SR. # KE MATERIAL CODE ITEM DESCRIPTION QTY UNIT SERVICES FOR RATE RUNNING CONTRACT FOR SERVICES FOR RATE RUNNING CONTRACT FOR FIELD BALANCING/DYNAMIC BALANCING "AS AND WHEN REQUIRED BASIS" AT BQPS-1 . VENDORS ARE TO SUBMIT FOLLOWING, AT LEAST 2 WEEKS BEFORE COMMENCEMENT OF OUTAGE; a. A LIST OF SKILLED MANPOWER FOR REVIEW OF USER b. A LIST OF TOOLS WITH CERTIFICATION PROOF c. MOBILIZATION PLAN d. JOB EXECUTION PLAN INCLUDING MILE STONES 2. VENDORS ARE BOUND TO; a. CONDUCT DAILY HOUSE KEEPING, FAILING WHICH THEY SHOULD BE PENALIZED IN MONITORING TERMS REFLECTING IN PO b. TO APPOINT SAFETY INSPECTOR FOR A GROUP OF 20 WORKER OR ABOVE. THE SAFETY INSPECTOR SHOULD HAVE AN EXPERIENCE OF 3 YEARS AND TO BE CERTIFIED BY SAFETY DEPARTMENT OF BQPS-1 AND MUST HAVE KNOWLEDGE OF: i. PERMIT TO WORK SYSTEM ii. RISK ASSESSMENT 3. LDS ON VENDORS SHALL BE IMPLEMENTED DUE TO FOLLOWING SAFETY VIOLATIONS i. NONCONFORMANCE OF PPES ii. NONCONFORMANCE OF HOUSE KEEPING iii. WORKING WITHOUT WORK PERMIT iv. UNSAFE ACTS 4. FOR A GROUP OF 100 WORKERS OR MORE, VENDORS SHALL BE BOUND TO HAVE THEIR OWN ARRANGEMENT OF ; a. SITE FACILITY WITH REST ROOMS b. TOOL FACILITY c. LUNCH FACILITY d. WATER FACILITY e. TOILET FACILITY 1 1 AU SERVICES FOR RATE RUNNING CONTRACT FOR FIELD BALANCING/DYNAMIC BALANCING "AS AND WHEN REQUIRED BASIS" AT BQPS-1 PR# 1300043130, FG1349/BQ1, Tender Cost Rs. 2000/- To Be Opened on 26.09.2019 TENDER NOTICE K-Electric is Pakistan’s only vertically-integrated power utility that generates, transmits and distributes energy to more than 2.5 million consumers across Karachi and its outskirts. The company invites sealed tenders for procurement / supply as per details given below; Collection of Tenders as follows : Monday - 09:00 AM to 03:00 PM Thursday - 09:00 AM to 03:00 PM

Upload: others

Post on 16-May-2020

8 views

Category:

Documents


3 download

TRANSCRIPT

Page 1: TENDER NOTICE - 26.09.2019€¦ · Fan function :Flame detector cooling fan Speed :3000rpm Power :15 KW Capacity :19m3 /min 4 EA SR. # KE MATERIAL CODE ITEM DESCRIPTION QTY UNIT SERVICE

SR. # KE MATERIAL CODE ITEM DESCRIPTION QTY UNIT

SERVICES FOR RATE RUNNING CONTRACT FORSERVICES FOR RATE RUNNING CONTRACT FOR FIELD BALANCING/DYNAMICBALANCING "AS AND WHEN REQUIRED BASIS" AT BQPS-1

. VENDORS ARE TO SUBMIT FOLLOWING, AT LEAST 2 WEEKS BEFORE COMMENCEMENT OF OUTAGE;a. A LIST OF SKILLED MANPOWER FOR REVIEW OF USERb. A LIST OF TOOLS WITH CERTIFICATION PROOFc. MOBILIZATION PLANd. JOB EXECUTION PLAN INCLUDING MILE STONES2. VENDORS ARE BOUND TO;a. CONDUCT DAILY HOUSE KEEPING, FAILING WHICH THEY SHOULD BE PENALIZED IN MONITORING TERMS REFLECTING IN POb. TO APPOINT SAFETY INSPECTOR FOR A GROUP OF 20 WORKER OR ABOVE. THE SAFETY INSPECTOR SHOULD HAVE AN EXPERIENCE OF 3 YEARS AND TO BE CERTIFIED BY SAFETY DEPARTMENT OF BQPS-1 AND MUST HAVE KNOWLEDGE OF:

i. PERMIT TO WORK SYSTEMii. RISK ASSESSMENT3. LDS ON VENDORS SHALL BE IMPLEMENTED DUE TO FOLLOWING SAFETY VIOLATIONSi. NONCONFORMANCE OF PPESii. NONCONFORMANCE OF HOUSE KEEPINGiii. WORKING WITHOUT WORK PERMITiv. UNSAFE ACTS4. FOR A GROUP OF 100 WORKERS OR MORE, VENDORS SHALL BE BOUND TO HAVE THEIR OWN ARRANGEMENT OF ;a. SITE FACILITY WITH REST ROOMSb. TOOL FACILITYc. LUNCH FACILITYd. WATER FACILITYe. TOILET FACILITY

1 1 AU

SERVICES FOR RATE RUNNING CONTRACT FOR FIELD BALANCING/DYNAMICBALANCING "AS AND WHEN REQUIRED BASIS" AT BQPS-1

PR# 1300043130, FG1349/BQ1, Tender Cost Rs. 2000/- To Be Opened on 26.09.2019

TENDER NOTICE

K-Electric is Pakistan’s only vertically-integrated power utility that generates, transmits and distributes energy to more than 2.5 million consumers across Karachi and its outskirts. The company invites sealed tenders for procurement / supply as per details given below;

Collection of Tenders as follows :

Monday - 09:00 AM to 03:00 PMThursday - 09:00 AM to 03:00 PM

Page 2: TENDER NOTICE - 26.09.2019€¦ · Fan function :Flame detector cooling fan Speed :3000rpm Power :15 KW Capacity :19m3 /min 4 EA SR. # KE MATERIAL CODE ITEM DESCRIPTION QTY UNIT SERVICE

Services of Forced Draft Fan (FDF)a. FD FANFan function :Forced draughtFan diameter :2520mmSpeed :980rpmBearing Dia :140mmPower :1275KW

. SCOPE OF WORKa. FIELD DYNAMIC BALANCING OF EQUIPMENTSb. SUBMISSION OF BALANCING REPORT INCLUSIVE PRE-BALANCING & POST BALANCING ,VIBRATION LEVEL ,FREQUENCY SPECTRUM AND FUTURE RECOMMENDATION.2. TERMS AND CONDITIONSa. SERVICES WILL BE REQUIRED ON "AS AND WHEN REQUIRED"BASISb. BIDDER WILL SUBMIT RATES FOR SCOPE OF WORK SEPARATELY ON PER EXERCISE FOR EACH INDIVIDUAL EQUIPMENT MENTIONED IN SERIAL 03.c. VALIDITY OF CONTRACT WILL BE 12 MONTHS FROM THE DATE OF PLACEMENT OF PURCHASE ORDER.d. THE CONTRACTOR WILL GIVE IMMEDIATE RESPONSE UPON CALL FROM D.G.M BOILER OR HIS REPRESENTATIVE.e. SERVICE PROVIDER MUST USE CALIBRATED EQUIPMENT.

NOTE1. BIDDER MUST SUBMIT UNIT PRICE FOR EACH ITEM & PAYMENT WILL BE MADE ON ACTUAL BASIS FOR SERVICES PROVIDER.2. LAST SERVICES PROVIDER FOR DYNAMIC BALANCING WAS PETRIAN ENGINEERING SERVICES(CONTACT # 0305-2573614, PTCL # 021-5848205,FAX # 021-58536208)

1.2 7200813

Services of Gas Recirculation Fan (GRF)b. GR FANFan function :Gas recirculationFan diameter :2982mmSpeed :740mmBearing Dia :180mmPower :600KW

4 EA

1.3 7200814

Services of Flame Detector Cooling Fanc. FDC FANFan function :Flame detector cooling fanSpeed :3000rpmPower :15 KWCapacity :19m3 /min

4 EA

SR. # KE MATERIAL CODE ITEM DESCRIPTION QTY UNIT

SERVICE FOR DYNAMIC BALANCING OF BFPSERVICE FOR DYNAMIC BALANCING OF BFP ROTOR, UNIT# 01 & 05 AND REPAIRING OF GENERATOR SEAL OIL VACUUM SYSTEM AND OTHER SHAFTS, UNIT 01-06, BQPS-1

72008121.1 4 EA

SERVICE FOR DYNAMIC BALANCING OF BFP ROTOS, UNIT# 01 & 05 ANDREPAIRING OF GENERATOR SEAL OIL VACUUM SYSTEM AND OTHER SHAFTS, UNIT 01-06, BQPS-1

PR# 1300042867, FG1350/BQ1, Tender Cost Rs. 2000/- To Be Opened on 26.09.2019

Page 3: TENDER NOTICE - 26.09.2019€¦ · Fan function :Flame detector cooling fan Speed :3000rpm Power :15 KW Capacity :19m3 /min 4 EA SR. # KE MATERIAL CODE ITEM DESCRIPTION QTY UNIT SERVICE

1. Vendors are to submit following, at least 2 weeks before commencement of outage;a. A list of skilled manpower for review of userb. A list of tools with certification proofc. Mobilization pland. Job execution plan including Mile Stones2. Vendors are bound to;a. Conduct Daily House Keeping, failing which they should be penalized in monitoring terms reflecting in POb. To appoint Safety Inspector for a group of 20 worker or above. The Safety Inspector should have an experience of 3 years and to be certified by Safety Department of BQPS-1 and must have knowledge of:

i. Permit to Work systemii. Risk assessment3. LDs on vendors shall be implemented due to following Safety violationsi. Nonconformance of PPEsii. Nonconformance of House Keepingiii. Working without Work Permitiv. Unsafe Acts4. For a group of 100 workers or more, vendors shall be bound to have their own arrangement of ;a. Site facility with Rest Roomsb. Tool facilityc. Lunch facilityd. Water facilitye. Toilet facility

1.1 7200773

Dynamic Balancing of BFP RotorSERVICE FOR DYNAMIC BALANCING OF BFP ROTOR, UNIT#01 BQPS-01

SCOPE OF WORK

"ACCURATE WEIGHING OF EACH ROTOR"INSTALLATION OF ROTOR ON BALANCING MACHINE, CHECKING AND RECORDING OF INITIAL UNBALANCE."CARRYING OUT LOW SPEED DYNAMIC BALANCING ON ISO STANDARD 1940 GRADE 2.5."SUBMISSION OF BALANCING REPORT"01 NOS. BFP ROTOR FOR DYNAMIC BALANCING

1

1.2 7200773

Dynamic Balancing of BFP RotorSERVICE FOR DYNAMIC BALANCING OF BFP ROTOR, UNIT#05 BQPS-01

SCOPE OF WORK

"ACCURATE WEIGHING OF EACH ROTOR"INSTALLATION OF ROTOR ON BALANCING MACHINE, CHECKING AND RECORDING OF INITIAL UNBALANCE."CARRYING OUT LOW SPEED DYNAMIC BALANCING ON ISO STANDARD 1940 GRADE 2.5."SUBMISSION OF BALANCING REPORT"01 NOS. BFP ROTOR FOR DYNAMIC BALANCING

1

1 1 AU

Page 4: TENDER NOTICE - 26.09.2019€¦ · Fan function :Flame detector cooling fan Speed :3000rpm Power :15 KW Capacity :19m3 /min 4 EA SR. # KE MATERIAL CODE ITEM DESCRIPTION QTY UNIT SERVICE

1.3 7200662

ONSITE MACHINERY DIAGNOSTIC SERVICESERVICE FOR MACHINE SHOP FOR REPAIRING OF GENERATOR SEAL OIL VACUUM PUMP AND OTHER SHAFTS, UNIT# 01-06, BQPS-1

