LOGISTIC ACTIVITIES & DEVELOPMENTS IN TCDD TER Workshop on Interstate Coordination of Maintenance Works on the Corridors
Border Stations Connecting our Country to Neighbouring Countries: Syria : Nusaybin-Kamışlı, Islahiye-Meydanekbez, Çobanbey (Closed) Greece : Uzunköprü-Pityon Bulgaria : Kapıkule-Sivilengrad Iran : Kapıköy-Razi Armenia : Doğukapı-Ahuryan (Closed)
Border Gates
2/22
Conventional Lines
High Speed Lines
Islahiye
Doğukapı
Çobanbey
Nusaybin
Uzunköprü
Kapıkule
Kapıköy
Derince Samsun
29.04.2015 KORİDORLARDA BAKIM ÇALIŞMALARININ DEVLETLER ARASI KOORDİNASYONU
TER Workshop on Interstate Coordination of Maintenance Works on the Corridors
Railway Connections in Turkey
TER Workshop on Interstate Coordination of Maintenance Works on the Corridors
In order to allow the transport from Agean and Marmara regions to
Europe and v.v. to be carried out on a shorter corridor between the
ports of Tekirdağ, Derince and Bandırma, rail ferry operations have
been launched.
Tekirdağ-Derince-Bandırma Rail Ferry Operations
Tekirdağ
Bandırma
Derince Conventional Lines High Speed Lines
In order to rehabilitate Van Lake Crossing which plays a significant role in the
trade between our country and Iran and Central Asia countries, the
construction of two fast and high-capacity ferries is going on. These ferries will
carry 100 wagons per day and hence will increase the efficiency by 2,5 times.
TER Workshop on Interstate Coordination of Maintenance Works on the Corridors
Marmaray
Marmaray, the Project of the Century, was commissioned on 29 October 2013.
43.6 million passengers have been carried since its inaguration.
TER Workshop on Interstate Coordination of Maintenance Works on the Corridors
6
It is targeted to revitalize historical Silk Way and to develop ecenomical and cultural relations
between the countries.
• The foundation for the section crossing over Turkey was laid down on 24 July 2008.
• % 83 physical progress has been achieved.
• The project is planned to be completed at the end of 2015.
Annually 6.5 million ton
freight
Kars-Tbilisi-Baku Railway Project
29.04.2015 KORİDORLARDA BAKIM ÇALIŞMALARININ DEVLETLER ARASI KOORDİNASYONU
TER Workshop on Interstate Coordination of Maintenance Works on the Corridors
Silk Wind Project
29.04.2015 KORİDORLARDA BAKIM ÇALIŞMALARININ DEVLETLER ARASI KOORDİNASYONU
TER Workshop on Interstate Coordination of Maintenance Works on the Corridors
OSMANELİ-BİLECİK 15.01.2015-06.03.2015
KARAGÖZLER-İNÖNÜ 01.04.2015-10.07.2015
ÇANKIRI-KURŞUNLU 01.03.2015-28.05.2015
ÇİĞİLİ-MENEMEN 15.04.2015-22.07.2015
CUMAOVASI-TEPEKÖY 01.10.2015-10.12.2015
ALAŞEHİR-EŞME 15.01.2015-15.05.2015
OVAKÖY-UŞAK 20.05.2015-08.06.2015
ŞARKIŞLA-YENİÇUBUK 04.04.2015-15.06.2015
KEMAH-ALP 31.05.2015-23.06.2015
TECER-ÇETİNKAYA 17.06.2015-08.09.2015
ÖZALP-KAPIKÖY 15.05.2015-27.07.2015 BASKİL-KUŞSARAYI
