The Environmental Code and Integrated Permitting (the IPPC way). Bo Jansson Swedish Environmental Protection Agency [email protected]. The Swedish Legislation. Background The legislation - General The general rules of consideration Environmentally hazardous activities - PowerPoint PPT PresentationTRANSCRIPT
![Page 1: The Environmental Code and Integrated Permitting (the IPPC way)](https://reader036.vdocument.in/reader036/viewer/2022062517/5681321c550346895d987de1/html5/thumbnails/1.jpg)
The Environmental Code and Integrated Permitting
(the IPPC way)Bo Jansson
Swedish Environmental Protection Agency
![Page 2: The Environmental Code and Integrated Permitting (the IPPC way)](https://reader036.vdocument.in/reader036/viewer/2022062517/5681321c550346895d987de1/html5/thumbnails/2.jpg)
The Swedish Legislation
• Background• The legislation - General• The general rules of consideration• Environmentally hazardous activities • Permit and notification requirements• Some results achieved
![Page 3: The Environmental Code and Integrated Permitting (the IPPC way)](https://reader036.vdocument.in/reader036/viewer/2022062517/5681321c550346895d987de1/html5/thumbnails/3.jpg)
Back ground
• Swedish EPA –First Environmental Protection Agency in the world (1967)
• The environmental protection act (1969) – Individual integrated permit in order to prevent pollution
• Sweden members of EU (1995)
• IPPC directive (1996)
![Page 4: The Environmental Code and Integrated Permitting (the IPPC way)](https://reader036.vdocument.in/reader036/viewer/2022062517/5681321c550346895d987de1/html5/thumbnails/4.jpg)
Administration – an overview
200
130+500
700
1500
60
Ministry of Environment
National Chemical Inspectorate - Swedish Environmental Protection Agency
County Administrative Boards (21)
Municipalities (289)Local Environment and public Healths Committies
Environmental courts
![Page 5: The Environmental Code and Integrated Permitting (the IPPC way)](https://reader036.vdocument.in/reader036/viewer/2022062517/5681321c550346895d987de1/html5/thumbnails/5.jpg)
The Swedish Environmental Code1999
• Replaced 15 Previous environmental acts
• A frame work legislation (thousands of provisions)• Natural resources• Nature conservation• Protection of plant and animal species• Environmentally hazardous activities• Health protection• Water operation• Chemical products/Waste
![Page 6: The Environmental Code and Integrated Permitting (the IPPC way)](https://reader036.vdocument.in/reader036/viewer/2022062517/5681321c550346895d987de1/html5/thumbnails/6.jpg)
The objective of the Code
• Promote sustainable development
• We and future generations must have a healthy and sound environment to live in
• Nature is worth protecting for its own sake
![Page 7: The Environmental Code and Integrated Permitting (the IPPC way)](https://reader036.vdocument.in/reader036/viewer/2022062517/5681321c550346895d987de1/html5/thumbnails/7.jpg)
16 (15) Environmental Quality Objectives
• Reduced Climate Impact• Clean Air• Natural Acidification Only• Non-toxic Environment• Protective Ozone Layer • Safe Radiation Environment• Zero Eutrophication• Flourishing Lakes and
Streams • Good-Quality Ground Water• A Balanced Marine
Environment
• Thriving Wetlands• Sustainable Forests• Varied Agricultural
Landscape• Magnificent Mountain
Landscape• Good Built Environment• A rich Diversity of Plant and
Animal Life
![Page 8: The Environmental Code and Integrated Permitting (the IPPC way)](https://reader036.vdocument.in/reader036/viewer/2022062517/5681321c550346895d987de1/html5/thumbnails/8.jpg)
Are we getting there??(within one generation)
• Annually progress reports
• Environmental Objectives Council
• Current conditions are enough
• Can be achieved but further measures are needed
• Very difficult to achieve
![Page 9: The Environmental Code and Integrated Permitting (the IPPC way)](https://reader036.vdocument.in/reader036/viewer/2022062517/5681321c550346895d987de1/html5/thumbnails/9.jpg)
Objectives and interim targets (2005)
• 16 Quality Objectives
• 72 Interim Targets – 23
– 34
– 14
![Page 10: The Environmental Code and Integrated Permitting (the IPPC way)](https://reader036.vdocument.in/reader036/viewer/2022062517/5681321c550346895d987de1/html5/thumbnails/10.jpg)
2 Clean airAir must be clean enough not to
present a risk to human health or to animals, plants and cultural assets
(2005)
![Page 11: The Environmental Code and Integrated Permitting (the IPPC way)](https://reader036.vdocument.in/reader036/viewer/2022062517/5681321c550346895d987de1/html5/thumbnails/11.jpg)
Interim targets• SO2, 5 g/m3, annual mean, (2005)
• NOx, 20 g/m3, annual mean (2010) 100 g/m3, hourly mean (2010)
• Ozon, 120 g/m3, 8-hour mean (2010)
• VOC, Sweden´s emission reducedto 240,000 tonnes per year
![Page 12: The Environmental Code and Integrated Permitting (the IPPC way)](https://reader036.vdocument.in/reader036/viewer/2022062517/5681321c550346895d987de1/html5/thumbnails/12.jpg)
Need for more interim targets
• Particles
• Benzene
• ?