SCOPE OF WORK

"VACUUM PUMP HOSING BORE MACHINING/ GRINDING WORK/ SIZING AS PER ORIGINAL DIMENSIONS"VACUUM PUMP SHAFT ARC SPRAY WELDING/ MACHINING/ GRINDING AND SIZING AS PER ORIGINAL DIMENSIONS"SLIDES/ PLATES REPAIRING/ GRINDING WORK AND SIZING AS PER ORIGINAL DIMENSIONS"SHAFT ARC SPRAY WELDING/ GRINDING AND SIZING AS PER ORIGINAL DIMENSIONS"SHAFT CHROME / ARC SPRAY AND SIZING AS PER ORIGINAL DIMENSIONS

NOTE: PAYMENT CAN BE MADE AS A PARTIAL / AS PER PARTS REPAIRED

1

SR. # KE MATERIAL CODE ITEM DESCRIPTION QTY UNIT

1 10115343

O'RING; HPBP PCV ACT. 239.3X5.7 P#3 U3-4 O’ring for HP Bypass PCV Hydraulic Actuator, Unit # 03-04, BQPS1. SPECIFICATION: Part # 3, Size: 239.3x5.7mm, Material:Nitrile, Actuator Type: SMH 200-C, Drawing No.: 871204, Make: EUR-CONTROL, SWEDEN

3 EA

2 10115344

RING; THRUST HPBP PCV 220X250 P#3:1 U3-4 Thrust Ring for HP Bypass PCV Hydraulic Actuator, Unit # 03-04, BQPS1. SPECIFICATION: Part # 3:1, Size: 220x250, Material:Hytrel, Actuator Type: SMH 200-C, Drawing No.: 871204, Make: EUR-CONTROL, SWEDEN

3 SET

3 10115345

O'RING; HPBP PCV ACT. 189.3X5.7 P#4 U3-4 O’ring for HP Bypass PCV Hydraulic Actuator, Unit # 03-04, BQPS1. SPECIFICATION: Part # 4, Size: 189.3x5.7mm, Material:Nitrile, Actuator Type: SMH 200-C, Drawing No.: 871204, Make: EUR-CONTROL, SWEDEN

3 EA

4 10115346

RING; THRUST HPBP PCV 190X200 P#4:1 U3-4 Thrust Ring for HP Bypass PCV Hydraulic Actuator, Unit # 03-04, BQPS1. SPECIFICATION: Part # 4:1, Size: 190x200, Material:Hytrel, Actuator Type: SMH 200-C, Drawing No.: 871204, Make: EUR-CONTROL, SWEDEN

6 SET

5 10115347

SEAL; PISTON HPBP PCV HYD. ACT. P#8 U3-4 Piston Seal for HP Bypass PCV Hydraulic Actuator, Unit # 03-04, BQPS1. SPECIFICATION: Part # 8, Type: KALOT KL-48-811-2000,Material: Kalov 48/Nitrile, Actuator Type: SMH 200-C, Drawing No.: 871204, Make: EUR-CONTROL, SWEDEN

3 SET

PROCUREMENT OF SPARES FOR OVERHAULING OF HP & LP BYPASS HYDRAULIC CYLINDERS UNIT 3-4, BQPS-1

PR# 1400025167, FG1353/BQ1, Tender Cost Rs. 2000/- To Be Opened on 26.09.2019

Page 5: TENDER NOTICE - 26.09.2019€¦ · Fan function :Flame detector cooling fan Speed :3000rpm Power :15 KW Capacity :19m3 /min 4 EA SR. # KE MATERIAL CODE ITEM DESCRIPTION QTY UNIT SERVICE

6 10115348

SEAL; PISTON ROD HPBP PCV ACT. P#9 U3-4 Piston Rod Seal for HP Bypass PCV Hydraulic Actuator, Unit # 03-04, BQPS1. SPECIFICATION: Part # 9, Type: KALOT 48-7-1-0560,Material: Kalov 48/Nitrile, Actuator Type: SMH 200-C, Drawing No.: 871204, Make: EUR-CONTROL, SWEDEN

3 SET

7 10115349

SEAL; LIP HPBP PCV HYD. ACT. P#12 U3-4 Lip Seal for HP Bypass PCV Hydraulic Actuator, Unit # 03-04, BQPS1. SPECIFICATION: Part # 12, Type: KALIP 99-931-0560,Material: Kalov 99/Nitrile, Actuator Type: SMH 200-C, Drawing No.: 871204, Make: EUR-CONTROL, SWEDEN

3 SET

8 10115350

O'RING; HPBP PCV ACT. 79.2X5.7 P#15 U3-4 O’ring for HP Bypass PCV Hydraulic Actuator, Unit # 03-04, BQPS1. SPECIFICATION: Part # 15, Size: 79.2x5.7mm, Material:Nitrile, Actuator Type: SMH 200-C, Drawing No.: 871204, Make: EUR-CONTROL, SWEDEN

3 EA

9 10115351

RING; THRUST HPBP PCV 80X90 P#15:1 U3-4 Thrust Ring for HP Bypass PCV Hydraulic Actuator, Unit # 03-04, BQPS1. SPECIFICATION: Part # 15:1, Size: 80x90, Material:Hytrel, Actuator Type: SMH 200-C, Drawing No.: 871204, Make: EUR-CONTROL, SWEDEN

3 SET

10 10115352

O'RING; LPBP PCV ACT. 299.3X5.7 P#3 U3-4 O’ring for LP Bypass PCV Hydraulic Actuator, Unit # 03-04, BQPS1. SPECIFICATION: Part # 3, Size: 299.3x5.7mm, Material:Nitrile, Actuator Type: SMH 250-C, Drawing No.: 871204, Make: EUR-CONTROL, SWEDEN

3 EA

11 10115353

RING; THRUST LPBP PCV 300X310 P#3:1 U3-4 Thrust Ring for LP Bypass PCV Hydraulic Actuator, Unit # 03-04, BQPS1. SPECIFICATION: Part # 3:1, Size: 300x310, Material:Hytrel, Actuator Type: SMH 250-C, Drawing No.: 871204, Make: EUR-CONTROL, SWEDEN

6 SET

12 10115354

O'RING; LPBP PCV ACT. 239.3X5.7 P#4 U3-4 O’ring for LP Bypass PCV Hydraulic Actuator, Unit # 03-04, BQPS1. SPECIFICATION: Part # 4, Size: 239.3x5.7mm, Material:Nitrile, Actuator Type: SMH 250-C, Drawing No.: 871204, Make: EUR-CONTROL, SWEDEN

3 EA

13 10115355

RING; THRUST LPBP PCV 240X250 P#4:1 U3-4 Thrust Ring for LP Bypass PCV Hydraulic Actuator, Unit # 03-04, BQPS1. SPECIFICATION: Part # 4:1, Size: 240x250, Material:Hytrel, Actuator Type: SMH 250-C, Drawing No.: 871204, Make: EUR-CONTROL, SWEDEN

6 SET

14 10115356

SEAL; PISTON LPBP PCV HYD. ACT. P#8 U3-4 Piston Seal for LP Bypass PCV Hydraulic Actuator, Unit # 03-04, BQPS1. SPECIFICATION: Part # 8, Type: KALOT KL-46-811-2500,Material: Kalov 48/Nitrile, Actuator Type: SMH 250-C, Drawing No.: 871204, Make: EUR-CONTROL, SWEDEN

3 SET

Page 6: TENDER NOTICE - 26.09.2019€¦ · Fan function :Flame detector cooling fan Speed :3000rpm Power :15 KW Capacity :19m3 /min 4 EA SR. # KE MATERIAL CODE ITEM DESCRIPTION QTY UNIT SERVICE

15 10115357

SEAL; PISTON ROD LPBP PCV ACT. P#9 U3-4 Piston Rod Seal for LP Bypass PCV Hydraulic Actuator, Unit # 03-04, BQPS1. SPECIFICATION: Part # 9, Type: KALOT 48-711-0700,Material: Kalov 48/Nitrile, Actuator Type: SMH 205-C, Drawing No.: 871204, Make: EUR-CONTROL, SWEDEN

3 SET

16 10115358

SEAL; LIP LPBP PCV HYD. ACT. P#12 U3-4 Lip Seal for LP Bypass PCV Hydraulic Actuator, Unit # 03-04, BQPS1. SPECIFICATION: Part # 12, Type: KALIP 99-931-0700,Material: Kalov 99/Nitrile, Actuator Type: SMH 250-C, Drawing No.: 871204, Make: EUR-CONTROL, SWEDEN

3 SET

17 10115359

O'RING; LPBP PCV ACT. 99.1X5.7 P#15 U3-4 O’ring for LP Bypass PCV Hydraulic Actuator, Unit # 03-04, BQPS1. SPECIFICATION: Part # 15, Size: 99.1x5.7mm, Material:Nitrile, Actuator Type: SMH 250-C, Drawing No.: 871204, Make: EUR-CONTROL, SWEDEN

3 EA

18 10115360

RING; THRUST LPBP PCV 100X110 P#15:1 U4 Thrust Ring for LP Bypass PCV Hydraulic Actuator, Unit # 03-04, BQPS1. SPECIFICATION: Part # 15:1, Size: 100x110, Material:Hytrel, Actuator Type: SMH 250-C, Drawing No.: 871204, Make: EUR-CONTROL, SWEDEN

3 SET

19 10115361

O'RING; HP/LPBP TCV ACT. 64.5X3 P#3 U3-4 O’ring for HP & LP Bypass TCV Hydraulic Actuator, Unit # 03-04, BQPS1. SPECIFICATION: Part # 3, Size: 64.5x3mm, Material:Nitrile, Actuator Type: SMH 50-C, Drawing No.: 871203, Make: EUR-CONTROL, SWEDEN

3 EA

20 10115362

RING; THRUST HP/LPBP TCV 65X70 P#3:1 U4 Thrust Ring for HP & LP Bypass TCV Hydraulic Actuator, Unit # 03-04, BQPS1. SPECIFICATION: Part # 3:1, Size: 65x70, Material:Hytrel, Actuator Type: SMH 50-C, Drawing No.: 871203, Make: EUR-CONTROL, SWEDEN

3 SET

21 10115363

SEAL; PISTON HP/LPBP TCV ACT. P#9 U3-4 Piston Seal for HP & LP Bypass TCV Hydraulic Actuator, Unit # 03-04, BQPS1. SPECIFICATION: Part # 9, Type: KALOTKL-48-811-0500, Material: Kalov 48/Nitrile, Actuator Type: SMH 50-C, Drawing No.: 871203, Make: EUR-CONTROL, SWEDEN

3 SET

22 10115364

SEAL; LIP HP LP BP PCV HYD. ACT. P#12 U3 Lip Seal for HP & LP Bypass TCV Hydraulic Actuator, Unit # 03-04, BQPS1. SPECIFICATION: Part # 12, Type: KALIP 99-931-0200,Material: Kalov 99/Nitrile, Actuator Type: SMH 50-C, Drawing No.: 871203, Make: EUR-CONTROL, SWEDEN

3 SET

23 10115365

O'RING; HP/LPBP TCV ACT 44.2X3 P#15 U3-4 O’ring for HP & LP Bypass TCV Hydraulic Actuator, Unit # 03-04, BQPS1. SPECIFICATION: Part # 15, Size: 44.2x3mm, Material:Nitrile, Actuator Type: SMH 50-C, Drawing No.: 871203, Make: EUR-CONTROL, SWEDEN

3 EA

Page 7: TENDER NOTICE - 26.09.2019€¦ · Fan function :Flame detector cooling fan Speed :3000rpm Power :15 KW Capacity :19m3 /min 4 EA SR. # KE MATERIAL CODE ITEM DESCRIPTION QTY UNIT SERVICE

24 10115366RING; THRUST HP/LPBP TCV 45X50 P#15:1 U4 RING; THRUST HP/LPBP TCV 45X50 P#15:1 U4 6 SET

25 10115367

SEAL; PISTON ROD HP/LPBP TCV ACT P#18 U4 Piston Rod Seal for HP & LP Bypass TCV Hydraulic Actuator, Unit # 03-04, BQPS1. SPECIFICATION: Part # 18, Type: KALOTKL-48-711-0200, Material: Kalov 48/Nitrile, Actuator Type: SMH 50-C, Drawing No.: 871203, Make: EUR-CONTROL, SWEDEN

3 SET

26 10115368

O'RING; HP/LPBP TCV ACT 34.2X3 P#19 U3-4 O’ring for HP & LP Bypass TCV Hydraulic Actuator, Unit # 03-04, BQPS1. SPECIFICATION: Part # 19, Size: 34.2x3mm, Material:Nitrile, Actuator Type: SMH 50-C, Drawing No.: 871203, Make: EUR-CONTROL, SWEDEN

3 EA

27 10115369

RING; THRUST HP/LPBP TCV 35X40 P#19:1 U4 Thrust Ring for HP & LP Bypass TCV Hydraulic Actuator, Unit # 03-04, BQPS1. SPECIFICATION: Part # 19:1, Size: 35x40, Material:Hytrel, Actuator Type: SMH 50-C, Drawing No.: 871203, Make: EUR-CONTROL, SWEDEN

6 SET

SR. # KE MATERIAL CODE ITEM DESCRIPTION QTY UNIT

1 10115265

CONSUMABLE; TOOLS FOR COLLECTOR RING U#2During overhauling of generator, collector ring replacement is alsoincluded in the whole activity, for replacement of collector ringspecial tools are required for removal and installation of collectorring.

