The cases which have been processed by State Government but pending for Forest Clearances- as on 27.09.2016. State S. No. Name of the Applica nt Mineral Area (Hect.) Village and Dist. Date of Approval under 5(1) , if scheduled mineral Letter of Intent issued, if non- schedul ed minera l Date of applica tion of Stage I of FC, if applied Date of Grant of Stage-I of FC, if granted Date of applicati on of Stage II of FC, if applied Date of Grant of Stage-II of FC, if granted Presentl y case pending with Action required & Timeline agreed. Andhra Pradesh NIL Chhattisgarh Cases pending with MoEF 1 CMDC/ NMDC NCL Iron Ore 646-596 Deposit No. 4, Dantewada 30.11.11 - 16.4.15 (Revise d) - - - MoEF Meeting held on 24.08.2016. MoEF to expedite stage 1 order. MoEF may expedite decision by 16.10.2016 2 M/s Monet Ispat & Enargy Ltd. Raipur - Iron Ore 78-09 Hahaladdi, Kanker 06.10.04 - 28.12.04 - - - MoEF FAC held for Stage I, Moef to expedite grant order. MoEF may expedite decision by 16.10.2016. Cases Pending with State Forest/ Company Chhattisga rh 1 M/s Monet Ispat & Enargy Ltd. Raipur Limeston e 252-552 Posri and Guma, Balodabazar - 5.10.201 0 30.9.201 3 (Revise d area) Not submitt ed - - - Applican t Applicant to expedite the matter by 10.09.2016. 2 M/s Jindal Steel & Power Limeston e 121-690 Godadih, Bilaspur - 04.10.0 8 5.2.201 0 13.6.13 10.5.14 11.9.15 State Forest Deptt. for issuance of Final Order. Compliance submitted with FC on 27.8.2016. Mines Dept. to ask State Forest Dept. to expedite

Upload: others

Post on 11-Jul-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: The cases which have been processed by State Government but … · 2016-10-17 · 08.07.2011 -- MP approved & FC awaited. FRA clearance obtained. NPV to be deposited. To be expedited

The cases which have been processed by State Government but pending for Forest Clearances- as on

27.09.2016.

State S.

No.

Name

of the

Applica

nt

Mineral Area

(Hect.)

Village and

Dist.

Date of

Approval under

5(1) , if

scheduled

mineral

Letter

of

Intent

issued,

if non-

schedul

ed

minera

l

Date of

applica

tion of

Stage –

I of FC,

if

applied

Date of

Grant of

Stage-I

of FC, if

granted

Date of

applicati

on of

Stage –

II of FC,

if

applied

Date of

Grant of

Stage-II of

FC, if

granted

Presentl

y case

pending

with

Action required

& Timeline

agreed.

Andhra

Pradesh

NIL

Chhattisgarh Cases pending with MoEF

1 CMDC/

NMDC

NCL

Iron Ore 646-596

Deposit No. 4,

Dantewada

30.11.11

- 16.4.15

(Revise

d)

- - - MoEF Meeting held on

24.08.2016.

MoEF to

expedite stage 1

order. MoEF

may expedite

decision by

16.10.2016

2 M/s

Monet

Ispat &

Enargy

Ltd.

Raipur -

Iron Ore 78-09

Hahaladdi,

Kanker

06.10.04

-

28.12.04 - - - MoEF FAC held for

Stage I, Moef to

expedite grant

order. MoEF may

expedite decision

by 16.10.2016.

Cases Pending with State Forest/ Company

Chhattisga

rh

1 M/s

Monet

Ispat &

Enargy

Ltd.

Raipur

Limeston

e

252-552 Posri and Guma,

Balodabazar

- 5.10.201

0

30.9.201

3

(Revise

d area)

Not

submitt

ed

- - - Applican

t

Applicant to

expedite the

matter by

10.09.2016.

2 M/s

Jindal

Steel &

Power

Limeston

e

121-690

Godadih,

Bilaspur

- 04.10.0

8

5.2.201

0

13.6.13 10.5.14 11.9.15 State

Forest

Deptt.

for

issuance

of Final

Order.

Compliance

submitted with

FC on

27.8.2016.

Mines Dept. to

ask State Forest

Dept. to expedite

Page 2: The cases which have been processed by State Government but … · 2016-10-17 · 08.07.2011 -- MP approved & FC awaited. FRA clearance obtained. NPV to be deposited. To be expedited

the matter by

16.09.2016.

