texas a&m universityutilities.tamu.edu/wp-content/uploads/2011/11/energy... · 2011. 11....
TRANSCRIPT
![Page 1: Texas A&M Universityutilities.tamu.edu/wp-content/uploads/2011/11/Energy... · 2011. 11. 15. · O&M Projects from HVAC Optimization Investigation (< $5,000) No. Bldg# Bldg Name Project](https://reader036.vdocument.in/reader036/viewer/2022071302/60ab9033a12dcd1d62252c57/html5/thumbnails/1.jpg)
Texas A&M University
College Station, Texas
Energy Conservation Plan Update
September 2010
![Page 2: Texas A&M Universityutilities.tamu.edu/wp-content/uploads/2011/11/Energy... · 2011. 11. 15. · O&M Projects from HVAC Optimization Investigation (< $5,000) No. Bldg# Bldg Name Project](https://reader036.vdocument.in/reader036/viewer/2022071302/60ab9033a12dcd1d62252c57/html5/thumbnails/2.jpg)
2
Table of Contents
Energy Conservation Plan September 2010 Update
Part A
Resource Efficiency Plan
Section One: Resource Efficiency Plan Certification Document
Section Two: Utility Assessment Reports
Section Three: Implementation Schedules
Section Four: Finance Strategy
Section Five: Utility Awareness Plan
Section Six: Asset Management Plan
Section Seven: Historic Utility Use and Cost
Section Eight: Savings Monitoring and Evaluation Plan
Section Nine: Project Implementation Update
Section Ten: Water Conservation Plan
Section Eleven: Long Range Utility Procurement Plan
Section Twelve: Previous Semi-Annual Energy Reports
Section Thirteen: Texas Administrative Codes and SECO Guidelines
Part B
Fleet Fuel Management Plan Section Fourteen: Fleet Fuel Management Plan
![Page 3: Texas A&M Universityutilities.tamu.edu/wp-content/uploads/2011/11/Energy... · 2011. 11. 15. · O&M Projects from HVAC Optimization Investigation (< $5,000) No. Bldg# Bldg Name Project](https://reader036.vdocument.in/reader036/viewer/2022071302/60ab9033a12dcd1d62252c57/html5/thumbnails/3.jpg)
3
EXECUTIVE SUMMARY
Governor Rick Perry implemented executive order RP 49 on October 27, 2005, requiring
each state agency to submit an Energy Conservation Plan to the Office of the Governor
and the Legislative Budget Board no later than December 1, 2005. The executive order
states “Each state agency shall develop a plan for conserving energy and shall set a
percentage goal for reducing its usage of electricity, gasoline, and natural gas.”
Each state agency shall report back to the Office of the Governor and the Legislative
Budget Board with goals achieved and ideas for additional savings on a quarterly basis.
The first quarterly report shall be due no later than April 1, 2006. Also, each state agency
shall post its report in a conspicuous place on its internet site for public inspection.
Texas A&M‟s September 2010 Update to the Energy Conservation Plan is provided
following this executive summary and is formatted in accordance with the guidance
provided by the Office of the Governor.
Texas A&M‟s Energy Conservation Plan continues with its six-year energy reduction
goal to reduce the Energy Use Index from 269 in FY06 mBtu/GSF to 225 mBtu/GSF in
FY12, representing a 16.4 percent reduction in energy consumption over six years. This
goal represents an annual EUI reduction of 2.7 percent. Many of the initiatives presented
in the December 2005 report have been completed or are moving forward and energy
conservation remains a top priority. As of September 2010, the campus Energy Use
Index is 239 mBtu/GSF, only 6% from meeting the 2012 target of 225 mBtu/GSF. The
FY12 EUI is currently projected to be 216 mBtu/GSF which will meet and exceed the
target set in 2005.
Texas A&M‟s Fleet Fuel Management Plan continues with its goal to reduce fleet fuel
consumption by three percent per year. New fuel conservation signs have been posted at
the fuel pumps, implementation continues on the use of biodiesel and adding additional
hybrid vehicles to the fleet continues.
Texas A&M‟s September 2010 Update to the Energy Conservation Plan presents updated
information on the subject of purchased natural gas, electricity and motor fuels. This
update also provides information on the status of initiatives that were presented in the
December 2005 Energy Conservation Plan, as well as any new initiatives to reduce the
consumption of energy, water or motor fuels.
![Page 4: Texas A&M Universityutilities.tamu.edu/wp-content/uploads/2011/11/Energy... · 2011. 11. 15. · O&M Projects from HVAC Optimization Investigation (< $5,000) No. Bldg# Bldg Name Project](https://reader036.vdocument.in/reader036/viewer/2022071302/60ab9033a12dcd1d62252c57/html5/thumbnails/4.jpg)
4
Part A
Resource Efficiency Plan
![Page 5: Texas A&M Universityutilities.tamu.edu/wp-content/uploads/2011/11/Energy... · 2011. 11. 15. · O&M Projects from HVAC Optimization Investigation (< $5,000) No. Bldg# Bldg Name Project](https://reader036.vdocument.in/reader036/viewer/2022071302/60ab9033a12dcd1d62252c57/html5/thumbnails/5.jpg)
5
Section One
Resource Efficiency Plan
Certification Document
![Page 6: Texas A&M Universityutilities.tamu.edu/wp-content/uploads/2011/11/Energy... · 2011. 11. 15. · O&M Projects from HVAC Optimization Investigation (< $5,000) No. Bldg# Bldg Name Project](https://reader036.vdocument.in/reader036/viewer/2022071302/60ab9033a12dcd1d62252c57/html5/thumbnails/6.jpg)
6
Resource Efficiency Plan Certification Document
The resource Efficiency Plan Certification Document is a one-time certification that
acknowledges the completion of the Resource Efficiency Plan (REP) required by 34 TAC
§ 19.14 (a), and assures that the recommendations contained in the REP will be
implemented.
The Resource Efficiency Plan certification document remains unchanged from December
2005. Please refer to the December report.
![Page 7: Texas A&M Universityutilities.tamu.edu/wp-content/uploads/2011/11/Energy... · 2011. 11. 15. · O&M Projects from HVAC Optimization Investigation (< $5,000) No. Bldg# Bldg Name Project](https://reader036.vdocument.in/reader036/viewer/2022071302/60ab9033a12dcd1d62252c57/html5/thumbnails/7.jpg)
7
Section Two
Utility Assessment Reports
![Page 8: Texas A&M Universityutilities.tamu.edu/wp-content/uploads/2011/11/Energy... · 2011. 11. 15. · O&M Projects from HVAC Optimization Investigation (< $5,000) No. Bldg# Bldg Name Project](https://reader036.vdocument.in/reader036/viewer/2022071302/60ab9033a12dcd1d62252c57/html5/thumbnails/8.jpg)
8
Utility Assessment Reports
In May 2005 the Utilities & Energy Management Department initiated a plan to
investigate opportunities to reduce energy consumption in buildings at Texas
A&M University. This utility assessment investigation was titled “Energy
Consumption Reduction Initiative Assessment” (ECRIA). The purpose of this
investigation was to identify energy saving opportunities in buildings, prioritize
the evaluations, and provide estimated cost, savings, and simple payback.
Opportunities identified from this report were categorized into two initiatives,
one short term the other long term. The short term initiative identified energy
saving opportunities in 63 buildings that cost less than $5,000 to implement,
which are being addressed using current operating budget. Other initiatives
identified energy saving opportunities in 71 buildings that cost greater than
$5,000, to be implemented using capital funding.
Of the original 63 ECRIs identified in the less than $5,000 category, only 16
remain to be completed. A description and a status update is presented below:
![Page 9: Texas A&M Universityutilities.tamu.edu/wp-content/uploads/2011/11/Energy... · 2011. 11. 15. · O&M Projects from HVAC Optimization Investigation (< $5,000) No. Bldg# Bldg Name Project](https://reader036.vdocument.in/reader036/viewer/2022071302/60ab9033a12dcd1d62252c57/html5/thumbnails/9.jpg)
9
O&M Projects from HVAC Optimization Investigation (< $5,000)
No. Bldg# Bldg Name Project Type Project Description Estimated Cost
Savings Payback Accumulated Cost
Accumulated Savings
Accumulated Payback
Status Sept 2010
1 398 Langford
Architecture A
Pumping Minor
Improvement
Reconnect signal lines of chilled water control valves of AHU-7 and 8. $200 $7,600 0.03 $200 $7,600 0.03 Complete
2 386 Jack Brown
Pumping Minor
Improvement
Modify control program for CHW and HW valves and pump
speed. $200 $7,694 0.03 $400 $15,294 0.03 Complete
3 387 Richardson
Pet.
Pumping Minor
Improvement
Modify control program for CHW and HW and check valve function;
Replace or repair several AHU valves and calibrate several AHU
controllers $200 $1,000 0.2 $600 $16,294 0.04 Complete
4 1194
Veterinary Large Animal
Hospital
Pumping Minor
Improvement
CHW sensors should be calibrated or replaced.