1 SET

SR. # KE MATERIAL CODE ITEM DESCRIPTION QTY UNIT

HIRING SERVICES OF TECHNICAL ADVISOR FOR HIRING SERVICES OF TECHNICAL ADVISOR FOR GENERATOR COLLECTOR RING REPLACEMENT, UNIT-2, BQPS-11. VENDORS ARE TO SUBMIT FOLLOWING, AT LEAST 2 WEEKS BEFORE COMMENCEMENT OF OUTAGE;a. A LIST OF SKILLED MANPOWER FOR REVIEW OF USERb. A LIST OF TOOLS WITH CERTIFICATION PROOFc. MOBILIZATION PLANd. JOB EXECUTION PLAN INCLUDING MILE STONES2. VENDORS ARE BOUND TO;a. CONDUCT DAILY HOUSE KEEPING, FAILING WHICH THEY SHOULD BE PENALIZED IN MONITORING TERMS REFLECTING IN POb. TO APPOINT SAFETY INSPECTOR FOR A GROUP OF 20 WORKER OR ABOVE. THE SAFETY INSPECTOR SHOULD HAVE AN EXPERIENCE OF 3 YEARS AND TO BE CERTIFIED BY SAFETY DEPARTMENT OF BQPS-1 AND MUST HAVE KNOWLEDGE OF:

PROCUREMENT OF CONSUMABLE SPARES PARTS FOR GENERATOR COLLECTOR RING REPLACEMENT, UNIT - 2, BQPS-1PR# 1400025124, FG1354/BQ1, Tender Cost Rs. 2000/- To Be Opened on 26.09.2019

HIRING SERVICES OF TECHNICAL ADVISOR FOR GENERATOR COLLECTOR RING REPLACEMENT, UNIT-2, BQPS-1

PR# 1300042868, FG1355/BQ1, Tender Cost Rs. 2000/- To Be Opened on 26.09.2019

Page 8: TENDER NOTICE - 26.09.2019€¦ · Fan function :Flame detector cooling fan Speed :3000rpm Power :15 KW Capacity :19m3 /min 4 EA SR. # KE MATERIAL CODE ITEM DESCRIPTION QTY UNIT SERVICE

i. PERMIT TO WORK SYSTEMii. RISK ASSESSMENT3. LDS ON VENDORS SHALL BE IMPLEMENTED DUE TO FOLLOWING SAFETY VIOLATIONSi. NONCONFORMANCE OF PPESii. NONCONFORMANCE OF HOUSE KEEPINGiii. WORKING WITHOUT WORK PERMITiv. UNSAFE ACTS4. FOR A GROUP OF 100 WORKERS OR MORE, VENDORS SHALL BE BOUND TO HAVE THEIR OWN ARRANGEMENT OF ;a. SITE FACILITY WITH REST ROOMSb. TOOL FACILITYc. LUNCH FACILITYd. WATER FACILITYe. TOILET FACILITY

1.1 7200130 Normal Working Days - Technical Advisor MECHANICAL ASSEMBLY) 21 DAY1.2 Normal Day OT Hrs MECHANICAL ASSEMBLY) 84 H1.3 7200130 Normal Working Days - Technical Advisor NIGHT SHIFT 8 DAY1.4 Night Shift Normal Day OT SPECIALIST) 32 H1.5 7200133 Holiday Working Days -Technical Advisor WEEKEND DAY 4 DAY1.6 Weekend OT Hrs 16 H1.7 7200133 Holiday Working Days -Technical Advisor NIGH SHIFT WEEKEND 2 DAY1.8 Night Shift Weekend OT 8 H1.9 7200133 Holiday Working Days -Technical Advisor NON WORKING DAY 5 DAY1.1 7200131 Travelling Days for Technical Advisor for LP Rotor Shroud Cover 16 DAY

1.11 7200132 Preparation Fee for Technical Advisor for LP Rotor Shroud Cover 4 EA

2HIRING SERVICES OF RENTAL TOOLS FOR HIRING SERVICES OF RENTAL TOOLS FOR GENERATOR COLLECTOR RING REPLACEMENT, UNIT-2, BQPS-1 1 AU

2.1 RENTAL TOOLS FOR COLLECTOR RING REPLACEMENT FOR UNIT 02 1 JOB

SR. # KE MATERIAL CODE ITEM DESCRIPTION QTY UNIT

1

SERVICES REQUIRED FOR UNIT # 1 REMOVALSERVICES REQUIRED FOR UNIT # 1 REMOVAL AND RE-FIXING OF AIR HEATER ELEMENTS 1. VENDORS ARE TO SUBMIT FOLLOWING, AT LEAST 2 WEEKS BEFORE COMMENCEMENT OF OUTAGE;a. A LIST OF SKILLED MANPOWER FOR REVIEW OF USERb. A LIST OF TOOLS WITH CERTIFICATION PROOFc. MOBILIZATION PLANd. JOB EXECUTION PLAN INCLUDING MILE STONES2. VENDORS ARE BOUND TO;a. CONDUCT DAILY HOUSE KEEPING, FAILING WHICH THEY SHOULD BE PENALIZED IN MONITORING TERMS REFLECTING IN POb. TO APPOINT SAFETY INSPECTOR FOR A GROUP OF 20 WORKER OR ABOVE. THE SAFETY INSPECTOR SHOULD HAVE AN EXPERIENCE OF 3 YEARS AND TO BE CERTIFIED BY SAFETY DEPARTMENT OF BQPS-1 AND MUST HAVE KNOWLEDGE OF:

1 AU

SERVICES REQUIRED FOR UNIT # 1 REMOVAL AND RE-FIXING OF AIR HEATER ELEMENTS.PR# 1300042783, FG1356/BQ1, Tender Cost Rs. 2000/- To Be Opened on 26.09.2019

1 1 AU

Page 9: TENDER NOTICE - 26.09.2019€¦ · Fan function :Flame detector cooling fan Speed :3000rpm Power :15 KW Capacity :19m3 /min 4 EA SR. # KE MATERIAL CODE ITEM DESCRIPTION QTY UNIT SERVICE

i. PERMIT TO WORK SYSTEMii. RISK ASSESSMENT3. LDS ON VENDORS SHALL BE IMPLEMENTED DUE TO FOLLOWING SAFETY VIOLATIONSi. NONCONFORMANCE OF PPESii. NONCONFORMANCE OF HOUSE KEEPINGiii. WORKING WITHOUT WORK PERMITiv. UNSAFE ACTS4. FOR A GROUP OF 100 WORKERS OR MORE, VENDORS SHALL BE BOUND TO HAVE THEIR OWN ARRANGEMENT OF ;a. SITE FACILITY WITH REST ROOMSb. TOOL FACILITYc. LUNCH FACILITYd. WATER FACILITYe. TOILET FACILITY

REMOVAL AND RE-FIX 1. REMOVAL AND RE-FIXING OF AIR HEATER ELEMENTS:

THE REGENERATIVE AIR HEATER ELEMENTS ARE USED FOR HEAT RECOVERY FROM FLUE GASSES. THE DIFFERENTIAL PRESSURE ACROSS THE AIR HEATERS IS ON HIGHER SIDE. THEREFORE, IT HAS BEEN DECIDED TO REPLACE /REMOVAL EXISTING CHOKED AIR HEATER ELEMENTS BY WASHING OR NEW ONES. THE REGENERATIVE AIR HEATER CONSIST OF TWO PARTS A & B AND EACH HAVING TWELVE SECTORS ON EACH PART WITH ASSOCIATED SEALS.

SCOPE OF WORK

TOTAL ELEMENTS BASKET FOR REMOVAL , WASHING / REPLACEMENT & RE-FIXING OF RAH ELEMENTS WITH SEALS U#1 624

THE OTHER DETAILS ARE AS PER ANNEXURE "A ".

ANNEXURE A

CONTRACTOR'S OBLIGATION" JOINT INSPECTION WILL BE CARRIED OUT BY CONTRACTOR AND K-ELECTRIC CONCERN ENGINEERS FOR THE COMPLETE SCOPE OF WORK, LIKE REMOVAL, RE FIXING, REPAIRING, WASHING OF OLD & NEW ELEMENTS ETC." FITTING OF SCAFFOLDING FROM INSIDE AND OUTSIDE OF THE AIR HEATER FOR INSPECTION/ REPAIR/ REPLACEMENT OF THE ELEMENTS." REMOVAL OF ALUMINIUM CLADDING & INSULATION FROM OUTSIDE AND OPENING& CLOSING OF WORKING MANHOLES." AFTER INSPECTION, REMOVAL & RE-FIXING OF AIR HEATER SEALS (RADIAL, CIRCUMFERENTIAL & POST)FOR BOTH COLD & HOT SIDE FOR EACH RAH#1&2 WILL BE DONE BY VENDOR." FOR REPAIRING/FABRICATION AND SEALS, MATERIAL WILL BE PROVIDED BY K-ELECTRIC.

Page 10: TENDER NOTICE - 26.09.2019€¦ · Fan function :Flame detector cooling fan Speed :3000rpm Power :15 KW Capacity :19m3 /min 4 EA SR. # KE MATERIAL CODE ITEM DESCRIPTION QTY UNIT SERVICE

" THE EQUIPMENT REQUIRED FOR LIFTING/ FIXING OF ELEMENT FROM THEIR SECTOR LIKE HOIST (ELECTRICAL & PNEUMATIC BOTH), CHAIN BLOCKS, 05 TON LIFTER, MOBILE CRANE AND TROLLEY WILL BE OF VENDOR RESPONSIBILITY." SHIFTING OF NEW ELEMENT BASKETS FROM STORE TO SITE AND OLD ELEMENTS FROM SITE TO SCRAP YARD WILL BE DONE SOLELY BY VENDOR." REMOVAL OF HOT ELEMENTS REQUIRE CUTTING OF SHEET TO GET ACCESS FOR ELEMENTS REMOVAL, CUTTING & WELDING OF SHEET WILL BE OF CONTRACTOR RESPONSIBILITY." ANY MINOR REPAIRING/ WELDING OR ANY FABRICATION WORK WILL BE DONE BY VENDOR FREE OF COST." RE-FIXING OF INSULATION, ALUMINIUM CLADDING." CLEANING OF BOTH RAH HOPPER & SURROUNDING AREA IS OF CONTRACTOR RESPONSIBILITY." REMOVAL OF OBSTRUCTION IF ANY, WITH THE PERMISSION OF G.M. (M/M), WHICH WILL BE NECESSARY TO MAKE THE ACCESS OF THE AREA OF WORK & THEN RE-FIXING THESE FREE OF CHARGE AFTER THE COMPLETION OF THE JOB FREE OF COST." ANY OTHER WORK NOT INCLUDES ABOVE, BUT REASONABLY REQUIRED FOR COMPLETION OF JOB WILL BE INCLUDED IN SCOPE OF WORK.

