the future of healthcare - chalmers.se · future changes and alterations a hospital built and...

20
THE FUTURE OF HEALTHCARE JULIUS BERNDTSON - FELIX TANG

Upload: others

Post on 26-Jun-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: THE FUTURE OF HEALTHCARE - chalmers.se · future changes and alterations A hospital built and optimised for today and tomorrow. The hospital was and is a symbol of health, knowledge

THE FUTURE OF HEALTHCARE

JULIUS BERNDTSON - FELIX TANG

Page 2: THE FUTURE OF HEALTHCARE - chalmers.se · future changes and alterations A hospital built and optimised for today and tomorrow. The hospital was and is a symbol of health, knowledge

The Hospital of 2022Situated in Frihamnen, Gothenburg, on a site in full development.

On a site to be colonized with modern housing, commercial systems, sustainable green recreation areas and effective flow conditions. These factors will be forming the foundation of what the hospital of Frihamnen will be standing for. The new district of Frihamnen will be realized divided through multiple

phases, the hospital standing right in the starting phase. These phases have a timeline which stretches to the unknown, which combined with the evolution of healthcare technology, demands a building of

flexibility.

The evolution of healthcare technology is a phenomenon meant to be prioritized. The healing environment is an

environment for every individual, and it appears in a vast amount of scenarios. The healing environment shall be

sustainable

THE PATIENT

FLEXIBILITY

THE STAFF

ENVIRONMENT STRUCTURE

The individual of treatment and the object of healingGreat variety of personas and scenarios

The individual contributing the healing processCooperation between professions

The mental and physical factor. Materials - access to daylight - sunlight - greenery - simplicity

Evidence-based design

The volatile and changeable building offers effective flows and simple rearrangements. It can become something completely different and switch back whenever desired

VISION

Page 3: THE FUTURE OF HEALTHCARE - chalmers.se · future changes and alterations A hospital built and optimised for today and tomorrow. The hospital was and is a symbol of health, knowledge

THEME 2THEME 1 THEME 4THEME 3

Combining the most rewarding results from the studies of healthcare history, patient-centred

care, evidence-based design and sustainability, this creates the starting point for the structuring

of the modern hospital

HISTORY OF HEALTHCARE PATIENT-CENTRED CARE EVIDENCE-BASED DESIGN SUSTAINABILITY

Though the most influential parts will be involving daylight, sunlight, insight, greenery, simplicity and

sustainable organisation. Seeing the building’s structure and planning as the main concept will

make the working process innovative

The evolution of the patient’s situation and the structuring of the future hospital. How much has

the standard hospital changed and what is a necessary change for the time right now?

How do you improve connection and efficiency between the staff and the patient?

The sustainable aspects, covering the hospital overall environment as well as its physical interi-or and exterior, affects both the patient’s and the

staff’s physical and mental well being

A structure planned for the future needs the-se essential parts to be both sustainable and

efficient. The hospital will outlive its content and equipment technology and therefore withstand

the changes time will impose on

A conscious working and merging of materials, flows, connections and organisations will create sustainable elements which will collaborate with

eachother to build a flexible plan layout

Is the building and its functions prepared for future changes and alterations?

A hospital built and optimised for today and tomorrow. The hospital was and is a symbol of health, knowledge and a forum for exchanging this knowledge. Though the perception of the

hospital was different many years ago, and will be necessary to improve in a modern hospital

THE STRUCTURE OF THE HOSPITAL THE PATIENT AND THE STAFF THE SUSTAINABLE ENVIRONMENT FLEXIBILITY AND DEFINITION

ESSENTIALCONCLUSIONS

Giving the patient a clearer sense of control by granting more choices regarding the healing process.

Working with the patient rather than for the patient. A simple, light and clear interior division will help to achieve this and also a good working environment

and flows for the medical staff

The modern hospital should take all these factors into acount. The daylight, possible

insight angles, elements of greenery such as trees and plants and also simple solutions and

arrangements of these factors.

The plan and flow structure is the most impor-tant factor in the modern hospital. Future-proo-fed and prepared to rearrange its contents. No

matter how many floors or functions it will house, it will still be an easy challenge to overcome

Page 4: THE FUTURE OF HEALTHCARE - chalmers.se · future changes and alterations A hospital built and optimised for today and tomorrow. The hospital was and is a symbol of health, knowledge

TRAMS GOODS CARS AMBULANCE COMBINED FLOWSThe main road through the site of HOX Hospital is a one way road, which will lead to a clean passage to and from the entrance area, on the north side.

Placing the reception for goods and freight on the north side enables an undisturbed path for its traffic. It also moves away from the ambulances traffic flow which is placed on the northwest side.

An important opportunity is that ambulance traffic have possibilities of driving directly to the backside of the hospital, if their direction originates from the center of Gothenburg.

ANALYSISSUN FLOWS SUSTAINABILITY INSIGHT SITE

The new tram situation and the construction of the new bridge will make a starting point for all the main flows covering Frihamnen.

SU

N S

TU

DY

OF

FR

IHA

MN

EN OCTOBER 2016

SUNRISE 07:00

MARS 2016SUNRISE 06:30

JULY 2016SUNRISE 03:45

SUNSET

SUNSET

SUNSET

FRIHAMNEN CONSTRUCTION PHASES

NEW BRIDGE AND

NEW TRAFFIC

FLOWS

PHASE 1

PHASE 2

PHASE 3

PHASE 4 EASTERN SIDE

PHASE 5

08:00 09:00 10:00 11:00 12:00 13:00 14:00 15:00 16:00 17:00 19:00

Standing in quite a narrow space the site still has great possibilities to absorb

a big amount of sunlight, with the right structure and form

The construction phases of frihamnen are all dependent on the new traffic situation and bridge, which is also mainly the reason for this. As the tram, car and goods traffic will be a big part of the site, the hospital need to have simple yet flexible solutions for this.

SITE LOCATION

NEW

DEVELOPMENT AREA

Page 5: THE FUTURE OF HEALTHCARE - chalmers.se · future changes and alterations A hospital built and optimised for today and tomorrow. The hospital was and is a symbol of health, knowledge

SIMPLICITYFLEXIBILITY LIGHTCONCEPT 1

HOX CONCEPT

The first form, which evolved through the work with site analysis, sun studies, insight calculations and flow planning, originated as two slim volumes processing its site. One key factor was keeping the light in mind when structuring every corner of the form. Though this first form was built almost solely on these elements, and was less focused on interior flows.

