tender drawing - bank of baroda · u/r1 u/y1 u/r3 u/r4 u/r5 u/r6 u/y1 u/y1 u/y3 u/y4 u/y5 u/y6 u/b1...

4
LP1/R1 LDB.1 UPSDB.1 PDB.1 LDB.3 UPSDB.3 PDB.3 LDB.2 UPSDB.2 PDB.2 LP1/R1 LP1/R1 LP1/R2 LP1/R2 LP1/R2 LP1/Y1 LP1/Y1 LP1/Y1 LP1/Y2 LP1/Y2 LP1/Y2 LP1/Y2 LP1/B1 LP1/B1 LP1/B1 LP1/B2 LP1/B2 LP1/R3 LP1/R4 LP1/R3 LP1/R4 LP1/Y3 LP1/Y4 LP1/B3 LP1/B3 LP1/B3 LP1/B3 LP1/B4 LP2/B1 LP2/B1 LP2/R1 LP2/B2 LP2/Y1 LP2/Y1 LP2/Y1 LP2/Y2 LP2/Y2 LP2/R1 LP2/R1 LP2/R2 LP2/R2 LP2/R3 LP2/R3 LP2/R4 LP2/R4 LP2/Y3 LP2/Y4 LP2/Y5 LP2/B3 LP2/B4 LP2/B5 LP3/R1 LP3/R1 LP3/R1 LP3/R2 LP3/R2 LP3/Y1 LP3/Y1 LP3/Y2 LP3/Y2 LP3/B1 LP3/B2 LP3/B3 LP3/R3 LP3/B4 LP3/B4 LP3/B7 LP3/B7 LP3/B7 LP3/B6 LP3/B6 LP3/Y4 LP3/Y4 LP3/Y3 LP3/Y3 LP3/Y5 LP3/Y6 LP3/R4 LP3/R7 LP3/R7 LP3/R7 LP3/R5 LP3/R5 LP3/R6 LP3/R6 LP3/R6 LP1/R3 LP3/Y7 LP3/B6 LP3/Y2 LP3/Y2 LP3/B5 LP1/R2 LP3/Y1 LU1/R8 LU1/R8 LU2/R9 LU2/R9 LU3/R9 LU3/R9 LU3/R9 LU3/R9 LU3/R9 LU3/R9 LU3/Y9 LU3/Y9 LU3/Y9 LU3/Y9 LU3/Y9 LU3/Y9 LU3/Y9 LU3/Y9 LU2/R9 LP2/R1 LP2/R3 LP3/Y7 LP3/Y7 ELECTRICAL CEILING PLAN ( ARCHITECT ) DATE: SCALE:- SCALE TO FIT TITLE: DRAWN BY:- CHECKED BY: PROJECT: PAHWA ARCH-TECH SERVICES ARCHITECTS, ENGINEERS, INTERIOR DESIGNER, VALUER PLOT NO-53, BLOCK-A SECTOR-49,NOIDA PH: 0120-2571762 DRG. NO PROPOSED INTERIOR WORK OF 27TH FLOOR OF GIFT ONE TOWER, GIFT CITY, GANDHI NAGAR, GUJRAT. REVISION DATES: KRISHNA SHARMA BOB/AHMEDABAD/TENDER/ELE/03 1) CONTRACTOR TO FIELD VERIFY ALL EXISTING CONDITIONS PRIOR TO BEGINNING WORK. DRAWINGS ARE NOT TO BE SCALED, ALL DIMENSIONS SHOWN RELATING TO EXISTING CONSTRUCTION ARE APPROXIMATE (EXISTING WALLS MAY NOT BE PLUMB AND WALLS MAY NOT BE EXACTLY PARAWEL), THE CONTRACTOR SHALL FIELD VERIFY ALL ACTUAL DIMENSIONS AND CONTACT ARCHITECT TO ADDRESS ANY DISCREPANCIES, DIMENSIONS ARE NOT ADJUSTABLE WITHOUT APPROVAL OF THE ARCHITECT, UNLESS NOTED +/. OR VIF (VERIFY IN FIELD), EXACT LOCATIONS, DISTANCES, ELEVATIONS AND SIMILAR DATA SHALL BE GOVERNED BY ACTUAL FIELD CONDITIONS AND BY THE ARCHITECTS INSTRUCTIONS 2) IN THE EVENT OF CONFLICT BETWEEN INFORMATION SHOWN ON DRAWINGS AND INFORMATION SHOWN ON THE SPECIFICATIONS, THE MORE STRINGENT SHALL TAKE PRECEDENCE, SHOULD THE CONTRACTOR AT ANY TIME DISCOVER AN ERROR IN A DRAWING OR SPECIFICATION OR A DISCREPANCY OR VARIATION BETWEEN DIMENSIONS ON DRAWINGS AND MEASUREMENTS AT THE SITE OR LACK OF DIMENSIONS OR OTHER INFORMATION, THE GENERAL CONTRACTOR SHALL NOT PROCEED WITH THE WORK AFFECTED UNTIL THE ARCHITECT HAS BEEN NOTIFIED AND PROCEED ONLY AFTER CLARIFICATION HAS BEEN MADE NOTE:- VIKRAM SINGH APPROVED BY:- AR.INDER PAL SINGH 17-07-2019 TENDER DRAWING THIS DRAWING IN ALL FORMS ELECTRONIC OR HARD COPY IS EXCLUSIVE PROPERLY OF PAHWA ARCH-TECH SERVICES AND MUST NOT BE REPRODUCED IN WHOLE OR IN PART WITHOUT WRITTEN AUTHORIZATION 3) PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT

Upload: others

Post on 30-Sep-2020

5 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: TENDER DRAWING - Bank of Baroda · u/r1 u/y1 u/r3 u/r4 u/r5 u/r6 u/y1 u/y1 u/y3 u/y4 u/y5 u/y6 u/b1 u/b2 u/b3 u/b4 u/b5 mcbmcb mcb mcb mcb u/r7 u/r8 u/y7 u/b7 mcb mcb 2x2.5+2.5 sq.mm

LP1/R1

LDB.1

UPSDB.1

PDB.1

LDB.3

UPSDB.3

PDB.3

LD

B.2

UPSDB.2

PD

B.2

LP1/R1

LP1/R1

LP1/R2

LP1/R2

LP1/R2

LP1/Y1

LP1/Y1

LP1/Y1

LP1/Y2

LP1/Y2

LP1/Y2

LP1/Y2

LP1/B1

LP1/B1

LP1/B1

LP1/B2

LP1/B2

LP1/R3

LP1/R4

LP1/R3

LP1/R4

LP1/Y3

LP1/Y4

LP1/B3 LP1/B3

LP1/B3

LP1/B3

LP1/B4

LP2/B1

LP2/B1

LP2/R1

LP2/B2

LP2/Y1

LP2/Y1

LP2/Y1

LP2/Y2

LP2/Y2

LP2/R1

LP2/R1

LP2/R2

LP2/R2

LP2/R3

LP2/R3

LP2/R4

LP2/R4

LP2/Y3

LP2/Y4

LP2/Y5

LP2/B3

LP2/B4

LP2/B5

LP3/R1

LP3/R1

LP3/R1

LP3/R2

LP3/R2

LP3/Y1

LP3/Y1

LP3/Y2

LP3/Y2

LP3/B1

LP3/B2

LP3/B3

LP3/R3

LP3/B4

LP3/B4

LP3/B7

LP3/B7

LP3/B7

LP3/B6

LP3/B6

LP3/Y4

LP3/Y4

LP3/Y3

LP3/Y3

LP3/Y5

LP3/Y6

LP3/R4

LP3/R7

LP3/R7

LP3/R7

LP3/R5

LP3/R5

LP3/R6

LP3/R6

LP3/R6

LP1/R3

LP3/Y7

LP3/B6

LP3/Y2

LP3/Y2

LP3/B5

LP1/R2

LP3/Y1

LU1/R8

LU1/R8

LU2/R9

LU2/R9

LU3/R9

LU3/R9

LU3/R9

LU3/R9

LU3/R9

LU3/R9

LU3/Y9

LU3/Y9

LU3/Y9

LU3/Y9

LU3/Y9

LU3/Y9

LU3/Y9

LU3/Y9

LU2/R9

LP2/R1

LP2/R3

LP3/Y7

LP3/Y7

ELECTRICAL CEILING PLAN

( ARCHITECT )

