the integration between design and maintenance...

459
THE INTEGRATION BETWEEN DESIGN AND MAINTENANCE OF OFFICE BUILDING AUTOMATION: A DECISION SUPPORT APPROACH by Frank Ching-Shou Lin BS (AeroEng), MTM (TecMgt) A thesis submitted in partial fulfillment of the requirements for the degree of Doctor of Philosophy Faculty of Built Environment and Engineering Queensland University of Technology 2005

Upload: hoangngoc

Post on 02-Apr-2018

217 views

Category:

Documents


4 download

TRANSCRIPT

Page 1: THE INTEGRATION BETWEEN DESIGN AND MAINTENANCE …eprints.qut.edu.au/16058/1/Frank_Lin_Thesis.pdf · the integration between design and maintenance of office building automation:

THE INTEGRATION

BETWEEN DESIGN AND MAINTENANCE

OF

OFFICE BUILDING AUTOMATION:

A DECISION SUPPORT APPROACH

by

Frank Ching-Shou Lin BS (AeroEng), MTM (TecMgt)

A thesis submitted in partial fulfillment of

the requirements for the degree of

Doctor of Philosophy

Faculty of Built Environment and Engineering

Queensland University of Technology

2005

Page 2: THE INTEGRATION BETWEEN DESIGN AND MAINTENANCE …eprints.qut.edu.au/16058/1/Frank_Lin_Thesis.pdf · the integration between design and maintenance of office building automation:

II

Page 3: THE INTEGRATION BETWEEN DESIGN AND MAINTENANCE …eprints.qut.edu.au/16058/1/Frank_Lin_Thesis.pdf · the integration between design and maintenance of office building automation:

III

DECLARATION The work contained in this thesis has not been previously submitted for a

degree or diploma at any other higher education institution. To the best of

my knowledge and belief, the thesis contains no material previously

published or written by another person except where due reference is

made.

Signature:

Date:

Page 4: THE INTEGRATION BETWEEN DESIGN AND MAINTENANCE …eprints.qut.edu.au/16058/1/Frank_Lin_Thesis.pdf · the integration between design and maintenance of office building automation:

IV

ACKNOWLEDGMENTS This thesis represents more than a research project to me. It is a new start for my life,

not only the culmination of the richest learning experience. Never say never,

everything is possible. Sincerely, I must express my gratitude.

First of all, praise and thanks must be to God for God’s mercy that the project can be

completed. I am convinced that it is the grace given from God.

In reality, it would not have been possible to complete this research without the

generous support, assistance and encouragements of several friends and staff members

at Queensland University of Technology, special thanks to Research Administrator

Denise Redfern and Computing Services Officer Ian Foote who provided

administration and technical support and various contributions during the process of

this research.

I am indebted to all those people including industry professionals who generously help

me finish the questionnaires. In addition, the support given by my postgraduate

colleagues- Guomin Zhang, Lisa Guan, Connie Susilawati and Soon Kam Lim

throughout the duration of the research is very much appreciated.

My sincere appreciation and thanks must go to my principal supervisor Associate

Professor Jay Yang for all the encouragement over the research period. His patient,

persistent assistance and right direction have made it possible for me to achieve in the

academic arena, and which has led me to where I am now. And I also thank my

associate supervisor Professor Martin Skitmore for his kind instruction and technical

advice.

Particularly, I very appreciate my parents-in-law and my beloved wife Peggy and our

children (Paul and David) who always gave me great inspiration and support. Without

them it could not have been done.

Thanks all of you. And may God bless you!

Frank Lin June 2005

Page 5: THE INTEGRATION BETWEEN DESIGN AND MAINTENANCE …eprints.qut.edu.au/16058/1/Frank_Lin_Thesis.pdf · the integration between design and maintenance of office building automation:

V

ABSTRACT This research explores the barriers and limitations of the interaction between building

development processes in an attempt of an integrated decision support approach to

improve building design for effective maintenance in the field of office building

automation.

Extensive coverage of literature and practice in office building industry over the last

two decades indicates a wide diffusion and application of the information and

communication technologies (ICT). While this has resulted in the adoption of

advanced system integration in buildings, system redundancy and excessive

expenditures are causing a major impact on the overall efficiency and has burdened

building owners and occupiers with escalating maintenance costs. This phenomenon

stimulates and warrants the re-examination of integrated building development, not

just on system integration but also on the interdisciplinary development process

integration particularly linking design and maintenance.

Studies in this field revealed existing problems such as the inherent professional

fragmentation, lack of historical information and service data, the first cost mentality

of owners and developers, difficulties in forecasting future conditions and changes

early in the design stage. With extensive use of qualitative information, this situation

presents a great potential for the development of a decision support system exploring

the communication and integration of design and maintenance phases, which has been

one of the primary objectives of this research.

In addition to literature studies, a questionnaire survey and a case study to identify

industry concerns, feasible solutions, and practical procedure oriented approaches

through knowledge extractions were carried out. A set of guidelines, a checklist for its

implementation and prototype system for computerized decision support to design and

maintenance of building automation systems were also produced. These strategic

approaches to balance design and maintenance will help facilitate appropriate decision

making in the early design stage for sustainable maintenance of buildings.

Page 6: THE INTEGRATION BETWEEN DESIGN AND MAINTENANCE …eprints.qut.edu.au/16058/1/Frank_Lin_Thesis.pdf · the integration between design and maintenance of office building automation:

VI

KEYWORDS Office building, Intelligent buildings, Integration, Design, maintenance, Information

and communication Technology (ICT), Decision support system, Building

Automation System (BAS), building performance, energy conservation,

maintainability, sustainable.

Page 7: THE INTEGRATION BETWEEN DESIGN AND MAINTENANCE …eprints.qut.edu.au/16058/1/Frank_Lin_Thesis.pdf · the integration between design and maintenance of office building automation:

VII

TABLE OF CONTENTS

DECLARATION.......................................................................................................III

ACKNOWLEDGMENTS ........................................................................................IV

ABSTRACT................................................................................................................ V

KEYWORDS.............................................................................................................VI

TABLE OF CONTENTS........................................................................................ VII

LIST OF FIGURES ................................................................................................ XII

LIST OF TABLES ...................................................................................................XV

LIST OF GUIDELINES...................................................................................... XVII

ABBREVIATIONS .............................................................................................XVIII

CHAPTER 1 INTRODUCTION ............................................................................ 1 1.1 Research Background................................................................................ 2 1.2 Research Problems and Proposition ........................................................... 4 1.3 Research Objectives.................................................................................. 6 1.4 An overview of Research Methodologies ................................................... 9 1.5 Outline of Thesis .................................................................................... 10 1.6 Definitions and Terminology ................................................................... 11 1.7 Summary ................................................................................................ 12

CHAPTER 2 LITERATURE STUDY ................................................................. 13 2.1 Introduction ............................................................................................ 14 2.2 Building Integration................................................................................ 17

2.2.1 Status of the Office Building Industry ....................................................... 17 2.2.2 ICT Application in the Building Process ................................................... 20 2.2.3 Reviewing the Current Building Process ................................................... 21 2.2.4 Integration Application in Building Process .............................................. 24

2.2.4.1 Implications of Integration.................................................................. 24 2.2.4.2 Potential Strategies of Balance between Design and Maintenance .... 25

2.2.5 Integration and Building Automation Systems (BAS)............................... 26 2.2.5.1 What is Intelligence?........................................................................... 26 2.2.5.2 What is an Intelligent Building? ......................................................... 28 2.2.5.3 Development and System Evolution of Intelligent Buildings............. 31

2.2.6 Interdisciplinary Building Systems Design and Maintenance ................... 32 2.2.7 Integration for Building Industry ............................................................... 33

2.2.7.1 Systems Integration............................................................................. 33 2.2.7.2 Process Integration.............................................................................. 35

2.2.8 Current Trends of Integration..................................................................... 37 2.3 Decision Support .................................................................................... 39

2.3.1 Decision Support System ........................................................................... 39 2.3.2 The Need for Decision Support System..................................................... 40 2.3.3 Decision Support and Integration in Building Construction Industry ....... 40 2.3.4 Limitation of Decision Support and Integration ........................................ 44

Page 8: THE INTEGRATION BETWEEN DESIGN AND MAINTENANCE …eprints.qut.edu.au/16058/1/Frank_Lin_Thesis.pdf · the integration between design and maintenance of office building automation:

VIII

2.4 Design and Maintenance for Office Building ...........................................45 2.4.1 Status of Design and Maintenance in Building Industry............................45 2.4.2 The Relationship between Design and Maintenance..................................47 2.4.3 The conflicts Between Design and Maintenance .......................................49 2.4.4 Design and Maintenance in Building Automation System (BAS) .............51 2.4.5 Security/ Fire System Design and Maintenance.........................................54 2.4.6 The Problems and Limitations of the Building Design and Maintenance Performance.........................................................................................................54 2.4.7 Findings in Relation to Design and Maintenance.......................................56

2.5 BAS for Office Building.......................................................................... 59 2.5.1 What is Building Automation and Building Management?........................59 2.5.2 Current Building Automation Systems (BAS) .............................................59

2.5.2.1 Functionalities of the BAS ..................................................................60 2.5.2.2 Components of a BAS.........................................................................63 2.5.2.3 Building Automation system (BAS) and Intelligent/green Building ..65 2.5.2.4 The Benefits of a BAS.........................................................................66 2.5.2.5 Current Situation and Limitation of BAS............................................67

2.5.3 The Future of the Office Building Automation ..........................................68 2.6 Other Relevant Literatures....................................................................... 71

2.6.1 Energy Conservation and High Performance Office Building...................71 2.6.2 Total Quality Management (TQM).............................................................73 2.6.3 Building Commissioning (BC)...................................................................76 2.6.4 LCC for Building Development .................................................................79

2.6.4.1 Life Cycle Cost....................................................................................80 2.6.4.2 Life Cycle Cost Analysis (LCCA).......................................................81

2.6.5 Practice with Smart and Sustainable Design Incorporating Maintenance..84 2.7 Summary................................................................................................. 87

CHAPTER 3 RESEARCH METHODOLOGIES AND DEVELOPMENT PROCESSES..............................................................................................................89 3.1 Introduction ............................................................................................90 3.2 Key Methodologies .................................................................................90

3.2.1 Justification of Literature Study .................................................................91 3.2.2 General Research Approaches....................................................................92 3.2.3 Industry Survey ..........................................................................................96

3.2.3.1 Information Required ..........................................................................96 3.2.3.2 Selection of Data Collection Method ..................................................97 3.2.3.3 Mail Questionnaire Survey..................................................................98

3.2.4 Case Study Method...................................................................................100 3.2.5 Data Analysis............................................................................................101 3.2.6 Knowledge Acquisition ............................................................................103 3.2.7 System Development................................................................................106

3.3 Research Design and Development ........................................................ 110 3.3.1 Schedule Planning for the Research ......................................................... 110 3.3.2 Overview of Each Research Stage............................................................ 111 3.3.3 Prototype System Design and Development ............................................ 115 3.3.4 Hardware and Software Specification ...................................................... 117 3.3.5 Programming ............................................................................................ 117 3.3.6 Validation and Verification ....................................................................... 118

3.4 Summary............................................................................................... 120

Page 9: THE INTEGRATION BETWEEN DESIGN AND MAINTENANCE …eprints.qut.edu.au/16058/1/Frank_Lin_Thesis.pdf · the integration between design and maintenance of office building automation:

IX

CHAPTER 4 SURVEY, DATA ANALYSIS AND CASE STUDY .................... 121 4.1 Introduction .......................................................................................... 122 4.2 The Questionnaire Survey ..................................................................... 123

4.2.1 Total Survey Response ............................................................................. 123 4.2.2 Composition of Respondents ................................................................... 124 4.2.3 BAS Design Questionnaire Response Analysis ....................................... 125

4.2.3.1 The Needs.......................................................................................... 126 4.2.3.2 Products............................................................................................. 129 4.2.3.3 Design Issues..................................................................................... 131 4.2.3.4 Assessment ........................................................................................ 135

4.2.4 BAS Maintenance Questionnaire Response Analysis.............................. 139 4.2.4.1 Overall Status .................................................................................... 140 4.2.4.2 Management...................................................................................... 144 4.2.4.3 Technical Issues................................................................................. 148 4.2.4.4 Assessment ........................................................................................ 151

4.2.5 Summary of the Survey Results and Suggestions.................................... 155 4.3 Survey Results in relation to Literature Study........................................ 157 4.4 The Case study ..................................................................................... 159

4.4.1 Outline of the Case Study ........................................................................ 159 4.4.2 Building Automation System in the “Asia Business Centre” Office Building........................................................................................................................... 162 4.4.3 Practice of the Design-build, Operation and Maintenance ...................... 164 4.4.4 Example of Process Integration ............................................................... 166 4.4.5 Example of Design and Maintenance Interface ....................................... 168 4.4.6 Lessons Learned....................................................................................... 170 4.4.7 Findings from the Case Study .................................................................. 171

4.5 Expanded Comparison of the Literatures, Surveys and Case study ......... 172 4.6 Summary .............................................................................................. 174

4.6.1 Implication from the Literature, survey and Case Study ......................... 174 4.6.2 Recommendations for the Better Design and Maintenance..................... 174

CHAPTER 5 KNOWLEDGE EXTRACTION................................................. 177 5.1 Introduction .......................................................................................... 178 5.2 Knowledge Extraction from Design Professionals ................................. 180

5.2.1 Knowledge Extraction in “The Needs”.................................................... 181 5.2.2 Knowledge Extraction in “Products” ....................................................... 184 5.2.3 Knowledge extraction in “Design issues”................................................ 187 5.2.4 Knowledge extraction in “Assessment”................................................... 190

5.3 Knowledge Extraction from Maintenance Professionals......................... 193 5.3.1 Knowledge Extraction in “Overall Status” .............................................. 194 5.3.2 Knowledge Extraction in “Management” ................................................ 197 5.3.3 Knowledge Extraction in “Technical Issues”........................................... 200 5.3.4 Knowledge extraction in “Assessment”................................................... 203

5.4 Decision Making Procedure .................................................................. 206 5.4.1 Decision Making Process......................................................................... 206 5.4.2 Decision Making Checklists .................................................................... 208

5.5 Summary of the Knowledge Extraction ................................................. 210

CHAPTER 6 GUIDELINES DEVELOPMENT............................................... 221 6.1 Introduction .......................................................................................... 222

Page 10: THE INTEGRATION BETWEEN DESIGN AND MAINTENANCE …eprints.qut.edu.au/16058/1/Frank_Lin_Thesis.pdf · the integration between design and maintenance of office building automation:

X

6.2 Strategies for Raising Awareness and Understanding.............................. 225 6.2.1 Principles of Process Integration between Design and Maintenance.......226 6.2.2 Building Life Cycle Process.....................................................................227 6.2.3 Responsibilities and Capabilities of Design and Maintenance.................228 6.2.4 Understand Comfort, Healthy and Energy Conservation of Office Building...........................................................................................................................230 6.2.5 Employ Strategic Process Integration for BAS Design and Maintenance232 6.2.6 BAS Structure...........................................................................................234

6.3 General Strategies for Promoting Design and Maintenance Integration... 236 6.3.1 Select Appropriate Design Professionals..................................................238 6.3.2 Specify the Applicable and Constructible BAS Specification .................240 6.3.3 Ensure Appropriate Product/ Systems Integration ...................................247 6.3.4 Integrate Systems with Infrastructure Functionally .................................249 6.3.5 Optimise Operational and Maintenance Practices....................................251 6.3.6 Select Appropriate Maintenance Strategy ................................................252 6.3.7 Facilitate Building Commissioning for Better Results.............................254 6.3.8 Strategies for ensuring the quality of design and maintenance ................256 6.3.9 Energy Efficient HVAC Design................................................................258 6.3.10 Select Energy Efficient Lighting Controls .............................................259 6.3.11 Minimise Energy Consumption..............................................................260 6.3.12 Promote Healthy and Comfortable Environments .................................261 6.3.13 Strategies for Security/ Fire System Design and Maintenance ..............262 6.3.14 Life- Cycle Cost Analysis (LCCA) ........................................................263

6.4 Operational Checklists .......................................................................... 264 6.4.1 Checklists for Building Automation System Implementation..................265 6.4.2 Select Applicable and Reliable Building Automation Systems and Products...........................................................................................................................267 6.4.3 Checklist for BAS Design ........................................................................269 6.4.4 Checklist for BAS Installation..................................................................270 6.4.5 Checklist for BAS Commissioning ..........................................................271 6.4.6 Checklist for BAS Maintenance...............................................................272 6.4.7 Execute BAS Maintenance Schedule checklist ........................................273 6.4.8 Apply Life- Cycle Cost Analysis (LCCA)................................................274 6.4.9 Project Delivery System (PDS) ................................................................275

6.5 Summary............................................................................................... 282

CHAPTER 7 DEVELOPMENT OF DECISION SUPPORT SYSTEM.........285

7.1 Introduction .......................................................................................... 287 7.1.1 Overview of Decision Support Systems...................................................288 7.1.2 Structure of Decision Support System .....................................................289

7.2 Pilot System Testing.............................................................................. 291 7.2.1 Introduction ..............................................................................................291 7.2.2 Objectives .................................................................................................291 7.2.3 Methodology Adopted in the System Development.................................292 7.2.4 Development Process ...............................................................................292 7.2.5 Illustration of the Pilot System.................................................................293 7.2.6 Discussion.................................................................................................295

7.3 Prototype System Development ............................................................. 296 7.3.1 Development of SBASpro Knowledge Base.............................................296 7.3.2 Model........................................................................................................297

Page 11: THE INTEGRATION BETWEEN DESIGN AND MAINTENANCE …eprints.qut.edu.au/16058/1/Frank_Lin_Thesis.pdf · the integration between design and maintenance of office building automation:

XI

7.4 Running SBASpro Model and Example ................................................. 298 7.4.1 Evaluation Model ..................................................................................... 299 7.4.2 Example of BAS Decision Support.......................................................... 301 7.4.3 Decision Support Application and Development..................................... 309 7.4.4 SBASpro Demonstration.......................................................................... 309

7.5 Verification and validation .................................................................... 319 7.6 Discussion ............................................................................................ 323

CHAPTER 8 CONCLUSIONS.............................................................................. 325 8.1 Introduction .......................................................................................... 326 8.2 Conclusions Relating to Research Objectives ........................................ 328

8.2.1 Objective 1: .............................................................................................. 328 8.2.2 Objective 2: .............................................................................................. 328 8.2.3 Objective 3: .............................................................................................. 329

8.3 Reviews................................................................................................ 330 8.3.1 Reviews of the Improvement in Design and Maintenance Practice ........ 330 8.3.2 Reviews of the Decision Support System Development.......................... 335

8.4 Limitations .......................................................................................................... 336 8.5 Recommendations................................................................................. 337 8.6 Conclusions .......................................................................................... 338 8.7 Contributions ........................................................................................ 340 8.8 Implications and Further Research ........................................................ 341

BIBLIOGRAPHY ................................................................................................... 343

REFERENCES........................................................................................................ 371

APPENDICES ............................................................................................................... Appendix A Postal Questionnaire for Design ..................................................... Appendix B Postal Questionnaire for Maintenance ............................................ Appendix C Case Study Information ................................................................. Appendix D Overview of BAS Design Knowledge Extraction ........................... Appendix E Overview of BAS Maintenance Knowledge Extraction ................... Appendix F Demonstration of the Pilot System ................................................. Appendix G Demonstration of the Prototype Decision Support System.............. Appendix H Prototype Decision Support System SBASpro ................................

Page 12: THE INTEGRATION BETWEEN DESIGN AND MAINTENANCE …eprints.qut.edu.au/16058/1/Frank_Lin_Thesis.pdf · the integration between design and maintenance of office building automation:

XII

LIST OF FIGURES Figure 1-1: Research Objectives……………………………………………………………8 Figure 2-0: Scopes of Literature Study……………………………………………………15 Figure 2-1: Islands of Automation in Construction……………………………………….19 Figure 2-2: The Development of the Intelligent Building………………………………...29 Figure 2-3: Evolution of Intelligent Building……………………………………………….32 Figure 2-4 (a): Conceptual Integration of Building Industry……………………………..35 Figure 2-4 (b): Integrated Building Systems and Process……………………………….36 Figure 2-4 (c): Flow of Building Process…………………………………………………..36 Figure 2-5: Relationship between Design and Maintenance……………………………48 Figure 2-6: A Typical BAS…………………………………………………………………..60 Figure 2-7: Environment Control…………………………………………………………...60 Figure 2.8: Structure of Office Building Automation System (BAS) ……………………61 Figure 2-9: The future Vision……………………………………………………………….70 Figure 2-10: Commercial Building Energy use …………………………………………..71 Figure 2-11: Building Construction Process………………………………………………75 Figure 2-12: Comparison of Cost in Building Process…………………………………..83 Figure 2-13: Environment Impact of Buildings…………………………………………...84 Figure 2-14: Summary of Literature Study………………………………………………..87 Figure 3-1: A Schematic View of DSS…………………………………………………….94 Figure 3-2: The process of Induction and Deduction……………………………………95 Figure 3-3: Breath v. Depth in ‘Question-based’ Studies………………………………100 Figure 3-4: Flow Diagram of Data Analysis Process……………………………………102 Figure 3-5: Integrated Knowledge Acquisition…………………………………………..105 Figure 3-6: The Traditional System Development Life Cycle (SDLC) ………………..106 Figure 3-7: The Prototyping Methodology……………………………………………….108 Figure 3-8: The Prototyping Development Methodology………………………………114 Figure 3-9: Research Design and Development………………………………………..115 Figure 3-10: Conceptual Model of Knowledge Integration…………………………….116 Figure 3-11: Data Flow and Design/ Maintenance Structure…………………………..120 Figure 3-12: Overview of the Research Design and Development……………………122 Figure 4-0: Outline of the Questionnaire Survey………………………………………..123 Figure 4-1: Survey Response Rate………………………………………………………125 Figure 4-2: Outline of the Design Questionnaire Survey………………………………126 Figure 4-3: Benefits and Responsibility of BAS………………………………………...128 Figure 4-4: Sources of BAS Requirement and Specification………………………….128 Figure 4-5: Affects of the Regulations and Specifications……………………………..129 Figure 4-6: Availabilities of the Products, Information and Records………………….130 Figure 4-7: Factors Affecting Design……………………………………………………..131 Figure 4-8: Designer providing Information to the Facilities Manager………………..131 Figure 4-9: Feedback from the Facilities Manager……………………………………..133 Figure 4-10: Necessity of the Decision Support System and CAD……………………134 Figure 4-11: Suitability of the System Integration………………………………………135 Figure 4-12: Sensor Applications………………………………………………………...137 Figure 4-13: Communication between Different Parties……………………………….138 Figure 4-14: Communication between Designer and Facilities Manager……………139 Figure 4-15: Outline of the Maintenance Questionnaire Survey……………………...140 Figure 4-16: BAS Features and Functions……………………………………………...142 Figure 4-17: Affects of the Building Regulation and Product Specification…………..143 Figure 4-18: Operation/ Maintenance SOP Provision Source………………………...143 Figure 4-19: Expectations of the Clients………………………………………………...143 Figure 4-20: Responsibilities of BAS O/M Process…………………………………….144

Page 13: THE INTEGRATION BETWEEN DESIGN AND MAINTENANCE …eprints.qut.edu.au/16058/1/Frank_Lin_Thesis.pdf · the integration between design and maintenance of office building automation:

