termİk santral performans İzleme ve deĞerlendİrme sİstem tasarimi ve uygulamasi (perİdsİs)...
TRANSCRIPT
TERMİK SANTRAL PERFORMANS İZLEME VE DEĞERLENDİRME SİSTEM TASARIMI VE UYGULAMASI (PERİDSİS)
DESIGN AND APPLICATION OF THE POWER PLANT
PERFORMANCE MONITORING AND EVALUATION SYSTEM
(PERİDSİS)
1
TERMİK SANTRAL PERFORMANS İZLEME VE DEĞERLENDİRME SİSTEM TASARIMI VE UYGULAMASI (PERİDSİS)
Customer Foundation: ELECTRICITY GENERATION COMPANY (EÜAŞ)
Administrator Foundation: YILDIZ TECHNICAL UNIVERSITY (YTU)
Executive Foundations:YILDIZ TECHNICAL UNIVERSITY (YTU)
TUBITAK-MAM
2
TERMİK SANTRAL PERFORMANS İZLEME VE DEĞERLENDİRME SİSTEM TASARIMI VE UYGULAMASI (PERİDSİS)
3
Support Program : TUBITAK 1007
Public Institutions Research Funding
Program
Start date 01.03.2011
Ending date 01.03.2013
Project duration 24 Months
Project budget 2.636.627 TL
TERMİK SANTRAL PERFORMANS İZLEME VE DEĞERLENDİRME SİSTEM TASARIMI VE UYGULAMASI (PERİDSİS)
TERMİK SANTRAL PERFORMANS İZLEME VE DEĞERLENDİRME SİSTEM TASARIMI VE UYGULAMASI (PERİDSİS)
WHAT IS PERFORMANCE MONITORING SYSTEM?
Performance monitoring system of power plant states evaluation of plant production capacity and efficiency with measured data at that time.
Performance monitoring is a system which shows decrease of plant’s and equipment performances to the operator.
GAZ TÜRBİNİ
MWe
Beklenen Performans
Gerçek Performans
T ref T ölçülen Giriş Sıcaklığı
Anma Değeri
BeklenenDeğer
ÖlçülenDeğer
TERMİK SANTRAL PERFORMANS İZLEME VE DEĞERLENDİRME SİSTEM TASARIMI VE UYGULAMASI (PERİDSİS)
TERMİK SANTRAL PERFORMANS İZLEME VE DEĞERLENDİRME SİSTEM TASARIMI VE UYGULAMASI (PERİDSİS)
5
AIM OF THE PROJECT
Aim of this project is to design of a power plant performance monitoring and
evaluation system and to implement it to a plant.
Power plant performance monitoring and evaluation system monitors
mechanical, hydraulic and thermodynamic parameters, which are measured
and affects of them to the plant’s performance. System also compares the real
performance of the plant with the reference performance criterias.
TERMİK SANTRAL PERFORMANS İZLEME VE DEĞERLENDİRME SİSTEM TASARIMI VE UYGULAMASI (PERİDSİS)
TERMİK SANTRAL PERFORMANS İZLEME VE DEĞERLENDİRME SİSTEM TASARIMI VE UYGULAMASI (PERİDSİS)
6
AIM OF THE PROJECT
• To inform the operator about the real performance levels of the equipments
by using the data taken from monitoring and evaluation system of the plant’s
.
TERMİK SANTRAL PERFORMANS İZLEME VE DEĞERLENDİRME SİSTEM TASARIMI VE UYGULAMASI (PERİDSİS)
TERMİK SANTRAL PERFORMANS İZLEME VE DEĞERLENDİRME SİSTEM TASARIMI VE UYGULAMASI (PERİDSİS)
7
AIM OF THE PROJECT
• To diagnose the problems about the
power plant performance.
• To determine the parameters that cause
degradation of the performance.
• To represent fast, easy and human
independent solutions to the operator.
• To help the operator for generating a
planned maintenance program on the
equipment basis.
TERMİK SANTRAL PERFORMANS İZLEME VE DEĞERLENDİRME SİSTEM TASARIMI VE UYGULAMASI (PERİDSİS)
TERMİK SANTRAL PERFORMANS İZLEME VE DEĞERLENDİRME SİSTEM TASARIMI VE UYGULAMASI (PERİDSİS)
8
AIM OF THE PROJECT
• To determine the causes of possible boiler pipe deformations and to increase
the power production ability of the plant.
TERMİK SANTRAL PERFORMANS İZLEME VE DEĞERLENDİRME SİSTEM TASARIMI VE UYGULAMASI (PERİDSİS)
TERMİK SANTRAL PERFORMANS İZLEME VE DEĞERLENDİRME SİSTEM TASARIMI VE UYGULAMASI (PERİDSİS)
9
AIM OF THE PROJECT
• To create an infrastructure for designing of local power plant monitoring
system that is possible to apply for all plants.
• To maintain a local performance monitoring system which will be installed by
Turkish companies.
