the haven at mountain oaks

Upload: ryan-sloan

Post on 07-Apr-2018

218 views

Category:

Documents


0 download

TRANSCRIPT

  • 8/6/2019 The Haven at Mountain Oaks

    1/33

    Is project in Qualified Census Tract & Difficult to Develop area?

    Does a community revitalization plan exist?

    Print Preview - Final Application

    Tax Credits, RPP Loans, and/or Tax Exempt Bond Loans

    Project Name and Location

    Project Name: The Haven at Mountain Oaks

    Address: 500 Nanny's Lane

    City: Sylva County: Jackson Zip: 28779

    Census Tract: 9503 Block Group:

    Yes

    No

    Political Jurisdiction: Jackson County

    Jurisdiction CEO Name: First: Last:Kenneth Westmoreland Title: County Manager

    Jurisdiction Address: 401 Grindstaff Road

    Jurisdiction City: Sylva Zip: 28779

    Jurisdiction Phone: (828)586-7580

    Site Latitude:

    Site Longitude:

    Page 1 of 33Print - APP04-0131

    1/14/2005https://www.nchfa.org/Rental/RTCApp/(zlvmib55c2y0zj550wnts3ug)/site/PrintApp.aspx?...

  • 8/6/2019 The Haven at Mountain Oaks

    2/33

    Is this project a follow-on (Phase II, etc) to a previously-awarded tax credit development project?

    If yes, list names of previous phase(s):If yes, list names of previous phase(s):

    Will the project be receiving project based federal rental assistance?

    If yes, provide the subsidy source:If yes, provide the subsidy source: HUD and number of units:and number of units:

    Target Population: Elderly (RHS/HUD)

    Indicate below any additional targeting for special populations proposed for this project:

    Project Description

    Project Type:* New Construction Rehab Adaptive Reuse

    No

    Yes

    2424

    Mobility impaired handicapped: 5% of units comply with QAP Section IV(F)(3) (in addition to the units required by other federaland state codes.)

    Persons with disabilities or homeless populations: the greater of 5 units or 10% of the total units

    Remarks:

    Page 2 of 33Print - APP04-0131

    1/14/2005https://www.nchfa.org/Rental/RTCApp/(zlvmib55c2y0zj550wnts3ug)/site/PrintApp.aspx?...

  • 8/6/2019 The Haven at Mountain Oaks

    3/33

    Applicant Information

    Applicant Name: HEGM Corporation

    Address: 2021 Cross Beam Drive

    City: State: NC Zip:Charlotte 28217

    Contact: First: Last: Title:Danny Ellis Director

    Telephone: (704)357-6000

    Alt Phone:

    Fax: (704)357-1881

    Email Address: [email protected]

    Page 3 of 33Print - APP04-0131

    1/14/2005https://www.nchfa.org/Rental/RTCApp/(zlvmib55c2y0zj550wnts3ug)/site/PrintApp.aspx?...

  • 8/6/2019 The Haven at Mountain Oaks

    4/33

    Total Site Acreage: Total Buildable Acreage:

    If buildable acreage is less than total acreage, please explain:

    Identify utilities and services currently available (and with adequate capacity) for this site:

    Storm Sewer Water Sanitary Sewer Electric

    Is the demolition of any buildings required or planned?

    If yes, please describe:

    Are existing buildings on the site currently occupied?

    If yes:(a) Briefly describe the situation:

    (b) Will tenant displacement be temporary?

    (c) Will tenant displacement be permanent?

    Is the site directly accessed by an existing, paved, publicly maintained road?

    If no, please explain:

    Is any portion of the site located inside the 100 year floodplain?

    If yes:(a) Describe placement of project buildings in relation to this area:

    (b) Describe flood mitigation if the project will have improvements within the 100 year floodplain:

    Site Description

    2.0 2.0

    No

    No

    Yes

    No

    Page 4 of 33Print - APP04-0131

    1/14/2005https://www.nchfa.org/Rental/RTCApp/(zlvmib55c2y0zj550wnts3ug)/site/PrintApp.aspx?...

  • 8/6/2019 The Haven at Mountain Oaks

    5/33

    Page 5 of 33Print - APP04-0131

    1/14/2005https://www.nchfa.org/Rental/RTCApp/(zlvmib55c2y0zj550wnts3ug)/site/PrintApp.aspx?...