XIII

Figure 4-21: Maintenance of the BAS…………………………………………………...145 Figure 4-22: Problem Solving of the BAS……………………………………………….146 Figure 4-23: Importance of the HVAC Controls…………………………………………148 Figure 4-24: Responses of the HVAC Application……………………………………...149 Figure 4-25: Preference of the Maintenance Duration…………………………………152 Figure 4-26: Responsibility of the BAS Evaluation……………………………………..152 Figure 4-27: Supports between Design and Maintenance…………………………….154 Figure 4-28: Outlines of the Research Process………………………………………...173 Figure 5-1: Example of the Inductive and Deductive Process………………………...178 Figure 5-2: Outline of the Knowledge Extraction……………………………………….179 Figure 5-3: Outline of the Design Knowledge Extraction………………………………180 Figure 5-4: Induction Results of “The Needs” from the Design Issues……………….181 Figure 5-5: Deduction of “The Needs” from the Design Issues……………………….182 Figure 5-6: Induced Results of “Products” from Design Issues……………………….184 Figure 5-7: Deduced Results of “Products” from the Design Issues…………………185 Figure 5-8: Induced results of “Design Issues” ………………………………………...187 Figure 5-9: Deduced Results of “Design Issues” ………………………………………188 Figure 5-10: Induced Results of “Assessment” from the Design Issues……………..190 Figure 5-11: Deduced Results of “Assessment” from the Design Issues…………….191 Figure 5-12: Outline of the Maintenance Knowledge Extraction……………………...193 Figure 5-13: Induction Results of “Overall Status” from the Maintenance Issues…..194 Figure 5-14: Deduction of “Overall Status” from the Maintenance Issues…………...195 Figure 5-15: Induced Results of “Management” from the Maintenance Issues……..197 Figure 5-16: Deduced Results of “Management” from the Maintenance issues…….198 Figure 5-17: Induced Results of “Technical Issues” …………………………………...200 Figure 5-18: Deduced Results of “Technical Issues” …………………………………..201 Figure 5-19: Induced Results of “Assessment” from the Maintenance Issues………203 Figure 5-20: Deduced Results of “Assessment” from the Maintenance issues……..204 Figure 5-21: The Decision–making Process…………………………………………….206 Figure 5-22: Summary of Knowledge Extraction……………………………………….211 Figure 5-23: Knowledge Inference Flow………………………………………………...219 Figure 6-0: Guideline Development……………………………………………………...224 Figure 6-1: Outline of the Basic Guidelines……………………………………………..225 Figure 6-2: Outline of the General Strategies……………………………………………237 Figure 6-3: Outline of the Operational Checklists………………………………………264 Figure 6-4: Guideline Application Flow…………………………………………………..283 Figure 6-5: Integrated Knowledge Rules with Guidelines……………………………..284 Figure 7-0: The Structure of Decision Support System………………………………..289 Figure 7-1: The Structure of System Development…………………………………….290 Figure 7-2: Pilot System (1) - Information Retrieval Process………………………….293 Figure 7-3: Pilot System (2) - Information Retrieval Process………………………….294 Figure 7-4: Pilot System (3) - Retrieval Result………………………………………….294 Figure 7-5: Evaluation Process…………………………………………………………..300 Figure 7-6: Information behind the Example……………………………………………301 Figure 7-7: Flow of Decision Support Example…………………………………………305 Figure 7-8: Design and Maintenance Example Home…………………………………306 Figure 7-9: Building Type Selection……………………………………………………...306 Figure 7-10: Control and Monitoring Points Selection and Decision Support……….307 Figure 7-11: Recommendation and Guidelines…………………………………………307 Figure 7-12: Maintenance Strategy Selection…………………………………………..308 Figure 7-13: Guidelines of the Selected Maintenance Strategy………………………308 Figure 7-14: General Quiz………………………………………………………………...310 Figure 7-15: Quiz Result…………………………………………………………………..310 Figure 7-16: Evaluation Home……………………………………………………………311 Figure 7-17: Evaluation End………………………………………………………………311

Page 14: THE INTEGRATION BETWEEN DESIGN AND MAINTENANCE …eprints.qut.edu.au/16058/1/Frank_Lin_Thesis.pdf · the integration between design and maintenance of office building automation:

XIV

Figure 7-18: Evaluation Result…………………………………………………………...312 Figure 7-19: Evaluation Guideline………………………………………………………...312 Figure 7-20: Search Home………………………………………………………………..313 Figure 7-21: Professional Search Result………………………………………………..313 Figure 7-22: Guideline Search…………………………………………………………....314 Figure 7-23: Guideline Search Result…………………………………………………...314 Figure 7-24: Update Home…………………………………………………………………315 Figure 7-25: Update Result……………………………………………………………….315 Figure 7-26: Hot Topics Home……………………………………………………………316 Figure 7-27: Hot Topic Example………………………………………………………….316 Figure 7-28: Links Home………………………………………………………………….317 Figure 7-29: Links Result…………………………………………………………………..317 Figure 7-30: Help Home……………………………………………………………………318 Figure 7-31: Help- Operation procedure………………………………………………...318 Figure 8-1: Accomplishment of the Research Process…………………………………329 Figure 8-2: Overviews of Decision Support Flow (1) ………………………………….333 Figure 8-3: Overviews of Decision Support Flow (2) ………………………………….334

Page 15: THE INTEGRATION BETWEEN DESIGN AND MAINTENANCE …eprints.qut.edu.au/16058/1/Frank_Lin_Thesis.pdf · the integration between design and maintenance of office building automation:

XV

LIST OF TABLES Table 2-1: Official World's Ten Tallest High-rise Buildings (Office Use) ………………18 Table 2-2: Hierarchical Summary of Development of Intelligent Buildings……………28 Table 2-3: Attributes of Maintenance in Office Building Automation Systems………...51 Table 2-4: Features of Design in the Office Building Automation Systems……………52 Table 2-5: Elements of Control System…………………………………………………...63 Table 2-6: Types of Sensors………………………………………………………………..64 Table 2-7: Functions of BAS in addition to Controlling…………………………………..65 Table 2-8: Benefits of a BAS……………………………………………………………….66 Table 3-1: Advantages and Disadvantages of the Mail Questionnaires……………….97 Table 3-2 Comparison of Questionnaire Communication Methods…………………….98 Table 3-3: Criteria for Selecting a Methodology………………………………………...107 Table 3-4: Hardware and Software Specification……………………………………….117 Table 4-1: Survey Response Rate………………………………………………………..123 Table 4-2: Importance of BAS Preference……………………………………………….126 Table 4-3: Major Consideration of BAS Preference…………………………………….127 Table 4-4: BAS in relation to Building Performance and the Life Cycle Cost………..127 Table 4-5: Sources of BAS Requirements and Specifications…………………………128 Table 4-6: Importance of the Building Systems (Designer views) ……………………132 Table 4-7: Troubles of the Building Systems…………………………………………….132 Table 4-8: Functionalities of the Integration……………………………………………..134 Table 4-9: Concerns of the Cost and Performance…………………………………….135 Table 4-10: Assessment of the BAS Design…………………………………………….136 Table 4-11: Reasons of the Poor BAS Performance (Design Views) ………………..136 Table 4-12: Factors Affecting to Energy Conservation…………………………………137 Table 4-13: Communication between Designer and Facilities Manager……………..138 Table 4-14: BAS Features and Functions……………………………………………….140 Table 4-15: Problems of the Building Systems………………………………………….141 Table 4-16: Reasons of the Poor BAS Performance (Maintenance Views) …………141 Table 4-17: Affects of the Building Regulation and Product Specification……………142 Table 4-18: Expectations of the Clients………………………………………………….143 Table 4-19: Responsibilities of BAS O/M Process……………………………………..144 Table 4-20: Evaluation of the BAS Management……………………………………….145 Table 4-21: Maintenance of the BAS…………………………………………………….145 Table 4-22: Integration of the Building Systems…………………………………………146 Table 4-23: Problem Solving of the BAS………………………………………………...146 Table 4-24: Communication between Design and O/M………………………………..147 Table 4-25: Importance of the HVAC Controls………………………………………….148 Table 4-26: Responses of the HVAC Application……………………………………….149 Table 4-27: Integration Preference of the Security System……………………………149 Table 4-28: Access Management of Office Building……………………………………150 Table 4-29: Preference of the Sensor controls………………………………………….150 Table 4-30: Satisfaction of the Maintenance Support…………………………………..151 Table 4-31: Factors Affecting to Energy Conservation…………………………………151 Table 4-32: Importance of the Building Systems (Maintenance views) ………………153 Table 4-33: Assessment of the BAS Application………………………………………..153 Table 4-34: Comparison of the Induced Survey Results with Literature Findings…..157 Table 4-35: Profile of the “Asia Business Centre “Office Building…………………….160 Table 4-36: Features of the “Asia Business Centre” 5A-Building Automations………162 Table 4-37: Expanded Comparison of Literature Study, Surveys and Case Study….172 Table 5-1: Induced Knowledge Rules in relation to “The Needs” …………………….183 Table 5-2: Induced Knowledge Rules in relation to “Products” of BAS Design………186

Page 16: THE INTEGRATION BETWEEN DESIGN AND MAINTENANCE …eprints.qut.edu.au/16058/1/Frank_Lin_Thesis.pdf · the integration between design and maintenance of office building automation:

XVI

Table 5-3: Induced Knowledge Rules in relation to “Design Issues” …………………189 Table 5-4: Induced Knowledge Rules in relation to “Assessment” ……………………192 Table 5-5: Induced Knowledge Rules in relation to “Overall Status” of Maintenance…………………………………………………………………..196 Table 5-6: Induced Knowledge Rules in relation to “Management” ………………….199 Table 5-7: Induced Knowledge Rules in relation to the “Technical Issues” ………….202 Table 5-8: Induced Knowledge Rules in relation to the “Assessment” of the Maintenance…………………………………………………………………..205 Table 5-9: Summary of knowledge extraction associated with the integration context of design and maintenance………………………………………………….212 Table 5-10: Variables with Codes of the Knowledge…………………………………...213 Table 5-11: Induced Knowledge Rules of BAS Design and Maintenance……………215 Table 6.1: Implications of the PDS for design and maintenance………………………276 Table 7-1: Expression of the Knowledge Base………………………………………….299 Table 7-2: The Application of the Control and Monitoring Points………………………303 Table 7-3: Maintenance Strategies………………………………………………………..303 Table 7-4: List of the Control and Monitoring Functions……………………………….304 Table 7-5: Decision Support Application………………………………………………....309 Table 7-6: Validity Testing of SBASpro Prototype Model………………………………..321

Page 17: THE INTEGRATION BETWEEN DESIGN AND MAINTENANCE …eprints.qut.edu.au/16058/1/Frank_Lin_Thesis.pdf · the integration between design and maintenance of office building automation:

XVII

LIST OF GUIDELINES Guideline # 01 (G001): Principles of the Integration……………..…………………….226 Guideline # 02 (G002): Building Life Cycle Process………………………………….. 227 Guideline # 03 (G003): Responsibilities and Capabilities of Design and Maintenance…………………………………………………………229 Guideline # 04 (G004): Attributes of High-performance and Energy Conservation Office Building………………………………………………………..230 Guideline # 05 (G005): Types of HVAC Systems and Control………………………...231 Guideline # 06 (G006): Benefits of the Process Integration…………………………...233 Guideline # 07 (G007): Components of Building Control System…………………….234 Guideline # 08 (G008): Elements of Sensor and Actuator…………………………….235 Guideline # 09 (G009): Tips for Design Professional Selection………………………239 Guideline # 10 (G010): Strategies for Designing BAS Specification………………….241 Guideline # 11 (G011): Requirements of Specification Design………..………………242 Guideline # 12 (G012): Tips of Specification Design……………...……………………243 Guideline # 13 (G013): Tips for Avoiding the Pitfalls of BAS Selection………………244 Guideline # 14 (G014): Strategies for Assuring the Reliable Systems….……………246 Guideline # 15 (G015): Strategies for Systems Integration……………………………247 Guideline # 16 (G016): Strategies for Integrating with Infrastructure……...…………249 Guideline # 17 (G017): Strategies for Optimizing Design and Maintenance…...……251 Guideline # 18 (G018): Strategies for Selection Maintenance Strategy……….……..253 Guideline # 19 (G019): Strategies for Building Commissioning……………………….254 Guideline # 20 (G020): Strategies for High Performance, Energy Conservation and Comfort…………………………………….256 Guideline # 21 (G021): Strategies for Energy Efficient HVAC Design…….………….258 Guideline # 22 (G022): Strategies for the Selection of Light Control………………...259 Guideline # 23 (G023): Strategies for Minimising Energy Consumption……………..260 Guideline # 24 (G024): Strategies for Promoting Healthy and Comfortable Environments…………………………………………………….261 Guideline # 25 (G025): Strategies for Security/ Fire system Design and Maintenance………………………………………………………….262 Guideline # 26 (G026): Guidelines for the Applications of LCCA…………………….263 Guideline # 27 (G027): Steps of BAS Selection………………………………………..268 Guideline # 28 (G028): Checklist for BAS Design………………………………………269 Guideline # 29 (G029): Checklist for BAS Installation………………………………….270 Guideline # 30 (G030): Checklist for BAS Commissioning……………………………271 Guideline # 31 (G031): Checklist for BAS Maintenance……………………………….272 Guideline # 32 (G032): Schedule of Checklist for Sensor and Actuator Maintenanc.273 Guideline # 33 (G033): Life Cycle Cost Calculation………………………….…………274 Guideline # 34 (G034): Project Delivery System………………………………………..280

Page 18: THE INTEGRATION BETWEEN DESIGN AND MAINTENANCE …eprints.qut.edu.au/16058/1/Frank_Lin_Thesis.pdf · the integration between design and maintenance of office building automation:

XVIII

ABBREVIATIONS BA Building Automation

BACNet Building Automation Control Network

BAS Building Automation System

BMS Building Management System

CA Communication Automation

CAPEX Capital Expense

RH Relative Humidity

CPU Central Processing Units

DDC Direct Digital Control

DGP Data Gathering Panel

EMS Energy Management Control

EMCS Energy Management and Control System

FA Fire Automation

IB Intelligent Building

ICT Information and Communication Technology

IDEC Indirect Evaporative Cooling

IEQ Indoor Environment Quality

LAN Local Area Network

MA Management Automation

OA Office Automation

SBASPRO Office Building Automation Decision Support Pro

OPEX Operation Expense

PDS Project Delivery System

PI Proportional and Integral

PID Proportional and Integral and Derivative

PMV Predicated Mean Vote

SA Security Automation

TCP/IP Transmission Control Protocol/ Internet Protocol

VAV Variable Air Volume

Page 19: THE INTEGRATION BETWEEN DESIGN AND MAINTENANCE …eprints.qut.edu.au/16058/1/Frank_Lin_Thesis.pdf · the integration between design and maintenance of office building automation:

CHAPTER 1 INTRODUCTION

1

CHAPTER 1 INTRODUCTION

1.1 Research Background 1.2 Research Problems and Proposition 1.3 Research Objectives 1.4 An Overview of Research Methodologies 1.5 Outline of Thesis 1.6 Definitions and Terminology 1.7 Summary

The Integration between Design and Maintenance of Office Building Autom

ation: A Decision Support Approach

Page 20: THE INTEGRATION BETWEEN DESIGN AND MAINTENANCE …eprints.qut.edu.au/16058/1/Frank_Lin_Thesis.pdf · the integration between design and maintenance of office building automation:

CHAPTER 1 INTRODUCTION

2

1.1 Research Background

The research primarily explores some of the barriers and limitations in the building

conception process and endeavours to provide the strategies for the improvement of

effective decision- making in the office building automation field through the

integration of design and maintenance associated with the development of a decision-

support computer-based approach.

On a global scale, much new technology has been developed over the past two

decades. The information and communication technology (ICT) has also offered an

easy and affordable tool for industries, including the construction and building

industry which has had comparatively less growth than other industries such as the

motor and aeronautical industry (Council on Tall Buildings and Urban Habitat 1995).

The situation of building industry indicates that it should move with the times to

enhance the improvements in the building process.

Observed from the literature reviews, due to the long lifetime of buildings, the

specific features and unique characteristics which exist in the professionals of the

building industry and various problems and conflicts with service and maintenance

may cause non-sustainable consequences, such as excessive energy consumption,

increased service schedules and costs, and sick building syndromes. Subsequently,

among them some of the existing gaps and overlaps in design could be barriers for

building improvement. It would rely on the exploration of a new strategic integration

approach to improve on the current situation.

The integration of existing knowledge and techniques among different fields has

been studied and is commonly recognized as an effective method to overcome the

current constraints to improvement in the present era as well as a decision support

approach, which can be applied for linking of different parities such as design and

construction, design and scheduling, design and planning. The integrated approach

has been explored and introduced into the construction industry.

Efforts in construction automation have facilitated system integration with effective

functions. However, the integration development across the different phases is still in

the infant stage which is only exploring ideas and concepts. The integration activities

Page 21: THE INTEGRATION BETWEEN DESIGN AND MAINTENANCE …eprints.qut.edu.au/16058/1/Frank_Lin_Thesis.pdf · the integration between design and maintenance of office building automation:

CHAPTER 1 INTRODUCTION

3

have mostly focused on the improvement of respective system effectiveness in

isolated phases such as architectural design, engineering design, construction,

production planning, production automation, and building use and maintenance

(Matti, H. 2000). Hence, in order to overcome the known barriers, integration can be

directed to and focused on process integration i.e. integration across different phases

such as design and maintenance. The exploration of process integration could be a

feasible alternative for building improvement. Additionally, in light of growing

concerns about the overall life-cycle performance and the comfort of buildings,

process integration would also potentially be in the viable exploration a

knowledge-based decision process to optimise building performance.

The office building is getting smarter because of availability of advanced information

and communication technologies (ICT) which facilitate the adaptability of building

automation systems and satisfy the users’ prospects increasingly in the real world.

The building systems have advanced and become integrated with new technologies.

However, has it promoted the overall benefits and occupant-satisfaction during the

life of buildings? This deserves rethinking and exploring, consequently an integrated

approach could be an alternative for solving the current problems relating to the

inherent separated processes in the building industry.

Findings from the observation of building operation practices in the past several

years associated with office building maintenance have encouraged an exploration of

the feasibility of providing total solutions in the maintenance-based design issues of

office building automation. Thus this research has concentrated on the sphere of

office building automation design and management including maintenance to

discover what is now known to respond to the practical requirements, and to develop

an applicable decision support platform for the advanced development of office

building automation.

Page 22: THE INTEGRATION BETWEEN DESIGN AND MAINTENANCE …eprints.qut.edu.au/16058/1/Frank_Lin_Thesis.pdf · the integration between design and maintenance of office building automation:

CHAPTER 1 INTRODUCTION

4

1.2 Research Problems and Proposition

With an expectation to extend the life of systems and ensure the function and

performance of buildings, the industry and researchers are gradually paying more

attention to the subjects of total efficiency and overall performance throughout

building process. However, people without a direct ongoing 'relationship' with the

building may be less concerned to care for it. Developments in maintenance have

tended to focus on efficiency rather than effectiveness, losing sight of motivational

matters (Wood, B. 2003).

The main problem in the building care is the lack of 'intelligence' in a variety of

aspects - lack of data, particularly historical relevant data, lack of research into the

behaviour and durability of materials, and lack of forethought applied to the

maintenance field. There are also possible problems of interpretation and

misunderstanding between design works and the maintenance staff, such as in the

design and maintenance of building materials and components or systems,

specifically communicating among designers and maintainers, which related to the

diverse disciplines, skills, and techniques. It would be desirable to give the

maintainor understanding of the building design aspect, and to learn what was

intended in the initial design to cover the lifetime of the building.

In practice, available data for the ongoing needs of operation and maintenance are

insufficient or inappropriate and out of date, especially in the environment of

increasing occupants’ expectations, which mainly related to historical data related to

the actual operational conditions. Above all, forecasting the future changes and

performance of buildings is difficult in the early design stage. Resolution of such

problems is more likely with a continuing relationship from the design phase,

through construction to operation and maintenance with continuous, encouraging and

responsible attitudes and facilitating actions.

Previous research efforts also demonstrated the limitations such as:

• The lack of adequate up-to-date knowledge

• The advanced technologies are not yet provided for in the time and budget

limits

Page 23: THE INTEGRATION BETWEEN DESIGN AND MAINTENANCE …eprints.qut.edu.au/16058/1/Frank_Lin_Thesis.pdf · the integration between design and maintenance of office building automation:

CHAPTER 1 INTRODUCTION

5

• The building professionals do not recognise the importance of the interaction

between design and maintenance

• Generally, developers just focus on the initial capital cost, but the “first

capital cost” is only 20% of the operational costs of a building over the life of

the building.

• Difficulty in obtaining the systematic information from the feedback of the

maintenance.

Those problems and limitations result in the declining environment. The existing old

buildings comprise the major part of the stock of buildings. The huge and increasing

expenditures for the routine maintenance and the retrofit have burdened the owners

and occupants, which were already over budget, thus the situation has made them

seriously thinking about strategic solutions. The implication on the overall

performance of buildings along with the energy and money loss has also been of

concern. It is the time to take effective action to solve the problem. Consequently,

focusing on the office building automation field in this research, a possible

proposition would be:

“Could possible alternatives be created to help the improvement of the problems

which exist between the design and maintenance of office building automation during

the lifetime of buildings?”

Page 24: THE INTEGRATION BETWEEN DESIGN AND MAINTENANCE …eprints.qut.edu.au/16058/1/Frank_Lin_Thesis.pdf · the integration between design and maintenance of office building automation:

CHAPTER 1 INTRODUCTION

6

1.3 Research Objectives

Based on the observation of the building maintenance in practice, an individual

equipment problem in a building can cause the failure of the whole building systems.

However, was it related to the reliability during the maintenance process or the

robustness of the design, or maybe both? The appropriate answer will rely on using

appropriate tools for assessing the systems during the building lifecycle. It also

depends on the realization of the original design and the building operation and

management process including the maintenance.

In common building operations, the owners/occupants and service providers

generally lack the knowledge to distinguish between design and maintenance, and

the effective solutions for the problems on hand; the evaluation methods of building

performance and applicable guidelines are also insufficient. Moreover, the research

findings from the literature survey illustrate the limitations as well. These findings

have been backed by:

(1) Author’s professional experience over 10 years in the office building

construction and management field, and quality control and assurance for 15

years in the aeronautical vehicle maintenance fields.

(2) Scarce literature on linking the building design and maintenance.

(3) Initial discussions with Queensland based building operation.

For these reasons, the research has been justified in focusing on the integration of

design and maintenance in the office-building field and proposes to develop a

computer-based decision support for improving the building status.

The intention of the research is to explore an integration attempt for the building

design and maintenance process. In order to reach this goal, concentration on a

specific system would be necessary that provides both a pilot instruction and a

feasibility study for the future development. In office buildings, the Building

Automation System (BAS) which is the main brain and the heart of systems, plays a

key role in the building operation and maintenance.

Page 25: THE INTEGRATION BETWEEN DESIGN AND MAINTENANCE …eprints.qut.edu.au/16058/1/Frank_Lin_Thesis.pdf · the integration between design and maintenance of office building automation:

CHAPTER 1 INTRODUCTION

7

The growth of the BAS is set to enhance the performance of buildings and allows the

building gain a high level of intelligence, which is associated with the depth of

communication between the different phases, such as design and maintenance.

However, the right choice and maintenance of applicable BAS and related

subsystems is not only the responsibility of the designers, but also of building owners

and maintainers who need to gain learn about the selection, integration and

maintenance of the whole systems. To fulfil their liabilities and expectations,

adequate knowledge and sufficient current information will come from the outside

sources. This presents a great potential for the development of integrated decision

support systems for communicating different phases such as design, operation and

maintenance during the process. Most of the earlier research development in decision

support addressed the solution of isolated problems in the building process or the

initial related stages of projects such as design and planning, scheduling, estimating,

costing and maintenance. Efforts on integration and communicating during the

building phases, such as building design and maintenance are rare. The previous

research efforts stopped short at the conceptual stage.

In modernised office building developments, Intelligent Building (IB) is not only the

result of the application of various technologies to satisfy the expectations and

requirements of the occupants; however, it seems a long way to go to change all of

our buildings from traditional ones to intelligent ones. Intelligent and sustainable

buildings are still at the developmental and experimental stage; more work is

required to explore and record their performance in use. The “Maintenance issue”

has few research works or reports; the integration of “design” and “maintenance”

might not yet be explored and deserves greater concentration.

Therefore, this research project has been developed to study the relationship between

design and maintenance in office building automation, and to seek the possible

solutions for some of the problems discussed in the domain of office buildings. The

research objectives have been proposed as:

1. To identify the barriers and limitations of building automation practice

between the design and maintenance phases.

2. To establish a guide for effective enhancement between design and

maintenance of office building automation system.

Page 26: THE INTEGRATION BETWEEN DESIGN AND MAINTENANCE …eprints.qut.edu.au/16058/1/Frank_Lin_Thesis.pdf · the integration between design and maintenance of office building automation:

CHAPTER 1 INTRODUCTION

8

3. To develop a computerised decision support prototype for ease in integrating the

design and maintenance in office building automation.