The curvation of each wing represents the clarification of the entrance side, back side and as mentioned, the daylight and sunlight.

CONCEPT 2

CONCEPT 3

The second form, the phase where the interior took its place. Factors like insight, flows and site were considered, though a great amount of light and flexibility were still missing

The third form. Well functioning light conditions, flows, communication, insight but greatest of all, the flexibility. With this form HOX Hospital achieved great adaptability through the possibility of exchanging its ”wings” to other forms of purpose

PHYSICAL MODEL

PHYSICAL MODEL

PHYSICAL MODEL

The department program and scheme for vertical communication may have been well executed in this form, but somewhere HOX had lost its former potential

One big added change was the relocation of the main entrance, which in this case moved from elevated floor 1 back to the ground floor. This would simplify both the entrance and the main communication for the whole hospital activity

In this phase HOX sprawled out and made the final sprint to find itself in its almost finished form. The rooftop would create a well angled terrace and engender even more views with daylight and direct sunlight. Also the short sides of the form were now handling the insight factors well

SOUTHEAST VIEW NORTH VIEW WEST VIEW SOUTHWEST VIEW

Page 6: THE FUTURE OF HEALTHCARE - chalmers.se · future changes and alterations A hospital built and optimised for today and tomorrow. The hospital was and is a symbol of health, knowledge

94003400 5630 7000 4000 8100

STAFF ENTRANCE

TRAM STOP

AMBULANCE STOP

GOODS STOP

MA

IN ENTRANCE

SITE1:1000

NE

W B

RID

GE

OF

HIS

ING

EN

LINDHOLMEN

BR

AN

TIN

GS

MO

TE

T

MODEL VIEWSOUTHEAST

MODEL VIEWNORTH

MODEL VIEWWEST

MODEL VIEWSOUTHWEST

The main entrance area which aims towards the north creates a distinct persona for HOX. The open and embracing structure works well with its surrounding buildings and keeps a clearness where the position of primary and secondary entrances are positioned.

The south side houses stops for ambulance traffic. The ambulance personnel then have direct contact with an elevator placed exclusively for their purpose.

The staff have opportunity to park their chosen way of transport on the east side. With a limited amount of parking spots for cars and bicycles.

1:200ENTRANCE SECTION

3400 9400 5630 7000 4000 8100

FINAL FORMHOX HOSPITAL FINAL CONCEPT

Page 7: THE FUTURE OF HEALTHCARE - chalmers.se · future changes and alterations A hospital built and optimised for today and tomorrow. The hospital was and is a symbol of health, knowledge

SUSTAINABLE FLEXIBILITYHOX STRUCTURE AND CONSTRUCTION PRINCIPLE

63006300

63006300

63006300

63006300

63006300

63006300

12900

12900

63006300

63006300

6300 6300 6300 6300 6300 6300

1290

0

1290

0

GENERAL FORMMULTIPLE/ONE DEPARTMENT

2-WING DEPARTMENTEFFECTIVE SEPARATION

TWO LARGER DEPARTMENTS

FOUR 1-WING DEPARTMENTSFOUR DEPARTMENTS ON ONE FLOOR

ENABLES MANY VARIETIES FOR INTERIOR STRUCTURE

3-WING + 1 WINGONE LARGE 3 WING DEPARTMENT

WITH POSSIBLE DOUBLE CONNECTION THE THE 1 WING DEPARTMENT

2-WING + 1-WING + 1-WINGONE LARGE DEPARTMENT

2 SMALL

DISTANCE BETWEEN PILLARS 13 METERSENABLES FREE AND FLEXIBLE INTERIOR SPACE FOR

EXTREMELY STRAIGHTFORWARD MODIFICATION

CONSTRUCTION MODELSLABS AND PILLAR PLACEMENT

Page 8: THE FUTURE OF HEALTHCARE - chalmers.se · future changes and alterations A hospital built and optimised for today and tomorrow. The hospital was and is a symbol of health, knowledge

HOX DEPARTMENTS

PLAN 0

PLAN 1

PLAN 2

PLAN 3

PLAN 4

PLAN 5

PLAN 6

PLAN 7

PLAN 8

PLAN 9

TOTALGOODSCOMMERCIAL

PRIMARY CARE 1345 sqm

PEDIATRICS & YOUTH 1107 sqm

392 sqm

SPECIALIST CARE ADULTS 2126 sqm

ORTHOPEDICS 941 sqm

GYNECOLOGY 506 sqm

EAR NOSE THROAT 689 sqm

IMAGING 1037 sqm

SAMPLING 557 sqm

RESEARCH CENTER 536 sqm

OPERATION - PRE & POST 2148 sqm

TECHNICAL 2235 sqm

DIALYSIS 1109 sqm

DAYCARE 1018 sqm

REHAB 850

PSYCHIATRY

TERRACE

931 sqm

392 sqm

ADMIN

TERRACE

1654 sqm

192 sqm

HOX Hospital is mainly divided in two parts, one more public ground floor and the hospital floors above.The main reason for this is that it’s essential keeping a clear line between what is clean hospital area and what is not.

GROSS AREA24 055 sqm

MAIN COMMUNICATIONSELEVATORS & STAIRSSTAIRS ON CORNERS MAINLY CATEGORIZED AS FIRE ESCAPES

720 sqm

2375 sqm

Page 9: THE FUTURE OF HEALTHCARE - chalmers.se · future changes and alterations A hospital built and optimised for today and tomorrow. The hospital was and is a symbol of health, knowledge

PLAN 0

After being guided by the angle of the north wings you find yourself in the main entrance area of HOX Hospital. Just as all the other hospital floors there is straight visibility and passing of light rays from your back, front, left and right side. In close proximity to the main entrance you find the reception which with its configuration is designed to guide and simplify your waypath.

Behind the reception on the south side, a big amount of changing rooms are placed. As the staff can enter HOX from both the main and secondary entrance, their path is always similar.

Goods and ambulance departments are concentrated on the north and west side. Though the goods traffic is separated from the ambulance traffic to create even more legibility when arriving and departuring.