Modify control programs for pumping and valves $200 $1,000 0.2 $800 $17,294 0.05 Complete
5 1197
Veterinary Research Building
Pumping Minor
Improvement Modify control programs for pumping and valves $200 $1,000 0.2 $1,000 $18,294 0.05 Complete
6 457
Agricultural Program Human
Resources
Pumping Minor
Improvement
DDC on Honeywell needs to be checked
and optimized $200 $500 0.4 $1,200 $18,794 0.06 Complete
7 473 Williams
Pumping Minor
Improvement
Calibrate CHW valve and balance internal
water loop $250 $600 0.42 $1,450 $19,394 0.07 Complete
8 468 Evans Lib
Annex
Pumping Minor
Improvement
Replace both CHW and HW primary supply and
return temp sensors. Check HW control
valve. Repair CHW and HW flow meters $300 $1,500 0.2 $1,750 $20,894 0.08 Complete
9 420 Milner Hall
Pumping Minor
Improvement Replace bad pneumatic
controller for CHW $350 $1,500 0.23 $2,100 $22,394 0.09 Complete
![Page 10: Texas A&M Universityutilities.tamu.edu/wp-content/uploads/2011/11/Energy... · 2011. 11. 15. · O&M Projects from HVAC Optimization Investigation (< $5,000) No. Bldg# Bldg Name Project](https://reader036.vdocument.in/reader036/viewer/2022071302/60ab9033a12dcd1d62252c57/html5/thumbnails/10.jpg)
10
O&M Projects from HVAC Optimization Investigation (< $5,000)
No. Bldg# Bldg Name Project Type Project Description Estimated Cost
Savings Payback Accumulated Cost
Accumulated Savings
Accumulated Payback
Status Sept 2010
10 467
Biological Sciences
Building East (BSBE)
Pumping Minor
Improvement Fix leaky HW control
valve. $500 $2,000 0.25 $2,600 $24,394 0.11 Complete
11 524 Blocker
Pumping Minor
Improvement
Repair/Replace sensors and modify control programming $500 $8,400 0.06 $3,100 $32,794 0.09 Complete
12 1510 Wehner Bldg
Pumping Minor
Improvement
Modify control program for CHW
and HW valves and pump speed $600 $3,500 0.17 $3,700 $36,294 0.1 Complete
13 972 Laboratory
Animal Care
Pumping Minor
Improvement
VFD’s for CHW pump need to be
released from "Hand" control to auto
control and calibrated; $600 $3,200 0.19 $4,300 $39,494 0.11 Complete
14 445 Teague Building
HVAC System Maintenance &
Upgrade
Inspect and clean coils, also repair
valves and controllers on
specified AHU’s. $600 $1,200 0.5 $4,900 $40,694 0.12 Complete
15 385 CE/TTI Tower
Pumping Minor
Improvement
Modify control program, correct
several AHU’s valve control $600 $1,000 0.6 $5,500 $41,694 0.13 Complete
16 387 Richardson Pe.
HVAC System Maintenance &
Upgrade
Inspect and clean coils, also calibrate and correct several AHU CHW valve
operation $600 $500 1.2 $6,100 $42,194 0.14 Complete
17 1508 Ag Research
Pumping Major
Improvement Replace the HW
pump seal. $600 $500 1.2 $6,700 $42,694 0.16 Complete
18 461 Coke
Pumping Minor
Improvement
Modify control program for CHW
and HW valves and pump speed $700 $1,500 0.47 $7,400 $44,194 0.17 Complete
19 1026
Veterinary Medicine
Administration
Pumping Minor
Improvement
Internal water balance for building 1026; Replace or calibrate existing
pneumatic controllers $700 $1,500 0.47 $8,100 $45,694 0.18 Planned
![Page 11: Texas A&M Universityutilities.tamu.edu/wp-content/uploads/2011/11/Energy... · 2011. 11. 15. · O&M Projects from HVAC Optimization Investigation (< $5,000) No. Bldg# Bldg Name Project](https://reader036.vdocument.in/reader036/viewer/2022071302/60ab9033a12dcd1d62252c57/html5/thumbnails/11.jpg)
11
O&M Projects from HVAC Optimization Investigation (< $5,000)
No. Bldg# Bldg Name Project Type Project Description Estimated Cost
Savings Payback Accumulated Cost
Accumulated Savings
Accumulated Payback
Status Sept 2009
20 1085
Veterinary Small
Animal Hospital
Pumping Minor
Improvement
Modify CHW and HW control program; Internal water balance for CHW
and HW $700 $1,500 0.47 $8,800 $47,194 0.19 Complete
21 385 CE/TTI Labs
Pumping Minor
Improvement
Modify control program, correct several AHU’s
valve control $700 $1,200 0.58 $9,500 $48,394 0.2 Complete
22 445 Teague Building
Pumping Minor
Improvement
Adjusting CHW pump head; Replace or repair
several sensors; Replace HW pump seal $750 $1,300 0.58 $10,250 $49,694 0.21 Complete
23 517
Computing Services Addition
Pumping Minor
Improvement
Adjusting CHW pump head; Replace or repair
several sensors; Replace HW pump seal $750 $1,300 0.58 $11,000 $50,994 0.22 Complete
24 446 Rudder Tower
Pumping Major
Improvement
Check/replace the head of CHW control valve of
west zone for FCUs. $800 $11,100 0.07 $11,800 $62,094 0.19 Complete
25 434 Cyclotron
Pumping Minor
Improvement
Modify CHW pump control program; Internal water balance for CHW
and HW $800 $2,160 0.37 $12,600 $64,254 0.2 Planned
26 484
Wing 32, Chemistry Building
Pumping Minor
Improvement
Repair or replace several AHU CHW
valves that are stuck in open position $800 $1,000 0.8 $13,400 $65,254 0.21 Complete
27 453 G. Rollie Annex
HVAC System Maintenance &
Upgrade Rebuild one of the HW
pumps. $800 $500 1.6 $14,200 $65,754 0.22 Complete
28 468 Evans Lib
68wing
Pumping Minor
Improvement
Replace the failed chilled water primary return
sensor and check the chilled water control
valves on AH6 and AH3 and the hot water control
valve on AH6 $1,000 $20,000 0.05 $15,200 $85,754 0.18 Complete
![Page 12: Texas A&M Universityutilities.tamu.edu/wp-content/uploads/2011/11/Energy... · 2011. 11. 15. · O&M Projects from HVAC Optimization Investigation (< $5,000) No. Bldg# Bldg Name Project](https://reader036.vdocument.in/reader036/viewer/2022071302/60ab9033a12dcd1d62252c57/html5/thumbnails/12.jpg)
12
O&M Projects from HVAC Optimization Investigation (< $5,000)
No. Bldg# Bldg Name Project Type Project Description Estimated Cost
Savings Payback Accumulated Cost
Accumulated Savings
Accumulated Payback
Status Sept 2010
29 456
Military Science
(office side)
Pumping Minor
Improvement
Check and fix CHW and HW control valves and their corresponding
controls. $1,000 $8,000 0.13 $16,200 $93,754 0.17 Complete
30 682 Wisenbaker
Pumping Major
Improvement
Install VFD with DDC on both hot water
pumps $1,000 $5,050 0.2 $17,200 $98,804 0.17 Planned
31 1559
West Campus Parking Garage
Pumping Major
Improvement
Install a HW building control valve with
DDC $1,000 $300 3.33 $18,200 $99,104 0.18 Planned
32 435 Harrington
Tower
Pumping Major
Improvement
Install pressure sensor on the
secondary supply for both CHW and HW. $1,100 $5,700 0.19 $19,300 $104,804 0.18 Complete
33 478 Scoates
Pumping Minor
Improvement
Local controllers for CHW and HW valves need to be calibrated
or replaced $1,100 $1,400 0.79 $20,400 $106,204 0.19 Complete
34 376 Chemistry '72
Pumping Minor
Improvement
Several failed EMCS sensors and VFD for CHW pump need to
be repaired or replaced $1,200 $500 2.4 $21,600 $106,704 0.2 Complete
35 516
Computing Service Center
Pumping Minor
Improvement Install a HW blending
station $1,200 $300 4 $22,800 $107,004 0.21 Complete
36 462 Academic
Pumping Minor
Improvement
Hot water valve was not controlling and also leaking; Install HW blending station $1,400 $1,600 0.88 $24,200 $108,604 0.22 Complete
37 511 Heep Lab Building
Pumping Minor
Improvement
Controllers for CHW and HW valves need
to be calibrated; Install HW blending
station $1,400 $800 1.75 $25,600 $109,404 0.23 Complete
![Page 13: Texas A&M Universityutilities.tamu.edu/wp-content/uploads/2011/11/Energy... · 2011. 11. 15. · O&M Projects from HVAC Optimization Investigation (< $5,000) No. Bldg# Bldg Name Project](https://reader036.vdocument.in/reader036/viewer/2022071302/60ab9033a12dcd1d62252c57/html5/thumbnails/13.jpg)
13
O&M Projects from HVAC Optimization Investigation (< $5,000)
No. Bldg# Bldg Name Project Type Project Description Estimated Cost
Savings Payback Accumulated Cost
Accumulated Savings
Accumulated Payback
Status Sept 2010
38 432
Langford Architecture
C&B
Pumping Major
Improvement
HW pump VFD needs worked on. CHW and
HW DP flow meters are failed. $1,500 $9,000 0.17 $27,100 $118,404 0.23 Complete
39 476 Francis Hall
Pumping Minor
Improvement
Modified control program for CHW and HW valves and pump speed; Several failed sensors need to be
repaired or replaced; CHW DP was reset $1,500 $7,500 0.2 $28,600 $125,904 0.23 Planned
40 376 Chemistry'86
Pumping Major
Improvement
HW pump control needs to be upgraded
from pneumatic to DDC $1,500 $6,000 0.25 $30,100 $131,904 0.23 In
Progress
41 439 Cain Hall
Pumping Minor
Improvement
Replace sensors, Modify control program, Resolve simultaneous heating and cooling $1,600 $26,500 0.06 $31,700 $158,404 0.2 Complete
42 376 Chemistry'86
Pumping Minor
Improvement
Modify control program for CHW and HW valves and pump speed; Replace
corroded CHW valve; Valve for HW pump #3
system was bad; $1,700 $7,500 0.23 $33,400 $165,904 0.2 In
Progress
43 484
Wing 28, Chemistry Building
Pumping Minor
Improvement
Repair or replace several AHU CHW
valves that are stuck in open position $1,700 $2,100 0.81 $35,100 $168,004 0.21 Complete
44 518 Zachry
Engineering
Pumping Minor
Improvement
Repair or replace failed CHW sensors; Modify
existing HW sys. Control program; Install
HW blending station $1,800 $1,200 1.5 $36,900 $169,204 0.22 Complete
45 477 Anthropology
Pumping Minor
Improvement Install CHW blending
station $1,800 $300 6 $38,700 $169,504 0.23 In
Progress
![Page 14: Texas A&M Universityutilities.tamu.edu/wp-content/uploads/2011/11/Energy... · 2011. 11. 15. · O&M Projects from HVAC Optimization Investigation (< $5,000) No. Bldg# Bldg Name Project](https://reader036.vdocument.in/reader036/viewer/2022071302/60ab9033a12dcd1d62252c57/html5/thumbnails/14.jpg)
14
O&M Projects from HVAC Optimization Investigation (< $5,000)
No. Bldg# Bldg Name Project Type Project Description Estimated Cost
Savings Payback Accumulated Cost
Accumulated Savings
Accumulated Payback
Status Sept 2010
46 507 Vet. Med. Sci. Wing
Pumping Minor
Improvement Install CHW blending
station $1,800 $300 6 $40,500 $169,804 0.24 Under
Investigation
47 444 Peterson Building
Pumping Minor
Improvement
Change the CHW control valve due to corrosion, calibrate the local controllers for CHW and HW
valves, and balance the internal water for
CHW and HW $1,900 $1,600 1.19 $42,400 $171,404 0.25 Complete
48 463 Psychology
Pumping Minor
Improvement
Install CHW blending station; Repair HW
blending station $2,000 $900 2.22 $44,400 $172,304 0.26 Complete
49 1501 Kleberg
Bldg.