15.04.2015-31.05.2015
MUŞ-BAHÇETEPE 01.06.2015-01.08.2015
VAN-ÖZALP 15.04.2015-14.05.2015
T.KALE-FEVZİPAŞA 23.02.2015-23.08.2015
DUMLUPINAR-AFYON 10.06.2015-05.09.2015
GÖKÇEDAĞ-NUSRAT 01.04.2015-15.08.2015
ARGITHAN-KADINHANI 01.04.2015-18.06.2015
B.KÖPRÜ-GÖMEÇ 01.01.2015-30.04.2015
Y.HİSAR-ULUKIŞLA 01.05.2015-30.06.2015
B.KÖPRÜ-Y.HİSAR 09.02.2015-30.04.2015
BALIKESİR-BANDIRMA
BALIKESİR-SOMA
SOMA-MANİSA
GÖMEÇ-SARIOĞLAN 01.05.2015-30.08.2015
SARIOĞLAN-HANLI 01.09.2015-31.12.2015
ULUKIŞLA-YENİCE 01.07.2015-01.10.2015
ADANA-T.KALE 09.02.2015-10.08.2015
ADANA-MERSİN 01.06.2015-01.08.2015
TAVŞANLI-DURSUNBEY 01.03.2015-01.08.2015
SIGNALIZATION & ELECTRIFICATION WORKS
TRACK RENEWAL & MAINTENANCE WORKS
HALKALI-ÇERKEZKÖY 07.06.2010-İŞ BİTİMİ
KAZLIÇEŞME-HALKALI 01.03.2013-İŞ BİTİMİ
HAYDARPAŞA- PENDİK 01.02.2012-İŞ BİTİMİ
DERİNCE-ESKİŞEHİR 04.12.2012-İŞBİTİMİ
ÜLKÜ-IRMAK 15.04.2014-31.12.2015
ZONGULDAK ARABÜK 15.04.2014-31.12.2015
KONYA-KARAMAN 01.12.2014-30.03.2015
NUSRAT-BALIKESİR 29.11.2014-28.02.2015
TRACK CLOSURES CARRIED OVER FROM 2014
LINE SECTION DURATION
Halkalı-Çerkezköy Continually
Kazlıçeşme-Halkalı Continually
Haydarpaşa-Pendik Continually
Derince-Eskişehir 17
Ülkü-Irmak 5/2
Zonguldak-Karabük 10
Konya-Karaman 16
Nusrat-Balıkesir 8
MAINTENANCE WORKS CARRIED OVER FROM
LAST YEAR
Y.HİSAR – HÜYÜK 16.02.2015-30.02.2015
LINES TO BE MAINTAINED IN 2015
ELECTRIFICATION WORKS TRACK RENEWAL WORKS LINE SECTION DURATION LINE SECTION DURATION
Boğazköprü-Gömeç 8 Osmaneli-Bilecik 8
Yeşilhisar-Hüyük 5 Karagözler-İnenü 8
Boğazköprü-Yeşilhisar 5 Çankırı-Kurşunlu 8
Yeşilhisar-Ulukışla 5 Çiğili-Menemen 8
Balıkesir-Soma 4 Cumaovası-Tepeköy 8
Soma-Manisa 4 Alaşehir-Eşme 8
Balıkesir-Bandırma 4 Ovaköy-Uşak 8
Gömeç-Sarıoğlan 8 Şarkışla-Yeniçubuk 8
Sarıoğlan-Hanlı 4 Tecer-Çetinkaya 8
Ulukışla-Yenice 4 Kemah-Alp 8
Adana-Toprakkale 4 Özalp-Kapıköy 8
Adana-Mersin 12 Baskil-Kuşsarayı 8
Tavşanlı-Dursunbey 5 Muş-Bahçetepe 8
Van-Özalp 8
Toprakkale-Fevzipaşa 8
Dumlupınar-Afyon 8
Gökçedağ-Nusrat 8
Argıthan-Kadınhanı 8
TRACK MAINTENANCE PROGRAM FOR 2015
Track Maintenance Works in Turkey
29.04.2015 KORİDORLARDA BAKIM ÇALIŞMALARININ DEVLETLER ARASI KOORDİNASYONU
TER Workshop on Interstate Coordination of Maintenance Works on the Corridors
DERİNCE-ESKİŞEHİR 04.12.2012-İŞBİTİMİ
HALKALI-ÇERKEZKÖY 07.06.2010-İŞ BİTİMİ
ÜLKÜ-ÇANKIRI 15.04.2014-30.04.2015
ZONGULDAK-FİLYOS
15.04.2014-30.04.2015
HAYDARPAŞA- PENDİK 01.02.2012-İŞ BİTİMİ
KAZLIÇEŞME-HALKALI 01.03.2013-İŞ BİTİMİ
FİLYOS-KARABÜK 15.04.2014-30.04.2015
LINES UNDER MAINTENANCE LINE SECTION DURATION LINE SECTION DURATION
Halkalı-Çerkezköy Kesintisiz Uşak-Eşme 8
Kazlıçeşme-Halkalı Kesintisiz Erzincan-Tanyeri 8
Haydarpaşa-Pendik Kesintisiz Karagöl-Bozarmut 5
Derince-Eskişehir 17 Gölbaşı-Kapıdere 6
Çankırı-Irmak 5/2 Belemedik-Çiftehan 7
