AutoCAD SHX Text
EX. 3.69
AutoCAD SHX Text
EX. 3.38
AutoCAD SHX Text
EX. 3.67
AutoCAD SHX Text
EX. 3.89
AutoCAD SHX Text
EX. 4.85
AutoCAD SHX Text
EX. 4.76
AutoCAD SHX Text
EX. 4.62
AutoCAD SHX Text
EX. 3.20
AutoCAD SHX Text
EX. 4.72
AutoCAD SHX Text
EX. 2.72
AutoCAD SHX Text
EX. 2.63
AutoCAD SHX Text
EX. 2.95
AutoCAD SHX Text
EX. 4.72
AutoCAD SHX Text
EX. 2.91
AutoCAD SHX Text
EX. 5.45
AutoCAD SHX Text
EX. 5.54
AutoCAD SHX Text
EX. 5.67
AutoCAD SHX Text
EX. 5.47
AutoCAD SHX Text
EX. 5.68
AutoCAD SHX Text
EX. 5.57
AutoCAD SHX Text
EX. 5.49
AutoCAD SHX Text
EX. 4.93
AutoCAD SHX Text
EX. 5.15
AutoCAD SHX Text
EX. 4.06
AutoCAD SHX Text
EX. 3.81
AutoCAD SHX Text
EX. 4.66
AutoCAD SHX Text
EX. 3.07
AutoCAD SHX Text
EX. 2.92
AutoCAD SHX Text
EX. 4.62
AutoCAD SHX Text
EX. 4.47
AutoCAD SHX Text
EX. 4.82
AutoCAD SHX Text
EX. 3.92
AutoCAD SHX Text
EX. 5.49
AutoCAD SHX Text
011
AutoCAD SHX Text
PASTA COOKER
AutoCAD SHX Text
012
AutoCAD SHX Text
WORK-
AutoCAD SHX Text
BENCH
AutoCAD SHX Text
013
AutoCAD SHX Text
SINGLE FRYER
AutoCAD SHX Text
014
AutoCAD SHX Text
GRILL PLATE
AutoCAD SHX Text
015
AutoCAD SHX Text
WORKBENCH
AutoCAD SHX Text
016
AutoCAD SHX Text
DOUBLE HOB
AutoCAD SHX Text
016
AutoCAD SHX Text
DOUBLE HOB
AutoCAD SHX Text
001/004
AutoCAD SHX Text
FRIDGE (BENCH-2 DOORS)
AutoCAD SHX Text
7919.27NMV.00
AutoCAD SHX Text
034
AutoCAD SHX Text
FRIDGE (BENCH-W/ BASIN)
AutoCAD SHX Text
7919.36NTV.24
AutoCAD SHX Text
028
AutoCAD SHX Text
COMBI OVEN
AutoCAD SHX Text
XEVC-0511-
AutoCAD SHX Text
E1R
AutoCAD SHX Text
FALL
AutoCAD SHX Text
FALL
AutoCAD SHX Text
FALL
AutoCAD SHX Text
FALL
AutoCAD SHX Text
FALL
AutoCAD SHX Text
FALL
AutoCAD SHX Text
FALL
AutoCAD SHX Text
FALL
AutoCAD SHX Text
FALL
AutoCAD SHX Text
FALL
AutoCAD SHX Text
FALL
AutoCAD SHX Text
FALL
AutoCAD SHX Text
FFL 5.55
AutoCAD SHX Text
SFL 5.70
AutoCAD SHX Text
FFL 5.75
AutoCAD SHX Text
SFL 5.45
AutoCAD SHX Text
FFL 5.50
AutoCAD SHX Text
FFL 5.20
AutoCAD SHX Text
FFL 5.42
AutoCAD SHX Text
FFL 5.50
AutoCAD SHX Text
FFL 5.20
AutoCAD SHX Text
019
AutoCAD SHX Text
DISHWASHER
AutoCAD SHX Text
0710.00500.03
AutoCAD SHX Text
SFL 5.70
AutoCAD SHX Text
FFL 5.75
AutoCAD SHX Text
SFL 5.70
AutoCAD SHX Text
FFL 5.75
AutoCAD SHX Text
SFL 5.70
AutoCAD SHX Text
FFL 5.75
AutoCAD SHX Text
FFL 5.50
AutoCAD SHX Text
FFL 5.50
AutoCAD SHX Text
018
AutoCAD SHX Text
DRAINER SINK
AutoCAD SHX Text
023
AutoCAD SHX Text
ICE MAKER
AutoCAD SHX Text
001/004
AutoCAD SHX Text
FRIDGE (BENCH-2 DOORS)
AutoCAD SHX Text
7919.27NMV.00
AutoCAD SHX Text
002
AutoCAD SHX Text
TOASTER
AutoCAD SHX Text
7850.52402.20
AutoCAD SHX Text
021
AutoCAD SHX Text
COFFEE
AutoCAD SHX Text
MACHINE
AutoCAD SHX Text
022
AutoCAD SHX Text
022
AutoCAD SHX Text
020
AutoCAD SHX Text
024
AutoCAD SHX Text
SINK
AutoCAD SHX Text
7758.056A5.01
AutoCAD SHX Text
020
AutoCAD SHX Text
SFL 5.70
AutoCAD SHX Text
FFL 5.75
AutoCAD SHX Text
025
AutoCAD SHX Text
COLD TUBULAR GLASS
AutoCAD SHX Text
DISPLAY UNIT
AutoCAD SHX Text
7ETD.14C15.SS
AutoCAD SHX Text
008
AutoCAD SHX Text
OUTLET TABLE
AutoCAD SHX Text
7711.09075.12
AutoCAD SHX Text
001/004
AutoCAD SHX Text
FRIDGE (BENCH-2 DOORS)
AutoCAD SHX Text
7919.27NMV.00
AutoCAD SHX Text
019
AutoCAD SHX Text
DISHWASHER
AutoCAD SHX Text
0710.00500.03
AutoCAD SHX Text
5.60
AutoCAD SHX Text
SFL 6.80
AutoCAD SHX Text
FFL 6.85
AutoCAD SHX Text
SFL 7.25
AutoCAD SHX Text
FFL 7.30
AutoCAD SHX Text
032
AutoCAD SHX Text
EXHAUST HOOD
AutoCAD SHX Text
FFL 5.75
AutoCAD SHX Text
SFL 7.70
AutoCAD SHX Text
FFL 7.75
AutoCAD SHX Text
SFL 7.25
AutoCAD SHX Text
FFL 7.30
AutoCAD SHX Text
X
AutoCAD SHX Text
Z
AutoCAD SHX Text
J
AutoCAD SHX Text
H
AutoCAD SHX Text
G
AutoCAD SHX Text
F
AutoCAD SHX Text
E
AutoCAD SHX Text
D
AutoCAD SHX Text
C
AutoCAD SHX Text
B
AutoCAD SHX Text
U
AutoCAD SHX Text
K
AutoCAD SHX Text
L
AutoCAD SHX Text
M
AutoCAD SHX Text
N
AutoCAD SHX Text
P
AutoCAD SHX Text
Q
AutoCAD SHX Text
R
AutoCAD SHX Text
S
AutoCAD SHX Text
T
AutoCAD SHX Text
Y
AutoCAD SHX Text
FFL 5.35
AutoCAD SHX Text
FFL 5.50
AutoCAD SHX Text
FFL 5.50
AutoCAD SHX Text
SFL 5.60
AutoCAD SHX Text
FFL 5.65
AutoCAD SHX Text
FFL 5.40
AutoCAD SHX Text
FFL 5.50
AutoCAD SHX Text
FFL 5.30
AutoCAD SHX Text
FFL 5.20
AutoCAD SHX Text
SFL 5.45
AutoCAD SHX Text
FFL 5.50
AutoCAD SHX Text
SFL 5.15
AutoCAD SHX Text
FFL 5.20
AutoCAD SHX Text
SFL 5.25
AutoCAD SHX Text
FFL 5.30
AutoCAD SHX Text
SFL 5.25
AutoCAD SHX Text
FFL 5.30
AutoCAD SHX Text
SFL 5.60
AutoCAD SHX Text
FFL 5.65
AutoCAD SHX Text
SFL 5.60
AutoCAD SHX Text
FFL 5.65
AutoCAD SHX Text
SFL 5.60
AutoCAD SHX Text
FFL 5.65
AutoCAD SHX Text
HR
AutoCAD SHX Text
EXIT
AutoCAD SHX Text
EXIT
AutoCAD SHX Text
EXIT
AutoCAD SHX Text
EXIT
AutoCAD SHX Text
EXIT
AutoCAD SHX Text
EXIT
AutoCAD SHX Text
EXIT
AutoCAD SHX Text
EXIT
AutoCAD SHX Text
EXIT
AutoCAD SHX Text
010
AutoCAD SHX Text
INLET TABLE
AutoCAD SHX Text
7711.12075.21
AutoCAD SHX Text
SFL 5.70
AutoCAD SHX Text
FFL 5.75
AutoCAD SHX Text
+7.0
AutoCAD SHX Text
TOP OF WATER METER CABINET 1
AutoCAD SHX Text
005
AutoCAD SHX Text
FREEZER
AutoCAD SHX Text
7919.12NMV.10
AutoCAD SHX Text
(4 DOORS)
AutoCAD SHX Text
HR
AutoCAD SHX Text
SFL 5.60
AutoCAD SHX Text
FFL 5.65
AutoCAD SHX Text
150
AutoCAD SHX Text
150
AutoCAD SHX Text
150
AutoCAD SHX Text
SFL 5.45
AutoCAD SHX Text
FFL 5.50
AutoCAD SHX Text
006
AutoCAD SHX Text
FREEZER
AutoCAD SHX Text
7919.06LMV.10
AutoCAD SHX Text
(2 DOORS)
AutoCAD SHX Text
150
AutoCAD SHX Text
EXISTING POND
AutoCAD SHX Text
TAM KON CHAU ROAD
AutoCAD SHX Text
PAVEMENT
AutoCAD SHX Text
PAVEMENT
AutoCAD SHX Text
FIXED GLASS WINDOW
AutoCAD SHX Text
L/UL FOR LIGHT BUS
AutoCAD SHX Text
GROUND FLOOR PLAN AT +5.70
AutoCAD SHX Text
UNDERGROUND RETENTION TANK AT +3.75 (AREA = ##### SQ.M) ##### SQ.M) SQ.M) (INTERNAL DEPTH=2.0M) (ASSUME=4HRS PEAK FLOW
AutoCAD SHX Text
PART PLAN OF WATER METER CABINET
AutoCAD SHX Text
UNDERGROUND SLUDGE HOLDING TANK AT +2.75 (AREA = ##### SQ.M) ##### SQ.M) SQ.M) (INTERNAL DEPTH=3.0M)
AutoCAD SHX Text
ACCESSIBLE CARPARK SPACE (3.5M x 5.0M)
AutoCAD SHX Text
CARPARK SPACE (2.5M x 5.0M)
AutoCAD SHX Text
NEW CONC. MASS
AutoCAD SHX Text
EXISTING TREE NO. T24 NO. T24 TO BE FELLED
AutoCAD SHX Text
P1
AutoCAD SHX Text
P2
AutoCAD SHX Text
P3
AutoCAD SHX Text
P5
AutoCAD SHX Text
LED DISPLAY WALL
AutoCAD SHX Text
SHELVES
AutoCAD SHX Text
(MIN. 1050 CLEAR)
AutoCAD SHX Text
(MIN. 3000 CLEAR)
AutoCAD SHX Text
COFFEE STATION
AutoCAD SHX Text
COUNTER W/ SHELF
AutoCAD SHX Text