  • 8/6/2019 The Haven at Mountain Oaks

    6/33

    Does the owner have fee simple ownership of the property (site/buildings)?

    If yes provide:

    Purchase Date: Purchase Price:

    If no:

    Site Control

    No

    (a) Does the owner/principal or ownership entity have vaild option/contract to purchase the property? Yes

    (b) Does an identity of interest (direct or indirect) exist between the owner/principal or ownership entity with the option/contract for

    purchase of the property and the seller of the property?If yes, specify the relationship:

    No

    (c) Enter the current expiration date of the option/contract to purchase: 12/31/2004

    (D) Enter Purchase Price: 154,000

    Page 6 of 33Print - APP04-0131

    1/14/2005https://www.nchfa.org/Rental/RTCApp/(zlvmib55c2y0zj550wnts3ug)/site/PrintApp.aspx?...

  • 8/6/2019 The Haven at Mountain Oaks

    7/33

    Present zoning classification of the site:

    Is mutifamily use permitted?

    Are variances, special or conditional use permits or any other item requiring a public hearing needed to develop this proposal?

    If yes, have the hearings been completed and permits been obtained?

    If yes, specify permit or variance required and date obtained. If no, describe permits/variances required and schedule for obtainingthem:

    Are there any existing conditions of historical significance located on the project site that will require State Historic Preservation office review?

    If yes, describe below:

    Are there any existing conditions of environmental significance located on the project site?

    If yes, describe below:

    Zoning

    No Zoning in Jackson County

    Yes

    No

    No

    No

    Page 7 of 33Print - APP04-0131

    1/14/2005https://www.nchfa.org/Rental/RTCApp/(zlvmib55c2y0zj550wnts3ug)/site/PrintApp.aspx?...

  • 8/6/2019 The Haven at Mountain Oaks

    8/33

  • 8/6/2019 The Haven at Mountain Oaks

    9/33

  • 8/6/2019 The Haven at Mountain Oaks

    10/33

    The Median Income for Jackson county is $47,300.

    Low Income Units

    Employee Units (will add to Low Income Unit total)

    Market Rate Units

    Statistics

    Square Footage Information

    Notes

    Unit Mix

    Type # BRs Net Sq.Ft.Total

    # Units#Units

    MonthlyRent

    UtilityAllowance

    MandatoryServ. Fees

    **TotalHousing Exp.

    Gdn Apt 1 593 24 5 391 78 469

    Utilites included in rents: Water/Sewer Electric Gas Other Trash Collection

    Type # BRs Net Sq.Ft.Total

    # Units#Units

    MonthlyRent

    UtilityAllowance

    MandatoryServ. Fees

    **TotalHousing Exp.

    Utilites included in rents: Water/Sewer Electric Gas Other

    Type # BRs Net Sq.Ft. Total# Units #Units MonthlyRent UtilityAllowance MandatoryServ. Fees **TotalHousing Exp.

    Utilites included in rents: Water/Sewer Electric Gas Other

    AllUnits

    Units

    Gross MonthlyRental Income

    Low Income....... 24 5 9384

    Market Rate.......

    Totals............... 24 5 9384

    Proposed number of residential buildings: 6 Maximum number of stories in buildings: 1

    Project Includes:Separate community building -- Sq. Ft. (Floor Area):Sq. Ft. (Floor Area): 1,2001,200

    Community space within residential bulding(s) -- Sq. Ft. (Floor Area):Sq. Ft. (Floor Area):

    Elevators -- Number of Elevators:Number of Elevators:

    Gross Floor Square Footage: 16,380

    Total Net Sq. Ft. (All Heated Areas): 15,440

    ** Please refer to the Income Limits and Maximum Housing Expense Table to ensure that Total Monthly Tenant Expenses for low incomeunits are within established thresholds.

    Page 10 of 33Print - APP04-0131

    1/14/2005https://www.nchfa.org/Rental/RTCApp/(zlvmib55c2y0zj550wnts3ug)/site/PrintApp.aspx?...

  • 8/6/2019 The Haven at Mountain Oaks

    11/33

    Specify Low Income Unit Targeting in table below. List each applicable targeting combination in a separate row below. Click [Add] to createanother row. Click "X" (at the left of each row) to delete a row. Add as many rows as needed.

