tf-vss activity 4 intro andr ás kovács,
DESCRIPTION
TF-VSS Activity 4 intro Andr ás Kovács, . Athens, Greece 22/02/2007. Activity 4 goals. “High level technical plans…” Agree on technical aspects Define implementation phases Preparation of D4.1 Depends on Activity 3 D3.1 (Service specification) Brain storming - PowerPoint PPT PresentationTRANSCRIPT
Athens, Greece22/02/2007
TF-VSS Activity 4 introAndrás Kovács, <[email protected]>
Activity 4 goals
NIIF – http://www.niif.hu
• “High level technical plans…”
• Agree on technical aspects
• Define implementation phases
• Preparation of D4.1
• Depends on Activity 3 D3.1 (Service
specification)
• Brain storming
• This presentation:
• Basics from GN2 Y3 planning + some more
detail added
• Kick-off A4 discussion
EU VC service constrains
NIIF – http://www.niif.hu
• Based on:
• Standards: H.323/SIP
• GDS (ENUM?)
• Central website:
• Scheduling interface (MCU service)
• Federative authentication framework
• Localisation + time zone handling
EU VC service scheme
NIIF – http://www.niif.hu
Central Service Elements AAI, HTTPE-mail
Domain/NREN1 Domain/NREN2
Agent
PeriodicResource Report
Reservation()Modify()Delete()…
Status()…
MCU
Agent
MCU
EU VC service scheme
NIIF – http://www.niif.hu
Central Service Elements AAI, HTTPE-mail
Domain/NREN1 Domain/NREN2
Agent
PeriodicResource Report
Reservation()Modify()Delete()…
Status()…
MCU
Agent
MCU
VCR
GW