PLATING STATION COUNTER W/ SHELF FOR DISHES
AutoCAD SHX Text
DOUBLE SINK (FOR VEGETABLES)
AutoCAD SHX Text
COOKING STATION COUNTER W/ FRIDGE
AutoCAD SHX Text
COLD PREP (SALAD) COUNTER W/. FRIDGE
AutoCAD SHX Text
ORDER PICK-UP
AutoCAD SHX Text
P.O.S.
AutoCAD SHX Text
SELF SERVICE DISPLAY
AutoCAD SHX Text
RECYLING BINS
AutoCAD SHX Text
P4
AutoCAD SHX Text
SCULLERY(MV/AL) (MV/AL) U.F.A. = 7.385 SQ.M 7.385 SQ.M SQ.M NO. OF P = 1 P.
AutoCAD SHX Text
SEWAGE TREATMENT PLANT ROOM U.F.A. = ###### ###### SQ.M
AutoCAD SHX Text
JANITOR U.F.A. = 3.063 SQ.M 3.063 SQ.M SQ.M NO. OF P = 1P
AutoCAD SHX Text
MULTI-PURPOSE ROOM 1 U.F.A. = 32.137 SQ.M 32.137 SQ.M SQ.M NO. OF P = 34 P.
AutoCAD SHX Text
BRIEFING & LEARNING CENTRE (MV/AL) (MV/AL) U.F.A. = 100.019 SQ.M 100.019 SQ.M SQ.M NO. OF P = 60 P. (SAY)
AutoCAD SHX Text
CANTEEN U.F.A. = 70.530 SQ.M 70.530 SQ.M SQ.M NO. OF P = 64 P.
AutoCAD SHX Text
ANCILLARY SHOP U.F.A. = 37.077 SQ.M 37.077 SQ.M SQ.M NO. OF P = 40 P.
AutoCAD SHX Text
LOBBY U.F.A. = 204.263 SQ.M204.263 SQ.M SQ.M
AutoCAD SHX Text
KITCHEN (MV/AL) (MV/AL) U.F.A. = 26.742 SQ.M 26.742 SQ.M SQ.M NO. OF P = 6 P.
AutoCAD SHX Text
VIEWING DECK
AutoCAD SHX Text
STORE 3 U.F.A. = 5.549 SQ.M 5.549 SQ.M SQ.M NO. OF P = 1P
AutoCAD SHX Text
TRANSFORMER ROOM U.F.A. = 41.175 SQ.M41.175 SQ.M SQ.M
AutoCAD SHX Text
STORE 2 U.F.A. = 6.300 SQ.M 6.300 SQ.M SQ.M NO. OF P = 1P
AutoCAD SHX Text
F.S. DUCT
AutoCAD SHX Text
STORE 1 U.F.A. = 9.420 SQ.M SQ.M NO. OF P = 1P
AutoCAD SHX Text
P.D.
AutoCAD SHX Text
ACCESSIBLE LIFT
AutoCAD SHX Text
DUMB WAITER
AutoCAD SHX Text
UP 32R
AutoCAD SHX Text
ST-2
AutoCAD SHX Text
INTERNAL STAIRCASE
AutoCAD SHX Text
UP 32R
AutoCAD SHX Text
ELV ROOM U.F.A. = 4.965 SQ.M4.965 SQ.M SQ.M
AutoCAD SHX Text
UP 32R
AutoCAD SHX Text
ST-3
AutoCAD SHX Text
ST-1
AutoCAD SHX Text
MALE TOILET (MV/AL)
AutoCAD SHX Text
FEMALE TOILET (MV/AL)
AutoCAD SHX Text
ACCESSIBLE TOILET(MV/AL)(MV/AL)
AutoCAD SHX Text
ELECT. DUCT
AutoCAD SHX Text
STORE 5 U.F.A. = 7.007 SQ.M 7.007 SQ.M SQ.M NO. OF P = 1P
AutoCAD SHX Text
F.S. DUCT
AutoCAD SHX Text
PIPE DUCT
AutoCAD SHX Text
1000x1000 ACCESS HATCH
AutoCAD SHX Text
GREYWATER RECYCLING PLANT ROOM U.F.A. = 11.754 SQ.M11.754 SQ.M SQ.M
AutoCAD SHX Text
WATER METER CABINET 2
AutoCAD SHX Text
WATER METER CABINET 1
AutoCAD SHX Text
UNDERGROUND SOAKAWAY PIT AT LEVEL +3.40 AREA = ####### SQ.M####### SQ.M SQ.M
AutoCAD SHX Text
P6
AutoCAD SHX Text
800x800 HATCH DOOR FOR SOAKAWAY PIT
AutoCAD SHX Text
BUILDING LINE ABOVE
AutoCAD SHX Text
BUILDING LINE ABOVE
AutoCAD SHX Text
FALL
AutoCAD SHX Text
FALL
AutoCAD SHX Text
4.5KG CO2 FE
AutoCAD SHX Text
4.5KG CO2 FE
AutoCAD SHX Text
4.5KG CO2 FE
AutoCAD SHX Text
4.5KG CO2 FE
AutoCAD SHX Text
FIRE BLANKET
AutoCAD SHX Text
S.F.H.
AutoCAD SHX Text
F.H.
AutoCAD SHX Text
SIGNAGE
AutoCAD SHX Text
SINK
AutoCAD SHX Text
P.A.
AutoCAD SHX Text
BICYCLE PARKING SPACE (0.8M x 1.8M)
AutoCAD SHX Text
FOLDING PARTITION
AutoCAD SHX Text
-/60/60 F.R.R. GLASS WALL
AutoCAD SHX Text
BUILDING LINE ABOVE
AutoCAD SHX Text
DECK LEVEL +5.75
AutoCAD SHX Text
DECK LEVEL +5.75
AutoCAD SHX Text
P.D.
AutoCAD SHX Text
DECK LEVEL +5.75
AutoCAD SHX Text
3mm THK. ALUM. CLADDING WITH G.M.S. SUPPORT
AutoCAD SHX Text
FALL 1:21
AutoCAD SHX Text
300mm WIDE DRAINAGE CHANNEL WITH 2 NOS. RAINWATER OUTLET
AutoCAD SHX Text
150H. R.C. KERB
AutoCAD SHX Text
-/120/- F.R.R. LIFT DOOR
AutoCAD SHX Text
150H. R.C. KERB
AutoCAD SHX Text
NEW 150H. R.C. KERB
AutoCAD SHX Text
150H. R.C. KERB
AutoCAD SHX Text
EXISTING KERB TO BE DEMOLISHED
AutoCAD SHX Text
L/UL FOR L.G.V.
AutoCAD SHX Text
NEW SIGNAGE POST
AutoCAD SHX Text
RAMP UP 1:12
AutoCAD SHX Text
-/120/- F.R.R. LIFT DOOR
AutoCAD SHX Text
1000x1000 ACCESS HATCH
AutoCAD SHX Text
350H. R.C. PLINTH
AutoCAD SHX Text
M.L. AT H/L
AutoCAD SHX Text
MIN. 1100H. GLASS BALUSTRADE
AutoCAD SHX Text
METAL MAINTENANCE DOOR
AutoCAD SHX Text
MIN. 1100H. METAL RAILING
AutoCAD SHX Text
STORE 4 U.F.A. = 4.310 SQ.M 4.310 SQ.M SQ.M NO. OF P = 1P
AutoCAD SHX Text
VOID ABOVE
AutoCAD SHX Text
SINK
AutoCAD SHX Text
SINK
AutoCAD SHX Text
DECK LEVEL +5.75
AutoCAD SHX Text
NEW CONC. MASS
AutoCAD SHX Text
STONE CLADDING WITH G.M.S. SUPPORT
AutoCAD SHX Text
STONE CLADDING WITH G.M.S. SUPPORT
AutoCAD SHX Text
HATCH DOOR
AutoCAD SHX Text
-/60/60 F.R.R. FIXED GLASS WINDOW
AutoCAD SHX Text
M.L. AT H/L
AutoCAD SHX Text
HATCH DOOR
AutoCAD SHX Text
M.L. AT H/L
AutoCAD SHX Text
M.L. AT H/L
AutoCAD SHX Text
M.L. AT H/L
AutoCAD SHX Text
M.L. AT L/L & H/L
AutoCAD SHX Text
EXISTING TREES NO. T6, T9 & 10 TO BE FELLED
AutoCAD SHX Text
EXISTING KERB TO BE DEMOLISHED
AutoCAD SHX Text
TOILET CORRIDOR (MV/AL)
AutoCAD SHX Text
RECEPTION COUNTER
AutoCAD SHX Text
300mm WIDE DRAINAGE CHANNEL
AutoCAD SHX Text
NEW 150H RC KERB
AutoCAD SHX Text
SFL 5.70
AutoCAD SHX Text
FFL 5.75
AutoCAD SHX Text
1000x1000 ACCESS HATCH
AutoCAD SHX Text
U/G GREASE TRAP
AutoCAD SHX Text
EXISTING SIMAR SLOPE SIMAR SLOPE FEATURE NO. 2SE-A/C85EATURE NO. 2SE-A/C85 2SE-A/C852SE-A/C85
AutoCAD SHX Text
MIN. 1100H. GLASS BALUSTRADE
AutoCAD SHX Text
SINK
AutoCAD SHX Text
ALUM. PANEL CLADDING WITH G.M.S. SUPPORT
AutoCAD SHX Text
SFL 3.65
AutoCAD SHX Text
FFL 3.70
AutoCAD SHX Text
GF LAYOUT 1:250 A3
AutoCAD SHX Text
SHELVES
AutoCAD SHX Text
SHELVES
AutoCAD SHX Text
AV
AutoCAD SHX Text
NEST-SHAPE SEATING
AutoCAD SHX Text
SHELVES
AutoCAD SHX Text
AV
AutoCAD SHX Text
EXIT
AutoCAD SHX Text
150
AutoCAD SHX Text
NOTE:
AutoCAD SHX Text
ALL SOIL AND WASTE WATER COLLECTED WILL BE TREATED BY THE SEWAGE
AutoCAD SHX Text
TREATMENT PLANT.
AutoCAD SHX Text
*
AutoCAD SHX Text
GREY WATER TREATMENT PLANT WILL USE THE SAME APPROACH TO SEWAGE
AutoCAD SHX Text
TREATMENT PLANT.
AutoCAD SHX Text
WATER QUALITY OF THE EFFLUENT FROM THE SEWAGE TREATMENT PLANT
AutoCAD SHX Text
*
AutoCAD SHX Text
SHALL COMPLY THE STANDARDS FOR EFFLUENTS DISCHARGED INTO GROUP A
AutoCAD SHX Text
INLAND WATERS AS TECHNICAL MEMORANDUM STANDARDS FOR EFFLUENTS
AutoCAD SHX Text
DISCHARGED INTO DRAINAGE AND SEWAGE SYSTEMS, INLAND AND COASTAL
AutoCAD SHX Text
WATER FROM EPD.
AutoCAD SHX Text
WATER QUALITY OF THE EFFLUENT FROM THE GREY WATER TREATMENT PLANT
AutoCAD SHX Text
*
AutoCAD SHX Text
SHALL COMPLY THE STANDARDS FOR RECLAIMED WATER IN ACCORDANCE WITH
AutoCAD SHX Text
TECHNICAL SPECIFICATIONS ON GREY WATER REUSE AND RAINWATER HARVESTING
AutoCAD SHX Text
ISSUED BY WSD.
AutoCAD SHX Text
UNLESS OTHERWISE SPECIFIED IN DRAWINGS AND/OR SPECIFICATION, DRAINAGE
AutoCAD SHX Text
*