    Total Low Income Units:

    Note: This number should match the total number of low income units in the Unit Mix section.

    Targeting

    # BRs Units %

    1 15 targeted at 50 percent of median income.

    1 9 targeted at 60 percent of median income.

    24

    Page 11 of 33Print - APP04-0131

    1/14/2005https://www.nchfa.org/Rental/RTCApp/(zlvmib55c2y0zj550wnts3ug)/site/PrintApp.aspx?...

  • 8/6/2019 The Haven at Mountain Oaks

    12/33

    Estimated pricing on sale of Federal Tax Credits: $0.

    Remarks concerning project funding sources:(Please be sure to include the name of the funding source(s))

    Funding Sources

    Source AmountNon-

    Amortizing*Rate(%)

    Term(Years)

    Amort.Period(Years)

    AnnualDebt

    Service

    Bank Loan

    RPP LoanLocal Gov. Loan - Specify:

    RD 515 Loan

    RD 538 Loan - Specify:

    AHP Loan 307,241 2.00 20 20 18,651

    Other Loan 1 - Specify:

    Other Loan 2 - Specify:

    Other Loan 3 - Specify:

    Tax Exempt Bonds

    State Tax Credit(Loan) 330,790 0 30 30 0

    State Tax Credit(Direct Refund)

    Equity: Federal LIHTC 1,395,809

    Non-Repayable Grant

    Equity: Historic Tax Credits

    Deferred Developer Fees

    Owner Investment

    Other - Specify:

    Total Sources** 2,033,840

    * "Non-amortizing" indicates that the loan does not have a fixed annual debt service. For these items, you must fill in 20-year debt servicebelow.

    ** Total Sources must equal total replacement cost in Project Development Cost (PDC) section.

    75

    704,836 is max STC loan. We can blend any portion of this with all or part of AHP loan atdirection of your Agency to gain maximum points andmeet your underwriting guidelines.

    Page 12 of 33Print - APP04-0131

    1/14/2005https://www.nchfa.org/Rental/RTCApp/(zlvmib55c2y0zj550wnts3ug)/site/PrintApp.aspx?...

  • 8/6/2019 The Haven at Mountain Oaks

    13/33

    Development Costs

    Item Cost Element TOTAL COSTEligible Basis

    30% PV 70% PV

    1 Purchase of Buildings (Rehab) 0

    2 Demoli tion

    3 On-site Improvements 260,000 260,000

    4 Rehabilitation

    5 Construction of New Building(s) 940,000 940,000

    6 Accessory Building(s)

    7 General Requirements 72,000 72,000

    8 Contractor Overhead 25,440 25,440

    9 Contractor Profit 76,320 76,320

    10 Construction Contingency 41,212 41,212

    11 Architect's Fee - Design 26,001 26,000

    12 Architect's Fee - Inspection 6,500 6,500

    SUBTOTAL (lines 1 through 12) 1,447,473

    13 Construction Insurance (prorate)

    14 Construction Loan Orig. Fee (prorate) 24,000 24,000

    15 Construction Loan Interest (prorate) 34,000 34,000

    16 Construction Loan Credit Enhancement (prorate)

    17 Construction Period Taxes (prorate)

    18 Water, Sewer and Impact Fees 17,251 17,251

    19 Survey 8,000 8,000

    20 Property Appraisal 2,500 2,500

    21 Environmental Report 5,000 5,000

    22 Market Study 4,000 4,000

    23 Bond Costs (specify)

    24 Cost of Issuance

    25 Placement Fee

    26 Permanent Loan Origination Fee

    27 Permanent Loan Credit Enhancement

    28 Title and Recording

    SUBTOTAL (lines 13 through 28) 94,751

    29 Real Estate Attorney 18,000 18,000

    30 Other Attorney's Fees 7,000 7,000

    31 Tax Credit App Fees 14,316 14,316

    32 Cost Certification 2,500 2,500

    33 Tax Opinion

    34 Organizational (Partnership)

    35 Tax Credit Monitoring Fee 12,600

    SUBTOTAL (lines 29 through 35) 54,416

    36 Furnishings and Equipment 4,000 4,000

    37 Relocation Expenses

    38 Developer's Fee (max 15% lines 2-36, less 8 & 9) 222,000 222,000

    39 Other Basis Expense (specify)

    40 Other Basis Expense (specify)

    41 Rent-up Expenses

    42 Other Non-basis Expense (specify)

    43 Other Non-basis Expense (specify)

    SUBTOTAL (lines 36 through 43) 226,000

    44 Rent up Reserve 7,200

    Page 13 of 33Print - APP04-0131

    1/14/2005https://www.nchfa.org/Rental/RTCApp/(zlvmib55c2y0zj550wnts3ug)/site/PrintApp.aspx?...

