Texas Horse Park Master Plan and Design Trinity River Corridor Project Committee Briefing December 4, 2007 City of Dallas Park & Recreation Department Trinity River Corridor Project BROWN REYNOLDS WATFORD A R C H I T E C T S , I N C .

Upload: others

Post on 16-Jul-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Texas Horse Park Master Plan and Design - Dallas · Texas Horse Park at the Trinity 3 Project History 1998 Trinity River Corridor Bond Package passed including $2.56 million for an

Texas Horse ParkMaster Plan and Design

Trinity River Corridor Project CommitteeBriefing

December 4, 2007

City of DallasPark & Recreation DepartmentTrinity River Corridor Project

BROWN REYNOLDS WATFORD A R C H I T E C T S , I N C .

Page 2: Texas Horse Park Master Plan and Design - Dallas · Texas Horse Park at the Trinity 3 Project History 1998 Trinity River Corridor Bond Package passed including $2.56 million for an

Texas Horse Park at the Trinity 2

Project Team

Dallas Park and Recreation Department OwnerTrinity River Project Office OwnerTexas Horse Park, Inc. Operator

Brown Reynolds Watford Architects, Inc. ArchitectThe Office of Christopher Miller Landscape ArchitectPacheco Koch* Civil Engineer Lopez Garcia Group* MEPJaster-Quintanilla* Structural EngineerLyons Zaremba, Inc. Exhibit Planner Geo-Marine Archeology HistoryDeShazo, Tang & Associates* TrafficHill International, Inc. Cost Estimator

*M/WBE

Page 3: Texas Horse Park Master Plan and Design - Dallas · Texas Horse Park at the Trinity 3 Project History 1998 Trinity River Corridor Bond Package passed including $2.56 million for an

Texas Horse Park at the Trinity 3

Project History

1998 Trinity River Corridor Bond Package passed including $2.56 million for an equestrian center

2002 BRW Architects engaged for feasibility study and planning of the center

2005 Texas Horse Park, Inc. (THPI) formed as a non-profit to operate the Texas Horse Park under a Development and Management Agreement with the City of Dallas

2006 THPI committed to match City’s total funding of $15 million

City of Dallas 2006 Bond Election passed including $12 million for the development of the Texas Horse Park and $2 million for land acquisition

Remainder of Phase I cost to be raised by THPI through private donations and grants

2007 Texas Horse Park Masterplan completed

Page 4: Texas Horse Park Master Plan and Design - Dallas · Texas Horse Park at the Trinity 3 Project History 1998 Trinity River Corridor Bond Package passed including $2.56 million for an

Texas Horse Park at the Trinity 4

Project Goals● Promote the development of a multi-disciplinary

equestrian facility as a component of the Trinity River Corridor Project

● Host local and world class equestrian events and establish inner city and educational outreach programs

● Benefit the City of Dallas and its citizens economically, educationally, culturally, recreationally, and ecologically

● Foster conservation and appreciation of Texas’historic equestrian tradition

Page 5: Texas Horse Park Master Plan and Design - Dallas · Texas Horse Park at the Trinity 3 Project History 1998 Trinity River Corridor Bond Package passed including $2.56 million for an

Texas Horse Park at the Trinity 5

Project Area

I 20

I 45

HWY 175

LOOP 12

Page 6: Texas Horse Park Master Plan and Design - Dallas · Texas Horse Park at the Trinity 3 Project History 1998 Trinity River Corridor Bond Package passed including $2.56 million for an

Texas Horse Park at the Trinity 6

Project Area

Page 7: Texas Horse Park Master Plan and Design - Dallas · Texas Horse Park at the Trinity 3 Project History 1998 Trinity River Corridor Bond Package passed including $2.56 million for an

Texas Horse Park at the Trinity 7

Site PlanMaster Plan

Page 8: Texas Horse Park Master Plan and Design - Dallas · Texas Horse Park at the Trinity 3 Project History 1998 Trinity River Corridor Bond Package passed including $2.56 million for an