C. PRE-QUALIFICATION CONDITIONS OF THE BIDDERS.

1. COPY OF VALID LICENSE FROM PAKISTAN ENGINEERING COUNCIL IN THE CATEGORY CORRESPONDING BOTH TECHNICALLY AND FINANCIALLY WITH RESPECT TO THE SUBJECT JOB.

2. THE BIDDER SHOULD HAVE 10 YEARS' EXPERIENCE OF MAINTENANCE AND REPLACEMENT WORK OF SIMILAR TYPE OF BOILER AT LEAST OF THE SAME CAPACITY. THE BIDDER SHOULD SUBMIT THE RELEVANT EXPERIENCE CERTIFICATES.

3. TITLE OF THE COMPANY WITH LOCATION OF REGISTERED OFFICE, ADDRESS OF THE OWNERS & DIRECTORS AND LIST OF ENGINEER AND OTHER TECHNICAL PERSONAL REQUIRED FOR THE ABOVE JOB ARE TO BE PROVIDED BY THE CONTRACTOR.

4. ALL COMMERCIAL TERMS & CONDITIONS FOR PREQUALIFICATION MAY BE ADDED BY THE PURCHASE DEPARTMENT AS PER PRACTICE AT THEIR OWN.

Page 11: TENDER NOTICE - 26.09.2019€¦ · Fan function :Flame detector cooling fan Speed :3000rpm Power :15 KW Capacity :19m3 /min 4 EA SR. # KE MATERIAL CODE ITEM DESCRIPTION QTY UNIT SERVICE

D. OTHER SPECIFIC TERMS & CONDITIONS.

1. THE WORK WILL BE CARRIED OUT UNDER THE SUPERVISION OF MAINTENANCE ENGINEER OF BQPS AND UP TO THE ENTIRE SATISFACTION OF THE AUTHORISED ENGINEER & G.M. MAINTENANCE.

2. ALL TOOLS/FIXTURES WELDING PLANT AND CONSUMABLE APPROVED WELDING ELECTRODES WILL BE THE RESPONSIBILITY OF THE CONTRACTOR. ALL RIGGING TOOLS, MATERIAL HANDLING EQUIPMENT AND SCAFFOLDING ETC WILL ALSO BE RESPONSIBILITY OF THE CONTRACTOR.3. ALL MATERIAL RELATED TO INSULATION. CLADDING WILL BE THE RESPONSIBILITY OF K-ELECTRIC.

4. ELECTRIC POWERS AND WATER & EXISTING SERVICE AIR, WHEREVER REQUIRED SHALL BE SUPPLIED BY K-ELECTRIC FREE OF COST. TO USE ELECTRICITY THE CONTRACTOR WILL MAKE HIS OWN ARRANGEMENTS OF CABLES, FITTINGS, SWITCHES, CIRCUIT BREAKERS AND FUSES ETC, UNDER THE SUPERVISION OF A LICENSED ELECTRICIAN.

5. THE JOB WILL BE CARRIED OUT AS PER INSTRUCTIONS AND GUIDANCE OF D.G.M BOILER OR THROUGH HIS AUTHORIZED ENGINEER AND WILL BE COMPLETED TO HIS ENTIRE SATISFACTION.

6. THE CONTRACTOR SHALL SUBMIT WORKING PROCEDURES AND A SCHEDULE OF WORK SHOWING DURATION OF ALL ACTIVITIES TO BE CARRIED OUT AT SITE. THESE PROCEDURES AND SCHEDULE SHALL BE SUBMITTED BEFORE THE COMMENCEMENT OF WORK AND THEIR APPROVAL WILL BE OBTAINED FROM BQPS AUTHORITIES. THE REPAIR WORK SHALL BE DONE STRICTLY IN ACCORDANCE WITH THE APPROVED PROCEDURES AND SCHEDULE.

7. THE PROGRESS OF WORK SHALL BE CHECKED ON DAY-TO-DAY BASIS AS PER DAILY WORK SCHEDULE SUBMITTED BY THE CONTRACTOR.

8. CONTRACTOR SHOULD TAKE CARE OF EXISTING PIPING SYSTEM/EQUIPMENT IN THE VICINITY OF BOILER IN CASE OF ANY DAMAGE (S) & SUBSEQUENT LOSS OF ANY PART OR EQUIPMENT, THE CONTRACTOR SHALL BE HELD RESPONSIBLE AND ANY SUCH LOSSES SHALL BE RECOVERED FROM THE CONTRACTOR'S BILL.

9. SAFETY OF THE PERSONNEL EMPLOYED BY THE CONTRACTOR WILL BE RESPONSIBILITY OF THE CONTRACTOR STANDARD SAFE WORKING PRACTICES SHALL BE FOLLOWED AND THE AUTHORIZED ENGINEER OF BQPS WILL CHECK THIS.

10. THE CONTRACTOR IS RESPONSIBLE FOR ALL SAFETY GADGETS FOR THEIR EMPLOYEES.

1.1 624 EA

Page 12: TENDER NOTICE - 26.09.2019€¦ · Fan function :Flame detector cooling fan Speed :3000rpm Power :15 KW Capacity :19m3 /min 4 EA SR. # KE MATERIAL CODE ITEM DESCRIPTION QTY UNIT SERVICE

11. SAFETY OF ANY MATERIAL/ EQUIPMENT HANDED OVER TO THE CONTRACTOR FOR THE ERECTION WORK SHALL BE HIS RESPONSIBILITY.

12. THE SAFETY AND SECURITY OF ALL THE EQUIPMENT PARTS AND MATERIAL ETC. BROUGHT BY THE CONTRACTOR AT BQPS SITE SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR.

13. THE QUALITY AND THE QUANTITY OF ALL THE MATERIAL TOOLS AND FIXTURES TO BE USED FOR CARRYING OUT THE JOB WHEN BROUGHT ON SITE, SHALL BE CHECKED AND CERTIFIED IN WRITING BY THE AUTHORIZED ENGINEER OF BQPS.

14. PROPER QUALIFIED SITE ENGINEER/SUPERVISOR SHALL HAVE TO BE DEPUTED BY THE CONTRACTOR TO SUPERVISE THE WORK AND COORDINATE ALL SITE ACTIVITIES WITH THE RESPONSIBLE ENGINEER OF BQPS. PROPER SAFETY ENGINEER/SUPERVISOR HAS TO BE DEPUTED BY THE CONTRACTOR TO MONITOR THE SAFETY MEASURES DURING THE WORKS

15. MOBILIZATION PERIOD MUST BE WITHIN 01 WEEK.

16. ANY WORK ON SUNDAY, HOLIDAYS OR OVER AND ABOVE THE PRESCRIBED DAILY WORKING HOURS, SHALL ONLY BE DONE WITH THE PRIOR APPROVAL OF G.M. MAINTENANCE.

17. THE FINAL BILL SUBMITTED BY THE CONTRACTOR SHALL ONLY BE CLEARED AFTER THE SATISFACTORILY COMPLETION OF THE ENTIRE WORK.

18. ALL THE BIDDERS SHALL HAVE TO VISIT THE SITE BEFORE SUBMITTING THEIR QUOTATION SO THAT THEY MAY HAVE AN IDEA OF THE PREVAILING SIT CONDITIONS AND THE EXACT NATURE OF WORK INVOLVED.

19. OBTAINING THE SECURITY PERMISSION FROM K-ELECTRIC SECURITY DEPARTMENT SHALL BE THE CONTRACTOR'S RESPONSIBILITY.

20. CREDENTIAL OF WELDERS, FABRICATORS RIGGERS AND OTHER WORKERS WILL BE VETTED BY K-ELECTRIC ENGINEER.

21. ANY REASONABLE TERMS/CONDITIONS NOT FORESEEN AT THIS STAGE MAY BE ADDED WHEN THE CASE IS UNDER TECHNICAL EVALUATION.

E. COMPLETION PERIOD

THE ENTIRE JOB SHOULD BE COMPLETED WITHIN 15(FIFTEEN) DAYS, IN ORDER TO COMPLETE THE ENTIRE JOB WITHIN SPECIFIED TIME IF REQUIRED, THE WORK SHALL HAVE TO BE CONTINUE ON DAY/NIGHT AND SUNDAY/HOLIDAYS AS WELL WITH DUE PERMISSION OF G.M. (MAINT).

2

SERVICES REQUIRED FOR UNIT # 2 REMOVALSERVICES REQUIRED FOR UNIT # 2 REMOVAL AND RE-FIXING OF AIR HEATER ELEMENTS

1 AU

Page 13: TENDER NOTICE - 26.09.2019€¦ · Fan function :Flame detector cooling fan Speed :3000rpm Power :15 KW Capacity :19m3 /min 4 EA SR. # KE MATERIAL CODE ITEM DESCRIPTION QTY UNIT SERVICE

2.1

REMOVAL AND RE-FIX1. REMOVAL AND RE-FIXING OF AIR HEATER ELEMENTS:

THE REGENERATIVE AIR HEATER ELEMENTS ARE USED FOR HEAT RECOVERY FROM FLUE GASSES. THE DIFFERENTIAL PRESSURE ACROSS THE AIR HEATERS IS ON HIGHER SIDE. THEREFORE, IT HAS BEEN DECIDED TO REPLACE /REMOVAL EXISTING CHOKED AIR HEATER ELEMENTS BY WASHING OR NEW ONES. THE REGENERATIVE AIR HEATER CONSIST OF TWO PARTS A & B AND EACH HAVING TWELVE SECTORS ON EACH PART WITH ASSOCIATED SEALS.

SCOPE OF WORK

TOTAL ELEMENTS BASKET FOR REMOVAL , WASHING / REPLACEMENT & RE-FIXING OF RAH ELEMENTS WITH SEALS U#2

624 EA

3

SERVICES REQUIRED FOR UNIT # 3 REMOVALSERVICES REQUIRED FOR UNIT # 3 REMOVAL AND RE-FIXING OF AIR HEATER ELEMENTS

1 AU

3.1

REMOVAL AND RE-FIX

1. REMOVAL AND RE-FIXING OF AIR HEATER ELEMENTS:

THE REGENERATIVE AIR HEATER ELEMENTS ARE USED FOR HEAT RECOVERY FROM FLUE GASSES. THE DIFFERENTIAL PRESSURE ACROSS THE AIR HEATERS IS ON HIGHER SIDE. THEREFORE, IT HAS BEEN DECIDED TO REPLACE /REMOVAL EXISTING CHOKED AIR HEATER ELEMENTS BY WASHING OR NEW ONES. THE REGENERATIVE AIR HEATER CONSIST OF TWO PARTS A & B AND EACH HAVING TWELVE SECTORS ON EACH PART WITH ASSOCIATED SEALS.

SCOPE OF WORKTOTAL ELEMENTS BASKET FOR REMOVAL , WASHING / REPLACEMENT & RE-FIXING OF RAH ELEMENTS WITH SEALS U#3 480

480 EA

SR. # KE MATERIAL CODE ITEM DESCRIPTION QTY UNIT

SERVICES REQUIRED FOR UNIT # 4 REMOVALSERVICES REQUIRED FOR UNIT # 4 REMOVAL AND RE-FIXING OF AIR HEATER ELEMENTS

SSERVICES REQUIRED FOR REMOVAL AND RE-FIXING OF AIR HEATER ELEMENTS,UNIT# 4, 5 & 6 BQPS-1.