3 M/s SKS

Ispat &

power

Ltd.

Raipur

Lime Stone 299-751 Lohrabodh,

Bilaspur

- 13.10.0

8

21.05.2

011

(Registr

ation

No

2011/04

7)

Applicati

on

submitted

on

29.08.201

6

- - State

Forest

State Forest to

forward Stage I

application to

MoEF by

16.09.2016.

4 M/s

Navbhara

t Fuse

Company

Ltd.

Raipur

Iron Ore 220-00

Rasuli, Kanker 24.09.08

-

Registere

d on

2010

Documen

t

submitted

on June

2015

- - - Applicant Applicant finding

land for CA, may

expedite the

matter by

16.09.2016.

5 Shree

Bajarang

power

Ispat Ltd.

Raipur

Iron Ore 57-00

Chotedongar,

Bastar

13.04.11

-

4.4.15 - - - Applicant

& State

Forest

Panbchayat NOC

to be obtained.

State Forest to

expedite the

matter by

16.09.2016.

6 M/s Inds

Senergy

Ltd.

Iron Ore 313

Hahaladdi,

Kanker

08.05.08

-

25.9.08 26.10.12 - - Applicant

for NPV

& CA

deposit

Applicant had

difficulty in

arranging finance,

but assured to

expedite the

matter by

20.09.2016.

7

CMDC Bauxite 99-35 Pathrai, Sarguja 7.3.13 - 30.5.16 - - - State

Forest

Stage I

compliance

submitted. SG to

expedite the

matter by

16.09.2016.

8 CMDC/

NMDC

Iron Ore 413-745

Deposit No. 13,

Dantewada

13.02.07

-

- 12.11.14 12.2.15 - Applicant,

State

Forest &

MoEF

Land identified

for CA.

Compliance to

be sent to MoEF

this week.

MoEF may

expedite

decision by

16.09.

2016

9 M/s

Jaisawal

Neco Ltd.

Iron Ore 50-00

Metabodli,

Kanker

06.10.04

-

12.5.04 22.10.13 9.1.14 - Applicant,

MoEF &

State

Forest

Clarification

sought from

MoEF regarding

the amount of

Page 3: The cases which have been processed by State Government but … · 2016-10-17 · 08.07.2011 -- MP approved & FC awaited. FRA clearance obtained. NPV to be deposited. To be expedited

CA Land

required, which

is awaited. Letter

has been sent on

16.12.2014 By

PCCF

Chhattisgarh.

MoEF may

expedite

decision by

16.09.

2016. Applicant

submitting double

amount, but State

to expedite

compliance report

for Stage II

clearance to

MoEF.

Cases pending with Project Proponent.

1 M/s

Jaisawal

Neco Ltd.

Iron Ore 50-00

Metabodli,

Kanker

06.10.04

-

12.5.04 22.10.13 9.1.14 - Project

Proponent

Clarification

sought from

MoEF regarding

the amount of

CA Land

required, which

is awaited. Letter

has been sent on

16.12.2014 By

PCCF

Chhattisgarh.

MoEF may

expedite

decision by

16.09.

2016. Applicant

submitting

double amount,

but State to

expedite

compliance

report for Stage

II clearance to

MoEF.

2 M/s Arti

Sponge

Ltd.

Iron Ore 31-55

Alnar,

Dantewada

21.04.11

- 12.3.14 - - - Project

Proponent

Applicant to give

compliance to 15

point objections

by 16.09.2016.

Page 4: The cases which have been processed by State Government but … · 2016-10-17 · 08.07.2011 -- MP approved & FC awaited. FRA clearance obtained. NPV to be deposited. To be expedited

Goa NIL

Gujarat NIL

Jharkhand Cases pending with MoEF

Jharkhan

d

1 M/s

Electros

teel

Casting

Ltd.

Iron ore

(ML)

192.50

Ha.

Kodlibad

(West

Singhbhum)

01.06.2006 - It relates to MOEF, GOI Stage-II FC is

not submitted by

the applicant.

Saranda cases.

MoEF may

expedite

decision by

16.09.

2016

2 M/s

Rungta

Mines

Ltd.

Iron ore

(ML)

350.50

Ha.

Kodlibad

(West

Singhbhum)

18.04.2006 - Stage-II FC is

not submitted by

the applicant.

Saranda cases.

MoEF may

expedite

decision by

16.09.

2016

3 M/s

Arcelar

Mittal

India

Ltd.

