teppc 3-25-10 swat summary - r. kondziolka 1 robert kondziolka salt river project march 25, 2010...
TRANSCRIPT
TEPPC 3-25-10 SWAT Summary - R. Kondziolka 1
Robert Kondziolka Salt River Project
March 25, 2010Salt Lake City, Utah
WECC TEPPC Meeting SWAT Update
Western Electricity Coordinating CouncilWestern Electricity Coordinating Council
Transmission Expansion Planning Policy CommitteeTransmission Expansion Planning Policy Committee
TEPPC 3-25-10 SWAT Summary - R. Kondziolka 2
SouthwestArea
Transmission
SWATSWAT
SWAT Footprint One of the WestConnect Sub-Regional Planning
Groups
SWAT Footprint One of the WestConnect Sub-Regional Planning
Groups
http://www.westconnect.com
TEPPC 3-25-10 SWAT Summary - R. Kondziolka 3
Transmission Projects in WECC Regional Planning, Path Rating Process, or Development
Palo Verde-North Gila II
SWIP
Navajo TransmissionProject Segment 1
SunZia
High Plain Express
Palo Verde–Devers IICalifornia Portion
Pinal West to Pinal CentralPinal Central to BrowningPinal Central to TortolitaMorgan to Pinnacle PeakPalo Verde to Sun Valley
Sun Valley to MorganSPPR
TransWest Express
Chinook
Zephyr
Santa Fe
Tres Amigas
South Line
TEPPC 3-25-10 SWAT Summary - R. Kondziolka 4
Palo Verde
Imperial Valley
North Gila
Miguel
Mira Loma
Serrano
Valley
Devers
Vincent
Lugo
Victorville
Adelanto
RinaldiToluca
Crystal
McCullough
Mead
Eldorado
Mohave
Marketplace
Rudd
Four
Corners
YavapaiMoenkopi
Kyrene
Jojoba
PerkinsWestwing
Navajo
Harry Allen
Saguaro
Cholla
Coronado
Nevada
California
Utah
Peacock
Liberty
500 kV line
345 kV line
Major Substation
Major Power Plants
Silver
King
To Intermountain
To Celilo
Sylmar
To Midway
+/- 500 kV DC line
Arizona
DPV2 Project
Harquahala
EHV Transmission Upgrades In Development
2010400MWEnergized
500kV Line Upgrade
2009625MWEnergized
2009625MWEnergized
2010600MW
TEPPC 3-25-10 SWAT Summary - R. Kondziolka 5
Status of Major New Transmission ProjectsProject Name Voltage Capacity
Proposed In-Service Sponsor Status
Pinal Central to Browning 500kV 1400MW 2011 - 2nd Qtr SRP In Construction
Pinal West to Pinal Central 500kV 1400MW 2014 - 2nd Qtr SRP In Design & ROW Acquisition
Palo Verde to Sun Valley 500kV 650MW 2014 - 2nd Qtr APS In Design & ROW Acquisition
Sun Valley to Morgan 500kV 1200MW 2016 - 2nd Qtr APS In Design & ROW Acquisition
Morgan to Pinnacle Peak 500kV 1000MW 2010 – 4th Qtr APS In Construction
Arizona Gateway South (Double Circuit) 345kV 2000MW 2014 TEP In Perpetual Federal Permitting
Navajo Transmission Project 500kV 1500MW 2012 DPA In Path Rating Study Process
Palo Verde to North Gila II 500kV 1250MW 2014 - 2nd Qtr APS In Design & ROW Acquisition
Palo Verde to Devers II (California Only) 500kV 1200MW 2012 – 4th Qtr SCE In Siting & Permitting
TransWest Express (Bi-Pole DC) 600kV 3000MW 2015 Anschutz In Siting & Permitting & Path Rating
Chinook and Zephyr (Bi-Pole DC) 500kV 6000MW 2015 TransCan In Siting & Permitting
Pinal Central to Tortolita 500kV 1200MW 2014 - 2nd Qtr TEP In Siting & Permitting
ON-Line … Consolidated into SWIP 500kV 2000MW 2012 - 4th Qtr NVEnergy In Siting & Permitting & Path Rating
SWIP – Southwest Intertie Project (South) 500kV 2000MW Phase I 2012 LS Power In Siting & Permitting & Path Rating
Project kV MW 20XX ID I
SunZia Southwest Trans Project (2 Circuits) 500kV 3000MW 2014 SW Power In Path Rating Process & Permitting
High Plains Express Initiative (2 Circuits) 500kV 3500MW 2017+ Xcel Feasibility Studies
TEPPC 3-25-10 SWAT Summary - R. Kondziolka 6
A—Palo Verde-North Gila• 500-kV, 100 miles
B—Palo Verde-Blythe• 500-kV, 110 miles
C—North of Parker• Potential double circuit, 230/500-kV, 190 miles
C—South of Parker• Potential double circuit, 230/500-kV, 330 miles
D−Imperial Valley• Potential 500-kV network addition to the Southern California grid in Imperial County, California, miles TBD
Western Area Power AdministrationTransmission Infrastructure Program