MAIN ENTRANCEGOODS - COMMERCIAL - CHANGING ROOMS

1:400

1:800

1:200

1:200

Page 10: THE FUTURE OF HEALTHCARE - chalmers.se · future changes and alterations A hospital built and optimised for today and tomorrow. The hospital was and is a symbol of health, knowledge

Ex14,9 m²Ex

14,8 m²Ex14,9 m²Ex

14,8 m²Ex14,9 m²

Ex14,8 m²Ex

14,9 m²

Ex23,9 m²

Ex14,8 m²

Ex14,8 m²

Ex14,9 m²

Ex14,9 m²Ex

14,8 m²

Eye14,8 m² Eye

14,8 m² Ex14,9 m² Ex

14,8 m² Ex14,9 m² Ex

14,8 m²

Ex16,5 m²

Meeting23,9 m²

ECG Rest14,8 m² ECG Rest

14,9 m² ECG Rest14,8 m²

WC2,4 m²

Ex19,7 m² Ex

2,9 m²

Emergency stairs12,1 m²

Emergency stairs12,3 m²

Emergency stairs12,0 m²

Emergency stairs12,0 m²

Shaft9,6 m²

Shaft9,5 m²

Shaft9,8 m²

Shaft9,8 m²

Admin14,8 m² Admin

14,9 m² Admin14,8 m²

Staff Breakroom28,6 m²

Treatment14,8 m²Treatment

14,9 m²

Treatment21,3 m²Treatment

14,9 m²

Treatment17,8 m²

Treatment14,8 m²

Treatment14,8 m²

Treatment14,8 m²

Meeting31,8 m²

RWC6,8 m²

RWC4,8 m²

RWC6,9 m²

RWC5,1 m²

Desinfection12,4 m²

Desinfection12,5 m²

Storage21,1 m²

Goods27,2 m²

Medical storage24,7 m²

Cleaning storage9,4 m²

WC2,0 m²

Quiet room34,6 m²

Pentry14,8 m²

Printer & storage14,8 m²

Pentry14,9 m²

ECG14,9 m² ECG

14,8 m²

Printer10,7 m²

Admin8,6 m²

Admin9,8 m²

Admin5,7 m²

RWC4,8 m² RWC

4,8 m²Admin8,6 m²

Admin9,8 m²

Admin5,7 m²

Admin8,6 m²

Admin9,8 m²

Admin5,7 m²

RWC4,8 m²

Admin42,8 m²

ECG14,9 m²

ECG14,8 m²

Admin23,0 m²

WC2,4 m²

Administration/Office

goods

Korridor

MeetinG

Technical area

wc

Admin32,8 m²

Admin261,1 m²

UPPDRAG.NR RITAD/KONSTR. AV HANDLÄGGARE

DATUM ANSVARIG

SKALA NUMMER BET

A1A3

Y:\G

rou p

1\0

2 Mo

del\Re

vit\

Projek

tfil

U pda

te 161129\

Cent

ral File X

ospit a

l_fe

lix.rv

t20

16-12-

19 2

2:44

:07

FASTIGHETSBETECKNING

PROJEKTTYP

PROJEKTNAMN

A40.1-114b

Plan 2 COLORS

Projekt nr Author

Arkitekt AB tel. 099-99 99 99A

Proj Designer

BET ÄNDRINGEN AVSER DATUM SIGN

Ex14,9 m²Ex

14,8 m²Ex14,9 m²Ex

14,8 m²Ex14,9 m²

Ex14,8 m²Ex

14,9 m²

Ex23,9 m²

Ex14,8 m²

Ex14,8 m²

Ex14,9 m²

Ex14,9 m²Ex

14,8 m²

Eye14,8 m² Eye

14,8 m² Ex14,9 m² Ex

14,8 m² Ex14,9 m² Ex

14,8 m²

Ex16,5 m²

Meeting23,9 m²

ECG Rest14,8 m² ECG Rest

14,9 m² ECG Rest14,8 m²

WC2,4 m²

Ex19,7 m² Ex

2,9 m²

Emergency stairs12,1 m²

Emergency stairs12,3 m²

Emergency stairs12,0 m²

Emergency stairs12,0 m²

Shaft9,6 m²

Shaft9,5 m²

Shaft9,8 m²

Shaft9,8 m²

Admin14,9 m²

Admin14,8 m²

Admin14,9 m²

Conference47,9 m²

Staff Breakroom30,4 m²

Admin14,0 m²

Admin42,6 m²

Admin261,1 m²Admin

9,4 m²

RWC4,8 m²WC2,9 m²WC3,0 m²

WC3,0 m²

RWC4,8 m²

WC2,7 m²

Meeting11,6 m²

Admin32,8 m²

Korridor526,5 m²

Korridor13,2 m²

Specialist Care Adults

Imaging

Sampling

Daycare

Operation

Children and Youth

Administration

Gynocology

Orthopedics

Dialysis

Post

Pre

Ear, Nose, Throat

Primary Care

Psychiatry

Rehab

Research

Technical

UPPDRAG.NR RITAD/KONSTR. AV HANDLÄGGARE

DATUM ANSVARIG

SKALA NUMMER BET

A1A3

Y:\G

rou p

1\0

2 Mo

del\Re

vit\

Projek

tfil

U pda

te 161129\

Cent

ral File X

ospit a

l_fe

lix.rv

t20

16-12-

19 2

2:44

:23

FASTIGHETSBETECKNING

PROJEKTTYP

PROJEKTNAMN

A40.1-114c

Plan 2 DEPARTMENTS

Projekt nr Author

Arkitekt AB tel. 099-99 99 99A

Proj Designer

BET ÄNDRINGEN AVSER DATUM SIGN

Ex14,9 m²Ex

14,8 m²Ex14,9 m²Ex

14,8 m²Ex14,9 m²

Ex14,8 m²Ex

14,9 m²

Ex23,9 m²

Ex14,8 m²

Ex14,8 m²

Ex14,9 m²

Ex14,9 m²Ex

14,8 m²

Eye14,8 m² Eye

14,8 m² Ex14,9 m² Ex

14,8 m² Ex14,9 m² Ex

14,8 m²

Ex16,5 m²

Meeting23,9 m²

ECG Rest14,8 m² ECG Rest

14,9 m² ECG Rest14,8 m²

WC2,4 m²

Ex19,7 m² Ex

2,9 m²

Emergency stairs12,1 m²

Emergency stairs12,3 m²

Emergency stairs12,0 m²

Emergency stairs12,0 m²

Shaft9,6 m²

Shaft9,5 m²

Shaft9,8 m²

Shaft9,8 m²

Admin14,8 m² Admin

14,9 m² Admin14,8 m²

Staff Breakroom28,6 m²

Treatment14,8 m²Treatment

14,9 m²

Treatment21,3 m²Treatment

14,9 m²

Treatment17,8 m²

Treatment14,8 m²

Treatment14,8 m²

Treatment14,8 m²

Meeting31,8 m²

RWC6,8 m²

RWC4,8 m²

RWC6,9 m²

RWC5,1 m²

Desinfection12,4 m²

Desinfection12,5 m²

Storage21,1 m²

Goods27,2 m²

Medical storage24,7 m²

Cleaning storage9,4 m²

WC2,0 m²

Quiet room34,6 m²

Pentry14,8 m²

Printer & storage14,8 m²

Pentry14,9 m²

ECG14,9 m² ECG

14,8 m²

Printer10,7 m²

Admin8,6 m²

Admin9,8 m²

Admin5,7 m²

RWC4,8 m² RWC

4,8 m²Admin8,6 m²

Admin9,8 m²

Admin5,7 m²

Admin8,6 m²

Admin9,8 m²

Admin5,7 m²

RWC4,8 m²

Admin42,8 m²

ECG14,9 m²

ECG14,8 m²

Admin23,0 m²

WC2,4 m²

Administration/Office

goods

Korridor

MeetinG

Technical area

wc

Admin32,8 m²

Admin261,1 m²

UPPDRAG.NR RITAD/KONSTR. AV HANDLÄGGARE

DATUM ANSVARIG

SKALA NUMMER BET

A1A3

Y:\G

rou p

1\0

2 Mo

del\Re

vit\

Projek

tfil

U pda

te 161129\

Cent

ral File X

ospit a

l_fe

lix.rv

t20

16-12-

19 2

2:44

:07

FASTIGHETSBETECKNING

PROJEKTTYP

PROJEKTNAMN

A40.1-114b

Plan 2 COLORS

Projekt nr Author

Arkitekt AB tel. 099-99 99 99A

Proj Designer

BET ÄNDRINGEN AVSER DATUM SIGN

PLAN 2

The second floor houses specialist care for adults. This floor has the main general room structure for the framework of HOX.

With a column grid resulting in an inner wing width of 13.2 meters and an exterior width of 14 meters, this enables a room-corridor-room structure in this scenario.

The admin rooms and examination rooms are in this case similar in placement and sizes, which together offers great opportunities for light, simplicity and qualitative environment.

The span width also offers many different kinds of plan layouts, which is used on the upper floors.

ADULT SPECIALIST CAREGENERAL FLOOR PLAN

1:400

1:800 1:200

Page 11: THE FUTURE OF HEALTHCARE - chalmers.se · future changes and alterations A hospital built and optimised for today and tomorrow. The hospital was and is a symbol of health, knowledge