  • 8/6/2019 The Haven at Mountain Oaks

    14/33

    Comments:

    45 Operating Reserve 50,000

    46 Other Reserve (specify)

    47 Other Reserve (specify)

    48 DEVELOPMENT COST (lines 1-47) 1,879,840 0 1,810,039

    49 Less Federal Financing

    50 Less Disproportionate Standard

    51 Less Nonqualified Nonrecourse Financing

    52 Less Historic Tax Credit (residential) 0

    53 TOTAL ELIGIBLE BASIS 1,810,039 0 1,810,039

    54 Applicable Fraction (percentage of LI Units) 100.00% 100% 100%

    55 Basis Before Boost 1,810,039 0 1,810,039

    56 Boost for QCT/DDA (if applicable, enter 130%) 130.00% 130.00%

    57 TOTAL QUALIFIED BASIS 2,353,050 0 2,353,050

    58 Tax Credit Rate 0.00% 7.91%

    59 Federal Tax Credits at Estimated Rate 186,126 0 186,126

    60 Federal Tax Credits at 8.5% or 3.75% 200,009 0 200,009

    61 Federal Tax Credits Requested 185,842 185,842

    62 Land Cost 154,000

    63 TOTAL REPLACEMENT COST 2,033,840

    Page 14 of 33Print - APP04-0131

    1/14/2005https://www.nchfa.org/Rental/RTCApp/(zlvmib55c2y0zj550wnts3ug)/site/PrintApp.aspx?...

  • 8/6/2019 The Haven at Mountain Oaks

    15/33

    Please provide a detailed description of the proposed project:

    Construction (check all that apply):

    Brick Vinyl Wood HardiPlank Balconies/Patios Sunrooms Front Porches

    Front Gables or Dormers Wide Banding or Vertical/Horizontal Siding

    Other:

    Have you built other tax credit developments that use the same building design as this project?

    If yes, please provide name and address:

    Site Amenities (check all that apply):

    Onsite Activities:

    Landscaping Plans:

    Market Study Information

    Twenty-four 1 BR garden type units for elderly residents per HUD definition located in Sylva, NCwith project based Section 8 and amenities applicable to resident population.

    No

    Community Bldg - Sq Ft: 1,200 Community Room - Sq Ft: 600 Garages - Number:

    Laundry Rm Screened Porch Resident Computer Center Exam Rm Reading Rm/Library

    Game/Craft Rm Exercise Rm TV Rm Beauty Salon Vending Rm

    Chapel/Prayer Rm Picnic Area Onsite Leasing Office Onsite Mgr Onsite Maint. Person

    Irrigated Lawns Security Gate Car Care Area Storage Units Gazebos

    Walking Trails Garden Spots Basketball/Tennis Court Playground Ball Field

    Pool Fitness Stations Horseshoe Pit Shuffleboard Covered Drive Thru

    Page 15 of 33Print - APP04-0131

    1/14/2005https://www.nchfa.org/Rental/RTCApp/(zlvmib55c2y0zj550wnts3ug)/site/PrintApp.aspx?...

  • 8/6/2019 The Haven at Mountain Oaks

    16/33

    Interior Apartment Amenities (check all that apply):

    Flooring: Carpet Vinyl Wood Wood Parquet Ceramic Tile Other

    Heating/Cooling: Central Air Gas Heat Heat Pump Electric Pump

    Do you plan to submit additional market data (market study, etc.) that you want considered?

    If yes, please make sure to include the additional information in your pre-application packet.

    Range Hood Dishwasher Disposal Refrigerator (frost free) Storage interior/exterior

    W/D Hookups Mini-blinds Pantry Ceiling fans Walk-in closets

    Yes

    Page 16 of 33Print - APP04-0131

    1/14/2005https://www.nchfa.org/Rental/RTCApp/(zlvmib55c2y0zj550wnts3ug)/site/PrintApp.aspx?...