Pumping Major
Improvement
VFD’s for CHW pumps need to be
activated $2,000 $2,000 1 $46,400 $174,304 0.27 In Progress
50 492 Civil Eng.
Bldg.
Pumping Minor
Improvement
Reconnect air line to CHW valve; Calibrate the valve controllers
for both CHW and HW systems; Install CHW
blending station $2,000 $700 2.86 $48,400 $175,004 0.28 Planned
51 465 Butler Hall
Pumping Major
Improvement
CHW and HW 3-way control valves on 12 fan-coil units in the
basement need to be replaced with 2-way
valves. $2,220 $2,050 1.08 $50,620 $177,054 0.29 Complete
52 507
Veterinary Medical
Sciences Building
Pumping Minor
Improvement
Install CHW blending station; Controllers for CHW and HW valves need to be calibrated; HW valve was in bad
shape $2,300 $2,100 1.1 $52,920 $179,154 0.3 Complete
53 383 Koldus
Pumping Major
Improvement
Replace LB-5 cooling control valve. Install
space air temperature sensors. $2,650 $4,750 0.56 $55,570 $183,904 0.3 Complete
![Page 15: Texas A&M Universityutilities.tamu.edu/wp-content/uploads/2011/11/Energy... · 2011. 11. 15. · O&M Projects from HVAC Optimization Investigation (< $5,000) No. Bldg# Bldg Name Project](https://reader036.vdocument.in/reader036/viewer/2022071302/60ab9033a12dcd1d62252c57/html5/thumbnails/15.jpg)
15
O&M Projects from HVAC Optimization Investigation (< $5,000)
No. Bldg# Bldg Name Project Type Project Description Estimated Cost
Savings Payback Accumulated Cost
Accumulated Savings
Accumulated Payback
Status Sept 2010
54 471 Pavilion
Pumping Minor
Improvement
CHW valve was corroded and leaking; Install CHW blending
station $2,900 $2,100 1.38 $58,470 $186,004 0.31 Complete
55 518 Zachry
Engineering
HVAC Control System Upgrade
Upgrade AHU 3-1 to DDC $3,000 $9,000 0.33 $61,470 $195,004 0.32 Planned
56 517
Computing Services Addition
HVAC Control System Upgrade
Upgrade 2 AHU’s to DDC $3,000 $4,000 0.75 $64,470 $199,004 0.32 Planned
57 468 Evans Lib
79wing
Pumping Major
Improvement
Replace building chilled water control
valve $3,000 $3,000 1 $67,470 $202,004 0.33 Complete
58 483 Thompson
Hall
Pumping Minor
Improvement
Valves on both CHW and HW were not
controlling and the hot water valve needs to be replaced (severe
corrosion); Install CHW blending station $3,300 $2,100 1.57 $70,770 $204,104 0.35 Planned
59 508
Veterinary Teaching Hospital
Pumping Minor
Improvement
Internal water balance for building 508;
Replace or calibrate existing pneumatic controllers; Install
CHW and HW blending station $3,700 $2,100 1.76 $74,470 $206,204 0.36 Complete
60 436 Reed
McDonald
Pumping Major
Improvement Install DDC for the hot
water system. $3,850 $8,500 0.45 $78,320 $214,704 0.36 Completed
61 1507
Biochemistry / Biophysics (Bio-Bio)
Pumping Major
Improvement
Install 4 pressure sensors on CHW
system and 4 pressure sensors on
HW system. $4,400 $3,100 1.42 $82,720 $217,804 0.38 Completed
62 490
Halbouty Geo Sciences
(Old)
Pumping Major
Improvement
Install 4 pressure sensors on the chilled water system and 4 pressure sensors on the hot water system. $4,400 $2,300 1.91 $87,120 $220,104 0.4 Complete
63 386 Jack Brown
HVAC Control System Upgrade
Change discharge air temperature set point for AHU’s; raise CO2 set point for 2 AHU’s; reduce operating time
of 1 AHU. $4,600 $126,555 0.04 $91,720 $346,659 0.26 Complete
Total $91,720 $346,659 0.3
![Page 16: Texas A&M Universityutilities.tamu.edu/wp-content/uploads/2011/11/Energy... · 2011. 11. 15. · O&M Projects from HVAC Optimization Investigation (< $5,000) No. Bldg# Bldg Name Project](https://reader036.vdocument.in/reader036/viewer/2022071302/60ab9033a12dcd1d62252c57/html5/thumbnails/16.jpg)
16
UTILITY ASSESSMENT REPORTS (CONTINUED)
A second ECRIA initiative identified long term energy saving opportunities in
71 buildings that cost greater than $5,000 each to be implemented.
Previously, a funding source had not been identified and secured to implement
these projects. In December 2009 and again in April 2010, Texas A&M
requested and received approval for funding from SECO to implement a $15.1
million Energy Consumption Reduction project using Siemens as the ESCO.
The scope of the project includes upgrading Building Automation Systems
(BAS) and lighting which will include some of the ECRIs over $5,000
identified in the original 2005 document. This scope of work will be
implemented in (19) teaching and research facilities that total over 3.3 million
GSF. In addition to BAS upgrades, the lighting in all five campus parking
garages will be retrofitted to a higher efficiency fixture and other lighting
upgrades will be performed in some of the buildings receiving BAS upgrades.
Energy Engineering Associates, Inc. (EEA) was hired by the university in
November 2005 to implement two lighting upgrade projects. EEA surveyed
and documented existing building lighting and performed energy analysis to
determine project savings, cost and payback, and produced an energy
assessment report in the SECO format. The energy audits were reviewed,
prioritized and prepared for contractor bids. Amtech Lighting was selected as
the contractor. Lighting retrofits began in June, 2008 and as of September
2010, all lighting retrofit projects that were part of this scope have been
completed.
![Page 17: Texas A&M Universityutilities.tamu.edu/wp-content/uploads/2011/11/Energy... · 2011. 11. 15. · O&M Projects from HVAC Optimization Investigation (< $5,000) No. Bldg# Bldg Name Project](https://reader036.vdocument.in/reader036/viewer/2022071302/60ab9033a12dcd1d62252c57/html5/thumbnails/17.jpg)
17
Section Three
Implementation Schedules
![Page 18: Texas A&M Universityutilities.tamu.edu/wp-content/uploads/2011/11/Energy... · 2011. 11. 15. · O&M Projects from HVAC Optimization Investigation (< $5,000) No. Bldg# Bldg Name Project](https://reader036.vdocument.in/reader036/viewer/2022071302/60ab9033a12dcd1d62252c57/html5/thumbnails/18.jpg)
18
Implementation Schedules
The December 2005 report included a list of ECRIA‟s Implemented, Planned, and
Opportunities. This section provides updates on the progress of the ECRIA‟s.
ECRIA’s - Planned
Energy Conservation Reduction Initiatives - Planned - Sept 2010 Update No. Project Description Estimated Cost to
Implement (Not including
finance charges)
Estimated Annual Avoided
Cost
Simple Payback (in
years)
Status Sept 2010
1
Continue retro-commissioning MEP and HVAC systems in buildings (during FY10) $1,500,000 $1,000,000 1.5 On Going
2 Utility Plant Performance Optimization Program (POP) $1,800,000 $1,000,000 1.6
Complete Feb. 2011
3 Energy Consumption Reduction Project (Buildings) $15,100,000 $1,500,000 10 In Progress
4
SUP1 Chilled Water Improvements (necessary to meet reliability requirements) $5,950,000 $1,250,000 4.8 Complete
5 Central Thermal Distribution Loop Optimization $1,000,000 $500,000 2.0 In Progress
6 Combined Heat & Power (CHP) Upgrade in the CUP $70,250,000 $6,000,000 10.0 In Progress
7 Utilities & Energy Management Master Plan $500,000 TBD TBD In Progress
ECRIA – Opportunities
Energy Conservation Reduction Initiatives - Opportunities - Sept 2010 Update
No. Project Description Estimated Cost to Implement (Not
including finance charges)
Estimated Annual
Avoided Cost
Simple Payback (in
years)
Status Sept 2010
1 Energy Stewardship Program $500,000 $500,000 1.0 Pending Approval
2
Schedule HVAC systems OFF in 80 buildings, having this control capability,
from 9 PM to 6 AM, M-F and on weekends
(requires major initiative to consolidate and optimize building space usage
before implementation) TBD $2,500,000 TBD On Going
![Page 19: Texas A&M Universityutilities.tamu.edu/wp-content/uploads/2011/11/Energy... · 2011. 11. 15. · O&M Projects from HVAC Optimization Investigation (< $5,000) No. Bldg# Bldg Name Project](https://reader036.vdocument.in/reader036/viewer/2022071302/60ab9033a12dcd1d62252c57/html5/thumbnails/19.jpg)
19
Section Four
Finance Strategy
![Page 20: Texas A&M Universityutilities.tamu.edu/wp-content/uploads/2011/11/Energy... · 2011. 11. 15. · O&M Projects from HVAC Optimization Investigation (< $5,000) No. Bldg# Bldg Name Project](https://reader036.vdocument.in/reader036/viewer/2022071302/60ab9033a12dcd1d62252c57/html5/thumbnails/20.jpg)
20
Finance Strategy
Funding for approved energy projects are financed by the Utilities & Energy
Management (UEM) operating budget, University Division of Finance, and the Texas
LoanSTAR (Saving Taxes and Resources) Program, or other loan programs.
