The Follo Line Project
A presentation: Norway`s largest transport project
LONGEST. URBAN. COMPLEX. FASTER.
![Page 2: The Follo Line Project - NFF med fagstoff fra ...nff.no/wp-content/uploads/2015/05/18-Enoksen-Follobanen.pdf · The Follo Line Project: Time line . Drill & Blast. EPC Drill&Blast](https://reader036.vdocument.in/reader036/viewer/2022062401/5aaa51a87f8b9a95188dedf8/html5/thumbnails/2.jpg)
The Follo Line will be built to meet the increased demand for rail capacity south of Oslo.
1,1 million residents in the Oslo region
30 % population increase by 2025
Currently no spare capacity on neither rail nor road
150 000 passengers every day
Potential for increased freight traffic
Background
NEXT PHASE IN PLANNING
Studies prior to public planning
Municipal master plan
Area Development plan
Planning completed/under construction
Completed
![Page 3: The Follo Line Project - NFF med fagstoff fra ...nff.no/wp-content/uploads/2015/05/18-Enoksen-Follobanen.pdf · The Follo Line Project: Time line . Drill & Blast. EPC Drill&Blast](https://reader036.vdocument.in/reader036/viewer/2022062401/5aaa51a87f8b9a95188dedf8/html5/thumbnails/3.jpg)
Extensive works at Oslo Central Station
The Follo Line will be constructed with connections to several platforms
A total relocation of the existing Østfold Line within this area
The work shall be carried out with minimum conflict with other traffic
Special attention shall be paid to a Medieval Park
Connection to Oslo Central Station
![Page 4: The Follo Line Project - NFF med fagstoff fra ...nff.no/wp-content/uploads/2015/05/18-Enoksen-Follobanen.pdf · The Follo Line Project: Time line . Drill & Blast. EPC Drill&Blast](https://reader036.vdocument.in/reader036/viewer/2022062401/5aaa51a87f8b9a95188dedf8/html5/thumbnails/4.jpg)
Outbound Follo LineInbound Follo LineOutbound Østfold LineInbound Østfold Line
Loenga
Oslo S
Oslo S area: Total track
length about 9,5 KM
Oslo S: Four tracks through «Klypen»
![Page 5: The Follo Line Project - NFF med fagstoff fra ...nff.no/wp-content/uploads/2015/05/18-Enoksen-Follobanen.pdf · The Follo Line Project: Time line . Drill & Blast. EPC Drill&Blast](https://reader036.vdocument.in/reader036/viewer/2022062401/5aaa51a87f8b9a95188dedf8/html5/thumbnails/5.jpg)
The longest railway tunnel in Norway - approximately 20 km
Two separate tubes with cross-passage approx. every 500 meters
Main excavation method is TBM, but also by drill & blast/drill & split
Close to Oslo Central Station the Follo Line and the inbound ØstfoldLine is to be excavated by Drill and Blast
Tunnel: Tunnel TBM and Tunnel D&B
![Page 6: The Follo Line Project - NFF med fagstoff fra ...nff.no/wp-content/uploads/2015/05/18-Enoksen-Follobanen.pdf · The Follo Line Project: Time line . Drill & Blast. EPC Drill&Blast](https://reader036.vdocument.in/reader036/viewer/2022062401/5aaa51a87f8b9a95188dedf8/html5/thumbnails/6.jpg)
Outbound FB Inbound FB Inbound ØB
Tunnels approaching Oslo S
![Page 7: The Follo Line Project - NFF med fagstoff fra ...nff.no/wp-content/uploads/2015/05/18-Enoksen-Follobanen.pdf · The Follo Line Project: Time line . Drill & Blast. EPC Drill&Blast](https://reader036.vdocument.in/reader036/viewer/2022062401/5aaa51a87f8b9a95188dedf8/html5/thumbnails/7.jpg)
Large rig area including production facilities
Two access tunnels Direct access to E6 Limited transportation along local
roads
Åsland rigg area: Four TBMs
![Page 8: The Follo Line Project - NFF med fagstoff fra ...nff.no/wp-content/uploads/2015/05/18-Enoksen-Follobanen.pdf · The Follo Line Project: Time line . Drill & Blast. EPC Drill&Blast](https://reader036.vdocument.in/reader036/viewer/2022062401/5aaa51a87f8b9a95188dedf8/html5/thumbnails/8.jpg)
The new Ski station shall be built with six tracks and three central platforms
The scope includes new pedestrian underpass, new road bridge and bus terminal
The scope includes an open section of approximately 1,5 km containing retaining walls and culverts.
