the conveyor system company. - aftes :: association ... belt conveyor for tunnelling. tunnel...

30
The Conveyor System Company. H+E Logistik GmbH, Bochum - Germany

Upload: vuongnhi

Post on 01-May-2018

216 views

Category:

Documents


0 download

TRANSCRIPT

  • The Conveyor System Company. H+E Logistik GmbH, Bochum - Germany

  • 15-12-01

    Introduction.

    Founded: November 1999 Location: D - 44805 Bochum / Germany Employees: 160 Main Share Holder: Herrenknecht AG

    Seite 2 H+E Logistik GmbH, Josef-Baumann-Str. 18, 44805 Bochum, Fon +49 234 950 23 60, Fax +49 234 950 23 89

  • 15-12-01

    Belt Conveyor for Tunnelling.

    Seite 3 H+E Logistik GmbH, Josef-Baumann-Str. 18, 44805 Bochum, Fon +49 234 950 23 60, Fax +49 234 950 23 89

  • 15-12-01

    Belt Conveyor for Tunnelling.

    Seite 4 H+E Logistik GmbH, Josef-Baumann-Str. 18, 44805 Bochum, Fon +49 234 950 23 60, Fax +49 234 950 23 89

    Projects demands - Long and short tunnel length - Tunnel diameter range between 5m17+m - Small and huge capacity e.g. 3.000 t/h - Tunnel radius < 200 m - different material conditions - complex surface/shaft arrangements

    - Special set-ups, we follow your demands

  • 15-12-01

    Belt Conveyor for Tunnelling.

    Seite 5 H+E Logistik GmbH, Josef-Baumann-Str. 18, 44805 Bochum, Fon +49 234 950 23 60, Fax +49 234 950 23 89

    Items of Tunnel Belt Conveyor: - Belt Drive Station - Booster Drive Stations - Horizontal or Vertical Belt Storage Units - Assembly Station for extending the Belt Supporting Structure on TBM back-up

  • 15-12-01

    Belt Conveyor for Tunnelling.

    Seite 6 H+E Logistik GmbH, Josef-Baumann-Str. 18, 44805 Bochum, Fon +49 234 950 23 60, Fax +49 234 950 23 89

    Tunnel belt conveyor from the TBM to the shaft

  • 15-12-01

    Belt Conveyor for Tunnelling. Supporting Structure.

    Seite 7 H+E Logistik GmbH, Josef-Baumann-Str. 18, 44805 Bochum, Fon +49 234 950 23 60, Fax +49 234 950 23 89

    supporting structure in variable length according to segment width Modular design allows easy transport and assembly

    Stringers in U-profile

    Idler brackets 3 trough for carrying starnd 2 trough for return strand

    Idlers Special developed low friction idlers to reduce frinction in bearings and sealings to reduce drive power & increasing livetime

    Diagonal to give more stability to be installed approx every 10th section of supporting structure

    Long hole to adjust bracket in curve sections

    3 positions for idler in brackets to track the belt

  • 15-12-01

    Belt Conveyor for Tunnelling. Tunnel Alignment & Drive Arrangement.

    Seite 8 H+E Logistik GmbH, Josef-Baumann-Str. 18, 44805 Bochum, Fon +49 234 950 23 60, Fax +49 234 950 23 89

    Curve section in Toullouese, 2003

    Winding horizontal alignment, H+E Reference is Toulouse with Radii > 200m Booster drives allow belt tracking through curves

    Booster Drive

    Booster Drive Portal -Booster drive to allow inclination -Drive unit at discharge -Vertical cassette

    Curve R = 200m; R = 656 ft L = 447m; L = 1466 ft

  • 15-12-01

    Belt Conveyor for Tunnelling.

    Seite 9 H+E Logistik GmbH, Josef-Baumann-Str. 18, 44805 Bochum, Fon +49 234 950 23 60, Fax +49 234 950 23 89

    Serves to transfer additional power to reduce the belt tension at certain places e.g. in front of horizontal curves Allows a lower Conveyor Belt Strength (cost saving)

  • 15-12-01

    Metro Toronto

    Projects - Shaft Installation.

