terminal lay out
DESCRIPTION
TERMINAL LAY OUT. SYSTEMS FACILITIES CAPACITIES. TERMINAL LAY OUT. Quay Storage Area (Yard) Reception/Delivery Area Facilities QUAY: Ship’s working area Bollards marked and numbered Safe access for pedestrians etc. - marked by yellow lines Marking of trucklanes. - PowerPoint PPT PresentationTRANSCRIPT
TERMINAL LAY OUTTERMINAL LAY OUT SYSTEMS SYSTEMS
FACILITIES FACILITIES
CAPACITIESCAPACITIES
TERMINAL LAY OUTTERMINAL LAY OUT
Quay Quay Storage Area (Yard) Storage Area (Yard) Reception/Delivery Area Reception/Delivery Area Facilities Facilities QUAY: QUAY: Ship’s working area Ship’s working area Bollards marked and numbered Bollards marked and numbered Safe access for pedestrians etc. - marked Safe access for pedestrians etc. - marked
by yellow lines Marking of trucklanesby yellow lines Marking of trucklanes
TERMINAL LAY OUTTERMINAL LAY OUT
Backreach for hatchcovers /shifters etc.Backreach for hatchcovers /shifters etc. STORAGE AREA STORAGE AREA Stacking pattern:Stacking pattern:
Straddle carrier: transversal to the quayStraddle carrier: transversal to the quayRTG/RMG:parallel to the quayRTG/RMG:parallel to the quayFLT:transversal to the quayFLT:transversal to the quayReachstacker: transversal to the quay Reachstacker: transversal to the quay
Fire fighting connections Fire fighting connections Light masts Light masts
TERMINAL LAY OUTTERMINAL LAY OUT
Stacking patterns - fire fighting hydrantsStacking patterns - fire fighting hydrants Terminal Lighting: Large masts, well Terminal Lighting: Large masts, well
protected (collisions) protected (collisions) Working area’s: Working area’s:
Container crane:Container crane: 100 - 200 Lux100 - 200 Lux Yard Yard working area: working area: Min. 20 LuxMin. 20 Lux Other:Other:
Min. 5 Lux Min. 5 Lux
FACILITIESFACILITIES GATE GATE ADMINISTRATION BUILDING:ADMINISTRATION BUILDING:
Ship’s AgentsShip’s AgentsCustomsCustoms
Truckers etc. Truckers etc. CANTEEN plus wash/shower facilities CANTEEN plus wash/shower facilities WORKSHOPWORKSHOP CONTAINER FREIGHT STATION (CFS) CONTAINER FREIGHT STATION (CFS) STORE ROOM STORE ROOM RAILCONNECTION RAILCONNECTION (REPAIRFACILITIES) (REPAIRFACILITIES) MT DEPOTMT DEPOT
TERMINAL LAY OUTTERMINAL LAY OUT IMPORT STACK/ZONING IMPORT STACK/ZONING EXPORT STACK/ZONING EXPORT STACK/ZONING MT STACK/DEPOT MT STACK/DEPOT REEFER STACK REEFER STACK REPAIR STACK REPAIR STACK STACKING OF DG CONTAINERS STACKING OF DG CONTAINERS STACKING OF SPECIALS/OVERSIZESTACKING OF SPECIALS/OVERSIZE
TERMINAL LAY OUTTERMINAL LAY OUT
CAPACITY CAPACITY
CAPACITYCAPACITY
EQUIPMENT EQUIPMENT STORAGE (AREA)STORAGE (AREA)
CAPACITY EQUIPMENTCAPACITY EQUIPMENT
Container Crane:Container Crane:3-4000 hrs x 25 ctrs/hr =75-100.000/yr 3-4000 hrs x 25 ctrs/hr =75-100.000/yr
Straddle Carrier:Straddle Carrier:3000 hrs x 12 ctrs/hr = 36.000/yr 3000 hrs x 12 ctrs/hr = 36.000/yr
Rubber Tyred Gantry:Rubber Tyred Gantry:3000 hrs x 20 ctrs/hr = 60.000/yr 3000 hrs x 20 ctrs/hr = 60.000/yr
Rail Mounted GantryRail Mounted Gantry
CAPACITY STORAGECAPACITY STORAGE
Storage Systems: Storage Systems: ChassisChassis 45 m2/TEU 45 m2/TEU Straddle CarrierStraddle Carrier 16 m2/TEU 16 m2/TEU RTGRTG 12 m2/TEU 12 m2/TEU RMGRMG 9 m2/TEU 9 m2/TEU FLT (MT)FLT (MT) 7 m2/TEU 7 m2/TEU FLT (Full)FLT (Full) 25 m2/TEU 25 m2/TEU ReachstackerReachstacker 15 m2/TEU15 m2/TEU
CAPACITYCAPACITY
EQUIPMENT: EQUIPMENT: Containers/moves per hour/shift/yearContainers/moves per hour/shift/year
STORAGE:STORAGE: TEU’sTEU’s SHIPS:SHIPS: TEU’s TEU’s TEU = Twenty feet Equivalent Unit TEU = Twenty feet Equivalent Unit FEU = Fourty feet Equivalent Unit FEU = Fourty feet Equivalent Unit
CAPACITY STORAGECAPACITY STORAGE
Criteria: Criteria: Equipment (m2/TEU) Equipment (m2/TEU) Dwell Times:Dwell Times: Exports Exports 3-5 days3-5 days
Imports Imports 6 days 6 daysMT’sMT’s 25 days 25 days
Yard Occupancy Factor: 0.75 Yard Occupancy Factor: 0.75 Peak Factor:Peak Factor: 1.3 1.3
CAPACITY STORAGECAPACITY STORAGE
EXAMPLE: EXAMPLE: Annual Throughput:Annual Throughput:
350.000 ctrs=420.000 TEU 350.000 ctrs=420.000 TEU 80% Full=336.000 TEU 80% Full=336.000 TEU 20% MT = 84.000 TEU 20% MT = 84.000 TEU Average dwelltimes: 12 days Average dwelltimes: 12 days Yard Handling Equipment: RTG Yard Handling Equipment: RTG
CAPACITY STORAGECAPACITY STORAGE
Storage Area Requirements:Storage Area Requirements:432.000 x 432.000 x 12 12 x 12(m2) x 1.3 x x 12(m2) x 1.3 x 1 1 ==
365 0.75 365 0.75 432.000 x 12 x 12 x 1.3432.000 x 12 x 12 x 1.3 ==
365 x 0.75 365 x 0.75296230 m2 = 30 ha.296230 m2 = 30 ha.
Facilities plus working area’s (Trucklanes - Facilities plus working area’s (Trucklanes - Quay - Backreach etc): abt. 35% Quay - Backreach etc): abt. 35%
Total Area : 45 ha.Total Area : 45 ha.