DATE:

SCALE:-

SCALE TO FIT

TITLE:

DRAWN BY:-

CHECKED BY:

PROJECT:

PAHWA ARCH-TECH SERVICES

ARCHITECTS, ENGINEERS,

INTERIOR DESIGNER, VALUER

PLOT NO-53, BLOCK-A

SECTOR-49,NOIDA PH: 0120-2571762

DRG. NO

PROPOSED

INTERIOR WORK OF 27TH

FLOOR OF GIFT ONE

TOWER, GIFT CITY, GANDHI

NAGAR, GUJRAT.

REVISION DATES:

KRISHNA SHARMA

BOB/AHMEDABAD/TENDER/ELE/03

1) CONTRACTOR TO FIELD VERIFY ALL EXISTING

CONDITIONS PRIOR TO BEGINNING WORK.

DRAWINGS ARE NOT TO BE SCALED, ALL

DIMENSIONS SHOWN RELATING TO EXISTING

CONSTRUCTION ARE APPROXIMATE (EXISTING

WALLS MAY NOT BE PLUMB AND WALLS MAY NOT

BE EXACTLY PARAWEL), THE CONTRACTOR

SHALL FIELD VERIFY ALL ACTUAL DIMENSIONS

AND CONTACT ARCHITECT TO ADDRESS ANY

DISCREPANCIES, DIMENSIONS ARE NOT

ADJUSTABLE WITHOUT APPROVAL OF THE

ARCHITECT, UNLESS NOTED +/. OR VIF (VERIFY IN

FIELD), EXACT LOCATIONS, DISTANCES,

ELEVATIONS AND SIMILAR DATA SHALL BE

GOVERNED BY ACTUAL FIELD CONDITIONS AND BY

THE ARCHITECTS INSTRUCTIONS

2) IN THE EVENT OF CONFLICT BETWEEN

INFORMATION SHOWN ON DRAWINGS AND

INFORMATION SHOWN ON THE SPECIFICATIONS,

THE MORE STRINGENT SHALL TAKE PRECEDENCE,

SHOULD THE CONTRACTOR AT ANY TIME DISCOVER

AN ERROR IN A DRAWING OR SPECIFICATION OR A

DISCREPANCY OR VARIATION BETWEEN DIMENSIONS

ON DRAWINGS AND MEASUREMENTS AT THE SITE

OR LACK OF DIMENSIONS OR OTHER INFORMATION,

THE GENERAL CONTRACTOR SHALL NOT PROCEED

WITH THE WORK AFFECTED UNTIL THE ARCHITECT

HAS BEEN NOTIFIED AND PROCEED ONLY AFTER

CLARIFICATION HAS BEEN MADE

NOTE:-

VIKRAM SINGH

APPROVED BY:-

AR.INDER PAL SINGH

17-07-2019

TENDER DRAWING

THIS DRAWING IN ALL FORMS ELECTRONIC OR HARD

COPY IS EXCLUSIVE PROPERLY OF PAHWA

ARCH-TECH SERVICES AND MUST NOT BE

REPRODUCED IN WHOLE OR IN PART WITHOUT

WRITTEN AUTHORIZATION

3)

PR

OD

UC

ED

B

Y A

N A

UT

OD

ES

K E

DU

CA

TIO

NA

L P

RO

DU

CT

PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT

PR

OD

UC

ED

B

Y A

N A

UT

OD

ES

K E

DU

CA

TIO

NA

L P

RO

DU

CT

PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT

Page 2: TENDER DRAWING - Bank of Baroda · u/r1 u/y1 u/r3 u/r4 u/r5 u/r6 u/y1 u/y1 u/y3 u/y4 u/y5 u/y6 u/b1 u/b2 u/b3 u/b4 u/b5 mcbmcb mcb mcb mcb u/r7 u/r8 u/y7 u/b7 mcb mcb 2x2.5+2.5 sq.mm