PR# 1300042782, FG1357/BQ1, Tender Cost Rs. 2000/- To Be Opened on 26.09.2019

Page 14: TENDER NOTICE - 26.09.2019€¦ · Fan function :Flame detector cooling fan Speed :3000rpm Power :15 KW Capacity :19m3 /min 4 EA SR. # KE MATERIAL CODE ITEM DESCRIPTION QTY UNIT SERVICE

1. Vendors are to submit following, at least 2 weeks before commencement of outage;a. A list of skilled manpower for review of userb. A list of tools with certification proofc. Mobilization pland. Job execution plan including Mile Stones2. Vendors are bound to;a. Conduct Daily House Keeping, failing which they should be penalized in monitoring terms reflecting in POb. To appoint Safety Inspector for a group of 20 worker or above. The Safety Inspector should have an experience of 3 years and to be certified by Safety Department of BQPS-1 and must have knowledge of:

i. Permit to Work systemii. Risk assessment3. LDs on vendors shall be implemented due to following Safety violationsi. Nonconformance of PPEsii. Nonconformance of House Keepingiii. Working without Work Permitiv. Unsafe Acts4. For a group of 100 workers or more, vendors shall be bound to have their own arrangement of ;a. Site facility with Rest Roomsb. Tool facilityc. Lunch facilityd. Water facilitye. Toilet facility

AIR HEATER ELEMENTS1. REMOVAL AND RE-FIXING OF AIR HEATER ELEMENTS:

THE REGENERATIVE AIR HEATER ELEMENTS ARE USED FOR HEAT RECOVERY FROM FLUE GASSES. THE DIFFERENTIAL PRESSURE ACROSS THE AIR HEATERS IS ON HIGHER SIDE. THEREFORE, IT HAS BEEN DECIDED TO REPLACE /REMOVAL EXISTING CHOKED AIR HEATER ELEMENTS BY WASHING OR NEW ONES. THE REGENERATIVE AIR HEATER CONSIST OF TWO PARTS A & B AND EACH HAVING TWELVE SECTORS ON EACH PART WITH ASSOCIATED SEALS.

SCOPE OF WORK

TOTAL ELEMENTS BASKET FOR REMOVAL , WASHING / REPLACEMENT & RE-FIXING OF RAH ELEMENTS WITH SEALS U#4 480

THE OTHER DETAILS ARE AS PER ANNEXURE "A ".

1 1 AU

Page 15: TENDER NOTICE - 26.09.2019€¦ · Fan function :Flame detector cooling fan Speed :3000rpm Power :15 KW Capacity :19m3 /min 4 EA SR. # KE MATERIAL CODE ITEM DESCRIPTION QTY UNIT SERVICE

ANNEXURE A

CONTRACTOR'S OBLIGATION" JOINT INSPECTION WILL BE CARRIED OUT BY CONTRACTOR AND K-ELECTRIC CONCERN ENGINEERS FOR THE COMPLETE SCOPE OF WORK, LIKE REMOVAL, RE FIXING, REPAIRING, WASHING OF OLD & NEW ELEMENTS ETC." FITTING OF SCAFFOLDING FROM INSIDE AND OUTSIDE OF THE AIR HEATER FOR INSPECTION/ REPAIR/ REPLACEMENT OF THE ELEMENTS." REMOVAL OF ALUMINIUM CLADDING & INSULATION FROM OUTSIDE AND OPENING& CLOSING OF WORKING MANHOLES." AFTER INSPECTION, REMOVAL & RE-FIXING OF AIR HEATER SEALS (RADIAL, CIRCUMFERENTIAL & POST)FOR BOTH COLD & HOT SIDE FOR EACH RAH#1&2 WILL BE DONE BY VENDOR." FOR REPAIRING/FABRICATION AND SEALS, MATERIAL WILL BE PROVIDED BY K-ELECTRIC." THE EQUIPMENT REQUIRED FOR LIFTING/ FIXING OF ELEMENT FROM THEIR SECTOR LIKE HOIST (ELECTRICAL & PNEUMATIC BOTH), CHAIN BLOCKS, 05 TON LIFTER, MOBILE CRANE AND TROLLEY WILL BE OF VENDOR RESPONSIBILITY.

" SHIFTING OF NEW ELEMENT BASKETS FROM STORE TO SITE AND OLD ELEMENTS FROM SITE TO SCRAP YARD WILL BE DONE SOLELY BY VENDOR." REMOVAL OF HOT ELEMENTS REQUIRE CUTTING OF SHEET TO GET ACCESS FOR ELEMENTS REMOVAL, CUTTING & WELDING OF SHEET WILL BE OF CONTRACTOR RESPONSIBILITY." ANY MINOR REPAIRING/ WELDING OR ANY FABRICATION WORK WILL BE DONE BY VENDOR FREE OF COST." RE-FIXING OF INSULATION, ALUMINIUM CLADDING." CLEANING OF BOTH RAH HOPPER & SURROUNDING AREA IS OF CONTRACTOR RESPONSIBILITY." REMOVAL OF OBSTRUCTION IF ANY, WITH THE PERMISSION OF G.M. (M/M), WHICH WILL BE NECESSARY TO MAKE THE ACCESS OF THE AREA OF WORK & THEN RE-FIXING THESE FREE OF CHARGE AFTER THE COMPLETION OF THE JOB FREE OF COST." ANY OTHER WORK NOT INCLUDES ABOVE, BUT REASONABLY REQUIRED FOR COMPLETION OF JOB WILL BE INCLUDED IN SCOPE OF WORK.

C. PRE-QUALIFICATION CONDITIONS OF THE BIDDERS.

1. COPY OF VALID LICENSE FROM PAKISTAN ENGINEERING COUNCIL IN THE CATEGORY CORRESPONDING BOTH TECHNICALLY AND FINANCIALLY WITH RESPECT TO THE SUBJECT JOB.

2. THE BIDDER SHOULD HAVE 10 YEARS' EXPERIENCE OF MAINTENANCE AND REPLACEMENT WORK OF SIMILAR TYPE OF BOILER AT LEAST OF THE SAME CAPACITY. THE BIDDER SHOULD SUBMIT THE RELEVANT EXPERIENCE CERTIFICATES.

3. TITLE OF THE COMPANY WITH LOCATION OF REGISTERED OFFICE, ADDRESS OF THE OWNERS & DIRECTORS AND LIST OF ENGINEER AND OTHER TECHNICAL PERSONAL REQUIRED FOR THE ABOVE JOB ARE TO BE PROVIDED BY THE CONTRACTOR.

4. ALL COMMERCIAL TERMS & CONDITIONS FOR PREQUALIFICATION MAY BE ADDED BY THE PURCHASE DEPARTMENT AS PER PRACTICE AT THEIR OWN.

Page 16: TENDER NOTICE - 26.09.2019€¦ · Fan function :Flame detector cooling fan Speed :3000rpm Power :15 KW Capacity :19m3 /min 4 EA SR. # KE MATERIAL CODE ITEM DESCRIPTION QTY UNIT SERVICE

D. OTHER SPECIFIC TERMS & CONDITIONS.

1. THE WORK WILL BE CARRIED OUT UNDER THE SUPERVISION OF MAINTENANCE ENGINEER OF BQPS AND UP TO THE ENTIRE SATISFACTION OF THE AUTHORISED ENGINEER & G.M. MAINTENANCE.

2. ALL TOOLS/FIXTURES WELDING PLANT AND CONSUMABLE APPROVED WELDING ELECTRODES WILL BE THE RESPONSIBILITY OF THE CONTRACTOR. ALL RIGGING TOOLS, MATERIAL HANDLING EQUIPMENT AND SCAFFOLDING ETC WILL ALSO BE RESPONSIBILITY OF THE CONTRACTOR.3. ALL MATERIAL RELATED TO INSULATION. CLADDING WILL BE THE RESPONSIBILITY OF K-ELECTRIC.

4. ELECTRIC POWERS AND WATER & EXISTING SERVICE AIR, WHEREVER REQUIRED SHALL BE SUPPLIED BY K-ELECTRIC FREE OF COST. TO USE ELECTRICITY THE CONTRACTOR WILL MAKE HIS OWN ARRANGEMENTS OF CABLES, FITTINGS, SWITCHES, CIRCUIT BREAKERS AND FUSES ETC, UNDER THE SUPERVISION OF A LICENSED ELECTRICIAN.

5. THE JOB WILL BE CARRIED OUT AS PER INSTRUCTIONS AND GUIDANCE OF D.G.M BOILER OR THROUGH HIS AUTHORIZED ENGINEER AND WILL BE COMPLETED TO HIS ENTIRE SATISFACTION.

6. THE CONTRACTOR SHALL SUBMIT WORKING PROCEDURES AND A SCHEDULE OF WORK SHOWING DURATION OF ALL ACTIVITIES TO BE CARRIED OUT AT SITE. THESE PROCEDURES AND SCHEDULE SHALL BE SUBMITTED BEFORE THE COMMENCEMENT OF WORK AND THEIR APPROVAL WILL BE OBTAINED FROM BQPS AUTHORITIES. THE REPAIR WORK SHALL BE DONE STRICTLY IN ACCORDANCE WITH THE APPROVED PROCEDURES AND SCHEDULE.

7. THE PROGRESS OF WORK SHALL BE CHECKED ON DAY-TO-DAY BASIS AS PER DAILY WORK SCHEDULE SUBMITTED BY THE CONTRACTOR.

8. CONTRACTOR SHOULD TAKE CARE OF EXISTING PIPING SYSTEM/EQUIPMENT IN THE VICINITY OF BOILER IN CASE OF ANY DAMAGE (S) & SUBSEQUENT LOSS OF ANY PART OR EQUIPMENT, THE CONTRACTOR SHALL BE HELD RESPONSIBLE AND ANY SUCH LOSSES SHALL BE RECOVERED FROM THE CONTRACTOR'S BILL.

9. SAFETY OF THE PERSONNEL EMPLOYED BY THE CONTRACTOR WILL BE RESPONSIBILITY OF THE CONTRACTOR STANDARD SAFE WORKING PRACTICES SHALL BE FOLLOWED AND THE AUTHORIZED ENGINEER OF BQPS WILL CHECK THIS.

72006771.1 480 EA

Page 17: TENDER NOTICE - 26.09.2019€¦ · Fan function :Flame detector cooling fan Speed :3000rpm Power :15 KW Capacity :19m3 /min 4 EA SR. # KE MATERIAL CODE ITEM DESCRIPTION QTY UNIT SERVICE

10. THE CONTRACTOR IS RESPONSIBLE FOR ALL SAFETY GADGETS FOR THEIR EMPLOYEES.

11. SAFETY OF ANY MATERIAL/ EQUIPMENT HANDED OVER TO THE CONTRACTOR FOR THE ERECTION WORK SHALL BE HIS RESPONSIBILITY.

12. THE SAFETY AND SECURITY OF ALL THE EQUIPMENT PARTS AND MATERIAL ETC. BROUGHT BY THE CONTRACTOR AT BQPS SITE SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR.

13. THE QUALITY AND THE QUANTITY OF ALL THE MATERIAL TOOLS AND FIXTURES TO BE USED FOR CARRYING OUT THE JOB WHEN BROUGHT ON SITE, SHALL BE CHECKED AND CERTIFIED IN WRITING BY THE AUTHORIZED ENGINEER OF BQPS.

14. PROPER QUALIFIED SITE ENGINEER/SUPERVISOR SHALL HAVE TO BE DEPUTED BY THE CONTRACTOR TO SUPERVISE THE WORK AND COORDINATE ALL SITE ACTIVITIES WITH THE RESPONSIBLE ENGINEER OF BQPS. PROPER SAFETY ENGINEER/SUPERVISOR HAS TO BE DEPUTED BY THE CONTRACTOR TO MONITOR THE SAFETY MEASURES DURING THE WORKS.

15. MOBILIZATION PERIOD MUST BE WITHIN 01 WEEK.

16. ANY WORK ON SUNDAY, HOLIDAYS OR OVER AND ABOVE THE PRESCRIBED DAILY WORKING HOURS, SHALL ONLY BE DONE WITH THE PRIOR APPROVAL OF G.M. MAINTENANCE.

17. THE FINAL BILL SUBMITTED BY THE CONTRACTOR SHALL ONLY BE CLEARED AFTER THE SATISFACTORILY COMPLETION OF THE ENTIRE WORK.