Texas Horse Park at the Trinity 8

Site PlanDeveloped Area

Page 9: Texas Horse Park Master Plan and Design - Dallas · Texas Horse Park at the Trinity 3 Project History 1998 Trinity River Corridor Bond Package passed including $2.56 million for an

Texas Horse Park at the Trinity 9

Site PlanPhase I

Page 10: Texas Horse Park Master Plan and Design - Dallas · Texas Horse Park at the Trinity 3 Project History 1998 Trinity River Corridor Bond Package passed including $2.56 million for an

Texas Horse Park at the Trinity 10

ProgramPhase I

Competition Venue1. Visitor Center (Administration /

Sponsors Lounge / Banquet / Conference Center / Security Points)

3. Equestrian Lounge5. Vendor Village & General Store7. Horse Barns (10 Barns = 300 stalls)9. Covered Grooming and Wash

Stations10. Farrier / Vet Clinic11. Covered Show Arena (150' x 300')13. Uncovered Large Performance Arena

(230' x 262')13.1 Uncovered Small Performance Arena

(100' x 250')14. Covered Warm-Up Arena (60‘ x 120‘)15. Two (2) Uncovered Warm-up Arenas

(100’ x 150’) 20. Two (2) Round 20m Pens28. Temporary Stalls (800)34. Straw and Manure Collection Stations

1.13. 13.115.

14.

11.

7.

7.

3.

7.

20. 5.9.

9. 9.

10.

15.

34.

34.

28.

Page 11: Texas Horse Park Master Plan and Design - Dallas · Texas Horse Park at the Trinity 3 Project History 1998 Trinity River Corridor Bond Package passed including $2.56 million for an

Texas Horse Park at the Trinity 11

ProgramPhase I

Equestrian Outreach CenterAdministration16. Office / Classrooms / Meeting

RoomsSchool of Horsemanship17. Covered Schooling Arena (200’ x

70’)18. Uncovered Schooling Arena (100’

x150’)19. Two (2) Schooling / Boarding Barns

(20 stalls each)20. Round 20m PenTrails36. Trailhead Staging Facility

16.

17.

18.19.

20.

36.

Page 12: Texas Horse Park Master Plan and Design - Dallas · Texas Horse Park at the Trinity 3 Project History 1998 Trinity River Corridor Bond Package passed including $2.56 million for an

Texas Horse Park at the Trinity 12

Comparable Facilities

Dressage Ring Shed Row Barns

Kentucky Horse Park

Page 13: Texas Horse Park Master Plan and Design - Dallas · Texas Horse Park at the Trinity 3 Project History 1998 Trinity River Corridor Bond Package passed including $2.56 million for an

Texas Horse Park at the Trinity 13

Comparable Facilities

Berm SeatingJumping Arena

Colorado Horse Park

Page 14: Texas Horse Park Master Plan and Design - Dallas · Texas Horse Park at the Trinity 3 Project History 1998 Trinity River Corridor Bond Package passed including $2.56 million for an

Texas Horse Park at the Trinity 14

Comparable Facilities

Café overlooking Arena Pavilion Seating

Lamplight Equestrian Center

Page 15: Texas Horse Park Master Plan and Design - Dallas · Texas Horse Park at the Trinity 3 Project History 1998 Trinity River Corridor Bond Package passed including $2.56 million for an

Texas Horse Park at the Trinity 15

Comparable Facilities

Covered Grooming and Wash Stations Covered Arena

Shea Therapeutic Center

Page 16: Texas Horse Park Master Plan and Design - Dallas · Texas Horse Park at the Trinity 3 Project History 1998 Trinity River Corridor Bond Package passed including $2.56 million for an

Texas Horse Park at the Trinity 16

Comparable Facilities

Mill Creek Equestrian CenterBarn Courtyard

Virginia Horse CenterCovered Grandstand Seating

Other Facilities Toured:Georgia International Horse Park Georgia National FairgroundsLos Angeles Equestrian Center Huntington Central Park