• ?
![Page 13: The Environmental Code and Integrated Permitting (the IPPC way)](https://reader036.vdocument.in/reader036/viewer/2022062517/5681321c550346895d987de1/html5/thumbnails/13.jpg)
New interim targets (2006)
• Particles• A level of PM10 of 35 g/m3 as a daily
mean (2010)• A level of PM 2,5 of 20 g/m3 as a daily
mean (2010)• Benzo(A)pyrene• A level of 0,3 ng/m3 as an an annual mean
(2015)
![Page 14: The Environmental Code and Integrated Permitting (the IPPC way)](https://reader036.vdocument.in/reader036/viewer/2022062517/5681321c550346895d987de1/html5/thumbnails/14.jpg)
![Page 15: The Environmental Code and Integrated Permitting (the IPPC way)](https://reader036.vdocument.in/reader036/viewer/2022062517/5681321c550346895d987de1/html5/thumbnails/15.jpg)
![Page 16: The Environmental Code and Integrated Permitting (the IPPC way)](https://reader036.vdocument.in/reader036/viewer/2022062517/5681321c550346895d987de1/html5/thumbnails/16.jpg)
![Page 17: The Environmental Code and Integrated Permitting (the IPPC way)](https://reader036.vdocument.in/reader036/viewer/2022062517/5681321c550346895d987de1/html5/thumbnails/17.jpg)
![Page 18: The Environmental Code and Integrated Permitting (the IPPC way)](https://reader036.vdocument.in/reader036/viewer/2022062517/5681321c550346895d987de1/html5/thumbnails/18.jpg)
![Page 19: The Environmental Code and Integrated Permitting (the IPPC way)](https://reader036.vdocument.in/reader036/viewer/2022062517/5681321c550346895d987de1/html5/thumbnails/19.jpg)
![Page 20: The Environmental Code and Integrated Permitting (the IPPC way)](https://reader036.vdocument.in/reader036/viewer/2022062517/5681321c550346895d987de1/html5/thumbnails/20.jpg)
![Page 21: The Environmental Code and Integrated Permitting (the IPPC way)](https://reader036.vdocument.in/reader036/viewer/2022062517/5681321c550346895d987de1/html5/thumbnails/21.jpg)
The General rules of considerations
• Burden of proof• Knowledge requirement• Precautionary Principle, PPP and the best
possible technology principle (BPT)• Appropriate location principle• Resource management and ecocycles
principle• Product choice principle
![Page 22: The Environmental Code and Integrated Permitting (the IPPC way)](https://reader036.vdocument.in/reader036/viewer/2022062517/5681321c550346895d987de1/html5/thumbnails/22.jpg)
Burden of proofKnowledge requirements
• Operator is liable to prove that the rules of the code is complied with
• Operator must have knowledge about Environmental effects and anything that needs to be known in order to protect environment
![Page 23: The Environmental Code and Integrated Permitting (the IPPC way)](https://reader036.vdocument.in/reader036/viewer/2022062517/5681321c550346895d987de1/html5/thumbnails/23.jpg)
Precautionary principle and best possible technique principle
• The mere risk of damage involves an obligation to take the necessary measures to combat or prevent adverse health and environmental effects, i.e technical measures, choosing suitable raw materials, using of treatment equipment, handling chemicals etc.