  • 8/6/2019 The Haven at Mountain Oaks

    17/33

  • 8/6/2019 The Haven at Mountain Oaks

    18/33

    For each applicable neighborhood feature, enter distance from project in miles.

    Other facilities or services:

    Grocery Store0.2 Community/Senior Center

    Mall/Strip Center1.0 Hospital3.2

    Outdoor Athletic Fields5.0 Pharmacy0.3

    Day Care/After School1.3 Basic Health Care3.2

    Schools0.4 Medical Offices3.2Public Transportation Stop Bank/Credit Union0.4

    Convenience Store0.7 Restaurants0.3

    Basketball/Tennis Courts5.0 Professional Services2.4

    Public Parks5.0 Movie Theater2.4

    Gas Station0.7 Video Rental1.4

    Library2.9 Public Safety (Fire/Police)2.4

    Fitness/Nature Trails5.0 Post Office1.1

    Public Swimming Pools5.0

    Page 18 of 33Print - APP04-0131

    1/14/2005https://www.nchfa.org/Rental/RTCApp/(zlvmib55c2y0zj550wnts3ug)/site/PrintApp.aspx?...

  • 8/6/2019 The Haven at Mountain Oaks

    19/33

  • 8/6/2019 The Haven at Mountain Oaks

    20/33

    DevelopmentList number low-income/tax credit housing projects and units developed, operated, and maintained in compliance by the principal(s) betweenDecember 1, 1996 and January 1, 2003:

    ManagementList number of low-income housing tax credit units managed in the past 10 years:

    Has any owner, principal, or management agent been debarred or received a limited denial participation in the past 10 years by any federal or

    state agency?

    Has any owner, principal, or management agent been involved in a bankruptcy, an adverse fair housing settlement, an adverse civil rights

    settlement, or an adverse federal or state government proceeding and settlement in the past 10 years?

    Has any owner or principal been in a mortgage default or delinquency of three months or more within the last 5 years on a FHA-insuredproject, a Rural Development funded rental project, a tax-exempt funded mortgage, a tax credit project, or any other publicly subsidized

    project?

    Has any owner or principal been involved within the last 10 years in a project which previously received an allocation of tax credits but failed tomeet compliance standards of the tax credit allocation, including return of a reservation of tax credits to the Agency after the carryover

    agreement has been signed?

    Has any owner or principal had a Form 8823 filed with the IRS for noncompliance on a project using low-income housing tax credits or

    received a letter of non-compliance from the Agency?

    Project Team Experience

    North Carolina Other States

    Projects: 16 16

    Units: 425 626

    North Carolina Other States

    Projects: 49 63

    Units: 1,462 2,009

    No

    No

    No

    No

    Yes

    Page 20 of 33Print - APP04-0131

    1/14/2005https://www.nchfa.org/Rental/RTCApp/(zlvmib55c2y0zj550wnts3ug)/site/PrintApp.aspx?...

  • 8/6/2019 The Haven at Mountain Oaks

    21/33

    Financing Commitments

    Does the project have a firm commitment for construction financing? Yes

    Does the project have a letter of intent for private permenant financing? No

    Does the project have a firm commitment for government financing? Yes

    Does the project have a letter of intent from an investor? Yes

    Is any portion of the eligible basis of new contruction or rehabilitation financed with federal subsidies other than CDBG funds or fundsfrom the HOME program? No

    If yes, indicate the type and amount below:

    Tax Exempt Financing: $

    RD 515 Financing: $

    Hope VI Financing: $

    Other: $

    If Other, specify the type of Federal subsidy:

    Page 21 of 33Print - APP04-0131

    1/14/2005https://www.nchfa.org/Rental/RTCApp/(zlvmib55c2y0zj550wnts3ug)/site/PrintApp.aspx?...