Page 17: Texas Horse Park Master Plan and Design - Dallas · Texas Horse Park at the Trinity 3 Project History 1998 Trinity River Corridor Bond Package passed including $2.56 million for an

Texas Horse Park at the Trinity 17

Budget Summary

Phase IInfrastructureBarnsArenasEntry / Visitor / AdministrationOutreach CenterCross CountryTrailsDevelopment Costs

Total Budget

$3,690,000$8,860,000$6,240,000

$970,000$2,660,000$1,100,000

$60,000$6,320,000

$30,000,000

Page 18: Texas Horse Park Master Plan and Design - Dallas · Texas Horse Park at the Trinity 3 Project History 1998 Trinity River Corridor Bond Package passed including $2.56 million for an

Texas Horse Park at the Trinity 18

Schedule

Start Schematic DesignPhase IStart Design Development Potential Floodplain and Fill PermitComplete Construction DocumentsBidding and Contract AwardStart ConstructionSubstantial Completion of ConstructionOwner OccupancySoft Opening

January 2008

February 2008February 2008 – July 2009

May 2008September 2008 - December 2008

January 2009March 1, 2010

March 2010May 1, 2010

Page 19: Texas Horse Park Master Plan and Design - Dallas · Texas Horse Park at the Trinity 3 Project History 1998 Trinity River Corridor Bond Package passed including $2.56 million for an

Texas Horse Park at the Trinity 19

SustainabilityLEED certification will be pursued for three major buildings: the Visitor’s Center, Outreach Administration, and Lodge.

Additional sustainable strategies will be studied for use throughout the park.

Energy Sustainability Water ConservationGeothermal Energy Rainwater HarvestingBiomass Gasification On-site Well Water Solar Panels XeriscapingWind Power

Materials and Indoor Environmental QualityDaylighting Low VOC MaterialsRecycled / Renewable Materials

Site SustainabilityOn-site Composting Constructed WetlandsPorous Paving Storm Water Collection

Porous Paving

Constructed Wetlands

Rainwater Harvesting

Page 20: Texas Horse Park Master Plan and Design - Dallas · Texas Horse Park at the Trinity 3 Project History 1998 Trinity River Corridor Bond Package passed including $2.56 million for an

Texas Horse Park at the Trinity 20

Concept DesignEntry

Page 21: Texas Horse Park Master Plan and Design - Dallas · Texas Horse Park at the Trinity 3 Project History 1998 Trinity River Corridor Bond Package passed including $2.56 million for an

Texas Horse Park at the Trinity 21

Concept DesignPlaza

Page 22: Texas Horse Park Master Plan and Design - Dallas · Texas Horse Park at the Trinity 3 Project History 1998 Trinity River Corridor Bond Package passed including $2.56 million for an

Texas Horse Park at the Trinity 22

Concept DesignArenas

Page 23: Texas Horse Park Master Plan and Design - Dallas · Texas Horse Park at the Trinity 3 Project History 1998 Trinity River Corridor Bond Package passed including $2.56 million for an

Texas Horse Park at the Trinity 23

Concept DesignBarns

Page 24: Texas Horse Park Master Plan and Design - Dallas · Texas Horse Park at the Trinity 3 Project History 1998 Trinity River Corridor Bond Package passed including $2.56 million for an

Texas Horse Park at the Trinity 24

Concept DesignLandscape

Page 25: Texas Horse Park Master Plan and Design - Dallas · Texas Horse Park at the Trinity 3 Project History 1998 Trinity River Corridor Bond Package passed including $2.56 million for an

Texas Horse Park at the Trinity 25

BROWN REYNOLDS WATFORD A R C H I T E C T S , I N C .

Texas Horse Parkat the Trinity

Trinity River Corridor Project CommitteeBriefing

December 4, 2007

City of DallasPark & Recreation DepartmentTrinity River Corridor Project