• Best possible technique (~BAT) must be used
![Page 24: The Environmental Code and Integrated Permitting (the IPPC way)](https://reader036.vdocument.in/reader036/viewer/2022062517/5681321c550346895d987de1/html5/thumbnails/24.jpg)
The Polluter Pays Principle
• Always the operator who causes or might cause environmental impact must pay for the preventive measures that must be taken to comply with the general rules of consideration
![Page 25: The Environmental Code and Integrated Permitting (the IPPC way)](https://reader036.vdocument.in/reader036/viewer/2022062517/5681321c550346895d987de1/html5/thumbnails/25.jpg)
Localisation principleResource managements principle• The choice of localisation must made in
such a way that intrusion and nuisance to human health and environment is minimized
• Operator must conserve raw material and energy. Renewable sources of energy is preferred
![Page 26: The Environmental Code and Integrated Permitting (the IPPC way)](https://reader036.vdocument.in/reader036/viewer/2022062517/5681321c550346895d987de1/html5/thumbnails/26.jpg)
Product Choice Principle
• Hazardous chemical products should be avoided if other less dangerous products can be used instead
![Page 27: The Environmental Code and Integrated Permitting (the IPPC way)](https://reader036.vdocument.in/reader036/viewer/2022062517/5681321c550346895d987de1/html5/thumbnails/27.jpg)
Permit system
• Structure and operations for which permits must be obtained are covered by a separate Ordinance – Environmentally Hazardous Activities, EHA
• Large EHA; A-activities; 500• Medium Size EHA;B-activities; 5500• Small Size EHA; C-activities15000 IPPC installations in Sweden ~1000
![Page 28: The Environmental Code and Integrated Permitting (the IPPC way)](https://reader036.vdocument.in/reader036/viewer/2022062517/5681321c550346895d987de1/html5/thumbnails/28.jpg)
Permitting organisation
• Permit applications are considered by 5 environmental courts (A-Activities)
• or county administrative boards (B-Activities)
• Notifications to the local environmental and public health committee (C-Activities)
![Page 29: The Environmental Code and Integrated Permitting (the IPPC way)](https://reader036.vdocument.in/reader036/viewer/2022062517/5681321c550346895d987de1/html5/thumbnails/29.jpg)
A-activities
• Iron and Steel Plants (25)
• Oil Refineries (5)
• Pulp and Paper Plants (65)
• Large Combustion Plants (200 MW) (~30)
![Page 30: The Environmental Code and Integrated Permitting (the IPPC way)](https://reader036.vdocument.in/reader036/viewer/2022062517/5681321c550346895d987de1/html5/thumbnails/30.jpg)
B- and C-activities
• Large food Industry B• Combustion Plants (20-200 MW) (~130)• Textile Industry
• Combustion Plants (< 20 MW) (hundreds) C • Petrol Stations (2500)• Dry Cleaners
![Page 31: The Environmental Code and Integrated Permitting (the IPPC way)](https://reader036.vdocument.in/reader036/viewer/2022062517/5681321c550346895d987de1/html5/thumbnails/31.jpg)
Permit organisation – A level
Environmental Court5+1
Swedish Environmental Protection Agency
County AdministrativeBoard
Municipality
![Page 32: The Environmental Code and Integrated Permitting (the IPPC way)](https://reader036.vdocument.in/reader036/viewer/2022062517/5681321c550346895d987de1/html5/thumbnails/32.jpg)
The Environmental Courts4 members
• Legally Qualified Judge
• Environmental Adviser
• Expert member (industrial operation experience)
• Expert member (public environmental exp.)
![Page 33: The Environmental Code and Integrated Permitting (the IPPC way)](https://reader036.vdocument.in/reader036/viewer/2022062517/5681321c550346895d987de1/html5/thumbnails/33.jpg)
EIA/ Content of application
• Environmental protection law 1969
• IPPC directive
• EIA directive
• Swedish permit legislation today: A mixture of all 3
![Page 34: The Environmental Code and Integrated Permitting (the IPPC way)](https://reader036.vdocument.in/reader036/viewer/2022062517/5681321c550346895d987de1/html5/thumbnails/34.jpg)
Environment Impact Assessment
• Why the site chosen is the best
• Transport to and from the site
• Consumption: raw material, energy, process-chemicals
• Production processes
• Internal and end-of-pipe measures
Alternatives - compare to BAT
![Page 35: The Environmental Code and Integrated Permitting (the IPPC way)](https://reader036.vdocument.in/reader036/viewer/2022062517/5681321c550346895d987de1/html5/thumbnails/35.jpg)
Environment Impact Assessment
• Environmental releases from the process to all media and environmental impact (dispersion models, recipient investigations)
• Generation and disposal of waste
• Landfill at the site
• Ambient noise and counter-measures
![Page 36: The Environmental Code and Integrated Permitting (the IPPC way)](https://reader036.vdocument.in/reader036/viewer/2022062517/5681321c550346895d987de1/html5/thumbnails/36.jpg)
Contents of application(more than EIA)
• administrative information• detailed technical description; manufacturing
process, use of chemicals, energy, waste etc• description of the consultations made• Suggestion of conditions
• Alternative processes• Compare to BAT (BREF)
![Page 37: The Environmental Code and Integrated Permitting (the IPPC way)](https://reader036.vdocument.in/reader036/viewer/2022062517/5681321c550346895d987de1/html5/thumbnails/37.jpg)
ConditionsELV or other
SITUATION IN RECIPIENT
NATIONAL QUALITYOBJECTIVES
BAT COST EFFICIENCY
BENCHMARKING
ENVIRONMENTALQUALITY NORMS
![Page 38: The Environmental Code and Integrated Permitting (the IPPC way)](https://reader036.vdocument.in/reader036/viewer/2022062517/5681321c550346895d987de1/html5/thumbnails/38.jpg)
Flow chart - Idea to permitOperator needs
a permit
consultation
Local env. AuthorityRegional env. Auth.