  • 8/6/2019 The Haven at Mountain Oaks

    22/33

    Project Operations (Year One)

    Projected Operating Costs

    Administrative Expenses

    Advertising 300

    Office Salaries

    Office Supplies

    Office or Model Apartment Rent

    Management Fee 12,096

    Manager or Superintendent Salaries 7,400

    Manager or Superintendent Rent Free Unit

    Legal Expenses (Project)

    Auditing Expenses (Project) 3,000

    Bookkeeping Fees/Accounting Services

    Telephone and Answering Service 1,200

    Bad Debts

    Other Administrative Expenses (specify):

    SUBTOTAL 23,996

    Utilities ExpenseFuel Oil

    Electricity (Light and Misc. Power) 2,000

    Water 3,400

    Gas

    Sewer 3,400

    SUBTOTAL 8,800

    Operating and Maintenance Expenses

    Janitor and Cleaning Payroll

    Janitor and Cleaning Supplies

    Janitor and Cleaning Contract

    Exterminating Payroll/Contract 600

    Exterminating Supplies

    Garbage and Trash Removal 1,080

    Security Payroll/Contract

    Grounds Payroll

    Grounds Supplies 400

    Grounds Contract 3,900

    Repairs Payroll 7,000

    Repairs Material 3,000

    Repairs Contract

    Elevator Maintenance/Contract

    Heating/Cooling Repairs and Maintenance

    Swimming Pool Maintenance/Contract

    Snow Removal 600

    Decorating Payroll/Contract

    Decorating Supplies 400

    Other (specify):

    Miscellaneous Operating & Maintenance Expenses 600

    SUBTOTAL 17,580

    Taxes and Insurance

    Real Estate Taxes 15,800

    Payroll Taxes (FICA)

    Miscellaneous Taxes, Licenses and Permits

    Page 22 of 33Print - APP04-0131

    1/14/2005https://www.nchfa.org/Rental/RTCApp/(zlvmib55c2y0zj550wnts3ug)/site/PrintApp.aspx?...

  • 8/6/2019 The Haven at Mountain Oaks

    23/33

    Property and Liability Insurance (Hazard) 4,200

    Fidelity Bond Insurance 100

    Workmen's Compensation 600

    Health Insurance and Other Employee Benefits

    Other Insurance:

    SUBTOTAL 20,700

    Supportive Service Expenses

    Service Coordinator

    Service Supplies

    Tenant Association Funds

    Other Expenses (specify):

    SUBTOTAL 0

    Reserves

    Replacement Reserves 6,000

    SUBTOTAL 6,000

    TOTAL OPERATING EXPENSES 77,076

    ADJUSTED TOTAL OPERATING EXPENSES(Does not include taxes, reserves and resident support services) *

    55,276

    TOTAL UNITS(from total units in the Unit Mix section) 24

    PER UNIT PER YEAR 2,303

    Page 23 of 33Print - APP04-0131

    1/14/2005https://www.nchfa.org/Rental/RTCApp/(zlvmib55c2y0zj550wnts3ug)/site/PrintApp.aspx?...

  • 8/6/2019 The Haven at Mountain Oaks

    24/33

  • 8/6/2019 The Haven at Mountain Oaks

    25/33

    Design Features

    ITEM DESCRIPTION

    Foundation/Slab Components 4" Thick Concrete Slab

    Primary Windows Make: Model:Binnings 70 Series Type/Construction: Aluminum Window/Insulated Glass

    Exterior Doors Type: Frames:Insulated Metal Wood

    Siding Type: Grade/Thickness:Hardi Plank 5/16"

    Warranty: 50 Years

    Exterior Trim Hardi Trim

    Shingles Type: Weight:Certainteed 235lbs./sq.

    Warranty: 30 Years

    Sprinkler System N/A

    Cabinets Factory Assembled Wood

    Heat Pump SEER: Make:10 SEER Janitrol

    Model: cpke 18-1

    Air Conditioner SEER: Make:10 SEER Janitrol

    Model: AW 18-05

    Other Heat Systems SEER: Make:N/A

    Model:

    Page 25 of 33Print - APP04-0131

    1/14/2005https://www.nchfa.org/Rental/RTCApp/(zlvmib55c2y0zj550wnts3ug)/site/PrintApp.aspx?...

