The Environmental Management of Highways

Institution of Highways and TransportationYorkshire & Humberside Branch Seminar

9 November 2001York

Ciaran McAleenan MPhil CEng MICE MICWEM MIOSH RSP

© Ciaran McAleenan, 2001

Delivering Effective Management Systems

© Ciaran McAleenan, 2001

a cautionary tale...

But first

Delivering Effective Management Systems

© Ciaran McAleenan, 2001

Letter to Montcalm County resident

• The construction of wood debris dams is an unauthorised activity,

• This is a violation since the required permit was not requested,

• The dams failed during recently causing flooding,

• Dams of this nature are hazardous and are not permitted.

• This Department orders you to cease and desist such activities, and

• Make good any damage or elseenforcement action will be taken.

Department of Environment & QualityMontcalm County MI

Delivering Effective Management Systems

© Ciaran McAleenan, 2001

Resident’s response...

• A couple of beavers are constructing and maintaining two wood debris dams across the outlet stream from my pond.

• I did not pay for, authorise or supervise their DAM project and challenge your Department to emulate their DAM project anytime.

• No way you could match their DAM skills, their Dam resourcefulness, their DAM ingenuity, their DAM persistence, their DAM determination and their DAM work ethic.

• The dams failing is a natural occurrence that the Department is required to protect.

• So if you want the stream restored toa DAM free-flow condition contact the DAM builders yourself.

LandownerMontcalm County MI

Delivering Effective Management Systems

© Ciaran McAleenan, 2001

Delivering Effective Management Systems

“Dam Government Policy”

Delivering Effective Management Systems

© Ciaran McAleenan, 2001

Analysethe

Operation

Improve

EffectivenessReview

Managethe

Operation

Set your work objectives to include;

“...tasks/ activities are to be completed on time and in a manner that does not cause environmental damage or harm”.

Operational Analysis & Control Model

Delivering Effective Management Systems

© Ciaran McAleenan, 2001

Analysethe

Operation

Operational Analysis & Control Model

Three questions

• What can cause environmental damage?

• What are you doing about it

• Is it enough?

Analysethe

Operation

Improve

EffectivenessReview

Managethe

Operation

© Ciaran McAleenan, 2001

Delivering Effective Management Systems

VehicleDriving

Cause Effect Control

Air Quality

Ecology

Energy

Noise

Reduce emissionsEnhance public transportUse modified fueletc.

Creature features, e.g.• badger tunnels• warning signs

Low noise road surfacings

Noise barriers

Delivering Effective Management Systems

© Ciaran McAleenan, 2001

Operational Analysis & Control Model

Managethe

Operation

Another three questions

• What has to be done?

• What resources do you need?

• When is a review needed?

Analysethe

Operation

Improve

EffectivenessReview

Managethe

Operation

Delivering Effective Management Systems

© Ciaran McAleenan, 2001

Operational Analysis & Control Model

EffectivenessReview

Three more questions

• Has the operation progressed as planned?

• Detail the changes needed.

• List the improvement actions.

Analysethe

Operation

Improve

EffectivenessReview

Managethe

Operation

© Ciaran McAleenan, 2001

Delivering Effective Management Systems

Maintenance

Design

EnvironmentalConstraints

Analysethe

Operation

Improve

EffectivenessReview

Managethe

Operation

In Practice...

© Ciaran McAleenan, 2001

Delivering Effective Management Systems

Design Manual for Roads and Bridges

Volume 10 Environmental Design - Good Roads Guide

• Largely reworked in recent update

Volume 11Environmental Assessment

• Going through modernisation project

EnvironmentalConstraints

Design

© Ciaran McAleenan, 2001

Delivering Effective Management Systems

Requires EA for;

• Motorway construction

• Privately Financed Toll Roads

• Coastal protection Schemes

EnvironmentalConstraints

Design

UK Planning Regulations

© Ciaran McAleenan, 2001

Delivering Effective Management Systems

EnvironmentalConstraints

Design

• All new roads over 10km

• New roads over 1km close to;

National Parks,

SSSI’s,

Conservation areas,

Nature Reserves, and

+1500 dwellings

• Motorway and road improvements

• Other new roads where significant

impact is expected

Additional industry EA Criteria

© Ciaran McAleenan, 2001

Delivering Effective Management Systems

Design objective

a. reduce the direct impact

b. give greater weight to local environment

c. reduce greenhouse gas emissions and pollutants.

EnvironmentalConstraints

Design

© Ciaran McAleenan, 2001

Delivering Effective Management Systems

Design aspectsNew Approach to Appraisal

a. Environmental Impactb. Safetyc. Economyd. Accessibilitye. Integration

To be replaced by Guidance on Methodology for Multi-modal studies

EnvironmentalConstraints

Design

© Ciaran McAleenan, 2001

Delivering Effective Management Systems

Environmental Design

this means looking at...

a. Recycling and re-useb. Energy efficiencyc. Use of brown-field sitesd. Waste managemente. Surface life expectancy

EnvironmentalConstraints

Design

© Ciaran McAleenan, 2001

Delivering Effective Management Systems

Maintenance Concerns

a. Roadside vergesb. Roadside hedgesc. Roadside boundariesd. Weed controle. Trees and shrubsf. Flora and faunag. Pollutionh. Conservation Areasi. Bridgesj. Street lightingk. Re-cycling

MaintenanceEnvironmentalConstraints

© Ciaran McAleenan, 2001

Delivering Effective Management Systems

VehicleDriving

Cause Effect Control

Air Quality

Ecology

Energy

Noise

Reduce emissionsEnhance public transportUse modified fueletc.

Creature features, e.g.• badger tunnels• warning signs

Low noise road surfacings

Noise barriers