AutoCAD SHX Text
PIPEWORK FROM EH SANITARY FITMENTS TO THE UNDERGROUND TANKS OF SEWAGE
AutoCAD SHX Text
TREATMENT SYSTEM AND GREY WATER TREATMENT SYSTEM TO BE DONE BY OTHERS.
AutoCAD SHX Text
THIS DRAWING IS FOR REFERNCE ONLY.
AutoCAD SHX Text
*
AutoCAD SHX Text
R.O.
AutoCAD SHX Text
NaOCL
AutoCAD SHX Text
CAUSTIC
AutoCAD SHX Text
SODA
AutoCAD SHX Text
U.V.
AutoCAD SHX Text
AND AIR BLOWER
AutoCAD SHX Text
(DUTY AND STANDBY)
AutoCAD SHX Text
SLUDGE PUMP
AutoCAD SHX Text
(DUTY AND STANDBY)
AutoCAD SHX Text
UV DISINFECTION SYSTEM
AutoCAD SHX Text
(DUTY AND STANDBY)
AutoCAD SHX Text
REVERSE OSMOSIS
AutoCAD SHX Text
%%C100 EFFLUENT PUMPED PIPE CONNECTED
AutoCAD SHX Text
TO PLUG OFF AT L/L
AutoCAD SHX Text
SEWAGE TREATMENT PLANT CONTROL PANEL
AutoCAD SHX Text
%%C50 EFFLUENT PUMPED PIPE
AutoCAD SHX Text
FROM H/L T/A
AutoCAD SHX Text
EFFLUENT PUMP
AutoCAD SHX Text
DOUBLE-DECK
AutoCAD SHX Text
CP1 pH
AutoCAD SHX Text
SEWAGE TREATMENT PLANT
AutoCAD SHX Text
PH ADJUSTMENT
AutoCAD SHX Text
U.V.
AutoCAD SHX Text
R.O.
AutoCAD SHX Text
UV DISINFECTION SYSTEM
AutoCAD SHX Text
(DUTY AND STANDBY)
AutoCAD SHX Text
MBR TANK
AutoCAD SHX Text
GREY WATER TREATMENT PLANT
AutoCAD SHX Text
GREY WATER TREATMENT PLANT
AutoCAD SHX Text
REVERSE OSMOSIS
AutoCAD SHX Text
CONTROL PANEL
AutoCAD SHX Text
SFL 3.60
AutoCAD SHX Text
SFL 1.30
AutoCAD SHX Text
LIFT PIT
AutoCAD SHX Text
UNDERGROUND RETENTION TANK (AREA = 19 SQ.M) (INTERNAL DEPTH=2.4M) (ASSUME=4HRS PEAK FLOW
AutoCAD SHX Text
EX. 6.03
AutoCAD SHX Text
FFL 5.40
AutoCAD SHX Text
SUBMERSIBLE TRANSFER PUMP
AutoCAD SHX Text
(DUTY AND STANDBY)
AutoCAD SHX Text
UNDERGROUND RETENTION TANK
AutoCAD SHX Text
UNDERGROUND SLUDGE
AutoCAD SHX Text
HOLDING TANK
AutoCAD SHX Text
SFL 3.90
AutoCAD SHX Text
UNDERGROUND RETENTION TANK (AREA = 19 SQ.M) (INTERNAL DEPTH=2.4M) (ASSUME=4HRS PEAK FLOW
AutoCAD SHX Text
UNDERGROUND SLUDGE HOLDING TANK (AREA = 11 SQ.M) (INTERNAL DEPTH=2.0M)
AutoCAD SHX Text
EX. 5.27
AutoCAD SHX Text
EX. 5.29
AutoCAD SHX Text
EX. 5.22
AutoCAD SHX Text
EX. 5.60
AutoCAD SHX Text
EX. 5.62
AutoCAD SHX Text
EX. 5.68
AutoCAD SHX Text
FFL 5.40
AutoCAD SHX Text
TAM KON CHAU ROAD
AutoCAD SHX Text
D
AutoCAD SHX Text
C
AutoCAD SHX Text
SUBMERSIBLE TRANSFER PUMP
AutoCAD SHX Text
(DUTY AND STANDBY)
AutoCAD SHX Text
UNDERGROUND GREY WATER TANK
AutoCAD SHX Text
APPROVED BY
AutoCAD SHX Text
REV.
AutoCAD SHX Text
CHECKED BY
AutoCAD SHX Text
DATE
AutoCAD SHX Text
Project Ref
AutoCAD SHX Text
File Name :
AutoCAD SHX Text
Signature for Submission/Construction
AutoCAD SHX Text
Scale :
AutoCAD SHX Text
The copyright of this drawing remains with the Architect.
AutoCAD SHX Text
This drawing is not valid for construction purposes unless
AutoCAD SHX Text
F.S.D. Ref:
AutoCAD SHX Text
B.D. Ref:
AutoCAD SHX Text
Notes & Legend
AutoCAD SHX Text
Do not scale from drawings.
AutoCAD SHX Text
expressedly certified.
AutoCAD SHX Text
All measurements must be verified on site.
AutoCAD SHX Text
World Wide Fund for Nature Hong Kong
AutoCAD SHX Text
15/F, Manhattan Centre,
AutoCAD SHX Text
8 Kwai Cheong Road, Kwai Chung
AutoCAD SHX Text
New Territories, Hong Kong
AutoCAD SHX Text
TEL : 2526 1011
AutoCAD SHX Text
FAX : 2845 2764
AutoCAD SHX Text
Faithful and Gould
AutoCAD SHX Text
13/F, Wharf T&T Centre,
AutoCAD SHX Text
Tsim Sha Tsui,
AutoCAD SHX Text
Hong Kong
AutoCAD SHX Text
TEL : 2972 1118
AutoCAD SHX Text
FAX : 3827 7070
AutoCAD SHX Text
AECOM Asia Company Limited
AutoCAD SHX Text
20/F, Grand Central Plaza, Tower 2,
AutoCAD SHX Text
138 Shatin Rural Committee Road,
AutoCAD SHX Text
Shatin, Hong Kong
AutoCAD SHX Text
TEL : 3922 9000
AutoCAD SHX Text
FAX : 3922 9797
AutoCAD SHX Text
Urbis Limited
AutoCAD SHX Text
11/F Siu On Centre,
AutoCAD SHX Text
188 Lockhart Road,
AutoCAD SHX Text
Wan Chai, Hong Kong
AutoCAD SHX Text
TEL : 2802 3333
AutoCAD SHX Text
FAX : 2802 8662
AutoCAD SHX Text
Parsons Brinckerhoff (Asia) Limited
AutoCAD SHX Text
7/F One Kowloon,
AutoCAD SHX Text
1 Wang Yuen Street,
AutoCAD SHX Text
Kowloon Bay, Hong Kong
AutoCAD SHX Text
TEL : 2528 3031
AutoCAD SHX Text
FAX : 2268 3740
AutoCAD SHX Text
Thomas Chow Architects Limited
AutoCAD SHX Text
Rm 1311, Eastern Harbour Centre
AutoCAD SHX Text
28 Hoi Chak Street, Quarry Bay
AutoCAD SHX Text
Hong Kong
AutoCAD SHX Text
TEL : 2527 8108
AutoCAD SHX Text
FAX : 2527 8813
AutoCAD SHX Text
Lead Design Consultant
AutoCAD SHX Text
Client
AutoCAD SHX Text
Project Manager
AutoCAD SHX Text
Civil, Structural, Geotechnical Engineering Consultant
AutoCAD SHX Text
Landscape Design Consultant
AutoCAD SHX Text
AV / ICT / Security System Consultant
AutoCAD SHX Text
Aurecon Hong Kong Limited
AutoCAD SHX Text
Building Services Engineering Consultant
AutoCAD SHX Text
Firefly Lighting Design (China) Ltd
AutoCAD SHX Text
Unit B, 17/F, Kay Kwong Commercial Building,
AutoCAD SHX Text
332-334 Lockhart Road,
AutoCAD SHX Text
Wan Chai, Hong Kong
AutoCAD SHX Text
TEL : 2528 3031
AutoCAD SHX Text
FAX : 2268 3740
AutoCAD SHX Text
Interior & Exterior Lighting Design Consultant
AutoCAD SHX Text
mksA (HK) Ltd
AutoCAD SHX Text
8/F Yick Shing Building
AutoCAD SHX Text
238 Lockhart Rd,
AutoCAD SHX Text
Wanchai, Hong Kong
AutoCAD SHX Text
TEL : 2528 3031
AutoCAD SHX Text
FAX : 2268 3740
AutoCAD SHX Text
Acoustic Consultant
AutoCAD SHX Text
2205-2206, 22/F Island Place Tower,
AutoCAD SHX Text
510 King's Road,
AutoCAD SHX Text
North Point, Hong Kong
AutoCAD SHX Text
TEL : 3664 6888
AutoCAD SHX Text
FAX : 3664 6999
AutoCAD SHX Text
MAI PO NATURE RESERVE INFRASTRUCTURE UPGRADE PROJECT PROPOSED PETER SCOTT FIELD STUDIES CENTRE AT D.D. 101, MAI PO (FACILITY OUTSIDE NATURE RESERVE)
AutoCAD SHX Text
253876
AutoCAD SHX Text
0
AutoCAD SHX Text
02-2020
AutoCAD SHX Text
SP
AutoCAD SHX Text
FL
AutoCAD SHX Text
%%UWATER TANK FOR STP
AutoCAD SHX Text
MAI PO NATURE RESERVE INFRASTRUCTURE UPGRADE PROJECT PROPOSED PETER SCOTT FIELD STUDIES CENTRE AT D.D. 101, MAI PO (FACILITY OUTSIDE NATURE RESERVE)
AutoCAD SHX Text
SEWAGE TREATMENT PLANT & GREY WATER TREATMENT PLANT INSTALLATION G/F LAYOUT PLAN
AutoCAD SHX Text
253876-DW-STP-201
AutoCAD SHX Text
253876
AutoCAD SHX Text
1:100@A1
AutoCAD SHX Text
%%UPLAN PLAN OF UNDERGROUND
AutoCAD SHX Text
%%UWATER TANK FOR GTP
AutoCAD SHX Text
%%UPLAN PLAN OF UNDERGROUND
Page 409: TENDER DOCUMENTS · schedule no. 1 – preliminaries sr1/1 – sr1 sum/1 schedule no. 2 – preambles sr2/1 – sr2/72 schedule no. 3 – sewage treatment plant system sr3/1 – sr3

