the european organisation for the safety of air navigation cfmu user forum ‘09 why flight plan and...
TRANSCRIPT
The European Organisation for the Safety of Air Navigation
CFMU User Forum ‘09Why Flight Plan and ATFCM adherence?
Christian Faber
Head of Investigation
CFMU User Forum 2009 2
The problem
Traffic exceeds capacitiesTraffic exceeds capacitiesby more than 10% = ATFCM "over delivery"by more than 10% = ATFCM "over delivery"
Not flying at the requested flight level (RFL)Not flying at the requested flight level (RFL) Arriving in the sector earlier or later than Arriving in the sector earlier or later than
plannedplanned Departing at times different from Departing at times different from
EOBT/CTOTEOBT/CTOT Deviating from their original planned routeDeviating from their original planned route
Network effect impacting SAFETY!Network effect impacting SAFETY!
CFMU User Forum 2009 3
Example 1
distanceADEP ADES
FL380
FL340
“Request FL 380!”
regulated airspace
re-filed FPL
CFMU User Forum 2009 4
Example 2:Example 2:over delivery in Austriaover delivery in Austria
16 flights flying higher than filed
comparison between ETFMS counted and actual flights
33
00
10
20
30
40
50
60
no
of
flig
hts
0
10
20
30
40
50
60
ETFMS counted flights
Actual flights
Capacity
5353
CFMU User Forum 2009 5
What’s the effect…
Potentially excessive workload,Potentially excessive workload, Wasted capacity in some sectors, Wasted capacity in some sectors, An overall lack of confidence in the An overall lack of confidence in the
accuracy of forecast traffic counts,accuracy of forecast traffic counts, Protective capacity reduction,Protective capacity reduction, Increased workload, stress or working Increased workload, stress or working
conditions such that the ability of ATC conditions such that the ability of ATC controller may be significantly impaired and controller may be significantly impaired and thus a safety issue.thus a safety issue.
CFMU User Forum 2009 8
Flight Plan and ATFCM adherence awareness campaign
Three main elements of adherence1. Adherence to requested FL (one of the main reason for over-
deliveries)2. Adherence to Flow Measures, mainly CTOT (thus arriving too
early/late in the sectors)3. Adherence to filed route (incomplete or incorrect ATFCM picture)
Procedures and rules exist already
CFMU User Forum 2009 9
ICAO Doc 7030/4 (EUR)
““ATC is responsible for departure slot monitoring at departure ATC is responsible for departure slot monitoring at departure aerodromes…aerodromes…””
“…“…Aircraft operators shall inform themselves ofAircraft operators shall inform themselves ofand adhere to… current ATFM measures…and adhere to… current ATFM measures…””
““AnyAny changes to the EOBT of more than 15 minutes for any changes to the EOBT of more than 15 minutes for any IFR flight within the IFPZIFR flight within the IFPZ
shall be communicated to the IFPSshall be communicated to the IFPS””
CFMU User Forum 2009 10
Commission regulation (EC) No 1033/2006 (1st January 2009)
““The operator shall ensure that the conditions of acceptance The operator shall ensure that the conditions of acceptance of a flight plan and any necessary changes thereto as of a flight plan and any necessary changes thereto as
notified by IFPS to the originator are incorporated into the notified by IFPS to the originator are incorporated into the planned flight operation and communicated to the pilotplanned flight operation and communicated to the pilot.”.”
““The operator shall ensure prior to operation of the flight that The operator shall ensure prior to operation of the flight that the content of the initial flight plan correctly reflects the the content of the initial flight plan correctly reflects the
operational intentionsoperational intentions.”.”
CFMU User Forum 2009 11
Possible reasons for non-adherence (received via ‘Support Request’ on Skybrary)
Pressureto make up
lost time
Lack oftrust in load
figuresUnderestimationof the network
effects
Weatherproblems
Inefficientturnoverprocess
Congestionon theground
Reason forNon-adherence
CFMU User Forum 2009 12
Recommendations(received via ‘Support Request’ on Skybrary)
et cetera …
Change of FLonly to ensure
safe separation
OPS Mgmtto promote strict
adherence
Provide ATFCMtraining for TWR
and AO
ATC & cockpitsystem to display
ATFM info
UpdateEOBTs
Solve problemof delayed OBT
EnableDCT filing
Move awayfrom RPLs
Recommendations
CFMU User Forum 2009 13
Publications:Publications:Website*, brochures, flyers, posters, presentations, WBT (e-learning)
Promotion with international organisations Promotion with international organisations and working groups:and working groups:
IATA, IACA, IFATCA, IFALPA/ECA, IFALDA, ODSG, DOP
Contacted:Contacted: ANSPs, ACCs, AOs, AOs military, FPL Service Providers to AOs, Airports, Pilots (via IATA / IFALPA), Industry.
What has been done?
*http://www.eurocontrol.int/dmean
CFMU User Forum 2009 14
What has been done? CTOT adherenceCTOT adherence
Following countries are/were involved or have been contacted regarding CTOT adherence:EB, LK, HE, LF, LG, LH, LT, EG
OPS evaluationOPS evaluationMaastricht and Rhein UAC operational evaluation of requested FL
TrainingTrainingSkyGuide include subject in ATCO refresher training (MUAC plans to do the same)
SystemSystemSkyGuide system trial of identification of flights at differing RFL prior to ACC entry.
CFMU User Forum 2009 15
From awareness to improvements
Continue awareness activities and assessments at local, regional and network levels
Continue to address adherence issues at individual airports and ACCs with ANSPs, AOs and authorities concerned
Best Practices (local initiatives, ATCO & pilot training, etc)
Trials, comparison exercises (routes filed versus flown) and simulations to show impact
Adherence Day (see next slide)
CFMU User Forum 2009 16
Adherence Day
Objectives:
• Measure the effectMeasure the effect of adherence to FPL and ATFCM measures
• Determine benefitsDetermine benefits arising from accurate EOBT/CTOT & RFL with regard to sector counts (potential release of capacity)
• Improve the qualityImprove the quality of FPL with regard to routes (incl. DCT) and FLs
One day operational evaluation through ‘full’ application of adherence procedures
CFMU User Forum 2009 17
Benefits of adherence
reliable and accurate data for all involvedreliable and accurate data for all involved improved predictability of trafficimproved predictability of traffic improved network demand-capacity balancingimproved network demand-capacity balancing increased capacityincreased capacity increased safetyincreased safety flight efficiencyflight efficiency