tf-vss activity 4 intro andr ás kovács,

5
Athens, Greece 22/02/2007 TF-VSS Activity 4 intro András Kovács, <[email protected]>

Upload: knut

Post on 06-Jan-2016

27 views

Category:

Documents


2 download

DESCRIPTION

TF-VSS Activity 4 intro Andr ás Kovács, . Athens, Greece 22/02/2007. Activity 4 goals. “High level technical plans…” Agree on technical aspects Define implementation phases Preparation of D4.1 Depends on Activity 3 D3.1 (Service specification) Brain storming - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: TF-VSS Activity 4 intro Andr ás Kovács,

Athens, Greece22/02/2007

TF-VSS Activity 4 introAndrás Kovács, <[email protected]>

Page 2: TF-VSS Activity 4 intro Andr ás Kovács,

Activity 4 goals

NIIF – http://www.niif.hu

• “High level technical plans…”

• Agree on technical aspects

• Define implementation phases

• Preparation of D4.1

• Depends on Activity 3 D3.1 (Service

specification)

• Brain storming

• This presentation:

• Basics from GN2 Y3 planning + some more

detail added

• Kick-off A4 discussion

Page 3: TF-VSS Activity 4 intro Andr ás Kovács,

EU VC service constrains

NIIF – http://www.niif.hu

• Based on:

• Standards: H.323/SIP

• GDS (ENUM?)

• Central website:

• Scheduling interface (MCU service)

• Federative authentication framework

• Localisation + time zone handling

Page 4: TF-VSS Activity 4 intro Andr ás Kovács,

EU VC service scheme

NIIF – http://www.niif.hu

Central Service Elements AAI, HTTPE-mail

Domain/NREN1 Domain/NREN2

Agent

PeriodicResource Report

Reservation()Modify()Delete()…

Status()…

MCU

Agent

MCU

Page 5: TF-VSS Activity 4 intro Andr ás Kovács,

EU VC service scheme

NIIF – http://www.niif.hu

Central Service Elements AAI, HTTPE-mail

Domain/NREN1 Domain/NREN2

Agent

PeriodicResource Report

Reservation()Modify()Delete()…

Status()…

MCU

Agent

MCU

VCR

GW