L i m i t e d

AutoCAD SHX Text
B5
AutoCAD SHX Text
B4
AutoCAD SHX Text
B2
AutoCAD SHX Text
B1
AutoCAD SHX Text
A4
AutoCAD SHX Text
A5
AutoCAD SHX Text
A7
AutoCAD SHX Text
A6
AutoCAD SHX Text
B3
AutoCAD SHX Text
A3
AutoCAD SHX Text
A2
AutoCAD SHX Text
A1
AutoCAD SHX Text
A8
AutoCAD SHX Text
MULTI-PURPOSE ROOM 2(MV/AL) (MV/AL) U.F.A. = 117.932 SQ.M 117.932 SQ.M SQ.M NO. OF P = 60 P.
AutoCAD SHX Text
SFL 10.55
AutoCAD SHX Text
FFL 10.60
AutoCAD SHX Text
SFL 10.55
AutoCAD SHX Text
FFL 10.60
AutoCAD SHX Text
SFL 10.55
AutoCAD SHX Text
FFL 10.60
AutoCAD SHX Text
SFL 10.55
AutoCAD SHX Text
FFL 10.60
AutoCAD SHX Text
SFL 10.40
AutoCAD SHX Text
FFL 10.45
AutoCAD SHX Text
SFL 10.55
AutoCAD SHX Text
FFL 10.60
AutoCAD SHX Text
SFL 10.10
AutoCAD SHX Text
FFL 10.15
AutoCAD SHX Text
SFL 10.55
AutoCAD SHX Text
FFL 10.60
AutoCAD SHX Text
SFL 8.45
AutoCAD SHX Text
FFL 8.50
AutoCAD SHX Text
SFL 8.90
AutoCAD SHX Text
FFL 8.95
AutoCAD SHX Text
SFL 8.90
AutoCAD SHX Text
FFL 8.95
AutoCAD SHX Text
SFL 10.55
AutoCAD SHX Text
FFL 10.60
AutoCAD SHX Text
SFL 9.35
AutoCAD SHX Text
FFL 9.40
AutoCAD SHX Text
J
AutoCAD SHX Text
H
AutoCAD SHX Text
G
AutoCAD SHX Text
K
AutoCAD SHX Text
L
AutoCAD SHX Text
M
AutoCAD SHX Text
N
AutoCAD SHX Text
SFL 10.55
AutoCAD SHX Text
FFL 10.60
AutoCAD SHX Text
HR
AutoCAD SHX Text
EXIT
AutoCAD SHX Text
EXIT
AutoCAD SHX Text
EXIT
AutoCAD SHX Text
EXIT
AutoCAD SHX Text
SFL 9.65
AutoCAD SHX Text
FFL 9.70
AutoCAD SHX Text
VIEWING DECK
AutoCAD SHX Text
ACCESSIBLE LIFT
AutoCAD SHX Text
GUEST ROOM 9 U.F.A. = 22.812 SQ.M 22.812 SQ.M SQ.M NO. OF P = 2P. (SAY)
AutoCAD SHX Text
-/60/60 F.R.R. GLASS DOOR
AutoCAD SHX Text
ST-2
AutoCAD SHX Text
INTERNAL STAIRCASE
AutoCAD SHX Text
BUILDING LINE ABOVE
AutoCAD SHX Text
DECK LEVEL +10.60
AutoCAD SHX Text
BEVERAGE STORE
AutoCAD SHX Text
SHELF
AutoCAD SHX Text
WORKBENCH
AutoCAD SHX Text
SKYLIGHT ABOVE
AutoCAD SHX Text
DN 32R
AutoCAD SHX Text
DN 32R
AutoCAD SHX Text
ACCESSIBLE BATHROOM (MV/AL)
AutoCAD SHX Text
BATHROOM (MV/AL)
AutoCAD SHX Text
BATHROOM (MV/AL)
AutoCAD SHX Text
BATHROOM (MV/AL)
AutoCAD SHX Text
GUEST ROOM 6 U.F.A. = 23.356 SQ.M 23.356 SQ.M SQ.M NO. OF P = 2P. (SAY)
AutoCAD SHX Text
GUEST ROOM 8 U.F.A. = 23.843 SQ.M 23.843 SQ.M SQ.M NO. OF P = 2P. (SAY)
AutoCAD SHX Text
ACCESSIBLE GUEST ROOM 7 U.F.A. = 26.093 SQ.M 26.093 SQ.M SQ.M NO. OF P = 2P. (SAY)
AutoCAD SHX Text
ACCESSIBLE GUEST ROOM 4 U.F.A. = 27.554 SQ.M 27.554 SQ.M SQ.M NO. OF P = 2P. (SAY)
AutoCAD SHX Text
GUEST ROOM 3 U.F.A. = 23.096 SQ.M 23.096 SQ.M SQ.M NO. OF P = 2P. (SAY)
AutoCAD SHX Text
GUEST ROOM 5 U.F.A. = 22.598 SQ.M 22.598 SQ.M SQ.M NO. OF P = 2P. (SAY)
AutoCAD SHX Text
GUEST ROOM 2 U.F.A. = 21.687 SQ.M 21.687 SQ.M SQ.M NO. OF P = 2P. (SAY)
AutoCAD SHX Text
GUEST ROOM 1 U.F.A. = 23.415 SQ.M 23.415 SQ.M SQ.M NO. OF P = 2P. (SAY)
AutoCAD SHX Text
SWITCH ROOM U.F.A. = 27.761 SQ.M27.761 SQ.M SQ.M
AutoCAD SHX Text
LOBBY U.F.A. = 33.995 SQ.M33.995 SQ.M SQ.M
AutoCAD SHX Text
LAUNDRY(MV/AL) (MV/AL) U.F.A. = 7.570 SQ.M 7.570 SQ.M SQ.M NO. OF P = 1P
AutoCAD SHX Text
HOUSEKEEPING U.F.A. = 23.372 SQ.M 23.372 SQ.M SQ.M NO. OF P = 1P
AutoCAD SHX Text
STORE 6 U.F.A. = 16.410 SQ.M 16.410 SQ.M SQ.M NO. OF P = 1P
AutoCAD SHX Text
M.TOILET(MV/AL) (MV/AL) U.F.A. = 7.815 SQ.M7.815 SQ.M SQ.M
AutoCAD SHX Text
SHOWER (MV/AL)
AutoCAD SHX Text
F.TOILET (MV/AL) (MV/AL) U.F.A. = 9.100 SQ.M9.100 SQ.M SQ.M
AutoCAD SHX Text
ACCESSIBLE TOILET (MV/AL)
AutoCAD SHX Text
PANTRY U.F.A. = 9.783 SQ.M 9.783 SQ.M SQ.M NO. OF P = 1P
AutoCAD SHX Text
STORE 7 U.F.A. = 4.431 SQ.M 4.431 SQ.M SQ.M NO. OF P = 1P
AutoCAD SHX Text
F.S. DUCT
AutoCAD SHX Text
PIPE DUCT
AutoCAD SHX Text
ELECT. DUCT
AutoCAD SHX Text
F.S. DUCT
AutoCAD SHX Text
PIPE DUCT
AutoCAD SHX Text
DUMB WAITER
AutoCAD SHX Text
CORRIDOR
AutoCAD SHX Text
LOUNGE U.F.A. = 58.015 SQ.M58.015 SQ.M SQ.M
AutoCAD SHX Text
VOID
AutoCAD SHX Text
-/60/60 F.R.R. GLASS WINDOW
AutoCAD SHX Text
ST-1
AutoCAD SHX Text
ST-3
AutoCAD SHX Text
UP 26R
AutoCAD SHX Text
T.R.S.
AutoCAD SHX Text
DN 32R
AutoCAD SHX Text
UP 24R
AutoCAD SHX Text
SKYLIGHT ABOVE
AutoCAD SHX Text
SKYLIGHT ABOVE
AutoCAD SHX Text
FIXED WINDOW GLASS
AutoCAD SHX Text
GLASS WALL WITH G.M.S. SUPPORT
AutoCAD SHX Text
SINK
AutoCAD SHX Text
3mm THK. ALUM. CLADDING WITH G.M.S. SUPPORT
AutoCAD SHX Text
ALUM. PANEL CLADDING WITH G.M.S. SUPPORT
AutoCAD SHX Text
4.5KG CO2 FE
AutoCAD SHX Text
F.H.
AutoCAD SHX Text
F.H.
AutoCAD SHX Text
P.D.
AutoCAD SHX Text
P.D.
AutoCAD SHX Text
STONE CLADDING WITH G.M.S. SUPPORT
AutoCAD SHX Text
P.D.
AutoCAD SHX Text
P.D.
AutoCAD SHX Text
SKYLIGHT ABOVE
AutoCAD SHX Text
STONE CLADDING WITH G.M.S. SUPPORT
AutoCAD SHX Text
-/120/- F.R.R. LIFT DOOR
AutoCAD SHX Text
-/120/- F.R.R. LIFT DOOR
AutoCAD SHX Text
MIN. 1100H. R.C. PARAPET
AutoCAD SHX Text
BATHROOM (MV/AL)
AutoCAD SHX Text
BATHROOM (MV/AL)
AutoCAD SHX Text
BATHROOM (MV/AL)
AutoCAD SHX Text
ACCESSIBLE BATHROOM (MV/AL)
AutoCAD SHX Text
BATHROOM (MV/AL)
AutoCAD SHX Text
P.D.
AutoCAD SHX Text
P.D.
AutoCAD SHX Text
-/60/60 F.R.R. GLASS WINDOW
AutoCAD SHX Text
ELECT.DUCT
AutoCAD SHX Text
SHELVES
AutoCAD SHX Text
SHELVES
AutoCAD SHX Text
HIGH TABLE
AutoCAD SHX Text
SHELVES
AutoCAD SHX Text
SFL 10.55
AutoCAD SHX Text
FFL 10.60
AutoCAD SHX Text
SFL 10.55
AutoCAD SHX Text
FFL 10.60
AutoCAD SHX Text
HR
AutoCAD SHX Text
EXIT
AutoCAD SHX Text
SFL 10.55
AutoCAD SHX Text
FFL 10.60
AutoCAD SHX Text
NOTE:
AutoCAD SHX Text
ALL SOIL AND WASTE WATER COLLECTED WILL BE TREATED BY THE SEWAGE
AutoCAD SHX Text
TREATMENT PLANT.
AutoCAD SHX Text
*
AutoCAD SHX Text
UNLESS OTHERWISE SPECIFIED IN DRAWINGS AND/OR SPECIFICATION, DRAINAGE
AutoCAD SHX Text
*
AutoCAD SHX Text
PIPEWORK FROM EH SANITARY FITMENTS TO THE UNDERGROUND TANKS OF SEWAGE
AutoCAD SHX Text
TREATMENT SYSTEM AND GREY WATER TREATMENT SYSTEM TO BE DONE BY OTHERS.
AutoCAD SHX Text
THIS DRAWING IS FOR REFERNCE ONLY.
AutoCAD SHX Text
*
AutoCAD SHX Text
%%C50 EFFLUENT PUMPED PIPE
AutoCAD SHX Text
F/B T/A
AutoCAD SHX Text
WASTE WATER FROM THE SANITARY FITMENTS
AutoCAD SHX Text
SHALL BE TREATED BY GREY WATER TREATMENT PLANT.
AutoCAD SHX Text
(DRAINAGE PIPEWORKS BY OTHERS.)
AutoCAD SHX Text
B4
AutoCAD SHX Text
B2
AutoCAD SHX Text
B1
AutoCAD SHX Text
A4
AutoCAD SHX Text
A5
AutoCAD SHX Text
A7
AutoCAD SHX Text
A6
AutoCAD SHX Text
B3
AutoCAD SHX Text
A3
AutoCAD SHX Text
A2
AutoCAD SHX Text
A1
AutoCAD SHX Text
A8
AutoCAD SHX Text
FLAT ROOF
AutoCAD SHX Text
+15.70
AutoCAD SHX Text
TOP OF PARAPET
AutoCAD SHX Text
+13.70
AutoCAD SHX Text
+15.65
AutoCAD SHX Text
TOP LEVEL
AutoCAD SHX Text
SFL 14.45
AutoCAD SHX Text
FFL 14.50
AutoCAD SHX Text
SFL 14.45
AutoCAD SHX Text
FFL 14.50
AutoCAD SHX Text
TANK SFL 14.45
AutoCAD SHX Text
TANK FFL 14.50
AutoCAD SHX Text
SFL 14.15
AutoCAD SHX Text
FFL 14.35
AutoCAD SHX Text
SFL 12.95
AutoCAD SHX Text
FFL 13.00
AutoCAD SHX Text
SFL 14.15
AutoCAD SHX Text
FFL 14.35
AutoCAD SHX Text
+14.60
AutoCAD SHX Text
TOP OF SOIL
AutoCAD SHX Text
+15.25
AutoCAD SHX Text
+15.70
AutoCAD SHX Text
TOP LEVEL
AutoCAD SHX Text
+15.70
AutoCAD SHX Text
TOP LEVEL
AutoCAD SHX Text
SFL 13.40
AutoCAD SHX Text
FFL 13.45
AutoCAD SHX Text
SFL 11.75
AutoCAD SHX Text
FFL 11.80
AutoCAD SHX Text
SFL 12.20
AutoCAD SHX Text
FFL 12.25
AutoCAD SHX Text
+14.70
AutoCAD SHX Text
TOP LEVEL
AutoCAD SHX Text
SFL 14.15