LOCKER ROOM

3245 X 6625

U1/R1

P1/R1P1/R1P1/R1P1/R1P1/R1P1/R1

P1/R2 P1/R2 P1/R2 P1/R2 P1/R2 P1/R2

P1/Y1

P1/Y2

P1/Y1

P1/Y2

P1/Y1

P1/Y2

P1/Y1

P1/Y2

P1/Y1

P1/Y2

P1/Y1

P1/Y2

P1/B1

P1/B2

P1/B1

P1/B2

P1/B1

P1/B2

P1/B1

P1/B2

P1/B1

P1/B2

P1/B1

P1/B2

P1/B1

P1/B2

P1/R3

P1/R4

P1/R3

P1/R4

P1/R3

P1/R4

P1/R3

P1/R4

P1/R3

P1/R4

P1/R3

P1/R4

P1/R3

P1/R4

P1/R3

P1/R4

P1/Y3

P1/Y4

P1/Y3

P1/Y4

P1/Y3

P1/Y4

P1/Y3

P1/Y4

P1/Y3

P1/Y4

P1/Y3

P1/Y4

P1/Y3

P1/Y4

P1/Y3

P1/Y4

P1/B3

P1/B4

P1/B3

P1/B4

P1/B3

P1/B4

P1/B3

P1/B4

P1/B3

P1/B4

P1/B3

P1/B4

P1/B3

P1/B4

P1/R5

P1/R6

P1/R5

P1/R6

P1/R5

P1/R6

P1/R5

P1/R6

P1/R5

P1/R6

P1/R5

P1/R6

P1/Y5

P1/Y6

P1/Y5

P1/Y6

P1/Y5

P1/Y6

P1/Y5

P1/Y6

P1/Y5

P1/Y6

P1/Y5

P1/Y6

P1/Y5

P1/Y6

P1/Y5

P1/Y6

P1

/B

6

P1

/B

6

P1

/B

6P

1/B

6

P1

/B

6

P1

/B

6

P3

/R

1

P3

/R

2

P3

/R

1

P3

/R

2

P3

/R

1

P3

/R

2

P3

/R

1

P3

/R

2

P3

/R

1

P3

/R

2

P3

/R

1

P3

/R

2

P3

/Y

1

P3

/Y

2

P3

/Y

1

P3

/Y

2

P3

/Y

1

P3

/Y

2

P3

/Y

1

P3

/Y

2

P3

/Y

1

P3

/Y

2

P3

/Y

1

P3

/Y

2

P3

/Y

1

P3

/Y

2

P3

/B

1

P3

/B

2

P3

/B

1

P3

/B

2

P3

/B

1

P3

/B

2

P3

/B

1

P3

/B

2

P3

/B

1

P3

/B

2

P3

/B

1

P3

/B

2

P3

/R

4

P3

/R

3

P3

/R

4

P3

/R

3

P3

/R

4

P3

/R

3

P3

/R

4

P3

/R

3

P3

/R

4

P3

/R

3

P3

/R

4

P3

/R

3

P3

/R

4

P3

/R

3

P3

/Y

4

P3

/Y

3

P3

/Y

4

P3

/Y

3

P3

/Y

4

P3

/Y

3

P3

/Y

4

P3

/Y

3

P3

/Y

4

P3

/Y

3

P3

/Y

4

P3

/Y

3

P3

/B

4

P3

/B

3

P3

/B

4

P3

/B

3

P3

/B

4

P3

/B

3

P3

/B

4

P3

/B

3

P3

/B

4

P3

/B

3

P3

/B

4

P3

/B

3

P3

/R

6

P3

/R

5

P3

/R

6

P3

/R

5

P3

/R

6

P3

/R

5

P3

/R

6

P3

/R

5

P3

/R

6

P3

/R

5

P3

/R

6

P3

/R

5

P3

/R

6

P3

/R

5

P3

/Y

6

P3

/Y

5

P3

/Y

6

P3

/Y

5

P3

/Y

6

P3

/Y

5

P3

/Y

6

P3

/Y

5

P3

/Y

6

P3

/Y

5

P3

/Y

6

P3

/Y

5

P3

/Y

6

P3

/Y

5

P3

/B

6

P3

/B

5

P3

/B

6

P3

/B

5

P3

/B

6

P3

/B

5

P3

/B

6

P3

/B

5

P3

/B

6

P3

/B

5

P3

/B

6

P3

/B

5

P3

/B

8

P3

/B

7

P3

/B

8

P3

/B

7

P3

/B

8

P3

/B

7

P3

/B

8

P3

/B

7

P3

/B

8

P3

/B

7

P3

/B

8

P3

/B

7

P3

/B

8

P3

/B

7

P3

/Y

7

P3

/R

7

P3

/Y

7

P3

/R

7

P3

/Y

7

P3

/R

7

P3

/Y

7

P3

/R

7

P3

/Y

7

P3

/R

7

P3

/Y

7

P3

/R

7

P3

/Y

7

P3

/R

7

P2

/R

2

P2

/R

1

P2

/R

2

P2

/R

1

P2

/R

2

P2

/R

1

P2

/R

2

P2

/R

1

P2

/R

2

P2

/R

1

P2

/R

2

P2

/R

1

P2

/Y

2

P2

/Y

1

P2

/Y

2

P2

/Y

1

P2

/Y

2

P2

/Y

1

P2

/Y

2

P2

/Y

1

P2

/Y

2

P2

/Y

1

P2

/Y

2

P2

/Y

1

P2

/Y

2

P2

/Y

1

P2

/B

2

P2

/B

1

P2

/B

2

P2

/B

1

P2

/B

2

P2

/B

1

P2

/B

2

P2

/B

1

P2

/B

2

P2

/B

1

P2

/B

2

P2

/B

1

P2

/B

2

P2

/B

1

P2

/R

4

P2

/R

3

P2

/R

4

P2

/R

3

P2

/R

4

P2

/R

3

P2

/R

4

P2

/R

3

P2

/R

4

P2

/R

3

P2

/R

4

P2

/R

3

P2

/Y

4

P2

/Y

3

P2

/Y

4

P2

/Y

3

P2

/Y

4

P2

/Y

3

P2

/Y

4

P2

/Y

3

P2

/Y

4

P2

/Y

3

P2

/Y

4

P2

/Y

3

P2

/Y

4

P2

/Y

3

P2

/B

4

P2

/B

3

P2

/B

4

P2

/B

3

P2

/B

4

P2

/B

3

P2

/B

4

P2

/B

3

P2

/B

4

P2

/B

3

P2

/B

4

P2

/B

3

P2

/B

4

P2

/B

3

P2

/B

7

P2

/B

7

P2

/B

7P

2/B

7P

2/B

7

P3/B8

P3/B8

P2/R5

P2/R6

P2/R5

P2/R6

P2/R5

P2/R6

P2/R5

P2/R6

P2/R5

P2/R6

P2/R5

P2/R6

P2/Y5

P2/Y6

P2/Y5

P2/Y6

P2/Y5

P2/Y6

P2/Y5

P2/Y6

P2/Y5

P2/Y6

P2/Y5

P2/Y6

P2/B5

P2/B6

P2/B5

P2/B6

P2/B5

P2/B6

P2/B5

P2/B6

P2/R8

P2/R7

P2/R8

P2/R7

P2/R8

P2/R7

P2/R8

P2/R7

P2/Y7 P2/Y7 P2/Y7 P2/Y7

P3/B8

P3/B8

P3/B8

P3/B8

P3/Y8

P3/Y8

P3/Y8

P3/Y8

P3/Y8

P3/Y8

P3/Y8

P2

/B

7

U1/R1

U1/R1

U1/R1

U1/R1

U1/R1

U1/R1

U1/R2

U1/R2

U1/R2

U1/R2

U1/R2

U1/R2

U1/Y1

U1/Y1

U1/Y1

U1/Y1U1/Y1

U1/Y1U1/Y2

U1/Y2U1/Y2

U1/Y2

U1/Y2

U1/Y2

U1/B1

U1/B1

U1/B1

U1/B1U1/B1

U1/B1

U1/B2

U1/B2

U1/B2

U1/B2U1/B2

U1/B2

U1/R3

U1/R3

U1/R3

U1/R3

U1/R3

U1/R3

U1/R4

U1/R4U1R4

U1/R4

U1R4

U1R4

U1/Y3

U1/Y3U1/Y3

U1/Y3

U1/Y3

U1/Y3

U1/Y4

U1/Y4U1/Y4

U1/Y4U1/Y4

U1/Y4

U1/B3

U1/B3

U1/B3

U1/B3U1/B3

U1/B3

U1/B4

U1/B4

U1/B4

U1/B4

U1/B4

U1/B4

U1/R5

U1R5

U1/R5

U1/R5U1/R5

U1/R5U1/R6

U1/R6U1/R6

U1/R6

U1/Y5U1/Y5

U1/Y5

U1/Y5

U1RY5

U1/Y6

U1/B7

U1/B7

U1/B7

U1/Y7

U1/B7