In this research, it will be shown that integration will facilitate the sharing of

information between designers and maintainers using computerised knowledge-based

decision support packages in making decisions to ensure design effectiveness, and to

improve the reliability of maintenance with the building automation systems. The

intention of this research is to explore a new integrated approach providing the

knowledge support and guidelines for the design and maintenance phases of the

building automation to reduce poor design which has a negative impact, and to

improve maintainability during the practical implementing processes, and eventually

to optimise the total performance and increase the long-term value. In simplification,

this research aims at the integration of design and maintenance in building

automation system (BAS) by using a decision support approach to demonstrate a

way for BAS in office building as shown in Figure 1-1.

Integration

Design

BAS

Decision Support for BAS in Office Building

Maintenance +

Figure 1-1: Research Objectives

Page 27: THE INTEGRATION BETWEEN DESIGN AND MAINTENANCE …eprints.qut.edu.au/16058/1/Frank_Lin_Thesis.pdf · the integration between design and maintenance of office building automation:

CHAPTER 1 INTRODUCTION

9

1.4 An overview of Research Methodologies

In this research, the integration development between design and maintenance of

office building automation was based on a comprehensive understanding of the

characteristics, major functions of the subject and the relationship of the design and

maintenance tasks.

Collection of the relevant information associated with building automation practice,

research findings and professional survey was the preliminary step. At the same time,

the research also needed a pilot computerised system design to explore the applicable

alternatives and evaluate the feasibilities for the whole prototype system, then to

develop other functions required for decision making to accomplish the whole

integration decision support system. Moreover, the research had to explore the

relevant design issues in relation to the maintenance of office building automation

system (BAS) and develop possible strategies for improving the performance and

optimisation of the operation and maintenance process in the long term. The key

methodologies for this research consist of:

• Literature study

• General research approaches

• Industry surveys and case study

• Knowledge acquisition

• System design and development

Page 28: THE INTEGRATION BETWEEN DESIGN AND MAINTENANCE …eprints.qut.edu.au/16058/1/Frank_Lin_Thesis.pdf · the integration between design and maintenance of office building automation:

CHAPTER 1 INTRODUCTION

10

1.5 Outline of Thesis

The thesis consists of ten chapters as follows:

Chapter 1: Introduction: to describe the research background to learn the problems,

then to give a proposition for the research objective justification; to outline the

research methodology, scope and limitations as well.

Chapter 2: Literature study: to present the literature findings in relation to the

proposed research problems to construct the core focused elements and ensure the

direction of research and development

Chapter 3: Research methodology: to justify the research paradigm and methodology

for the first hand data collection of induced/ deduced knowledge, to ensure carrying

out this proposal, and investigating the limitations.

Chapter 4: Research design and development: to justify the research methodologies

for the designated objectives and to design the necessary research activities.

Chapter 5: Survey, data analysis, and case study: to present the survey questionnaire

results and analysis in relation to the research problems and industry practice, as well

as to verify the research direction and scope through the case study of building.

Chapter 6: Knowledge extraction: to extract the relevant BAS knowledge in relation

to the design and maintenance, and to explore the applicable strategies as well.

Chapter 7: Guidelines Development: to outline the relevant guidance including

raising awareness, feasible strategies and operational checklist.

Chapter 8: Development of decision support system: to present the process of system

design and development, then demonstrate the prototype system.

Chapter 9: Verification and discussion: to review the research progress and the

computerized decision support prototype system.

Chapter 10: Conclusions: to conclude the research efforts and contribution and discuss

further implications and implementation.

Page 29: THE INTEGRATION BETWEEN DESIGN AND MAINTENANCE …eprints.qut.edu.au/16058/1/Frank_Lin_Thesis.pdf · the integration between design and maintenance of office building automation:

CHAPTER 1 INTRODUCTION

11

1.6 Definitions and Terminology Key Words Definition and Terminology Reference

Office building “a building containing offices where work is done” WordNet 2.0

Intelligent building

“An Intelligent Building is designed and constructed based on an appropriate selection of quality environment modules to meet the user's requirements by mapping with the appropriate building facilities to achieve long-term building value.”

So (1999)

Integration “the sharing of something by somebody using some approach for some purpose.” Betts et al. (1995)

Design

“To invent, create, or construct according to plan”; It also can be defined as “a plan or scheme, conceived in the mind, of something to be done: the preliminary conception of an idea that is to be carried into effect by action.”

Encarta dictionary; Hamilton G. & Harrison A.(1986)

Maintenance “To sustain the integrity of the physical assets by repairing, modifying or replacing them as necessary to provide and control their reliability.”

Encarta dictionary

Information & communication technologies (ICT)

“The study of the technology used to handle information and aid communication.” WWWICT

Decision support System

"interactive computer-based systems, which help decision makers utilise data and models to solve unstructured problems” “a DSS supports complex decision making and increases its effectiveness”

Scott-Morton (1971) Turban et al (2001)

Building automation system (BAS)

“Building Automation Systems (BAS) optimise the start-up and performance of HVAC equipment and alarm systems. BAS greatly increases the interaction of mechanical subsystems within a building, improve occupant comfort, lower energy use and allow off-site building control.”

BAS Load Management

Building performance

“Building performance mandates, namely, indoor air quality, acoustical quality, visual quality, thermal comfort quality, spatial quality, energy, building integrity.”

NEEC National Energy Efficiency Committee

Energy conservation

“Using energy efficiently or prudently; saving energy.” WWWEC

Maintainability

“Is the ease, accuracy, safety, and economy of maintenance in order to improve the effectiveness and efficiency of maintenance.” “The ease with which a software system or component can be modified to correct faults, improve performance, or other attributes, or adapt to a changed environment”. “Ease of maintenance, commonality of hardware, modular assembly, and Murphy-proofing”

ASHRAE 2003 IEEE 90 Neubeck 2004

Sustainable “Meets the needs of the present without compromising the ability of future generations to meet their own needs”

Agenda 21

Page 30: THE INTEGRATION BETWEEN DESIGN AND MAINTENANCE …eprints.qut.edu.au/16058/1/Frank_Lin_Thesis.pdf · the integration between design and maintenance of office building automation:

CHAPTER 1 INTRODUCTION

12

1.7 Summary

In summary, the rapid advancement of computer technology has made it possible to

explore the potential of integration between building design and maintenance

partitioners. There is also a sustained drive for research into decision support systems

in construction practice. However, several areas of problems and limitations in the

design and maintenance in practice, such as the inappropriate application of systems

and some deficiencies resulting from the limits of time and budget, highlight the

potential for the research proposed here.

This presents an opportunity for a computer-based integration approach for decision

support in the building process. The perception and benefits of integration have been

recognised and accepted in the industry. Supported by advanced information and

communication technologies (ICT), the trend toward better integration in building

process will create more advantage for the future.

This chapter has opened the discussion for the topics of the thesis. It has introduced

the research problems, limitations and propositions. The research background of the

office building automation practice was described, the research objectives was

proposed, the methodology was overviewed, the definition was presented, and the

structure of thesis was outlined. On this foundation, the thesis can proceed with a

detailed description of the research.

Page 31: THE INTEGRATION BETWEEN DESIGN AND MAINTENANCE …eprints.qut.edu.au/16058/1/Frank_Lin_Thesis.pdf · the integration between design and maintenance of office building automation:

CHAPTER 2 LITERATURE STUDY

13

CHAPTER 2 LITERATURE STUDY

The Integration between Design and Maintenance of Office Building Autom

ation: A Decision Support Approach

2.1 Introduction 2.2 Building Integration 2.2.1 Status of Building Industry

2.2.2 ICT Application in the Building Process 2.2.3 Reviewing the Current Building Process 2.2.4 Integration Application in Building Process 2.2.4.1 Implications of Integration

2.2.4.2 Potential Strategies of Balance between Design and Maintenance

2.2.5 Integration and Building Automation Systems (BAS) 2.2.5.1 What is Intelligence?

2.2.5.2 What is an Intelligent Building? 2.2.5.3 Development and System Evolution of Intelligent Buildings 2.2.6 Interdisciplinary Building Systems Design and Maintenance 2.2.7 Integration for Building Industry

2.2.7.1 Systems Integration 2.2.7.2 Process Integration

2.2.8 Current Trends of Integration 2.3 Decision Support 2.3.1 Decision Support System 2.3.2 The Need for Decision Support System 2.3.3 Decision Support and Integration in Building Construction Industry 2.3.4 Limitation of Decision Support and Integration

2.4 Design and Maintenance for Office Building 2.4.1 Status of Design and Maintenance in Building Industry 2.4.2 The Relationship between Design and Maintenance 2.4.3 The conflicts Between Design and Maintenance 2.4.4 Design and Maintenance in Building Automation System (BAS) 2.4.5 Security/Fire System Design and Maintenance 2.4.6 The Problems and Limitations of the Building Design and Maintenance Performance 2.4.7 Findings in Relation to Design and Maintenance 2.5 BAS for Office Building 2.5.1 What is Building Automation and Building Management? 2.5.2 Current Building Automation Systems (BAS)

2.5.2.1 Functionalities of the BAS 2.5.2.2 Components of a BAS 2.5.2.3 Building Automation system (BAS) and Intelligent/green Building 2.5.2.4 The Benefits of a BAS 2.5.2.5 Current Situation and Limitation of BAS

2.5.3 The Future of the Office Building Automation 2.6 Other Relevant Literatures 2.6.1 Energy Conservation and High Performance of Office Building 2.6.2 Total Quality Management 2.6.3 Building Commissioning 2.6.4 LCC for BuildingDevelopment 2.6.4.1 Life Cycle Cost 2.6.4.2 Life Cycle Cost Analysis (LCCA) 2.6.5 Practice with Smart and Sustainable Design Incorporating Maintenance 2.7 Summary

Page 32: THE INTEGRATION BETWEEN DESIGN AND MAINTENANCE …eprints.qut.edu.au/16058/1/Frank_Lin_Thesis.pdf · the integration between design and maintenance of office building automation:

CHAPTER 2 LITERATURE STUDY

14

2.1 Introduction

This chapter presents the relevant literature. It aims to build a foundation for the

research development. The literature review is defined as: ‘the selection of available

documents (both published and unpublished) on the topic, which contains

information, ideas and evidence written from a particular standpoint to fulfil certain

aims or express certain views on the nature of the topic and how it is to be

investigated, and the effective evaluation of these documents in relation to the

research being proposed’ (Hart 1998). The literature study needs to span the data and

information to identify the research issues by reviewing the relevant literature.

Literature survey is a documentation process of a comprehensive review of the

published and unpublished work from secondary sources of data in the areas of

specific topics to identify and highlight the important variables, and to document the

significant findings from earlier research that will serve as the foundation on which

the research framework for the current investigation can be built and developed; a

good literature survey also leads logically to a good problem statement (Sekaran

2003; Fellows and Liu 2003 ), then to gain good forward results. Meanwhile it also

has to ensure that no important variable that has in the past been found repeatedly to

have had an impact on the problem is ignored (Sekaran 2003). The literatures must

be considered in the context of theory and other literatures- the methodologies, data,

analytic techniques etc., and therefore they will be an on-going process till the

deadline of this research is reached (Fellows and Liu 2003).

Page 33: THE INTEGRATION BETWEEN DESIGN AND MAINTENANCE …eprints.qut.edu.au/16058/1/Frank_Lin_Thesis.pdf · the integration between design and maintenance of office building automation:

CHAPTER 2 LITERATURE STUDY

15

To fulfil the research objectives, this research has reviewed five aspects of literatures

as shown in Figure 2-0 in the context of research focus:

(1) Building integration

(2) Decision support approach

(3) Design and maintenance for office building

(4) Building automation systems (BAS) for office building

(5) Other relevant literatures

Building Integration

Maintenance BAS Design

Decision Support Approach

OFFICE BUILDING

Figure 2-0: Scopes of Literature Study

PERFORMANCE ENERGY CONSERVATION TQM COMMISSIONING LCC

Other Relevant Literatures

Page 34: THE INTEGRATION BETWEEN DESIGN AND MAINTENANCE …eprints.qut.edu.au/16058/1/Frank_Lin_Thesis.pdf · the integration between design and maintenance of office building automation:

CHAPTER 2 LITERATURE STUDY

16

The literature study will initiate from reviewing the building integration of both in

building systems and building processes. To achieve the benefits of the integration,

an effective approach is needed. The research has proposed to explore a decision

support for this purpose on the building processes such as design and maintenance.

In office building, BAS plays a key role. It will be taken to demonstrate the

integration exploration to share information and create close relationships between

design and maintenance. The integration activities should rely on the relevant

information such as TQM, Building Commissioning (BC), Life Cycle Costing (LCC)

and other literatures. There will be reviewed to develop useful strategies.

Page 35: THE INTEGRATION BETWEEN DESIGN AND MAINTENANCE …eprints.qut.edu.au/16058/1/Frank_Lin_Thesis.pdf · the integration between design and maintenance of office building automation:

CHAPTER 2 LITERATURE STUDY

17

2.2 Building Integration

2.2.1 Status of the Office Building Industry

The principal characteristic of a major office building was stated by Sullivan (1896)

as: “It must be tall- every inch of it must be tall. The force and power of height must

reside in it- the glamour and pride of enthusiasm”. Yet the high-rise is insufficiently

characterised by height alone; it must be higher than all others, at least for a time.

(Eisele & Kloft 2002). ‘High- higher- highest’ has become the trend of office

building construction. It has driven the building industry to apply cutting edge

technology on product and system innovation in the functional performance

enhancement to pursue the highest standards for office buildings.

However, in reality, office building projects are often constructed under constraints

of the time and budget and driven by some specific purpose, either for political or

economical reasons which can compromise the project. After all, the builders need to

cope with and balance between a variety of requirements during the process.

With yet another attempt at the worlds’ tallest building completed in Taipei this year,

it seems that the office building industries around the world are facilitated by design,

construction and operation the tallest landmarks on each, as evidences in Table 2-1.

However, inevitably, a question would be asked: “Does the remarkable feature of

height cope with the practical demands and technical supports, or does it create

non-technical compliance?”

Page 36: THE INTEGRATION BETWEEN DESIGN AND MAINTENANCE …eprints.qut.edu.au/16058/1/Frank_Lin_Thesis.pdf · the integration between design and maintenance of office building automation:

CHAPTER 2 LITERATURE STUDY

18

Table 2-1: Official World's Ten Tallest High-rise Buildings (Office Use) (Source: http://www.emporis.com/en/bu/sk/st/tp/ty/of/)

Nevertheless, the gap existing in the different fields is still a challenge for the

construction and building industries; it also presents opportunities for breakthrough

and growth. Over viewing the development of the building construction industry, the

information technology (IT) computer support was introduced during the 1960s to

the building process by structural engineers. Since then the islands of automation for

construction according to Figure 2-1 (Matti, H. 2000) has shown it is slowly growing

and the gap has gradually been reducing. For example, the isolated digital islands

have been created for design (2D/3D CAD, visualization, engineering calculations),

construction (quantity take off, resource management), maintenance/use (facility

management), and resource supply (components/material databases). IT creates great

changes that affect work content, team work and collaboration, project organisation,

building product and process descriptions (models) and Information and

Communication Technology (ICT) based tools.

halla
This figure is not available online. Please consult the hardcopy thesis available from the QUT Library
Page 37: THE INTEGRATION BETWEEN DESIGN AND MAINTENANCE …eprints.qut.edu.au/16058/1/Frank_Lin_Thesis.pdf · the integration between design and maintenance of office building automation:

CHAPTER 2 LITERATURE STUDY

19

Figure 2-1: Islands of Automation in Construction

(Courtesy: Matti Hannus and Pär Sill’en, VTT, Finland)

The changes are inevitably relevant to the construction industry and have an effect on

the building process. Accessing external vendor product information, regulations,

and community information would be crucial for the practice. A great need and

potential exists for the development of its application in specification, design,

implementation, and evaluation of tomorrow’s building process support systems into

the complex building process which will combine with deep knowledge and ICT

tools.

Predictably, the building products will themselves also contain embedded and

integrated IT support (Intelligent and responsive buildings) in the future. The

building processes will be more integrated, and supported to reduce gap. Information

produced during the whole building process will be used to a higher degree for the

maintenance and provide subsequent experience data for the enhancement of new

building designs and databases.

halla
This figure is not available online. Please consult the hardcopy thesis available from the QUT Library
Page 38: THE INTEGRATION BETWEEN DESIGN AND MAINTENANCE …eprints.qut.edu.au/16058/1/Frank_Lin_Thesis.pdf · the integration between design and maintenance of office building automation:

CHAPTER 2 LITERATURE STUDY

20

2.2.2 ICT Application in the Building Process

Information and Communication Technology (ICT) has rapidly advanced to provide

support for business and industries including the construction and building industries.

This technology provides applicable tools and infrastructure to increase the

efficiency of the process, enhance communication and facilitate relationships during

the building process.

A close look at the role of ICT and its capacities in the whole building process from

sketch/concept, design, construction, operation& maintenance (O&M), use, to

building demolition/ recycling will present a bright prospect for the future, though the

past and present application status seems to be growing slowly as seen in the

description of Matti’s islands of construction automation. However, in light of the

ICT capabilities that ICT will continue to play a key role from now on is a great

possibility. The building process, through realistic integration, will be able to access

a much better decision making support in the very early phase of the design process.

The improved IT supports knowledge management, communication on all levels, decision

support, planning, information processing, intelligent building, collaboration, systems

design and integration (Christiansson, p. 2000).

In brief, ICT has provided several useful applications in the effective building

systems and processes. And it has also provided a sustainable infrastructure for the

advanced development with immediacy for the building industry. The status of ICT

applications in the building process can be outlined as:

- ICT provides knowledge and tools which can be used in all phases of the

building process from design concept to operation, maintenance and

demolition of buildings.

- ICT provides potential for the development of building systems and design

support tools for the building process.

- ICT supplies for building process integration to facilitate:

o Computerised building process systems

o Conceptual modeling of the building process

Page 39: THE INTEGRATION BETWEEN DESIGN AND MAINTENANCE …eprints.qut.edu.au/16058/1/Frank_Lin_Thesis.pdf · the integration between design and maintenance of office building automation:

CHAPTER 2 LITERATURE STUDY

21

o Realisation of Intelligent Buildings (IB): ICT provides methods,

systems, and techniques for design, operation and maintenance, and

administration of buildings as well as environmental improvement.

o Integrated Databases: it includes concepts and requirements for

technical and building process.

The advent of Information and Communication Technologies (ICT) has changed the

building industry in various fields; however, in the current state of the building

industry, the scope of the design service is still isolated within the traditional

boundaries. To create unique designs (production stage), the designers are operating

alone, seldom to extend their service and interest to the rest of the building process.

On the other hand, the buildings after delivery are operated by the building owners or

tenants (operation and maintenance stage), but in practice, the support tools are still

inadequate or not enough to support the building in the long term. This presents a

potential and need for the development of ICT support. ICT needs to support the total

building life cycle after the design and construction stage: asset management,

operation and maintenance (Matti H. 2000).

2.2.3 Reviewing the Current Building Process

According to Christiansson (2004), despite efforts and the advanced developments in

systems and products automation and integration as above mentioned, the

implementation in the building process automation has been rather slow due to:

• The building process is one of the most complex and less formalized applied

processes (short series of products, changing participants from project to

project, changing production sites, and cultural differences).

• Building process participants using different ICT tools, languages and model

formalisms.

• Rich spectrum of user interfaces with different characteristics.

• Low client understanding that IT pays back (because of better early decisions

in alternative solutions, higher quality and better documented end products).

In the building system integration process, along with the ICT technologies rapid

growth, smart and sustainable buildings are becoming a buzzword in the office

Page 40: THE INTEGRATION BETWEEN DESIGN AND MAINTENANCE …eprints.qut.edu.au/16058/1/Frank_Lin_Thesis.pdf · the integration between design and maintenance of office building automation:

CHAPTER 2 LITERATURE STUDY

22

building industry over recent years. One of the distinctive characteristics of a smart

building is that its design and construction requires the integration of complex new

technologies into the fabric of the building for more effective operation (Drewer, S.

& Gann, D. 1994). Therefore the main features of smart buildings are often

associated with advanced automation equipment and services for monitoring and

controlling purposes. The sustainable buildings will have an aim of reducing the

negative impacts on the environment and resources during its design, construction

and operation, while producing a healthy, productive and socially supportive built

environment; hence they require the sustained process integration for lifetime of the

building. Reviews of the building process can be summarised as the follows:

◊ The performance of buildings is very dependent on the quality of the whole

building process such as design and the operation and maintenance of the

building’s internal systems. Conventionally, these two phases of building process

take place independently of each other (LAMSAC 1981). However, each

individual process involved in the building development, from building design,

construction, to the operation and maintenance, is related and dependant on the

others and the degrees of their interaction significantly influences the end result

(Chanter B. et al., 1996).

◊ Buildings also require lifetime support and service of their operation and

maintenance. Technological assistance for this is now becoming available in the

form of building automation systems (BASs) – which offer proven benefits in

building performance and energy conservation (CIBSE 2000; Novak B. 2004). It

is likely that in the building delivery, the effectiveness and efficiency of BASs

will be a main concern of building owners and operators for years to come.

◊ It is being increasingly recognized, particularly for new construction projects, that

BASs are the most cost-effective way of building management and energy

conservation. In addition, advanced BASs help increase comfort levels and

healthy living/working conditions. Intelligent/green buildings need to be built

with sustainable materials through intelligent design and construction methods.

The process does not stop when the building is complete – proper operation of

building systems will ensure that the building remains intelligent and sustainable

throughout its lifetime. A BAS plays a key role in supporting intelligent/green

Page 41: THE INTEGRATION BETWEEN DESIGN AND MAINTENANCE …eprints.qut.edu.au/16058/1/Frank_Lin_Thesis.pdf · the integration between design and maintenance of office building automation:

CHAPTER 2 LITERATURE STUDY

23

design by reducing energy conservation and improving indoor environmental

quality (CIBSE 2000; Moult R. & Matasek, D. 2001).

The expectations placed upon office buildings have experienced extraordinary

changes over the years from the basic function of office working space to the modern

dynamic and comfortable workplace equipped with advanced automated

technologies. However the levels of adoption and complexities of new technologies

alone which have integrated several various systems do not really make a building

smart. The comprehensive functionality of a smart building will need to rely on the

extensive integration of building service systems, such as HVAC; electric power;

communication; safety and security; transportation; sanitation, etc. It is also

dependent on the integration between these systems and the building structure as

well as the infrastructure of the communication.

Hopefully, optimised systems integration can be fully accomplished through the

process integration from strategic planning of the building development, typically

starting at the initial design stages of the building and ending up with a life long

process of building maintenance and upgrade (Arkin & Pacink 1997).

On the other hand, office buildings are being developed with advanced systems

around the world, however building performance problems are also common on a

global basis; likely system breakdowns, control failures, frequent service intervals

may intertwine with high running cost and the inability to produce desirable user

comfort levels or flexibility, which are all contradictive to sustainability principles

(Coggan, D.A. 1997; Fellows M. C. T. C. R. 2000). As these problems are often

associated with the design, selection, installation and operation of building systems, a

question is “How can we facilitate a smarter design for more sustainable building

performance and maintenance?” In summary, current barriers and limitations on the

building system and process caused the process not being integrated effectively.

The following sections will demonstrate the details of the findings from the literature

reviews in five areas: (1) building integration; (2) decision support; (3) design and

maintenance for office building; (4) BAS for office building (5) other relevant

literatures.

Page 42: THE INTEGRATION BETWEEN DESIGN AND MAINTENANCE …eprints.qut.edu.au/16058/1/Frank_Lin_Thesis.pdf · the integration between design and maintenance of office building automation:

CHAPTER 2 LITERATURE STUDY

24

2.2.4 Integration Application in Building Process

The contributions from previous research have concluded that the useful and

practical approach for the resolution of the inconsistent and insufficient current

knowledge in building practices, and the decision based approach with knowledge

based support could be applied extensively at present with the exploration of

integration. In comparison to numeric based computations such as estimation, there

is a lack of computer support for problem solving and decision making during all

stages of the project development. In the light of this, decision support systems and

integration are becoming a highlight for research and will continue to be applied in

the construction and building practice.