Texas A&M currently has two LoanSTAR energy conservation loans outstanding, both
for lighting retrofit projects. The first is for $1.7 million which replaced inefficient lamps
and ballasts in 31 buildings (2.9 million square feet), with a payback of 5.6 years. This
loan will be paid in full in August 2011. The second lighting retrofit loan, for $1.3
million, replaced inefficient lamps and ballasts in 11 buildings (1.6 million square feet)
with a payback of 5.6 years. This loan will be paid in full in August 2012.
In 2009, Texas A&M University submitted a request for shared funding of a Combined
Heat and Power (CHP) Project, and in 2010, the U.S. Department of Energy (DOE)
awarded a $10 million grant to the university for the design and installation of a new
CHP generation system, which will very efficiently serve the growing energy demands of
the campus. Under this grant program, administered by the National Energy Technology
Laboratory, DOE awarded a total of $150 million in American Recovery and
Reinvestment Act funding for CHP and District Energy projects. The Texas A&M award
was one of only nine awards made by DOE under this program and was selected from a
very competitive nationwide pool of over 400 funding applications. Texas A&M
completed grant negotiations with DOE in June 2010 and had a final contract with DOE
in place in August 2010.
In December 2009, and again in April 2010, Texas A&M requested and received funding
from SECO to implement a $15.1 million Energy Consumption Reduction project. After
being notified of loan approval, Siemens was selected as the performance contractor.
The scope of the project includes Building Automation Systems (BAS) and lighting
upgrades which will include some of the ECRMS identified in the original 2005 greater
than $5,000 document. This scope of work will be implemented in 19 teaching and
research facilities that total over 3.3 million GSF. In addition to the BAS projects, the
lighting in all five campus parking garages will be retrofitted to a higher efficiency
fixture, together with lighting upgrades in many of the 19 buildings receiving BAS
upgrades.
Other sources of funding, as cited in the December 2005 report, remain as possible
sources of funding for future projects.
![Page 21: Texas A&M Universityutilities.tamu.edu/wp-content/uploads/2011/11/Energy... · 2011. 11. 15. · O&M Projects from HVAC Optimization Investigation (< $5,000) No. Bldg# Bldg Name Project](https://reader036.vdocument.in/reader036/viewer/2022071302/60ab9033a12dcd1d62252c57/html5/thumbnails/21.jpg)
21
Section Five
Utility Awareness Plan
![Page 22: Texas A&M Universityutilities.tamu.edu/wp-content/uploads/2011/11/Energy... · 2011. 11. 15. · O&M Projects from HVAC Optimization Investigation (< $5,000) No. Bldg# Bldg Name Project](https://reader036.vdocument.in/reader036/viewer/2022071302/60ab9033a12dcd1d62252c57/html5/thumbnails/22.jpg)
22
Campus Conservation Awareness Program
The Utilities & Energy Management (UEM) Department at Texas A&M University
continues to coordinate and participate in numerous initiatives aimed at reducing energy
and water consumption and improving conservation awareness among the students,
faculty, and staff at the university.
Listed below are updates on the various initiatives.
Energy Stewardship Program
The Energy Stewardship Program (ESP) was started in July 2009 as a pilot that included
(40) buildings and a total of 5.8 million GSF. ESP is designed to reduce energy
consumption and cost of operation in campus buildings by improving energy
conservation and efficiency while improving environmental conditions. With a goal of
improving service while educating, informing and enrolling building occupants, assigned
energy stewards have access to energy consumption and cost data – overall and per gross
square foot ‐ and use this data to educate themselves and others. The energy steward
meets with building proctors, facility managers, and occupants to continuously raise
awareness and improve operating efficiency.
Sustainability & Environmental Management Committee
This committee is comprised of faculty, staff, student and representatives from auxiliary
enterprises. UEM has two representatives on the committee and remains very active in
the promotion and outreach for energy & water conservation and recycling.
UEM Website / Energy Hotline
A UEM Website and Energy Hotline is maintained at http://uem.tamu.edu to:
a) promote energy and water conservation
b) provide a repository of energy and water conservation materials
c) provide “one point of contact” to report wasteful practices and recommendations
for improvement in the area of energy efficiency
In January 2009, a new UEM website was launched and continues to provide significant
information and successful results. Analysis software has been installed to better analyze
website use and effectiveness to enhance select areas with useful information.
The Energy Hotline is continuing to receive regular activity and expectations are that
contacts will increase with an expanded Energy Stewardship Program.
Energy Awareness Marketing Campaign
The university conducts an Energy Awareness Campaign that promotes good energy and
water conservation practices. Activities include, but are not limited to, Battalion
newspaper advertisements, Aggie Hotline articles, campus bus advertisements,
promotional material and promotional events, such as Earth Day and Sustainability Day
celebration and an Energy Awareness Month celebration.
![Page 23: Texas A&M Universityutilities.tamu.edu/wp-content/uploads/2011/11/Energy... · 2011. 11. 15. · O&M Projects from HVAC Optimization Investigation (< $5,000) No. Bldg# Bldg Name Project](https://reader036.vdocument.in/reader036/viewer/2022071302/60ab9033a12dcd1d62252c57/html5/thumbnails/23.jpg)
23
Students, staff and faculty are encouraged to turn off all unnecessary electrical equipment
before leaving for Spring Break, Thanksgiving, and Winter Break. UEM and Facilities
Services worked with building proctors to gain approval to turn air handler units OFF
where appropriate or setback temperature setpoints. Through combined conservation
efforts over holidays since FY05, Texas A&M has avoided over $1.5 million in
unnecessary expense when compared to the 2004 baseline.
Texas A&M‟s Residence Life, with support from UEM, sponsored a series of energy
challenge competitions with the first one in October 2007. The goals of Residence Hall
Energy Challenges are to: a) raise awareness and promote greater campus involvement in
conservation while having fun, b) encourage students to “Go Green” and change their
individual lifestyles and attitudes about the need for conservation and the importance of
sustainability, and c) encourage residence hall student participation in campus energy
conservation as the „right thing to do‟ to help save money and reduce fossil fuel
emissions.
The most recent “Challenge” included goals to:
Promote individual sustainability awareness among students.
Encourage sustainability habits, particularly in new students.
Build a sense of community within halls via a competitive spirit.
Residence Halls were awarded points by resident participation in the following events:
Energy reduction as compared to the same period the year before.
Participation in a sustainability program series on how to grow a garden.
Attendance in a film series pertaining to sustainability.
Participation in recycling events.
Signing a sustainability pledge.
Submitting green tips that were distributed to all residents.
Designating an Eco Rep to work on future recycling and outreach programs.
Host a bulletin board or other display promoting sustainability and wise use of
energy.
Texas A&M‟s Dining Services continues using a converted refrigerated delivery that uses
bio-diesel fuel made with waste food oil. The waste food oil is picked up from cafeteria
operations every three weeks by Tcor Services and processed by Texas Biofuels.
![Page 24: Texas A&M Universityutilities.tamu.edu/wp-content/uploads/2011/11/Energy... · 2011. 11. 15. · O&M Projects from HVAC Optimization Investigation (< $5,000) No. Bldg# Bldg Name Project](https://reader036.vdocument.in/reader036/viewer/2022071302/60ab9033a12dcd1d62252c57/html5/thumbnails/24.jpg)
24
Students
The Energy Stewardship Program includes ongoing outreach to student groups on
campus with a focus or mission specifically related to energy and water management to
address new ideas and offer a forum in which to present useful perspectives. At this time,
groups in which UEM has established communication include: The Texas Environmental
Action Coalition, the Environmental Issues Committee of Student Government,
Residence Hall Association (RHA) and the American Society of Mechanical
Engineering. Each group is concerned with some particular aspect of the Energy
Management Program. A number of groups on campus provide a valuable resource for
information on new developments in the field. In addition, each group and its members
are kept abreast of the activities and progress by the university.
Academic
Texas A&M is fortunate to have distinguished faculty in the area of energy management
and in accompanying fields such as environmental design, mechanical engineering, etc.
UEM has established relationships with individuals from each of these disciplines.
Interactions include: UEM presentations, tours of building retrofit projects, open forums
on specific topics that are pertinent to a phase or project of UEM, and joint participation
projects.
Non-State Funded Enterprises
There are 31 Non-State Funded Enterprises on the campus. These include the Residence
Halls, Food Services, Athletics, Transportation Services, Campus Bookstore, and others.
These Non-State Funded Enterprises are self-supporting businesses that purchase their
utilities from UEM and are billed monthly based on actual cost.
In the past, the Non-State Funded Enterprises were invoiced for utilities based on a
combination of profiles, square footage allocation, or estimates. Revenue-quality utility
metering has been installed in all major buildings on campus and UEM is now billing
these customers for utilities based on actual consumption and the allocation of space used
in their assigned buildings. Direct billing promotes energy conservation as well as
encourages the customers to upgrade their facilities with technologies that improve
building operating efficiency.