U1/B7

U1/Y5

U1/Y6

U1/Y6

U1/Y6U1/Y6

U1/Y6

U1/B5

U1/B5

U1/B5

U1/B5

U1/B6

U1/B6

U1/B6

U1/B6U1/B6

U1/B6

U1/R7

U1/R7

U1/R7

U1/R7U1/Y7

U1/Y7

U2

/R

1

U2

/R

1

U2

/R

1

U2

R1

U2

/R

1

U2

/R

1

U2

/R

2

U2

/R

2

U2

/R

2

U2

/R

2

U2

/R

2

U2

/R

2

U2

/Y

1

U2

/Y

1

U2

/Y

1

U2

/Y

1

U2

/Y

1

U2

/Y

1

U2

/Y

2

U2

/Y

2

U2/Y

2

U2

/Y

2

U2

/Y

2

U2

/Y

2

U2

/B

1

U2

/B

1

U2

/B

1

U2

/B

1

U2

/B

1

U2

/B

1

U2

/B

2

U2

/B

2

U2

/B

2

U2

/B

2

U2

/B

2

U2

/B

2

U2

/R

3

U2

/R

3

U2

/R

3

U2

/R

3

U2

/R

3

U2

/R

3

U2

/R

4

U2

/R

4

U2

R4

U2

/R

4

U2

/R

4

U2

/R

4

U2/Y

3

U2

/Y

3

U2

/Y

3

U2

/Y

3

U2

/Y

3

U2

/Y

3

U2

/Y

4

U2

/Y

4

U2

/Y

4

U2

/Y

4

U2

/Y

4

U2

/Y

4

U2

/B

3

U2

/B

3

U2

/B

3

U2

/B

3

U2

/B

3

U2

/B

3

U2

/B

4

U2

/B

4

U2

/B

4

U2

/B

4U

2/B

4

U2

/B

4

U2

/R

5

U2

/R

5

U2

/R

5

U2

/R

5

U2

/R

6

U2

/R

6

U2

/R

6

U2

/R

6

U2

/R

6

U2

/R

6

U2

/Y

5

U2

/Y

5

U2/Y

5

U2

/Y

5

U2

/Y

5

U2

/Y

5

U2

/Y

6

U2

/Y

6

U2

/R

5

U2

/R

5

U2

/Y

6

U2

/Y

6

U2

/Y

6

U2

/Y

6

U2

/B

5

U2

/B

5

U2

/B

5

U2

/B

5

U2

/B

5

U2

/B

5

U2

/B

6

U2

/B

6

U2

/B

6

U2

/B

6

U2

/B

6

U2

/B

6

U2

/R

7

U2

/R

7

U2

/R

7

U2

/R

7

U2

/R

7

U2

/R

7

U2

/R

8

U2

/R

8

U2

/R

8

U2

/R

8

U2

/R

8

U2

/R

8

U2

/Y

7

U2

/Y

7

U2

/Y

7

U2

/Y

7

U2

/Y

7

U2

/Y

7

U2/Y

8

U2

Y8

U2

/Y

8

U2

/Y

8

U2

/Y

8

U2

/Y

8

U3

/B

7

U3

/B

7

U3

/B

7

U3

/B

7

U3

/B

7

U3

/B

7

U3

/B

7

U3

/B

8

U3

/B

8

U3

/B

8

U3

/B

8

U3

/B

8

U3

/B

8

U3

/B

8

U3

/R

1

U3

/R

1

U3

/R

1

U3

/R

1

U3

/R

1

U3

/R

1

U3

/R

2

U/R

2

U3

/R

2

U3

/R

2

U3/R

2

U3/R

2

U3

/Y

1

U3

/Y

1

U3

/Y

1

U3

/Y

1

U3

/Y

1

U3

/Y

1

U3

/Y

2

U3

/Y

2

U3

/Y

2

U3

/Y

2

U3

/Y

2

U3

/Y

2

U3

B1

U3

/B

1

U3

/B

1

U3

/B

1

U3

/B

1

U3

/B

1

U3

/B

2

U3

/B

2

U3

/B

2

U3

/B

2

U3

/B

2

U3

/B

2

U3

/R

3

U3

/R

3

U3

/R

3

U3

/R

3

U3

/R

3

U3

/R

3

U3

/R

4

U3

/R

4

U3

/R

4

U3

/R

4

U3

/R

4

U3

/R

4

U3

/Y

3

U3

Y3

U3

/Y

3

U3/Y

3

U3

/Y

3

U3

/Y

3

U3

/Y

4

U3

/Y

4

U3

/Y

4

U3

/Y

4

U3

/Y

4

U3

/Y

4

U3

/B

3

U3

/B

3

U3

/B

3

U3

/B

3

U3

/B

4

U3

/B

4

U3

/B

4

U3

/B

4

U3

/B

4

U3

/B

4

U3

/R

5

U3

/R

5

U3/R

5

U3/R

5

U3

/R

5

U3

/R

5

U3

/R

6

U3

/R

6

U3

/B

3

U3

/B

3

U3

/R

6

U3

/R

6

U3

/R

6

U3

/R

6

U3

/B

8

U3

/B

8

U3/Y5

U3/Y5

U3/Y5

U3/Y5

U3/Y5

U3/Y5U3/Y6

U3/Y6

U3/Y6

U3/Y6U3/Y6

U3/Y6

U3/B6

U3/B6

U3/B6

U3/B6U3/B6

U3/B6

U3/RB5

U3/B5U3/B5

U3/B5

U3/B5

U3/B5

U3/R7

U3/R7

U3/R7

U3/R7

U3/R7

U3/R7

U3/R8

U3/R8

U3/Y7

U3/Y7

U3/Y7

U3/Y7

U3/R8

U3/R8

U3/R8

U3/R8

U3/Y8U3/Y8

U3/Y7

U3/Y7

U3/Y8

U3/Y8 U3/Y8

U3/Y8

U3/B7

U3/B7

U3/B7

U3/B7U3/B7

U3/B7

U3/B7

U3

/B

8U

3/B

8

U3

/B

8

U3/B8

P3/R9

P3/R9

P3/R9

P3

/R

9

CONDUIT

P3

/Y

4

P3

/Y

3

P1/B5

P1/B5

P1/B5

P1/B5

U1/R6

U1/R6

U1/B5

U1/B5

U1/Y7

U1/Y7

U3

/R

6U

3/R

6

300X40MM RACEWAY

FOR TELEPHONE

& DATA IN FLOOR

400X40MM RACEWAY

FOR TELEPHONE

& DATA IN FLOOR

400X40MM RACEWAY

FOR TELEPHONE

& DATA IN FLOOR

200X40MM RACEWAY

FOR TELEPHONE

& DATA IN FLOOR

200X40MM RACEWAY

FOR POWER

IN FLOOR

200X40MM RACEWAY

FOR POWER UPS

IN FLOOR

200X40MM RACEWAY

FOR POWER UPS

IN FLOOR

200X40MM RACEWAY

FOR POWER

IN FLOOR

150X40MM RACEWAY

FOR POWER

IN FLOOR

150X40MM RACEWAY

FOR POWER UPS

IN FLOOR

100X40MM RACEWAY

FOR POWER UPS

IN FLOOR

250X40MM RACEWAY

FOR POWER

IN FLOOR

250X40MM RACEWAY

FOR POWER UPS

IN FLOOR

300X40MM RACEWAY

FOR POWER

IN FLOOR

300X40MM RACEWAY

FOR POWER UPS

IN FLOOR

100X40MM RACEWAY

FOR POWER UPS

IN FLOOR

100X40MM RACEWAY

FOR POWER

IN FLOOR

400X40MM RACEWAY

FOR TELEPHONE

& DATA IN FLOOR

200X40MM RACEWAY

FOR TELEPHONE

& DATA IN FLOOR

300X40MM RACEWAY

FOR TELEPHONE

& DATA IN FLOOR

400X40MM RACEWAY

FOR TELEPHONE

& DATA IN FLOOR

200X40MM RACEWAY

FOR TELEPHONE

& DATA IN FLOOR

300X40MM RACEWAY

FOR TELEPHONE

& DATA IN FLOOR

300X40MM RACEWAY

FOR TELEPHONE

& DATA IN FLOOR

300X40MM RACEWAY

FOR TELEPHONE

& DATA IN FLOOR

400X40MM RACEWAY

FOR TELEPHONE