The total length of new tracks in the Ski area is ~ 16,5 km.
Ski: The scope
![Page 9: The Follo Line Project - NFF med fagstoff fra ...nff.no/wp-content/uploads/2015/05/18-Enoksen-Follobanen.pdf · The Follo Line Project: Time line . Drill & Blast. EPC Drill&Blast](https://reader036.vdocument.in/reader036/viewer/2022062401/5aaa51a87f8b9a95188dedf8/html5/thumbnails/9.jpg)
The Follo Line Project: Time line
![Page 10: The Follo Line Project - NFF med fagstoff fra ...nff.no/wp-content/uploads/2015/05/18-Enoksen-Follobanen.pdf · The Follo Line Project: Time line . Drill & Blast. EPC Drill&Blast](https://reader036.vdocument.in/reader036/viewer/2022062401/5aaa51a87f8b9a95188dedf8/html5/thumbnails/10.jpg)
Drill & Blast
![Page 11: The Follo Line Project - NFF med fagstoff fra ...nff.no/wp-content/uploads/2015/05/18-Enoksen-Follobanen.pdf · The Follo Line Project: Time line . Drill & Blast. EPC Drill&Blast](https://reader036.vdocument.in/reader036/viewer/2022062401/5aaa51a87f8b9a95188dedf8/html5/thumbnails/11.jpg)
EPC Drill&Blast
• EPC – design and build
• All works to be performed from Sydhavna
• Apx 420.000 m3 rock to be excavated
• Separate contract to reduce total construction time for the Follo Line
![Page 12: The Follo Line Project - NFF med fagstoff fra ...nff.no/wp-content/uploads/2015/05/18-Enoksen-Follobanen.pdf · The Follo Line Project: Time line . Drill & Blast. EPC Drill&Blast](https://reader036.vdocument.in/reader036/viewer/2022062401/5aaa51a87f8b9a95188dedf8/html5/thumbnails/12.jpg)
Ekeberg Tank
Ekeberghallene
Ekeberg Oljelager
Operatunnelen
Grønliatunnelen
Alnaelvtunnel
Tresporshallen
Ekebergtunnelene(E6)
OmlagtAlnaelvtunnel
E18 Mosseveien
Østfoldbanen
Utgående Follobane
Inngående Follobane
Tunnel til Ryen
Kloakktunnel Kværner-Ljan
Midgardsormenoverføringstunnel
Inngående Østfoldbane
Pumpestasjon
Sjursøytunnelen
Tverrslag Nord
Tverrslag Sør
Adkomst og Rømningstunneler
Søndre Portal
DemontasjekamreTBM
The three track tunnel
![Page 13: The Follo Line Project - NFF med fagstoff fra ...nff.no/wp-content/uploads/2015/05/18-Enoksen-Follobanen.pdf · The Follo Line Project: Time line . Drill & Blast. EPC Drill&Blast](https://reader036.vdocument.in/reader036/viewer/2022062401/5aaa51a87f8b9a95188dedf8/html5/thumbnails/13.jpg)
The three track tunnel
• 140 m long cavern
• Low overburden to the existing Grønlia tunnel
• Three tracks -> apx 300 m2 cross-section
• Crossing a fault line in the tunnel opening
• Alum shale
• Entire excavation to be done from the inside
• Rock anchors to be installed from outside
![Page 14: The Follo Line Project - NFF med fagstoff fra ...nff.no/wp-content/uploads/2015/05/18-Enoksen-Follobanen.pdf · The Follo Line Project: Time line . Drill & Blast. EPC Drill&Blast](https://reader036.vdocument.in/reader036/viewer/2022062401/5aaa51a87f8b9a95188dedf8/html5/thumbnails/14.jpg)
Ekeberg Tank
Ekeberghallene
Ekeberg Oljelager
Operatunnelen
Grønliatunnelen
Alnaelvtunnel
Tresporshallen
Ekebergtunnelene(E6)
OmlagtAlnaelvtunnel
E18 Mosseveien
Østfoldbanen
Utgående Follobane
Inngående Follobane
Tunnel til Ryen
Kloakktunnel Kværner-Ljan
Midgardsormenoverføringstunnel
Inngående Østfoldbane
Pumpestasjon
Sjursøytunnelen
Tverrslag Nord
Tverrslag Sør
Adkomst og Rømningstunneler
Søndre Portal
DemontasjekamreTBM
Crossings of the existing E6 road tunnels
![Page 15: The Follo Line Project - NFF med fagstoff fra ...nff.no/wp-content/uploads/2015/05/18-Enoksen-Follobanen.pdf · The Follo Line Project: Time line . Drill & Blast. EPC Drill&Blast](https://reader036.vdocument.in/reader036/viewer/2022062401/5aaa51a87f8b9a95188dedf8/html5/thumbnails/15.jpg)
