Test Report No : HT-10 Dated 14.10.2014
8. Pressure drop (during holding time) observed : Nil Kg/cm2 in 10 Minutes
9. Details of leakage found in test : No Leak observed in weld joints
10. Remarks:Hydro Test performed for Feed Water system & connected piping for 439 Kg/Cm2, as per the suggestion given by BHEL-PEM, vide mail Dated 26.08.2014. (Mail Copy enclosed)11.Test Result: Test completed satisfactorily
12. Date of Test:13.10.2014
13. Test Conducted by: NameSignature
14. Test Witnessed by: NameSignature
15. Test evaluated by: NameSignature