A<datum>

Operation55,5 m²

Operation55,4 m²

Operation61,5 m²

Operation61,1 m²

Operation55,9 m²

Post Op232,1 m²

Pentry39,6 m²

sterile wash6,8 m²

Operation56,0 m²

Goods Reception24,0 m²

Admin40,9 m²

Admin41,1 m²

Endoscopy30,2 m²

Staff Breakroom28,5 m²

Endoscopy30,7 m²

MaterialtekniskAvdelning37,7 m²

Förrum11,6 m²

Förrum11,5 m²

Sterile Storage21,4 m²

Sterile Storage21,1 m²

Förrum11,5 m²

Förrum11,6 m²

Machine storage24,0 m²

Machine storage24,0 m²

Anesthetic storage8,7 m²

Anesthetic storage8,7 m²Medical storage

8,7 m²Medical storage8,7 m²

Preperation12,9 m²

Conference38,3 m²

Waste23,9 m²

Garbage/ Pneumatictube3,8 m²

Preperation12,6 m²

sterile wash6,6 m²

Changingroom/Staff20,6 m²

Wash & Pack38,3 m²

WC2,6 m²WC

2,6 m²WC2,6 m²

WC2,6 m²

Wash & Pack15,0 m²

ELEL

Data/IT

Data/IT

Data/ITEL ELData/IT

ELEL

Gynocology21,4 m²

Admin14,0 m²

RWC4,8 m²

Data/IT

Data/IT

Changing room Patients20,4 m²

Changing room Patients20,5 m²

Sluss17,6 m²

Conversation room15,1 m²Conversation room

15,0 m²

Waiting room20,4 m² Desinfection

11,9 m²

Storage4,8 m²

RWC4,8 m²

WC1,8 m²

WC1,4 m²Shower1,8 m²

UPPDRAG.NR RITAD/KONSTR. AV HANDLÄGGARE

DATUM ANSVARIG

SKALA NUMMER BET

A1A3

Y:\G

rou p

1\0

2 Mo

del\Re

vit\

Projek

tfil

U pda

te 161129\

Cent

ral File X

ospit a

l_fe

lix.rv

t20

16-12-

18 17:10:58

FASTIGHETSBETECKNING

PROJEKTTYP

PROJEKTNAMN

A40.1-115

Plan 5

Projekt nr Author

Arkitekt AB tel. 099-99 99 99A

Proj Designer

BET ÄNDRINGEN AVSER DATUM SIGN

A<datum>

Operation55,5 m²

Operation55,4 m²

Operation61,5 m²

Operation61,1 m²

Operation55,9 m²

Post Op232,1 m²

Pentry39,6 m²

sterile wash6,8 m²

Operation56,0 m²

Goods Reception24,0 m²

Admin40,9 m²

Admin41,1 m²

Endoscopy30,2 m²

Staff Breakroom28,5 m²

Endoscopy30,7 m²

MaterialtekniskAvdelning37,7 m²

Förrum11,6 m²

Förrum11,5 m²

Sterile Storage21,4 m²

Sterile Storage21,1 m²

Förrum11,5 m²

Förrum11,6 m²

Machine storage24,0 m²

Machine storage24,0 m²

Anesthetic storage8,7 m²

Anesthetic storage8,7 m²Medical storage

8,7 m²Medical storage8,7 m²

Preperation12,9 m²

Conference38,3 m²

Waste23,9 m²

Garbage/ Pneumatictube3,8 m²

Preperation12,6 m²

sterile wash6,6 m²

Changingroom/Staff20,6 m²

Wash & Pack38,3 m²

WC2,6 m²WC

2,6 m²WC2,6 m²

WC2,6 m²

Wash & Pack15,0 m²

ELEL

Data/IT

Data/IT

Data/ITEL ELData/IT

ELEL

Gynocology21,4 m²

Admin14,0 m²

RWC4,8 m²

Data/IT

Data/IT

Changing room Patients20,4 m²

Changing room Patients20,5 m²

Sluss17,6 m²

Conversation room15,1 m²Conversation room

15,0 m²

Waiting room20,4 m² Desinfection

11,9 m²

Storage4,8 m²

RWC4,8 m²

WC1,8 m²

WC1,4 m²Shower1,8 m²

UPPDRAG.NR RITAD/KONSTR. AV HANDLÄGGARE

DATUM ANSVARIG

SKALA NUMMER BET

A1A3

Y:\G

rou p

1\0

2 Mo

del\Re

vit\

Projek

tfil

U pda

te 161129\

Cent

ral File X

ospit a

l_fe

lix.rv

t20

16-12-

18 17:10:58

FASTIGHETSBETECKNING

PROJEKTTYP

PROJEKTNAMN

A40.1-115

Plan 5

Projekt nr Author

Arkitekt AB tel. 099-99 99 99A

Proj Designer

BET ÄNDRINGEN AVSER DATUM SIGN

UPPDRAG.N RITAD/KONSTR. HANDLÄGGAR

DATUM ANSVARI

SKAL NUMMER BE

A1A3

Y:\G

rou p

1\0

2 Mo

del\Re

vit\

Projek

tfil

U pda

te 161129\

Cent

ral File X

ospit a

l_fe

lix.rv

t20

/12/

2 016 2

3:41

:20

FASTIGHETSBETECKNING

PROJEKTTYP

PROJEKTNAMN

A40.1-117b

Plan 5 DEPARTMENTS

Projekt nr Author

Arkitekt AB tel. 099-99 99 99A

Proj Designer

BET ÄNDRINGEN AVSER DATUM SIGN

PLAN 5

Floor 5 houses the whole operation department for HOX Hospital. Great light capacity, clear contact to outside and a calming professional atmosphere.

Once it is your time you will step into pre and post section with changing rooms right outside the initial waiting room. The changing rooms are situated in the very center of the department with all necessary functional examination rooms on the wings. Next to the changing room there will also be a seperate waiting room stationed before going to the sterile department.

The sterile department is composed by six full sized ope-ration theatres with support-functions in close proximity. By placing all theatres on the north wings the floor achie-ves great rationality, also by concentrating pre-and post operation on the south wings.

OPERATION

1:400

1:800 1:200

Page 12: THE FUTURE OF HEALTHCARE - chalmers.se · future changes and alterations A hospital built and optimised for today and tomorrow. The hospital was and is a symbol of health, knowledge