18. ALL THE BIDDERS SHALL HAVE TO VISIT THE SITE BEFORE SUBMITTING THEIR QUOTATION SO THAT THEY MAY HAVE AN IDEA OF THE PREVAILING SIT CONDITIONS AND THE EXACT NATURE OF WORK INVOLVED.

19. OBTAINING THE SECURITY PERMISSION FROM K-ELECTRIC SECURITY DEPARTMENT SHALL BE THE CONTRACTOR'S RESPONSIBILITY.

20. CREDENTIAL OF WELDERS, FABRICATORS RIGGERS AND OTHER WORKERS WILL BE VETTED BY K-ELECTRIC ENGINEER.

21. ANY REASONABLE TERMS/CONDITIONS NOT FORESEEN AT THIS STAGE MAY BE ADDED WHEN THE CASE IS UNDER TECHNICAL EVALUATION.

E. COMPLETION PERIOD

THE ENTIRE JOB SHOULD BE COMPLETED WITHIN 15(FIFTEEN) DAYS, IN ORDER TO COMPLETE THE ENTIRE JOB WITHIN SPECIFIED TIME IF REQUIRED, THE WORK SHALL HAVE TO BE CONTINUE ON DAY/NIGHT AND SUNDAY/HOLIDAYS AS WELL WITH DUE PERMISSION OF G.M. (MAINT).

2

SERVICES REQUIRED FOR UNIT # 5 REMOVALSERVICES REQUIRED FOR UNIT # 5 REMOVAL AND RE-FIXING OF AIR HEATER ELEMENTS

1 AU

Page 18: TENDER NOTICE - 26.09.2019€¦ · Fan function :Flame detector cooling fan Speed :3000rpm Power :15 KW Capacity :19m3 /min 4 EA SR. # KE MATERIAL CODE ITEM DESCRIPTION QTY UNIT SERVICE

2.1 7200677

AIR HEATER ELEMENTS1. REMOVAL AND RE-FIXING OF AIR HEATER ELEMENTS:

THE REGENERATIVE AIR HEATER ELEMENTS ARE USED FOR HEAT RECOVERY FROM FLUE GASSES. THE DIFFERENTIAL PRESSURE ACROSS THE AIR HEATERS IS ON HIGHER SIDE. THEREFORE, IT HAS BEEN DECIDED TO REPLACE /REMOVAL EXISTING CHOKED AIR HEATER ELEMENTS BY WASHING OR NEW ONES. THE REGENERATIVE AIR HEATER CONSIST OF TWO PARTS A & B AND EACH HAVING TWELVE SECTORS ON EACH PART WITH ASSOCIATED SEALS.

SCOPE OF WORK

TOTAL ELEMENTS BASKET FOR REMOVAL , WASHING / REPLACEMENT & RE-FIXING OF RAH ELEMENTS WITH SEALS U#5 624

624 EA

3

SERVICES REQUIRED FOR UNIT # 6 REMOVALSERVICES REQUIRED FOR UNIT # 6 REMOVAL AND RE-FIXING OF AIR HEATER ELEMENTS

1 AU

3.1 7200677

AIR HEATER ELEMENTS1. REMOVAL AND RE-FIXING OF AIR HEATER ELEMENTS:

THE REGENERATIVE AIR HEATER ELEMENTS ARE USED FOR HEAT RECOVERY FROM FLUE GASSES. THE DIFFERENTIAL PRESSURE ACROSS THE AIR HEATERS IS ON HIGHER SIDE. THEREFORE, IT HAS BEEN DECIDED TO REPLACE /REMOVAL EXISTING CHOKED AIR HEATER ELEMENTS BY WASHING OR NEW ONES. THE REGENERATIVE AIR HEATER CONSIST OF TWO PARTS A & B AND EACH HAVING TWELVE SECTORS ON EACH PART WITH ASSOCIATED SEALS.

SCOPE OF WORK

TOTAL ELEMENTS BASKET FOR REMOVAL , WASHING / REPLACEMENT & RE-FIXING OF RAH ELEMENTS WITH SEALS U#6 624

624 EA

SR. # KE MATERIAL CODE ITEM DESCRIPTION QTY UNIT

1 10114815

GAUGE; GLASS WATER LEVEL, BOILER DRUMU5Water level gauge glass of boiler drumU5 Specification Water level gaugeglass Type: BMP-200EII , BI-Color Maximum working pressure: 172 bar (g)Maximum working Temperature: 354 Degree centigrade Hydraulic testpressure : 323.6 bar (g) DWG # 981907-03 Babcock Hitachi K.K YOKOHOMAWorks

2 EA

SR. # KE MATERIAL CODE ITEM DESCRIPTION QTY UNIT

1 10008892

GREASE; MOLYKOTE1000 ~ 1050 TEMP. DEG CNAME; MOLYKOTE GREASE 1000~1050 DEG CSPECIFICATION:PACKED IN 01 KG TINMAKE: DOW CORNING USA/GERMANY

24 KG

PR# 1400024471, FG1358/BQ1, Tender Cost Rs. 2000/- To Be Opened on 26.09.2019

PROCUREMENT OF GREASE FOR TURBINE AND AUXILARIES , UNIT 1-6, BQPS-1PR# 1400025293, FG1359/BQ1, Tender Cost Rs. 2000/- To Be Opened on 26.09.2019

PROCUREMENT OF BOILER DRUM WATER LEVEL GUAGE GLASS WITH SPARES FOR UNIT 5, BQPS-1

Page 19: TENDER NOTICE - 26.09.2019€¦ · Fan function :Flame detector cooling fan Speed :3000rpm Power :15 KW Capacity :19m3 /min 4 EA SR. # KE MATERIAL CODE ITEM DESCRIPTION QTY UNIT SERVICE

2 20000104GREASE; GULF CROWN GREASE EP-1PACKED IN 182 KGS NON RETURNABLE STEEL DRUMS 364 KG

3 20000085

GREASE; GULF CROWN GREASE NO.2NAME; GULF CROWN GREASE NO.2PACKING: 182 KG STEEL DRUM (NON RETURNABLE)

364 KG

SR. # KE MATERIAL CODE ITEM DESCRIPTION QTY UNIT

1 10100479

MEMBRANE; REJECT RO FOR RO PLANT AE400NAME: HIGH REJECTION LOW ENERGY SEAWATER RO ELEMENTS - THIN-FILM REVERSEOSMOSIS MEMBRANESPECIFICATION: MODEL # ELEMENT AE 400, 34 TYPE: FEMALE AVERAGE PERMEATEFLOW GPD (M3/DAY): 9000 (34.1) ACTIVE AREA: 400 (37.2) FT2 (M2) OUTERWRAP: FIBER GLASS MAXIMUM TEMPERATURE: CONTINUOUS OPERATION: 122°F (50°C) CLEAN-IN-PLACE (CIP): 122°F (50°C) MAXIMUM OPERATING PRESSURE: 1200PSI (8,274 KPA) MODULE LENGTH: 1537.5 MM (60.51 INCH) FEED CONNECTION:220.0 MM (8.66 INCH) PERMEATE CONNECTION: 42.6 MM (1.68 INCH) PART #3056662 MAKE: GE-POWER & WATER, WATER & PROCESS TECHNOLOGIES,USA OEM ITEM

15 EA

2 10100478

MEMBRANE; RO FOR RO PLANT AG440NAME: HIGH REJECTION BRACKISH WATER RO ELEMENTS - THIN-FILM REVERSEOSMOSIS MEMBRANESPECIFICATION: MODEL # ELEMENT AG 440 TYPE: FEMALE AVERAGE PERMEATE FLOWGPD (M3/DAY): 11500 (43.5) ACTIVE AREA: 440 (40.9) FT2 (M2) OUTER WRAP:FIBER GLASS MAXIMUM TEMPERATURE: CONTINUOUS OPERATION: 122°F (50°C)CLEAN-IN-PLACE (CIP): 122°F (50°C) MAXIMUM OPERATING PRESSURE: 600 PSI(4,137 KPA) MODULE LENGTH: 40 INCH (101.6 CM) FEED CONNECTION: 7.9 INCH(20.1 CM) PERMEATE CONNECTION: 1.125 INCH (2.86 CM) PART # 3056669 MAKE:GE-POWER & WATER, WATER & PROCESS TECHNOLOGIES, USA OEM ITEM

70 EA

SR. # KE MATERIAL CODE ITEM DESCRIPTION QTY UNIT

PROCUREMENT OF CARTRIDGE FILTERS FOR RO PLANT, BQPS-1PR# 1400025204, FG1364/BQ1, Tender Cost Rs. 2000/- To Be Opened on 26.09.2019

PROCUREMENT OF MEMBRANES FOR RO PLANT, BQPS-1PR# 1400024765, FG1363/BQ1, Tender Cost Rs. 2000/- To Be Opened on 26.09.2019

Page 20: TENDER NOTICE - 26.09.2019€¦ · Fan function :Flame detector cooling fan Speed :3000rpm Power :15 KW Capacity :19m3 /min 4 EA SR. # KE MATERIAL CODE ITEM DESCRIPTION QTY UNIT SERVICE

1 10095139

FILTER; CARTRIDGE TYPE: PXP.Zs 05-40NAME: PURTREX PLUS

SPECIFICATION:POLY PROPYLENE FILTERMODEL:CARTRIDGE FILTER-PXP.Zs05-40-PWTYPE:PXP.ZsMICRON RATING:5 MICRONCARTRIDGE LENGTH:40"P/N;3048864MAKE: GE-INFRASTRUCTURE WATER & PROCESS TECHNOLOGIES/SAGISA FILTERSCOUNTRY OF ORIGIN:USA/SOUTH AFRICA

1,000 EA

SR. # KE MATERIAL CODE ITEM DESCRIPTION QTY UNIT

1 10108876

DESSICANT; MOLECULAR SEIVE U#3/4 IADDESIGNATION: DESSICANT FOR U#3/4 INSTRUMENT AIR DRYERSWeight : 830 Kg/UNIT POS : 997DRAWING NO.: S-WI400-0456.00DIAGRAM NO: S-PI-WI-0450.2PART LIST NO: S-WI400-0456/1.9DESIGNATION: ADSORPTION DRYER WI 400 MS PN 12 DRYERMAKE: ZENDER AUFBEREITUNGSTECHNIK Gmbh

1,680 KG

SR. # KE MATERIAL CODE ITEM DESCRIPTION QTY UNIT

1 10115037 O RING; FOR OLTC P# 860258 OLTC O Ring Part no 860258 OLTC MR150343 1 EA

2 10115038RING; SEALING FOR OLTC P#40030302 SEALING RING 165 x 4 Part no 40030302 OLTC MR150343 1 EA

3 10115039PARTS; SET SMALL FOR OLTC P#09267112 SET OF SMALL PARTS (T/R) Part no 09267112 OLTC MR150343 1 EA

4 10115040CONTACT; CHAGNE ACCESSORY OLTC#79087900 ACCESSORY KIT CONTACTCHANGE 3SEC R+T Part no 79087900 OLTC MR150343 1 EA

5 10115041SCREW; HEX HEAD OLTC MR150343 P#450090 HEXAGON HEAD SCREW Part no 450090 OLTC MR150343 4 EA

6 10115042SCREW; HEXAGON HEAD OLTC P#450387 HEXAGON HEAD SCREW Part no 450387 OLTC MR150343 4 EA

7 10115043NUT; HEX SELF LOCKING OLTC P#45397801 SELF LOCKING HEX NUT OKS1710 Part no 45397801 OLTC MR150343 8 EA

PR# 1400025148, FG1368/BQ1, Tender Cost Rs. 2000/- To Be Opened on 26.09.2019

PROCUREMENT OF DESICANT FOR INSTRUMENT AIR DRYER UNIT 3-4, BQPS-1PR# 1400024679, FG1365/BQ1, Tender Cost Rs. 2000/- To Be Opened on 26.09.2019