& DATA IN FLOOR

400X40MM RACEWAY

FOR TELEPHONE

& DATA IN FLOOR

400X40MM RACEWAY

FOR TELEPHONE

& DATA IN FLOOR

300X40MM RACEWAY

FOR TELEPHONE

& DATA IN FLOOR

400X40MM RACEWAY

FOR TELEPHONE

& DATA IN FLOOR

300X40MM RACEWAY

FOR TELEPHONE

& DATA IN FLOOR

300X40MM RACEWAY

FOR TELEPHONE

& DATA IN FLOOR

200X40MM RACEWAY

FOR TELEPHONE

& DATA IN FLOOR

300X40MM RACEWAY

FOR TELEPHONE

& DATA IN FLOOR

400X40MM RACEWAY

FOR TELEPHONE

& DATA IN FLOOR

400X40MM RACEWAY

FOR TELEPHONE

& DATA IN FLOOR

200X40MM RACEWAY

FOR TELEPHONE

& DATA IN FLOOR

LDB.1

UPSDB.1

PDB.1

LDB.3

UPSDB.3

PDB.3

LD

B.2

UPSDB.2

PD

B.2

( ARCHITECT )

DATE:

SCALE:-

SCALE TO FIT

TITLE:

DRAWN BY:-

CHECKED BY:

PROJECT:

PAHWA ARCH-TECH SERVICES

ARCHITECTS, ENGINEERS,

INTERIOR DESIGNER, VALUER

PLOT NO-53, BLOCK-A

SECTOR-49,NOIDA PH: 0120-2571762

DRG. NO

PROPOSED

INTERIOR WORK OF 27TH

FLOOR OF GIFT ONE

TOWER, GIFT CITY, GANDHI

NAGAR, GUJRAT.

REVISION DATES:

KRISHNA SHARMA

BOB/AHMEDABAD/TENDER/ELE/04

1) CONTRACTOR TO FIELD VERIFY ALL EXISTING

CONDITIONS PRIOR TO BEGINNING WORK.

DRAWINGS ARE NOT TO BE SCALED, ALL

DIMENSIONS SHOWN RELATING TO EXISTING

CONSTRUCTION ARE APPROXIMATE (EXISTING

WALLS MAY NOT BE PLUMB AND WALLS MAY NOT

BE EXACTLY PARAWEL), THE CONTRACTOR

SHALL FIELD VERIFY ALL ACTUAL DIMENSIONS

AND CONTACT ARCHITECT TO ADDRESS ANY

DISCREPANCIES, DIMENSIONS ARE NOT

ADJUSTABLE WITHOUT APPROVAL OF THE

ARCHITECT, UNLESS NOTED +/. OR VIF (VERIFY IN

FIELD), EXACT LOCATIONS, DISTANCES,

ELEVATIONS AND SIMILAR DATA SHALL BE

GOVERNED BY ACTUAL FIELD CONDITIONS AND BY

THE ARCHITECTS INSTRUCTIONS

2) IN THE EVENT OF CONFLICT BETWEEN

INFORMATION SHOWN ON DRAWINGS AND

INFORMATION SHOWN ON THE SPECIFICATIONS,

THE MORE STRINGENT SHALL TAKE PRECEDENCE,

SHOULD THE CONTRACTOR AT ANY TIME DISCOVER

AN ERROR IN A DRAWING OR SPECIFICATION OR A

DISCREPANCY OR VARIATION BETWEEN DIMENSIONS

ON DRAWINGS AND MEASUREMENTS AT THE SITE

OR LACK OF DIMENSIONS OR OTHER INFORMATION,

THE GENERAL CONTRACTOR SHALL NOT PROCEED

WITH THE WORK AFFECTED UNTIL THE ARCHITECT

HAS BEEN NOTIFIED AND PROCEED ONLY AFTER

CLARIFICATION HAS BEEN MADE

NOTE:-

VIKRAM SINGH

APPROVED BY:-

AR.INDER PAL SINGH

17-07-2019

POWER/UPS/DATA/TELE/RACEWAY

DRG.

TENDER DRAWING

THIS DRAWING IN ALL FORMS ELECTRONIC OR HARD

COPY IS EXCLUSIVE PROPERLY OF PAHWA

ARCH-TECH SERVICES AND MUST NOT BE

REPRODUCED IN WHOLE OR IN PART WITHOUT

WRITTEN AUTHORIZATION

3)

PR

OD

UC

ED

B

Y A

N A

UT

OD

ES

K E

DU

CA

TIO

NA

L P

RO

DU

CT

PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT

PR

OD

UC

ED

B

Y A

N A

UT

OD

ES

K E

DU

CA

TIO

NA

L P

RO

DU

CT

PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT

Page 3: TENDER DRAWING - Bank of Baroda · u/r1 u/y1 u/r3 u/r4 u/r5 u/r6 u/y1 u/y1 u/y3 u/y4 u/y5 u/y6 u/b1 u/b2 u/b3 u/b4 u/b5 mcbmcb mcb mcb mcb u/r7 u/r8 u/y7 u/b7 mcb mcb 2x2.5+2.5 sq.mm

U/R

1

U/R

3

U/R

5

U/R

6

U/Y

1

U/R

4

U/Y

1

U/Y

3

U/Y

4

U/Y

5

U/Y

6

U/B

2

U/B

3

U/B

5

U/Y

1

U/B

1

U/B

4

MC

B

MC

B

MC

B

MC

B

MC

B

MC

B

U/R

7

U/R

8

U/Y

7

MC

B

MC

B

U/B

7

MC

B

MC

B

2X

2.5

+2

.5

S

q.m

m.

Cu

. W

IR

E in

C

on

duit

63A,TPN

MCB(10KA)

63A,DP

ELCB(30mA)

63A,DP

ELCB(30mA)

63A,DP

ELCB(30mA)

100A CU.BUSBAR

FLOOR OF GIF ONE TOWER 10WAY TPN UDB-1

(LOCATION:- SMELF DEPT. )

(R)

(Y)

(B)

(KW)

TOTAL LOAD

TOTAL LOAD

TOTAL LOAD

TOTAL LOAD

12135

12000

12600

36.70

(1

80

0W

)

U/B

6

MC

B

MC

B

MC

B

MC

B

MC

B

MC

B

MC

B

MC

B

MC

B

MC

B

MC

B

MC

B

MC

B

U/Y

8

U/B

8

MC

B

R Y B

10

A S

P

10A

S

P

10

A S

P

10

A S

P

10

A S

P

10

A S

P

10

A S

P

10

A S

P

10

A S

P

10

A S

P

10

A S

P

10

A S

P

10

A S

P

10

A S

P

10

A S

P

10

A S

P

10

A S

P

10

A S

P

10

A S

P

10

A S

P

10

A S

P

10

A S

P

100A CU.BUSBAR 100A CU.BUSBAR

10

A S

P

10

A S

P

FROM UPS

(1

35

W)

(S

PA

RE

)

(S

PA

RE

)

(1

20

0W

)

(1

80

0W

)

(1

20

0W

)

U/B

9

MC

B

MC

B

U/B

10

10

A S

P

10

A S

P

(S

PA

RE

)

(S

PA

RE

)

U/R

9

U/R

10

U/Y

9

MC

B

MC

B

MC

B

MC

B

U/Y

10

10A

S

P

10

A S

P

10

A S

P

10

A S

P

(S

PA

RE

)

(S

PA

RE

)

(S

PA

RE

)

MC

B

MC

B

MC

B

MC

B

MC

B

MC

B

MC

B

MC

B

MC

B

MC

B

2X

2.5

+2

.5

S

q.m

m.