![Page 25: Texas A&M Universityutilities.tamu.edu/wp-content/uploads/2011/11/Energy... · 2011. 11. 15. · O&M Projects from HVAC Optimization Investigation (< $5,000) No. Bldg# Bldg Name Project](https://reader036.vdocument.in/reader036/viewer/2022071302/60ab9033a12dcd1d62252c57/html5/thumbnails/25.jpg)
25
Building Construction Standards
UEM actively participates on new building project review committees and ensures that
energy and water conservation remains a priority throughout the building design and
construction process. In 2009, Texas A&M made the decision to require that new
buildings be designed and built to LEED Silver standards, but without going through the
certification process . Recent buildings completed using this standard include:
Interdisciplinary Life Sciences Building (ILSB), Texas Institute for Preclinical Studies
(TIPS), Texas Transportation Institute (TTI) expansion, and Mitchell Physics buildings.
The Emerging Technology & Economic Development (ETED) building currently under
construction will also be built using LEED Silver standards.
UEM has engaged Burns McDonnell to develop a Utilities & Energy Management
Master Plan. The deliverables of the Plan will be:
• identify operational and functional issues and priorities that require capital renewal
or investment in the existing utility infrastructure and building energy systems to
replace unreliable or inefficient equipment and upgrade systems to meet future
projected requirements.
• provide recommendations for infrastructure expansion or upgrades and define
comprehensive design guidelines to be followed for projects that will maintain,
upgrade, or expand the utility infrastructure to meet University requirements;
• provide recommendations for modification or upgrade of energy systems within
existing campus facilities and define comprehensive design guidelines to be
followed for projects that will renovate existing or new facilities on campus;
• establish guidelines for existing and new facilities that will optimize the efficiency
of building space utilization, with full consideration of occupant needs for teaching,
research, business functions, data storage and retrieval, and various University
auxiliary functions such as dining facilities and residence halls;
• provide recommendations to ensure Texas A&M is able to meet needs for reliable
and economic energy production and distribution of all utility commodities
provided to campus;
• reduce energy consumption and optimize the use of energy in the campus buildings;
• minimize energy losses in utility production and distribution systems;
• optimize overall utility plant and facility energy use efficiency;
• provide energy efficiency guidelines for new construction, procurement,
information technology, and building operation;
• reduce carbon dioxide emissions through the above efficiency gains, the use of
technology such as combined heat and power and evaluate cost-effective ways to
increase the use of renewable energy;
![Page 26: Texas A&M Universityutilities.tamu.edu/wp-content/uploads/2011/11/Energy... · 2011. 11. 15. · O&M Projects from HVAC Optimization Investigation (< $5,000) No. Bldg# Bldg Name Project](https://reader036.vdocument.in/reader036/viewer/2022071302/60ab9033a12dcd1d62252c57/html5/thumbnails/26.jpg)
26
• provide incremental capacity for campus growth from reductions in demand created
by energy efficiency improvements and conservation;
• establish recommended energy efficiency design guidelines and standards for new
building construction on campus compared to the most recent ASHRAE and LEED
standards;
• position Texas A&M as a model of sustainable energy use and management with
full consideration and use of life-cycle economics;
• Identify and recommend implementation of technology improvements and upgrades
in the areas of utility and energy production, distribution, storage, metering,
automation, optimization, use and reporting to support the development of a smart
energy campus that continuously monitors and adjusts energy use to ensure overall
needs are met in the most reliable, efficient and cost-effective manner. Consider
and include, as appropriate, recommendations to support technology including plug-
in vehicles, use of direct current power supply for data centers, smart meters,
renewable energy generation, design standards for energy efficient equipment and
lighting, and energy management automation to monitor, integrate and optimize the
use of energy.
![Page 27: Texas A&M Universityutilities.tamu.edu/wp-content/uploads/2011/11/Energy... · 2011. 11. 15. · O&M Projects from HVAC Optimization Investigation (< $5,000) No. Bldg# Bldg Name Project](https://reader036.vdocument.in/reader036/viewer/2022071302/60ab9033a12dcd1d62252c57/html5/thumbnails/27.jpg)
27
Section Six
Asset Management Plan
![Page 28: Texas A&M Universityutilities.tamu.edu/wp-content/uploads/2011/11/Energy... · 2011. 11. 15. · O&M Projects from HVAC Optimization Investigation (< $5,000) No. Bldg# Bldg Name Project](https://reader036.vdocument.in/reader036/viewer/2022071302/60ab9033a12dcd1d62252c57/html5/thumbnails/28.jpg)
28
Asset Management Plan
The Asset Management Plan presents information on building gross square footage and
departmental space data based on inventory information managed by the Texas A&M
University Office of Facilities Coordination (FCOR).
The Asset Management section has not changed for this update. Please refer back to the
December 2005 plan.
![Page 29: Texas A&M Universityutilities.tamu.edu/wp-content/uploads/2011/11/Energy... · 2011. 11. 15. · O&M Projects from HVAC Optimization Investigation (< $5,000) No. Bldg# Bldg Name Project](https://reader036.vdocument.in/reader036/viewer/2022071302/60ab9033a12dcd1d62252c57/html5/thumbnails/29.jpg)
29
Section Seven
Historic Utility Use and Cost
![Page 30: Texas A&M Universityutilities.tamu.edu/wp-content/uploads/2011/11/Energy... · 2011. 11. 15. · O&M Projects from HVAC Optimization Investigation (< $5,000) No. Bldg# Bldg Name Project](https://reader036.vdocument.in/reader036/viewer/2022071302/60ab9033a12dcd1d62252c57/html5/thumbnails/30.jpg)
30
Historic and Projected Purchased Utility
Cost and Consumption
Texas A&M University has an outstanding record of accomplishment in recent years in
the area of energy consumption reduction and efficiency improvement. The campus has
over 21.5 million gross square feet (GSF) of building space and consumes 5.2 trillion
Btu‟s of energy annually - providing electricity, cooling, heating and other utilities in
support of the University‟s educational and research mission. Over the last eight years
(FY02 – FY10), $106 million has been cost avoided at the University through an active
energy management and efficiency improvement program (compared to the FY02
baseline). UEM manages the campus energy program with ongoing support from the
Energy Systems Laboratory (ESL) and Facilities Services. This combined expertise in
the area of energy and operational efficiency has resulted in a 35% overall reduction in
energy consumption per GSF on campus, from 364 mBtu/GSF in FY02 to 239
mBtu/GSF in FY10. This is an incredible accomplishment that has been nationally
recognized, with operational efficiency improvements and capital upgrades in the four
utility plants serving campus creating the most significant results.
Since the 1893, the University has generated a significant portion of the electrical power
and all thermal (cooling and heating) requirements for campus. Over the last five years,
29,000 tons of high efficiency cooling capacity has been installed in four campus utility
plants to meet new demand and replace older less efficient chillers. Texas A&M now has
over 50,000 tons of central cooling capacity, which is enough to cool 10,000 large homes.
The power and steam generation equipment in the Central Utility Plant (CUP) is in
progress of being upgraded to provide new higher efficiency power and steam generation
capacity by 2011. The CHP project will include the installation of a modern, high-
efficiency gas turbine generator and steam turbine generator with 45 megawatts (MW) of
electrical power capacity. A heat recovery steam generator (HRSG) will also be installed
with 210,000 lb/hr of steam generation capacity. These upgrades, together with other
electrical and steam system improvements, will further enhance the ability of Texas
A&M to provide clean, reliable, efficient energy to campus – making Texas A&M truly
world class in terms of utility plant reliability and efficiency. In addition to improved
efficiency and financial benefits, reduced energy consumption also results in lower Green
House Gas (GHG) emissions, helping to create a more sustainable environment.
While operating and optimizing campus utility production and distribution systems, UEM
manages energy systems in the buildings with a mission of meeting customer needs in the
most efficient manner possible. UEM manages an extensive utility metering program, a
sophisticated building automation/control system, lighting efficiency improvements, and
building energy system retro-commissioning.
Efficiency improvements in the buildings have been positive, but less dramatic than
improvements in the utility plants – with a six percent reduction in energy consumption
![Page 31: Texas A&M Universityutilities.tamu.edu/wp-content/uploads/2011/11/Energy... · 2011. 11. 15. · O&M Projects from HVAC Optimization Investigation (< $5,000) No. Bldg# Bldg Name Project](https://reader036.vdocument.in/reader036/viewer/2022071302/60ab9033a12dcd1d62252c57/html5/thumbnails/31.jpg)
31
per GSF from FY02 through FY10. A six percent improvement in campus building
energy efficiency is positive, but there is still excellent potential for additional energy
conservation and efficiency improvement. The Energy Stewardship Program at Texas
A&M is placing energy stewards in campus buildings to work actively with building
occupants - educating, raising awareness and implementing initiatives to reduce energy
consumption. Providing leadership and continuing to make progress in the area of energy
conservation and efficiency, together with active environmental stewardship, enhances
the image of Texas A&M and supports the teaching and research mission.
On September 8, 2006, Texas A&M received a certificate from the Texas Comptroller of
Public Accounts, State Energy Conservation Office, recognizing the University for
achieving excellent results to improve energy efficiency and air quality in the State of
Texas. Texas A&M was only one of three Universities in the State to receive this
acknowledgment.
On August 14, 2007, the Association of Energy Engineers recognized Texas A&M
Utilities & Energy Management with the 2007 AEE Region IV Corporate Energy
Management Award. The award was presented in Atlanta, Georgia the day prior to the
opening of the World Energy Engineering Congress. The award is in recognition of
Texas A&M achieving excellent results in improving campus energy efficiency and
energy conservation.
On August 30, 2007, the Energy Systems Laboratory recognized Texas A&M Utilities &
Energy Management with the Mega-Energy Saver Award. The award is in recognition
for Texas A&M reducing utility costs with “green” improvements.
See the following charts presenting historic consumption and cost for purchased
electricity and natural gas, and charts showing historic Energy Use Index (EUI).
![Page 32: Texas A&M Universityutilities.tamu.edu/wp-content/uploads/2011/11/Energy... · 2011. 11. 15. · O&M Projects from HVAC Optimization Investigation (< $5,000) No. Bldg# Bldg Name Project](https://reader036.vdocument.in/reader036/viewer/2022071302/60ab9033a12dcd1d62252c57/html5/thumbnails/32.jpg)
32
364
316
269258
239235
216
180172
167
0
50
100
150
200
250
300
350
400
02 03 04 05 06 07 08 09 10 11 12
En
erg
y c
on
su
mp
tio
n p
er
gro
ss
sq
ua
re f
oo
t(
tho
us
an
d B
tu p
er
GS
F)
Fiscal Year
Total Source Energy Use
Building Site Energy Use
Note: New CHP to be operating in FY12.