Specialist Care Adults

Imaging

Commercial

Sampling

Daycare

Operation

Children and Youth

Goods

Ground Floor

Administration

Gynocology

Orthopedics

Dialysis

Post

Pre

Ear, Nose, Throat

Primary Care

Psychiatry

Rehab

Research

Technical

UPPDRAG.N RITAD/KONSTR. HANDLÄGGAR

DATUM ANSVARI

SKAL NUMMER BE

A1A3

Y:\G

rou p

1\0

2 Mo

del\Re

vit\

Projek

tfil

U pda

te 161129\

Cent

ral File X

ospit a

l_fe

lix.rv

t20

/12/

2 016 2

1:18:13

FASTIGHETSBETECKNING

PROJEKTTYP

PROJEKTNAMN

A40.1-113b

Plan 1 DEPARTMENTS

Projekt nr Author

Arkitekt AB tel. 099-99 99 99A

Proj Designer

BET ÄNDRINGEN AVSER DATUM SIGN

Specialist Care Adults

Imaging

Sampling

Daycare

Operation

Children and Youth

Administration

Gynocology

Orthopedics

Dialysis

Post

Pre

Ear, Nose, Throat

Primary Care

Psychiatry

Rehab

Research

Technical

UPPDRAG.NR RITAD/KONSTR. AV HANDLÄGGARE

DATUM ANSVARIG

SKALA NUMMER BET

A1A3

Y:\G

rou p

1\0

2 Mo

del\Re

vit\

Projek

tfil

U pda

te 161129\

Cent

ral File X

ospit a

l_fe

lix.rv

t20

16-12-

19 2

3:19:17

FASTIGHETSBETECKNING

PROJEKTTYP

PROJEKTNAMN

A40.1-115b

Plan 3 DEPARTMENTS

Projekt nr Author

Arkitekt AB tel. 099-99 99 99A

Proj Designer

BET ÄNDRINGEN AVSER DATUM SIGN

Specialist Care Adults

Imaging

Sampling

Daycare

Operation

Children and Youth

Administration

Gynocology

Orthopedics

Dialysis

Post

Pre

Ear, Nose, Throat

Primary Care

Psychiatry

Rehab

Research

Technical

UPPDRAG.NR RITAD/KONSTR. AV HANDLÄGGARE

DATUM ANSVARIG

SKALA NUMMER BET

A1A3

Y:\G

rou p

1\0

2 Mo

del\Re

vit\

Projek

tfil

U pda

te 161129\

Cent

ral File X

ospit a

l_fe

lix.rv

t20

16-12-

19 2

2:44

:49

FASTIGHETSBETECKNING

PROJEKTTYP

PROJEKTNAMN

A40.1-115c

Plan 4 DEPARTMENTS

Projekt nr Author

Arkitekt AB tel. 099-99 99 99A

Proj Designer

BET ÄNDRINGEN AVSER DATUM SIGN

A<datum>

No color scheme assigned to view

HVAC113,3 m²

UPPDRAG.NR RITAD/KONSTR. AV HANDLÄGGARE

DATUM ANSVARIG

SKALA NUMMER BET

A1A3

Y:\G

rou p

1\0

2 Mo

del\Re

vit\

Projek

tfil

U pda

te 161129\

Cent

ral File X

ospit a

l_fe

lix.rv

t20

16-12-

18 17:11:04

FASTIGHETSBETECKNING

PROJEKTTYP

PROJEKTNAMN

A40.1-116

Plan 6

Projekt nr Author

Arkitekt AB tel. 099-99 99 99A

Proj Designer

BET ÄNDRINGEN AVSER DATUM SIGN

Specialist Care Adults

Imaging

Sampling

Daycare

Operation

Children and Youth

Administration

Gynocology

Orthopedics

Dialysis

Post

Pre

Ear, Nose, Throat

Primary Care

Psychiatry

Rehab

Research

Technical

UPPDRAG.NR RITAD/KONSTR. AV HANDLÄGGARE

DATUM ANSVARIG

SKALA NUMMER BET

A1A3

Y:\G

rou p

1\0

2 Mo

del\Re

vit\

Projek

tfil

U pda

te 161129\

Cent

ral File X

ospit a

l_fe

lix.rv

t20

16-12-

19 2

2:45

:17

FASTIGHETSBETECKNING

PROJEKTTYP

PROJEKTNAMN

A46.0-24

Plan 7 DEPARTMENTS

Projekt nr Author

Arkitekt AB tel. 099-99 99 99A

Proj Designer

BET ÄNDRINGEN AVSER DATUM SIGN

PLAN 1 PLAN 3

PLAN 4 PLAN 5

PLAN 2

PLAN 6

Specialist Care Adults

Imaging

Commercial

Sampling

Daycare

Operation

Children and Youth

Goods

Ground Floor

Administration

Gynocology

Orthopedics

Dialysis

Post

Pre

Ear, Nose, Throat

Primary Care

Psychiatry

Rehab

Research

Technical

UPPDRAG.N RITAD/KONSTR. HANDLÄGGAR