Crossings of the existing E6 road tunnels
• Very low overburden to the existing E6 tunnels
• 3D modelling of expected deformation in the road tunnels
• Restrictions on blasting
– Risk for damage to infrastructure in E6 tunnels
– Closing of tunnels will have huge impact on traffic
• Constructing concrete pillar to support E6 tunnels
![Page 16: The Follo Line Project - NFF med fagstoff fra ...nff.no/wp-content/uploads/2015/05/18-Enoksen-Follobanen.pdf · The Follo Line Project: Time line . Drill & Blast. EPC Drill&Blast](https://reader036.vdocument.in/reader036/viewer/2022062401/5aaa51a87f8b9a95188dedf8/html5/thumbnails/16.jpg)
Ekeberg Tank
Ekeberghallene
Ekeberg Oljelager
Operatunnelen
Grønliatunnelen
Alnaelvtunnel
Tresporshallen
Ekebergtunnelene(E6)
OmlagtAlnaelvtunnel
E18 Mosseveien
Østfoldbanen
Utgående Follobane
Inngående Follobane
Tunnel til Ryen
Kloakktunnel Kværner-Ljan
Midgardsormenoverføringstunnel
Inngående Østfoldbane
Pumpestasjon
Sjursøytunnelen
Tverrslag Nord
Tverrslag Sør
Adkomst og Rømningstunneler
Søndre Portal
DemontasjekamreTBM
Rerouting of the Alna river
![Page 17: The Follo Line Project - NFF med fagstoff fra ...nff.no/wp-content/uploads/2015/05/18-Enoksen-Follobanen.pdf · The Follo Line Project: Time line . Drill & Blast. EPC Drill&Blast](https://reader036.vdocument.in/reader036/viewer/2022062401/5aaa51a87f8b9a95188dedf8/html5/thumbnails/17.jpg)
Rerouting of the Alna river
• The new IØL crosses the existing Alna river
• River must be re-routed before full excavation is possible
• To maintain progress a temporary passage should be established
![Page 18: The Follo Line Project - NFF med fagstoff fra ...nff.no/wp-content/uploads/2015/05/18-Enoksen-Follobanen.pdf · The Follo Line Project: Time line . Drill & Blast. EPC Drill&Blast](https://reader036.vdocument.in/reader036/viewer/2022062401/5aaa51a87f8b9a95188dedf8/html5/thumbnails/18.jpg)
Ekeberg Tank
Ekeberghallene
Ekeberg Oljelager
Operatunnelen
Grønliatunnelen
Alnaelvtunnel
Tresporshallen
Ekebergtunnelene(E6)
OmlagtAlnaelvtunnel
E18 Mosseveien
Østfoldbanen
Utgående Follobane
Inngående Follobane
Tunnel til Ryen
Kloakktunnel Kværner-Ljan
Midgardsormenoverføringstunnel
Inngående Østfoldbane
Pumpestasjon
Sjursøytunnelen
Tverrslag Nord
Tverrslag Sør
Adkomst og Rømningstunneler
Søndre Portal
DemontasjekamreTBM
Close to oilcaverns
![Page 19: The Follo Line Project - NFF med fagstoff fra ...nff.no/wp-content/uploads/2015/05/18-Enoksen-Follobanen.pdf · The Follo Line Project: Time line . Drill & Blast. EPC Drill&Blast](https://reader036.vdocument.in/reader036/viewer/2022062401/5aaa51a87f8b9a95188dedf8/html5/thumbnails/19.jpg)
Close to oil caverns
• The IØL and the Folloline passes on either side of Ekeberg Oil Cavern
• Very low overburden to caverns
• Restriction on blasting due to sensitive infrastructure in the oil caverns
• Groundwater level must be obtained
• Grouting forbidden due to closeness to caverns
![Page 20: The Follo Line Project - NFF med fagstoff fra ...nff.no/wp-content/uploads/2015/05/18-Enoksen-Follobanen.pdf · The Follo Line Project: Time line . Drill & Blast. EPC Drill&Blast](https://reader036.vdocument.in/reader036/viewer/2022062401/5aaa51a87f8b9a95188dedf8/html5/thumbnails/20.jpg)
Ekeberg Tank
Ekeberghallene
Ekeberg Oljelager
Operatunnelen
Grønliatunnelen
Alnaelvtunnel
Tresporshallen
Ekebergtunnelene(E6)
OmlagtAlnaelvtunnel
E18 Mosseveien
Østfoldbanen
Utgående Follobane
Inngående Follobane