Realized and Projected Improvement of Energy Use per GSF
![Page 33: Texas A&M Universityutilities.tamu.edu/wp-content/uploads/2011/11/Energy... · 2011. 11. 15. · O&M Projects from HVAC Optimization Investigation (< $5,000) No. Bldg# Bldg Name Project](https://reader036.vdocument.in/reader036/viewer/2022071302/60ab9033a12dcd1d62252c57/html5/thumbnails/33.jpg)
33
5.0
5.5
6.0
6.5
7.0
7.5
8.0
8.5
15.0
16.0
17.0
18.0
19.0
20.0
21.0
22.0
02 03 04 05 06 07 08 09 10
To
tal C
am
pu
s E
ne
rgy C
on
su
mp
tio
n (
tril
lio
n B
tu)
To
tal C
am
pu
s (
mil
lio
n G
SF)
Fiscal Year
Campus Growth and Energy Consumption
Total Campus GSF
Total Campus Energy Consumption
Note: From FY02 to FY10, gross square footage of facilities served increased by 17.5% while total energy consumption decreased by 22.9%
35 percent less energy consumption per GSF
achieved over 8 year period (FY02 to FY10) with $106
million in purchased energy
cost avoidance
![Page 34: Texas A&M Universityutilities.tamu.edu/wp-content/uploads/2011/11/Energy... · 2011. 11. 15. · O&M Projects from HVAC Optimization Investigation (< $5,000) No. Bldg# Bldg Name Project](https://reader036.vdocument.in/reader036/viewer/2022071302/60ab9033a12dcd1d62252c57/html5/thumbnails/34.jpg)
34
Section Eight
Savings Monitoring and Evaluation
Plan
![Page 35: Texas A&M Universityutilities.tamu.edu/wp-content/uploads/2011/11/Energy... · 2011. 11. 15. · O&M Projects from HVAC Optimization Investigation (< $5,000) No. Bldg# Bldg Name Project](https://reader036.vdocument.in/reader036/viewer/2022071302/60ab9033a12dcd1d62252c57/html5/thumbnails/35.jpg)
35
Savings Monitoring and Evaluation Plan
The university started installing revenue-quality utility meters in 2002 and by
August 2009, the goal of becoming fully metered in buildings larger than 5,000 GSF was
realized. Today, Texas A&M operates 1,400 utility meters in over 400 buildings,
allowing accurate billing and verification of energy efficiency improvements. The meters
measure consumption of electricity, chilled water, heating hot water, domestic cold
water, domestic hot water, and steam. The data is used to:
Troubleshoot problems in the buildings and measure their energy efficiency
Produce accurate cost estimates for budgeting purposes
Generate monthly customer statements, which raise awareness among campus
customers and demonstrate the results of conservation efforts
Generate accurate monthly billing and allow for accurate and timely cost recovery
An integral part of the metering project is the SQL database that was developed to
organize and store all meter consumption information. The electronic meters are polled
via the campus Ethernet, stored in the application software, and then exported into the
main SQL database. Manually read meters have their data entered via web-based
interface developed internally by UEM.
All metered data is organized by customer, and by building, and plotted to show a
consumption profile for that utility. These profiles are reviewed for reasonableness and
any anomalies recorded and sent to field technicians for sensor verification.
Measurement of utility consumption is recorded to determine conservation results
achieved through energy consumption reduction initiatives such as HVAC system
modification, scheduling, lighting retrofits, etc.
Utility invoices are created and posted monthly for auxiliaries and agencies, which are
directly billed for their utility consumption. Educational and General (E&G) entities are
not directly billed for consumption but monthly statements will be generated starting with
September 2010 to raise awareness for both energy consumption and cost.
With the combination of meters that measure the consumption of electricity, chilled
water, heating hot water, steam, domestic cold water, and domestic hot water, together
with other areas such as athletic and agriculture fields, the University will be prepared to
record and closely manage all utility consumption.
The ability to accurately see where, and how much, energy is being used is the first step
in recognizing where waste and inefficiency exist. The next step will be to utilize this
information to implement measures to eliminate waste, improve efficiencies, and promote
energy and water conservation.
![Page 36: Texas A&M Universityutilities.tamu.edu/wp-content/uploads/2011/11/Energy... · 2011. 11. 15. · O&M Projects from HVAC Optimization Investigation (< $5,000) No. Bldg# Bldg Name Project](https://reader036.vdocument.in/reader036/viewer/2022071302/60ab9033a12dcd1d62252c57/html5/thumbnails/36.jpg)
36
Section Nine
Project Implementation Update
![Page 37: Texas A&M Universityutilities.tamu.edu/wp-content/uploads/2011/11/Energy... · 2011. 11. 15. · O&M Projects from HVAC Optimization Investigation (< $5,000) No. Bldg# Bldg Name Project](https://reader036.vdocument.in/reader036/viewer/2022071302/60ab9033a12dcd1d62252c57/html5/thumbnails/37.jpg)
37
Project Implementation Update
Sept 2010
Retro-Commissioning Existing Facilities
UEM leads the program with support from Facilities Maintenance and ESL, with a goal
of improving HVAC system effectiveness and efficiency through commissioning of
energy systems in existing facilities. Close to 50 buildings on campus have been retro-
commissioned since FY06.
Utility Plant Performance Optimization Program (POP)
In 2011, UEM will be implementing a Utility Plant Performance Optimization Program
that will provide real-time monitoring capabilities and enable operational staff to make
better decisions regarding which equipment to operate based on a number of equipment
and operational variables. The program will also provide modeling capabilities to model
the efficiency of different plant operating scenarios.
Energy Consumption Reduction Measures
The University has engaged in a more aggressive campaign to upgrade building
automation systems and increase lighting efficiency across campus using a performance
contract and a low interest loan made available through SECO. The overall program
consists of two loans – one for $10 million and second for $5.1 million. The details of
the project are as follows:
Connecting occupancy sensors (already present or to be installed as part of the
lighting retrofit) to the TECs (Terminal Equipment Controllers) in order to reset space
temperature and airflow setpoints based on occupancy.
In non-lab areas (offices, classrooms, conference rooms, etc.), the room temperature
setpoints will be:
- Daytime and nightime occupied: 70 °F for heating and 75 °F for cooling,
- Daytime unoccupied: 65 °F for heating and 80 °F for cooling,
- Nighttime unoccupied: 60 °F for heating and 85 °F for cooling
When the occupancy sensor indicates that the space is unoccupied, the minimum
airflow for VAV boxes will be reset to zero (no flow), where permissible.
In lab areas served by 100% outside air units, the ventilation setpoint will be reset
from 8 ACH to a minimum of 4 ACH (air changes per hour) only when the system is
in “night” mode and the occupancy sensor indicates that the room is unoccupied.
Temperature setpoints for lab areas will be:
- Daytime (regardless or occupancy): 70 °F for heating and 75 °F for cooling,
- Nighttime occupied: 70 °F for heating and 75 °F for cooling,
- Nighttime unoccupied: 60 °F for heating and 85 °F for cooling
- Laboratories with specific temperature requirements will be programmed to
maintain these accordingly.
Converting control systems at the AHU and zone levels from pneumatic to direct
digital control (DDC).
![Page 38: Texas A&M Universityutilities.tamu.edu/wp-content/uploads/2011/11/Energy... · 2011. 11. 15. · O&M Projects from HVAC Optimization Investigation (< $5,000) No. Bldg# Bldg Name Project](https://reader036.vdocument.in/reader036/viewer/2022071302/60ab9033a12dcd1d62252c57/html5/thumbnails/38.jpg)
38
Implementing heating/cooling and day/night temperature setpoints with DDC in
zones that were previously controlled pneumatically with a single setpoint.
Optimizing the discharge air temperature and static pressure reset programming to
minimize unnecessary reheating and fan power.
Tying exhaust fans to the BAS in order to schedule them off at night.
Installing VFDs on constant-speed AHU fans to reduce fan motor energy use and
improve dehumidification capability.
Installing VFDs on constant-speed pumps and programming differential pressure
setpoint schedules.
Re-commissioning heat recovery systems previously removed from service.
This scope of work will be implemented in 19 teaching and research facilities that total
over 3.3 million GSF. In addition to the BAS projects, the lighting in all five campus
parking garages will be retrofitted to a higher efficiency fixture and many lighting
upgrades will be performed in same buildings receiving BAS upgrades.
Estimated Cost: $15.1 million
Estimated Completion: December 2011
SUP1 Chilled Water Improvements (necessary to meet reliability requirements)
The three steam driven centrifugal chillers in SUP1 were replaced with new electric
centrifugal machines to enable the machines to operate without steam service to the plant.
It also provides excellent operational savings because the new units will replace steam
driven chillers with very poor efficiencies. In addition to converting/replacing the steam
driven centrifugal chillers, steam service to West Campus should be discontinued, the
absorption chillers should be removed, and additional chiller capacity should be added to
help the plant meet N+1 redundancy goals. When the 6000 total tons of steam driven
chilling is removed there will be cooling tower capacity sufficient to support the
installation of 8400 tons of electric centrifugal chillers. This project should be undertaken
as soon as possible, as this will ensure sufficient capacity to meet load growth as well as
bring immediate energy and cost savings to the campus.
This project has been completed.
Annual estimated avoided cost: $1,250,000
Building Thermal Loop Optimization
Optimizing low system differential temperatures (DT‟s) presents an ongoing challenge.
Effective and efficient delivery of cooling and heating energy to all the buildings is
another important responsibility. Optimizing loop pressures throughout the system
requires consistent and comprehensive management of building controls, plant and loop
operation, and central thermal system development planning.