Cu

. W

IR

E in C

on

du

it

63A,TPN

MCB(10KA)

63A,DP

ELCB(30mA)

63A,DP

ELCB(30mA)

63A,DP

ELCB(30mA)

100A CU.BUSBAR

FLOOR OF GIF ONE TOWER 10WAY TPN UDB-2

(LOCATION:- SMELF DEPT. )

(R)

(Y)

(B)

(KW)

TOTAL LOAD

TOTAL LOAD

TOTAL LOAD

TOTAL LOAD

14565

14400

15000

43.96

MC

B

MC

B

MC

B

MC

B

MC

B

MC

B

MC

B

MC

B

MC

B

MC

B

MC

B

MC

B

MC

B

MC

B

R Y B

10

A S

P

10

A S

P

10A

S

P

10A

S

P

10A

S

P

10A

S

P

10A

S

P

10A

S

P

10

A S

P

10

A S

P

10

A S

P

10

A S

P

10

A S

P

10

A S

P

10

A S

P

10

A S

P

10

A S

P

10

A S

P

10

A S

P

10

A S

P

10

A S

P

10

A S

P

100A CU.BUSBAR 100A CU.BUSBAR

10A

S

P

10

A S

P

FROM UPS

MC

B

MC

B

10A

S

P

10A

S

P

MC

B

MC

B

MC

B

MC

B

10

A S

P

10A

S

P

10A

S

P

10A

S

P

MC

B

MC

B

MC

B

MC

B

MC

B

MC

B

MC

B

MC

B

MC

B

MC

B

2X

2.5

+2

.5

S

q.m

m.

Cu

. W

IR

E in C

on

duit

63A,TPN

MCB(10KA)

63A,DP

ELCB(30mA)

63A,DP

ELCB(30mA)

63A,DP

ELCB(30mA)

100A CU.BUSBAR

FLOOR OF GIF ONE TOWER 10WAY TPN UDB-3

(LOCATION:- SMELF DEPT. )

(R)

(Y)

(B)

(KW)

TOTAL LOAD

TOTAL LOAD

TOTAL LOAD

TOTAL LOAD

15135

14535

14700

44.70

MC

B

MC

B

MC

B

MC

B

MC

B

MC

B

MC

B

MC

B

MC

B

MC

B

MC

B

MC

B

MC

B

MC

B

R Y B

10

A S

P

10

A S

P

10

A S

P

10

A S

P

10

A S

P

10

A S

P

10

A S

P

10

A S

P

10

A S

P

10

A S

P

10

A S

P

10

A S

P

10

A S

P

10

A S

P

10

A S

P

10

A S

P

10

A S

P

10

A S

P

10

A S

P

10

A S

P

10

A S

P

10

A S

P

100A CU.BUSBAR 100A CU.BUSBAR

10

A S

P

10

A S

P

FROM UPS

MC

B

MC

B

10

A S

P

10

A S

P

MC

B

MC

B

MC

B

MC

B

10

A S

P

10

A S

P

10

A S

P

10

A S

P

(1

80

0W

)

(1

80

0W

)

(1

80

0W

)

(1

80

0W

)

(1

80

0W

)

(1

80

0W

)

(1

80

0W

)

(1

80

0W

)

(1

80

0W

)

(1

80

0W

)

(1

80

0W

)

(1

80

0W

)

(1

80

0W

)

(1

80

0W

)

(1

80

0W

)

(1

80

0W

)

(1

80

0W

)

U/R

1

U/R

3

U/R

5

U/R

6

U/Y

1

U/R

4

U/Y

1

U/Y

3

U/Y

4

U/Y

5

U/Y

6

U/B

2

U/B

3

U/B

5

U/Y

1

U/B

1

U/B

4

U/R

7

U/R

8

U/Y

7

U/B

7

(1

80

0W

)

U/B

6

U/Y

8

U/B

8

(1

80

0)

(2

10

0W

)

(18

00

W)

(1

80

0W

)

(1

80

0W

)

(1

80

0W

)

U/B

9

U/B

10

(S

PA

RE

)

(S

PA

RE

)

U/R

9

U/R

10

U/Y

9

U/Y

10

(S

PA

RE

)

(S

PA

RE

)

(1

65

W)

(1

80

0W

)

(18

00

W)

(1

80

0W

)

(1

80

0W

)

(1

80

0W

)

(1

80

0W

)

(1

80

0W

)

(1

80

0W

)

(1

80

0W

)

(1

80

0W

)

(1

80

0W

)

(1

80

0W

)

(1

80

0W

)

(1

80

0W

)

(1

80

0W

)

(1

80

0W

)

(2

10

0W

)

(S

PA

RE

)

(S

PA

RE

)

U/R

1

U/R

3

U/R

5

U/R

6

U/Y

1

U/R

4

U/Y

1

U/Y

3

U/Y

4

U/Y

5

U/Y

6

U/B

2

U/B

3

U/B

5

U/Y

1

U/B

1

U/B

4

U/R

7

U/R

8

U/Y

7

U/B

7

(1

80

0W

)

U/B

6

U/Y

8

U/B

8

(1

80

0)

(1

80

0W

)

(1

80

0W

)

(1

80

0W

)

(1

80

0W

)

(1

80

0W

)

U/B

9

U/B

10

(S

PA

RE

)

(S

PA

RE

)

U/R

9

U/R

10

U/Y

9

U/Y

10

(S

PA

RE

)

(S

PA

RE

)

(1

35

W)

(1

80

0W

)

(1

80

0W

)

(1

80

0W

)

(1

80

0W

)

(2

40

0W

)

(1

80

0W

)

(1

80

0W

)

(1

80

0W

)

(1

80

0W

)

(1

80

0W

)

(1

80

0W

)

(1

80

0W

)

(1

80

0W

)

(1

80

0W

)

(1

80

0W

)

(1

80

0W

)

(2

10

0W

)

(1

35

W)

SLD DB DRAWING

( ARCHITECT )

DATE:

SCALE:-

SCALE TO FIT

TITLE:

DRAWN BY:-

CHECKED BY:

PROJECT:

PAHWA ARCH-TECH SERVICES

ARCHITECTS, ENGINEERS,

INTERIOR DESIGNER, VALUER

PLOT NO-53, BLOCK-A

SECTOR-49,NOIDA PH: 0120-2571762

DRG. NO

PROPOSED

INTERIOR WORK OF 27TH

FLOOR OF GIFT ONE

TOWER, GIFT CITY, GANDHI

NAGAR, GUJRAT.

REVISION DATES:

KRISHNA SHARMA

BOB/AHMEDABAD/TENDER/SLD DB/01

1) CONTRACTOR TO FIELD VERIFY ALL EXISTING

CONDITIONS PRIOR TO BEGINNING WORK.