DATUM ANSVARI

SKAL NUMMER BE

A1A3

H:\G

rou p

1\0

2 Mo

del\Re

vit\

Projek

tfil

U pda

te 161129\

Cent

ral File X

ospit a

l_Ju

lius.rv

t20

16-12-

21 2

0:00

:16

FASTIGHETSBETECKNING

PROJEKTTYP

PROJEKTNAMN

A46.0-27

Plan 9 DEPARTMENTS

Projekt nr Author

Arkitekt AB tel. 099-99 99 99A

Proj Designer

BET ÄNDRINGEN AVSER DATUM SIGN

Stretch zone

Stretch mat

wall bars

Specialist Care Adults

Imaging

Commercial

Sampling

Daycare

Operation

Children and Youth

Goods

Ground Floor

Administration

Gynocology

Orthopedics

Dialysis

Post

Pre

Ear, Nose, Throat

Primary Care

Psychiatry

Rehab

Research

Technical

UPPDRAG.N RITAD/KONSTR. HANDLÄGGAR

DATUM ANSVARI

SKAL NUMMER BE

A1A3

Y:\G

rou p

1\0

2 Mo

del\Re

vit\

Projek

tfil

U pda

te 161129\

Cent

ral File X

ospit a

l_fe

lix.rv

t07

/01/2 0

17 19:57

:17

FASTIGHETSBETECKNING

PROJEKTTYP

PROJEKTNAMN

A46.0-26

Plan 8 DEPARTMENTS

Projekt nr Author

Arkitekt AB tel. 099-99 99 99A

Proj Designer

BET ÄNDRINGEN AVSER DATUM SIGN

PLAN 9PLAN 8PLAN 7

Ex14,9 m²Ex

14,8 m²Ex14,9 m²Ex

14,8 m²Ex14,9 m²

Ex14,8 m²Ex

14,9 m²

Ex23,9 m²

Ex14,8 m²

Ex14,8 m²

Ex14,9 m²

Ex14,9 m²Ex

14,8 m²

Eye14,8 m² Eye

14,8 m² Ex14,9 m² Ex

14,8 m² Ex14,9 m² Ex

14,8 m²

Ex16,5 m²

Meeting23,9 m²

ECG Rest14,8 m² ECG Rest

14,9 m² ECG Rest14,8 m²

WC2,4 m²

Ex19,7 m² Ex

2,9 m²

Emergency stairs12,1 m²

Emergency stairs12,3 m²

Emergency stairs12,0 m²

Emergency stairs12,0 m²

Shaft9,6 m²

Shaft9,5 m²

Shaft9,8 m²

Shaft9,8 m²

Admin14,9 m²

Admin14,8 m²

Admin14,9 m²

Conference47,9 m²

Staff Breakroom30,4 m²

Admin14,0 m²

Admin42,6 m²

Admin261,1 m²Admin

9,4 m²

RWC4,8 m²WC2,9 m²WC3,0 m²

WC3,0 m²

RWC4,8 m²

WC2,7 m²

Meeting11,6 m²

Admin32,8 m²

Korridor526,5 m²

Korridor13,2 m²

Specialist Care Adults

Imaging

Sampling

Daycare

Operation

Children and Youth

Administration

Gynocology

Orthopedics

Dialysis

Post

Pre

Ear, Nose, Throat

Primary Care

Psychiatry

Rehab

Research

Technical

UPPDRAG.NR RITAD/KONSTR. AV HANDLÄGGARE

DATUM ANSVARIG

SKALA NUMMER BET

A1A3

Y:\G

rou p

1\0

2 Mo

del\Re

vit\

Projek

tfil

U pda

te 161129\

Cent

ral File X

ospit a

l_fe

lix.rv

t20

16-12-

19 2

2:44

:23

FASTIGHETSBETECKNING

PROJEKTTYP

PROJEKTNAMN

A40.1-114c

Plan 2 DEPARTMENTS

Projekt nr Author

Arkitekt AB tel. 099-99 99 99A

Proj Designer

BET ÄNDRINGEN AVSER DATUM SIGN

UPPDRAG.N RITAD/KONSTR. HANDLÄGGAR

DATUM ANSVARI

SKAL NUMMER BE

A1A3

Y:\G

rou p

1\0

2 Mo

del\Re

vit\

Projek

tfil

U pda

te 161129\

Cent

ral File X

ospit a

l_fe

lix.rv

t20

/12/

2 016 2

3:41

:20

FASTIGHETSBETECKNING

PROJEKTTYP

PROJEKTNAMN

A40.1-117b

Plan 5 DEPARTMENTS

Projekt nr Author

Arkitekt AB tel. 099-99 99 99A

Proj Designer

BET ÄNDRINGEN AVSER DATUM SIGN

PRIMARY CARE

PEDIATRICS & YOUTH

SPECIALIST CARE ADULTS ORTHOPEDICS

GYNECOLOGY

EAR NOSE THROAT

IMAGING

SAMPLING

RESEARCH CENTER

OPERATION - PRE & POST TECHNICAL

DIALYSIS

DAYCAREREHAB

PSYCHIATRY

Terrace

ADMIN

TerraceTerrace

1:800

Page 13: THE FUTURE OF HEALTHCARE - chalmers.se · future changes and alterations A hospital built and optimised for today and tomorrow. The hospital was and is a symbol of health, knowledge