SEPARV
PublicOther auth.
Operator sends applicationTo Environmental Court
Env. Court sends appl. To authoritiesIs appl. Complete?
Authorities suggest improvements(written document)
Company improves application
Court decides appl. Is OKCourt adverts in local papers inviting
Public to give viewsCourt asks auth. for their views
Authorities give their views on applicationIn a written statement
Suggesting conditions for permit
Company replies on given views
Public hearing
PERMITIs issued
![Page 39: The Environmental Code and Integrated Permitting (the IPPC way)](https://reader036.vdocument.in/reader036/viewer/2022062517/5681321c550346895d987de1/html5/thumbnails/39.jpg)
Permitting – overall view
• Conditions according to the Code can refer to ”anything” to get a sustainable development
• ELV• Trigger values• Demand to install a certain installation• Demand for monitoring
![Page 40: The Environmental Code and Integrated Permitting (the IPPC way)](https://reader036.vdocument.in/reader036/viewer/2022062517/5681321c550346895d987de1/html5/thumbnails/40.jpg)
BAT -BREF
• IPPC Directive
• Directive 96/61/EC on Integrated Pollution Prevention and Control
• BREF BAT Reference Document
BAT - Best Available Technique
![Page 41: The Environmental Code and Integrated Permitting (the IPPC way)](https://reader036.vdocument.in/reader036/viewer/2022062517/5681321c550346895d987de1/html5/thumbnails/41.jpg)
BREF http://eippcb.jrc.es~35 adopted BREFs Pulp and Paper Industry
Iron and Steel IndustryCement IndustryChlor-Alkali IndustryNon-Ferrous-Metal IndustryRefineriesWaste IncinerationStorage of ChemicalsOrganic Fine ChemicalsLarge Combustion Plants
![Page 42: The Environmental Code and Integrated Permitting (the IPPC way)](https://reader036.vdocument.in/reader036/viewer/2022062517/5681321c550346895d987de1/html5/thumbnails/42.jpg)
Summary experience of integrated permit procedures
• One individual, integrate permit procedure
• Self-monitoring of emissions etc
• Reports (monthly/annual) from plants to authorities
• Compliance checking by the authorities Sanctions and charges for non-compliance
• Openness to the public
![Page 43: The Environmental Code and Integrated Permitting (the IPPC way)](https://reader036.vdocument.in/reader036/viewer/2022062517/5681321c550346895d987de1/html5/thumbnails/43.jpg)
The system requires
• Highly qualified staff both in industries and authorities
• Knowledge about BAT for the sector
• Industry takes its responsibility
• Preventive, in-process measures are preferred to end-of-pipe solutions
• Openness between different stakeholders
![Page 44: The Environmental Code and Integrated Permitting (the IPPC way)](https://reader036.vdocument.in/reader036/viewer/2022062517/5681321c550346895d987de1/html5/thumbnails/44.jpg)
Results from 30 years
• A drastic reduction of emissions from large point sources without harming the competitiveness of industry
• The BREFs are expected to play a role in future work with IPPC-installations in Sweden
![Page 45: The Environmental Code and Integrated Permitting (the IPPC way)](https://reader036.vdocument.in/reader036/viewer/2022062517/5681321c550346895d987de1/html5/thumbnails/45.jpg)
![Page 46: The Environmental Code and Integrated Permitting (the IPPC way)](https://reader036.vdocument.in/reader036/viewer/2022062517/5681321c550346895d987de1/html5/thumbnails/46.jpg)
Ökad produktion – minskade utsläpp
0
0,2
0,4
0,6
0,8
1
1,2
1,4
1,6
90 91 92 93 94 95 96 97 98 99 00 01 02 03 04 05 06 07 08
Massaproduktion
Pappersproduktion
Elanvändning
CO2 (fossil)
Svavel
COD
AOX
Index