AutoCAD SHX Text
FFL 14.20
AutoCAD SHX Text
SFL 14.15
AutoCAD SHX Text
FFL 14.20
AutoCAD SHX Text
SFL 14.15
AutoCAD SHX Text
FFL 14.20
AutoCAD SHX Text
SFL 14.15
AutoCAD SHX Text
FFL 14.20
AutoCAD SHX Text
SFL 14.15
AutoCAD SHX Text
FFL 14.20
AutoCAD SHX Text
J
AutoCAD SHX Text
K
AutoCAD SHX Text
L
AutoCAD SHX Text
M
AutoCAD SHX Text
N
AutoCAD SHX Text
HR
AutoCAD SHX Text
SFL 14.70
AutoCAD SHX Text
TOP OF GLASS
AutoCAD SHX Text
+14.60
AutoCAD SHX Text
TOP OF SOIL
AutoCAD SHX Text
+14.60
AutoCAD SHX Text
TOP OF SOIL
AutoCAD SHX Text
+14.70
AutoCAD SHX Text
TOP LEVEL
AutoCAD SHX Text
+14.60
AutoCAD SHX Text
TOP OF SOIL
AutoCAD SHX Text
+14.70
AutoCAD SHX Text
TOP LEVEL
AutoCAD SHX Text
+15.70
AutoCAD SHX Text
TOP OF PARAPET
AutoCAD SHX Text
+14.60
AutoCAD SHX Text
TOP OF SOIL
AutoCAD SHX Text
SFL 14.70
AutoCAD SHX Text
TOP OF GLASS
AutoCAD SHX Text
+14.60
AutoCAD SHX Text
TOP OF SOIL
AutoCAD SHX Text
(MAINTENANCE ROOF)
AutoCAD SHX Text
CAT LADDER
AutoCAD SHX Text
ONE COURSE OF ROOFING TILE ON INSULATION ON WATERPROOFING MEMBRANE ON CEMENT SAND SCREEDING LAID TO FALL
AutoCAD SHX Text
INACCESSIBLE ROOF
AutoCAD SHX Text
245 CU.M STREET FIRE HYDRANT WATER TANK (AREA = 88.608 SQ.M) 88.608 SQ.M) SQ.M) (WATER DEPTH=3.0M) (ASSUME=4HRS PEAK FLOW
AutoCAD SHX Text
CAT LADDER
AutoCAD SHX Text
ELECT. DUCT
AutoCAD SHX Text
1000x1000 ACCESS HATCH
AutoCAD SHX Text
36m F.S. 3 F.S. WATER TANK (AREA = ###### SQ.M) ###### SQ.M) SQ.M) (2.0M DEPTH WATER)
AutoCAD SHX Text
SINK
AutoCAD SHX Text
M.L.
AutoCAD SHX Text
STREET FIRE HYDRANT WATER TANK & PUMP ROOM (AREA = 18.935 SQ.M)18.935 SQ.M) SQ.M)
AutoCAD SHX Text
POTABLE & FLUSHING WATER TANK & PUMP ROOM (AREA = 40.041 SQ.M)40.041 SQ.M) SQ.M)
AutoCAD SHX Text
ST-2
AutoCAD SHX Text
INTERNAL STAIRCASE
AutoCAD SHX Text
PIPE DUCT ROOM (AREA = 3.023 SQ.M) SQ.M)
AutoCAD SHX Text
WATER METER CABINET 3
AutoCAD SHX Text
LIFT OVERRUN
AutoCAD SHX Text
PROTECTED CORRIDOR
AutoCAD SHX Text
DN 26R
AutoCAD SHX Text
DN 2R
AutoCAD SHX Text
ST-3
AutoCAD SHX Text
DN 24R
AutoCAD SHX Text
PIPE DUCT
AutoCAD SHX Text
INVERTED BEAM
AutoCAD SHX Text
M.L.
AutoCAD SHX Text
M.L.
AutoCAD SHX Text
DECK LEVEL 14.50
AutoCAD SHX Text
4.5KG CO2 FE
AutoCAD SHX Text
4.5KG CO2 FE
AutoCAD SHX Text
4.5KG CO2 FE
AutoCAD SHX Text
SKYLIGHT
AutoCAD SHX Text
F.H.
AutoCAD SHX Text
SKYLIGHT
AutoCAD SHX Text
DECK LEVEL 14.50
AutoCAD SHX Text
SINK
AutoCAD SHX Text
SINK
AutoCAD SHX Text
P.A.
AutoCAD SHX Text
P.A.
AutoCAD SHX Text
P.A.
AutoCAD SHX Text
P.A.
AutoCAD SHX Text
P.A.
AutoCAD SHX Text
P.A.
AutoCAD SHX Text
P.A.
AutoCAD SHX Text
P.A.
AutoCAD SHX Text
WINDOW GLASS
AutoCAD SHX Text
350H R.C. PLINTH
AutoCAD SHX Text
350H R.C. PLINTH
AutoCAD SHX Text
P.A.
AutoCAD SHX Text
P.A.
AutoCAD SHX Text
P.A.
AutoCAD SHX Text
P.A.
AutoCAD SHX Text
P.A.
AutoCAD SHX Text
DUMBWAITER OVERRUN
AutoCAD SHX Text
150H R.C. KERB
AutoCAD SHX Text
300x100 ARCHI. FINS
AutoCAD SHX Text
4.5KG CO2 FE
AutoCAD SHX Text
1150
AutoCAD SHX Text
EXIT
AutoCAD SHX Text
EXIT
AutoCAD SHX Text
4.5KG CO2 FE
AutoCAD SHX Text
%%C50 EFFLUENT PUMPED PIPE
AutoCAD SHX Text
F/B TURN AT L/L
AutoCAD SHX Text
FLUSHING WATER MIXING TANK
AutoCAD SHX Text
(BY OTHERS)
AutoCAD SHX Text
%%C50 EFFLUENT PUMPED PIPE
AutoCAD SHX Text
%%C50 EFFLUENT PUMPED PIPE
AutoCAD SHX Text
AT L/L & TURN AT H/L
AutoCAD SHX Text
%%UT TO B
AutoCAD SHX Text
APPROVED BY
AutoCAD SHX Text
REV.
AutoCAD SHX Text
CHECKED BY
AutoCAD SHX Text
DATE
AutoCAD SHX Text
Project Ref
AutoCAD SHX Text
File Name :
AutoCAD SHX Text
Signature for Submission/Construction
AutoCAD SHX Text
Scale :
AutoCAD SHX Text
The copyright of this drawing remains with the Architect.
AutoCAD SHX Text
This drawing is not valid for construction purposes unless
AutoCAD SHX Text
F.S.D. Ref:
AutoCAD SHX Text
B.D. Ref:
AutoCAD SHX Text
Notes & Legend
AutoCAD SHX Text
Do not scale from drawings.
AutoCAD SHX Text
expressedly certified.
AutoCAD SHX Text
All measurements must be verified on site.
AutoCAD SHX Text
World Wide Fund for Nature Hong Kong
AutoCAD SHX Text
15/F, Manhattan Centre,
AutoCAD SHX Text
8 Kwai Cheong Road, Kwai Chung
AutoCAD SHX Text
New Territories, Hong Kong
AutoCAD SHX Text
TEL : 2526 1011
AutoCAD SHX Text
FAX : 2845 2764
AutoCAD SHX Text
Faithful and Gould
AutoCAD SHX Text
13/F, Wharf T&T Centre,
AutoCAD SHX Text
Tsim Sha Tsui,
AutoCAD SHX Text
Hong Kong
AutoCAD SHX Text
TEL : 2972 1118
AutoCAD SHX Text
FAX : 3827 7070
AutoCAD SHX Text
AECOM Asia Company Limited
AutoCAD SHX Text
20/F, Grand Central Plaza, Tower 2,
AutoCAD SHX Text
138 Shatin Rural Committee Road,
AutoCAD SHX Text
Shatin, Hong Kong
AutoCAD SHX Text
TEL : 3922 9000
AutoCAD SHX Text
FAX : 3922 9797
AutoCAD SHX Text
Urbis Limited
AutoCAD SHX Text
11/F Siu On Centre,
AutoCAD SHX Text
188 Lockhart Road,
AutoCAD SHX Text
Wan Chai, Hong Kong
AutoCAD SHX Text
TEL : 2802 3333
AutoCAD SHX Text
FAX : 2802 8662
AutoCAD SHX Text
Parsons Brinckerhoff (Asia) Limited
AutoCAD SHX Text
7/F One Kowloon,
AutoCAD SHX Text
1 Wang Yuen Street,
AutoCAD SHX Text
Kowloon Bay, Hong Kong
AutoCAD SHX Text
TEL : 2528 3031
AutoCAD SHX Text
FAX : 2268 3740
AutoCAD SHX Text
Thomas Chow Architects Limited
AutoCAD SHX Text
Rm 1311, Eastern Harbour Centre
AutoCAD SHX Text
28 Hoi Chak Street, Quarry Bay
AutoCAD SHX Text
Hong Kong
AutoCAD SHX Text
TEL : 2527 8108
AutoCAD SHX Text
FAX : 2527 8813
AutoCAD SHX Text
Lead Design Consultant
AutoCAD SHX Text
Client
AutoCAD SHX Text
Project Manager
AutoCAD SHX Text
Civil, Structural, Geotechnical Engineering Consultant
AutoCAD SHX Text
Landscape Design Consultant
AutoCAD SHX Text
AV / ICT / Security System Consultant
AutoCAD SHX Text
Aurecon Hong Kong Limited
AutoCAD SHX Text
Building Services Engineering Consultant
AutoCAD SHX Text
Firefly Lighting Design (China) Ltd
AutoCAD SHX Text
Unit B, 17/F, Kay Kwong Commercial Building,
AutoCAD SHX Text
332-334 Lockhart Road,
AutoCAD SHX Text
Wan Chai, Hong Kong
AutoCAD SHX Text
TEL : 2528 3031
AutoCAD SHX Text
FAX : 2268 3740
AutoCAD SHX Text
Interior & Exterior Lighting Design Consultant
AutoCAD SHX Text
mksA (HK) Ltd
AutoCAD SHX Text
8/F Yick Shing Building
AutoCAD SHX Text
238 Lockhart Rd,
AutoCAD SHX Text
Wanchai, Hong Kong
AutoCAD SHX Text
TEL : 2528 3031
AutoCAD SHX Text
FAX : 2268 3740
AutoCAD SHX Text
Acoustic Consultant
AutoCAD SHX Text
2205-2206, 22/F Island Place Tower,
AutoCAD SHX Text
510 King's Road,
AutoCAD SHX Text
North Point, Hong Kong
AutoCAD SHX Text
TEL : 3664 6888
AutoCAD SHX Text
FAX : 3664 6999
AutoCAD SHX Text
MAI PO NATURE RESERVE INFRASTRUCTURE UPGRADE PROJECT PROPOSED PETER SCOTT FIELD STUDIES CENTRE AT D.D. 101, MAI PO (FACILITY OUTSIDE NATURE RESERVE)
AutoCAD SHX Text
253876
AutoCAD SHX Text
0
AutoCAD SHX Text
02-2020
AutoCAD SHX Text
SP
AutoCAD SHX Text
FL
AutoCAD SHX Text
MAI PO NATURE RESERVE INFRASTRUCTURE UPGRADE PROJECT PROPOSED PETER SCOTT FIELD STUDIES CENTRE AT D.D. 101, MAI PO (FACILITY OUTSIDE NATURE RESERVE)
AutoCAD SHX Text
SEWAGE TREATMENT PLANT & GREY WATER TREATMENT PLANT INSTALLATION 1/F LAYOUT PLAN
AutoCAD SHX Text
253876-DW-STP-202
AutoCAD SHX Text
253876
AutoCAD SHX Text
1:100@A1
Page 410: TENDER DOCUMENTS · schedule no. 1 – preliminaries sr1/1 – sr1 sum/1 schedule no. 2 – preambles sr2/1 – sr2/72 schedule no. 3 – sewage treatment plant system sr3/1 – sr3