  • 8/6/2019 The Haven at Mountain Oaks

    26/33

  • 8/6/2019 The Haven at Mountain Oaks

    27/33

    Remarks:

    Mirror/Shower Door/Encls. 0

    Hardware/Bath Access. 3,000 5,000 8,000

    Appliances 3,400 19,600 23,000

    Playground Equipment 0

    Interior Clean 2,000 2,000

    Exterior Clean/Dumpster Rental 1,000 1,000

    Other 1 (specify in Remarks) 0

    Other 2 (specify in Remarks) 0

    Total Cost 321,500 618,500 940,000

    Page 27 of 33Print - APP04-0131

    1/14/2005https://www.nchfa.org/Rental/RTCApp/(zlvmib55c2y0zj550wnts3ug)/site/PrintApp.aspx?...

  • 8/6/2019 The Haven at Mountain Oaks

    28/33

    This is a detailed breakdown of the General Requirements cost element you summarized in the Development Costs table (GeneralRequirements). The total should match that roll-up value.

    Remarks:

    Costs - General

    ITEM TOTAL

    Supervision 35,500

    Job Site Office/Trailer Rental 5,500

    Office Supplies

    Security/Watchman 200

    Project Signage

    Tools and Equipment

    Gas, Oil, and Maintenance

    Temporary Water, Electric, and Telephone 6,000

    Storage/Hauling 3,800

    Driveway Access Permit

    Porta-John Rental/DumpingBuilders Risk Insurance 4,130

    Re-inspection Fees

    Extra Plans and Specifications 400

    Miscellaneous, Casual Labor 14,670

    Equipment Rental 1,800

    Other 1 (specify in Remarks)

    Other 2 (specify in Remarks)

    Total Cost 72,000

    Page 28 of 33Print - APP04-0131

    1/14/2005https://www.nchfa.org/Rental/RTCApp/(zlvmib55c2y0zj550wnts3ug)/site/PrintApp.aspx?...

  • 8/6/2019 The Haven at Mountain Oaks

    29/33

    This is a detailed breakdown of the Site Improvements cost element you summarized in the Development Costs table (On-siteImprovements). The total should match that roll-up value.

    Remarks:

    Costs - Improvements

    ITEM TOTAL

    Subsurface Explorat ion/Perk Testing/Site Engineering 3,000

    Clearing/Grading/Final Grading/Excess and Borrow 82,500

    Demolition 8,000

    Earthwork/Excavation/Aerating 14,000

    Soil Treatment 2,000

    Pile Foundations

    Caissons

    Shoring/Bracing

    Site Drainage 18,000

    Site Utilities/Site Lighting 56,000

    Paving and Surfacing/Curb and Gutter 31,000Walkways 9,000

    Site Signage 500

    Parking Lot Painting 3,000

    Dumpster Pads/Fencing 5,000

    Fencing/Gates

    Landscaping/Topsoil 20,000

    Rock and Hardpan Excavation

    Site Supervision Personnel 8,000

    Other (specify in Remarks)

    Total Cost 260,000

    Page 29 of 33Print - APP04-0131

    1/14/2005https://www.nchfa.org/Rental/RTCApp/(zlvmib55c2y0zj550wnts3ug)/site/PrintApp.aspx?...

  • 8/6/2019 The Haven at Mountain Oaks

    30/33

    This is a detailed breakdown of the Bond Costs cost element you summarized in the Development Costs table (Bond Costs). The totalshould match that roll-up value.

    Remarks:

    Costs - Bond Costs

    ITEM TOTAL

    Letter of Credit Fee

    Credit Enhancement

    Underwriter Discount

    Capital Interest Fund

    Other 1 (specify in Remarks)

    Other 2 (specify in Remarks)

    Total Cost 0

    Page 30 of 33Print - APP04-0131

    1/14/2005https://www.nchfa.org/Rental/RTCApp/(zlvmib55c2y0zj550wnts3ug)/site/PrintApp.aspx?...

  • 8/6/2019 The Haven at Mountain Oaks

    31/33

    This is a detailed breakdown of the Bond Issuance cost element you summarized in the Development Costs table (Cost of Issuance). Thetotal should match that roll-up value.

    Remarks:

    Costs - Bond Issuance

    ITEM TOTAL

    Bond Counsel

    Issuer Counsel

    Credit Enhancement/LOC Counsel

    Underwriter Counsel

    Developer's Counsel

    Rating Agency Fee

    Printing

    Trustee Fee

    Trustee Counsel

    Issuer's Fee

    Other 1 (specify in Remarks)Other 2 (specify in Remarks)

    Other 3 (specify in Remarks)

    Total Cost 0

    Page 31 of 33Print - APP04-0131

    1/14/2005https://www.nchfa.org/Rental/RTCApp/(zlvmib55c2y0zj550wnts3ug)/site/PrintApp.aspx?...