Ülkü-Çankırı 12 Karaisalı-Durak 5
Zonguldak-Filyos 7,5 Fevzipaşa-Bahçe 7
Filyos-Karabük 10 Konya-Karaman 16
Boğazköprü-Hüyük 5 Nusrat-Balıkesir 8
Boğazköprü-Gömeç 8 Kadınhanı-Argıthan 8
Balıkesir-Soma 12 Kütahya-Dursunbey 8
Balıkesir-Bandırma 4 Afyon-Dumlupınar 8
CONTINUALLY CLOSED
CLOSED FOR 0-12 HOURS
CLOSED MORE THAN 12 HOURS
KÜTAHYA-T.BİLEK-D.BEY 18.03.2013-01.08.2015
KONYA-KARAMAN 17.03.2015-31.12.2015
BOĞAZKÖPRÜ-GÖMEÇ 27.10.2014-31.05.2015
ÇANKIRI-IRMAK 15.04.2014-30.04.2015
BALIKESİR-BANDIRMA 01.03.2015-01.05.2015
KARAİSALI-DURAK 15.01.2015-30.04.2015
BOĞAZKÖPRÜ-HÜYÜK 09.02.2015-30.04.2015
FEVZİPAŞA-BAHÇE 23.02.2015-13.08.2015
NUSRAT-BALIKESİR 29.11.2014-30.04.2015
BALIKESİR-SOMA 01.03.2015-06.08.2015
BELEMEDİK-ÇİFTEHAN 03.03.2015-30.04.2015
KADINHANI-ARGITHAN 01.04.2015-18.06.2015
ERZİNCAN-TANYERİ 25.03.2015-17.04.2015
UŞAK-EŞME 23.03.2015-17.04.2015 AFYON-DUMLUPINAR
05.03.2015-30.04.2015
KARAGÖL-BOZARMUT 25.03.2015-20.04.2015
GÖLBAŞI-KAPIDERE 01.04.2015-30.04.2015
STATUS OF CURRENT MAINTENANCE WORKS
SIGNALIZATION & ELECTRIFICATION WORKS
TRACK RENEWAL & MAINTENANCE WORK
Track Maintenance Works in Turkey
TER Workshop on Interstate Coordination of Maintenance Works on the Corridors
Agreement concerning the Database of CIT Members (ABD-CIT)
The Database of CIT Members (BD-CIT) constitutes a system to allow participants in this agreement to access high quality
general information about other participants and about traffic restrictions applying to international traffic in real time.
BD-CIT may be accessed via the website www.cit-rail.org provided by the International Rail Transport Committee.
Freight traffic Passenger traffic
1. No., originator and date of the traffic restriction.
2. Reason for the traffic restriction.
3. Regions affected by the restriction: If particular stations or, as appropriate, particular consignees are affected by the
restriction, they are to be precisely specified. If traffic is suspended over a particular section of line, all of the
stations affected are to be listed.
4. Sending regions affected by the restriction.
5. Types of traffic affected (trainload, individual wagonload, “combined traffic”, empty wagons).
6. Goods affected: Goods are to be precisely specified, if possible using the NHM code.
7. Duration of the restriction: The date is to be given in figures using the following format: 2003-11-04.
If the duration cannot be given immediately, it must be notified subsequently and as soon as possible.
8. Traffic already consigned:
- will be accepted and moved via the planned route,
- is to be diverted via ...
- is to be stopped, and if appropriate, the person entitled is to be asked for his instructions.
Announcement Restrictions
Thank You For Your Kind Attention
Orhan AKÇAY Acting Division Manager
TCDD Freight Department