100m LONG (5m POTENTIAL DIFFERENCE)

L i m i t e d

AutoCAD SHX Text
1/F
AutoCAD SHX Text
SW
AutoCAD SHX Text
AIR
AutoCAD SHX Text
BALL VALVE
AutoCAD SHX Text
CHECK VALVE
AutoCAD SHX Text
GATE VALVE
AutoCAD SHX Text
BUTTERFLY VALVE
AutoCAD SHX Text
VARIABLE SPEED DRIVE
AutoCAD SHX Text
FLOW SWITCH
AutoCAD SHX Text
FLEXIBLE JOINT
AutoCAD SHX Text
CHEMICAL PORT
AutoCAD SHX Text
REDUCER
AutoCAD SHX Text
SAMPLING POINT
AutoCAD SHX Text
SILENCER
AutoCAD SHX Text
ELECTROMAGNETIC FLOWMETER
AutoCAD SHX Text
PRESSURE TRANSMITTER
AutoCAD SHX Text
LOW LEVEL ALARM
AutoCAD SHX Text
CHEMICAL DOSING PUMP
AutoCAD SHX Text
%%UAIR BLOWER
AutoCAD SHX Text
ROTAMETER
AutoCAD SHX Text
GLASS REINFORCED PLASTIC
AutoCAD SHX Text
LEVEL SENSING EQUIPMENT
AutoCAD SHX Text
INSTRUMENT FOR DISSOLVED OXYGEN MEASUREMENT
AutoCAD SHX Text
3" STANESS STEEL316 CAM & GROOVE COUPLING TO CONNECT TANKER
AutoCAD SHX Text
PRESSURE RELIEF VALVE
AutoCAD SHX Text
HIGH LEVEL ALARM
AutoCAD SHX Text
POLYETHYLENE
AutoCAD SHX Text
CHEMICAL DOSING PUMP
AutoCAD SHX Text
PRESSURE GAUGE WITH COCK
AutoCAD SHX Text
PRESSURE GAUGE
AutoCAD SHX Text
%%ULEGEND
AutoCAD SHX Text
%%UFINE SCREEN CHAMBER
AutoCAD SHX Text
FLOW MEASURING APPARATUS
AutoCAD SHX Text
(FOR DETAILS, SEE DETAIL 'A')
AutoCAD SHX Text
(P2)
AutoCAD SHX Text
(P1)
AutoCAD SHX Text
%%UCHEMICAL STORAGE TANK (PE)
AutoCAD SHX Text
SCREEN
AutoCAD SHX Text
PENSTOCK (P1 & P2)
AutoCAD SHX Text
PERMEATE PUMP (PP)
AutoCAD SHX Text
AIR BLOWER (1 DUTY & 1 STANDBY)
AutoCAD SHX Text
AIR BLOWER (AB)
AutoCAD SHX Text
SUBMERSIBLE AIR EJECTOR (SAE1 & SAE2)
AutoCAD SHX Text
(CS)
AutoCAD SHX Text
(CS)
AutoCAD SHX Text
MANUAL COARSE BAR SCREEN
AutoCAD SHX Text
AUTO MECHANICAL RAKED COARSE BAR SCREEN
AutoCAD SHX Text
MANUAL FINE BAR SCREEN
AutoCAD SHX Text
EFFLUENT DISCHARGE PIPE
AutoCAD SHX Text
(FS)
AutoCAD SHX Text
(FS)
AutoCAD SHX Text
(AB)
AutoCAD SHX Text
(AB)
AutoCAD SHX Text
pH SENSOR
AutoCAD SHX Text
SOLENOID VALVE
AutoCAD SHX Text
TURBIDITY SENSOR
AutoCAD SHX Text
MEMBRANE MODULE
AutoCAD SHX Text
C
AutoCAD SHX Text
P
AutoCAD SHX Text
C
AutoCAD SHX Text
REINFORCED CONCRETE
AutoCAD SHX Text
MIXED LIQUOR PUMP (MLP)
AutoCAD SHX Text
M
AutoCAD SHX Text
FM
AutoCAD SHX Text
M
AutoCAD SHX Text
PI
AutoCAD SHX Text
SW-100-DI
AutoCAD SHX Text
SW-100-DI
AutoCAD SHX Text
CH-20-PVC
AutoCAD SHX Text
CH-20-PVC
AutoCAD SHX Text
DRIP TRAY
AutoCAD SHX Text
TW-50-PVC
AutoCAD SHX Text
AIR-100-SS
AutoCAD SHX Text
SW-100-DI
AutoCAD SHX Text
TW-100-DI
AutoCAD SHX Text
SL-200-DI
AutoCAD SHX Text
PT
AutoCAD SHX Text
DO
AutoCAD SHX Text
LL
AutoCAD SHX Text
H
AutoCAD SHX Text
VSD
AutoCAD SHX Text
FS
AutoCAD SHX Text
pH
AutoCAD SHX Text
RC
AutoCAD SHX Text
GRP
AutoCAD SHX Text
FMA
AutoCAD SHX Text
HL
AutoCAD SHX Text
PE
AutoCAD SHX Text
LL
AutoCAD SHX Text
H
AutoCAD SHX Text
PT
AutoCAD SHX Text
PI
AutoCAD SHX Text
HL
AutoCAD SHX Text
AIR-100-SS
AutoCAD SHX Text
AIR-100-SS
AutoCAD SHX Text
FMA
AutoCAD SHX Text
HL
AutoCAD SHX Text
HL
AutoCAD SHX Text
HL
AutoCAD SHX Text
VSD
AutoCAD SHX Text
VSD
AutoCAD SHX Text
OVERFLOW TO
AutoCAD SHX Text
RETENTION TANK
AutoCAD SHX Text
M
AutoCAD SHX Text
RC
AutoCAD SHX Text
FLOW METER
AutoCAD SHX Text
FM
AutoCAD SHX Text
OVERFLOW TO
AutoCAD SHX Text
RETENTION TANK
AutoCAD SHX Text
LL
AutoCAD SHX Text
DRIP TRAY
AutoCAD SHX Text
SODIUM HYPOCHLORITE
AutoCAD SHX Text
DOSING SYSTEM
AutoCAD SHX Text
TANKER AWAY
AutoCAD SHX Text
LL
AutoCAD SHX Text
DRIP TRAY
AutoCAD SHX Text
%%UpH ADJUSTMENT SYSTEM
AutoCAD SHX Text
AUTO MECHANICAL RAKED FINE BAR SCREEN
AutoCAD SHX Text
SUBMERSIBLE/NON SUBMERSIBLE RETORN SLUDGE PUMP
AutoCAD SHX Text
RSP
AutoCAD SHX Text
FM
AutoCAD SHX Text
RISIDUE CHLORINE
AutoCAD SHX Text
RC
AutoCAD SHX Text
ANOIXC
AutoCAD SHX Text
ZONE
AutoCAD SHX Text
%%UPERMEATE PUMP
AutoCAD SHX Text
PERMEATE PUMP (1 DUTY & 1 STANDBY)
AutoCAD SHX Text
(PP)
AutoCAD SHX Text
(PP)
AutoCAD SHX Text
P
AutoCAD SHX Text
P
AutoCAD SHX Text
VSD
AutoCAD SHX Text
VSD
AutoCAD SHX Text
TW-100-DI
AutoCAD SHX Text
TW-100-DI
AutoCAD SHX Text
RAW SEWAGE
AutoCAD SHX Text
%%UUNDERGROUND RETENTION TANK (RC)
AutoCAD SHX Text
(SSP)
AutoCAD SHX Text
SUBMERSIBLE SEWAGE PUMP
AutoCAD SHX Text
(1 DUTY & 1 STANDBY)
AutoCAD SHX Text
AIR
AutoCAD SHX Text
OVERFLOW
AutoCAD SHX Text
HL
AutoCAD SHX Text
H
AutoCAD SHX Text
LL
AutoCAD SHX Text
pH
AutoCAD SHX Text
M
AutoCAD SHX Text
FM
AutoCAD SHX Text
%%UMEMBRANE BIOREACTOR TANK
AutoCAD SHX Text
SEWAGRE TREATMENT PLANT
AutoCAD SHX Text
ROOM
AutoCAD SHX Text
LL
AutoCAD SHX Text
HL
AutoCAD SHX Text
M
AutoCAD SHX Text
DRAIN PIPE TO
AutoCAD SHX Text
RETENTION TANK
AutoCAD SHX Text
80
AutoCAD SHX Text
MLSS
AutoCAD SHX Text
pH
AutoCAD SHX Text
UV2
AutoCAD SHX Text
UV1
AutoCAD SHX Text
CH-20-PVC
AutoCAD SHX Text
UV LIGHT
AutoCAD SHX Text
SYSTEM
AutoCAD SHX Text
TW-100-PVC
AutoCAD SHX Text
TW-100-PVC
AutoCAD SHX Text
TS
AutoCAD SHX Text
%%U(EFFECTIVE VOL: 12 CU.M)
AutoCAD SHX Text
TREATED WATER FROM
AutoCAD SHX Text
MEMBRANE BIOREACTOR (MBR)
AutoCAD SHX Text
WILL BE DISCHARGED TO
AutoCAD SHX Text
SOAKAWAY PIT AT G/F
AutoCAD SHX Text
RAW SEWAGE
AutoCAD SHX Text
G/F
AutoCAD SHX Text
TW - TREATED WATER
AutoCAD SHX Text
SW - SEWAGE
AutoCAD SHX Text
SL - SLUDGE
AutoCAD SHX Text
CH - CHEMICAL
AutoCAD SHX Text
AIR - AIR
AutoCAD SHX Text
%%UPIPE MATERIAL
AutoCAD SHX Text
%%USERVICE MEDIA
AutoCAD SHX Text
PIPE NOMINAL SIZE (mm)
AutoCAD SHX Text
DI - DUCTILE IRON
AutoCAD SHX Text
PVC - POLYCHLOROETHENE
AutoCAD SHX Text
SS - STAINLESS STEEL
AutoCAD SHX Text
%%UPIPE CONFIGURATION
AutoCAD SHX Text
SL-200-DI
AutoCAD SHX Text
%%USLUDGE HOLDING TANK (RC)
AutoCAD SHX Text
SLUDGE PUMP
AutoCAD SHX Text
(1 DUTY & 1 STANDBY)
AutoCAD SHX Text
%%USOAKAWAY PIT
AutoCAD SHX Text
G/F
AutoCAD SHX Text
RO
AutoCAD SHX Text
REVERSE OSMOSIS
AutoCAD SHX Text
RO
AutoCAD SHX Text
Ø100 PLUG OFF
AutoCAD SHX Text
BY OTHERS
AutoCAD SHX Text
(BY OTHERS)
AutoCAD SHX Text
(BY OTHERS)
AutoCAD SHX Text
(BY OTHERS)
AutoCAD SHX Text
BY THIS SUB-CONTRACTOR
AutoCAD SHX Text
BY MAIN CONTRACTOR
AutoCAD SHX Text
BY THIS SUB-CONTRACTOR
AutoCAD SHX Text
BY MAIN CONTRACTOR
AutoCAD SHX Text
APPROVED BY
AutoCAD SHX Text
REV.
AutoCAD SHX Text
CHECKED BY
AutoCAD SHX Text
DATE
AutoCAD SHX Text
Project Ref
AutoCAD SHX Text
File Name :
AutoCAD SHX Text
Signature for Submission/Construction
AutoCAD SHX Text
Scale :
AutoCAD SHX Text
The copyright of this drawing remains with the Architect.
AutoCAD SHX Text
This drawing is not valid for construction purposes unless
AutoCAD SHX Text
F.S.D. Ref:
AutoCAD SHX Text
B.D. Ref:
AutoCAD SHX Text
Notes & Legend
AutoCAD SHX Text
Do not scale from drawings.
AutoCAD SHX Text
expressedly certified.
AutoCAD SHX Text
All measurements must be verified on site.
AutoCAD SHX Text
World Wide Fund for Nature Hong Kong
AutoCAD SHX Text
15/F, Manhattan Centre,
AutoCAD SHX Text
8 Kwai Cheong Road, Kwai Chung
AutoCAD SHX Text
New Territories, Hong Kong
AutoCAD SHX Text
TEL : 2526 1011
AutoCAD SHX Text
FAX : 2845 2764
AutoCAD SHX Text
Faithful and Gould
AutoCAD SHX Text
13/F, Wharf T&T Centre,
AutoCAD SHX Text
Tsim Sha Tsui,
AutoCAD SHX Text
Hong Kong
AutoCAD SHX Text
TEL : 2972 1118
AutoCAD SHX Text
FAX : 3827 7070
AutoCAD SHX Text
AECOM Asia Company Limited
AutoCAD SHX Text
20/F, Grand Central Plaza, Tower 2,
AutoCAD SHX Text
138 Shatin Rural Committee Road,
AutoCAD SHX Text
Shatin, Hong Kong
AutoCAD SHX Text
TEL : 3922 9000
AutoCAD SHX Text
FAX : 3922 9797
AutoCAD SHX Text
Urbis Limited
AutoCAD SHX Text
11/F Siu On Centre,
AutoCAD SHX Text
188 Lockhart Road,
AutoCAD SHX Text
Wan Chai, Hong Kong
AutoCAD SHX Text
TEL : 2802 3333
AutoCAD SHX Text
FAX : 2802 8662
AutoCAD SHX Text
Parsons Brinckerhoff (Asia) Limited
AutoCAD SHX Text
7/F One Kowloon,
AutoCAD SHX Text
1 Wang Yuen Street,
AutoCAD SHX Text
Kowloon Bay, Hong Kong
AutoCAD SHX Text
TEL : 2528 3031
AutoCAD SHX Text
FAX : 2268 3740
AutoCAD SHX Text
Thomas Chow Architects Limited
AutoCAD SHX Text
Rm 1311, Eastern Harbour Centre
AutoCAD SHX Text
28 Hoi Chak Street, Quarry Bay
AutoCAD SHX Text
Hong Kong
AutoCAD SHX Text
TEL : 2527 8108
AutoCAD SHX Text
FAX : 2527 8813
AutoCAD SHX Text
Lead Design Consultant
AutoCAD SHX Text
Client
AutoCAD SHX Text
Project Manager
AutoCAD SHX Text
Civil, Structural, Geotechnical Engineering Consultant
AutoCAD SHX Text
Landscape Design Consultant
AutoCAD SHX Text
AV / ICT / Security System Consultant
AutoCAD SHX Text
Aurecon Hong Kong Limited
AutoCAD SHX Text
Building Services Engineering Consultant
AutoCAD SHX Text
Firefly Lighting Design (China) Ltd
AutoCAD SHX Text
Unit B, 17/F, Kay Kwong Commercial Building,
AutoCAD SHX Text
332-334 Lockhart Road,
AutoCAD SHX Text
Wan Chai, Hong Kong
AutoCAD SHX Text
TEL : 2528 3031
AutoCAD SHX Text
FAX : 2268 3740
AutoCAD SHX Text
Interior & Exterior Lighting Design Consultant
AutoCAD SHX Text
mksA (HK) Ltd
AutoCAD SHX Text
8/F Yick Shing Building
AutoCAD SHX Text
238 Lockhart Rd,
AutoCAD SHX Text
Wanchai, Hong Kong
AutoCAD SHX Text
TEL : 2528 3031
AutoCAD SHX Text
FAX : 2268 3740
AutoCAD SHX Text
Acoustic Consultant
AutoCAD SHX Text
2205-2206, 22/F Island Place Tower,
AutoCAD SHX Text
510 King's Road,
AutoCAD SHX Text
North Point, Hong Kong
AutoCAD SHX Text
TEL : 3664 6888
AutoCAD SHX Text
FAX : 3664 6999
AutoCAD SHX Text
MAI PO NATURE RESERVE INFRASTRUCTURE UPGRADE PROJECT PROPOSED PETER SCOTT FIELD STUDIES CENTRE AT D.D. 101, MAI PO (FACILITY OUTSIDE NATURE RESERVE)
AutoCAD SHX Text
253876
AutoCAD SHX Text
THIS PLANT SHALL BE CAPABLE FOR DAILY
AutoCAD SHX Text
SOIL AND WASTE WATER GENERATION OF
AutoCAD SHX Text
24 CU.M
AutoCAD SHX Text
NOTE:
AutoCAD SHX Text
FOR REFERENCE ONLY
AutoCAD SHX Text
0
AutoCAD SHX Text
02-2020
AutoCAD SHX Text
SP
AutoCAD SHX Text
FL
AutoCAD SHX Text
MAI PO NATURE RESERVE INFRASTRUCTURE UPGRADE PROJECT PROPOSED PETER SCOTT FIELD STUDIES CENTRE AT D.D. 101, MAI PO (FACILITY OUTSIDE NATURE RESERVE)
AutoCAD SHX Text
SEWAGE TREATMENT PLANT & GREY WATER TREATMENT PLANT INSTALLATION SCHEMATIC DIAGRAM FOR SEWAGE TREATMENT PLANT
AutoCAD SHX Text
253876-DW-STP-301
AutoCAD SHX Text
253876
AutoCAD SHX Text
N.T.S.
Page 411: TENDER DOCUMENTS · schedule no. 1 – preliminaries sr1/1 – sr1 sum/1 schedule no. 2 – preambles sr2/1 – sr2/72 schedule no. 3 – sewage treatment plant system sr3/1 – sr3