This is another energy conservation measure that has been successful and will be more
fully evaluated in the Utilities & Energy Management Master Plan.
![Page 39: Texas A&M Universityutilities.tamu.edu/wp-content/uploads/2011/11/Energy... · 2011. 11. 15. · O&M Projects from HVAC Optimization Investigation (< $5,000) No. Bldg# Bldg Name Project](https://reader036.vdocument.in/reader036/viewer/2022071302/60ab9033a12dcd1d62252c57/html5/thumbnails/39.jpg)
39
Combined Heat & Power (CHP) Upgrade in the CUP
Since the 1893, Texas A&M has generated a significant portion of the electrical power
and all thermal (cooling and heating) requirements for campus. Over the last five years,
29,000 tons of high efficiency cooling capacity has been installed in four campus utility
plants to meet new demand and replace older less efficient chillers. Texas A&M now has
over 50,000 tons of central cooling capacity, which is enough to cool 10,000 large homes.
The power generation equipment in the Central Utility Plant (CUP) had also reached the
end of its useful life and a new Combined Heat and Power (CHP) project is in progress to
provide new higher efficiency power and steam generation capacity by 2011. The CHP
project will include the installation of a modern, high-efficiency gas turbine generator
and steam turbine generator with 45 megawatts (MW) of electrical power capacity. A
heat recovery steam generator (HRSG) will also be installed with 210,000 lb/hr of steam
generation capacity. These upgrades, together with other electrical and steam system
improvements, will further enhance the ability of Texas A&M to provide clean, reliable,
efficient energy to campus – making Texas A&M truly world class in terms of utility
plant reliability and efficiency. In addition to financial benefits, reduced energy
consumption also results in lower Green House Gas (GHG) emissions, helping to create a
more sustainable environment.
Estimated Cost: $73.25 million
Estimated Completion: December 2011
Estimated FY12 Cost Avoidance (before debt service): $5.7 million
Estimated FY12 Cost Avoidance (after debt service): $1.0 million
Energy Stewardship Program
The Energy Stewardship Program (ESP) was started in July 2009 as a pilot that included
(40) buildings for a total of 5.8 million GSF. ESP is designed to reduce energy
consumption and cost of operation in campus buildings by improving energy
conservation and efficiency while improving environmental conditions. When fully
implemented, ESP will assign an Energy Steward (ES) to every building with significant
energy consumption. The ES will become familiar with occupant needs in their assigned
buildings and perform a key role to inform and educate occupants on the most efficient
and cost‐effective use of energy. The ES will also develop an understanding of HVAC
and control systems, lighting, water, and other energy requirements in the buildings and
act as a liaison with technical support staff who will work with them to ensure occupant
needs are met in the most cost‐effective manner. In addition to reducing consumption
through improved conservation and efficiency, ESP will focus on ensuring proper air
quality and comfort standards are consistently met.
With a goal of improving service while educating, informing and enrolling building
occupants, the ES will have access to energy consumption and cost data – overall and per
gross square foot ‐and use this data to educate themselves and others. The ES will meet
with building proctors and/or facility managers, and occupants to continuously raise
awareness and improve operating efficiency. They will also meet with department
![Page 40: Texas A&M Universityutilities.tamu.edu/wp-content/uploads/2011/11/Energy... · 2011. 11. 15. · O&M Projects from HVAC Optimization Investigation (< $5,000) No. Bldg# Bldg Name Project](https://reader036.vdocument.in/reader036/viewer/2022071302/60ab9033a12dcd1d62252c57/html5/thumbnails/40.jpg)
40
managers and representatives to ensure thorough understanding of occupant energy
requirements and schedules. The ES will tour assigned buildings observing all aspects of
energy consumption, room temperature, humidity, and lighting. Unnecessary
consumption will be identified and steps taken to improve operating efficiency while
educating occupants and requesting support to encourage every occupant to become a
steward for efficient energy use. Temperature, humidity and air flow issues that need
correction will be documented, along with recommended solutions, so effective
corrective measures can be implemented. Mechanical rooms and energy systems will be
inspected routinely to ensure HVAC systems, VFD‟s and controls are operating properly.
Energy Stewards will spot check buildings during and after normal occupant working
hours and weekends to ensure conservation measures are being implemented and
maintained as expected and make note of wasteful energy use, along with required
solutions.
The ES continually ask the following questions in each of their assigned buildings:
Are occupants comfortable and are departmental requirements being met?
Are temperature, humidity and air flow standards being achieved and not exceeded?
Are space heaters or other energy wasting devices being used? If so, why?
Are HVAC systems and lighting being secured after regular business hours?
Are HVAC systems, pumps and controls operating as intended? Are any being
bypassed?
Are lights and equipment being turned off when not needed? If not, why not?
Is there any water (DCW, DHW, CHW, HHW) being wasted or improperly used?
Are there any other improvements that will conserve energy or improve efficiency?
Once a week, all ESs meet with the ESP Management Team (EMT) to review and report
progress, request needed assistance or resources, and get appropriate approval to proceed
with specific initiatives. Energy Stewards will present people and process challenges,
with recommended solutions, to the BMT so priorities can be established, strategic
decisions can be made, and necessary approvals or support can be obtained.
In addition, the ESs will be supported by a ESP Technical Team (ETT), comprised of
members from UEM Energy Services (UES), UEM Analytical Services (UAS), Energy
Systems Laboratory (ESL), and Facilities Maintenance (FM). A weekly ETT meeting
will be held to review energy consumption and cost profiles, discuss accomplishments
and review technical challenges, and identify solutions or follow‐up action required.
Energy Stewards will review specific energy consumption reduction measures they have
identified in buildings with the BTT to determine the best technical solutions and course
of action.
ESP is an ongoing process of improvement to identify and eliminate waste, inform and
educate building occupants, and enroll ALL building occupants in the process of
conserving energy and improving energy efficiency. As first priority, the ES will work
with occupants, EMT and ETT to identify and eliminate energy use that is obviously
wasteful and improve building operational efficiency without investment of capital or
major maintenance. While raising awareness and implementing priority one items, the
![Page 41: Texas A&M Universityutilities.tamu.edu/wp-content/uploads/2011/11/Energy... · 2011. 11. 15. · O&M Projects from HVAC Optimization Investigation (< $5,000) No. Bldg# Bldg Name Project](https://reader036.vdocument.in/reader036/viewer/2022071302/60ab9033a12dcd1d62252c57/html5/thumbnails/41.jpg)
41
second priority of the program will be to identify and implement space use efficiency
improvements that can be made without significant modification, capital investment or
major maintenance. As a third priority, with ongoing support from the EMT and ETT,
opportunities will be identified, working with various departments and building
occupants, that will accomplish greater operational efficiency through improved space
usage, consolidation of like uses, capital upgrades, improved mechanical/electrical
systems and controls. Each of the priority three opportunities will require thorough
discussion, review, justification, management approval and funding to implement.
If made a high priority by Texas A&M administration and academic department
management, ESP has the potential to cost avoid millions of dollars annually through
reduced purchased energy consumption, significantly improve the environment, and
provide world class support for the Texas A&M mission of teaching and research. This
accomplishment and the example it demonstrates will provide tremendous positive
benefit to the many students, faculty, staff, alumni and stakeholders of Texas A&M. This
benefit will extend far beyond Texas A&M and the current generation of students, faculty
and staff. Our accomplishment and leadership in the field of energy conservation and
efficiency will provide an example for institutions and individuals throughout the country
and around the world.
The pilot program was conducted in over 40 buildings totaling over 5.8 million GSF.
Energy Systems Lab (ESL) estimates the cost avoidance of the program in excess of
$350k annually. Based upon the results, the program was expanding in October 2010 to
include a total of (55) buildings and 7.3 million GSF.
HVAC Scheduling
HVAC scheduling is simply identifying those buildings that can be shut down or set back
during unoccupied periods. This means that if a building is occupied from 8:00am to
5:00pm, Monday through Friday then be sure to turn off the HVAC or set it back during
unoccupied periods. UEM has developed a way to measure the effectiveness of the
program by establishing the HVAC run time index. The HVAC run time index is simply
the number of hours in a given period that the HVAC system is running, divided by the
total number of hours in that period. For example, if the HVAC is scheduled to run from
6:00am to 6:00pm Monday through Friday and be setback or turned off during other
periods, the HVAC run time index would be about 36%. As a point of reference, our
campus HVAC run time index is currently about 79% for those buildings that we can
schedule and we do have a building that is operating at about 45%.
A variation to HVAC scheduling is Holiday HVAC scheduling. Texas A&M has had a
holiday HVAC scheduling program in place since the fall of 2005 which is focused on
the holiday breaks in November, December and March. These months are periods where
the students, faculty and staff are gone from campus for longer periods than normal.
Prior to the 2005 holiday season, there was recognition that most of the 21.5 million GSF
would operate as normal unless something was changed. The team very quickly put
together a plan and moved forward with turning off equipment or setting it back where
shutting it off is not practical or does not meet the needs of the occupants.
![Page 42: Texas A&M Universityutilities.tamu.edu/wp-content/uploads/2011/11/Energy... · 2011. 11. 15. · O&M Projects from HVAC Optimization Investigation (< $5,000) No. Bldg# Bldg Name Project](https://reader036.vdocument.in/reader036/viewer/2022071302/60ab9033a12dcd1d62252c57/html5/thumbnails/42.jpg)
42
Through this past holiday period, we have avoided of $1.5 million in direct energy cost.
Cost avoidances is measured in direct cost not total cost because only purchased energy
cost is being reduced. With a carbon foot print of 506,000 MTeCO2, the savings to date
represent 5% of the annual total.
More remains to be done with this program by consolidating server rooms or moving
them to a centralized data center so that air handlers that server entire floors of a building
do not have to run 24/7 to meet the requirements of the server located in a closet.
