The Case for IGCC Kay Pashos President, Duke Energy Indiana Presented to CCTR Advisory Panel June 1, 2006

Upload: others

Post on 22-Sep-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: The Case for IGCC - Purdue University€¦ · ¾GE/Bechtel analysis indicating its feasibility ... 45% tax increment finance district was approved by the Knox County Council on April

The Case for IGCC

Kay PashosPresident, Duke Energy IndianaPresented to CCTR Advisory Panel

June 1, 2006

Page 2: The Case for IGCC - Purdue University€¦ · ¾GE/Bechtel analysis indicating its feasibility ... 45% tax increment finance district was approved by the Knox County Council on April

2

BackdropIn 2004, Cinergy/PSI (now Duke Energy Indiana) signed a letter of intent with GE Energy and Bechtel Corporation to study feasibility of an Integrated Gasification Combined Cycle (IGCC) plantDuke Energy Indiana is estimated to need 300-500 MW of additional base load capacity in 2010-2015 timeframeThe 2005 State Utility Forecasting Group report projects electricity usage to grow by 2.22% annually

Page 3: The Case for IGCC - Purdue University€¦ · ¾GE/Bechtel analysis indicating its feasibility ... 45% tax increment finance district was approved by the Knox County Council on April

3

IGCC’s “Perfect Storm”

Need for base load

Abundant coal reserves

Continuation of stringent emission reduction standards

Rising energy commodity prices

Future carbon constraints

Page 4: The Case for IGCC - Purdue University€¦ · ¾GE/Bechtel analysis indicating its feasibility ... 45% tax increment finance district was approved by the Knox County Council on April

4

Edwardsport –Preferred IGCC Site

Existing 160 MW fossil steam plant (units circa 1940s-1950s) Near Edwardsport, INReplace with 600 MW Class IGCC PlantDuke Energy Indiana and Vectren have petitioned IURC for study costs

Page 5: The Case for IGCC - Purdue University€¦ · ¾GE/Bechtel analysis indicating its feasibility ... 45% tax increment finance district was approved by the Knox County Council on April

5

“Arriving” At Edwardsport

One of 5 sites in Indiana and 1 in Kentucky included in site studyGE/Bechtel analysis indicating its feasibilityEnables use of high sulfur regional coalsGeologically well-suited for possible carbon sequestration

*Edwardsport

Page 6: The Case for IGCC - Purdue University€¦ · ¾GE/Bechtel analysis indicating its feasibility ... 45% tax increment finance district was approved by the Knox County Council on April

6

IGCC Process Diagram

CombinedCycle

Generation

Coal Gasification

Page 7: The Case for IGCC - Purdue University€¦ · ¾GE/Bechtel analysis indicating its feasibility ... 45% tax increment finance district was approved by the Knox County Council on April

7

The Big Deal

Currently, 160 MW Edwardsport runs about 30% of the time and emits (annually):– Approximately 11,000 metric tons of SO2,

NOx, and particulatesThe 600 MW class IGCC plant operating 100% of the time will emit: – less than 2,900 tons of these pollutants

More is Less!

Page 8: The Case for IGCC - Purdue University€¦ · ¾GE/Bechtel analysis indicating its feasibility ... 45% tax increment finance district was approved by the Knox County Council on April

8

General Environmental Performance ComparisonNew Source Performance Standards (NSPS) vs. IGCC

0.16

0.12

0.015

0.08

0.06

0.01

0.00

0.02

0.04

0.06

0.08

0.10

0.12

0.14

0.16

0.18

0.20

Sulfur Dioxide (SO2) Nitrogen Oxide (NOx) Particulate Matter (PM-10)

Emiss

ion R

ate, L

bs/M

MBtu

NSPS (Limit) IGCC (Capable)*

Actual SO2 emission rate will depend on type of coal burned, and IGCC emission permit limits may be greater than that shown for operating margin.Approximate conversion of NSPS lb/MWh (gross) to lb/MMBtu for SO2 and NOx.

Page 9: The Case for IGCC - Purdue University€¦ · ¾GE/Bechtel analysis indicating its feasibility ... 45% tax increment finance district was approved by the Knox County Council on April

9

Additional Advantages of IGCC

Less Water Used

Less Solid Waste Generated

Overall Higher Efficiency than a Conventional PC Plant with Currently Required Pollution Control Equipment

Ability to Use Local Indiana and Midwestern Higher Sulfur coals

Page 10: The Case for IGCC - Purdue University€¦ · ¾GE/Bechtel analysis indicating its feasibility ... 45% tax increment finance district was approved by the Knox County Council on April

10

Advantages of IGCC (cont’d)

Potential to Control Hg at a Lower Cost than is Possible with Other Coal-Based Generation TechnologiesPotential to Tap into Future Poly-generation Capabilities – Including Production of Fertilizer and Transportation FuelsPotential for Future Capture of CO2 at a Significantly Lower Cost than Conventional PC Because CO2 can be Separated Prior to Combustion– Dependent upon ability to technologically sequester

carbon economically in the future

Page 11: The Case for IGCC - Purdue University€¦ · ¾GE/Bechtel analysis indicating its feasibility ... 45% tax increment finance district was approved by the Knox County Council on April

11

Source – National Energy Technology Lab

Potential to Capture CO2Economically in the Future

98%87%

30%

0

20

40

60

80

100

IGCC PC NGCC

Effect of CO2 Capture on Capital Cost(% Increase Resulting from CO2 Capture)

Estimated Capital Cost

72%60%

25%

0

20

40

60

80

100

IGCC NGCC PC

Effect of CO2 Capture on Cost of Electricity(% Increase Resulting from CO2 Capture)

Estimated Cost of Electricity

Page 12: The Case for IGCC - Purdue University€¦ · ¾GE/Bechtel analysis indicating its feasibility ... 45% tax increment finance district was approved by the Knox County Council on April

12

Additional BenefitsLocal/regional economy– Estimated property taxes years 1-10: $22.2 M– Estimated property taxes years 11-30: $52.6M– 1.5 M tons of coal/year valued at about $40 M

annuallyJobs– An average of 800-900 construction jobs

during 3-year period (as many as 2000 during peak)

– Creation of 77-97 permanent jobs– Estimated annual payroll of $5-7 million

By-products– Elemental sulfur and vitrified slag can be sold

Page 13: The Case for IGCC - Purdue University€¦ · ¾GE/Bechtel analysis indicating its feasibility ... 45% tax increment finance district was approved by the Knox County Council on April

13

Costs and Considerations

Typical 600 MW class IGCC plant is estimated to cost up to $1.2 billion

IGCC capital cost is estimated to be 15-20% higher than a PC plant

Incentives needed to bridge the gap

Page 14: The Case for IGCC - Purdue University€¦ · ¾GE/Bechtel analysis indicating its feasibility ... 45% tax increment finance district was approved by the Knox County Council on April

14

Financial Incentives

State and Local– Indiana SB 29 Provides for Timely Recovery of IGCC

Construction and Operating Costs– Indiana SB 378 Provides Investment Tax Credit of 10%

of Project Cost for the First $500 million and 5% of the Remaining Cost Above $500 million

– 10 year real and personal property tax abatement and a 45% tax increment finance district was approved by the Knox County Council on April 11, 2006

Federal – 2005 Energy Bill– 20% Investment Tax Credit for IGCC Capped at $800

million and Split Across Three Coal Types. Process will be Very Competitive

– Some Type of Loan Guarantee Program May Also be Available in the future

Page 15: The Case for IGCC - Purdue University€¦ · ¾GE/Bechtel analysis indicating its feasibility ... 45% tax increment finance district was approved by the Knox County Council on April

15

Status of Proposed Project

Vectren participating with Duke Energy Indiana on preliminary studiesA Feasibility Study was completed in September 2005A CPCN filing at the IURC & environmental permits necessaryThe Front-End Engineering and Design (FEED) Study is to be completed around second quarter of 2007Decision whether to build by third quarter 2007

( Dates subject to change)

Page 16: The Case for IGCC - Purdue University€¦ · ¾GE/Bechtel analysis indicating its feasibility ... 45% tax increment finance district was approved by the Knox County Council on April

16

Tentative IGCC Timeline

2005 2006 2007 2008 2009 2010 2011

Jan 2005 Jan 2005 -- IGCC IGCC Feasibility Study Feasibility Study

Started (Completed Started (Completed Sept 2005)Sept 2005)

•• 1st Quarter 2007 1st Quarter 2007 -- Determine price Determine price -- review contract review contract approach approach -- make recommendations make recommendations

•• 2nd Quarter 2007 2nd Quarter 2007 -- Board Review and Approval Board Review and Approval •• 3rd Quarter 20073rd Quarter 2007-- Air and IURC Approvals secured Air and IURC Approvals secured •• 4th Quarter 2007 4th Quarter 2007 -- Construction MobilizationConstruction Mobilization

2nd Quarter 2011 2nd Quarter 2011 ––Commercial Commercial OperationOperation

•• March 2006 March 2006 -- Front end engineering study kickFront end engineering study kick--off off •• May 2006 May 2006 -- Hearing on front end engineering study cost & Hearing on front end engineering study cost &

settlement agreement. Order expected July/August 2006 settlement agreement. Order expected July/August 2006 •• June 2006 June 2006 -- File Integrated Resource Plan (IRP) in Indiana File Integrated Resource Plan (IRP) in Indiana •• July 2006 July 2006 -- File Air Permit Application File Air Permit Application •• Late Summer / Early Fall 2006 Late Summer / Early Fall 2006 –– File for Certificate of Public File for Certificate of Public

Convenience and Necessity (CPCN) in IndianaConvenience and Necessity (CPCN) in Indiana

Page 17: The Case for IGCC - Purdue University€¦ · ¾GE/Bechtel analysis indicating its feasibility ... 45% tax increment finance district was approved by the Knox County Council on April

17

Conclusions

Many factors make IGCC a desirable way to meet the need for new capacity

IGCC enhances our commitment to provide reliable, affordable electricity for customers in an environmentally responsible manner

If regulatory, engineering and economic factors come together, an IGCC plant at Edwardsport will benefit all stakeholders