the brief history of lumo construction from mit to hu ozgur ates hampton university olympus...

28
THE BRIEF HISTORY OF LuMo CONSTRUCTION FROM MIT TO HU OZGUR ATES HAMPTON UNIVERSITY OLYMPUS COLLABORATION MEETING 26-27 APRIL 2011

Post on 15-Jan-2016

215 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: THE BRIEF HISTORY OF LuMo CONSTRUCTION FROM MIT TO HU OZGUR ATES HAMPTON UNIVERSITY OLYMPUS COLLABORATION MEETING 26-27 APRIL 2011

THE BRIEF HISTORY OF LuMo CONSTRUCTION FROM MIT

TO HU

OZGUR ATESHAMPTON UNIVERSITY

OLYMPUS COLLABORATION MEETING 26-27 APRIL 2011

Page 2: THE BRIEF HISTORY OF LuMo CONSTRUCTION FROM MIT TO HU OZGUR ATES HAMPTON UNIVERSITY OLYMPUS COLLABORATION MEETING 26-27 APRIL 2011

Luminosity Monitors: Telescopes

Forward telescopes

12o

2 tGEM telescopes, 1.2msr, 12o,R=187/237/287cm, dR=50cm, 3 tracking planes

TOF

LEPTON

PROTON

LEPTON

PROTON

Page 3: THE BRIEF HISTORY OF LuMo CONSTRUCTION FROM MIT TO HU OZGUR ATES HAMPTON UNIVERSITY OLYMPUS COLLABORATION MEETING 26-27 APRIL 2011

1. Handling The Olympus GEMs at MIT-BATES between June 6th-August 8th 2010

Received the total 51 GEMs come with 5 Batches

Optically Inspected 100% of the GEMs @ MIT

CCD Scanned 30% of the GEMs @ MIT

HV-Tested 100% of the GEMs @ MIT

Glued into the Frames 4 GEMs @ BATES

Page 4: THE BRIEF HISTORY OF LuMo CONSTRUCTION FROM MIT TO HU OZGUR ATES HAMPTON UNIVERSITY OLYMPUS COLLABORATION MEETING 26-27 APRIL 2011

A DEFECTIVE GEM LAYER FROM CCD SCANNER

Page 5: THE BRIEF HISTORY OF LuMo CONSTRUCTION FROM MIT TO HU OZGUR ATES HAMPTON UNIVERSITY OLYMPUS COLLABORATION MEETING 26-27 APRIL 2011
Page 6: THE BRIEF HISTORY OF LuMo CONSTRUCTION FROM MIT TO HU OZGUR ATES HAMPTON UNIVERSITY OLYMPUS COLLABORATION MEETING 26-27 APRIL 2011

Bar Graphs of Inner(left) and Outer(right) Diameters of LUMI Foils

Page 7: THE BRIEF HISTORY OF LuMo CONSTRUCTION FROM MIT TO HU OZGUR ATES HAMPTON UNIVERSITY OLYMPUS COLLABORATION MEETING 26-27 APRIL 2011

7

2. Manufacturing The GEMs at HU-GEM LAB

Page 8: THE BRIEF HISTORY OF LuMo CONSTRUCTION FROM MIT TO HU OZGUR ATES HAMPTON UNIVERSITY OLYMPUS COLLABORATION MEETING 26-27 APRIL 2011

Stretching and Gluing of GEM+MYLAR+HV Foils

Page 9: THE BRIEF HISTORY OF LuMo CONSTRUCTION FROM MIT TO HU OZGUR ATES HAMPTON UNIVERSITY OLYMPUS COLLABORATION MEETING 26-27 APRIL 2011

Leakage Current Test using GEM2D Box

Page 10: THE BRIEF HISTORY OF LuMo CONSTRUCTION FROM MIT TO HU OZGUR ATES HAMPTON UNIVERSITY OLYMPUS COLLABORATION MEETING 26-27 APRIL 2011

Readout Boards – Shortcuts and How To Fix Them...

Up to 5 shorts per board possible Checked all boards with Ohmmeter for shorts Found between 0 and 7 (8?) per board, typically ~3 Verified under microscope and fixed them Currently 8 boards without any shorts

Page 11: THE BRIEF HISTORY OF LuMo CONSTRUCTION FROM MIT TO HU OZGUR ATES HAMPTON UNIVERSITY OLYMPUS COLLABORATION MEETING 26-27 APRIL 2011

Readout Boards – Shortcuts and How To Fix Them...

blown with current from a 9V battery

Page 12: THE BRIEF HISTORY OF LuMo CONSTRUCTION FROM MIT TO HU OZGUR ATES HAMPTON UNIVERSITY OLYMPUS COLLABORATION MEETING 26-27 APRIL 2011

Readout Boards – Shortcuts and How To Fix Them...

Page 13: THE BRIEF HISTORY OF LuMo CONSTRUCTION FROM MIT TO HU OZGUR ATES HAMPTON UNIVERSITY OLYMPUS COLLABORATION MEETING 26-27 APRIL 2011

Readout Boards – Shortcuts and How To Fix Them...

scratched with knife

Page 14: THE BRIEF HISTORY OF LuMo CONSTRUCTION FROM MIT TO HU OZGUR ATES HAMPTON UNIVERSITY OLYMPUS COLLABORATION MEETING 26-27 APRIL 2011

FIRST SIGNALS FROM GEMS (JUERGEN’s TALK)

Page 15: THE BRIEF HISTORY OF LuMo CONSTRUCTION FROM MIT TO HU OZGUR ATES HAMPTON UNIVERSITY OLYMPUS COLLABORATION MEETING 26-27 APRIL 2011

SOLDERING PINS INTO THE GEM FRAMES

Page 16: THE BRIEF HISTORY OF LuMo CONSTRUCTION FROM MIT TO HU OZGUR ATES HAMPTON UNIVERSITY OLYMPUS COLLABORATION MEETING 26-27 APRIL 2011

Gluing Process of The Chambers

Page 17: THE BRIEF HISTORY OF LuMo CONSTRUCTION FROM MIT TO HU OZGUR ATES HAMPTON UNIVERSITY OLYMPUS COLLABORATION MEETING 26-27 APRIL 2011
Page 18: THE BRIEF HISTORY OF LuMo CONSTRUCTION FROM MIT TO HU OZGUR ATES HAMPTON UNIVERSITY OLYMPUS COLLABORATION MEETING 26-27 APRIL 2011
Page 19: THE BRIEF HISTORY OF LuMo CONSTRUCTION FROM MIT TO HU OZGUR ATES HAMPTON UNIVERSITY OLYMPUS COLLABORATION MEETING 26-27 APRIL 2011
Page 20: THE BRIEF HISTORY OF LuMo CONSTRUCTION FROM MIT TO HU OZGUR ATES HAMPTON UNIVERSITY OLYMPUS COLLABORATION MEETING 26-27 APRIL 2011
Page 21: THE BRIEF HISTORY OF LuMo CONSTRUCTION FROM MIT TO HU OZGUR ATES HAMPTON UNIVERSITY OLYMPUS COLLABORATION MEETING 26-27 APRIL 2011
Page 22: THE BRIEF HISTORY OF LuMo CONSTRUCTION FROM MIT TO HU OZGUR ATES HAMPTON UNIVERSITY OLYMPUS COLLABORATION MEETING 26-27 APRIL 2011
Page 23: THE BRIEF HISTORY OF LuMo CONSTRUCTION FROM MIT TO HU OZGUR ATES HAMPTON UNIVERSITY OLYMPUS COLLABORATION MEETING 26-27 APRIL 2011

PACKING THE CHAMBERS

Page 24: THE BRIEF HISTORY OF LuMo CONSTRUCTION FROM MIT TO HU OZGUR ATES HAMPTON UNIVERSITY OLYMPUS COLLABORATION MEETING 26-27 APRIL 2011

The Status of The GEM Manufacturing

• Glued 9 GEM Chambers(6+3 Spares):-- 27 GEM Foils--18 Pressure(Mylar) Foils--9 High Voltage Foils--9 Readout Boards with NO Shorts--7 chambers checked with picoammeter.We shipped from HU and we received last week at

here DESY!

Page 25: THE BRIEF HISTORY OF LuMo CONSTRUCTION FROM MIT TO HU OZGUR ATES HAMPTON UNIVERSITY OLYMPUS COLLABORATION MEETING 26-27 APRIL 2011

LUMI Gas System Test Beam in May

Page 26: THE BRIEF HISTORY OF LuMo CONSTRUCTION FROM MIT TO HU OZGUR ATES HAMPTON UNIVERSITY OLYMPUS COLLABORATION MEETING 26-27 APRIL 2011

• Many configurations were simulated.• Varied intrinsic res. and distance between

tracking planes.• 100 µm intrinsic res. and 50 cm gap between

Gem1/2 and Gem2/3 show the optimum performance.

26

MC Simulation of the GEMsDesign Parameters: Resolutions

Left Sec. RESOLUTIONS

Proton DeltaZ

Electron DeltaZ

Proton Del.Theta

Electron Del.Theta

Proton DeltaPhi

Electron DeltaPhi

Proton DeltaP

Electron DeltaP

100mic./50cmLUMI + MWPC

1.60 mm 1.18 cm 0.52 Deg. 0.09 Deg. 0.52 Deg. 0.22 Deg. 20 MeV 59 MeV

Page 27: THE BRIEF HISTORY OF LuMo CONSTRUCTION FROM MIT TO HU OZGUR ATES HAMPTON UNIVERSITY OLYMPUS COLLABORATION MEETING 26-27 APRIL 2011

LUMI MS STUDIES --MC runs now on bird@DESY, HUPPCF@HU,

blaster@KPHMZ--We have ROOT files on disk with XY beam offsets--We will analyze those runs soon (NAS is ready now)

***Beam offsets were -1, -0.75, -0.5, -0.25, 0., +0.25, +0.5, +0.75, +1 mm.

Page 28: THE BRIEF HISTORY OF LuMo CONSTRUCTION FROM MIT TO HU OZGUR ATES HAMPTON UNIVERSITY OLYMPUS COLLABORATION MEETING 26-27 APRIL 2011

Next Steps with the New MC Code:

• Study of systematic effects (beam offset, slope, width; etc.) (ONGOING)

• Simulations of acceptance and count rates

• Simulation of backgrounds

28