100m LONG (5m POTENTIAL DIFFERENCE)

L i m i t e d

AutoCAD SHX Text
1/F
AutoCAD SHX Text
SW
AutoCAD SHX Text
AIR
AutoCAD SHX Text
BALL VALVE
AutoCAD SHX Text
CHECK VALVE
AutoCAD SHX Text
GATE VALVE
AutoCAD SHX Text
BUTTERFLY VALVE
AutoCAD SHX Text
VARIABLE SPEED DRIVE
AutoCAD SHX Text
FLOW SWITCH
AutoCAD SHX Text
FLEXIBLE JOINT
AutoCAD SHX Text
CHEMICAL PORT
AutoCAD SHX Text
REDUCER
AutoCAD SHX Text
SAMPLING POINT
AutoCAD SHX Text
SILENCER
AutoCAD SHX Text
ELECTROMAGNETIC FLOWMETER
AutoCAD SHX Text
PRESSURE TRANSMITTER
AutoCAD SHX Text
LOW LEVEL ALARM
AutoCAD SHX Text
CHEMICAL DOSING PUMP
AutoCAD SHX Text
%%UAIR BLOWER
AutoCAD SHX Text
ROTAMETER
AutoCAD SHX Text
GLASS REINFORCED PLASTIC
AutoCAD SHX Text
LEVEL SENSING EQUIPMENT
AutoCAD SHX Text
INSTRUMENT FOR DISSOLVED OXYGEN MEASUREMENT
AutoCAD SHX Text
3" STANESS STEEL316 CAM & GROOVE COUPLING TO CONNECT TANKER
AutoCAD SHX Text
PRESSURE RELIEF VALVE
AutoCAD SHX Text
HIGH LEVEL ALARM
AutoCAD SHX Text
POLYETHYLENE
AutoCAD SHX Text
CHEMICAL DOSING PUMP
AutoCAD SHX Text
PRESSURE GAUGE WITH COCK
AutoCAD SHX Text
PRESSURE GAUGE
AutoCAD SHX Text
%%ULEGEND
AutoCAD SHX Text
%%UFINE SCREEN CHAMBER
AutoCAD SHX Text
FLOW MEASURING APPARATUS
AutoCAD SHX Text
(FOR DETAILS, SEE DETAIL 'A')
AutoCAD SHX Text
(P2)
AutoCAD SHX Text
(P1)
AutoCAD SHX Text
%%UCHEMICAL STORAGE TANK (PE)
AutoCAD SHX Text
SCREEN
AutoCAD SHX Text
PENSTOCK (P1 & P2)
AutoCAD SHX Text
PERMEATE PUMP (PP)
AutoCAD SHX Text
AIR BLOWER (1 DUTY & 1 STANDBY)
AutoCAD SHX Text
AIR BLOWER (AB)
AutoCAD SHX Text
SUBMERSIBLE AIR EJECTOR (SAE1 & SAE2)
AutoCAD SHX Text
(CS)
AutoCAD SHX Text
(CS)
AutoCAD SHX Text
MANUAL COARSE BAR SCREEN
AutoCAD SHX Text
AUTO MECHANICAL RAKED COARSE BAR SCREEN
AutoCAD SHX Text
MANUAL FINE BAR SCREEN
AutoCAD SHX Text
EFFLUENT DISCHARGE PIPE
AutoCAD SHX Text
(FS)
AutoCAD SHX Text
(FS)
AutoCAD SHX Text
(AB)
AutoCAD SHX Text
(AB)
AutoCAD SHX Text
pH SENSOR
AutoCAD SHX Text
SOLENOID VALVE
AutoCAD SHX Text
TURBIDITY SENSOR
AutoCAD SHX Text
MEMBRANE MODULE
AutoCAD SHX Text
C
AutoCAD SHX Text
P
AutoCAD SHX Text
C
AutoCAD SHX Text
REINFORCED CONCRETE
AutoCAD SHX Text
MIXED LIQUOR PUMP (MLP)
AutoCAD SHX Text
M
AutoCAD SHX Text
FM
AutoCAD SHX Text
M
AutoCAD SHX Text
PI
AutoCAD SHX Text
SW-100-DI
AutoCAD SHX Text
SW-100-DI
AutoCAD SHX Text
CH-20-PVC
AutoCAD SHX Text
CH-20-PVC
AutoCAD SHX Text
DRIP TRAY
AutoCAD SHX Text
TW-50-PVC
AutoCAD SHX Text
AIR-50-SS
AutoCAD SHX Text
SW-100-DI
AutoCAD SHX Text
TW-50-SS
AutoCAD SHX Text
PT
AutoCAD SHX Text
DO
AutoCAD SHX Text
LL
AutoCAD SHX Text
H
AutoCAD SHX Text
VSD
AutoCAD SHX Text
FS
AutoCAD SHX Text
pH
AutoCAD SHX Text
RC
AutoCAD SHX Text
GRP
AutoCAD SHX Text
FMA
AutoCAD SHX Text
HL
AutoCAD SHX Text
PE
AutoCAD SHX Text
LL
AutoCAD SHX Text
H
AutoCAD SHX Text
PT
AutoCAD SHX Text
PI
AutoCAD SHX Text
HL
AutoCAD SHX Text
AIR-50-SS
AutoCAD SHX Text
AIR-50-SS
AutoCAD SHX Text
FMA
AutoCAD SHX Text
HL
AutoCAD SHX Text
HL
AutoCAD SHX Text
HL
AutoCAD SHX Text
VSD
AutoCAD SHX Text
VSD
AutoCAD SHX Text
OVERFLOW TO
AutoCAD SHX Text
PLANT ROOM DRAIN
AutoCAD SHX Text
RC
AutoCAD SHX Text
FLOW METER
AutoCAD SHX Text
FM
AutoCAD SHX Text
OVERFLOW TO
AutoCAD SHX Text
PLANT ROOM DRAIN
AutoCAD SHX Text
LL
AutoCAD SHX Text
DRIP TRAY
AutoCAD SHX Text
SODIUM HYPOCHLORITE
AutoCAD SHX Text
DOSING SYSTEM
AutoCAD SHX Text
TANKER AWAY
AutoCAD SHX Text
LL
AutoCAD SHX Text
DRIP TRAY
AutoCAD SHX Text
%%UpH ADJUSTMENT SYSTEM
AutoCAD SHX Text
AUTO MECHANICAL RAKED FINE BAR SCREEN
AutoCAD SHX Text
SUBMERSIBLE/NON SUBMERSIBLE RETORN SLUDGE PUMP
AutoCAD SHX Text
RSP
AutoCAD SHX Text
FM
AutoCAD SHX Text
RISIDUE CHLORINE
AutoCAD SHX Text
RC
AutoCAD SHX Text
ANOIXC
AutoCAD SHX Text
ZONE
AutoCAD SHX Text
%%UPERMEATE PUMP
AutoCAD SHX Text
PERMEATE PUMP (1 DUTY & 1 STANDBY)
AutoCAD SHX Text
(PP)
AutoCAD SHX Text
(PP)
AutoCAD SHX Text
P
AutoCAD SHX Text
P
AutoCAD SHX Text
VSD
AutoCAD SHX Text
VSD
AutoCAD SHX Text
TW-50-PVC
AutoCAD SHX Text
TW-50-SS
AutoCAD SHX Text
WASTE WATER
AutoCAD SHX Text
%%UUNDERGROUND RETENTION TANK (RC)
AutoCAD SHX Text
(SSP)
AutoCAD SHX Text
SUBMERSIBLE SEWAGE PUMP
AutoCAD SHX Text
(1 DUTY & 1 STANDBY)
AutoCAD SHX Text
AIR
AutoCAD SHX Text
OVERFLOW
AutoCAD SHX Text
HL
AutoCAD SHX Text
H
AutoCAD SHX Text
LL
AutoCAD SHX Text
pH
AutoCAD SHX Text
M
AutoCAD SHX Text
FM
AutoCAD SHX Text
%%UMEMBRANE BIOREACTOR TANK
AutoCAD SHX Text
GREYWATER PLANT
AutoCAD SHX Text
ROOM
AutoCAD SHX Text
LL
AutoCAD SHX Text
HL
AutoCAD SHX Text
M
AutoCAD SHX Text
DRAIN PIPE TO
AutoCAD SHX Text
RETENTION TANK
AutoCAD SHX Text
80
AutoCAD SHX Text
MLSS
AutoCAD SHX Text
pH
AutoCAD SHX Text
UV2
AutoCAD SHX Text
UV1
AutoCAD SHX Text
CH-20-PVC
AutoCAD SHX Text
UV LIGHT
AutoCAD SHX Text
SYSTEM
AutoCAD SHX Text
TW-100-PVC
AutoCAD SHX Text
TW-100-PVC
AutoCAD SHX Text
TS
AutoCAD SHX Text
%%U(EFFECTIVE VOL: 3 CU.M)
AutoCAD SHX Text
G/F
AutoCAD SHX Text
TW - TREATED WATER
AutoCAD SHX Text
SW - SEWAGE
AutoCAD SHX Text
SL - SLUDGE
AutoCAD SHX Text
CH - CHEMICAL
AutoCAD SHX Text
AIR - AIR
AutoCAD SHX Text
%%UPIPE MATERIAL
AutoCAD SHX Text
%%USERVICE MEDIA
AutoCAD SHX Text
PIPE NOMINAL SIZE (mm)
AutoCAD SHX Text
DI - DUCTILE IRON
AutoCAD SHX Text
PVC - POLYCHLOROETHENE
AutoCAD SHX Text
SS - STAINLESS STEEL
AutoCAD SHX Text
%%UPIPE CONFIGURATION
AutoCAD SHX Text
SL-200-DI
AutoCAD SHX Text
%%USLUDGE HOLDING TANK
AutoCAD SHX Text
SLUDGE PUMP
AutoCAD SHX Text
(1 DUTY & 1 STANDBY)
AutoCAD SHX Text
FROM GUEST ROOM
AutoCAD SHX Text
(SHOWER AND
AutoCAD SHX Text
WASH BASIN)
AutoCAD SHX Text
TW-50-SS
AutoCAD SHX Text
MH
AutoCAD SHX Text
VP
AutoCAD SHX Text
(BY MAIN CONTRACTOR)
AutoCAD SHX Text
FROM MAKE-UP WATER TANK
AutoCAD SHX Text
FLUSHING / POTABLE WATER
AutoCAD SHX Text
TANKS & PUMP ROOM
AutoCAD SHX Text
REVERSE OSMOSIS
AutoCAD SHX Text
RO
AutoCAD SHX Text
RO
AutoCAD SHX Text
%%U(BT OTHERS)
AutoCAD SHX Text
BY THIS SUB-CONTRACTOR
AutoCAD SHX Text