PROCUREMENT OF OVERHAULING SPARES OF IN LOAD TAP CHANGER AT UNIT # 6, BQPS-1

Page 21: TENDER NOTICE - 26.09.2019€¦ · Fan function :Flame detector cooling fan Speed :3000rpm Power :15 KW Capacity :19m3 /min 4 EA SR. # KE MATERIAL CODE ITEM DESCRIPTION QTY UNIT SERVICE

8 10115044

LEAD; RESISTOR CONN OLTC P#09805000 RESISTOR CONNECTING LEAD COMPL.T/R 520LG Part no 09805000 OLTC MR150343

6 EA

9 10115045RUBBER; FOR OLTC P#16012002 PROFILE RUBBER MA7 Part no 16012002 OLTC MR150343 4 M

10 10115046O RING; FOR OLTC P#40018200 O-RING Part no 40018200 OLTC MR150343 4 EA

11 10115186BOLT; FOR OLTC MR150343 P#05194003 COUPLING BOLT Part no 05194003 OLTC MR150343 4 EA

12 10115187DRIVE; COUPLING OLTC MR150343 70940701 SMALL PARTS DRIVE SHAFT COUPLING 70940701 OLTC MR150343 4 EA

13 10115188CLIP; HOSE OLTC MR150343 P# 90053801 HOSE CLIP D85-110 W5 Part no 90053801 OLTC OLTC MR150343 2 EA

14 10115189GASKET; OLTC MR150343 P# 59008702 CD64 GASKET BEVEL GEAR CD6400 Part no 59008702 OLTC MR150343 1 EA

15 10115190RING; SEALING OLTC MR150343 P#860122 SEALING RING TYPC Part No 860122 OLTC MR150343 4 EA

16 10115122COVER; GASKET OLTC MR150343 P#70169501 COVER GASKET RS 2001 Part no 70169501 OLTC MR150343 1 EA

17 10115123SCREW; HEX HEAD OLTC MR150343 P#455042 HEXAGON HEAD SCREW Part no 455042 OLTC MR150343 12 EA

18 10115124WASHER; LOCKING OLTC MR150343 P#45337301 LOCKING WASHER VSKD6 Part no 45337301 OLTC MR150343 12 EA

19 10115125COVERL RELAY OLTC MR150343 P#70272302 COVER FOR PROTECT. RELAIS RS 2001 Part no 70272302 OLTC MR150343 1 EA

20 10115126COVER;RELAY PRO OLTC MR150343 P#09297303 PROTECTIVE RELAY COVER COMPLETE Part no 09297303 OLTC MR150343 1 EA

21 10115331TRANSMITTER; OLTC MR150343 SINEAX V604 T TRANSMITTER V604 TYP 604-122 SNr 97308309 85 to 230V 1 EA

PROCUREMENT OF COMMON CONSUMABLE ITEMS FOR BQPS-1

Page 22: TENDER NOTICE - 26.09.2019€¦ · Fan function :Flame detector cooling fan Speed :3000rpm Power :15 KW Capacity :19m3 /min 4 EA SR. # KE MATERIAL CODE ITEM DESCRIPTION QTY UNIT SERVICE

SR. # KE MATERIAL CODE ITEM DESCRIPTION QTY UNIT

1 10008688

CLAMP; JUBLIEE, 5" HOSE/PIPENAME; JUBLIEE CLAMP FOR RUBBER HOSE/PIPE,SIZE: 5 INCH,MAKE: CHINA OR EQUIVALENT SUPPLY SUBJECT TO PRIOR APPROVAL OF SAMPLE.

75

2 10008690

CLAMP; SIZE 13/16" TO 1-1/2"NAME; JUBILEE CLAMP SIZE: 13/16 TOSIZE: 13/16" TO 1-1/2 INCHTERRY BRANDMAKE: CHINA

SUPPLY: SUBJECT TO PRIOR APPROVAL OF SAMPLE"

100

3 10008758GAS; DISSOLVED ACETYLINE GASREFILLING IN KE`s CYLINDERS. 60

4 10008761

GAS; CARBON DIOXIDE GAS (C02)Min/Max GT 5040 10080Min/Max ST 880 2220 4,400

5 20001183RE-FILLING OF NITROGEN CYLINDERSIN KE,S CYLINDERS OF 6.23 M3 (ON AS AND WHEN REQUIRE BASIS) 600

6 20001184

RE-FILLING OF ARGON CYLINDERSIN KE`s CYLINDERS.CAPACITY: 6.8 M3RETURNABLE CYLINDERS AT WORKING PRESSURE OF 2000 PSI/137 BAR

100

7 20001185

RE-FILLING OF OXYGEN CYLINDERSIN KE`s CYLINDERS.CAPACITY: 6.8 M3RETURNABLE CYLINDERS AT WORKING PRESSURE OF 2000 PSI/137 BAR

1,200

8 10019586

JUBILEE CLAMP; 3 INCH CHINANAME; JUBILEE CLAMPSIZE 3 INCHTERRY BRANDMAKE: CHINA

SUPPLY: SUBJECT TO PRIOR APPROVAL OF SAMPLE

120

SR. # KE MATERIAL CODE ITEM DESCRIPTION QTY UNIT

PR# 1400024713 & 1400021520, FG1367/BQ1, Tender Cost Rs. 2000/- To Be Opened on 26.09.2019

PROCUREMENT REJECT RO PUMP AND SPARES FOR RO PLANT, BQPS-1PR# 1400025404, FG1369/BQ1, Tender Cost Rs. 2000/- To Be Opened on 26.09.2019

Page 23: TENDER NOTICE - 26.09.2019€¦ · Fan function :Flame detector cooling fan Speed :3000rpm Power :15 KW Capacity :19m3 /min 4 EA SR. # KE MATERIAL CODE ITEM DESCRIPTION QTY UNIT SERVICE

1 10100722

SEAL; MECHANICAL FOR PT TRANSFER PUMP,RONAME: MECHANICAL SEAL FOR PERMEATE TRANSFER PUMP, RO PLANTSPECIFICATION: OEM SEAL PART #: 32FP5165700 PUMPSPECIFICATION:CAPACITY: 75 M3/HR HEAD: 55METER RPM: 2900 POWER: 25 HP, 3/50HZ/415VMATERIAL: SS316 SUCTION: DN 100DISCHARGE: DN 100TYPE: CENTRIFUGAL OEMPART # PVM 90-3-2-F -T -I1- 50MAKE: PENTAIR, FLOW TECHNOLOGY - GLOBALBUSINESS UNIT PENTAIR MIDDLE EAST OEM ITEM

3 EA

2 10100732

SEAL; MECHANICAL FOR REJECT RO FEED PUMPNAME: MECHANICAL SEAL FOR REJECT RO FEED PUMP, RO PLANT SPECIFICATION:OEM SEAL PART #: 10FP5165700 PUMP SPECIFICATION CAPACITY: 23 M3/HR HEAD:35 METER RPM: 2900 POWER: 7.5 HP, 3/50HZ/415V MATERIAL: SS316 SUCTION:DN 50 DISCHARGE: DN 50 TYPE: CENTRIFUGAL OEM PART # PVM 20-4 -F -T -I1-50 MAKE: PENTAIR, FLOW TECHNOLOGY - GLOBAL BUSINESS UNIT PENTAIR MIDDLEEAST OEM ITEM

2 EA

3 10104555

PUMP; REJECT RO FEED FOR RO PLANTNAME: REJECT RO FEED PUMP-VERTICAL MULTISTAGE CENTRIFUGAL IN-LINE PUMPSCAPACITY: 23 M3/HR HEAD: 35METER RPM: 2900 POWER: 7.5 HP, 3/50HZ/415VMATERIAL: SS316 SUCTION: DN 50DISCHARGE: DN 50TYPE: CENTRIFUGAL OEM PART # PVM 20-4 -F -T -I1- 50MAKE: PENTAIR, FLOW TECHNOLOGY - GLOBAL BUSINESS UNIT PENTAIR MIDDLEEAST OEM ITEM

Origin: USA, EU

1 EA

SR. # KE MATERIAL CODE ITEM DESCRIPTION QTY UNIT

PROCUREMENT OF CBD AND DURM REDUCING VALVES FOR UNIT 5-6, BQPS-1PR# 1400024959, FG1370/BQ1, Tender Cost Rs. 2000/- To Be Opened on 26.09.2019

Page 24: TENDER NOTICE - 26.09.2019€¦ · Fan function :Flame detector cooling fan Speed :3000rpm Power :15 KW Capacity :19m3 /min 4 EA SR. # KE MATERIAL CODE ITEM DESCRIPTION QTY UNIT SERVICE

1 10110629

VALVE; DRUM REDUCING 1ST MOV W/ACT U5&6Specifications: -Drum reducing 1st MOV with actuatorIdentification: 05HAN30AA03Mfg. Serial: C2327-1-2Mfg. type: 53009Size: 65 mmRating: ASME 1500 B16.34 3705 psi at 1000 F.Body Material: A216 MWCBStem: SUH600Disc material: Stellite6Seat material: Stellite6

Make: Okano Valve Mfg. Co Japan.

Elecrtrical Actuator Rating:Voltage: 380VFrequency: 50HzOutput: 0.7 HPAmpere: 2.0ATorque: 2.75 ft.lbRPM: 1350Brearing (shield): 6203C3 ; 6204C3Design: D

1 EA

VALVE; DRUM REDUCING 2ND MOV W/ACT U5&6Specifications: -Drum reducing 2nd MOV with actuatorIdentification: 5HAN30AAO02Mfg. Serial: B5640-1Mfg. type: 64209Size: 2-1/2 inRating: ASME 1500 B16.34 255.3 bar. g at 380C.Body Material: WCBStem: SUS403Disc material: Stellite6Seat material: Stellite6

Make: Okano Valve Mfg. Co Japan.

Elecrtrical Actuator Rating:Voltage: 380VFrequency: 50HzOutput: 0.925 HPAmpere: 2.3 ATorque: 3.76 ft.lbRPM: 1290Brearing (shield): 6204C3 ; 6201C3Design: DType: HTP-NRTemp rise: 75 degreesRating: 15 MINInsulation class: HSerial no: 9H70720001Make : Meidensha Electrical mfg. Co. Ltd.

101106602 1 EA

Page 25: TENDER NOTICE - 26.09.2019€¦ · Fan function :Flame detector cooling fan Speed :3000rpm Power :15 KW Capacity :19m3 /min 4 EA SR. # KE MATERIAL CODE ITEM DESCRIPTION QTY UNIT SERVICE

VALVE; CBD 1ST MOV W/ACTUATOR U5&6Specifications: -CBD 1st MOV with actuatorIdentification: 05HAN31AA02Mfg. Serial: 77551-11-1Mfg. type: 1220922Size: 2 inRating: ASME 1500 B16.34 255.3 bar. g at 380C.Body Material: A-105Stem: SUH600Disc material: Stellite6Seat material: 13CRSSMake: Okano Valve Mfg. Co Japan.

Elecrtrical Actuator Rating:Voltage: 380VFrequency: 50HzOutput: 0.94 HPAmpere: 2.3 ATorque: 3.76 ft.lbRPM: 1310Brearing (shield): 6204C3 ; 6204C3Design: DType: HZR-NRTemp rise: 75 degreesRating: 15 MINInsulation class: HSerial no: 0A25070001Make : Meidensha Electrical mfg. Co. Ltd.

VALVE; CBD 2ND MOV W/ACTUATOR U5&6

Specifications: -CBD 2nd MOV with actuatorIdentification: 05HAN31AA01Mfg. Serial: B6294-1Mfg. type: 62209Size: 2 inRating: ASME 1500 B16.34 255.3 bar. g at 380C.Body Material: A-105MStem: SUS403Disc material: Stellite6Seat material: Stellite6

Make: Okano Valve Mfg. Co Japan.

Elecrtrical Actuator Motor Rating:

Voltage: 380VFrequency: 50HzPower: 0.1KW

Make : Meidensha Electrical mfg. Co. Ltd.