Sonoran-Mohave Renewable Transmission (SMRT) Project
TEPPC 3-25-10 SWAT Summary - R. Kondziolka 7
SWAT 2010 Progress • CRT Subcommittee
– RMR Studies for Yuma and Mohave counties– Yuma 230kV Ring and Western TIP SMRT
• SATS Subcommittee– 2009 study work approved and filed– Alternative evaluation and VAR Margin study
• Short Circuit Work Group– Expanding area to include southern California– Retained consultant for CAPE, ASPEN, PSS/E
• NM Subcommittee– Wind collector and integration system, include pass through
• SWAT Renewable Transmission Task Force – Coordination with TEPPC studies
TEPPC 3-25-10 SWAT Summary - R. Kondziolka 8
SWAT 2010 Progress• CATS Subcommittee
– Development of WestConnect Base Cases
– Joint MOD-029 Studies
• Transmission Corridor Planning Committee– WGA Roadmap/Primer for Transmission Development
BLM Arizona Restoration Design Energy Projects Western’s Transmission Infrastructure Program (SMRT) Arizona Corporation Commission Biennial Transmission
Assessment 4th Qtr 2009 - Utilities filed reports identifying top 3 renewable
transmission projects and workshop to address filings Initiating 6th BTA
Arizona Renewable Generation Interconnection Requests
APS
Solar
Wind
SRP
Solar
Wind
TEP
Solar
Wind
WAPA
Solar
Wind
CAISO
Solar
Interconnection Queue Listing
As of 2/8/10
8102MW
3244MW
260MW
125MW
150MW
400MW
1000MW
300MW
400MW
800MW
500MW
150MW
500MW
280MW
480MW
300MW
250MW
87MW
80MW
45MW
150MW
297MW
300MW
900MW
99MW
99MW
40MW
500MW
390MW
2095MW
1400MW
700MW200MW
125MW
180MW
180MW
180MW
180MW
500MW
700MW
700MW
700MW
700MW
150MW
150MW
2950MW
1275MW
1600MW
500MW
500MW
125MW
250MW
110MW
150MW
10MW
200MW
600MW
300MW
500MW
480MW
5MW
100MW20MW
20MW
20MW
20MW
20MW
20MW
20MW
18.9MW
70MW
20MW
20MW
125MW
125MW
500MW
250MW
250MW
50MW
50MW
50MW
340MW
600MW
200MW
100MW
2000MW
290MW
960MW
750MW
TEPPC 3-25-10 9SWAT Summary - R. Kondziolka
TEPPC 3-25-10 SWAT Summary - R. Kondziolka 10
TEPPC 3-25-10 SWAT Summary - R. Kondziolka 11
TEPPC 3-25-10 SWAT Summary - R. Kondziolka 12
TEPPC 3-25-10 SWAT Summary - R. Kondziolka 13
TEPPC 3-25-10 SWAT Summary - R. Kondziolka 14
Morgan 500/230kV Substation
TEPPC 3-25-10 SWAT Summary - R. Kondziolka 15
Morgan 500/230kV Substation
TEPPC 3-25-10 SWAT Summary - R. Kondziolka 16
Morgan to Pinnacle Peak 500/230kV Transmission Line
TEPPC 3-25-10 SWAT Summary - R. Kondziolka 17
Pinnacle Peak 500/230kV Substation
TEPPC 3-25-10 SWAT Summary - R. Kondziolka 18
Pinal Central to Abel to Browning 500/230kV Transmission Line
TEPPC 3-25-10 SWAT Summary - R. Kondziolka 19
Pinal Central to Abel to Browning 500/230kV Transmission Line
TEPPC 3-25-10 SWAT Summary - R. Kondziolka 20
Pinal Central to Abel to Browning 500/230kV Transmission Line
TEPPC 3-25-10 SWAT Summary - R. Kondziolka 21
Pinal Central to Abel to Browning 500/230kV Transmission Line
TEPPC 3-25-10 SWAT Summary - R. Kondziolka 22
Pinal Central to Abel to Browning 500/230kV Transmission Line
TEPPC 3-25-10 SWAT Summary - R. Kondziolka 23
Pinal Central to Abel to Browning 500/230kV Transmission Line
TEPPC 3-25-10 SWAT Summary - R. Kondziolka 24
Pinal Central to Abel to Browning 500/230kV Transmission Line
TEPPC 3-25-10 SWAT Summary - R. Kondziolka 25
Pinal Central to Abel to Browning 500/230kV Transmission Line
TEPPC 3-25-10 SWAT Summary - R. Kondziolka 26
Pinal Central to Abel to Browning 500/230kV Transmission Line
TEPPC 3-25-10 SWAT Summary - R. Kondziolka 27
Pinal Central to Abel to Browning 500/230kV Transmission Line
TEPPC 3-25-10 SWAT Summary - R. Kondziolka 28
Western Electricity Coordinating CouncilWestern Electricity Coordinating Council
Transmission Expansion Planning Policy CommitteeTransmission Expansion Planning Policy Committee
Robert E. KondziolkaRobert E. [email protected]
(602) 236-0971(602) 236-0971
Questions?Questions?
Contact InformationContact Information
Details http://www.westconnect.com