  • 8/6/2019 The Haven at Mountain Oaks

    32/33

    MINIMUM REQUIRED SET ASIDES (No Points Awarded):

    Minimum Set-Asides

    Select one of the following two options:

    20% of the qualified units are rent restricted and occupied by households with incomes at or below 50% of the median income (Note:No Tax Credit Eligble Units in the the project can exceed 50% of median income)

    40% of the qualified units are rent restricted and occupied by households with incomes at or below 60% of the median income (Note:No Tax Credit Eligble Units in the the project can exceed 60% of median income)

    If requesting RPP funds:

    40% of the qualified unit are occupied by households with incomes at or below 50% of median income.

    State Tax Credit and QAP Targeting Points:

    Low Income County:

    At least forty percent (40%) of qualified units will be affordable to households with incomes at or below fifty percent (50%) of countymedian income.

    At least forty percent (40%) of qualified units will be affordable to and occupied by households with incomes at or below fifty percent(50%) of county median income.

    Tax Exempt Bonds

    Threshold requirement (select one):

    At least ten percent (10%) of qualified units will be affordable to and occupied by households with incomes at or below fifty percent(50%) of county median income.

    At least five percent (5%) of qualified units will be affordable to and occupied by households with incomes at or below forty percent(40%) of county median income.

    Eligible for mortgage subsidy points (select one):

    At least twenty percent (20%) of qualified units will be affordable to and occupied by households with incomes at or below fifty percent(50%) of county median income.

    At least ten percent(10%) of qualified units will be affordable to and occupied by households with incomes at or below forty percent(40%) of county median income.

    Page 32 of 33Print - APP04-0131

    1/14/2005https://www.nchfa.org/Rental/RTCApp/(zlvmib55c2y0zj550wnts3ug)/site/PrintApp.aspx?...

  • 8/6/2019 The Haven at Mountain Oaks

    33/33

    PLEASE indicate which of the following exhibits are attached to your application. Others may be required as noted.

    Full Application Checklist

    A Nonprofit Organization Documentation or For-profit Corporation Documentation

    B Current Financial Statements/Principals and Owners

    C Ownership Entity Agreement, Development Agreement or any other agreements governing development services

    D Management Agent Agreement

    E Development and manager multi-family experience & Management Questionnaire (Appendix C)

    F Letters from State Housing Agencies or designated monitoring agent verifying Out of State Management Experience

    G Completed IRS Form 8821 (Appendix I)

    H Letters from Local Utility Providers (original on letterhead, no fax or photocopies)

    I Local Government Letter or Letter from Certified Engineer or Land Surveyor Confirming Floodplain Designation with Mapshowing 100 year and 500 year floodplain (original on letterhead, no fax or photocopies)

    J Local Government Letter Confirming Zoning (original on letterhead, no fax or photocopies)

    K Copy of certificate of occupancy or proof of placed-in-service date (Rehabs Only)

    L Site plan, floor plans and elevations

    M Hazard and structural inspection and termite reports (Renovation projects only)

    N Anticipated budget demonstrating how the project would meet the 10% test by November 14th.

    O Evidence of Architect's Errors and Omissions insurance (or equivalent).

    P Description of acquisition for existing/occupied projects or for projects with occupied buildings to be demolished.

    Q Description of proposed Relocation Plan & Relocation Budget, Etc. If any relocation is anticipated, reference Appendix F.

    R Targeting Plan and supporting documentation (Required for all projects)

    S Local Housing Authority Agreement (Reference Model in Appendix I)

    T Appraisal (for land costs greater than $5,000 and for buildings in rehab projects)

    U Evidence of Permanent Loan Commitment, other sources of funds, and project-based subsidies.

    V Statement regarding terms of Deferred Developer Fee and, if nonprofit, resolution of Board approving fee.

    W Inducement Resolution (Tax-Exempt Bond Financed Projects only)

    X Documentation to support estimated utility costs.

    Page 33 of 33Print - APP04-0131