2.2.4.1 Implications of Integration

A generic concept of integration was defined by Betts et al. (1995) as: “the sharing

of something by somebody using some approach for some purpose”. When the

construction and building process consists of many interlinked stages as discussed

earlier, it is naturally logical and efficient for information to be processed

consistently and on an integral basis. This has also proved to be practical with the

arrival of new techniques and methods. There are also research attempts to provide

the readily useable linkages between the construction tasks such as the use of

knowledge-based processing between design and planning for decision support and

integration (Yang & Lin 1998).

However, from the previous literature reviews and observations in the building

practice, it is rare that integration between different fields such as design and

maintenance, particularly in attempts to advance the stand alone reliable

competencies to discover the real energy and cost savings with a built better

environment.

During the office building design stage, consultants often do not have sufficient

understanding on maintenance issues for the operation of the building. As a result,

there is often a lack of effective solutions for service, upgrade and maintenance

problems during the life-span of the building. For automated and intelligent

buildings, with their wide range of technology adaptation and upgrading capacity, the

Page 43: THE INTEGRATION BETWEEN DESIGN AND MAINTENANCE …eprints.qut.edu.au/16058/1/Frank_Lin_Thesis.pdf · the integration between design and maintenance of office building automation:

CHAPTER 2 LITERATURE STUDY

25

issue between demand and lack of response is more critical. Previous efforts on

integrated building development phases, particularly between design and

maintenance, are very rare with only a few related topics exploring ideas. This

situation presents a great potential for developing an integrated decision support

system for the integration of and communication between design and maintenance

phases during the conception stage of an office building project.

In practice, the designers have time or budget pressures and the lack of up-to-date

information about the applicable systems for the life-cycle process. Research needs

to explore an approach for the decision support and examine the potential for the

advanced development in the office building automation.

2.2.4.2 Potential Strategies of Balance between Design and Maintenance

To deal with the sheer volume of information, knowledge and decision points, a

potentially feasible alternative is to facilitate ‘smarter’ design of building systems for

the benefit ‘more sustainable’ maintenance. Being smart here refers to the specific

approach of using feedback from maintainers, accessing historical information on

failed as well as completed design-build examples, and studying alternative decisions

that may impact on maintenance during the building design process. ‘Sustainable’

maintenance advocates the practice for maintenance teams to be involved early in

design able to access comprehensive documentation of building systems and other

components, obtain better understanding of design intentions, and practice proactive

maintenance rather than reactive service work and emphasize performance

improvement.

Consistent integration between design and maintenance will not only optimise output

from these two stages of work but will also support other stages of the building

development by way of information support. Potential strategies for better balance

between design and maintenance will stem from (Lin & Yang 2003):

◊ Easy access of information from previous examples and historical data.

◊ Adequate and prompt support to each other between all professionals involved.

◊ Increase of the efficiency in maintenance practice through improved understandings.

Page 44: THE INTEGRATION BETWEEN DESIGN AND MAINTENANCE …eprints.qut.edu.au/16058/1/Frank_Lin_Thesis.pdf · the integration between design and maintenance of office building automation:

CHAPTER 2 LITERATURE STUDY

26

◊ Integration of multi-disciplines throughout project development.

2.2.5 Integration and Building Automation Systems (BAS)

This section examines the issues of the integration and office building automation

systems primarily from the building systems technology perspective. The building

systems and facilities provide for the requirements of end users by the various system

services during the life of building. From the literature reviews, most contentious

issues associated with building systems can be recognised and summarised as

failures in the communication, coordination, and integration of building systems

information between designers and maintainers. Building systems coordination and

integration are the responsibilities of the architectural technical coordinators and

project managers.

Furthermore, it is also necessary to plan building process integration as early as

possible during the whole process, and needs designers continue their service for the

life of the building. Automating and integrating building systems into the complete

design process, and coordinating them throughout the manufacturing, construction,

and operating/ maintenance phases, can minimise costly errors and problems, and

increase the serviceability of building systems.

2.2.5.1 What is Intelligence?

Before the issues of the integration and BAS which is the major aspect of intelligent

building are discussed, to gain an understanding of the real implications, it obviously

would be necessary and helpful to explore subject deeply.

Intelligence is an expressive topic for human beings. Almost everybody is impressed

with Einstein's achievements in “general relativity”. There is universal agreement

that Einstein, an enormously creative thinker, was highly intelligent. He is the

portrait of an intelligent person. All definitions of intelligence have a common

denominator related to innovation and adaptability. However, it is hard to define

intelligence, and not much agreement has been definitely reached (Pfeifer & Scheier

1999).

The introductory explanation on intelligence in the Penguin Dictionary of

Psychology reflects this lack of consensus: "…. Few concepts in psychology have

Page 45: THE INTEGRATION BETWEEN DESIGN AND MAINTENANCE …eprints.qut.edu.au/16058/1/Frank_Lin_Thesis.pdf · the integration between design and maintenance of office building automation:

CHAPTER 2 LITERATURE STUDY

27

received more devoted attention and few have resisted clarification so thoroughly"

(Reber 1995). Nevertheless, definitions can provide a source of perception such as:

1. A definition (Garmonsway 1969) includes: ability to understand, reason and

perceive; quickness in learning; mental alertness; ability to grasp

relationships; and information.

2. The Journal of Educational Psychology (JEP 1921) collected and

summarised the definitions of intelligence as: the ability to carry on abstract

thinking; having learned or ability to learn to adjust oneself to the

environment; the ability to adapt oneself adequately to relatively new

situations in life; a biological mechanism by which the effects of a

complexity of stimuli are brought together and given a somewhat unified

effect in behaviour; the capacity to acquire capacity; the capacity to learn or

to profit by experience.

3. The commonsense notions of intelligence, is commonly related to the

thinking and problem solving; the competence to speak, read, and write;

intuition and creativity; learning and memory; emotions; surviving in a

complex world; perceptual and motor abilities and consciousness. They also

include the distinction of degrees of intelligence. This symposium of

commonsense notions in intelligence will be providing a sense of the variety

of abilities and components involved in what we, scientists and laypeople,

think of as intelligence (Rolf Pfeifer and Christian Scheier 1999).

As we have seen, intelligence is multifaceted and not restricted to one characteristic.

Such intelligence may be sought today in people and in buildings! Until recently this

was in short supply in both. On the other hand, the Abdu'l-Baha demonstrated: “That

is, they believe that minds are equal to begin with, but that training and education

will result in mental variations and differing levels of intelligence, and that such

variations are not an inherent component of the individuality but are the result of

education: that no one hath any inborn superiority over another..” (Abdu'l-Baha

2001). It implies that the intelligence of the individuals could be improved by means

of education and training, specifically in the support of advanced technologies;

similarly, building intelligence could be promoted by means of upgrade and

innovation, and sustained optimisation through a strategic approach as well.

Page 46: THE INTEGRATION BETWEEN DESIGN AND MAINTENANCE …eprints.qut.edu.au/16058/1/Frank_Lin_Thesis.pdf · the integration between design and maintenance of office building automation:

CHAPTER 2 LITERATURE STUDY

28

2.2.5.2 What is an Intelligent Building?

The definition of Intelligent Building (IB) is still as diverse as that relating to the

intelligence of human beings. In a rough sense, an intelligent building is “one

equipped with the telecommunications infrastructure that enables it to continuously

respond and adapt to changing conditions, allowing for a more efficient use of

resources and increasing the comfort and security of its occupants”. A broad

spectrum of the implications and definitions of intelligent buildings in the IB

development are summarised and mapped in Table 2-2 and Figure 2-2.

Table 2-2: Hierarchical Summary of Development of Intelligent Buildings

Year Organisation Definition Reference 1981 United

Technology Building Co. (UTBS) USA

"Intelligent Building" originated to denote buildings which incorporated sophisticated telecommunications facilities, building management and data networking services which provided shared tenant services to the occupants.

So and Tanaka 1990

1988 Intelligent Building Institute (IBI) USA

An IB was one which provides a productive and cost-effective environment through optimisation of its four basic elements, i.e. structure, systems, services and management and the interrelationships between them.

Caffrey 1988

1991 Nippon Telegraph and Telephone (NTT) Japan

Japanese IBs focused on four aspects: (1) Receiving and transmitting information and supporting management efficiency; (2) Ensuring satisfaction and convenience for the people working in them; (3) Building management to provide more attentive administrative services with lower cost; (4) Fast, flexible and economical responses to changing sociological environments, diverse and complicated office work and active business strategies. Regarding cultural considerations, IBs must maintain an effective working environment, run automatically and comprehensively, and be flexible enough to adapt to future changes in the needs of the working environment.

Fujie and Mikami 1991

1992 DEGW Europe

An alternative European model of IB was developed to identify three phases in the development of intelligent buildings: (1) Automated buildings (1981-1985), (2) Responsive buildings (1986-1991), (3) Effective buildings (1992- present). The definition of IB in Europe is increasingly more on the users' requirements than the technologies.

DEGW 1992

1994 The European Intelligent Building Group(EIBG)

An IB was defined as one that "creates an environment which maximises the effectiveness of the building's occupants while at the same time enabling efficient management of resources with minimum life-time costs of hardware and facilities"

EIBG 1994

1995 The Public Works Department of Singapore

An IB must fulfill three conditions: the building should have (1) advanced automatic control systems, (2) good networking infrastructure, and (3) adequate

Choi 1995

Page 47: THE INTEGRATION BETWEEN DESIGN AND MAINTENANCE …eprints.qut.edu.au/16058/1/Frank_Lin_Thesis.pdf · the integration between design and maintenance of office building automation:

CHAPTER 2 LITERATURE STUDY

29

Figure 2-2: The Development of the Intelligent Building

Technology Automation

Response

Optimisation

Advanced Automation

Quality

End-user’s Satisfaction

Advanced Technology

Telecommunication, Building management, Networking, Services

Productive, Cost-effective environment, Optimisation

Efficiency, Convenience, Cost, Responses

Automated, Responsive, Effective

AdvancedAutomatic, Net., Telecom.

Automation5 A: CA, OA, BA, FA, MA

Q/V

Effective, Efficient, CostsOptimisation

2002 -1999 AIIB

1995 China

1995 Singa pore

1994 EIBG

1992 DEGW

1991 NTT Japan

1988 IBI

1981

USA

20 Years

government telecommunication facilities. 1995 Shanghai

developer China

An IB was labeled as "3A" or "5A". "3A" means the building contains three automatic functions: communication automation (CA), office automation (OA) and building management automation (BA). IBs integrated the fire alarm function or an independent fire automation system (FA) and a comprehensive maintenance automation system (MA) with the various automation systems in the building.

Choi 1995

1999- 2002

Asian Institute of Intelligent Buildings (AIIB)

New official definition for IB was “An Intelligent Building is designed and constructed based on an appropriate selection of quality environment modules to meet the user's requirements by mapping with the appropriate building facilities to achieve long-term building value”

So 2002

From the literature reviews into office building over the last two decades,

development has mapped a great future as seen in Figure 2-2 for the so-called

Intelligent Building (IB). IB was initiated in 1981 in the USA, originally denoting

automation in office buildings. At that stage the focus of the building industry was to

employ the technologies for good visible features. Then gradually they became

Page 48: THE INTEGRATION BETWEEN DESIGN AND MAINTENANCE …eprints.qut.edu.au/16058/1/Frank_Lin_Thesis.pdf · the integration between design and maintenance of office building automation:

CHAPTER 2 LITERATURE STUDY

30

concerned with the building’s productive, cost effective environment to optimise the

building’s efficiency for greater convenience and quicker responses (UTBS 1981;

IBI 1988; NTT 1991). The office buildings were being developed by means of the

providing good infrastructure for automatic systems, communication and networking

systems. Through the optimisation process, they were not only adapting the advanced

products of technology, but also increasing the system effectiveness, efficiency and

minimizing the cost of hardware and software as well.

From 1989 to 1995, intelligent buildings were progressing into the boom stage in

Asia including Japan, Singapore, Malaysia, China and Taiwan; developers did invest

and produce massive numbers of office buildings by applying the advanced

automation systems so-called 5A i.e. CA, OA, BA, FA, and MA. During this stage,

the building industry benefited from the fast growth of IT, telecommunications and

networking services, especially, office buildings which used many modern and

advanced technological features (DEGW 1992; EIBG 1994; Choi 1995; So 2002).

From the definitions of IB around the world as in Table 2-2, the different features

have outlined with varying emphasis either on technologies or on user's requirements

as in Figure 2-2. In simplicity, the definition of IB will be: "an IB is designed and

constructed on an appropriate selection of quality environment modules to meet the

user's requirements by mapping to the appropriate building facilities to achieve

long-term building value" (So, 2002). It implicates the needs of the building

developers/owners/occupants (deliverable items) and the enabling technologies

(systems and services) which will generate values for the building, i.e. productivity,

market values and energy conservation etc.

However, a good quality environment and long-term value of the building was

always beyond the end users’ expectation and satisfaction. It would be a great

opportunity for reviewing the advantages of good infrastructures and the weakness in

not taking care of the consumers’ real requirements, and considering the relationship

between technology and intelligence, and the desire of human beings to search for a

strategic total solution.

Consequently, an exact definition of Intelligent Building (IB) is not critical in the

practice except in the application of advertising and marketing. IB is an integrated

Page 49: THE INTEGRATION BETWEEN DESIGN AND MAINTENANCE …eprints.qut.edu.au/16058/1/Frank_Lin_Thesis.pdf · the integration between design and maintenance of office building automation:

CHAPTER 2 LITERATURE STUDY

31

product composed of various technological systems and products which would be a

typical example of the systems’ integration. Nonetheless, the key issue should be

located on what IB does, not just on what IB is. It should be kept in mind that the

integration is to ensure that the functionalities of IB meet with the expectations of

occupants. Hence, the integration will not end at the system integration; it should be

extended to the life-time operation and maintenance. Therefore, the contribution of

IB should be continually backed by advanced integration in building processes to

enhance maintenance activities.

2.2.5.3 Development and System Evolution of Intelligent Buildings

The development of intelligent buildings was closely linked to the growth of

Information Technology (IT). Over the past decade, the focus of computer usage

moved from mainframe to mini and on to the rapid increase in use of personal

computers (PC). The popularity in using of personal computers has seen massive

progress in the PC based environment.

The development and popularisation of information processing and communication

technologies have given rise to an advanced information society in which the ability

to access and process information at high speeds has come to play a significant role.

Intelligent buildings provide a basis upon which even further development can be

made in the future. In recent years, digital communications have become

commonplace, enabling computers to communicate at ever-increasing speeds and

leading to the development of high-speed communications networks, Furthermore,

diversification of communications services is improving the value of information and

communications which are viewed as utilities.

Building automation systems have also benefited from the advanced data processing

and communications technologies, leading to a broader range of building service

functions. In the new century, a major trend will probably be the development of

diverse communication technologies, ranging from the transmission of audio and text

to the transmission of still and moving images, and in addition, the development of

multimedia systems incorporating all of these features. It will continue to be focused

on providing (Wood B. 1999):

Page 50: THE INTEGRATION BETWEEN DESIGN AND MAINTENANCE …eprints.qut.edu.au/16058/1/Frank_Lin_Thesis.pdf · the integration between design and maintenance of office building automation:

CHAPTER 2 LITERATURE STUDY

32

◊ Visual services for the transmission of pictures with high definition and

stereoscopic images,

◊ Intelligent services that exhibit awareness, recognition, comprehension and

inference, and

◊ Personal mobile communications services with enhanced portability.

It was aimed at achieving a greater degree of coordination between information

processing and communications technologies. This should lead to intelligent

buildings with an even higher level of integration (Akihiko, et al., 1993) able to

integrate telecommunication system with office automation and building automation

systems as shown in Figure 2-3.

Figure 2-3: Evolution of Intelligent Building

2.2.6 Interdisciplinary Building Systems Design and

Maintenance

The fragmented abilities of building professionals are helpful for the development of

existing expertise in the specialised fields, but it is an obstacle for interdisciplinary

collaboration between design and maintenance. Although computer hardware

technology has progressed rapidly in recent years and the relative cost of this

Building automation system

Telecommunication system

Building engineering & Environmental planning

EVO

LUTIO

N

EVO

LUTIO

N

Office automation system

Page 51: THE INTEGRATION BETWEEN DESIGN AND MAINTENANCE …eprints.qut.edu.au/16058/1/Frank_Lin_Thesis.pdf · the integration between design and maintenance of office building automation:

CHAPTER 2 LITERATURE STUDY

33

technology has decreased during this same period of time, software technology in

the building industry has not kept pace with this computer hardware revolution.

With today's hardware it is possible not only to develop office building design

software that is integrated across the design and maintenance disciplines, but also

to communicate such information directly to software systems in the other

segments of the industry.

A fully automated and integrated office building development and operating/

maintaining system is now a feasible objective. The obstacles are mainly

administrative and political, not technical. Problems of communication and

coordination that in the past have overwhelmed the process of designing a building

can be minimised in the future through process integration to design and

maintenance. The process integration approach will also increase the efficiency

and effectiveness of design and maintenance.

2.2.7 Integration for Building Industry

The integration of the building industry can be broken up into two categories as

horizontal integration (or systems integration) and vertical integration (or process

integration). Horizontal integration is an integration of building systems and services

such as HVAC, electrical power/ lighting system, fire system, security system,

parking system, drainage system, etc,. Vertical integration is an integration of

building processes such as design, planning, construction, installation, financial,

operation and maintenance, demolition, etc, (Council on Tall Building and Urban

Habitat 1995). This research was specifically designed and attempted to explore this

process integration issue.

2.2.7.1 Systems Integration

Intelligent elevators, intelligent roofing materials, intelligent drinking fountains,

intelligent wiring systems, intelligent refrigeration and intelligent HVAC control

systems have been released and promoted through the media. Yet, is it really

intelligent and enabling? (Hoffmann T. 2004) The foundation of these advanced

technologies is in place and understood enough to be applied; however that answer

might be conservative.

Page 52: THE INTEGRATION BETWEEN DESIGN AND MAINTENANCE …eprints.qut.edu.au/16058/1/Frank_Lin_Thesis.pdf · the integration between design and maintenance of office building automation:

CHAPTER 2 LITERATURE STUDY

34

A successfully designed building has often been compared to an outstanding

symphony. The parts of a building, like individual instruments in an orchestra, have

the capacity to make up a whole that is greater than if they were played alone. The

expectation on “intelligent” is often relies on the effective integration of the related

factors and components. Fully integrating architecture is a framework which enables

total building systems integration offering solutions and value to the end user. It

combines the expected ability to tie all of the subsystems in a building together into

an interconnected network that appears homogeneous to a user but maintains

independence and the separation of subsystem powers.

Systems integration involves developing an integrating architecture which is a

collection of products, tools, software and hardware, and communication

instruments; in order to assure connectivity, interoperability and usability, they work

together as different pieces of a single building management system. The key

features and benefits of system integrating are ( CIBSE 2000; Hoffmann T. 2004):

1. Features:

• Integrating devices and subsystems using multiple communications

with proprietary and standard protocols.

• Providing a single user interface and a common interaction method for

the different products and subsystems.

• Adopting and promoting by an informed base of manufacturers,

suppliers and end users.

2. Benefits:

• Savings in installation costs.

• Greater choices for the designer.

• Simpler building operation.

• Integrated operation

Effective integration requires partnerships and an experience base between key

parties. Enabling technology does exist in the areas of computer hardware, software,

networks and standard protocols to ensure the success of integration. However, the

Page 53: THE INTEGRATION BETWEEN DESIGN AND MAINTENANCE …eprints.qut.edu.au/16058/1/Frank_Lin_Thesis.pdf · the integration between design and maintenance of office building automation:

CHAPTER 2 LITERATURE STUDY

35

Design

Security HVAC Lighting Electrical power

Fire Building Systems

Integration

Building Process Integration

Figure 2-4 (a): Conceptual Integration of Building Industry

Maintenance

substantial issues are raising the consensus- awareness and understanding, the need

to take effective action.

2.2.7.2 Process Integration

The building industry constitutes a variety of processes from planning, design,

procurement, construction, commissioning, operation, maintenance to demolition.

Their entities and attributes are different and independent and are traditionally

isolated. Their professional expertises rarely take into account work of others. This

results in the ignoring the cost of the rest and a lack of communication with others

with different expertise, thus making it impossible to enhance the effectiveness for

the whole building progress taking a life time view.

The efforts of implementing the horizontal integration by the building system

manufacturers, has rapidly increased the efficiency of the respective systems, along

with the advanced technologies, especially in information technologies and

telecommunication. However, it also produced redundancy and overlaps. On the

other hand, the vertical process integration might be used to achieve a greater

advantage than the horizontal integration for the systems. Accordingly, the vertical

integration should be promoted for the real enhancement of the building performance

and energy conservation in the life cycle of the building industry as in Figure 2-4 (a),

(b), and (c):

Page 54: THE INTEGRATION BETWEEN DESIGN AND MAINTENANCE …eprints.qut.edu.au/16058/1/Frank_Lin_Thesis.pdf · the integration between design and maintenance of office building automation:

CHAPTER 2 LITERATURE STUDY

36

halla
This figure is not available online. Please consult the hardcopy thesis available from the QUT Library
halla
This figure is not available online. Please consult the hardcopy thesis available from the QUT Library
Page 55: THE INTEGRATION BETWEEN DESIGN AND MAINTENANCE …eprints.qut.edu.au/16058/1/Frank_Lin_Thesis.pdf · the integration between design and maintenance of office building automation:

CHAPTER 2 LITERATURE STUDY

37

2.2.8 Current Trends of Integration

The intense activities and excitement of the late 1960s to produce integrated

computer systems for buildings appear to have peaked in the 1970s. Since the middle

1980s the computer hardware and graphics software technology has significantly

advanced, and efforts were also made to utilise this within the building industry, in

spite of the professional and intellectual fragmentation. The interchange of the

information developed by each profession to achieve optimum solutions continues

to take place orally at frequent meetings between representatives from the various

professions through the specific symposiums and conferences (Christiansson, p.

2000).

Database and systems integration must be extended beyond design to all phases of

the high rise building development and operating cycles. An integrated building

system that can operate the high rise building as a whole, and that can react

automatically, correctly, and appropriately to the frequent changes that occur during

building development, can reduce some of the problems of the past that were due to

poor and ineffective communication (CIBSE 2000). The last decade produced

computer imitations of a manual system reflecting the technology innovation. The

next decade should produce a redefinition of the industry structure and a

reprogramming of the high rise building processes through integrated efforts that

will result in a more efficient use of the computer and support software

development.

There are two features inherent in ongoing computer systems development that

will produce changes in the organizational alignment of the building industry, and

also impact on the process of developing and operating a tall building. The first is the

continuous expansion of the scope of existing software applications and the

continuous increase in the number of new applications to replace manual procedures

that never before used the computer. The second is the cumulative effect of software

development on the industry in the integration between different professional

phases (Council on Tall Building and Urban Habitat 1995).

The building works are created and constructed in accordance with the requirements

of owners or architects. Normally that could be categorised into two classes, one

Page 56: THE INTEGRATION BETWEEN DESIGN AND MAINTENANCE …eprints.qut.edu.au/16058/1/Frank_Lin_Thesis.pdf · the integration between design and maintenance of office building automation:

CHAPTER 2 LITERATURE STUDY

38

technical, and the other art. The IT computer development can help to speed

processing and duplicating. However the building projects usually are distinguished

by unique identities which normally are different in case by case.

Therefore in the future the computer will continue to support the enhancement of

building innovation, but the radical progress of the integration of

interdisciplinary process would need architectural designers involving inherent

creative and artistic expressions to pay more attention on such drastic changes.

The architectural designer's role is therefore expected to bear more responsibilities in

the future, in addition to their professional design tasks; they will be expected to

extend the after-delivery service across the whole building life (Council on Tall

Building and Urban Habitat 1995).

Consequently, the promotion of whole building performance and energy

conservation would not only rely on the building system integration by the vendors

or system suppliers, which have been reorganized and widely accepted the need for

technical action to increase the effectiveness of the systems. But to actually improve

the life cycle efficiency also needs the building process integration to be properly

executed and accomplished by the virtual integrated teams including the designers

and the associated professionals such as facilities managers through the adequate

support tools. To accomplish these integration attempts, the diverse information and

supports are needed. It highlights the fact that the integration will require extensive

decision making and support.