Changing room Patients24,8 m²

Goods27,2 m²

Admin34,5 m²

Examination14,8 m²

Examination14,9 m²

Examination14,9 m²Examination

14,8 m²

Examination14,8 m²

Examination14,8 m²

Examination14,9 m²

Examination14,9 m²

Examination14,8 m²

Examination14,8 m²

Examination14,9 m²

Examination14,8 m²

Examination14,9 m²

Examination14,8 m²

Examination14,8 m²

Examination14,8 m²

Examination14,9 m²

Examination14,6 m²

Gym146,5 m²

Changing room Patients24,8 m²

Spirometri16,3 m²

Spirometri16,3 m²

Examination14,8 m²

Examination14,8 m²

Examination14,8 m²

Examination14,9 m² Examination

14,8 m²Examination14,9 m² Examination

14,8 m²

Storage Walking aids31,3 m²

Meeting room30,6 m²

Admin14,8 m²

Admin14,8 m²

WC2,0 m²

Pentry14,8 m²

Admin34,5 m²

Stretch zone

Stretch mat

wall bars

Admin45,6 m²

Storage6,8 m²

RWC4,8 m²

Cleaning storage6,9 m²

RWC5,1 m²

Medical storage27,2 m²

Walking aid testing25,5 m²

WC2,0 m²

Meeting room10,2 m²

Administration/Office

goods

Korridor

MeetinG

Technical area

wc

Storage12,5 m²

Meeting7,2 m²

Meeting7,2 m²

Meeting8,6 m²

RWC4,8 m²RWC

4,8 m²RWC4,8 m²

Admin5,7 m²

Admin7,4 m²

Korridor85,8 m²

Korridor99,9 m²

Korridor13,4 m²

Admin512,7 m²

Admin23,9 m²

Examination14,9 m²Examination

14,8 m² Examination14,9 m²

UPPDRAG.NR RITAD/KONSTR. AV HANDLÄGGARE

DATUM ANSVARIG

SKALA NUMMER BET

A1A3

Y:\G

rou p

1\0

2 Mo

del\Re

vit\

Projek

tfil

U pda

te 161129\

Cent

ral File X

ospit a

l_fe

lix.rv

t20

16-12-

19 2

2:45

:33

FASTIGHETSBETECKNING

PROJEKTTYP

PROJEKTNAMN

A46.0-25

Plan 8 COLORS

Projekt nr Author

Arkitekt AB tel. 099-99 99 99A

Proj Designer

BET ÄNDRINGEN AVSER DATUM SIGN

Stretch zone

Stretch mat

wall bars

Specialist Care Adults

Imaging

Commercial

Sampling

Daycare

Operation

Children and Youth

Goods

Ground Floor

Administration

Gynocology

Orthopedics

Dialysis

Post

Pre

Ear, Nose, Throat

Primary Care

Psychiatry

Rehab

Research

Technical

UPPDRAG.N RITAD/KONSTR. HANDLÄGGAR

DATUM ANSVARI

SKAL NUMMER BE

A1A3

Y:\G

rou p

1\0

2 Mo

del\Re

vit\

Projek

tfil

U pda

te 161129\

Cent

ral File X

ospit a

l_fe

lix.rv

t07

/01/2 0

17 19:57

:17

FASTIGHETSBETECKNING

PROJEKTTYP

PROJEKTNAMN

A46.0-26

Plan 8 DEPARTMENTS

Projekt nr Author

Arkitekt AB tel. 099-99 99 99A

Proj Designer

BET ÄNDRINGEN AVSER DATUM SIGN

PLAN 8

The 8th floor houses a cooperation between rehabilitation and the psychiatry department. The rehab department is focused on the northwestern wings while the psychiatry is focused on the other two.

Both departments are sharing a common terrace facing the south. The terrace also enables the light to travel even further into the plan structure, giving light and fine exami-nation, consultation and administration rooms.

On the northest tip in the rehab department the patients have access to a full-equipped rehabilitation gym with day- and sunlight from all directions

