the bow valley centre 14.9 hectares (36.8 acres) inner city community bridgeland/riverside

37

Upload: hayley

Post on 30-Jan-2016

36 views

Category:

Documents


1 download

DESCRIPTION

In October of 2002, the IBI Group was retained to undertake an analysis of sustainable building and site development opportunities and make recommendations regarding their incorporation into various aspects of marketing and development of the Bow Valley Centre Lands Redevelopment project. - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: The Bow Valley Centre   14.9 hectares (36.8 acres) Inner city community Bridgeland/Riverside
Page 2: The Bow Valley Centre   14.9 hectares (36.8 acres) Inner city community Bridgeland/Riverside
Page 3: The Bow Valley Centre   14.9 hectares (36.8 acres) Inner city community Bridgeland/Riverside
Page 4: The Bow Valley Centre   14.9 hectares (36.8 acres) Inner city community Bridgeland/Riverside

In October of 2002, the IBI Group was retained to undertake an analysis of sustainable building and site development opportunities and make recommendations regarding their incorporation into various aspects of marketing and development of the Bow Valley Centre Lands Redevelopment project.

Page 5: The Bow Valley Centre   14.9 hectares (36.8 acres) Inner city community Bridgeland/Riverside

• The Bow Valley Centre 14.9 hectares (36.8 acres)

• Inner city community Bridgeland/Riverside

• Site of former Calgary General Hospital

Page 6: The Bow Valley Centre   14.9 hectares (36.8 acres) Inner city community Bridgeland/Riverside
Page 7: The Bow Valley Centre   14.9 hectares (36.8 acres) Inner city community Bridgeland/Riverside
Page 8: The Bow Valley Centre   14.9 hectares (36.8 acres) Inner city community Bridgeland/Riverside

• Urban village-medium density residential development, mixed use commercial and public open spaces

• 1575 residential units

• 67,000 sq. ft. of commercial/retail and office use.

Page 9: The Bow Valley Centre   14.9 hectares (36.8 acres) Inner city community Bridgeland/Riverside
Page 10: The Bow Valley Centre   14.9 hectares (36.8 acres) Inner city community Bridgeland/Riverside
Page 11: The Bow Valley Centre   14.9 hectares (36.8 acres) Inner city community Bridgeland/Riverside
Page 12: The Bow Valley Centre   14.9 hectares (36.8 acres) Inner city community Bridgeland/Riverside
Page 13: The Bow Valley Centre   14.9 hectares (36.8 acres) Inner city community Bridgeland/Riverside
Page 14: The Bow Valley Centre   14.9 hectares (36.8 acres) Inner city community Bridgeland/Riverside

• Generation of long list of alternatives ( 180)

• 2 main categories

1. Building Structure2. Site Development

Page 15: The Bow Valley Centre   14.9 hectares (36.8 acres) Inner city community Bridgeland/Riverside

1. Building Structure

Under Building Structure there are five sub categories:

- Energy;

- Water;

- Health;

- Green Building Materials; and

- Waste.

Page 16: The Bow Valley Centre   14.9 hectares (36.8 acres) Inner city community Bridgeland/Riverside

2. Site Development

Under Site Development there are three subcategories, including:

- Community Planning;

- Construction Practices; and

- Landscaping.

Page 17: The Bow Valley Centre   14.9 hectares (36.8 acres) Inner city community Bridgeland/Riverside

Filter #1

CURRENTLY REQUIREDCURRENT BLDG PRACTICEALREADY ADDRESSED IN BVC PLANTECHNICAL FEASIBILITYUNDER DEVELOPMENTAVAILABILITYTRAINED INSTALLERS/INSPECTORSNOT APPLICABLEPASS

Page 18: The Bow Valley Centre   14.9 hectares (36.8 acres) Inner city community Bridgeland/Riverside

Filter #2

ENVIRONMENTAL BENEFITS (L-M-H)COST IMPLICATIONS (L-M-H)NEGATIVE IMPACTS (L-M-H)TECHNICAL FEASIBILITYMARKET ACCEPTANCEPASS

Page 19: The Bow Valley Centre   14.9 hectares (36.8 acres) Inner city community Bridgeland/Riverside
Page 20: The Bow Valley Centre   14.9 hectares (36.8 acres) Inner city community Bridgeland/Riverside

• As a means of gauging market acceptance it was decided to conduct interviews with knowledgeable builders of multi-family product.

• The building interviews were structured to elicit the following information:

Page 21: The Bow Valley Centre   14.9 hectares (36.8 acres) Inner city community Bridgeland/Riverside

• Current sustainable practices employed by the builder;

• Potential strategies that they believed could be incorporated into a sustainable project;

Page 22: The Bow Valley Centre   14.9 hectares (36.8 acres) Inner city community Bridgeland/Riverside

• Market acceptance of sustainable initiatives;

• Implementation mechanisms; and

• General comments

Page 23: The Bow Valley Centre   14.9 hectares (36.8 acres) Inner city community Bridgeland/Riverside

• Short list of sustainable practices subjected to further evaluation

• Iterative, some subjective judgement

• Suite of alternatives selected $2000 per unit in additional cost

Page 24: The Bow Valley Centre   14.9 hectares (36.8 acres) Inner city community Bridgeland/Riverside
Page 25: The Bow Valley Centre   14.9 hectares (36.8 acres) Inner city community Bridgeland/Riverside
Page 26: The Bow Valley Centre   14.9 hectares (36.8 acres) Inner city community Bridgeland/Riverside
Page 27: The Bow Valley Centre   14.9 hectares (36.8 acres) Inner city community Bridgeland/Riverside

• A range of implementation alternatives were considered including:

1. Mandatory Requirements; 2. Checklist and Scoring; 3. Cash Rebate; and 4. Encouragement/Guidelines

Page 28: The Bow Valley Centre   14.9 hectares (36.8 acres) Inner city community Bridgeland/Riverside

• Based on a consideration of pros and cons associated with each of the alternatives, it was decided that a list of specific practices would be mandated for employment on the project.

Page 29: The Bow Valley Centre   14.9 hectares (36.8 acres) Inner city community Bridgeland/Riverside

• Sustainable building and development practices secondary marketing advantage

• Lifestyle and location aspects primary determinants

Page 30: The Bow Valley Centre   14.9 hectares (36.8 acres) Inner city community Bridgeland/Riverside

• Thresholds need to be tested through direct consumer research

• More importantly, need for education and awareness

Page 31: The Bow Valley Centre   14.9 hectares (36.8 acres) Inner city community Bridgeland/Riverside

• Marketing approach outlining benefits associated with sustainable initiatives

• Need to develop objective third party rating and accreditation process for sustainable projects

Page 32: The Bow Valley Centre   14.9 hectares (36.8 acres) Inner city community Bridgeland/Riverside

• Sustainable building initiatives proposed for incorporation into the BVC project were evaluated in the context of the LEED Rating System

Page 33: The Bow Valley Centre   14.9 hectares (36.8 acres) Inner city community Bridgeland/Riverside

• Project in current state scored 7 of 26 points for certification/33 points for Silver Rating

• Addition of IBI Group initiatives scored 20 of 26 points for certification/33 points for Silver Rating

Page 34: The Bow Valley Centre   14.9 hectares (36.8 acres) Inner city community Bridgeland/Riverside

• A number of potential additional sustainability measures were recommended that would conceivably allow the project to obtain 33 points/Silver Rating

Page 35: The Bow Valley Centre   14.9 hectares (36.8 acres) Inner city community Bridgeland/Riverside

• Total cost to achieve a Silver Rating is estimated at $11,000 per unit or $11 per square foot

Page 36: The Bow Valley Centre   14.9 hectares (36.8 acres) Inner city community Bridgeland/Riverside

• Current analysis represents initial step in the incorporation of sustainable practices

• Practices proposed should not be viewed as definitive

Page 37: The Bow Valley Centre   14.9 hectares (36.8 acres) Inner city community Bridgeland/Riverside

• Review and audit on annual basis

• Initiatives expanded upon over time based upon consideration of environmental benefits and associated costs