Page 57: THE INTEGRATION BETWEEN DESIGN AND MAINTENANCE …eprints.qut.edu.au/16058/1/Frank_Lin_Thesis.pdf · the integration between design and maintenance of office building automation:

CHAPTER 2 LITERATURE STUDY

39

2.3 Decision Support

2.3.1 Decision Support System

Decision Support Systems (DSS) was first articulated by Scott-Morton in the early

1970s, and defined such system as "interactive computer-based systems, which help

decision makers utilise data and models to solve unstructured problems”

(Scott-Morton 1971). Another classic definition of DSS is as follows (Keen and Scott

Morton 1978):

“Decision support systems couple the intellectual resources of individuals with the

capabilities of the computer to improve the quality of decisions. It is a

computer-based support system for management decision makers who deal with

semi-structured problems.”

The system must aid a decision maker in solving unprogrammed, unstructured or

semi-structured problems; the system must possess an interactive query facility, with

a query language that is easy to learn and use (Bonczek, Holsapple & Whinston,

1981): DSS help managers/ decision makers use and manipulate data; apply

checklists and heuristics; and build and use mathematical models.

Decision support systems are not only providing information, but also providing a

tool for learning and exploration (Olson 1998). According to Turban, E. et al. (2001),

“a DSS supports complex decision making and increases its effectiveness”, the major

DSS characteristics and capabilities will be the following:

• Semi-structured programs for managers at different levels-for groups and individuals

• Interdependent or sequential decisions • Support intelligence, design, choice in a variety of decision styles and

process. • Adaptability and flexibility • Interactive ease of use and construction • Effectiveness, not efficiency for humans control the machine • Modeling and analysis for data access • Integration and web connection

The DSS has been broadly employed in the various areas, in the Matti’s islands of

automation, continuing growth of the different entities such as design and

maintenance, but the gaps between them would need a bridging tool to remove the

Page 58: THE INTEGRATION BETWEEN DESIGN AND MAINTENANCE …eprints.qut.edu.au/16058/1/Frank_Lin_Thesis.pdf · the integration between design and maintenance of office building automation:

CHAPTER 2 LITERATURE STUDY

40

barriers. In brief, the DSS with the data store, retrieval, and integration functions can

be applied in the construction and building industry.

2.3.2 The Need for Decision Support System

The environment today is changing very rapidly, is more complex than ever before,

and the trend is toward increasing complexity; decision making today is more

complicated than it was in the past, and is more difficult to make decisions for

several reasons such as: the number of available information is larger; the cost of

making errors can be very large; continuous changes creates more uncertainty; and

requires quick decision-making. As a result, it is very difficult to rely on a

trial-and-error approach to management, and managers must learn how to use new

techniques such as DSS to support effective decision making, specially computerised

decision support systems may be required for various reasons: speedy computations,

increased productivity, technical support, quality support, competitive edge and

overcoming cognitive limits in processing and storage (Turban, et al. 2001).

Computerised systems enable people to quickly access and process vast amounts of

stored information; computers can also improve coordination and communication for

group work as the building project progresses.

2.3.3 Decision Support and Integration in Building Construction

Industry

In order to identify desired features of the new approach in this research, it is

appropriate to pay attention to the construction industry’s intensified research for

practical decision support systems (Riley et al., 1994; Miresco, et al., 1995; Tang

1996). The intention is to make effective use of the knowledge and information on

the operations required for various types of building processes (Syal, et al., 1991;

Yamazaki 1994). The text that follows summarizes existing research efforts and

applications in construction decision support systems.

Reviews of the generic research in construction decision support, during the last

decade, shows computer technology has been going through rapid changes and

advancement. The late eighties saw building researchers focusing on the use of

computers to develop automated construction systems. With the inception of the

Page 59: THE INTEGRATION BETWEEN DESIGN AND MAINTENANCE …eprints.qut.edu.au/16058/1/Frank_Lin_Thesis.pdf · the integration between design and maintenance of office building automation:

CHAPTER 2 LITERATURE STUDY

41

Artificial Intelligence (AI) technology, a number of these researchers attempted to

employ the AI expert system to develop a range of applications from welding robots

to building-defect analysis systems (Syal, et.al., 1991; Yamazaki 1994). This has

provided potential tools for designers and clients to effectively use related knowledge

during the practical construction processes.

Some researchers and construction software vendors began to study the integrated

approach for many construction problems (Thabet 1994; Ito 1995; Dharwadkar 1995;

Goncalves, et al., 1996; Scott 1997). The new generations of computer software are

becoming compatible with each other and have extended their user friendliness.

Computer Aided Design (CAD) has advanced from 2D drafting software (automated

drafting system) to 3D based software which has the function of simulation. There

are research projects to incorporate time measures into 3D based design information

(Paulson 1995).

Currently, the advanced integration of current well-developed software is being

developed for design and construction, including CAD, Estimation and Scheduling,

has been moved from 3D to 4D, the integration of 3D CAD with the progress of the

construction, i.e. three Dimension plus time (Paulson 1995).

One of the inadequacies of these technologies however, is that they do not address

the processing need for qualitative information which is generated during the

building process and will be used for making management decisions (Miresco, 1995;

Yang, 2001). In fact, there is lack of support for problem solving and decision

making during all stages of project development. In the light of this, decision support

systems are needed to be developed and introduced into the building process.

A review of the relevant literature has identified two major types of decision support

development: one is stand-alone applications for supporting the specific building

phase such as design or planning and the integration approach across the different

phases such as linking design and planning.

In the aspect of stand –alone applications as:

Design support to computer aided design and drafting (Goettel

1994).

Page 60: THE INTEGRATION BETWEEN DESIGN AND MAINTENANCE …eprints.qut.edu.au/16058/1/Frank_Lin_Thesis.pdf · the integration between design and maintenance of office building automation:

CHAPTER 2 LITERATURE STUDY

42

Project planning: estimating, scheduling (Miresco 1995; Thabet

1994; Fischer 1996).

Project control: Quality Control, Simulation of operations (Syal et al.,

1991).

Construction management: supplier selection (Chau et al., 2003 ;

Onesime et al., 2004)

Maintenance : selection of maintenance organisation and

maintenance system (Emblemsvag et al., 2003 ; Fernandes et al.,

2003)

o In the aspect of the integration applications as:

Project Management tasks linking with quality assurance (QA)

(Riley, 1994).

Design linking with cost planning (Drogemuller, 1994).

Design linking with Project Control (Syal, et al., 1991).

Design linking with scheduling and cost estimating (Yau 1991;

Greste 1997).

These research efforts have explored the possibilities of using multiple packages for

the processing of different project management tasks. However, little has been done

in providing a readily useable linkage between these tasks, especially knowledge

based decision support between design and planning (Miresco 1995; Ito 1995), and

maintenance as well.

In the relevant research into the integration of different parities, the literature review

has also identified research with a certain degree of relevance to the research project.

Examples of these include the integration interface and framework as summaries

below:

• Morad, et.al. (1989) presented an interface concept between Computer-Aided

Design (CAD) and Construction Planning System (CPM). They point out that

the benefits obtained from the integration of CAD and CPM is far greater

than those realised from their separate application.

• A computer-integrated design drawings and construction project plans system

was designed by Parfitt, et al., (1993) as a true two-way multi-application

framework with shared-resource database. However, the lack of a universally

Page 61: THE INTEGRATION BETWEEN DESIGN AND MAINTENANCE …eprints.qut.edu.au/16058/1/Frank_Lin_Thesis.pdf · the integration between design and maintenance of office building automation:

CHAPTER 2 LITERATURE STUDY

43

accepted data model for representing this information has limited further

development and implementation. Major improvement to this system is

needed to include a shared database module for hot-linking common data

between all programs within the system.

• A Collaborative Knowledge-Integration System was developed by El-Bibany

et al. (1994) to present a unified constraint-based representation and inference

methodology as a tool for AEC design, management, and coordination. This

system differentiates and formalises the relationship between knowledge and

data, which provides robust tools for decision support. However, the research

did not go on to generate applicable systems because of the lack of

cooperation between all parties of the AEC industry.

The previous research efforts have employed a variety of methods to improve the

integration among different tasks and stages of project. Their efforts can be classified

into two categories, one is to integrate and make better use of conventional computer

software, and the other is to explore the advanced information technology such as

Artificial Intelligence (AI) technologies to bridge gaps between isolated PM tasks.

A variety of techniques and methods are used. They range from the explorations of

Object Linking and Embedding (OLE) and Dynamic Data Exchange (DDE) to the

orchestrated application of spreadsheet, word processing and graphical presentations

(Paulson 1995). The linking of commercial related packages such as estimation,

scheduling, cost control and CAD, have been studied by many in a hope of providing

immediate interfaces for data transfer. Object oriented technology, hypertext, and

case based reasoning methods have been applied to develop decision support

systems.

Page 62: THE INTEGRATION BETWEEN DESIGN AND MAINTENANCE …eprints.qut.edu.au/16058/1/Frank_Lin_Thesis.pdf · the integration between design and maintenance of office building automation:

CHAPTER 2 LITERATURE STUDY

44

2.3.4 Limitation of Decision Support and Integration

Despite the pilot exploration and a few earlier applications, the previous related

researches were hindered by several common limitations. They can be summarised

as follows:

1. The concept and method of integration between architectural design and

planning, or construction and operation/ Maintenance is still at an exploration

stage. They do not provide immediate reference to practical operations during

these stages that reflect consistency, accuracy and promptness (Miresco

1995).

2. Large volumes of information generated at various design stages are still

difficult to be applied accurately and quickly at subsequent construction

stages. This information is seldom used for forward process (Yang, 1995,

Fischer et al., 1996).

3. There is a lack of sufficient integration approach to the various stages of the

project development and transfer, which may have sequential impact on the

use of design information (Parfitt, et al., 1993).

4. Effective and coordinated computer tools are still not available which can

translate design information and update it automatically for other process

application. Commercial packages and systems developed from earlier

research do not communicate with each other in practical terms (Fischer et al.,

1996).

The limitations described above indicate that much more work needs to be done in

the process integration. Reviews of related research attempts emphasised the

feasibility of developing a new integrated approach to eliminate the gaps, reduce the

errors and optimise the operations between different processes such as design and

maintenance. The problems existing in the construction and building industry with

the limitations of different approaches should be explored for practical methods to

overcome them.

Page 63: THE INTEGRATION BETWEEN DESIGN AND MAINTENANCE …eprints.qut.edu.au/16058/1/Frank_Lin_Thesis.pdf · the integration between design and maintenance of office building automation:

CHAPTER 2 LITERATURE STUDY

45

2.4 Design and Maintenance for Office Building

2.4.1 Status of Design and Maintenance in Building Industry

Design and maintenance are two core activities in the building development process

that directly contribute to the quality of construction and performance. Located at

opposite ends of the construction sequence they are traditionally treated as separate

entities (Chanter, B. et, al., 1996). The priorities considered in design frequently rank

maintenance as the lowest need and the lessons learned through remedial measures

rarely influence design procedures. In few other industries is design so consistently

divorced from construction, and construction so alienated from maintenance that they

are divided by time and undertaken by various professionals having minimal

knowledge or respect for each other's problems.

Design and maintenance are normally undertaken by different professionals and

personnel, and operated through conflicting criteria and objectives. These processes

are often counterproductive and fail to achieve an acceptable quality of building

performance. Unfortunately, many factors relating to design and maintenance create

contrasting and contradictory objectives and in accommodating certain design needs,

maintenance requirements may be adversely affected. Conversely, the attempt to

produce maintenance free buildings may impose completely impractical and

certainly uneconomic design provisions. Consequently, there is a need to

compromise and balance the opposing criteria to improve overall building

performance.

In the light of the life cycle costing, the existing buildings that are the major part of

the building stocks normally lack thorough documentation to reveal the real costs

during the life of the building. Conventionally we may focus on the beginning cost of

building i.e. built cost, but not really take care about the subsequent costs such as the

maintenance costs.

Only in recent years, the expertise of maintainers and property managers has been

recognised as an important contributor to the design process (Lueprasert, K. et al.

2000, and Wood 2003). The monitoring of buildings in use and feedback

mechanisms is now recognised as regular activities. Feedback digests and reports on

Page 64: THE INTEGRATION BETWEEN DESIGN AND MAINTENANCE …eprints.qut.edu.au/16058/1/Frank_Lin_Thesis.pdf · the integration between design and maintenance of office building automation:

CHAPTER 2 LITERATURE STUDY

46

condition surveys of buildings are prepared but are they being effectively

communicated to designers?

Some effort has been attempted to facilitate improved communication and

management to create a better balance of design and maintenance. One approach to

this is for a single group to coordinate design, construction and maintenance

activities. Another alternative is to forcefully involve greater participation by

assigning legal responsibilities.

However, attempts to facilitate effective communication are burdened by conflicting

objectives, professional prejudices, and inappropriate management structures. If

design and maintenance issues are to be balanced, it is essential for one group to

coordinate design, construction and maintenance activities.

For this reason, Singapore’s planning requirement for developers regulates to retain a

30% share in the building for ten years after completion (Clive, B. 1990); and

Taiwan’s construction rules for the developers require to hand-over a maintenance

budget to the building management control board during the building delivery

process. These compulsory requirements will actively assist in increasing

maintenance assessment but improved design and construction techniques are also

important to achieve good quality buildings. These highlighted the on-going

responsibilities of developers on buildings after project delivery. Furthermore, the

impact on design and maintenance in different project delivery needs to be

considered. For example, the design construct project delivery can effectively

complete a building project as designed in house, but will do little for the on-going

operation and maintenance due to the lack of interaction with direct benefits for the

developers. In the Build, Operation and Transfer (BOT) project delivery system, the

transition and technology transfer during the process can perform effectively,

however this system is only applicable in larger projects with adequate financial

backing and total considerations on cultural, political as well as economical and

technical issues (Hampson, K. et al. 2001; CSI 2005).

Why do architects spend five or more years addressing design issues and practically

no time on building maintenance? In practice, there is still only a limited degree of

association and relation between maintainers and designers. Designers continue to

Page 65: THE INTEGRATION BETWEEN DESIGN AND MAINTENANCE …eprints.qut.edu.au/16058/1/Frank_Lin_Thesis.pdf · the integration between design and maintenance of office building automation:

CHAPTER 2 LITERATURE STUDY

47

create many buildings which fail to achieve satisfactory long-term performance and

maintainers still have little evident influence or impact on design. Design and

maintenance issues require a practical approach, a problem solving orientation and a

learning from experience exercise to produce a comprehensive approach to problem

solving for improving the building performance and reducing lifecycle cost.

Building maintenance works can be classified as periodic inspection, cleaning,

restoration and repair of the main building fabric, internal finishes, communication

systems and engineering services (eg. electrical and gas services; heating, ventilation

and air-conditioning; lifts, escalators & mechanical equipment; fire precautions;

security installations; special equipment). Under legislation the building owners may

be liable for any accident resulting from negligence in maintenance.

Over the typical lifespan of 50-100 years of office buildings, the design-build stage

represents only 10% or less of this period; the rest, including operation and

maintenance, makes up 90% (Yang & Peng 2001). The actual service life is

dependent upon several factors such as quality of design; quality of construction;

durability of construction materials and component systems; incorporated

technology; location and local climate; use and intensity of use; type of operation and

maintenance methods used; and damage caused by natural disasters and human error

(NRC, 1998). Most facilities are designed to provide a minimum acceptable level of

service of 30 years; facilities with proper maintenance and management may perform

adequately for 100 years or longer (FFC 2001). However, recent studies revealed a

decreasing lifespan of office-buildings with an average around 60 years (Amato, A.A

& Eaton, K. J. 1998; Fletcher, S.L. et, al., 2003). What does it implicate?

2.4.2 The Relationship between Design and Maintenance

There is little explicit relationship between maintenance and the design process such

as in the following description: 'Maintenance and design are frequently treated as if

the two activities were unconnected ... Maintenance sections often appear to be self

contained ... [leading to] ... risk of undesirable divorce from other related functions.

The status of the section and its personnel may be such that there is a lack of

influence at policy and strategic levels' (LAMSAC 1981). This view compels

consideration of the design/maintenance relationship from a wider perspective.

Page 66: THE INTEGRATION BETWEEN DESIGN AND MAINTENANCE …eprints.qut.edu.au/16058/1/Frank_Lin_Thesis.pdf · the integration between design and maintenance of office building automation:

CHAPTER 2 LITERATURE STUDY

48

In ideal circumstances, a design would represent a perfect model of the proposed

facility which, as well as being of relevance to the detailed design and construction,

will be of value to the maintenance related agents. This will be necessary, not only

for design purposes, but also be useful later for all those concerned with the effective

maintenance of the building.

The relationship between design and maintenance, characterised by design’s rapidly

diminishing influence upon maintenance over time, is shown as in Figure 2-5:

Figure 2-5: Relationship between Design and Maintenance

Literature studies have identified a range of issues relevant to the nature, influence,

characteristics, and information support and communication needs between design

and maintenance for office buildings as follows:

◊ Life-time cost consideration: High maintenance costs are resulting in poor

design detailing and ignoring the ease maintenance. Designers are responsible

for minimizing future maintenance. (Lomas, L.C. et. al., 1970; Roger et. al.,

1998). Designer’s involvement in building is gradually decreasing along with

the building life.

◊ Collaboration effectiveness: Collaboration between architects and other

members of the building team can militate against poor design (Benroy, E.

1971). The maintenance manager is able to assist the designer with providing

a building which is easily managed and thereby less costly to the owner

(James, D.B. 1972).

Commissioning period

Maintenance period

Building Lifespan Low

High

Extent of designers’ involvem

ent and Influence on building m

aintenance

Design-Build

0 5 50 80 10

Page 67: THE INTEGRATION BETWEEN DESIGN AND MAINTENANCE …eprints.qut.edu.au/16058/1/Frank_Lin_Thesis.pdf · the integration between design and maintenance of office building automation:

CHAPTER 2 LITERATURE STUDY

49

◊ Design- maintenance influence: The role of the design team should be

carefully considered for maintenance and operation (Arditi, D. et al 1999).

Particular attention is needed on correct specification of materials (Thompson,

E. 1975). Typical maintenance problems are often associated with inadequate

design (Norman, C. 1977).

It should be noted that many of these findings were made between the 70’s and 80’s.

More recent research efforts had been scarce. The overall situation of maintenance

problems in the building industry is alarming which seem to coincide with the

observed decrease of office building lifespan over the recent few decades. What may

be the cause? In addition to climate changes and other environmental impacts on

these buildings, are there any influence from poorly coordinated design, or lack of

good maintenance?

2.4.3 The conflicts Between Design and Maintenance

Determining the requirement of a building in practice will set a decision making

process which will inevitably affect the maintenance requirements of the building.

Even if low maintenance is not directly on the agenda, a less than accurate definition

of the requirements of the building may lead to inappropriate planning. It means the

specification of design will relate to the whole following activities including

maintenance in their performance and cost, and choice of components, materials,

systems etc., any of which will lead to poor building performance, with the

implications this has for its maintenance.

Many deficiencies as accuracy of the equipments, shutdown of the specific system,

should be classified as defects to be accepted as normal maintenance work, or their

rectification as an improvement (Lee 1987). It may also lead to the development of a

perception amongst building owners, about the nature of their buildings that is

decidedly unhelpful to a maintenance team. Action to remedy many of these may

also be classified as improvements, in reality a substantial proportion should be

considered to be design defects.

During the early 1970s the Building Research Advisory Service made detailed

studies of samples of buildings and their analyses revealed that the majority of faults

resulted from making wrong choices about materials or components for a particular

Page 68: THE INTEGRATION BETWEEN DESIGN AND MAINTENANCE …eprints.qut.edu.au/16058/1/Frank_Lin_Thesis.pdf · the integration between design and maintenance of office building automation:

CHAPTER 2 LITERATURE STUDY

50

situation in the building. The poor decision making leading to this may have

occurred at the detailed design stage.

A key issue is that maintenance must be fully considered at the design stage. The

maintenance determinants are measured that could be normal or abnormal, when

classified on experiences and current expectations, and each of the following was

influential (Lee 1987; Chanter & Swallow 1996):

• The adequacy of the design and the suitability of the materials specified

• The standard of workmanship in the initial construction and subsequent

maintenance

• operations

• The extent to which the designer has allowed for present and anticipated

future needs

• A major issue, during detailed design, is the selection of materials and

components, and choice is becoming increasingly difficult.

Additionally, designers are subjected to a great deal of lobbying to use one product

rather than another, and are bombarded with an overabundance of publicity material.

This can have two severe consequences (Chanter & Swallow 1996):

1. It may influence the designer to using a new component, which has not

been sufficiently proved in practice, with a consequential failure to meet

requirements.

2. Conversely there may be the opposite reaction, resulting in the designer

using a component or material with which he is familiar, whether or not it

is the right choice in the circumstances.

The major short-coming in detailed design appeared to be a failure to make use of the

authoritative guidance that was available. This might be a simple failure to use codes

and standards properly, or attributable to the shear volume of advice. Thus, the

design should be beyond the codes which would be only served as the basic

requirements to meet the extensive client oriented requirements.

No matter how sustainable a building may have been in its design and construction, it

can only be remained on an optimum condition so if it is operated responsibly and

maintained properly (Goger 1998). The use of inappropriate systems can cause

ineffective functionalities or overspending money; failure to test sensor control

Page 69: THE INTEGRATION BETWEEN DESIGN AND MAINTENANCE …eprints.qut.edu.au/16058/1/Frank_Lin_Thesis.pdf · the integration between design and maintenance of office building automation:

CHAPTER 2 LITERATURE STUDY

51

points can affect energy efficiency and comfort; and poor training can lead to system

failures and inadequate maintenance will result in higher operation and maintenance

costs. Therefore, buildings must be operated and maintained with the security, safety,

health, comfort, and productivity of their occupants, and with an understanding of the

needs and technology developments.

2.4.4 Design and Maintenance in Building Automation System

(BAS) Today's Building Automation Aystems (BAS) are more complex. The owner pays for

an automation control system and will expect to get one with all available controls

and automation capabilities. To meet these expectations, the technical support is

often needed, especially during the initial design and installation stages. Therefore,

BAS application engineers should be part of the design team. Their contributions

could reduce the HVAC system cost and result in better overall design (Boed, V.

1996).

The following tables summarise the main issues of BAS design, their features, and

frequently experienced problems during the maintenance stage as listed in Table 2-3

and 2-4. These BAS design and maintenance characteristics will help learn their

interaction during the process.

Table 2-3: Attributes of Maintenance in Office Building Automation Systems (Arditi

& Messiha 1996)

halla
This figure is not available online. Please consult the hardcopy thesis available from the QUT Library
Page 70: THE INTEGRATION BETWEEN DESIGN AND MAINTENANCE …eprints.qut.edu.au/16058/1/Frank_Lin_Thesis.pdf · the integration between design and maintenance of office building automation:

CHAPTER 2 LITERATURE STUDY

52

halla
This figure is not available online. Please consult the hardcopy thesis available from the QUT Library
Page 71: THE INTEGRATION BETWEEN DESIGN AND MAINTENANCE …eprints.qut.edu.au/16058/1/Frank_Lin_Thesis.pdf · the integration between design and maintenance of office building automation:

CHAPTER 2 LITERATURE STUDY

53

BAS has become a powerful and effective tool for facility management in office

buildings. It helps resolve problems quickly, reduces energy use, improves system

performance, increases occupant comfort and safety, and helps manage maintenance

costs. Savings produced by the systems can pay for their installation in as little as

three to five years (James 2002). The development of BAS also allows previously

independent building systems such as lighting, HVAC, fire safety, security and

management to be seamlessly integrated into a single, comprehensive building

system. In spite of the advantages and capabilities offered by BAS today, generally,

many systems imperfectly performed never achieve their full potential with designed

capabilities, or become unused after installation. Sometimes the needed functions

were never installed. As a result, the building may fail to perform properly and

projected cost savings never fully become visible (Arditi, D. et al 1999).

halla
This figure is not available online. Please consult the hardcopy thesis available from the QUT Library
Page 72: THE INTEGRATION BETWEEN DESIGN AND MAINTENANCE …eprints.qut.edu.au/16058/1/Frank_Lin_Thesis.pdf · the integration between design and maintenance of office building automation:

CHAPTER 2 LITERATURE STUDY

54

2.4.5 Security/ Fire System Design and Maintenance

The security for the office building encompasses several aspects, ranging from the

tangible building to the intangible data information, and also how affects the human

beings and is related to the fire, therefore it should be necessary to provide guidelines

for protecting the building, the occupants and data to ensure their safety and

availability during the conception design stage. Threats from natural-accidents and

disasters are the potential direct causes of the building being damaged and humans

being injured and fatalities. The data loss would affect the business benefits; hence it

is an essential subject in addition to improving the performance and energy

conservation, and the expectation of the comfort.