DRAWINGS ARE NOT TO BE SCALED, ALL

DIMENSIONS SHOWN RELATING TO EXISTING

CONSTRUCTION ARE APPROXIMATE (EXISTING

WALLS MAY NOT BE PLUMB AND WALLS MAY NOT

BE EXACTLY PARAWEL), THE CONTRACTOR

SHALL FIELD VERIFY ALL ACTUAL DIMENSIONS

AND CONTACT ARCHITECT TO ADDRESS ANY

DISCREPANCIES, DIMENSIONS ARE NOT

ADJUSTABLE WITHOUT APPROVAL OF THE

ARCHITECT, UNLESS NOTED +/. OR VIF (VERIFY IN

FIELD), EXACT LOCATIONS, DISTANCES,

ELEVATIONS AND SIMILAR DATA SHALL BE

GOVERNED BY ACTUAL FIELD CONDITIONS AND BY

THE ARCHITECTS INSTRUCTIONS

2) IN THE EVENT OF CONFLICT BETWEEN

INFORMATION SHOWN ON DRAWINGS AND

INFORMATION SHOWN ON THE SPECIFICATIONS,

THE MORE STRINGENT SHALL TAKE PRECEDENCE,

SHOULD THE CONTRACTOR AT ANY TIME DISCOVER

AN ERROR IN A DRAWING OR SPECIFICATION OR A

DISCREPANCY OR VARIATION BETWEEN DIMENSIONS

ON DRAWINGS AND MEASUREMENTS AT THE SITE

OR LACK OF DIMENSIONS OR OTHER INFORMATION,

THE GENERAL CONTRACTOR SHALL NOT PROCEED

WITH THE WORK AFFECTED UNTIL THE ARCHITECT

HAS BEEN NOTIFIED AND PROCEED ONLY AFTER

CLARIFICATION HAS BEEN MADE

NOTE:-

VIKRAM SINGH

APPROVED BY:-

AR.INDER PAL SINGH

17-07-2019

TENDER DRAWING

THIS DRAWING IN ALL FORMS ELECTRONIC OR HARD

COPY IS EXCLUSIVE PROPERLY OF PAHWA

ARCH-TECH SERVICES AND MUST NOT BE

REPRODUCED IN WHOLE OR IN PART WITHOUT

WRITTEN AUTHORIZATION

3)

PR

OD

UC

ED

B

Y A

N A

UT

OD

ES

K E

DU

CA

TIO

NA

L P

RO

DU

CT

PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT

PR

OD

UC

ED

B

Y A

N A

UT

OD

ES

K E

DU

CA

TIO

NA

L P

RO

DU

CT

PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT

Page 4: TENDER DRAWING - Bank of Baroda · u/r1 u/y1 u/r3 u/r4 u/r5 u/r6 u/y1 u/y1 u/y3 u/y4 u/y5 u/y6 u/b1 u/b2 u/b3 u/b4 u/b5 mcbmcb mcb mcb mcb u/r7 u/r8 u/y7 u/b7 mcb mcb 2x2.5+2.5 sq.mm

P/R

1

P/R

3

P/R

5

P/R

6

P/R

2

P/R

4

P/Y

1

P/Y

3

P/Y

4

P/Y

5

P/Y

6

P/B

2

P/B

3

P/B

5

P/Y

2

P/B

1

P/B

4

MC

B

MC

B

MC

B

MC

B

MC

B

MC

B2X

2.5

+2

.5

S

q.m

m.

Cu

. W

IR

E in

C

on

du

it

63A,TPN

MCB(10KA)

63A,DP

ELCB(30mA)

63A,DP

ELCB(30mA)

63A,DP

ELCB(30mA)

100A CU.BUSBAR

FLOOR OF GIFT ONE TOWER10WAY TPN PDB-1

(LOCATION:- ZOSARB-1 DEPT. )

(R)

(Y)

(B)

(KW)

TOTAL LOAD

TOTAL LOAD

TOTAL LOAD

TOTAL LOAD

4000

4000

3800

11.80

(6

00

W)

P/B

6

MC

B

MC

B

MC

B

MC

B

MC

B

MC

B

MC

B

MC

B

MC

B

MC

B

MC

B

MC

B

R Y B

20

A S

P

20

A S

P

(6

00

W)

(7

00

W)

20

A S

P

20

A S

P

20

A S

P

20

A S

P

20

A S

P

20

A S

P

20

A S

P

20

A S

P

20

A S

P

20

A S

P

20

A S

P

20

A S

P

20

A S

P

20

A S

P

100A CU.BUSBAR 100A CU.BUSBAR

20

A S

P

20

A S

P

FROM ELECTRICAL PANEL

(8

00

W)

(6

00

W)

(4

00

W)

(6

00

W)

(8

00

W)

P/B

7

MC

B

P/B

8

10

A S

P

20

A S

P

(S

PA

RE

)

(S

PA

RE

)

P/Y

7

P/Y

8

MC

B

MC

B

20

A S

P

20

A S

P

(S

PA

RE

)

(S

PA

RE

)

P/R

7

P/R

8

MC

B

MC

B

20

A S

P

20

A S

P

(S

PA

RE

)

(S

PA

RE

)

MC

B

20

A S

P

(6

00

W)

(6

00

W)

(8

00

W)

(6

00

W)

(6

00

W)

(8

00

W)

(7

00

W)

(7

00

W)

(7

00

W)

(6

00

W)

P/B

9

MC

B

P/B

10

20

A S

P

(S

PA

RE

)

(S

PA

RE

)

MC

B

20

A S

P

P/Y

9

P/Y

10

MC

B

MC

B

20

A S

P

20

A S

P

(S

PA

RE

)

(S

PA

RE

)

P/R

9

P/R

10

MC

B

MC

B

20

A S

P

20

A S

P

(S

PA

RE

)

(S

PA

RE

)

P/R

1

P/R

3

P/R

5

P/R

6

P/R

2

P/R

4

P/Y

1

P/Y

3

P/Y

4

P/Y

5

P/Y

6

P/B

2

P/B

3

P/B

5

P/Y

2

P/B

1

P/B

4

MC

B

MC

B

MC

B

MC

B

MC

B

MC

B2X

2.5

+2

.5

S

q.m

m.

Cu

. W

IR

E in

C

on

du

it

63A,TPN

MCB(10KA)

63A,DP

ELCB(30mA)

63A,DP

ELCB(30mA)

63A,DP

ELCB(30mA)

100A CU.BUSBAR

FLOOR OF GIFT ONE TOWER 10WAY TPN PDB-2

(LOCATION:- ZOSARB-2 DEPT. )

(R)

(Y)

(B)

(KW)

TOTAL LOAD

TOTAL LOAD

TOTAL LOAD

TOTAL LOAD

4900

4900

5000

14.80

(6

00

W)

P/B

6

MC

B

MC

B

MC

B

MC

B

MC

B

MC

B

MC

B

MC

B

MC

B

MC

B

MC

B

MC

B

R Y B

20

A S

P

20

A S

P

(6

00

W)

20

A S

P

20

A S

P

20

A S

P

20

A S

P

20

A S

P

20

A S

P

20

A S

P

20

A S

P

20

A S

P

20

A S

P

20

A S

P

20

A S

P

20

A S

P

20

A S

P

100A CU.BUSBAR 100A CU.BUSBAR

20

A S

P

20

A S

P

FROM ELECTRICAL PANEL

(7

00

W)

(7

00

W)