REHAB & PSYCHIATRY+ TERRACE

Changing room Patients24,8 m²

Goods27,2 m²

Admin34,5 m²

Examination14,8 m²

Examination14,9 m²

Examination14,9 m²Examination

14,8 m²

Examination14,8 m²

Examination14,8 m²

Examination14,9 m²

Examination14,9 m²

Examination14,8 m²

Examination14,8 m²

Examination14,9 m²

Examination14,8 m²

Examination14,9 m²

Examination14,8 m²

Examination14,8 m²

Examination14,8 m²

Examination14,9 m²

Examination14,6 m²

Gym146,5 m²

Changing room Patients24,8 m²

Spirometri16,3 m²

Spirometri16,3 m²

Examination14,8 m²

Examination14,8 m²

Examination14,8 m²

Examination14,9 m² Examination

14,8 m²Examination14,9 m² Examination

14,8 m²

Storage Walking aids31,3 m²

Meeting room30,6 m²

Admin14,8 m²

Admin14,8 m²

WC2,0 m²

Pentry14,8 m²

Admin34,5 m²

Stretch zone

Stretch mat

wall bars

Admin45,6 m²

Storage6,8 m²

RWC4,8 m²

Cleaning storage6,9 m²

RWC5,1 m²

Medical storage27,2 m²

Walking aid testing25,5 m²

WC2,0 m²

Meeting room10,2 m²

Administration/Office

goods

Korridor

MeetinG

Technical area

wc

Storage12,5 m²

Meeting7,2 m²

Meeting7,2 m²

Meeting8,6 m²

RWC4,8 m²RWC

4,8 m²RWC4,8 m²

Admin5,7 m²

Admin7,4 m²

Korridor85,8 m²

Korridor99,9 m²

Korridor13,4 m²

Admin512,7 m²

Admin23,9 m²

Examination14,9 m²Examination

14,8 m² Examination14,9 m²

UPPDRAG.NR RITAD/KONSTR. AV HANDLÄGGARE

DATUM ANSVARIG

SKALA NUMMER BET

A1A3

Y:\G

rou p

1\0

2 Mo

del\Re

vit\

Projek

tfil

U pda

te 161129\

Cent

ral File X

ospit a

l_fe

lix.rv

t20

16-12-

19 2

2:45

:33

FASTIGHETSBETECKNING

PROJEKTTYP

PROJEKTNAMN

A46.0-25

Plan 8 COLORS

Projekt nr Author

Arkitekt AB tel. 099-99 99 99A

Proj Designer

BET ÄNDRINGEN AVSER DATUM SIGN

1:400

1:800

1:200

Page 14: THE FUTURE OF HEALTHCARE - chalmers.se · future changes and alterations A hospital built and optimised for today and tomorrow. The hospital was and is a symbol of health, knowledge

Plan 2+10,000

Plan 3+14,800

1430

300

3270

4800

1000

400

800

2200

2600

Plan 0+0,000

Plan 1+5,000

Plan 2+10,000

Plan 3+14,800

Plan 4+19,600

Plan 5+24,400

Plan 6+29,200

Plan 7+34,000

Plan 8+38,800

Plan 9+43,600

Plan 10+48,400

UPPDRAG.NR RITAD/KONSTR. AV HANDLÄGGARE

DATUM ANSVARIG

SKALA NUMMER BET

A1A3

Y:\G

rou p

1\0

2 Mo

del\Re

vit\

Projek

tfil

U pda

te 161129\

Cent

ral File X

ospit a

l_fe

lix.rv

t20

16-12-

19 18:10:34

FASTIGHETSBETECKNING

PROJEKTTYP

PROJEKTNAMN

A46.0-16

Sektion Syd - norr

Projekt nr Author

Arkitekt AB tel. 099-99 99 99A

Proj Designer

BET ÄNDRINGEN AVSER DATUM SIGN

SECTIONsMATERIALS DETAIL STRUCTURE

Plan 2+10,000

Plan 3+14,800

Plan 4+19,600

3270

1230

4500

25200

LONG SECTION 1:2000

ELEVATION

1:200Each general floor is made up of a height of 4.8 meters. This allows the hospital a flexibility to be ready for any technical future healthcare changes. The ceiling height of 1.2 meters makes enough space for any technical solutions. The final free height lands at just about 3.3 meters

This standard provides the hospital the option, if needed, to add additional operation theatres on any given floor.

A

SECTION A - A

1:400

A

B B

SECTION B - B

1:800

DETAIL

NO SCALEThe facade and exterior wall structure builds on the sandwich-element

standard. Facade details such as the wavy parts

are lightweight concrete elements

Page 15: THE FUTURE OF HEALTHCARE - chalmers.se · future changes and alterations A hospital built and optimised for today and tomorrow. The hospital was and is a symbol of health, knowledge

The exterior design continues its flows into HOX interi-or. Here you can see a resemblance of the wavy exterior elements in the ceiling. The ceiling design is also meant to resemble a human’s muscle tissue, and with this type of design, it can also be used as a guiding tool to make the wayfinding much easier

HOX great possibilities of transforming and rearranging its contents is characterized in its facade. Wavy lightweight concrete elements relieves the heavy structure of the white concrete finish. The dark grey metal sheets also gives a lighter character to the structural vertical communication.

FACADEMATERIALS DETAIL STRUCTURE

NORTH FACADE 1:800 SOUTH FACADE 1:800 EAST FACADE 1:800

WEST FACADE 1:800

EXTERIOR EXTERIOR

INTERIOR

CEILING DESIGN

M AT E R I A L S E L E C T I O N

WOODEN PANELSDARK WOOD VENEER

LIT WOODEN PANELSMAINLY PRESENT IN ENTRANCE AREA AND WAITING ROOMS

INTERIOR FURNITUREWHITEBEIGEGREY

INTERIOR FLOORINGWHITE

WHITE + CONTRAST-STRIPESCOLOR - GREEN & BLUE

INTERIOR COATED STONE FLOORINGHEAVY CHARACTER

LIGHT COLOR & REFLECTIONENTRANCE-BASED

OFFICE & EXAMINATIONWALL TEXTILE MATERIAL

WISE WHITEMARINE BLUE

WHITE TREATED CONCRETE

BLACK & GREY METAL SHEETSCOLLABORATES WITH WINDOW AND CONCRETE STRUCTURE

WINDOW GRID AND MULLIONS UTILIZE THE SAME MATERIAL FINISH AS EX-

TERIOR METAL SHEETS

HOX CUSTOM CEILING DESIGNRESEMBLES THE BODY’S MUSCLE

TISSUE

PHYSICAL MODEL OF FACADE

Page 16: THE FUTURE OF HEALTHCARE - chalmers.se · future changes and alterations A hospital built and optimised for today and tomorrow. The hospital was and is a symbol of health, knowledge

EXTERIOR

Page 17: THE FUTURE OF HEALTHCARE - chalmers.se · future changes and alterations A hospital built and optimised for today and tomorrow. The hospital was and is a symbol of health, knowledge

MAIN ENTRANCE

Page 18: THE FUTURE OF HEALTHCARE - chalmers.se · future changes and alterations A hospital built and optimised for today and tomorrow. The hospital was and is a symbol of health, knowledge

ADMIN DEPARTMENTS

Page 19: THE FUTURE OF HEALTHCARE - chalmers.se · future changes and alterations A hospital built and optimised for today and tomorrow. The hospital was and is a symbol of health, knowledge

WAITING ROOM - SPECIALIST CARE ADULTS

Page 20: THE FUTURE OF HEALTHCARE - chalmers.se · future changes and alterations A hospital built and optimised for today and tomorrow. The hospital was and is a symbol of health, knowledge

HOX”HOX genes are a group of related genes that control the body plan of an embryo along the head-tail axis.The HOX proteins determine the type of segment structures such as legs, arms, antennas and wings that will form on a given segment. HOX proteins thus confer

segmental identity, but do not form the actual segments themselves”

JULIUS BERNDTSON - FELIX TANG