    Seite 10 H+E Logistik GmbH, Josef-Baumann-Str. 18, 44805 Bochum, Fon +49 234 950 23 60, Fax +49 234 950 23 89

    Complex shaft installation for twin tube TBM drive Vertical muck transport with belt Longitudinal muck pit arrangement with tripper car

  • 15-12-01

    Equipment: Belt Storages.

    Seite 11 H+E Logistik GmbH, Josef-Baumann-Str. 18, 44805 Bochum, Fon +49 234 950 23 60, Fax +49 234 950 23 89

    Vertical Belt Storage up to 500 m Horizontal Belt Storage up to 600 m Horizontal Double Stack Storages

  • 15-12-01

    Equipment: Vertical Conveyor.

    Seite 12 H+E Logistik GmbH, Josef-Baumann-Str. 18, 44805 Bochum, Fon +49 234 950 23 60, Fax +49 234 950 23 89

    Vertical muck transportation for different lifting heights Application of Vertical Conveyor hard/soft rock as well as for sticky material possible

  • 15-12-01

    Equipment: Stacker Solutions.

    Seite 13 H+E Logistik GmbH, Josef-Baumann-Str. 18, 44805 Bochum, Fon +49 234 950 23 60, Fax +49 234 950 23 89

    Tripper car installation for longitudinal muck pit arrangement cross conveyor to assure the offset discharge

  • 15-12-01

    Equipment: Stacker Solutions.

    Seite 14 H+E Logistik GmbH, Josef-Baumann-Str. 18, 44805 Bochum, Fon +49 234 950 23 60, Fax +49 234 950 23 89

    Tripper Car with telescopic chute

  • 15-12-01

    Equipment: Stacker Solutions.

    Seite 15 H+E Logistik GmbH, Josef-Baumann-Str. 18, 44805 Bochum, Fon +49 234 950 23 60, Fax +49 234 950 23 89

    Different Stacker solutions for different demands

    discharge at end of tunnel belt conveyor

    fixed Stacker without and with telescopic chute to reduce dust emission

  • 15-12-01

    Equipment: Stacker Solutions.

    Seite 16 H+E Logistik GmbH, Josef-Baumann-Str. 18, 44805 Bochum, Fon +49 234 950 23 60, Fax +49 234 950 23 89

    Movable Stacker

    Rotating Stacker

  • 15-12-01

    Projects: Hong Kong Conveyor Installation.

    Seite 17 H+E Logistik GmbH, Josef-Baumann-Str. 18, 44805 Bochum, Fon +49 234 950 23 60, Fax +49 234 950 23 89

    Drill and blast driven tunnel in Hong Kong Conveyor installation underground and on surface

  • 15-12-01

    Vertical Conveyor in Hong Kong.

    Seite 18 H+E Logistik GmbH, Josef-Baumann-Str. 18, 44805 Bochum, Fon +49 234 950 23 60, Fax +49 234 950 23 89

    Drive station and return station Shaft including all installation completely enclosed

  • 15-12-01

    Overland Conveyor Installation in Hong Kong.

    Seite 19 H+E Logistik GmbH, Josef-Baumann-Str. 18, 44805 Bochum, Fon +49 234 950 23 60, Fax +49 234 950 23 89

    Overland conveyor arrangement Road crossing with a span of 40m

  • 15-12-01

    Overland Conveyor Installation in Hong Kong.

    Seite 20 H+E Logistik GmbH, Josef-Baumann-Str. 18, 44805 Bochum, Fon +49 234 950 23 60, Fax +49 234 950 23 89

    Muck transportation in inner city Hong Kong Encapsulated overland conveyor at the water front

  • 15-12-01

    Projects: Overland Conveyor in Seattle.

    Seite 21 H+E Logistik GmbH, Josef-Baumann-Str. 18, 44805 Bochum, Fon +49 234 950 23 60, Fax +49 234 950 23 89

    Overland conveyor from the shaft to the water front Different span of bridges between 15m and 45m

  • 15-12-01

    Projects: Road Tunnel Brisbane, Australia.