The application and installation of BAS can serve and improve the dual functions of

security and safety by means of the intrusion detection, smoke and fire detection

systems, alarm and communication systems that warn occupants of an event and

guide evacuation and safety actions. However how to ensure the designated

functionalities can be as effective as possible should be considered at the outset of

the design, and balanced with maintenance needs in the future. There are no

cookbook solutions for incorporating security into office building design. Each

design must be tailored to project functional requirements on a case-by-case basis.

2.4.6 The Problems and Limitations of the Building Design and

Maintenance Performance

The quality and performance of buildings is dependant on the effectiveness of the

design and sustained maintenance (Arditi, D. et al 1999). However, traditionally,

these tasks are treated as separate entities. This intrinsic separation causes several

problems such as:

◊ Lack of feedback and support: Design and maintenance professionals often

have minimal knowledge or respect for each other's problems (LAMSAC

1981; Lee 1987; Chanter & Swallow 1996). The priorities considered in

design frequently rank maintenance as the lowest need and the lessons learned

through remedial measures rarely influence design procedures.

Page 73: THE INTEGRATION BETWEEN DESIGN AND MAINTENANCE …eprints.qut.edu.au/16058/1/Frank_Lin_Thesis.pdf · the integration between design and maintenance of office building automation:

CHAPTER 2 LITERATURE STUDY

55

◊ Lack of knowledge and understanding among design professionals: Due to the

inherent separation and under the pressure of time/ budget, design consultants

often do not have sufficient understanding and knowledge on maintenance

issues during office building design stage. As a result, there are limited

considerations for service, upgrade and maintenance during the life span of

the building (Eyke, M. 1988; Chanter & Swallow 1996; Kua 2002).

◊ Lack of data on operational requirement: There is a lack of historical data

concerning the operational requirements and maintenance performance of

existing buildings. As a result, designers have to work with insufficient and

within the limited times, even inappropriate information (Eyke, M. 1988).

◊ Difficulties in forecasting future condition and changes: Increasing global

warming may have a significantly important effect on the climate conditions

for buildings to withstand. Without necessary support, designers are unable to

predict such changes for remedial measures for building servicing and

maintenance (Chanter & Swallow 1996; Arditi & Messiha 1996; Wood, B.

2000).

◊ The “First cost” mentality: Influenced by owners and developers, designers

often focus on the initial cost of building, i.e. built cost, without sufficient

consideration for subsequent costs such as that incurred in building

maintenance. Capital cost is only 20% of the operation cost of a building over

its lifespan (Edward, D. M. 1980; Chanter & Swallow 1996; Wood, B. 2000;

Howard M. 2002). How buildings will perform or what they will cost to run,

in 20, 50, and 80 years time is currently not a key issue considered by

developers.

These problems and limitations are particularly evident in buildings built before the

80’s, which make up a large part of the existing building stock in many countries

including Australia. Documentation is a matter of discipline, which, unfortunately,

many maintenance systems do not have (Mostia, B. 2002), hence, the buildings’

operation and maintenance activities are normally insufficiently documented to

reveal the true costs incurred during their life. Increased expenditure on routine

maintenance and refurbishment are a burden for owners and occupants, who are only

Page 74: THE INTEGRATION BETWEEN DESIGN AND MAINTENANCE …eprints.qut.edu.au/16058/1/Frank_Lin_Thesis.pdf · the integration between design and maintenance of office building automation:

CHAPTER 2 LITERATURE STUDY

56

now beginning seek strategic solutions. These problems also caused overall poor

performance of buildings, with excessive energy use and high upgrading costs.

2.4.7 Findings in Relation to Design and Maintenance

Consideration of maintenance implications at the design stage is not a new idea

(Seeley, I.H.1976). However, success in this area has been moderate, maintenance

and renewal consideration in the early project stages has been impeded for a variety

of reasons, the most critical including time pressures, unaware decision-makers and

ill-informed designers ( McGeorge, D. et. al., 2002).

Previous research has identified several findings that demonstrated some concepts

and principles on design and maintenance, and their recommendations towards

maintenance issues in the design stage were like as design for maintainability. The

maintenance concept has to be understood fully right from the start and features

promoting the ease of maintenance have to be planned as part of the design as in

(Chanter et al. 1996, Mostia, B. 2002, Neubeck, K. 2004):

1. Minimise maintenance from the beginning and get customer maintenance

people involved whenever possible.

2. Suitable materials, finishes and components should be chosen and specified

by the architects, which are long-lasting and robust in use, easily

maintainable or readily and economically replaced.

3. Good design and detailing should become the first line of protection to avoid

weathering or to reduce wear and tear.

4. Consideration of "buildability" and "maintainability" should be proposed to

build a good standard of work.

5. Accessibility, ease and safety would be considered and facilitated for

undertaking the inspection or the replacement of components in the future

maintenance process avoiding long shutdown periods.

The relationship between design and maintenance and their roles can be amplified

from an old belief among maintenance personnel that "The designers and engineers

have it for a year, but maintenance has to live with it for 20 years." (Mostia, B.

2002).

Page 75: THE INTEGRATION BETWEEN DESIGN AND MAINTENANCE …eprints.qut.edu.au/16058/1/Frank_Lin_Thesis.pdf · the integration between design and maintenance of office building automation:

CHAPTER 2 LITERATURE STUDY

57

Short term design activities could have impact significant on the long term

maintenance. In general, maintenance tasks can generally be divided into those that

are performed in-house on a regular basis, and those that are more specialised and

require some disassembly. By identifying potential major maintenance problems, a

strategic approach can be worked out, either to avoid these by specifying components

and materials that are easy to maintain or replace when they become damaged or

decayed, or by providing the best conditions to carry out unavoidable repairs. Such

moves should become an instinctive part of the design process, and not seen as

hindering design or being an additional financial burden to the client.

The maintainability concept is very important since reliability and maintainability

overlap in many areas (Neubeck, K. 2004). The concept of design for maintainability

is an integral and worthwhile part of creating a building. In the long run, the building

maintenance, whether routine, repair or replacement, places a responsibility on the

architect to make adequate prerequisite allowance to either reduce or facilitate this by

good design. From the design aspect, good provision for future maintenance need not

restrict the designer's creativity, but may actually help to shape the building.

Rethinking of maintainability may provide hints to more efficient design.

Maintenance has become a big issue in the world of property and building. In a

world of increasing costs, and at a time when clients are becoming more aware of the

implications of budgeting for asset management, a greater degree of responsibility

falls on the shoulders of the architect to make all possible effort to reduce this

burden. An awareness of maintenance is the architect's responsibility, but to a good

designer this should be neither a new concept nor a hindrance, but rather regarded as

a positive motivation to allow this particular design factor, amongst all the others, to

help him to 'shape' the building.

The designer must firstly identify the nature of the task of reducing, or minimising

maintenance (Mostia, B. 2002). In building practice, during the construction market

booming periods, there is only a short time for the developer and the designer to

carry out a sophisticated plan in the preliminary design stages, or to do the detailed

design work. This situation is partly caused by a client's ignorance of the information

needs and procedures that must be undergone. Additionally, the financing of

buildings, both in the public and private sectors, is subjected to pressures that do not

Page 76: THE INTEGRATION BETWEEN DESIGN AND MAINTENANCE …eprints.qut.edu.au/16058/1/Frank_Lin_Thesis.pdf · the integration between design and maintenance of office building automation:

CHAPTER 2 LITERATURE STUDY

58

encourage proper consideration of the building's long term performance.

Consequently the conclusion will be as (Bowyer, J.T. 1985):

"... The Architect is caught between the two forces of limited time for his professional

work and the problem of designing a sound and suitable building within unrealistic

cost limits. "

Therefore, under the designer's duty to produce design works that can be safely built,

the most important consideration will be access, not only during construction but also

for cleaning, servicing, maintenance and repair. The client must reasonably receive a

health and safety file at hand-over, warning of any potential risks, and the designer is

responsible for providing relevant information and suggestions.

Page 77: THE INTEGRATION BETWEEN DESIGN AND MAINTENANCE …eprints.qut.edu.au/16058/1/Frank_Lin_Thesis.pdf · the integration between design and maintenance of office building automation:

CHAPTER 2 LITERATURE STUDY

59

2.5 BAS for Office Building

2.5.1 What is Building Automation and Building Management?

The building automation is an approach designed for automatic operation on building

systems by being equipped with sensors and controllers which are integrated in

various ways to form a Building Automation System (BAS) for the specified

functions and building services. It is being increasingly recognised, particularly in

new construction projects, that a BAS is the most cost-effective way of managing the

buildings.

BAS, which is the automatic operation of building systems by sensors and

controllers, is normally used to perform the following tasks in office building (Eyke,

M. 1988):

• To optimise the start-up and performance and control/monitor systems.

• To reduce the risk of breakdown of building services.

• To increase the interaction of mechanical subsystems within a building

• To prevent deterioration of the internal environment provide by building

services.

• To increase reliability of system and services

• To decrease energy, time and operating costs.

BAS plays an essential role in building management. It not only helps personnel to

execute the operation and maintenance tasks, but also facilitate the high performance

of building, reduces the energy consumption and enhances the occupant’s comfort. A

modern BAS is capable of fire detection and fire suppression which includes

responsibility for personal safety, therefore their operations and maintenance must be

given the highest priority.

2.5.2 Current Building Automation Systems (BAS) A Building Automation System (BAS) is a system comprising microprocessor

controllers (Direct Digital Controller (DDC)), personnel computers, printers,

modems and controlled devices used to control and monitor subsystems such as

Heating, Ventilation and Air Conditioning systems (HVAC) and other building

Page 78: THE INTEGRATION BETWEEN DESIGN AND MAINTENANCE …eprints.qut.edu.au/16058/1/Frank_Lin_Thesis.pdf · the integration between design and maintenance of office building automation:

CHAPTER 2 LITERATURE STUDY

60

services such as lighting, fire protection, lifts, security etc. It is used extensively in

HVAC to control temperature, humidity, pressure and other parameters to optimise

the start-up and performance of the equipment and alarm systems. A typical system

is shown as in Figure 2.6.

2.5.2.1 Functionalities of the BAS The necessity of an automated control system is designed to eliminate the need for

manual adjustment, maximise comfort by maintaining the required temperature,

conserve energy and reduce operating costs by preventing over-heating or

over-cooling as shown in Figure 2-7.

Sensors/ Actuators

Lan Tap

DDC Controllers

Operator’s Interface PC (Person-Machine Interface)

Remote Operator’s PC

Modem

I/O I/O I/O

Report

DGP

CPU CPU CPU

Controlled Devices

Figure 2-6: A Typical BAS

Figure 2-7: Environment Control (Source: http://global.daikin.com/global/our_product/sp_Inverter/3_techno.html#daikin8)

halla
This figure is not available online. Please consult the hardcopy thesis available from the QUT Library
Page 79: THE INTEGRATION BETWEEN DESIGN AND MAINTENANCE …eprints.qut.edu.au/16058/1/Frank_Lin_Thesis.pdf · the integration between design and maintenance of office building automation:

CHAPTER 2 LITERATURE STUDY

61

Modern BAS have greatly increased the interaction of mechanical subsystems within

a building, improved occupant comfort, reduced heating, ventilation, and cooling

costs through improved sub-system management, reduced the time required to

monitor and manage building operations, and allow support and diagnostics from

remote locations. Computer-based monitoring has been used to coordinate, organize

and integrate building control sub-systems such as security, fire/life safety, elevators,

etc. Common BAS applications include: equipment scheduling; optimum start/stop;

operator adjustment; monitoring; alarm reporting (Eyke 1988). The structure of

Office Building Automation System (BAS) is illustrated as the Figure 2-8:

Along with the development of advanced information and communication

technologies, lifestyle patterns have significantly changed over the last two decades.

For buildings, the orientation is shifting from the simple adoption of new materials

and technologies to a balanced approach focused on user comfort, convenience,

health and safety considerations and long term performance issues such as efficiency,

market values and energy conservation (Harrision, A. et al. 1998; Ellis, M.W. et al.

2002) Automated and intelligent buildings, which can better perform and facilitate

the prospective intentions of stakeholders, are becoming a major stream or ideal

model of building development. These new trends will inevitably depend on more

advanced building automation systems for flexibility, adaptability and energy

conservation.

Security system/ Fire prevention

Parking/ Parking system

HVAC system

Fresh air intake/ Exhaust

Water supply/ Drainage

Lighting system

Electrical Power system

BAS

Figure 2.8: Structure of Office Building Automation System (BAS)

Lifts/ Escalators

Page 80: THE INTEGRATION BETWEEN DESIGN AND MAINTENANCE …eprints.qut.edu.au/16058/1/Frank_Lin_Thesis.pdf · the integration between design and maintenance of office building automation:

CHAPTER 2 LITERATURE STUDY

62

Besides affecting the physical and emotional well-being of the office building

occupants, a building's interior lighting system is both a dominant consumer of

electrical energy and a major source of internal heat. In the United States about

one-quarter of the electricity budget is spent on lighting or more than $37 billion

annually. In commercial buildings it normally accounts for more than 30% of the

total electrical energy consumed. Yet much of this expense can be avoided. (Nelson,

D. 2004).

Specifying a high quality energy efficient lighting system that utilizes both natural

and electric sources as well as lighting controls can provide a comfortable yet

visually interesting environment for the occupants of a space. To achieve a quality

lighting environment, carefully choose lighting equipment and controls to satisfy

both performance and aesthetics needs. Lighting equipment selection should be

based on a balance between the requirements of the design and an effort to limit the

number of fixture types and lamp types in order to have reasonable maintenance

inventories. They are applied as part of a high quality energy efficient lighting

system that integrates daylight and electric light sources to provide a comfortable and

visually interesting environment for the occupants of a space and incorporated with

day-lighting to provide flexibility, energy savings, and ecological benefits in office

building (Nelson, D. 2004).

Electric lighting controls are used in lighting design projects to achieve a high quality

energy efficient lighting system through specifying a layered, daylight-integrated

lighting and control system to give the occupants control of the lighting.

When electric lighting controls are used properly, energy will be saved and the life of

bulbs and ballasts can be extended. Moreover, they can provide a comfortable

environment in office building as well as improve productivity and security by the

various sensors.

Page 81: THE INTEGRATION BETWEEN DESIGN AND MAINTENANCE …eprints.qut.edu.au/16058/1/Frank_Lin_Thesis.pdf · the integration between design and maintenance of office building automation:

CHAPTER 2 LITERATURE STUDY

63

2.5.2.2 Components of a BAS

Modern control systems have three key necessary elements: sensors, controllers, and

the controlled devices as in Table 2-5:

Table 2-5: Elements of Control System

Component Description

Sensors There is an increasing variety and level of sophistication of sensors available for use with modern control systems. Some of the more common include: temperature, humidity, pressure, flow rate, and power. Sensors that track indoor air quality, lighting level, and fire or smoke are becoming more common.

Controllers The function of the controller is to compare a signal received from the sensor to a desired setpoint, and then send out a corresponding signal to the controlled device for action. Controllers may be very simple, such as a thermostat where the sensor and controller are usually co-located, to very sophisticated microprocessor based systems capable of powerful analysis routines.

Controlled devices

The controlled device is the terminal device receiving the signal from the controller. Amongst others, typical controlled devices include: air dampers, mixing boxes, control valves, and in some cases, fans, pumps, and motors.

Building Automation System (BAS) is the building’s brain. It can normally include 5

major components (UNESCO, 1984; Boed, V. 1996).

Sensors and Actuators

Data Gathering Panel

Central Processing Unit

Transmission System

Person-machine Interface

Sensors and Actuators: Sensors can be classified into two types, such as analog and

digital. Analog sensors are used for measuring temperature, pressure, humidity,

voltage etc.; on the other hand digital sensors are suitable for application as alarm

sensors and as operating status indicators. Actuators can be in the form of digital and

analog types. Digital signals are used for command such as start / stop, open / close,

or secure / access, whereas analog signals are for positioning of dampers, modulating

cooling coil valve, or resets control set point. In order to provide input information

and to receive output signals, both sensors and actuators are connected to a data

Page 82: THE INTEGRATION BETWEEN DESIGN AND MAINTENANCE …eprints.qut.edu.au/16058/1/Frank_Lin_Thesis.pdf · the integration between design and maintenance of office building automation:

CHAPTER 2 LITERATURE STUDY

64

gathering panel, which is adjacent to the relevant area, usually the plant rooms for

monitoring and controlling.

Data gathering panel (DGP): collects data from the central processing unit (CPU)

and transforms them into practical signals or actions. In other words, DGP provides

the interface between the input signals from the sensors to the CPU and the output

signals from CPU to the actuators to perform output functions. This is also where

signals conversion is performed to be compatible from sensors to CPU and then out

to actuators.

Transmission system: provides a communication link between the DGP and CPU.

The central processing unit (CPU) is the most critical element of BAS, which

consists of the transmission interface, the computer and the data base. The software

typically comprises base operating software, application software and energy

management software. Upon command or request from the software, the computer

processes data and then communicates through the transmission interface board.

Person-machine Interface: is where the operator can access information, feedback

or update data from the system, give commands to plants being controlled, modify on

software programs from the keyboard or request printout records from the printer.

The type of sensor, control system and control actions and the functions of BAS are

summarised as in Table 2-6 and 2-7 (Source: UNESCO, 1984; Boed, V. 1996):

Table 2-6: Types of Sensors

Types Description Temperature • Can be sensed by the movement of a bimetallic strip that directly

operates a switch giving an on/off electrical signal as in a thermostat.

• Other devices include thermostats, thermocouples, resistance elements etc that give a varying voltage or current signal representing temperature as their resistance varies with temperature.

• Thermostats are the most common due to their large resistance change with temperature.

Humidity Can be sensed by the change in length of a hygroscopic material (traditionally human hair) or the change in electrical resistance or capacitance of a hygroscopic material.

Pressure Can be sensed by the movement of a bellows or diaphragm and the movement converted into a digital or analogue signal by a switch or variable resistor.

Page 83: THE INTEGRATION BETWEEN DESIGN AND MAINTENANCE …eprints.qut.edu.au/16058/1/Frank_Lin_Thesis.pdf · the integration between design and maintenance of office building automation:

CHAPTER 2 LITERATURE STUDY

65

Table 2-7: Functions of BAS in addition to Controlling

Functions Description Operator Control

The building services engineer or manager can make changes to the operation of the building services via a PC. Changes could include adjusting temperatures, operating times, alarm settings, etc or change the type of control of a plant item.

Graphics Diagrams of the services can be shown on the PC screen complete with actual temperatures, plant on/off status, and fault indication.

Logging Operating data can be collected (logged) for later print-out and/or graphed in real time on the screen.

Reporting Maintenance schedules, fault history, energy consumption etc can be viewed or printed out.

Maintenance call-out

Service technicians can be automatically called when a fault occurs by means of an auto-dialer or modem and beeper system.

Remote control

A building services engineer can dial in to the system by means of a home or portable PC and modem. This allows remote monitoring or system adjustments.

2.5.2.3 Building Automation system (BAS) and Intelligent/green Building

In an office building, the building automation system (BAS) can help minimise

energy consumption and maximise indoor comfort, making it a valuable tool for any

intelligent and sustainable design. It also can help ensure that a building remains

intelligent long after it is built. When properly integrated into a facility, a BAS can

help to optimise energy, operations and indoor comfort over the entire lifetime of the

building. Besides minimising the building's environmental impact, such benefits can

also minimise operational and maintenance costs while increasing employee

retention and productivity, making a BAS a valuable investment. A truly intelligent

building is a green building.

In a green building, a BAS works with already specified high-efficiency equipment,

like variable air volume (VAV) HVAC systems, to fully maximise their potential for

energy savings. It increases energy efficiency in two ways - by controlling the

amount of energy used, and by monitoring energy use to ensure that building systems

are operating as designed.

Today's advanced BAS can often further optimise a building's performance by

ensuring that all systems are working together to achieve maximum efficiency,

monitoring a building's energy use to ensure that all systems are operating as

Page 84: THE INTEGRATION BETWEEN DESIGN AND MAINTENANCE …eprints.qut.edu.au/16058/1/Frank_Lin_Thesis.pdf · the integration between design and maintenance of office building automation:

CHAPTER 2 LITERATURE STUDY

66

intended. A BAS can track the daily consumption of electricity and alert the operator

if consumption is outside the normal range.

In addition to providing increased energy efficiency, a BAS can help ensure the

comfort and health of a building's occupants by automatically monitoring the amount

of heat and fresh air that enters a space. More sophisticated BAS systems can also

track the occupancy status of each zone, and adjust the temperature and fresh airflow

accordingly to minimize energy use.

Intelligent/green buildings must be built with intelligent and sustainable design

methods and materials. Nevertheless, the process does not stop when the building is

complete - steps should also be taken to ensure that the building remains intelligent

and sustainable throughout its lifetime. To comply with these requirements a BAS

plays a key role in supporting an intelligent/green design by reducing energy and

improving indoor environmental quality from design to commissioning and through

the full optimisation of the facility in the building.

2.5.2.4 The Benefits of a BAS

When deciding on the appropriate type of control system to specify for a building, it

is necessary to remember that the benefits of a modern control system are satisfied

by the different groups of users involved with the building. Table 2-8 (CIBSE 2000;

WWWBAS) lists some of the benefits to be achieved with an effective modern BAS.

Table 2-8: Benefits of a BAS

Categories Benefits Building owner Higher rental value and reduced maintenance costs

Flexibility on change of building use Individual tenant billing for services

Building tenant Reduced energy consumption Effective monitoring and energy conservation Good control of internal comfort conditions Increased staff productivity Improved plant reliability and life

Occupants Better comfort and lighting Possibility of individual room control Effective response to HVAC-related complaints

Facilities manager Control from central supervisor Remote monitoring possible Rapid alarm indication and fault diagnosis Reduced maintenance training Good plant schematics and documentation

Page 85: THE INTEGRATION BETWEEN DESIGN AND MAINTENANCE …eprints.qut.edu.au/16058/1/Frank_Lin_Thesis.pdf · the integration between design and maintenance of office building automation:

CHAPTER 2 LITERATURE STUDY

67

As the above benefits of BAS, it has capabilities to meet the expectations and

requirements of different parties. However these benefits will only be obtained if the

BAS and associated building systems are properly specified, installed,

commissioned, operated and maintained.

Effective control of the heating, ventilating and air conditioning systems in a

building is essential to provide a productive, healthy and safe working environment

for the occupants. Without a properly functioning BAS the activities carried out in

the building will be disadvantaged.

Along with good building design and efficient HVAC plant, the BAS plays a vital

role in the prevention of energy waste and reducing the environmental impact of the

building. The scale and complexity of the control system should be appropriate to the

building and its operation; highly effective and reliable control may be achieved with

relatively simple control systems. Furthermore, when considering the life cycle cost

effectiveness of a BAS, all of the benefits that result from a well-managed facility

should be taken into account including energy conservation, reductions in staffing

cost, improvement of the maintenance scheduling and the benefits of system

integration with other building facilities.

2.5.2.5 Current Situation and Limitation of BAS

In BAS there is not a lot of history on the new integration and communication

protocols, but the success of the building automation industry is now 20 years old

and has made conventional building controls obsolete and expensive (Eyke1988). To

fully perform the BAS capabilities, reviews of the BAS current applications expose

several limitations and challenges in relation to the economical consideration, design

and managerial process. These can be summarised as (Eyke 1988; CIBSE 2000):

Economical factors: The BAS application is still limited on the cost of building

control systems, quantity and complexity of sub-systems.

Needs of BAS: The need to integrate building sub-systems should be investigated

and new functionality discussed and understood to ensure successful implementation

of BAS in new building designs.