Iron ore

(ML)

500.00

Ha.

Silpungi etc.

(West

Singhbhum)

05.06.2008 - It relates to MOEF, GOI Stage-I FC

isawaited.

Saranda case.

MoEF may

expedite

decision by

16.09.

2016

4 M/s

Rungta

Sons

Pvt.

Ltd.

Iron ore

(ML)

343.00

Acre

Bokna

(West

Singhbhum)

11.09.1990 - 15.12.2

003

Under

process.

Pending

with State

Govt

- - - Kept in abeyance

for Carrying

Capacity Study

Report. MoEF

may expedite

decision by

16.08.

2016

5

M/s

JSPL

Iron Ore 537 ha

Ghatkuri 6.9.2007 16.6.20

08

22.05 Kept in abeyance

due to Saranda

forest land.

MoEF may

expedite

Page 5: The cases which have been processed by State Government but … · 2016-10-17 · 08.07.2011 -- MP approved & FC awaited. FRA clearance obtained. NPV to be deposited. To be expedited

decision by

16.09.

2016

Jharkhand State is not sending comments report on ICFRIE. SG needs to expedite.

Cases Pending with State Forest/ Company

Jharkhand 1 M/s

Manmo

han

Mineral

Pvt.

Ltd.

Gold

(ML)

134.80

Acre

Lawa,Nimdih

etc.

(Sarai Kela)

22.02.2010 - State

Forest

Dept

Integrated

wildlife

Management

Plan to be

approved by

State Forest

DEpt. for

onward

processing of

Stage II FC.

2 M/s

Bhusha

n Power

& Steel

Ltd.

Iron ore

(ML)

422.75

Ha.

Ghatkuri

(R.F)

(West

Singhbhum)

14.09.2007 - State

Forest

Departm

ent

FC application

pending with

State Forest

Dept. for being

sent to MoEF

due to area

falling in

Saranda Forest

area.

Karnataka

Cases Pending with MoEFCC

1

M/s.

Bellary

Steel

and

Alloys

Ltd.

Iron Ore 99.15 Muraripura Approved

21/1 /1999

ADV1993 Sl.

No. 16, Received

08 applications

pursuant to the

notification.

After conducting

hearing GoK

considered the

area in favour of

this applicant.

GoI accorded

prior approval on

22.01.1999.

Govt. vide letter

19.03.1999

sought

clarification as to

whether the

proposed land

belongs to Forest

Page 6: The cases which have been processed by State Government but … · 2016-10-17 · 08.07.2011 -- MP approved & FC awaited. FRA clearance obtained. NPV to be deposited. To be expedited

or Revenue and

other

information/docu

ments. Further

no

correspondence.

15 years lapsed.

Govt. directed to

submit

individual

proposals in

respect of 5(1)

approved cases.

DGPS survey

conducted. Govt.

yet to issue in

principle

approval or

Section 5(1)

notification. As

per GOK, the

party has

submitted the

R&R Plan the

fix the

production

target to State

DMG for

further

necessary

action.

2

Shri N.

Sathyan

arayana

Iron Ore 15

Hect. Nandihalli

Approved

dt :9 /6 /2006

DGPS survey

conducted. Lease

deed is to be

executed after

obtaining delay

condonation

from the Govt.

and on

submission of

stage-II F.C. PL

to ML case. The

case is pending

with DC office

of Bellary

regarding the

constitution of

committe and

FC pending.

Page 7: The cases which have been processed by State Government but … · 2016-10-17 · 08.07.2011 -- MP approved & FC awaited. FRA clearance obtained. NPV to be deposited. To be expedited

3

Shri G.

Mallikar

juna

Babu

Iron Ore 17.4

Hect. Dharamapuri

Approved dt

:11/8 /2010

Govt. heard and

passed

proceedings on

09.06.2016.

Applicant has to

furnish

complaince. FC

is pending due

to non

submission of

DGPS survey

sketch to the

Forest Dept of

the State.

4

M/s.

Umiya

Holding

Pvt.

Ltd.

Iron Ore

,Mangan

ese Ore

6 Hect. NER Range Approved

dt :14/2 /2006

The matter is

pending with

GOK due to

overlapping

issue with M/s

MML & M/s

Mineral

Syndicate.

5

Sh. B.

Rudra

Gowda

Mangane

se

Ore,Iron

Ore

68.31

Hect. N.E.B. Range

Approved

dt :12/12/2007

All statutory

clearances

obtained except

FC. Stage II

pending.

Presently the

case is pending

before Hon'ble

Delhi High

Court due to

overlapping

issue.

6

M/s.

P.M.

Mines

&

Mineral

s Pvt.

Ltd.

Iron Ore 210

Hect. NEB Range

Approved

dt :22/7 /2008

All statutory

clearances

obtained except

FC. In the

meanwhile,

overlapping

found with the

area reserved in

f/o VISL after

CEC survey.

Grantee filed

revision petition

before GoI.

Presently the

case is pending

before Hon'ble

Page 8: The cases which have been processed by State Government but … · 2016-10-17 · 08.07.2011 -- MP approved & FC awaited. FRA clearance obtained. NPV to be deposited. To be expedited

Delhi High

Court.

7

M/s

Upendra

and

Compan

y

Iron ore

&

Mangane

se ore

121.41

Ha

Yarrekatte

Tumkur

Approved on 21-

04-2006

Grantee has

submitted all

clearances

except FC.

Pending with

lessee.

But the

considered area

is notified area

for Manganese

and this

applicant

company is a

sole applicant,

without

conducting

hearing

recommended

this application

for grant. FC is

pending due to

deemed forest

issue and party

has to provide

the

compensatory

land.

Cases Pending with State Forest/ Company

1

Shri

J.M.

Vrushab

endraiah

Iron Ore 8.81

Acre Ramgarh

Approved

dt :26/9 /2007

Grantee has

made a proposal

on 7.02.2014 for

FC which is

pending. EC &

FC is pending

with State

Forest as on

date.

2

M/s.

Asha

Mining

Co.

Iron Ore 25 Acre R.M. Block Approved

dt :24/7 /2006

Party has to

submit the

compensatory

land to the

Forest Dept. to

further

processing of

Page 9: The cases which have been processed by State Government but … · 2016-10-17 · 08.07.2011 -- MP approved & FC awaited. FRA clearance obtained. NPV to be deposited. To be expedited

FC. There is no

provision of

purchasing

agricultural

land in

Karnataka

State. Pending

with State

Forest.

4

Allum

Prashant

h

Mangane

se

19.50

Ha

Kanchihalli

Chitradurga

Dist

Approved on 24-

03-2011

Translation of

kannada letter

and other

related issue is

pending with

the Forest Dept.

of Chitradurga

as reported by

the applicant.

Pending with

State forest.

5

M/s.

Umiya

Holding

Pvt.

Ltd.

Iron Ore

,Mangan

ese Ore

6 Hect. NER Range Approved

dt :14/2 /2006

The matter is

pending with

GOK due to

overlapping

issue with M/s

MML & M/s

Mineral

Syndicate.

Pending with

State Forest. Sg

to decide in 15

days.

Madhya Pradesh

Cases pending with MoEF

Madhya

Pradesh

1 M/s Rio

Tinto

Explorat

ion India

Pvt Ltd.

Diamond

and

Kimberlit

e

971.5

95

(954

ML+1

7.595

Appro

ach

Road)

Bakswaha/

Chhatarpur

17.11.2011 -- 31.05.2

014

11.08.201

5

-- MoEF MP approved. In

principle EC

received.

Wildlife

Conservation

Plan approved.

Objections

raised by FAC.

Cases Pending with State Forest/ Company

1 Modern

Mineral

Industrie

s

Manganes

e

7.088 Khapadripar/

Chhindwara

21.04.2011 --

Pending for

submission of

AMP/FC.

Applied to

Forest

Page 10: The cases which have been processed by State Government but … · 2016-10-17 · 08.07.2011 -- MP approved & FC awaited. FRA clearance obtained. NPV to be deposited. To be expedited

Department for

FRA clearance

which is under

process. To be

expedited by

Sep, 2016.

2 Modern

Mineral

Industrie

s

Manganes

e

10 Madkasur/

Chhindwara

08.07.2011 -- MP approved &

FC awaited.

FRA clearance

obtained. NPV

to be deposited.

To be expedited

by Sep, 2016

3 M/s

Anik

Industrie

s Ltd.

Manganes

e

130 Mirgpur/

Balaghat

13.08.2009 MP approved.

Pending for

submission of

FC. To be

expedited by

Sep, 2016

4 Maa

Kali Iron

and steel

Co.

Iron Ore 11.56 Pahadi/ Katni 26.11.2008

FC required, the

CA land has

been rejected.

Pending for

court case, the

case yet to be

recommended

from the State

Forest dept.

5 AP

Trivedi

Manganes

e

4.20 Ramrama,

Balaghat

24.09.2012 MP approved.

Approval of

SPCB. FC

approval

awaited.

Approval of

Forest Awaited.

To be expedited

by Sep, 2016

6 Aparn

Ferro

Alloys.

Manganes

e

69.22 Mohaganvgh

at /Balaghat

16.11.1993 FRA clearance

obtained. MP

approved.

Revision of MP

required after

change in land

status. FC

applied.

7 M/s

Jivan

Lime

Chemica

l

Bauxite 4 Jariyari/

Satna

16.09.2013 MP approved,

FC Stage I

granted. Final

order FC-II

awaited. EC

Page 11: The cases which have been processed by State Government but … · 2016-10-17 · 08.07.2011 -- MP approved & FC awaited. FRA clearance obtained. NPV to be deposited. To be expedited

under process

DIEAA

Maharashtra Cases pending with MoEF

1 Smt.

Nila V.

Dempo

&Shrini

vas V.

Dempo

Iron Ore 263.82 Zolambe,

Dist.

Sindhudurg

01/08/2008 --- Not

granted

Forest

Departme

nt

ESZ , Pending

with MoEF. MoEF may

expedite decision

by 16.08. 2016

Cases pending with Other departments of MoEF.

1 M/s.

Puntam

bekar

Mineral

s

Bauxite 206.37 Talagaon

&Baveli,

Dist.

Kolhapur

30/06/2005 --- Not

granted

Forest

Departme

nt

Wild

Life

Departm

ent

EC has been

granted in april,

2016 subject to a

wild life issue to

be cleared by

NBWL. MoEF

may expedite

decision by

16.08.

2016

2 M/s.

Jaiswal

Neco

Ltd.

Mangane

se Ore

61.45 Ramdongari,

Dist. Nagpur

01/12/2006

--- Not

granted

Forest

Departme

nt

Pending with

MoEF for issue

of final

notification

about the

sanctuary

concerned as the

draft was already

issued in Mar,

2016.

Cases Pending with State Forest/ Company

1 M/s.

Gopani

Iron

&Power

(India)

Pvt.

Ltd.

Iron Ore 153.09 Surjagad

Wooria, Dist.

Gadchiroli

01/06/2006 --- Forest

Departme

nt

Gram

Panchaya

t

FC stage 1

applied and

pending for Wild

Life Clearance.

SG to expedite

the matter with

Gram Panchayat

to issue order.

2 M/s. Jai

Bamles

hvari

Iron Ore 4.30 Manegaon,

Dist. Gondia

16/11/2006

--- Not

granted

Forest

Departme

nt

Pending with

State Forest

Department. SG

to expedite the

matter by

16.08.2016.

Cases pending with Project Proponent.

1 M/s.

New

Limeston

e

293.12 Chedvi, Dist.

Chandrapur

----- 28/02/2

006

Due to land

ownership

Page 12: The cases which have been processed by State Government but … · 2016-10-17 · 08.07.2011 -- MP approved & FC awaited. FRA clearance obtained. NPV to be deposited. To be expedited

India

Mining

Corpora

tion

issues, FC filed

in Mar, 2016

online.

2 M/s.

Murli

Industri

es Ltd.

Limeston

e

695.72 Chedvi, Dist.

Chandrapur

----- 28/02/2

006

Due to land

ownership

issues, FC filed

in Mar, 2016

online.

Odisha

Cases pending with MoEF

1

M/s.

Orissa

Sponge

Iron

Ltd.

Iron 459.00

Garjantoli &

Kadamdihi

Dist-

Keonjhar

17.07.02 - 05.09.2

005

03.06.201

3 - - MoEF

The diversion

proposal has been

accorded stage-I (In

Principle) approval

for 173.02 hect.

Against originally

proposed 269.1698

hect. Further an

extent 34.00 hect.

Of non forest land

has been considered

as forest land by the

Ministry during

their site inspection

for which GOI,

MOEF has sought

for separate

diversion proposal

and then

modification of

Stage-I approval

order. The user

agency has filed the

D.P. for 34.00

hect. which is under

scrutinity at the

field level. MoEF

may expedite

decision by

16.08.2016

2 K.C.

Pradhan Iron 24.57

Nayagarh

Dist-

Keonjhar

05.12.03 - 06.06.11 MoEF

Stage -II approval

has been accorded

GOI, MOEF vide

F. No-

5/ORC059/2007

FCE dated-

06.06.2011 over

20.310 hect. (

Page 13: The cases which have been processed by State Government but … · 2016-10-17 · 08.07.2011 -- MP approved & FC awaited. FRA clearance obtained. NPV to be deposited. To be expedited

excluding safety

zone).NPV

amounting to Rs.

16084090/- paid

over total forest

land. Pending with

MoEF. MoEF to

expedite approval

for safety zone.

MoEF may

expedite decision

by 16.08.2016. MP

&EC approved.

The applicant

moved for

clearance over

entire forest area of

24.507 hects U/s

2(iii) of FC Act,

1980 which is

approved by

Regional Empower

Committee, Easter

Regional Office

MoEF, Govt. of

India.

3

M/s.

National

Enterpri

ses

Iron 15.074

Adaghat

Dist-

Sundergarh

04.10.2000 - 02.11.2

004

MoEF

& C.C,

GoI

Forest diversion

proposal for entire

forest land has been

sent to MOEF &

CC, ERO vide

letter

no.12469/F&E

dated-16.07.2015

of F&E Deptt.

Pending with

MoEF. MoEF may

expedite decision

by 16.08.2016

4

M/s.OC

L India

Ltd.

Iron &

Mangane

se

45.131

Kundaposi

Dist-

Keonjhar

29.09.2008 - 16.10.2

009

MoEF The proposal has

been submitted to

MOEF vide no.

7591 dated-

26.04.2014 of State

Govt. Pending with

MoEF subject to

NEERI. MoEF may

expedite decision

by 16.08.2016

Page 14: The cases which have been processed by State Government but … · 2016-10-17 · 08.07.2011 -- MP approved & FC awaited. FRA clearance obtained. NPV to be deposited. To be expedited

5

M/s.Pra

kash

Industri

es Ltd.

Iron &

Mangane

se

19.532 SirkaguttaDis

t-Keonjhar 17.06.09 -

03.11.2

010

Pending

with

MoEF,

GoI due

to want of

NEERI

report

- -

MoEF The diversion

proposal has been

submitted to GOI,

MOEF vide letter

No.12266/F&E

dated-05.07.2014.

Pending with

MoEF subject to

NEERI. MoEF may

expedite decision

by 16.10.2016

6 D.C.

Jain

Iron &

Mangane

se

257.78

Sidhamatha

R.F

Dist-

Keonjhar

04.03.83 -

MoEF The proposal has

been submitted to

MOEF vide no.

14850/F&E dated-

13.09.2010 of State

Govt. The State

Govt. F& E deptt

forwarded its

recommendation

for approval u/s

2(III) to MoEF &

F&C.C, GoI vide

letter

dated.16.06.2016.

Pending with

MoEF subject to

NEERI. Grant

order revoked by

SG and State has

gone to High Court.

Matter Subjudice

7 Dr. S.

Pradhan

Iron &

Mangane

se

94.256

Sidhamatha

R.F

Dist-

Keonjhar

04.03.83 - 2005 21.09.06 26.09.07

MoEF Stage-II approval

has been accorded

by GoI, MoEF vide

F.No. 8-100/2006-

FC dated

26.09.2007 over

85.55 hect. Balance

area applied for FC

by U/A u/s 2(III).

Pending with

MoEF subject to

NEERI. MoEF may

expedite decision

by

16.08.2016.Safety

Zone clearance

issue.Legal Heir

issue pointed out

Page 15: The cases which have been processed by State Government but … · 2016-10-17 · 08.07.2011 -- MP approved & FC awaited. FRA clearance obtained. NPV to be deposited. To be expedited

by FC is also

beinfg sorted by

the State Govt in

consultation with

the Legal dept.

8 Dr. S.

Pradhan

Iron &

Mangane

se

152.93

Kalaparbat

Dist-

Keonjhar

08.04.99 - 20.10.1

997 03.11.04 15.01.07

MoEF Stage-II approval

has been accorded

by GoI, MoEF vide

F. stage-II approval

F.No. 8-177/1997-

FC dated

15.01.2007 over

52.002 hect.

Balance area

applied for FC by

U/A u/s 2(III).

Pending with

MoEF. Safety Zone

issue. MoEF may

expedite decision

by 16.08.2016.

Safety Zone

clearance

issue.Legal Heir

issue pointed out by

FC is also beinfg

sorted by the State

Govt in

consultation with

the Legal dept.

9

Rudrase

n

Sindhu

Mangane

se 65.71

Bhanjapali,

Koira,Dist-

Sundergarh

14.12.1999 - 20.01.14

MoEF Stage-II approval

accorded by GoI ,

MoEF vide letter

no. 8-6/2004-FC

dated-20.01.2014

(excluding safety

zone). Full amount

of NPV for Rs.

3,36,53,200/-has

been realised.

Safety Zone issue.

MoEF may

expedite decision

by 16.08.2016.

Safety Zone issue.

Matter pending

with MoEF since

June 16

Page 16: The cases which have been processed by State Government but … · 2016-10-17 · 08.07.2011 -- MP approved & FC awaited. FRA clearance obtained. NPV to be deposited. To be expedited

10

M/s.

Nilachal

a Ispat

Nigam

Ltd.

Iron 874.29

Kadalia,

Mithrida etc.

Dist-

Sundergarh

20.05.99 -

MoEF The Proposal for

diversion of

806.153 hect of

forest land

(including 16.601

hect for safety

Zone) with in

874.290 hect of the

mining lease

granted area for

Iron Ore mining in

sundargarh and

Keonjhar District of

Odisha has been

forwarded to the

MoEF &CC, Govt.

of India vide letter

No. 17199/F&E dt.

19.08.2013 of F&E

Department, Govt.

of Odisha. NPV

not demanded.

Pending with

MoEF subject to

NEERI. MoEF may

expedite decision

by 16.08.2016

11 M.

Aikath Chromite 56.656

Ostapal

Jajpur

NA

However, grant

order issued on

29.06.1991

Granted

GP No.

7829/S

M

dt.29.06

.1991

MoEF MP & EC

approved. FC

pointed out issues

of legal heir which

has been answered

on 31.8.2016. FC

obtained over

14.836 hects. out of

total forest area

39.179 hects.,

Application U/s

2(iii) of FC Act,

1980 pending with

State Govt. NPV

not paid over the

Forest area which

was to be paind

within 60 days. But

now the NPV has

been deposited on

7.9.2016 and sent

to MoEF for

expediting FC.

Page 17: The cases which have been processed by State Government but … · 2016-10-17 · 08.07.2011 -- MP approved & FC awaited. FRA clearance obtained. NPV to be deposited. To be expedited

12

M/s.Shr

ee

Metalik

s Ltd.

Iron &

Mangane

se

35.774

Khandabandh

& Baitarni

R.F.

Keonjhar

13.04.2007 -

MoEF Stage-I (in principle

) approval accorded

by GOI, MOEF,

vide F.No.5-

ORC097/2010-

BHU dated-

11.03.2011. The

stage-I compliance

received from

RCCF, Rourkela

Circle is fowarded

by PCCF, Odisha to

Govt, F&E

department on

17.05.2016. The

matter pending

with RO, of MoEF

from 11.08.2016

for considering the

compliance of

Staege I and grant

of Stage II

clearance

Page 18: The cases which have been processed by State Government but … · 2016-10-17 · 08.07.2011 -- MP approved & FC awaited. FRA clearance obtained. NPV to be deposited. To be expedited

13

M/s.

SMC

Power

&

Generati

on Ltd.

Iron 246.04

Khandabandh

a & Baitarani

RF, Keonjhar

07.04.2010 -

MoEF

Govt. have

accepted the

reduced area over

176.816 hects. The

applicant submitted

Mining plan for

revised area and

applied for EC

online on

02.08.2016. Forest

clearance for

approval U/s 2(iii)

FC Act, 1980

initiated by the

applicant which is

pending with

MoEF, Govt. of

India. Online

submission of FC

on 6.9.2016 and

asked for CA land

DGPS survey to be

completed by the

applicant within 15

days.SG to

facilitate with the

help of concerned

departments -

Forect, Revenue &

mining

Cases Pending with State Forest /Company

1 Miter

Sen

Mangane

se 21.356

Katasahi

Keonjhar

NA

However LoI

issued on

08.01.2004

State

Forest

MP appvd on

25.9.2005. PH

conducted on

26.12.3012, and EC

pending for FC. FC

applied in 2008, but

FRA pending with

DFO. The State

Forest may be

asked to expedite

by Sep, 2016

Page 19: The cases which have been processed by State Government but … · 2016-10-17 · 08.07.2011 -- MP approved & FC awaited. FRA clearance obtained. NPV to be deposited. To be expedited

2

Sri

Jagdish

Mishra

Mangane

se 19.6

Sarkunda,

Sundergarh

NA

However LoI

issued on

07.09.93

-

State

Forest

Mining Plan

approved

25.9.1994.No

precondition of EC.

Forest Clearance

applied on

04.06.2016,

pending with State

Govt.

3

M/s.

Pradhan

Associat

es

Iron &

Mangane

se

484.75

Rengalbeda

& Segasahi

Keonjhar

NA

However, LoI

issued on

13.11.1991

-

State

Forest

Diversion proposal

received from user

agency during

28.03.2016 has

been forwarded to

DFO, Bonai for

compilation of part-

II.

As reported by

DFO, Bonai

division, DDM,

Koira, Tahsildar,

Koira & RO, Koira

have been

requested to submit

authenticated land

schedule of applied

ML area vide his

memo no. 2252

dated-16.03.2016.

which is awaited.

MP approved. EC

applied online on

12.08.2015, but

TOR not given in

want of NEERI

report. FC initiated

but pending with

the DFO for

inspection from

March, 2016. The

inspection date has

been fixed on

17.9.2016.FC not

obtained but

applied U/s 2(iii) of

FC Act, 1980 on

12.02.2016.

Page 20: The cases which have been processed by State Government but … · 2016-10-17 · 08.07.2011 -- MP approved & FC awaited. FRA clearance obtained. NPV to be deposited. To be expedited

4

M/s.

OMC

Ltd.

Iron &

Mangane

se

416.835

Kundrupani

&

Chormalda,

Keonjhar

06.11.2007 -

State

Forest

Survey plan to be

finalised after

completion of

DGPS plan by

ORSAC and

Mining plan to be

filed by 15 Oct,16.

The FC under 2(iii)

is to applied by end

of Sep, 2016

5

M/s.

Pradhan

Industri

es

Graphite 58.704 Bainibasa,

Koraput -

LoI

issued

vide

letter

No.

6325/S

M dt.

20.06.0

5

State

Forest

Survey &

Demarcation of the

area is not

completed so far.

Due to district

change and Hal

settlement maps not

available with the

revenue

department. DGPS

to be completed by

Sep, 2016 by the

applicant. MP, EC

& FC not applied,

to be expedited by

the applicant.

6

M/s.

Pradhan

Associat

es

Mangane

se 39.678

Sirilijor,Kora

pt

NA

However, LoI

issued on

18.11.04

-

State

Forest

Survey &

Demarcation of the

area is not

completed so far.

Due to district

change and Hal

settlement maps not

available with the

revenue

department. DGPS

to be completed by

Sep, 2016 by the

applicant. MP, EC

& FC not applied,

to be expedited by

the applicant.

7

M/s.

OMC

Ltd.

Bauxite 428.31 Kodingmali

P.F, Koraput 11.01.1999 -

State

Forest

MP & EC

approved. FC not

obtained. The

applicant has

moved application

for approval of FC

U/s 2(iii) of FC

Act, 1980, pending

Page 21: The cases which have been processed by State Government but … · 2016-10-17 · 08.07.2011 -- MP approved & FC awaited. FRA clearance obtained. NPV to be deposited. To be expedited

with MoEF Govt.

of India. As FC

applied in 2000 but

still not got Stage I.

The DGPS survey

issue to be sorted

out by DDM

Koraput to enable

application of

Mining Plan by 31t

Oct, 2016

Rajasthan

Cases pending with MoEF

Nil

Cases Pending with State Forest

1 M/s.

Ojaswi

Marbles

&

Granite

Pvt.

Ltd.

Iron ore 180 Deepas/Sikar 17-12-13 05-12-

14

Applied

in year

2014

No No No State

Govt.

State FAC has

cleared the

proposal on

16.03.2016,

pending with

MoEF for onward

processing.

MoEF may

expedite decision

by 16.08.

2016. Reply from

State forest not

received.

2 M/s.

Steel

Authorit

y of

India

Iron ore 871.386

1

Dhulkhera/B

hilwara

02-09-13 01-07-

15

16-06-

16

No No No State

Govt.

State Forest

department is in

the process of

forwarding the

application to

MoEF for onward

processing.

MoEF may

expedite decision

by 16.08.

2016. Not

Traceable.

Tamil

Nadu

NIL

Telangan

a

NIL