P/B

7

MC

B

P/B

8

10

A S

P

20

A S

P

(7

00

W)

(7

00

W)

P/Y

7

P/Y

8

MC

B

MC

B

20

A S

P

20

A S

P

(S

PA

RE

)

P/R

7

P/R

8

MC

B

MC

B

20

A S

P

20

A S

P

(S

PA

RE

)

MC

B

20

A S

P

(7

00

W)

(6

00

W)

P/B

9

MC

B

P/B

10

20

A S

P

(S

PA

RE

)

(S

PA

RE

)

MC

B

20

A S

P

P/Y

9

P/Y

10

MC

B

MC

B

20

A S

P

20

A S

P

(S

PA

RE

)

(S

PA

RE

)

P/R

9

P/R

10

MC

B

MC

B

20

A S

P

20

A S

P

(S

PA

RE

)

(S

PA

RE

)

P/R

1

P/R

3

P/R

5

P/R

6

P/R

2

P/R

4

P/Y

1

P/Y

3

P/Y

4

P/Y

5

P/Y

6

P/B

2

P/B

3

P/B

5

P/Y

2

P/B

1

P/B

4

MC

B

MC

B

MC

B

MC

B

MC

B

MC

B2X

2.5

+2

.5

S

q.m

m.

Cu

. W

IR

E in

C

on

du

it

63A,TPN

MCB(10KA)

63A,DP

ELCB(30mA)

63A,DP

ELCB(30mA)

63A,DP

ELCB(30mA)

100A CU.BUSBAR

FLOOR OF GIFT ONE TOWER10WAY TPN PDB-1

(LOCATION:- ZOSARB-1 DEPT. )

(R)

(Y)

(B)

(KW)

TOTAL LOAD

TOTAL LOAD

TOTAL LOAD

TOTAL LOAD

4800

5100

4800

14.70

(6

00

W)

P/B

6

MC

B

MC

B

MC

B

MC

B

MC

B

MC

B

MC

B

MC

B

MC

B

MC

B

MC

B

MC

B

R Y B

20

A S

P

20

A S

P

(6

00

W)

(7

00

W)

20

A S

P

20

A S

P

20

A S

P

20

A S

P

20

A S

P

20

A S

P

20

A S

P

20

A S

P

20

A S

P

20

A S

P

20

A S

P

20

A S

P

20

A S

P

20

A S

P

100A CU.BUSBAR 100A CU.BUSBAR

20

A S

P

20

A S

P

FROM ELECTRICAL PANEL

(6

00

W)

(6

00

W)

(4

00

W)

(6

00

W)

(6

00

W)

P/B

7

MC

B

P/B

8

10

A S

P

20

A S

P

P/Y

7

P/Y

8

MC

B

MC

B

20

A S

P

20

A S

P

(S

PA

RE

)

(S

PA

RE

)

P/R

7

P/R

8

MC

B

MC

B

20

A S

P

20

A S

P

MC

B

20

A S

P

(6

00

W)

(6

00

W)

(8

00

W)

(6

00

W)

(6

00

W)

(8

00

W)

(7

00

W)

(7

00

W)

(7

00

W)

(4

00

W)

P/B

9

MC

B

P/B

10

20

A S

P

(S

PA

RE

)

(S

PA

RE

)

MC

B

20

A S

P

P/Y

9

P/Y

10

MC

B

MC

B

20

A S

P

20

A S

P

(S

PA

RE

)

(S

PA

RE

)

P/R

9

P/R

10

MC

B

MC

B

20

A S

P

20

A S

P

(S

PA

RE

)

(7

00

W)

(7

00

W)

(7

00

W)

(7

00

W)

(7

00

W)

(7

00

W)

(7

00

W)

(7

00

W)

(7

00

W)

(6

00

W)

(6

00

W)

(6

00

W)

(6

00

W)

(6

00

W)

(4

00

W)

(4

00

W)

(4

00

W)

(6

00

W)

(6

00

W)

SLD DB DRAWING

( ARCHITECT )

DATE:

SCALE:-

SCALE TO FIT

TITLE:

DRAWN BY:-

CHECKED BY:

PROJECT:

PAHWA ARCH-TECH SERVICES

ARCHITECTS, ENGINEERS,

INTERIOR DESIGNER, VALUER

PLOT NO-53, BLOCK-A

SECTOR-49,NOIDA PH: 0120-2571762

DRG. NO

PROPOSED

INTERIOR WORK OF 27TH

FLOOR OF GIFT ONE

TOWER, GIFT CITY, GANDHI

NAGAR, GUJRAT.

REVISION DATES:

KRISHNA SHARMA

BOB/AHMEDABAD/TENDER/SLD DB/02

1) CONTRACTOR TO FIELD VERIFY ALL EXISTING

CONDITIONS PRIOR TO BEGINNING WORK.

DRAWINGS ARE NOT TO BE SCALED, ALL

DIMENSIONS SHOWN RELATING TO EXISTING

CONSTRUCTION ARE APPROXIMATE (EXISTING

WALLS MAY NOT BE PLUMB AND WALLS MAY NOT

BE EXACTLY PARAWEL), THE CONTRACTOR

SHALL FIELD VERIFY ALL ACTUAL DIMENSIONS

AND CONTACT ARCHITECT TO ADDRESS ANY

DISCREPANCIES, DIMENSIONS ARE NOT

ADJUSTABLE WITHOUT APPROVAL OF THE

ARCHITECT, UNLESS NOTED +/. OR VIF (VERIFY IN

FIELD), EXACT LOCATIONS, DISTANCES,

ELEVATIONS AND SIMILAR DATA SHALL BE

GOVERNED BY ACTUAL FIELD CONDITIONS AND BY

THE ARCHITECTS INSTRUCTIONS

2) IN THE EVENT OF CONFLICT BETWEEN

INFORMATION SHOWN ON DRAWINGS AND

INFORMATION SHOWN ON THE SPECIFICATIONS,

THE MORE STRINGENT SHALL TAKE PRECEDENCE,

SHOULD THE CONTRACTOR AT ANY TIME DISCOVER

AN ERROR IN A DRAWING OR SPECIFICATION OR A

DISCREPANCY OR VARIATION BETWEEN DIMENSIONS

ON DRAWINGS AND MEASUREMENTS AT THE SITE

OR LACK OF DIMENSIONS OR OTHER INFORMATION,

THE GENERAL CONTRACTOR SHALL NOT PROCEED

WITH THE WORK AFFECTED UNTIL THE ARCHITECT

HAS BEEN NOTIFIED AND PROCEED ONLY AFTER

CLARIFICATION HAS BEEN MADE

NOTE:-

VIKRAM SINGH

APPROVED BY:-

AR.INDER PAL SINGH

17-07-2019

TENDER DRAWING

THIS DRAWING IN ALL FORMS ELECTRONIC OR HARD

COPY IS EXCLUSIVE PROPERLY OF PAHWA

ARCH-TECH SERVICES AND MUST NOT BE

REPRODUCED IN WHOLE OR IN PART WITHOUT

WRITTEN AUTHORIZATION

3)

PR

OD

UC

ED

B

Y A

N A

UT

OD

ES

K E

DU

CA

TIO

NA

L P

RO

DU

CT

PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT

PR

OD

UC

ED

B

Y A

N A

UT

OD

ES

K E

DU

CA

TIO

NA

L P

RO

DU

CT

PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT