test 123

Download Test 123

If you can't read please download the document

Upload: wesal-refat

Post on 12-Dec-2015

214 views

Category:

Documents


0 download

DESCRIPTION

test

TRANSCRIPT

Nokia Siemens NetworksNokia Siemens Networks 1/29 FIFA Workinstruction_V_1.0FIFA,FTFB WorkinstructionFIFA Workinstruction_V_1.0Nokia Siemens NetworksNokia Siemens Networks 2/29 FIFA Workinstruction_V_1.0Purpose:The purpose of this document is to describe the installation of the FIFA Flexbus Transmission Sub-module forNokia Siemens Networks Flexi Multiradio BTS.INDEX:FIFA...................................................................................................................................................... 3Overview:.......................................................................................................................................... 3Licensing........................................................................................................................................... 3Swap cases ........................................................................................................................................ 3Local management............................................................................................................................ 4Commissioning: ................................................................................................................................ 4Commissioning BTS:.................................................................................................................... 4Commissioning FIFA: .................................................................................................................. 5Commissioning a single hop for FlexiHopper .............................................................................. 6Commissioning a single hop for MetroHopper ............................................................................ 8Configuration Backup....................................................................................................................... 9Configuring................................................................................................................................... 9Configuring Q1 settings.............................................................................................................. 13Configuring IP settings ............................................................................................................... 14Setting the real time clock........................................................................................................... 14Using alarm disturbance filtering................................................................................................ 14Cross-Connection:........................................................................................................................... 15Software status FIFA ...................................................................................................................... 15Upgrading FIFA software with FlexiHub Manager.................................................................... 15FIFA 1.3 SW compatibility............................................................................................................. 16Exporting information to a text file ............................................................................................ 16FTFB................................................................................................................................................... 17Exporting information to a text file ............................................................................................ 17Establishing a connection to the node............................................................................................. 17Connecting to the LMP............................................................................................................... 17Commissioning NSN FlexiWCDMA FTFB module and FlexiHopper.......................................... 18with the Commissioning Wizard .................................................................................................... 18Starting the Commissioning Wizard........................................................................................... 18Commissioning a single hop........................................................................................................... 23Commissioning DCN...................................................................................................................... 26Software:......................................................................................................................................... 28Software Update on FTFB from R1.0 to R1.1................................................................................ 29Steps................................................................................................................................................ 29Further information..................................................................................................................... 29Nokia Siemens NetworksNokia Siemens Networks 3/29 FIFA Workinstruction_V_1.0FIFAOverview:The following figures present FIFA Flexbus Transmission Sub-module forNokia Siemens Networks Flexi Multiradio BTS.LicensingFIFA has 2 Flexbus interfaces. Flexbus 1 can be used without any licence and Flexbus 2 usage requires aseparate licence.To activate Flexbus 2 interface an Additional Flexbus (FB) interface licence must be ordered and installed forFIFA.Guideline_License_download_FIFA.docSwap casesSwap cases are divided into two categories, which are described in the following.In this category standalone transmission indoor units are replaced with integrated transmission indoor unitsand Flexi Multiradio BTS transmission unit is replaced with a newer release.. FIFA -> FIFA (= new release update, see Release Note). FIU 19E -> FIFA2G UltraSite / MetroSite and Flexi Multiradio BTSIn this category 2G UltraSite / MetroSite is replaced with Flexi Multiradio BTS.. ITN + FXC RRI - > FIFATalk BTS and Flexi Multiradio BTSIn this category Talk BTS is replaced with Flexi Multiradio BTS.. RRIC -> FIFANokia Siemens NetworksNokia Siemens Networks 4/29 FIFA Workinstruction_V_1.0Local managementThe Flexi Multiradio BTS local management port is used for communicating with FIFA locally. The FlexiMultiradio BTS LMP port is an Ethernet-based interface.FlexiHub Manager communicates with FIFA using an IP-based protocol. When connecting locally, the IPaddress of the PC must be manually configured to the same subnet as FIFA management port. The usermust have appropriate Windows access rights to configure the PCs IP address settings.It is recommended that you use IP address 192.168.255.130.. LMP: 192.168.255.131. FIFA: 192.168.255.254If the LMP port is used, then the PC IP address should be 192.168.255.130and the Netmask 255.255.255.0.Commissioning:Commissioning BTS:- update the SW of BTS (the System detects the FIFA card)- Start the commissioning Wizzard and go through the wizzard and configure all parameters accordingto datafill- Than you need to activate the Interfaces- be aware of the Clock Interfaces- check or configure the BTS cross connections- after finishing the commissioning SAVE the BTS Com-file to your Laptap- send com-file to the BTSNokia Siemens NetworksNokia Siemens Networks 5/29 FIFA Workinstruction_V_1.0Commissioning FIFA:LogIn to FIFA using Flexi Hub ManagerSteps:1. Connect your computer to the LMP of the BTS System Module through an Ethernet cable.2. Start the FlexiHub Manager program.3. Select File ? Connect.4. Uncheck Connect to Remote Host.5. Select Flexi EDGE FIFA as Connection Type.6. Enter Login Information.Factory defaults:User name: PAM; Password: PAMIn case the password is changed, it applies only to the node where the change has been made.7. Click Connect.A Pop-up-Window opens User name=PAM PW=PAMNokia Siemens NetworksNokia Siemens Networks 6/29 FIFA Workinstruction_V_1.0Closing the connection to a nodeSteps1. If necessary, save any changes you have made.2. In the FlexiHub Manager menu, select File ? Disconnect.Expected outcomeThe connection to the node is closed.Commissioning a single hop for FlexiHopperIf you are commissioning a new site, you should commission the network element andeither the single hop or the protected hop. Follow the steps in Commissioning thenetwork element first and proceed then with either the steps below or with Commissioning a protected hop.Before you startFollow the instructions given in Starting the Commissioning Wizard and Commissioningthe network element.Steps:1 Perform the antenna fine alignment. If you are not going to perform the outdoor unit antenna finealignment now, continuecommissioning by clicking Next and skip Step 2.2 Configure the outdoor unit settings and click Apply.If you are aligning the near-end antenna, select Flexbus Capacity, enter the TX Frequency value and clickApply. The transmitter power can be off.If you are aligning the far-end antenna, select Flexbus Capacity, enter the TX Frequency and Maximum TXPower values, select the TX Power check box.The incoming signal level can be viewed from the Outdoor unit status box at the bottom of the window.If you are going to continue working at the other end of the radio hop, the alignmentsettings can be made now and the commissioning can be completed at a later time.Configure the settings and then cancel the wizard if this is the case.The modifications made will take effect immediately when you click Apply.3 When the antenna alignment is finished, click Next. The modifications made will take effect immediatelywhen you click Apply.Nokia Siemens NetworksNokia Siemens Networks 7/29 FIFA Workinstruction_V_1.04 Enter the Radio Interface Properties and click Next.Enter the Radio Interface Properties according to the network plan.Note that Unit Name, Installer and Notes are mandatory fields.Select whether the transmitter power should be on.Expected outcomeThe single hop commissioning part of the Commissioning Wizard has been completed.Click Next to continue the wizard.5 If there is a second single hop connected to FIFA (chain site)ThenRepeat the steps above.Nokia Siemens NetworksNokia Siemens Networks 8/29 FIFA Workinstruction_V_1.0Commissioning a single hop for MetroHopperBefore you startFollow the instructions given in Starting the Commissioning Wizard and Commissioning the network element.When commissioning MetroHopper, it is recommended that you commission the Slave radio before theMaster. Therefore it is needed to go to the slave-site first or a othertechnician stay there in the swap.Note that MetroHopper does not support protected configuration. For MetroHopper it is only possible to selectthe single hop.Steps1 Perform the antenna fine alignment.If you are going to perform the outdoor unit antenna fine alignment using AGC voltage,select the appropriate Antenna Alignment option and choose Commissioning Mode,then click Next.2 If aligning the antenna using AGC voltageThenSelect the required channel spacing and channel number. Choose whetheraligning the near-end or far-end antenna. Click Start Alignment.3 When the antenna alignment is finished, click Next.The modifications made will take effect immediately when you click Start Alignment.The incoming signal level can be viewed from the Outdoor unit status box at thebottom of the window.If you are going to continue working at the other end of the radio hop, the alignmentsettings can be made now and the commissioning can be completed when the other endof the hop is also operating. Configure the settings and then cancel the wizard if this isthe case.Enter the Radio Interface Properties and click Next.Enter the Radio Interface Properties according to the network plan.Note that Unit Name, Installer and Notes are mandatory fields.When commissioning a new hop, the same temporary hop ID must be entered in theHop ID field at both ends of the hop. This will be replaced with a permanent hop ID oncethe commissioning has been completed.In manual commissioning, select the channel to be used.In autosearch commissioning, select the channels that may be used. The MetroHopperunits will choose one of the channels from the list automatically.Nokia Siemens NetworksNokia Siemens Networks 9/29 FIFA Workinstruction_V_1.0Configuration BackupFlexi Hub Manager -> Tools -> Configuration BackupThe FlexiHopper (Plus) outdoor unit, starting from releases FH 3.3.4, FH 5.2.4, FH 6.6 and FHP 2.6 andMetroHopper, starting from release 4.0 as well as FIFA support configuration backup. This feature makes itpossible to create a backup copy of important unit configurations to other connected units. That informationcan be restored to recover from error situations orto quickly commission a unit which has been replaced. Backups can be made automatically or manually withFlexiHub Manager.The following backup cases are possible:. Outdoor unit settings are backed up to the indoor unit.. Indoor unit settings are backed up to all outdoor units.Press Backup All UnitsNote:Configuration backup is used to backup the most importantconfiguration settings for each unit. These settings are storedin other parts of the network element, so that when one unit isreplaced its settings can be retrieved from the other units. Forexample, the settings for a FlexiHopper outdoor unit can bebacked up to the ndoor unit. When this unit is replaced itssettings can be retrieved and used to configure thereplacement unit.!Caution!If automatic backup is enabled when replacing a unit, you will lose thebackup after connecting the unit to the indoor unit.Always disable automatic backup before replacing a unit.ConfiguringPurposeAll FIFA properties and settings are viewed and edited using the Hardware View in FlexiHub Manager. Clickon a unit in the equipment pane in order to select it.Steps1. On the FlexiHub Manager View Bar, select Hardware.The equipment pane is shown.2. Select the appropriate unit.Click on the unit. The settings are shown on the configuration pane on the right.Click the tabs to switch between pages.3. Make sure the Properties tab is selected, detailing the properties of the selected NE.klick on FlexiEDGE FIFA and go through all tabs and fill in Site-details into the empty-fieldsNokia Siemens NetworksNokia Siemens Networks 10/29 FIFA Workinstruction_V_1.0Klick on FIFA HW and go through the tabs, fill in Site details which are important:- Unit name: Name of the Site like e.g. FIFA GE8010Nokia Siemens NetworksNokia Siemens Networks 11/29 FIFA Workinstruction_V_1.0klick on OU (OutdoorUnit) and fill out necessary info`s which are important:- UNIT Name: name must be given from source destination HOP, like e.g. GE_8010-GE_2002- Installation: fill out the installation-fields (Installer, Date, Time)Nokia Siemens NetworksNokia Siemens Networks 12/29 FIFA Workinstruction_V_1.0In the settings tab you can modify the transmit frequency, transmitpower, automatic transmit power control (ATPC/ALCQ), modulation, and interleaving settings for the outdoorunit(s). In a protected setup, some settings are common for both radios, depending on theprotection method (hot-standby operation (HSB) or diversity protection).Nokia Siemens NetworksNokia Siemens Networks 13/29 FIFA Workinstruction_V_1.0Steps:1. LogIn to FHM (FlexiHubManager)-> go to ODU unit and start with setting of details.2. To turn the transmit power on/off, select/clear the Tx Power check box.3. To change the transmit frequency, type in the new value in the Tx Frequency (kHz) box or click thearrows to adjust the frequency. The frequency step is read from the equipment.4. To change the transmit power, type in the new value in the Maximum Tx Power (dBm) box or click thearrow to adjust the power.The range of values for the transmit power is read from the equipment.5. To change automatic transmit power control (ATPC), select the control mode from the Auto TX PowerControl drop-down list. The possible operating modes for automatic transmit power control are Off, ATPC,and ALCQ.For the ATPC or ALCQ to function, you must set a value in the ALCQ/ATPC Set Point (dB) box. This valuecan be obtained from transmission planning.6. To change the interleaving mode, select a new value from the Interleave status drop-down list.Possible values for interleaver status are Off, Depth 2, and Depth 4 in 4-state modulation mode.Note that the outdoor unit stops transmitting while this setting is being changed. Change the settingaccordingly also at the other end of the hop. In 16-state modulation the interleaver status is fixed to Depth 4.9. To change the modulation type, select a new value from the Modulation mode drop-down list.Possible values are 4-state modulation or 16-state modulation. Changing the modulation mode settingsinterrupts the traffic for one minute.Note that 16-state modulation is a licensed feature, and may require installation of a software licence.10. In the Outdoor Unit Settings dialogue box, click Send to submit the changes to the node.Expected outcomeThe outdoor unit settings have been configured.Further informationNote that if the hop is operating, the settings are for the whole radio hop,not just the near-end radio.Configuring Q1 settingsBefore you startMake sure that FlexiHub Manager is running on your computer and aconnection to the node has been established.Steps1. On the FlexiHub Manager View Bar, select DCN. The DCN view is shown.2. Select the Q1 tab.3. View and change, if necessary, the Q1 port settings.To change the Q1 address or the baud rate of the Q1 port,type in the desired value or select it from the list.When FIFA is used with BTS polling, the Q1 port addressis fixed to 4087 and the Q1 speed is set to 9600 bit/s.This is the default rate used by the BTS.NOTE !!!:NOT NEEDED, BECAUSE ONLY BTS-POLLING ISUSEDIn BSC polling the Q1 address must be configured in therange 0 - 3999 according to the Q1 plan. The Q1 portspeed must be set to the same value defined for the Q1bus in the BSC.Nokia Siemens NetworksNokia Siemens Networks 14/29 FIFA Workinstruction_V_1.04. View and change, if necessary, the Q1branching settings.Select or clear the boxes to achieve the desiredsetting.5. Click Send to submit the changes to the node.Expected outcomeThe Q1 settings have been set.Configuring IP settingsBefore you startMake sure that FlexiHub Manager is running onyour computer and a connection to the node hasbeen established.Steps1. On the FlexiHub Manager View Bar, select DCN.The DCN view is shown.2. Select the IP tab.The IP settings are used for local management only, and cannot bechanged. Modifications can only be made to the User Name andPassword controlling user access.Setting the real time clockBefore you startFlexiHub Manager is running on your computer and a connection to thenode has been established.Steps1. On the FlexiHub Manager View bar, select DCN.2. Select the Time tab.3. Check the Set Local Time in Network Element from PC Timecheck box.4. Click Send to submit new real time clock settings to the node.Expected outcomeThe real time clock has been set and the check box is cleared.Using alarm disturbance filteringPurposeWhen enabled alarm disturbance filtering prevents the alarm display andnetwork management system from being flooded with repetitions of thesame alarm.Nokia Siemens NetworksNokia Siemens Networks 15/29 FIFA Workinstruction_V_1.0Cross-Connection:In case you have to forward the signal to a another BTS go to Cross Connections in FHMSoftware status FIFAUpgrading FIFA software with FlexiHub ManagerSteps1. Upgrade software locally or remotely using FlexiHub Manager.a. Select Software from the View Bar or from the View menu.b. In the Software View, select the network element from the list.c. Check the Update check box.d. Select the software package from the Available Software Versions list or click Browse to locate thepackage.2. Click Upgrade.Expected outcomeThe software package is visible as the Inactive Software.3. Activate the updated software.a. Select Software from the View Bar or from the View menu.b. In the Software View, select the software unit from the list.c. Check the Activate check box.d. Click Activate to activate the updated software.Expected outcomeThe inactive software becomes the Active Software.Nokia Siemens NetworksNokia Siemens Networks 16/29 FIFA Workinstruction_V_1.0If SW-update is needed, tick the box in update-row and the line which equipment (IDU or ODU) you want toupdateFIFA 1.3 SW compatibilityCompatibility with indoor units: FIU 19E 2.1 or later FIU 19 4.7.2 or later FXC RRI ITN2.2 or later AXC 2.7 (IFUE 2.2) or later RRIC 3.3-2 or later FTFA (FIFA) 1.0 or laterCompatibility with outdoor units: FlexiHopper 3.3.4 or later FlexiHopper 5.2.4 or later FlexiHopper 6.6 or later FlexiHopper 4E1 2.6 or later FlexiHopper Plus 2.6 or later MetroHopper 4.0 or laterExporting information to a text fileSteps1. In the Manager menu, select File ? Save As.2. Enter the file name and save the required information.Note that cross-connections and active alarms can be exported forinformation or documentation purposes only. The information is intext format.Expected outcomeThe information is exported to a text file.Nokia Siemens NetworksNokia Siemens Networks 17/29 FIFA Workinstruction_V_1.0FTFBOverview of FTFB-HWExporting information to a text fileBefore you startMake sure that Nokia Siemens Networks FlexiHub Manager software application is running on your computerand a connection to the node has been established.Steps1 In the Manager menu, select File >Save As and save the required information to a file.For Alarms, Cross-connections and performance management data, they will be saved as text file. ForSnapshot and Configuration data, they will be saved as zip file. And the saved Configuration zip file can beimported later.Expected outcomeThe required information has been saved to a file.Establishing a connection to the nodeConnecting to the LMPBefore you startWhen Nokia Siemens Networks FlexiHub Manager is used for local management, thecomputer must be connected to BTS management port (LMP) via an Ethernet cable.g NoteIt is recommended to use IP address 192.168.255.130 mask 255.255.255.0 asdefault setting for the Ethernet interface settings.In case it is conflicted with FleixBTS instruction, please follow the FleixBTS instruction.Steps1 Connect your computer to the LMP of BTS via an Ethernet cable.2 Start the Nokia Siemens Networks FlexiHub Manager program.3 Select Connection > Connect.4 Select FlexiWCDMA FTFB for Connection Type.5 Uncheck Connect to remote Host.6 Enter Login Information.7 Press Log In.Nokia Siemens NetworksNokia Siemens Networks 18/29 FIFA Workinstruction_V_1.0Commissioning NSN FlexiWCDMA FTFB module and FlexiHopperwith the Commissioning WizardStarting the Commissioning WizardBefore you start1. Switch the power on.2. Connect the local management port (LMP) cable between the PC and the indoorunit. For instructions, see Connecting to the LMP.3. Start Nokia Siemens Networks FlexiHub Manager.Steps1 Set up the connection to the network element.For instructions, see Establishing a connection to the node.2 Establish the connection in the FlexiHub Manager. Click the Connect button orselect Connect from the Connection menu.3 On the FlexiHub Manger's NaviBar, select Commissioning to start the CommissioningWizard.The Commissioning Wizard is launched.4 Select the Commissioning Method either Commission manually or Commissionwith a file and fill in the Installer name, Notes etc.Nokia Siemens NetworksNokia Siemens Networks 19/29 FIFA Workinstruction_V_1.0Commission manually and filling in the Installer nameCommission with a file and filling in the Installer nameNokia Siemens NetworksNokia Siemens Networks 20/29 FIFA Workinstruction_V_1.0Choose a file to use for commissioningSteps1 Select the network element and radio hop(s) to be commissioned. Click the ConfigureHardware button, if it is available.If you are commissioning a new site, select the network element and either the single hop or the protected(HSB) hop as the commissioning targets.If you are converting the site from single mode to protected mode, you only need to select the protected hopfor commissioning.Clicking the Configure Hardware button turns the Flexbus power on and also set "in use". Then it searchesfor the necessary hardware for commissioning. The progress of hardware is shown.Selecting commissioning target and scanning for hardwareNokia Siemens NetworksNokia Siemens Networks 21/29 FIFA Workinstruction_V_1.0Expected outcomeOnce FlexiHub Manager founds a unit, its type is shown in the table.Unexpected outcomeIn case one of the units is not found, the network element is returned to its original state.Check the cable connections and start over.2 Click the Next button.3 If you are converting an existing site from single mode to protected mode,Otherwise:Continue commissioning the network element.4 Enter the site information (fields marked with yellow are mandatory, others areoptional), and click Next.Enter the following information: Equipment Name (mandatory) Group Name (mandatory) Site name (mandatory) Site location (mandatory) Installer (mandatory) Installation date Installation time Notes Unit Name (mandatory)Nokia Siemens NetworksNokia Siemens Networks 22/29 FIFA Workinstruction_V_1.05 Fill in either IP or Q1 management information depending on your network management,and click Next.Enter the following IP management information, in the format 255.255.255.255: IP address Subnet mask User Name: (Factory settings: PAM) Old Password: (Factory settings: PAM) New Password Confirm New Password Q1 BypassConfiguring management settings of the network elementNoteAt least two Flexbus interfaces must be selected to enable Q1 bypass.6 Set the real time clock settings, and click Next.Set the real time clock during commissioning by selecting the Set Time in Network Element from PC Timecheck box.Besides setting the clock from FlexiHub Manager, it is possible to use Network Time Protocol (NTP) to updatethe real time clock from the network.To use NTP, select the Enable NTP check box and select the Time Zone from the dropdown list.To add a new NTP server, click the last row in the NTP Servers table. Configure the settings as shown in thefollowing table:7 Configure SNMP Settings and click Next.Nokia Siemens NetworksNokia Siemens Networks 23/29 FIFA Workinstruction_V_1.0NoteIn SNMP, a trap is a type of PDU (protocol data unit) used to report an alert or other asynchronous eventabout a managed subsystem.8 Send parameters and click Next.9 Save Commissioning information to a file and click Finish.10 To continue with commissioning a hop, proceed with:Commissioning a single hopOr:Commissioning protected hot stand-by (HSB) hop.Otherwise:Proceed with Finishing the commissioning.Commissioning a single hopSteps1 If you are not going to perform the outdoor unit antenna fine alignment now, continuecommissioning by clicking Next.Otherwise:Configure the outdoor unit settings and click Apply.If you are aligning the near-end antenna, enter the TX Frequency value and click Apply.The transmitter power can be off.If you are aligning the far-end antenna, enter the TX Frequency and Maximum TX power values, select theTransmitter power on check box, and click Apply.Further informationThe modifications made will take effect immediately when you click Apply.The incoming signal level and the transmitting power level can be viewed from the outdoor unit status area.If you are going to continue working at the other end of the radio hop, the alignment settings can be madenow and the commissioning can be completed when the other end of the hop is also operating. Configure thesettings and then cancel the wizard if this is the case.Nokia Siemens NetworksNokia Siemens Networks 24/29 FIFA Workinstruction_V_1.0Aligning the outdoor unit antennaNoteThe Flexbus/Outdoor Unit Capacity has four choices: 2 x E1, 4 x E1, 8 x E1 and 16x E1.The modulation state only has two choices: 4-state and 16-state.2 Click Next.3 Enter the radio interface settings and click Next.4 Enter the following information: Unit name Installer Notes TX Frequency Maximum TX power5 Select whether the transmitter power should be on.Figure 22 Configuring radio interface settings of the outdoor unitExpected outcomeThe single hop commissioning part of the commissioning wizard has been completed.6 In the Send Parameters page, check that the settings are correct and click SendParameters to send the settings to the node.After you have entered all the required settings, a summary of commissioning settings is displayed. It containsall the settings you have defined for the radio(s).Verify the values before sending them to the node. If they are not correct, go back in the Wizard using theBack button and correct the settings.You can use the two buttons above the list to