BY MAIN CONTRACTOR
AutoCAD SHX Text
TO FLUSHING
AutoCAD SHX Text
WATER SYSTEM
AutoCAD SHX Text
CONTRACTOR
AutoCAD SHX Text
BY THIS SUB-
AutoCAD SHX Text
CONTRACTOR
AutoCAD SHX Text
BY MAIN
AutoCAD SHX Text
R/F
AutoCAD SHX Text
FLUSHING WATER MIXING
AutoCAD SHX Text
WATER TANK
AutoCAD SHX Text
(BY OTHERS)
AutoCAD SHX Text
APPROVED BY
AutoCAD SHX Text
REV.
AutoCAD SHX Text
CHECKED BY
AutoCAD SHX Text
DATE
AutoCAD SHX Text
Project Ref
AutoCAD SHX Text
File Name :
AutoCAD SHX Text
Signature for Submission/Construction
AutoCAD SHX Text
Scale :
AutoCAD SHX Text
The copyright of this drawing remains with the Architect.
AutoCAD SHX Text
This drawing is not valid for construction purposes unless
AutoCAD SHX Text
F.S.D. Ref:
AutoCAD SHX Text
B.D. Ref:
AutoCAD SHX Text
Notes & Legend
AutoCAD SHX Text
Do not scale from drawings.
AutoCAD SHX Text
expressedly certified.
AutoCAD SHX Text
All measurements must be verified on site.
AutoCAD SHX Text
World Wide Fund for Nature Hong Kong
AutoCAD SHX Text
15/F, Manhattan Centre,
AutoCAD SHX Text
8 Kwai Cheong Road, Kwai Chung
AutoCAD SHX Text
New Territories, Hong Kong
AutoCAD SHX Text
TEL : 2526 1011
AutoCAD SHX Text
FAX : 2845 2764
AutoCAD SHX Text
Faithful and Gould
AutoCAD SHX Text
13/F, Wharf T&T Centre,
AutoCAD SHX Text
Tsim Sha Tsui,
AutoCAD SHX Text
Hong Kong
AutoCAD SHX Text
TEL : 2972 1118
AutoCAD SHX Text
FAX : 3827 7070
AutoCAD SHX Text
AECOM Asia Company Limited
AutoCAD SHX Text
20/F, Grand Central Plaza, Tower 2,
AutoCAD SHX Text
138 Shatin Rural Committee Road,
AutoCAD SHX Text
Shatin, Hong Kong
AutoCAD SHX Text
TEL : 3922 9000
AutoCAD SHX Text
FAX : 3922 9797
AutoCAD SHX Text
Urbis Limited
AutoCAD SHX Text
11/F Siu On Centre,
AutoCAD SHX Text
188 Lockhart Road,
AutoCAD SHX Text
Wan Chai, Hong Kong
AutoCAD SHX Text
TEL : 2802 3333
AutoCAD SHX Text
FAX : 2802 8662
AutoCAD SHX Text
Parsons Brinckerhoff (Asia) Limited
AutoCAD SHX Text
7/F One Kowloon,
AutoCAD SHX Text
1 Wang Yuen Street,
AutoCAD SHX Text
Kowloon Bay, Hong Kong
AutoCAD SHX Text
TEL : 2528 3031
AutoCAD SHX Text
FAX : 2268 3740
AutoCAD SHX Text
Thomas Chow Architects Limited
AutoCAD SHX Text
Rm 1311, Eastern Harbour Centre
AutoCAD SHX Text
28 Hoi Chak Street, Quarry Bay
AutoCAD SHX Text
Hong Kong
AutoCAD SHX Text
TEL : 2527 8108
AutoCAD SHX Text
FAX : 2527 8813
AutoCAD SHX Text
Lead Design Consultant
AutoCAD SHX Text
Client
AutoCAD SHX Text
Project Manager
AutoCAD SHX Text
Civil, Structural, Geotechnical Engineering Consultant
AutoCAD SHX Text
Landscape Design Consultant
AutoCAD SHX Text
AV / ICT / Security System Consultant
AutoCAD SHX Text
Aurecon Hong Kong Limited
AutoCAD SHX Text
Building Services Engineering Consultant
AutoCAD SHX Text
Firefly Lighting Design (China) Ltd
AutoCAD SHX Text
Unit B, 17/F, Kay Kwong Commercial Building,
AutoCAD SHX Text
332-334 Lockhart Road,
AutoCAD SHX Text
Wan Chai, Hong Kong
AutoCAD SHX Text
TEL : 2528 3031
AutoCAD SHX Text
FAX : 2268 3740
AutoCAD SHX Text
Interior & Exterior Lighting Design Consultant
AutoCAD SHX Text
mksA (HK) Ltd
AutoCAD SHX Text
8/F Yick Shing Building
AutoCAD SHX Text
238 Lockhart Rd,
AutoCAD SHX Text
Wanchai, Hong Kong
AutoCAD SHX Text
TEL : 2528 3031
AutoCAD SHX Text
FAX : 2268 3740
AutoCAD SHX Text
Acoustic Consultant
AutoCAD SHX Text
2205-2206, 22/F Island Place Tower,
AutoCAD SHX Text
510 King's Road,
AutoCAD SHX Text
North Point, Hong Kong
AutoCAD SHX Text
TEL : 3664 6888
AutoCAD SHX Text
FAX : 3664 6999
AutoCAD SHX Text
MAI PO NATURE RESERVE INFRASTRUCTURE UPGRADE PROJECT PROPOSED PETER SCOTT FIELD STUDIES CENTRE AT D.D. 101, MAI PO (FACILITY OUTSIDE NATURE RESERVE)
AutoCAD SHX Text
253876
AutoCAD SHX Text
THIS PLANT SHALL BE CAPABLE FOR DAILY
AutoCAD SHX Text
WASTE WATER GENERATION OF
AutoCAD SHX Text
5 CU.M
AutoCAD SHX Text
NOTE:
AutoCAD SHX Text
FOR REFERENCE ONLY
AutoCAD SHX Text
0
AutoCAD SHX Text
02-2020
AutoCAD SHX Text
SP
AutoCAD SHX Text
FL
AutoCAD SHX Text
MAI PO NATURE RESERVE INFRASTRUCTURE UPGRADE PROJECT PROPOSED PETER SCOTT FIELD STUDIES CENTRE AT D.D. 101, MAI PO (FACILITY OUTSIDE NATURE RESERVE)
AutoCAD SHX Text
SEWAGE TREATMENT PLANT & GREY WATER TREATMENT PLANT INSTALLATION SCHEMATIC DIAGRAM FOR GREYWATER TREATMENT PLANT
AutoCAD SHX Text
253876-DW-STP-302
AutoCAD SHX Text
253876
AutoCAD SHX Text
N.T.S.
Page 412: TENDER DOCUMENTS · schedule no. 1 – preliminaries sr1/1 – sr1 sum/1 schedule no. 2 – preambles sr2/1 – sr2/72 schedule no. 3 – sewage treatment plant system sr3/1 – sr3

REFERENCE DOCUMENTS (NOT FORMING PART OF THE CONTRACT)

Page 413: TENDER DOCUMENTS · schedule no. 1 – preliminaries sr1/1 – sr1 sum/1 schedule no. 2 – preambles sr2/1 – sr2/72 schedule no. 3 – sewage treatment plant system sr3/1 – sr3

Tentative Construction Programe for PSFSC

Year 2019 Year 2020 Year 2021 Year 2022 Year 2023

PSFSCConstruction

Mobilisation

Excavation Works

Foundation

Street Fire Hydrant

(1. Application result; 2. Decision for FS tank construction)

Superstructure + roof

Lift installation + inspection (90 days + 60 days)

Soakaway pit

Sewerage Treatment Plant / Grey Scale Treatment Plant

Tender & Award

Coordination with TCA for BD / Tender works

Discharge License (prepration & application, 3 + 12)

Equipment Installation (4 months)

Sewerage Treatment Plant (underground work)

Sewerage Treatment Plant (equipment - 4 months)

Façade Glass wall (8 months)

Fitout Work for Intergrated area (Ground & 1st floor)

Window & glass door

MEP

FSD / OP inspection

Fitout Work (upto Handover) (9 months)

Critical Task 1 2 3 4 5 12 1 2 3 4 56 7 8 9 10 11 12 1 2 3 4 56 7 8 9 10 11 12 1 2 3 4 56 7 8 9 10 11 10 1112 1 2 3 4 56 7 8 9 10 11 6 7

Note:

1) The construction start date is subject to statutory approval. e.g. request for ACE

inspection in EIA; Planning and BD comment.

12 1 2 3 4 56 7 8 9

2nd fix1st fix

Partition / blockwall Final finishes