Tunnel til Ryen
Kloakktunnel Kværner-Ljan
Midgardsormenoverføringstunnel
Inngående Østfoldbane
Pumpestasjon
Sjursøytunnelen
Tverrslag Nord
Tverrslag Sør
Adkomst og Rømningstunneler
Søndre Portal
DemontasjekamreTBM
South portal
![Page 21: The Follo Line Project - NFF med fagstoff fra ...nff.no/wp-content/uploads/2015/05/18-Enoksen-Follobanen.pdf · The Follo Line Project: Time line . Drill & Blast. EPC Drill&Blast](https://reader036.vdocument.in/reader036/viewer/2022062401/5aaa51a87f8b9a95188dedf8/html5/thumbnails/21.jpg)
South portal
• Work to be performed very close to existing Østfold line and E18 Mosseveien
• Restrictions on what affect work can have on rail and road
• Demolishing and reconstructing bridge for the E18 and integrating this into the South portal
• New railroad bridge over the entrance to Ekeberg hallene
![Page 22: The Follo Line Project - NFF med fagstoff fra ...nff.no/wp-content/uploads/2015/05/18-Enoksen-Follobanen.pdf · The Follo Line Project: Time line . Drill & Blast. EPC Drill&Blast](https://reader036.vdocument.in/reader036/viewer/2022062401/5aaa51a87f8b9a95188dedf8/html5/thumbnails/22.jpg)
Drill & Split
Drill & Split
![Page 23: The Follo Line Project - NFF med fagstoff fra ...nff.no/wp-content/uploads/2015/05/18-Enoksen-Follobanen.pdf · The Follo Line Project: Time line . Drill & Blast. EPC Drill&Blast](https://reader036.vdocument.in/reader036/viewer/2022062401/5aaa51a87f8b9a95188dedf8/html5/thumbnails/23.jpg)
Drill & Split
• Due to large areas of the new tunnel having heavy restrictions on blast induced vibration
• Search for a method for mechanical breaking of the rock mass
• Reports from Asia where the method “Drill&Split” have been used with success
![Page 24: The Follo Line Project - NFF med fagstoff fra ...nff.no/wp-content/uploads/2015/05/18-Enoksen-Follobanen.pdf · The Follo Line Project: Time line . Drill & Blast. EPC Drill&Blast](https://reader036.vdocument.in/reader036/viewer/2022062401/5aaa51a87f8b9a95188dedf8/html5/thumbnails/24.jpg)
Drill & Split
![Page 25: The Follo Line Project - NFF med fagstoff fra ...nff.no/wp-content/uploads/2015/05/18-Enoksen-Follobanen.pdf · The Follo Line Project: Time line . Drill & Blast. EPC Drill&Blast](https://reader036.vdocument.in/reader036/viewer/2022062401/5aaa51a87f8b9a95188dedf8/html5/thumbnails/25.jpg)
![Page 26: The Follo Line Project - NFF med fagstoff fra ...nff.no/wp-content/uploads/2015/05/18-Enoksen-Follobanen.pdf · The Follo Line Project: Time line . Drill & Blast. EPC Drill&Blast](https://reader036.vdocument.in/reader036/viewer/2022062401/5aaa51a87f8b9a95188dedf8/html5/thumbnails/26.jpg)
![Page 27: The Follo Line Project - NFF med fagstoff fra ...nff.no/wp-content/uploads/2015/05/18-Enoksen-Follobanen.pdf · The Follo Line Project: Time line . Drill & Blast. EPC Drill&Blast](https://reader036.vdocument.in/reader036/viewer/2022062401/5aaa51a87f8b9a95188dedf8/html5/thumbnails/27.jpg)
![Page 28: The Follo Line Project - NFF med fagstoff fra ...nff.no/wp-content/uploads/2015/05/18-Enoksen-Follobanen.pdf · The Follo Line Project: Time line . Drill & Blast. EPC Drill&Blast](https://reader036.vdocument.in/reader036/viewer/2022062401/5aaa51a87f8b9a95188dedf8/html5/thumbnails/28.jpg)
![Page 29: The Follo Line Project - NFF med fagstoff fra ...nff.no/wp-content/uploads/2015/05/18-Enoksen-Follobanen.pdf · The Follo Line Project: Time line . Drill & Blast. EPC Drill&Blast](https://reader036.vdocument.in/reader036/viewer/2022062401/5aaa51a87f8b9a95188dedf8/html5/thumbnails/29.jpg)