TERMİK SANTRAL PERFORMANS İZLEME VE DEĞERLENDİRME SİSTEM TASARIMI VE UYGULAMASI (PERİDSİS)
TERMİK SANTRAL PERFORMANS İZLEME VE DEĞERLENDİRME SİSTEM TASARIMI VE UYGULAMASI (PERİDSİS)
10
SCOPE OF THE PROJECT
• To design a local monitoring and evaluation system for Ambarlı Combined
Cycle and Yatağan Coal Fired Power Plants.
• To implement this system to Ambarlı Combined Cycle Power Plant.
TERMİK SANTRAL PERFORMANS İZLEME VE DEĞERLENDİRME SİSTEM TASARIMI VE UYGULAMASI (PERİDSİS)
TERMİK SANTRAL PERFORMANS İZLEME VE DEĞERLENDİRME SİSTEM TASARIMI VE UYGULAMASI (PERİDSİS)
11
SCOPE OF THE PROJECT
• Investigating of available performance monitoring systems all over the world.
• Investigating the relevant standards.
• Preparing the simulations of the power plants.
• Determining the equipment which affect the performance and their effect
levels.
YBT
OBT ABT
Kazan
Ara Kızdırma
2
1
3
4
5
67
89
10
1112
30
29
28
14
15
16
18
48
23
25
27
26
17
22 1924 20
31 13
21
32
33
34
36 3738
4
39
40
6
7 89
41
35
42
43
44
45
46
46
49
52
51
12 ata Kol.
Gland Buharları
47
55
TERMİK SANTRAL PERFORMANS İZLEME VE DEĞERLENDİRME SİSTEM TASARIMI VE UYGULAMASI (PERİDSİS)
TERMİK SANTRAL PERFORMANS İZLEME VE DEĞERLENDİRME SİSTEM TASARIMI VE UYGULAMASI (PERİDSİS)
12
SCOPE OF THE PROJECT
• Determining the performance of equipment at different working conditions
• Developing an economic model which calculates the cost of the degradation
of equipment and all plant.
• Investigating the existing measurement devices and their locations, and
determining the need of new measurement tools.
• Determining the locations of new measurement tools and planning of their
installations.
TERMİK SANTRAL PERFORMANS İZLEME VE DEĞERLENDİRME SİSTEM TASARIMI VE UYGULAMASI (PERİDSİS)
TERMİK SANTRAL PERFORMANS İZLEME VE DEĞERLENDİRME SİSTEM TASARIMI VE UYGULAMASI (PERİDSİS)
13
SCOPE OF THE PROJECT
• Investigating the causes of the boiler pipe failures and increasing the power
production ability of the plant.
• Preparing a software that will help the operator. This software will;
– show and compare the expected performance of equipment and overall
plant.
– show the reasons, effects and possible solutions that causes degradation
of the equipment.
– calculate the cost of degradations.
• Installing, testing, calibrating and submitting of the developed performance
monitoring system to the Ambarlı Combined Cycle Power Plant.
TERMİK SANTRAL PERFORMANS İZLEME VE DEĞERLENDİRME SİSTEM TASARIMI VE UYGULAMASI (PERİDSİS)
TERMİK SANTRAL PERFORMANS İZLEME VE DEĞERLENDİRME SİSTEM TASARIMI VE UYGULAMASI (PERİDSİS)
14
OUTPUTS OF THE PROJECT
Outputs of the projects:
• Design of the power plant performance monitoring and evaluation system
• Software of the power plant performance monitoring and evaluation system
• Application of the power plant performance monitoring and evaluation system
• The essential specification for the installation of the system
• Design guide and algorithms of the monitoring system
• List of the parameters that affect the plant performance and their impact
analyses.
• Economic analysis for performance degradation of the equipment.
• Deformation analysis of boiler pipes.
TERMİK SANTRAL PERFORMANS İZLEME VE DEĞERLENDİRME SİSTEM TASARIMI VE UYGULAMASI (PERİDSİS)
TERMİK SANTRAL PERFORMANS İZLEME VE DEĞERLENDİRME SİSTEM TASARIMI VE UYGULAMASI (PERİDSİS)
• Designed system will;
– monitor of the power plant with real time graphics.
– maintain possibility of performance monitoring on the basis of
equipment to the operator.
– compare the existing performance with expected performance.
– Diagnose and give the solution offers before the problems come into
existence in the plant.
OUTPUTS OF THE PROJECT
TERMİK SANTRAL PERFORMANS İZLEME VE DEĞERLENDİRME SİSTEM TASARIMI VE UYGULAMASI (PERİDSİS)
CONTACT:
Assoc. Prof. Dr. Hasan Hüseyin ERDEM
YILDIZ TECHNICAL UNIVERSITYDEPARTMENT OF MECHANICAL ENGINEERINGBeşiktaş/İSTANBULTel: +90 212 3832907e-mail: [email protected]