    Seite 22 H+E Logistik GmbH, Josef-Baumann-Str. 18, 44805 Bochum, Fon +49 234 950 23 60, Fax +49 234 950 23 89

    Contractor: Leighton Contractors & Baulderstone Hornibrook Bilfinger Berger JV

  • 15-12-01

    Projects: Heating Tunnel, Copenhagen, Denmark.

    Seite 23 H+E Logistik GmbH, Josef-Baumann-Str. 18, 44805 Bochum, Fon +49 234 950 23 60, Fax +49 234 950 23 89

    Contractor: KFT-JV Kbenhaven Fjernvarme Tunnel

  • 15-12-01

    Projects:

    Seite 24 H+E Logistik GmbH, Josef-Baumann-Str. 18, 44805 Bochum, Fon +49 234 950 23 60, Fax +49 234 950 23 89

    Quarry Distribution Conveyor, Germany. Contractor: JV Katzenbergtunnel.

  • 15-12-01

    Conveyor Structure Also for Overland Arrangement.

    Seite 25 H+E Logistik GmbH, Josef-Baumann-Str. 18, 44805 Bochum, Fon +49 234 950 23 60, Fax +49 234 950 23 89

    Structure with bridge and column easy and quick installation with span about 6 - 12m

  • Equipment: Concrete Transport System Project 60539 Calle de Serrano (Atocha/Chamartin); Madrid, Spain

    15-12-01 Seite 26 H+E Logistik GmbH, Josef-Baumann-Str. 18, 44805 Bochum, Fon +49 234 950 23 60, Fax +49 234 950 23 89

    Shaft arrangement with tunnel belt and concrete transfer

  • Equipment: Concrete Transport System Project 60539 Calle de Serrano (Atocha/Chamartin); Madrid, Spain

    15-12-01 Seite 27 H+E Logistik GmbH, Josef-Baumann-Str. 18, 44805 Bochum, Fon +49 234 950 23 60, Fax +49 234 950 23 89

    Transportation of concrete into the tunnel via bottom strand Concreting the tunnel invert without using trucks Faster than using trucks for concrete transport (500 t/h)

  • 15-12-01

    Belt Conveyor Control System.

    Seite 28 H+E Logistik GmbH, Josef-Baumann-Str. 18, 44805 Bochum, Fon +49 234 950 23 60, Fax +49 234 950 23 89

    General communication overview Communication via Profibus Emergency Stop every 250m or pull rope switch every 100m

  • 15-12-01

    Advantages of Belt Conveyor for Tunneling.

    Seite 29 H+E Logistik GmbH, Josef-Baumann-Str. 18, 44805 Bochum, Fon +49 234 950 23 60, Fax +49 234 950 23 89

    Increasing availability and boring time of TBM Vertical Conveyor simplifies muck transportation to surface Enclosed overland structure to avoid noise and dust pollution/trucks Stackers discharge muck in disposal area Space-saving because of availability of vertical cassette Separation of ways of logistic Less ventilation required as less use of diesel loko/truck Safer operation, as less traffic in tunnel, and less noise Less personnel required

    Advantages of conveyor belts to be mention as following

  • 15-12-01

    The End.

    Seite 30 H+E Logistik GmbH, Josef-Baumann-Str. 18, 44805 Bochum, Fon +49 234 950 23 60, Fax +49 234 950 23 89

    Thanks for Your Attention!

    www.helogistik.de

    Foliennummer 1Foliennummer 2Foliennummer 3Foliennummer 4Foliennummer 5Foliennummer 6Foliennummer 7Foliennummer 8Foliennummer 9Foliennummer 10Foliennummer 11Foliennummer 12Foliennummer 13Foliennummer 14Foliennummer 15Foliennummer 16Foliennummer 17Foliennummer 18Foliennummer 19Foliennummer 20Foliennummer 21Foliennummer 22Foliennummer 23Foliennummer 24Foliennummer 25Foliennummer 26Foliennummer 27Foliennummer 28Foliennummer 29Foliennummer 30