expand and collapse all items in the list. You can also use thesmall arrows in title rows to expand and collapse individual parts of the list.Nokia Siemens NetworksNokia Siemens Networks 25/29 FIFA Workinstruction_V_1.07 Click Next to continue.8 Check hop status.9 Click Next to continueSave the final commissioning report to the local drive by clicking Save to file, andclick Finish.You are shown the final commissioning report. The commissioning report cannot be accessed later unless itis saved.Nokia Siemens NetworksNokia Siemens Networks 26/29 FIFA Workinstruction_V_1.0Commissioning DCNSteps1 Select the Mode, Address and Mask for PPP0 over Flexbus 1 and PPP1 overFlexbus 2. There are four modes available: Hoplan (numbered), AuxFast (numbered),Hoplan (unnumbered) and AuxFast (unnumbered).Figure 35 IP Network ExtensionsNote !!:PPP data is carried inside radio frame overhead data channels. These channels are called HopLAN andAuxFast. AuxFast interface capacity is 64 - 512 kbits/s depending on the radio link capacity. HopLAN datachanne capacity is 7 - 80 kbits/s depending on the radio links' capacity.AuxFast is a synchronous channel over the radio path. User capacity is 64 kbit/s.There are three AF bytes reserved in the frame,AuxFast capacity over the radio path is thus 160 kbit/s.The capacity is needed for the data, justification control and byte synchronization (octet information) transfer.HopLan (HL) bits are used only as internal communication channel between equipments.In FIU19/RATS/MICE configuration, this channel is used between two OUs and message is forwarded in OUsto/from FECLAN through processor. The capacity of the channel is n x 4 kbit/s, n = 2, 4, 8, 16 (depending onmain signal capacity).2 If Hoplan (numbered) or AuxFast (numbered) is selected, an IP address is neededto be specified. For example, in Figure 28, 100.0.0.3 is configured. If Hoplan(unnumbered) or AuxFast (unnumbered) is selected, the IP address and Maskfields are disabled and need to be configured in IP tab. For example, 12.12.12.12is set in IP address settings for unnumbered modes.Figure 36 PPP settingsNokia Siemens NetworksNokia Siemens Networks 27/29 FIFA Workinstruction_V_1.0NoteNumbered PPP subnet mask 255.255.255.255 is invalid. Please don't use it.3 In the Static Routing tab, a destination is needed to be specified for loopbackroute.Static Routing setting4 Click on the Send button at the bottom to commit the changes.Expected outcomeThe DCN has been set successfullyNokia Siemens NetworksNokia Siemens Networks 28/29 FIFA Workinstruction_V_1.0Finishing the commissioningSteps1 Make any additional settings with the FlexiHub Manager.These settings can include: Identification data E1 interfaces Software updates2 Reset performance data.For instructions, see Resetting the counters.3 Monitor the hop for at least half an hour.For instructions, see Reading performance information.4 Save as the alarm log (if needed).For instructions, see Exporting information to a text file.5 Save as Cross-Connections.For instructions, see Exporting information to a text file.6 Close the connection to the node.For instructions, see Closing the connection to a node.Expected outcomeThe commissioning has been completed.Software:Details on the new FTFB MWR R1.1 SW release:Release Notes of FTFB R1.1 SW Load A3-20100929SW product code and version: P59304.01.SW version: A3SW binary file name: P59304.01_A3.binSIO FPGA version: 5.9CVS tag: FTFB_R1_A1_20100929Release Date: 2010.09.29P59304.01_A3.bin in the .zip belowP59304.01_A3.zipNokia Siemens NetworksNokia Siemens Networks 29/29 FIFA Workinstruction_V_1.0Software Update on FTFB from R1.0 to R1.1Steps1. Connect to Flexi WCDMA FTFA, Flexi WCDMA FTFB or Flexi EDGE FIFA.For more information about connecting locally or remotely, see Connecting locally or Connecting remotely.2. Upgrade software.a. Select Software from the View Bar or from the View menu.The Software View opens.b. In the Software View, select the network element from the list.c. Check the Update check box.d. Select a software package from Available Software Versions list or Browse to locate the package.Click Update.Progress bar shows the status as "Downloading" during sw update. When the software package update iscompleted, new sw is visible as Inactive Software.Activate the updated software.. Select Software from the View Bar or from the View menu.a. In the Software View, select the software unit from the list.b. Check the Activate check box.c. Click Activate to activate the updated software.The inactive software becomes the Active Software.Further informationSoftware download does not cause a traffic interruption, but it slows down the management connection to thenode. Traffic may be cut when new software is activated if the respective unit is reset.The activation can take several minutes.- FIN -