101106503 1 EA

101106924 1 EA

Page 26: TENDER NOTICE - 26.09.2019€¦ · Fan function :Flame detector cooling fan Speed :3000rpm Power :15 KW Capacity :19m3 /min 4 EA SR. # KE MATERIAL CODE ITEM DESCRIPTION QTY UNIT SERVICE

SR. # KE MATERIAL CODE ITEM DESCRIPTION QTY UNIT

ANNUAL RATE RUNNING CONTRACT FOR THEANNUAL RATE RUNNING CONTRACT FOR THE SERVICES OF DIVERS (05) FOR UNDER WATER CLEANING OF COARSE AND FINE SCREENS OF CIRCULATING WATER SYSTEM ON AS AND WHEN REQUIRED BASIS AT BQPS-1

1. Vendors are to submit following, at least 2 weeks before commencement of outage;a. A list of skilled manpower for review of userb. A list of tools with certification proofc. Mobilization pland. Job execution plan including Mile Stones2. Vendors are bound to;a. Conduct Daily House Keeping, failing which they should be penalized in monitoring terms reflecting in POb. To appoint Safety Inspector for a group of 20 worker or above. The Safety Inspector should have an experience of 3 years and to be certified by Safety Department of BQPS-1 and must have knowledge of:

i. Permit to Work systemii. Risk assessment3. LDs on vendors shall be implemented due to following Safety violationsi. Nonconformance of PPEsii. Nonconformance of House Keepingiii. Working without Work Permitiv. Unsafe Acts4. For a group of 100 workers or more, vendors shall be bound to have their own arrangement of ;a. Site facility with Rest Roomsb. Tool facilityc. Lunch facilityd. Water facilitye. Toilet facility

1.1 7200775

DIVERS FOR UNDEROF COARSE AND FINE SCREENS OF CIRCULATING WATER SYSTEM ON AS AND WHEN REQUIRED BASIS AT BQPS-1

SCOPE OF WORK

A) SEALING OF DAM BOARDS FOR CHANNEL CLEANING OR ANY OTHER MAINTENANCE WORK.B) INSPECTION FOR CHOKING OR DAMAGE OF COARSE AND FINE SCREENS.C) CLEANING OF COARSE AND FINE SCREENS.D) TAKING OUT ANY FOREIGN ITEM PRESENT IN PUMP PIT.E) NO. OF VISITS IN A YEAR: 23F) DURATION OF SERVICES: NOV 2019 TO NOV 2020G) NO OF DIVERS: 05 NOS.

23 EA

SERVICES FOR ONLINE TESTING & CALIBRATION OF SAFETY VALVES FORUNIT # 1 TO 6, BQPS-1.

ANNUAL RATE RUNNING CONTRACT FOR THE SERVICES OF DIVERS (05) FORUNDER WATER CLEANING OF COARSE AND FINE SCREENS OF CIRCULATING WATER

SYSTEM ON AS AND WHEN REQUIRED BASIS AT BQPS-1

PR# 1300042993, FG1360/BQ1, Tender Cost Rs. 2000/- To Be Opened on 26.09.2019

1 1 AU

Page 27: TENDER NOTICE - 26.09.2019€¦ · Fan function :Flame detector cooling fan Speed :3000rpm Power :15 KW Capacity :19m3 /min 4 EA SR. # KE MATERIAL CODE ITEM DESCRIPTION QTY UNIT SERVICE

SR. # KE MATERIAL CODE ITEM DESCRIPTION QTY UNITSERVICES FOR ONLINE TESTING &

1. Vendors are to submit following, at least 2 weeks before commencement of outage;a. A list of skilled manpower for review of userb. A list of tools with certification proofc. Mobilization pland. Job execution plan including Mile Stones2. Vendors are bound to;a. Conduct Daily House Keeping, failing which they should be penalized in monitoring terms reflecting in POb. To appoint Safety Inspector for a group of 20 worker or above. The Safety Inspector should have an experience of 3 years and to be certified by Safety Department of BQPS-1 and must have knowledge of:

i. Permit to Work systemii. Risk assessment3. LDs on vendors shall be implemented due to following Safety violationsi. Nonconformance of PPEsii. Nonconformance of House Keepingiii. Working without Work Permitiv. Unsafe Acts4. For a group of 100 workers or more, vendors shall be bound to have their own arrangement of ;a. Site facility with Rest Roomsb. Tool facilityc. Lunch facilityd. Water facilitye. Toilet facility

ONLINE TESTING & CALIBRATION SAFETY Valv

FOR UNIT # 1 TO 6, BQPS-1.

SCOPE OF WORK.

1. MOBILISATION OF EQUIPMENT AND MAN POWR.

2. MODIFICATION, CALIBRATION AND PREPARATION OF EQUIPMENT AT BQPS-1 SITE (IF REQUIRED)

3. TESTING AND CALIBRATION OF PSV IN A SHIFT OF 12 HRS.

4. TEN DAYS FOR JOB COMPLETION.

NOTE: ANY WORK NOT INCLUDED ABOVE, BUT REASONABLE REQUIRED FOR COMPLETION OF WORK OF ONLINE TESTING AND CALIBRATION OF SAFETY VALVES SHOULD BE DEEMED TO BE INCLUDED IN THE SCOPE OF WORK.

PR# 1300043135, FG1361/BQ1, Tender Cost Rs. 2000/- To Be Opened on 26.09.2019

1 1 AU

Page 28: TENDER NOTICE - 26.09.2019€¦ · Fan function :Flame detector cooling fan Speed :3000rpm Power :15 KW Capacity :19m3 /min 4 EA SR. # KE MATERIAL CODE ITEM DESCRIPTION QTY UNIT SERVICE

1.DRUM SAFETY VALVE

NORMAL SIZE : 75AINLET DIA : 75MMMAX PRESSURE : 177BARTYPE : FULL BOREQUANTITY : 16

2.SUPER HEATER SAFETY VALVE

NORMAL SIZE : 75AINLET DIA : 75MMMAX PRESSURE : 159BARTYPE : FULL BOREQUANTITY : 08

3.RE HEATER OUTLET SAFETY VALVE

NORMAL SIZE : 155AINLET DIA : 155MMMAX PRESSURE : 44BARTYPE : FULL BOREQUANTITY : 26

4.IA RECIEVER TANK

MEAN SEAT AREA : 0.7858 IN2SIZE : 25MMDESIGN SET PRESSURE : 11.572BARTYPE : 1627QUANTITY : 04

5.SA RECIEVER TANK

MEAN SEAT AREA : 0.7858 IN2

SIZE : 25MMDESIGN SET PRESSURE : 9.4145BARTYPE : 1627QUANTITY : 04

6.IA/SA RECIEVER TANK

MEAN SEAT AREA : 0.8680 IN2SIZE : DN 20-150DESIGN SET PRESSURE : 15BARTYPE : 441-442-448/23QUANTITY : 08

7.IA RECIEVER TANK

MEAN SEAT AREA : 1.2200 IN2SIZE : N/ADESIGN SET PRESSURE : 11BARTYPE : N/AQUANTITY : 05

72008161.1 1 JOB

Page 29: TENDER NOTICE - 26.09.2019€¦ · Fan function :Flame detector cooling fan Speed :3000rpm Power :15 KW Capacity :19m3 /min 4 EA SR. # KE MATERIAL CODE ITEM DESCRIPTION QTY UNIT SERVICE

8.SA RECIEVER TANK

MEAN SEAT AREA : 0.7800 IN2SIZE : N/ADESIGN SET PRESSURE : 09BARTYPE : N/AQUANTITY : 05

SR. # KE MATERIAL CODE ITEM DESCRIPTION QTY UNIT

SERVICES REQUIRED FOR CLEANING OF BONASERVICES REQUIRED FOR CLEANING OF BONA PIPES OF UNITS # 1 TO 6 AT BQPS-1

1. Vendors are to submit following, at least 2 weeks before commencement of outage;a. A list of skilled manpower for review of userb. A list of tools with certification proofc. Mobilization pland. Job execution plan including Mile Stones2. Vendors are bound to;a. Conduct Daily House Keeping, failing which they should be penalized in monitoring terms reflecting in POb. To appoint Safety Inspector for a group of 20 worker or above. The Safety Inspector should have an experience of 3 years and to be certified by Safety Department of BQPS-1 and must have knowledge of:

i. Permit to Work systemii. Risk assessment3. LDs on vendors shall be implemented due to following Safety violationsi. Nonconformance of PPEsii. Nonconformance of House Keepingiii. Working without Work Permitiv. Unsafe Acts4. For a group of 100 workers or more, vendors shall be bound to have their own arrangement of ;a. Site facility with Rest Roomsb. Tool facilityc. Lunch facilityd. Water facilitye. Toilet facility

CLEANING OF BONA PIPES1 LENGTH OF BONA PIPE 1100 RFT (APPROX./UNIT)2 DIAMETER OF BONA PIPE 1800 MM (06 FEET)

SCOPE OF WORK FOR EACH UNIT:

1. SCRAPING OF ALL MARINE GROWTH.2. REMOVAL OF DEBRIS FROM THE BONA PIPE.3. SHIFTING OF ALL RUBBISH FROM THE SITE AS DIRECTED BY THE CONCERNED DGM.4. THE WORK WILL BE DONE DURING NOVEMBER 2019 TO MARCH 2020 SHUT DOWN PERIOD.

PR# 1300042992, FG1362/BQ1, Tender Cost Rs. 2000/- To Be Opened on 26.09.2019

1 1 AU

SERVICES REQUIRED FOR CLEANING OF BONA PIPES OF UNITS # 1 TO 6 AT BQPS1

Page 30: TENDER NOTICE - 26.09.2019€¦ · Fan function :Flame detector cooling fan Speed :3000rpm Power :15 KW Capacity :19m3 /min 4 EA SR. # KE MATERIAL CODE ITEM DESCRIPTION QTY UNIT SERVICE

TERM AND CONDITIONS:

1. THE WORK SHOULD BE COMPLETED WITHIN 15 DAYS FROM THE COMMENCEMENT OF THE JOB.2. ALL TOOLS & TACKLES TO PERFORM THE WORK WILL BE THE RESPONSIBILITY OF THE CONTRACTOR.3. SAFETY GADGETS WILL BE THE RESPONSIBILITY OF THE CONTRACTOR.4. ELECTRICITY WILL BE PROVIDED FREE OF COST AT THE SITE WORK UP TO SWITCH BOARD OF THE CONTRACTOR.5. DAY TO DAY HOUSEKEEPING IN THE VICINITY OF THE WORKING AREA TO BE ENSURE BY VENDOR.6. TRANSFORMER OF 24V, CABLE & BULBS WILL BE THE RESPONSIBILITY OF THE CONTRACTOR.

NOTE: THE CONTRACTOR MUST VISIT THE SITE AND ACCESS THE SCOPE OF WORK BEFORE FILLING OF TENDERS.

72007741.1 1 JOB

www.ke.com.pk

Validation: 120 DaysIncoterm: Ex-works/ FOB / CFR Karachi / FOR Plant SiteQUOTATION WILL NOT BE ACCEPTED AFTER THE GIVEN DEADLINE DATE

Tender document containing detailed scope of work, terms and conditions may be obtained on payment of tender fee (non-refundable) from theundersigned.KE reserves the right to reject any or all the bids and to annul the bidding process at any time without thereby incurring anyliability to the affected bidder(s) or any obligation to inform the affected bidder(s).

Note:− Quote with the reference of the RFQ serial number and men on specs accordingly− Detailed relevant Technical literature (English) must be submi ed with bid.− Quote original make & origin of all above items.− Incomplete quota ons shall not be considered for technical evalua on.− Vendors interested to par cipate in the aforesaid tender may obtain RFQ by purchasing the tender document from 1st Floor, Procurement Division (Support Building), Block-J, Elander Road (Power House) Complex, Karachi, Pakistan

General Manager (Procurement Supply Chain)

Payment Term:

[email protected] Floor, Procurement Division (Support Building), Block-J,

Delivery Period: