Four Crane-Tec Under Running Single Girder Cranes
12 ton Professionally Engineered Runway System
For Immediate Results Call 800-755-6378
CRANE-TEC.COM
THE CHALLENGE:To provide our customer, a leading forklift manufacturer, with a complete under running 12 ton crane system. The job incorporated the 12 ton runway system and four under running cranes.
SPECIAL CONSIDERATIONS:The customer needed design build capabilities for the crane and runway system. Crane-Tec provided complete design of the under hung runway system and incorporated it into the customers metal building.
OUR TEAM APPROACH:Our engineers, armed with building drawings, determined runway steel and hanger design. Engineered drawings with loads were submitted for approval. Crane-Tec’s experienced field crew installed the complete system and cranes in under 4 days, allowing the customer to use the equipment in the installation of new machinery.