![Page 43: Texas A&M Universityutilities.tamu.edu/wp-content/uploads/2011/11/Energy... · 2011. 11. 15. · O&M Projects from HVAC Optimization Investigation (< $5,000) No. Bldg# Bldg Name Project](https://reader036.vdocument.in/reader036/viewer/2022071302/60ab9033a12dcd1d62252c57/html5/thumbnails/43.jpg)
43
Section Ten
Water Conservation Plan
![Page 44: Texas A&M Universityutilities.tamu.edu/wp-content/uploads/2011/11/Energy... · 2011. 11. 15. · O&M Projects from HVAC Optimization Investigation (< $5,000) No. Bldg# Bldg Name Project](https://reader036.vdocument.in/reader036/viewer/2022071302/60ab9033a12dcd1d62252c57/html5/thumbnails/44.jpg)
44
Water Conservation Plan
Texas A&M has an outstanding record of accomplishment in recent years in the area of
water conservation. Over the past eighteen years, Texas A&M has implemented a number
of significant water conservation initiatives and water system improvements to ensure
University water needs are met in the most efficient and cost-effective manner. These
conservation efforts and operational improvements have resulted in huge reductions in
the amount of water required to operate and maintain the 21.5 million Gross Square Foot
(GSF) campus.
Texas A&M water consumption has been reduced by over 50 percent since the early
1990‟s and by almost one third since 2000. FY2010 water consumption of just over 1.5
billion gallons has set a record low. This reduction was accomplished while serving a
campus that has experienced a growth of 43% in square footage served (from 15 million
GSF in 1991 to 21.5 million GSF in 2010). This 50% decrease in overall water
consumption with a 43% increase in campus square footage represents a 65% reduction
in consumption per GSF!! This result has been accomplished by implementing 1)
improved utility plant operation and water treatment to reduce water consumption
required to provide electrical power, cooling and heating for campus, 2) improved
automation and management of campus irrigation systems, 3) improved standards for
building plumbing fixtures, 4) LEED certification standards for major new buildings, 5)
improved education and promotion to raise awareness of energy and water conservation,
and 6) separation of non-potable water systems from the campus municipal water system.
The domestic water system on the Texas A&M campus is operated and maintained by
Utilities & Energy Management and is rated as a Superior water system by Texas
Commission on Environmental Quality (TCEQ). Water rates at Texas A&M are also
some of the lowest in the State of Texas at a cost to customers of $1.57 per thousand
gallons. The UEM mission to ensure high reliability of utility services and environmental
stewardship, while reducing utility rates and consumption, supports the Texas A&M
mission of excellence in teaching and research.
![Page 45: Texas A&M Universityutilities.tamu.edu/wp-content/uploads/2011/11/Energy... · 2011. 11. 15. · O&M Projects from HVAC Optimization Investigation (< $5,000) No. Bldg# Bldg Name Project](https://reader036.vdocument.in/reader036/viewer/2022071302/60ab9033a12dcd1d62252c57/html5/thumbnails/45.jpg)
45
Section Eleven
Long Range Utility Procurement Plan
![Page 46: Texas A&M Universityutilities.tamu.edu/wp-content/uploads/2011/11/Energy... · 2011. 11. 15. · O&M Projects from HVAC Optimization Investigation (< $5,000) No. Bldg# Bldg Name Project](https://reader036.vdocument.in/reader036/viewer/2022071302/60ab9033a12dcd1d62252c57/html5/thumbnails/46.jpg)
46
Energy Procurement Strategic Plan
Since FY06, Texas A&M has employed the consulting firm Fulcrum Power Services for
the purchase of electricity and natural gas. Texas A&M currently purchases a
combination of natural gas futures and options contracts via the NYMEX to hedge future
energy costs. Texas A&M has hedged the energy requirements for FY11 at 95%, FY12
at 60% and FY13 at 25%. All energy consumption is currently being hedged using
financial hedges in natural gas, which are then converted prior to the start of each month
into physical natural gas or electricity.
Texas A&M is currently upgrading its own site power generation capability through the
CHP project previously mentioned. To ensure that the natural gas delivered to the
Central Utility Plant is of sufficient pressure, Texas A&M entered into a transportation
agreement with Atmos to install a pipeline and deliver 600 psi gas to the facility. Texas
A&M is also seeking competitive bids for the supply of natural gas and expects that a
new purchase agreement will be in effect by January 2011.
![Page 47: Texas A&M Universityutilities.tamu.edu/wp-content/uploads/2011/11/Energy... · 2011. 11. 15. · O&M Projects from HVAC Optimization Investigation (< $5,000) No. Bldg# Bldg Name Project](https://reader036.vdocument.in/reader036/viewer/2022071302/60ab9033a12dcd1d62252c57/html5/thumbnails/47.jpg)
47
Section Twelve
Previous Semi-Annual Energy Reports
![Page 48: Texas A&M Universityutilities.tamu.edu/wp-content/uploads/2011/11/Energy... · 2011. 11. 15. · O&M Projects from HVAC Optimization Investigation (< $5,000) No. Bldg# Bldg Name Project](https://reader036.vdocument.in/reader036/viewer/2022071302/60ab9033a12dcd1d62252c57/html5/thumbnails/48.jpg)
48
Semi-Annual Energy Report
The Semi-Annual Energy Report remains unchanged from December 2005. Please refer
to the December 2005 report.
![Page 49: Texas A&M Universityutilities.tamu.edu/wp-content/uploads/2011/11/Energy... · 2011. 11. 15. · O&M Projects from HVAC Optimization Investigation (< $5,000) No. Bldg# Bldg Name Project](https://reader036.vdocument.in/reader036/viewer/2022071302/60ab9033a12dcd1d62252c57/html5/thumbnails/49.jpg)
49
Section Thirteen
Texas Administrative Codes and
SECO Guidelines
![Page 50: Texas A&M Universityutilities.tamu.edu/wp-content/uploads/2011/11/Energy... · 2011. 11. 15. · O&M Projects from HVAC Optimization Investigation (< $5,000) No. Bldg# Bldg Name Project](https://reader036.vdocument.in/reader036/viewer/2022071302/60ab9033a12dcd1d62252c57/html5/thumbnails/50.jpg)
50
Texas Administrative Codes and SECO Guidelines
The Texas Administrative Codes and SECO Guidelines remain unchanged from
December 2005. Please refer to the December 2005 report.
![Page 51: Texas A&M Universityutilities.tamu.edu/wp-content/uploads/2011/11/Energy... · 2011. 11. 15. · O&M Projects from HVAC Optimization Investigation (< $5,000) No. Bldg# Bldg Name Project](https://reader036.vdocument.in/reader036/viewer/2022071302/60ab9033a12dcd1d62252c57/html5/thumbnails/51.jpg)
51
Part B
Fleet Fuel Management Plan
![Page 52: Texas A&M Universityutilities.tamu.edu/wp-content/uploads/2011/11/Energy... · 2011. 11. 15. · O&M Projects from HVAC Optimization Investigation (< $5,000) No. Bldg# Bldg Name Project](https://reader036.vdocument.in/reader036/viewer/2022071302/60ab9033a12dcd1d62252c57/html5/thumbnails/52.jpg)
52
Section Fourteen
Fleet Fuel Management Plan (vehicles)
![Page 53: Texas A&M Universityutilities.tamu.edu/wp-content/uploads/2011/11/Energy... · 2011. 11. 15. · O&M Projects from HVAC Optimization Investigation (< $5,000) No. Bldg# Bldg Name Project](https://reader036.vdocument.in/reader036/viewer/2022071302/60ab9033a12dcd1d62252c57/html5/thumbnails/53.jpg)
53
Fleet Fuel Management Plan
The following procedures have been and still are in place:
Reduced bus routes – focus on efficiencies
Reduced fleet vehicles – retiring older, less efficient vehicles
Photocell lighting used on exterior of all garages
Replaced lights in automotive shop with more efficient fixtures
Photocell lighting used at the fuel island
Fuel island offers biodiesel (B20) and have dedicated one 12,000 gallon
underground storage tank for biodiesel storage
Preventive Maintenance schedules have increased to 3 per year instead of twice a
year improving fuel efficiency.
Signs have been posted at the fuel center with helpful tips encouraging customers
to conserve fuel
Conservation tips have been posted on our website
A brochure has been produced regarding fuel conservation and is included with
each fleet rental agreement
We continue to communicate our efforts with Communication Representative
from Energy Conservation Committee and offer assistance where needed with
University-wide conservation efforts
Bid proposal for biodiesel has been reviewed by Purchasing. Biofuels vendor
Brenco Marketing has been selected.
Purchased 4 Ford Escape Hybrids
Purchased 6 Chevy Malibu Hybrids
The following procedures and communication efforts are proposed for immediate action:
Continue to replace lighting with more efficient fixtures at the heavy equipment
shop
Continue to investigate use of hybrid vehicles in the fleet
Research the effects of using B20 during the winter months
Research fuel additives to reduce gelling during the winter months
Continue to use B20 biodiesel in all Transit buses
Utilizing biodiesel in other university vehicles
Aggressively researching electric vehicles such as the E-ride (http://www.e-
ride.com/), Miles (http://www.milesev.com/) and Zenn
(http://www.zenncars.com/).
Week long test of three electric vehicles (two E-ride models and one Miles truck).
During the week long test, departments were allowed to use them in real work
scenarios to test their feasibility.
![Page 54: Texas A&M Universityutilities.tamu.edu/wp-content/uploads/2011/11/Energy... · 2011. 11. 15. · O&M Projects from HVAC Optimization Investigation (< $5,000) No. Bldg# Bldg Name Project](https://reader036.vdocument.in/reader036/viewer/2022071302/60ab9033a12dcd1d62252c57/html5/thumbnails/54.jpg)
54
![Page 55: Texas A&M Universityutilities.tamu.edu/wp-content/uploads/2011/11/Energy... · 2011. 11. 15. · O&M Projects from HVAC Optimization Investigation (< $5,000) No. Bldg# Bldg Name Project](https://reader036.vdocument.in/reader036/viewer/2022071302/60ab9033a12dcd1d62252c57/html5/thumbnails/55.jpg)
55