Page 86: THE INTEGRATION BETWEEN DESIGN AND MAINTENANCE …eprints.qut.edu.au/16058/1/Frank_Lin_Thesis.pdf · the integration between design and maintenance of office building automation:

CHAPTER 2 LITERATURE STUDY

68

System coordination: During the system design stage it is important to co-ordinate

the functions of computer hardware and software. Without this emphasis on the

co-ordination of system components, a BAS may not achieve its intended purpose.

Management arrangement: How the building will be operated and by whom

should be identified early in the process.

Early involvement: The Building Automation System designer should be involved

early in the building design process to identify the potential benefits of BAS could be

fully reached.

Integration: Identification of ownership and required interaction between building

sub-systems must be done to ensure successful integration. Both design presentation

and construction management should be an active part of this integration.

Quality concerns: Selection of good quality BAS and quality maintenance is equally

important.

Historical support: BAS design should get enough information such as examples

and references and the maintenance limitations or problems during the life of

building for the right decision making.

2.5.3 The Future of the Office Building Automation

Over viewing the history of the technology development, technical advancements

over the past two decades have dramatically affected and altered the way of living

and business and industry as well. Similar technical advancements and changes

also occurred in building industry during those years, particularly in office

buildings supported with new work environment, electrical and air-conditioning

systems. One of the most significant consequences to come out of these changes

was the development and use of building automation systems (BAS). These systems

were designed to electronically control, monitor, and regulate all building

functions such as HVAC, electrical, personal safety, or security.

The energy conservation and technological innovations drove building system design

in the 70s and 80s. In the 90s, there were some major factors that could have

potentially impacted on building system design such as air quality, optimum

Page 87: THE INTEGRATION BETWEEN DESIGN AND MAINTENANCE …eprints.qut.edu.au/16058/1/Frank_Lin_Thesis.pdf · the integration between design and maintenance of office building automation:

CHAPTER 2 LITERATURE STUDY

69

comfort levels, fire and personal-security, building services design, emphasis on

quality, energy options, environmental solutions, and cost-effective considerations.

Beyond the year 2000, a variety of technologies involving artificial intelligence will

be applied to modem building systems, where the occupants of sophisticated office

buildings will be able to control the HVAC, electrical, mechanical, security and life

safety systems of their immediate areas, while secured areas will be programmed to

turn on lights and air conditioning units in selected office zones. It is foreseeable that

technologies will be developed rapidly in the new decade and successful

implementations of them will ensure effective, reliable, robust and energy efficient

building systems (Akihiko, et. al. 1993; So and Chen 1999).

Several advances in related areas, including the central data management, linkage to

the information superhighway, distributed intelligence, the concept of open system,

human comfort based control, home automation and multi-media user interface. In

effect, there will be greater integration between electronic technology and building

systems. In this integration era we must be prepared to meet these new challenges and

new opportunities. (Norman and Kurtz 1991; So and Chen 1999)

Technologies for furthering the progress in building automation systems will lead to

advanced integration in some or there will be a partial combination and integration of

the systems such as in (Akihiko, et. al. 1993; So and Chen 1999; WWWHC):

• Integrated Facility Management system

• Emergency measures control systems

• Fault warning /diagnosis systems

• Standardisation of transmission methods

• Multi-vendor systems

• Open protocol/object oriented technology

• Predicted Mean Vote (PMV) control

• Long-range radio alarm/surveillance systems

• Facial recognition systems

• Intelligent sensors

The systems integration for different purposes will reflect the special diversities and

relevant functions while consideration must be given to budgets and individual

applications to reach the requirements of response and to cope with the demand of

Page 88: THE INTEGRATION BETWEEN DESIGN AND MAINTENANCE …eprints.qut.edu.au/16058/1/Frank_Lin_Thesis.pdf · the integration between design and maintenance of office building automation:

CHAPTER 2 LITERATURE STUDY

70

the occupants- expectations. In the new decade, the advanced technology is going to

be pursuing `CHIM': Computer Human Integrated Manufacturing. A dominant

message is that it represents a challenge to develop and exploit people's skills in

parallel with advancing automation as shown in Figure 2-9 (Willmott 2002).

Advancing automation and the development of technology implies that the activities

of Operations and Maintenance (O&M) have to keep pace fulfilling the system

design intentions. On the other hand, making predictions is very difficult but

whatever the future developments are it is difficult to imagine them not including

ways of making the systems easier to use (Eyke, M. 1988). Notwithstanding, in

anticipation the future changes, backed by the advanced technologies, BAS

development will move forward to be more simpler in the unit and to be more

sophisticated in the whole system to become intelligent and smarter. However, how

to keep BAS smart and sustainable for the building maintenance to meet with the

building occupant’s expectations in building performance, energy conservation and

comfort? These are critical and still a challenge. The solution would not only rely on

the building systems and BAS integration to ensure the systems are smart, but also

on the process integration in commissioning the diverse needs of the different parties

and quality management of process to sustain the maintenance effectiveness during

the life cycle process.

FUTURE NOW

AUTOMATION OF

EQIPMENT

THE MISSING

LINK CHIM

OPERATION

EQUIPMENT

ADVANCING AUTOMATION

Figure 2-9: The future Vision

Page 89: THE INTEGRATION BETWEEN DESIGN AND MAINTENANCE …eprints.qut.edu.au/16058/1/Frank_Lin_Thesis.pdf · the integration between design and maintenance of office building automation:

CHAPTER 2 LITERATURE STUDY

71

2.6 Other Relevant Literatures

2.6.1 Energy Conservation and High Performance Office

Building

Energy conservation in buildings has been regarded as an important issue of

sustainability all over the world. Building energy consumption accounts for 1/4 of

total primary energy consumption in China, and will inevitably increase (Maio 2004).

Statistically, in commercial buildings, heating is the largest single end use of energy

at 33% of total energy use in 1990 in Australia (ABS 2003) as in Figure 2-10. Energy

consumption in buildings accounts typically for over 30-40% of the national total

annual energy consumption in UK (Hensen 1996). Heating, Ventilating, and

Air-Conditioning (HVAC) systems are major energy users in buildings. HVAC

systems account for 40%-60% of the energy used in commercial and residential

buildings in the United States (DOE 2004). According to Ian & Graham (2004), the

use of high performance HVAC equipment can result in considerable energy,

emissions, and cost savings (10%-40%); in addition, high-performance HVAC can

provide increased user thermal comfort, and contribute to improved indoor air

quality (IAQ). This represents an opportunity to realise significant savings by

improving its control of HVAC operations and improving the efficiency of the

system.

Figure 2-10: Commercial Building Energy use

Page 90: THE INTEGRATION BETWEEN DESIGN AND MAINTENANCE …eprints.qut.edu.au/16058/1/Frank_Lin_Thesis.pdf · the integration between design and maintenance of office building automation:

CHAPTER 2 LITERATURE STUDY

72

The optimised control mechanisms can ensure occupant comfort, provide safe

operation of the equipment, and in a modern HVAC control system enable sensible

use of energy resources. The system’s efficiency in making energy savings as well as

in the utilisation of adequate methods to reach the savings expectation would require

a totally ideal performance of HVAC. The benefits of high performance,

energy-efficient HVAC systems are universally recognised. Therefore, the office

building could be installed with high performance HVAC systems to improve the

efficiency and meet the occupant’s expectation.

Hence, with respect to environmental impact and economics, the choice and design

of HVAC systems are of the utmost importance (Hensen 1996). In addition,

employing high-performance HVAC equipment in conjunction with adequate design

can result in significant energy savings and offer comfort. However, the

energy-efficient design utilizing high-performance HVAC equipment often requires

more effort and more collaboration from the design team than a conventional,

sequential approach. To reach the energy conservation and high performance in

office buildings, in addition to the high performance HVAC application, effective

alternatives should be adopted. Several alternatives such as Total Quality

Management (TQM), Total Building Commission (TBC), and Life Cycle Costing

(LCC) have been effectively practiced in the construction fields (Barrie, et. al. 1996;

McGeorge & Palmer 2002; DOE 2004), which would impact on design and

maintenance processes during the building’s lifetime.

Page 91: THE INTEGRATION BETWEEN DESIGN AND MAINTENANCE …eprints.qut.edu.au/16058/1/Frank_Lin_Thesis.pdf · the integration between design and maintenance of office building automation:

CHAPTER 2 LITERATURE STUDY

73

2.6.2 Total Quality Management (TQM)

Total Quality Management (TQM) is relevant with a broader philosophy than the

traditional techniques of quality control which has been widely applied in the

manufacturing industries. TQM is the integration of all functions and processes,

customer focus and the continuous improvement of the quality of goods and services

(Vinceent & Joel 1995; McGeorge & Palmer 2002). Japanese construction

companies began instituting TQM during the 1970s. An indication of their success is

that since the mid-1970s, three Japanese contractors have won Japan’s coveted

Deming Prize, which recognises quality improvement in industry (Deming, W. E.

1986).

TQM is an effective, comprehensive management technique that has proven

successful both in the United States and overseas in manufacturing, service and

construction (CII 1990). The effectiveness and benefits of TQM in quality of

product, integration process and user satisfaction can be realised from a definition as

“A people focused management system that aims at continual increase in customer

satisfaction at continually lower real cost. TQM is a total system approach (not a

separate area or program), and integral part of high level strategy. It works

horizontally across function and department, involving all employees, top to bottom,

and extends backwards and forwards to include the supply chain and the customer

chain.” (Rampsey & Roberts 1992). Therefore, TQM is accomplished through an

integrated effort among personnel at all levels to increase customer satisfaction by

continuously improving performance (Arditi & Gunaydin 1997; McGeorge & Palmer

2002). TQM focusing on the process integration as well as on the product and service

quality will impact and facilitate the whole process quality of the whole process.

The approach to Total Quality Management and the use of checklists is an effective

management tool, which can be utilised through the whole building process: design,

construction/ installation, operation/ maintenance to ensure the quality is presented as

designed. For BAS design and maintenance processes, progressive inspection by the

O&M personnel has experienced: familiarisation themselves with the location of

individual components for speed in responding to emergency or routine maintenance

calls, and a feeling of "ownership" of the building even before completion of the job.

Page 92: THE INTEGRATION BETWEEN DESIGN AND MAINTENANCE …eprints.qut.edu.au/16058/1/Frank_Lin_Thesis.pdf · the integration between design and maintenance of office building automation:

CHAPTER 2 LITERATURE STUDY

74

Over the years we have experienced a high level of acceptance of jobs by the O&M

personnel when they had a chance to participate in field inspections and/or in custom

development of graphical DDC screens, alarm definitions and other job-related

activities as the follows (Boed, V. 1996):

• Comply with site standards, specifications, codes and job documentation.

• Transfer of information from one trade to another.

• Quality assurance by inspecting the job site by trade supervisors and

construction managers.

• Progressive inspection and review of the installed systems by the owners

O&M personnel.

To reach the occupants expectations, the quality is vital whether it be in ‘the quality

in fact’ or quality in perception’. The providers of services or goods that meet

specifications achieve quality in fact. A service or product that meets the customer’s

expectations achieves quality in perception (Culp 1993). In other words, a product

can be of high quality and yet it may not meet customer’s needs and vice versa. An

example of not meeting customer needs is the high rise office building that was built

using cutting edge technology in a high-cost building process. However, few

occupants want to rent the building, because of the high rent. This building failed to

meet the tenants’ expectations of operation/ maintenance costs.

In office building industry, quality can be defined as meeting the requirements of the

designer, constructor and regulatory agencies as well as the owner. The quality of the

process may cause the quality product to be acceptable or not (Nagasaku & Oda

1965). ‘Product quality’ in the BAS may refer to achieving quality in the equipment

and systems such as sensors and thermostats, whereas ‘process quality’ may refer to

achieving quality in the way the project is organised and managed in the three phases

of planning and design, construction/ installation, and operation and maintenance.

Traditionally building construction organizations have been separated into several

parties that carry out a set function, such as design, construction and maintenance.

The hierarchical segmentation leads to some of the problems such a different

perception of values, conflicting priorities, different expectations and rigid structures

(Choppin 1991). One of the main drivers of TQM, integration aims to break down

the compartmentalization of organizations and move towards more integrated

Page 93: THE INTEGRATION BETWEEN DESIGN AND MAINTENANCE …eprints.qut.edu.au/16058/1/Frank_Lin_Thesis.pdf · the integration between design and maintenance of office building automation:

CHAPTER 2 LITERATURE STUDY

75

structures (McGeorge & Palmer 2002).

TQM is a process that requires overall involvement in the building construction

processes such as planning/ design, construction, and operation/ maintenance to be

successful. Juran’s triple role concept: supplier (input), processor (process), and

customer (output) (Juran 1992, 1999) applied to construction can be shown as in

Figure 2-11. Quality in each construction process is affected by the quality in the

preceding phases. Quality is important for the overall quality performance of the

process.

In addition, in TQM activities, some of inspection and review tasks may often be

omitted from the process unless there is an owner's appointed commissioning agent

or inspector for the job. These are important to ensure the quality of the installation

and for the operation of the installed systems. Many deficiencies become invisible

since the components are hidden behind walls, ceilings and in other building cavities

which are closed in as the job is nearing completion. They usually show up later as

maintenance items after the job is turned-over to the owner. The cost for "fixing"

these problems is then much higher than it would have been if discovered during

installation. Also, the costs associated with these problems burden the O&M

department, which usually do not have related costs in their budget. Most

importantly, the building occupants, who expected to move into a new comfortable

and trouble-free building, are inconvenienced by problems originating from systems

CONSTRUCTOR

Needs/

Requirem

ents

Constructed Facility

Plans/ Specification

s Operation/ Maintenance

Phase

Performance,

Energy conservation,

Com

fort

Construction Phase

Planning/ Design Phase

ARCHITECT/ ENGINEER

Output

Output

Input

Input Input

Output

Process Process

Process

OWNER/ DEVELOPER

OCCUPIER

Figure 2-11: Building Construction Process

Page 94: THE INTEGRATION BETWEEN DESIGN AND MAINTENANCE …eprints.qut.edu.au/16058/1/Frank_Lin_Thesis.pdf · the integration between design and maintenance of office building automation:

CHAPTER 2 LITERATURE STUDY

76

installation (or design). Therefore, this needs a balanced approach as with Building

Commissioning (BC) to fill the gap to ensure sustainable quality during the building

process.

2.6.3 Building Commissioning (BC)

Building Commissioning (BC) is the systematic process of ensuring and

documenting that all building systems are carried out in accordance with

specification and design intent, consistent with the owner's operational needs to

improve the building delivery process; to provide a safe and healthy facility; to

improve energy performance; to reduce operating costs; to provide O&M staff

orientation and training; and to improve systems documentation (DOE 2004; Prowler

2004).

Most complaints from building occupants are related to the operation of

environmental control systems, which are the building systems as HVAC and HVAC

controls and automation systems. According to the published survey of the

Architecture Institute of America, 90 % of complaints are due to occupancy comfort,

or rather; discomfort (Boed, V. 1996). As building systems have become more

complete and contractors more specialized, the traditional methods for building

start-up and final acceptance have proven inadequate. Building Commissioning fills

this gap by applying a comprehensive written plan of testing, approvals and

acceptances that begins with the basis of design preparation and extends throughout

the design and construction process. Correctly implemented, it provides fewer

requests for change, smoother building turnover, improved energy performance,

increased systems reliability, enhance occupancy comfort and reduced expenditure

for operations & maintenance (O&M). The benefits of commissioning to the building

participants were disclosed by Tamblyn et al (1994) as:

◊ To the owners:

o There is lower overall cost when considering first cost and

operating costs.

o There is a smooth hand-off from the design team and contractors

to the operations staff because of the O&M’s involvement in the

design process from the beginning.

o The smooth start-up permits the educational staff to perform their

Page 95: THE INTEGRATION BETWEEN DESIGN AND MAINTENANCE …eprints.qut.edu.au/16058/1/Frank_Lin_Thesis.pdf · the integration between design and maintenance of office building automation:

CHAPTER 2 LITERATURE STUDY

77

responsibilities.

◊ To the designers:

o Commissioning provides improved integration between design

disciplines.

o The design team can extend their devices by offering

commissioning activities.

o The gap of knowledge between designers and field staff

(construction and O/M staffs) is narrowed.

o Contractor-designer conflicts are reduced and start-ups are

smoother.

o The clients are handed a functioning building.

◊ To contractors:

o The inclusion of performance testing and commissioning

responsibilities in tender documents gives clearly documented

expectation of the contractor’s performance.

o The performance reports give a documented account of the

contractor’s performance.

o Less time is spent in conflict resolution.

o The contractor also has a satisfied client.

Commissioning provided these benefits can facilitate the overall quality of building

systems and satisfy the clients’ expectations. While building commissioning is

becoming more common, there is still no absolute consensus of what constitutes the

most appropriate scope of building commissioning activities. Building

Commissioning is a relatively new field and standard procedures are still not being

defined. Overall, the Building Commissioning process is intended to facilitate the

building turnover process, realize energy savings; assure indoor air quality (IAQ);

improve system function, operation and maintenance (O&M); and increase thermal

comfort. The key elements of a comprehensive Building Commissioning Plan

include (Prowler 2004):

• Thorough documentation of system design intent and operating sequences;

• Verification of system performance based on documented functional testing

and measurement;

Page 96: THE INTEGRATION BETWEEN DESIGN AND MAINTENANCE …eprints.qut.edu.au/16058/1/Frank_Lin_Thesis.pdf · the integration between design and maintenance of office building automation:

CHAPTER 2 LITERATURE STUDY

78

• Preparing and submitting O&M manuals (and increasing videos) and the

training of building operations staff on system operations and maintenance

procedures;

• Ongoing monitoring of system performance.

The use of commissioning must be tailored to suit the building owners. For the

owners, commissioning may help resolve major communication problems. If the

original building design does not accurately reflect the client's needs and

requirements, then regardless of the proper implementation of a commissioning

process, the building will not achieve the efficiency, comfort and performance

desired (Boed, V. 1996). Therefore Building Commissioning is not a substitute for

good architecture and engineering.

Experience in office building construction and management has validated that

starting the commissioning process as early as possible in a project leads to the best

results. In a survey (Larsson 1994), it reflected that usually occupancy and

construction phases are the time when commissioning activities begin.

Commissioning is a complex task which should confirm (GSA/FEMP):

• The installed systems meet design parameters,

• They are properly installed and set up,

• They operate properly under various operating conditions,

• They interact and are interoperable with other systems,

• Provide the owner with a set of start-up operating values - a very

valuable information for future system maintenance

• Provide instructions to O&M personnel on how to operate the building.

The owner’s O&M personnel should be fully involved in this stage of the project.

They should be part of setting up a commissioning plan, witness functional and

performance testing, and the validation and verification of systems operating

parameters. They should be instructed in the operation of the installed systems under

normal and emergency conditions, during shut-downs, start-ups, etc. They should

receive operator training documentation prior to final acceptance. They should be

involved in post-acceptance systems performance verification for a one-year

(four-season) systems performance warranty. The commissioning documentation

Page 97: THE INTEGRATION BETWEEN DESIGN AND MAINTENANCE …eprints.qut.edu.au/16058/1/Frank_Lin_Thesis.pdf · the integration between design and maintenance of office building automation:

CHAPTER 2 LITERATURE STUDY

79

should be part of the acceptance documentation package and should aid the owners

O&M personnel in future maintenance and systems calibration.

Therefore, Building Commissioning (BC) should be an alternative to balance and fill

gaps between different building phases to sustain the quality throughout the whole

building process. BC should be seen as a sub-set of quality assurance process

(Larsson 1994). The contractors quality control and commissioning program are

combined into an effective management tool that saves money not only for the

contractor, but for the building owner and design consultants as well (Tseng 1994).

TQM and BC offer a solution which, if properly applied, will enhance quality design

and system implementation, and provide a bridge between design/ implementation

and operation/ maintenance (O/M) (Boed, V. 1996), therefore, the quality of either

BAS products or building processes such as design and maintenance can be assured.

In addition, the costs through the whole building life also need to be taken into

consideration to balance the “First Cost mentality”. The multiple levels of savings,

which all are energy-related, that occur when building systems are properly

commissioned are tied into the long term revenue of the buildings (Benner/

Bjornskov 1994).

2.6.4 LCC for Building Development

Before improving the total performance of life cycle in office building, it would be

necessary to evaluate and compare the present status of the conventional building

with the intelligent office building. The Life Cycle Cost (LCC) analysis is a method

used to assess design alternatives considering all the significant costs of ownership.

The critical objective of LCC is the determination of optimum design decisions

following the evaluation of all feasible design alternatives to assure the total

performance related to the maintenance activities. The LCC process can be applied to

a total building or to any building components such as the Building Automation

System (BAS).

It is generally accepted that life cycle costing techniques are a valuable tool for

considering options of new developments, refurbishment works and even

maintenance strategies because they focus the owner's attention on the need to take

account of future maintenance liabilities as well as present capital costs. The basic

Page 98: THE INTEGRATION BETWEEN DESIGN AND MAINTENANCE …eprints.qut.edu.au/16058/1/Frank_Lin_Thesis.pdf · the integration between design and maintenance of office building automation:

CHAPTER 2 LITERATURE STUDY

80

information on life spans, maintenance costs and discount rates needs to be obtained

and whilst there are always elements of risk in any forecasting methods there is still a

case for an improved refinement in LCC to be of benefit. Various techniques have

been developed to assist in the analysis of a building's total costs over its life span.

2.6.4.1 Life Cycle Cost

The cost of building service systems in a modern high-rise building can be over

one-third of the building's total first cost, and over two-thirds of its 25-year total

life-cycle cost (Council on Tall Buildings and Urban Habit 1995). The Life Cycle

Cost (LCC) of an asset is defined as the present value of the total cost of that asset

over its operating life, including initial capital cost, occupation costs, operating costs

and the cost or benefit deriving from disposal of the asset at the end of its life.

An essential element in using LCC is defining the life cycle period, or 'building life',

and within this, the expected life of the components and/or elements. The application

of LCC must always be carried out in a proper context, as considerations of a life

cycle may differ somewhat from notions of the life of a building or a component as

normally perceived (Barrie, et. al. 1996).

Exhaustive lists of life cycle costs are difficult, but the following will typically need

to be counted:

• Maintenance, including redecoration

• Energy consumption

• Cleaning

• Rates

• Insurance

• Estate management or management overheads

• Finance costs

Single building systems apply those LCC components related to capital cost,

maintenance cost, operating cost and demolition cost.

Life cycle cost = Capital cost + cost-in-use - Net residual value

Page 99: THE INTEGRATION BETWEEN DESIGN AND MAINTENANCE …eprints.qut.edu.au/16058/1/Frank_Lin_Thesis.pdf · the integration between design and maintenance of office building automation:

CHAPTER 2 LITERATURE STUDY

81

2.6.4.2 Life Cycle Cost Analysis (LCCA)

Application of a BAS would measure their life time cost before a start was made on

design, installation and operation to ensure the system’s continuum in the building

life. Although the predictions of the life cycle cost of utilities and services are often

difficult at the outset of projects, since there are difficulties in determining long-term

economic conditions, along with other factors, such as unforeseen budget constraints,

making future cost predictions difficult. However, the accuracy of such cost

predictions can be increased significantly by analysing the total ownership cost of

facilities, especially the operating and maintenance costs, and identifying the factors

that govern them. Some of the factors that affect these costs are facility location,

facility type and purpose, facility size, facility design, quality of facility construction

material, price indices for utilities and services (inflationary effect) (Christain and

Pandeya 1997). Examining those factors is important in relation to the design and

maintenance activities; therefore, this examination would be cost effective. On the

other hand, that anticipating technologies and knowledge will increase during the

service life, could see the difficulties decrease, and above all that the BAS innovation

also will reduce the risks of the application, consequently, the LCC consideration

would be a strategy for problem solving.

Life-cycle cost analysis (LCCA) is a method for assessing the total cost of facility

ownership. It takes into account all costs of acquiring, owning, and disposing of a

building or building system. LCCA is especially useful when project alternatives that

fulfil the same performance requirements, but differ with their initial costs and

operating costs, have to be compared in order to select the one that maximizes net

savings. For example, LCCA will help determine whether the incorporation of a

high-performance HVAC or glazing system, which may increase initial cost but

result in dramatically reduced operating and maintenance costs, is cost-effective or

not. LCCA is not useful for budget allocation. Lowest life-cycle cost is the most

straightforward and easy-to-interpret measure of economic evaluation. The LCCA

should be performed early in the design process while there is still a chance to refine

the design to ensure a reduction in life-cycle costs. There are numerous costs

associated with acquiring, operating, maintaining, and disposing of a building or

building system. Building-related costs usually fall into the following categories:

Page 100: THE INTEGRATION BETWEEN DESIGN AND MAINTENANCE …eprints.qut.edu.au/16058/1/Frank_Lin_Thesis.pdf · the integration between design and maintenance of office building automation:

CHAPTER 2 LITERATURE STUDY

82

◊ Initial Costs (Purchase, Acquisition, Construction Costs, Fuel Costs),

◊ Operation, Maintenance,

◊ Repair Costs, Replacement Costs, Residual Values (Resale or Salvage Values

or Disposal Costs),

◊ Finance Charges (Loan Interest Payments, Non-Monetary Benefits or Costs).

The vast majority of costs associated with engineering and construction relate to

operation and maintenance as shown in Figure 2-12. There are three pillars of typical

Life-Cycle Cost with cost elements as design and construction costs, operating and

maintenance costs, and acquisition, and disposal costs (Christian and Pandeya 1997;

ASHRAE 2003; WWW2.6.4.2). In Figure 2-12, the cost of operation and

maintenance (O/M) is 60-85% of the life cycle costs of a facility. However, O/M cost

is not scrutinised as extensively as the first costs (Council on Tall Buildings and

Urban Habit 1995; FCC 2001), this would impact on the building costs decision

making in the planning and design stage, especially selection of the BAS and

building systems for easy maintenance and energy conservation.

Page 101: THE INTEGRATION BETWEEN DESIGN AND MAINTENANCE …eprints.qut.edu.au/16058/1/Frank_Lin_Thesis.pdf · the integration between design and maintenance of office building automation:

CHAPTER 2 LITERATURE STUDY

83

8 %

25 %

67 %

5-10

60-85

5-35

Operation and maintenance

Acquisition, Renewal, and Disposal

Design and construction

Figure 2-12: Comparison of Cost in Building Process (Three Pillars of Typical Life-Cycle Cost Elements: 30 year Period)

LIFE-CYCLE COST

Engineering Installation

Training

OPERATING AND

MAINTENANCE COSTS

Procurement Administration

Demolition Environmental

Recycling

Utilities Consumables

Waste Lost Production

Spares Equipment lif

Planned maintenance Unplanned repair

Labor costs Cost of parts and stores

Maintenance management

ACQUISITION, RENEWAL,

AND DISPOSAL COSTS

DESIGN AND

CONSTRUCTION COSTS

Page 102: THE INTEGRATION BETWEEN DESIGN AND MAINTENANCE …eprints.qut.edu.au/16058/1/Frank_Lin_Thesis.pdf · the integration between design and maintenance of office building automation:

CHAPTER 2 LITERATURE STUDY

84

2.6.5 Practice with Smart and Sustainable Design Incorporating

Maintenance

In spite of the fact that the definition of what constitutes smart and sustainable

building design is constantly changing, there are several fundamental principles that

nearly everyone agrees on: minimising energy consumption, protecting and

conserving water, using environmentally preferable products, enhancing indoor

environment, optimising the operational and maintenance practices.

In order to achieve quality, high performance buildings, optimisation of the

operational and maintenance (O/M) practices has been considered by incorporating

operating and maintenance into the design of a facility and BAS which will greatly

contribute to improved working environments, higher productivity, and reduced

energy and resource costs (James 2002). Since the building design, construction and

O/M have an enormous direct and indirect impact on the environment; appropriate

building construction and maintenance will increase thermal comfort, lower costs

and reduce the overall environmental impact (ABS 2003). The buildings impact

environment during construction, operation and maintenance, and demolition stages

in various aspects such as energy use, atmospheric emissions and raw material

usages (Roodman and Lenseen 1995; Vittori 2002). The extent of environment

impacts comes from buildings is illustrated as in the Figure 2-13 (WBDGEIB 2004).

Figure 2-13: Environment Impact of Buildings

(Sources: World watch Institute and U.S. EPA)

The building impacts on the environment start from the design decisions and material

choices that may relate to the energy use and solid waste generation to the whole life

Page 103: THE INTEGRATION BETWEEN DESIGN AND MAINTENANCE …eprints.qut.edu.au/16058/1/Frank_Lin_Thesis.pdf · the integration between design and maintenance of office building automation:

CHAPTER 2 LITERATURE STUDY

85

cycle of building phases. These direct and indirect influences may not only affect

construction of the building for about five years, but also have an effect on building

operation, maintenance for about 50 years or more in Life Costing estimates (Vittori

2002).

On the other hand, minimisation of energy consumption is also the main objective in

the office building, and this relies on conservation and passive design considerations

for its operation by meeting or exceeding applicable energy performance standards.

In an energy conservation studies, designs of energy improvement indicate that more

than 20% of energy use for HVAC is likely to be the result of improper equipment

operation, poor installation (Donahue 2001; Roth et al 2002). These studies in the

technology options for energy saving potential, encompassing building component,

equipment and system (such as Airfoil Fan Blades, Triple-Effect Absorption

Chillers, Microenvironments), and controls, operations and maintenance (O/M) (such

as Complete Commissioning, Building Automation Systems), indicate that the

system choices and O/M consideration in design stage have an effect on the energy

conservation (Roth et al 2002).

In addition, comfort and health are an expected necessity for the office buildings. To

ensure and enhance the impact on occupant’s health, comfort, and productivity,

maximising day lighting, installing appropriate ventilation and moisture control have

also to be taken into consideration. Hence designers are encouraged to specify

systems that simplify and reduce maintenance requirements; are cost-effective and

reduce life-cycle costs to meet the occupant’s expectations (WBDGEIB 2004).

This "smart and sustainable" approach supports an increased commitment to

environmental management and conservation, and results in an optimal balance of

cost, environmental, societal, and human benefits while meeting the mission and

function of the intended facility or infrastructure to avoid waste in the resources of

energy, water, and raw materials; prevent environmental degradation caused by

facilities and infrastructure throughout their life cycle; and create built environments

that are habitable, comfortable, safe and productive (UNEP 2003).

Sustainable development may include more recycled materials, require less energy or

water usage, reduce construction waste, increase natural lighting, or include other

Page 104: THE INTEGRATION BETWEEN DESIGN AND MAINTENANCE …eprints.qut.edu.au/16058/1/Frank_Lin_Thesis.pdf · the integration between design and maintenance of office building automation:

CHAPTER 2 LITERATURE STUDY

86

opportunities that contribute to an optimal facility (FCC 2001). Using more effective

alternatives such as life cycle costing (LCC), total quality management (TQM), and

building commissioning (BC) in design and maintenance can promote to balance

environmental performance with product reliability, safety, and functionality. When

all alternatives are utilised equally, sustainable development technology and

integration can then be fully evaluated for performance in the whole process.

Page 105: THE INTEGRATION BETWEEN DESIGN AND MAINTENANCE …eprints.qut.edu.au/16058/1/Frank_Lin_Thesis.pdf · the integration between design and maintenance of office building automation:

CHAPTER 2 LITERATURE STUDY

87

2.7 Summary

Being smart and sustainable office buildings are evolving characteristics of building

products pursued by many practitioners and researchers around the world today.

Design and maintenance, as two interrelated phases at the opposite ends of the

building development cycle, can have substantial implications on the long-term

performance of office buildings, therefore are highly relevant to both smart features

and sustainable outcomes. Smart building design, should actively consider potential

service and maintenance issues associated with building structure, components and

systems. Sustainable maintenance of office-buildings should be carried out to truly

reflect designated intended use of components and systems, aided by a full

knowledge of design decisions and a total appreciation of the characteristics and

behaviours of these systems. This will require the deployment of new strategies such

as decision support based integration.

In brief, the findings of the literature study can be categorised into four aspects such

as general status of the office building industry, potential approach, required

information and strategies development as in Figure 2-14:

Process Integration

2. Potential Approach

3. Required Information

4. Strategies Development

1. General Status of Office Building Industry

Process Integration, Decision Support, TQM, BC, LCC

IB, BAS, Design and Maintenance

Current BAS, Problems/ Limitations, Requirements of D/M

General Strategies, Guidance, Computerised Decision Support

Figure 2-14: Summary of Literature Study

Decision Support Approach

Page 106: THE INTEGRATION BETWEEN DESIGN AND MAINTENANCE …eprints.qut.edu.au/16058/1/Frank_Lin_Thesis.pdf · the integration between design and maintenance of office building automation:

CHAPTER 2 LITERATURE STUDY

88

1. General status:

• Intelligent building and building automation in the office building

industry

• Building designers and maintainers are normally working independently

with less communication and support during the life time of buildings.

• In the life cycle process, collaboration between design and maintenance

can help improve their relationship.

2. Potential approach:

• Process integration between different parties can help improve the

effectiveness and efficiency; it is a potential approach.

• Decision support tools have potentials for filling the gaps and limitations

in practice.

• Total Quality management (TQM) and Building Commissioning (BC)

and Life Cycle Costing (LCC) might have potentials for the improvement

of the quality of product and process, and balance the environmental

impact.

3. Required information:

• Current status of the office building automation

• Barriers and limitations existing in office building practices

• Information in relation to design and maintenance

4. Strategies development:

• Raising awareness and understanding to facilitate communication

between design and maintenance

• Guide to enhance the design and maintenance of office building

automation

• Exploration of the computerised decision support

Page 107: THE INTEGRATION BETWEEN DESIGN AND MAINTENANCE …eprints.qut.edu.au/16058/1/Frank_Lin_Thesis.pdf · the integration between design and maintenance of office building automation:

CHAPTER 3 RESEARCH METHODOLOGIES AND RESEARCH PROCESSES DEVELOPMENT

89

3.1 Introduction 3.2 Key Methodologies 3.2.1 Justification of Literature Study 3.2.2 General Research Approaches 3.2.3 Industry Survey

3.2.3.1 Information Required 3.2.3.2 Selection of Data Collection Method 3.2.3.3 Mail Questionnaire Survey

3.2.4 Case Study Method 3.2.5 Data Analysis 3.2.6 Knowledge Acquisition 3.2.7 System Development

3.3 Research Design and Development 3.3.1 Schedule Planning for the Research 3.3.2 Overview of each Research Stage 3.4.3 Prototype System Design and Development 3.4.4 Hardware and Software Specification 3.3.5 Programming 3.3.6 Validation and Verification 3.4 Summary

CHAPTER 3 RESEARCH METHODOLOGIES

AND DEVELOPMENT PROCESSES

The Integration between Design and Maintenance of Office Building Autom

ation: A Decision Support Approach

Page 108: THE INTEGRATION BETWEEN DESIGN AND MAINTENANCE …eprints.qut.edu.au/16058/1/Frank_Lin_Thesis.pdf · the integration between design and maintenance of office building automation:

CHAPTER 3 RESEARCH METHODOLOGIES AND RESEARCH PROCESSES DEVELOPMENT

90

3.1 Introduction

The objectives of the research have been disclosed in chapter 1 as:

◊ To identify barriers and limitations of BAS between design and maintenance

◊ To establish guidelines for the improvement of design and maintenance of

office building automation

◊ To develop a prototype decision support system to demonstrate the potential of

integrating design and maintenance tasks of office building automation

In order to achieve the research objectives, the research methodology should firstly

be considered and adopted. By examining the literature findings, it was revealed that

the current situation of BAS in office building design and maintenance should be

collected for advanced data analysis to extract the useful knowledge to justify the

potential issues. An in-depth study of office building relating the BAS issues is also

essential for further guideline generation and decision support development.

3.2 Key Methodologies Key methodologies proposed in the research project include:

• Literature study

• General research approaches

• Industry surveys

• Case study

• Knowledge acquisition

• System design and development

Page 109: THE INTEGRATION BETWEEN DESIGN AND MAINTENANCE …eprints.qut.edu.au/16058/1/Frank_Lin_Thesis.pdf · the integration between design and maintenance of office building automation:

CHAPTER 3 RESEARCH METHODOLOGIES AND RESEARCH PROCESSES DEVELOPMENT

91

3.2.1 Justification of Literature Study

The purpose of the literature review is to ensure that the required materials that have

in the past been found to have had an impact on the problem. Based on the issues of

research and the factors identified during the research process, a literature review

needs to be done. Generally, literature reviews have to go through three steps. The

first step involves identifying the various issues in published and unpublished

materials. The second step is gathering the relevant information either by going

through the necessary material in a library or by getting access to online sources. The

third step is writing up the literature review. In this research, after the literature

review detailed in Chapter 2, the research was able to narrow down the problem from

its original broad integration issues and define the issues of concern in the process

integration more clearly. The relevant literatures has been surveyed as detailed in the

previous chapter which has demonstrated and verified the possible direction for

providing a solution to the proposition of the research: “Could possible alternatives

be created to help overcome the problems which exist between design and

maintenance for office building automation during the life time of the buildings?”.

The literature study has reviewed several contexts encompassing building integration

in the building industry, the decision support approach for improving the practice,

design and maintenance of office buildings, BAS status and other literatures in

relation to the building assessment such as Life- Cycle Costing (LCC) and quality

assurance in Building Commissioning (BC) and Total Quality Management (TQM).

It has demonstrated the needs and feasibilities for this subject, and has also

highlighted the possible alternatives to accomplish the objectives which can be

achieved from the integration approach and decision support development. However,

the literature survey is potentially an endless task. In order to accomplish the

designated objectives to prove the theories, in addition to the on-going literature

reviews, the feasible and effective methodologies should be selected, justified and

deployed.

Page 110: THE INTEGRATION BETWEEN DESIGN AND MAINTENANCE …eprints.qut.edu.au/16058/1/Frank_Lin_Thesis.pdf · the integration between design and maintenance of office building automation:

CHAPTER 3 RESEARCH METHODOLOGIES AND RESEARCH PROCESSES DEVELOPMENT

92

3.2.2 General Research Approaches

Integration

The importance of integration can be highlighted from the literature reviews, because

the building development process is a dynamic one involving many stages of work

such as design, construction, operation, maintenance, retrofitting and upgrading.

There is a clear need for interaction between these stages among all participants

including designers and the maintenance team. Information related to maintenance

should be supplied to the designer as the assumptions of what will be required for

inspection, maintenance and replacement, sufficient details of relevant technical

considerations that apply, and especially, the unexpected deviations in performance

that have occurred in service.

The degree to which the design of a building embraces maintenance consideration

has a major impact on the performance of a building. Maintenance related problems

that occur during the lifetime of a building can be minimised by making future

decisions in the design stage of the project. The integration between design and

maintenance will at least achieve the following goals (Arditi, D. 1999):

◊ Enhance their inherent relationship and prevent mistakes from the lack of

understanding and communication,

◊ Facilitate effective consideration of maintenance in the design stage, and

◊ Fulfil design intentions through service and maintenance processes by taking

the right procedures for the specific problems encountered.

Page 111: THE INTEGRATION BETWEEN DESIGN AND MAINTENANCE …eprints.qut.edu.au/16058/1/Frank_Lin_Thesis.pdf · the integration between design and maintenance of office building automation:

CHAPTER 3 RESEARCH METHODOLOGIES AND RESEARCH PROCESSES DEVELOPMENT

93

Decision support

As the complicate and fragmental characteristics of building industry, management

and improvement are still challenge for the changing environment. Dealing with the

rapid alteration and quick response of decision making, appropriate decision supports

are required. Especially, across the two building phase- design and maintenance, the

bridge will relate more interdependent expertises and knowledge. To reach the

integration objective of the research, an approach as decision support might be

appropriate and effective way. The decision support approach can make available

trial-and error attempts, knowledge support and experience accumulation for speedy

response and process. It might not only support the sophisticate manual information,

but also can supply quick interactive response through the computer-based decision

support development. The computer-based decision support for quick access and

process vast amounts of stored information would improve coordination and

communication for building group work. The research objectives will accomplish

through this decision support development to integrate design and maintenance.

Increasing client expectations on building performance, energy conservation and

comfort, and continuing report of maintenance problems prompt researchers and

practitioners to search for solutions. Despite the integration approach, the

development of decision support is also an alternative. DSS can provide data store,

retrieval, and integration functions to help decision makers utilise these data and

models to solve unstructured problems. In this project, the integration will facilitate

the sharing of information and decision support between design and maintenance

utilising a knowledge-based system. Decision support methods have proved their

worthiness in the field of qualitative analysis of construction problems (Yang & Peng

2001).

A DSS is composed by three basic elements: the database and its management, the

model base and its management, and the dialog sub-system as in Figure 3-1:

• Data management: includes databases, which contains relevant data, performs

functions as data retrieval, capture, and integration.

• Model management: provides analytical capabilities and management.

• Communication (dialog subsystem): provides user interface to input and output

Page 112: THE INTEGRATION BETWEEN DESIGN AND MAINTENANCE …eprints.qut.edu.au/16058/1/Frank_Lin_Thesis.pdf · the integration between design and maintenance of office building automation:

CHAPTER 3 RESEARCH METHODOLOGIES AND RESEARCH PROCESSES DEVELOPMENT

94

data.

Inductive and Deductive methods

Generally, concept formation is at the base of knowledge. One of the research

methods such as inductive and deductive methods can be used to form the concepts

and build the knowledge base. Valid concepts are derived from observed reality.

Concepts are formed through the process such as observation, classification,

similarities, identification, combination and differentiation. Thus concept-formation

is basically an inductive process. Knowledge must be consistent without

contradiction. Deduction is how to achieve this. Concepts are generated inductively

and tested and refined deductively. Deduction gives concepts their predictive

usefulness. Hence knowledge generation is mostly a deductive process. If exceptions

in the nature of concepts and reality occur, the deduction again comes in, in refining

the concepts. All forms of deductive logic are some form of If A then necessarily B,

whose converse is If not B then necessarily not A. The first deduce the nature of

particular instances of existing concepts. The second refines the concepts. In brief,

induction is deriving the general from the particular; deduction is deriving the

particular from the general (Saunders et al 2000; Kruger and Welman 2002; Collis

Figure 3-1: A Schematic View of DSS

(Source: Turban, E. et al. 2001)

halla
This figure is not available online. Please consult the hardcopy thesis available from the QUT Library
Page 113: THE INTEGRATION BETWEEN DESIGN AND MAINTENANCE …eprints.qut.edu.au/16058/1/Frank_Lin_Thesis.pdf · the integration between design and maintenance of office building automation:

CHAPTER 3 RESEARCH METHODOLOGIES AND RESEARCH PROCESSES DEVELOPMENT

95

and Hussey 2003).

The induction has to do with building theory and collection of qualitative data. The

deduction seeks to test hypotheses in terms of the data obtained. The process of

induction and deduction is illustrated in Figure 3-2.

According to Figure 3-2, the facts and observations can be induced to make a

theoretical statement that explains the observations and facts. Through deduction,

such a theory is determined whether it is a reliable in reality. The validity of the

hypothesis is then determined in terms of the contradiction and suitability by

collecting new data.

Theory Hypotheses

Data, Facts, Observations Information

Data, Facts, Observations Information

INDUCTION

DEDUCTION

CONTRADICTION

Concepts, Ideas Knowledge

Figure 3-2: The process of Induction and Deduction

Reality

Conception

Page 114: THE INTEGRATION BETWEEN DESIGN AND MAINTENANCE …eprints.qut.edu.au/16058/1/Frank_Lin_Thesis.pdf · the integration between design and maintenance of office building automation:

CHAPTER 3 RESEARCH METHODOLOGIES AND RESEARCH PROCESSES DEVELOPMENT

96

3.2.3 Industry Survey

To reach the first objective, information in relation to BAS design and maintenance

in the office building industry must be collected to identify the current status. The

literature findings have demonstrated that the lack of the effective ways to bridge

design and maintenance as well as the insufficient acknowledge between different

building phases. The needs and overall situation of the management in building

practice would rely on the realistic survey. In spite of the rare literatures relating to

the research context, the survey of industry practice would be essential to reply and

develop effective approach. The survey can provide both information as facts of the

practice and opinions from the professional experience. The information can base the

initial source for the further knowledge base formulation along with the decision

support development to achieve the goals in this research. To get an understanding

the current status of the BAS design and maintenance of office building, the industry

professionals including design and maintenance personnel have been the major

subjects. The industry survey will be carried out in the major capital cities of

Australia.

3.2.3.1 Information Required

Useful, timely, accurate, reliable, and valid data are needed. When this data from the

replies are evaluated, analysed, and synthesised, useful information becomes

available to hep decision making (Sekaran, U. 2003). Information includes the facts

and opinions, from the surveys respondent’s opinions, their criticisms or description

and the responses of the current situation of industry. Data may be regarded as ‘raw

facts’, information is facts which are expressed in forms suitable to assist a decision

maker; information directly supports decisions (Fellows and Liu 2003).

In this research the required information may come in the forms of:

◊ Opinions

◊ Current design and maintenance practice

◊ Design and maintenance information

◊ Manual

The research concentration on the integration (system or process) and decision

support approach related to the research context is also required. All of this

Page 115: THE INTEGRATION BETWEEN DESIGN AND MAINTENANCE …eprints.qut.edu.au/16058/1/Frank_Lin_Thesis.pdf · the integration between design and maintenance of office building automation:

CHAPTER 3 RESEARCH METHODOLOGIES AND RESEARCH PROCESSES DEVELOPMENT

97

information should be obtained by means of accepted suitable methods.

3.2.3.2 Selection of Data Collection Method Data collection methods include interviews, questionnaires or instrument

administration, observation of documents and a variety of other motivational

techniques such as projective tests (Robson, 2002; Sekaran, U. 2003; Sproull, 1995).

Taking into consideration the necessities of research and justified by literature

reviews on research methodology, two distinctive approaches for data collection have

been selected. They are questionnaire surveys and case studies. The questionnaire is

specifically designed to reach the first objective of collecting first hand data; while

the case study is for supplementing any deficiencies in the data collection and will

indirectly reach the second objective.

Justification of the selected data collection methods should be undertaken on the

basis of understanding their advantages and disadvantages (Sekaran 2003; Fellows

and Liu 2003; Saunders, et. al. 2003), and then to select the appropriate choices.

Reviewing the research findings, one of the approaches used for data collection are

mail questionnaires which have several benefits as in Table 3-1.

Table 3-1: Advantages and Disadvantages of the Mail Questionnaires

Data Collection Advantages Disadvantages Mail Questionnaires

◊ Anonymity is high. ◊ Wide geographic regions can

be reached. ◊ Token gifts can be enclosed

to seek compliance. ◊ Respondent can take more

time to respond at convenience.

◊ Can be administered electronically, if desired.

◊ Response rate is almost always low.

◊ A 30% response rate is reasonable and quite acceptable or 25%-35% useable response rates.

◊ Cannot clarify questions. ◊ Follow-up procedures for

non-responses are necessary.

The mailed questionnaire survey is best suited (and perhaps the only alternative open

to the researchers) when information is to be obtained on a substantial scale through

structured questions, at a reasonable cost, from a sample that is widely dispersed

geographically (Sekaran, U. 2003). The advantages of the mail questionnaires

comply with the needs of the research in seeking for a wide geographic coverage of

current practices and wide-ranging responses because there are no time constraints

on the respondents and it is a convenient form of communication. Nevertheless, the

Page 116: THE INTEGRATION BETWEEN DESIGN AND MAINTENANCE …eprints.qut.edu.au/16058/1/Frank_Lin_Thesis.pdf · the integration between design and maintenance of office building automation:

CHAPTER 3 RESEARCH METHODOLOGIES AND RESEARCH PROCESSES DEVELOPMENT

98

disadvantages of the low response rate could be solved by using of the electronic

tools and strategic follow-up methods. On the other hand, it might also be verified by

the second approach- case study to overcome this shortcoming.

3.2.3.3 Mail Questionnaire Survey

A questionnaire is a pre-formulated written set of questions used to obtain

information from respondents, it can be administered personally, mailed to the

respondents, or electronically distributed is an efficient data collection instrument

when the researcher knows exactly what is required and how to measure the

variables (Sekaran, U. 2003). Questionnaire surveys can be carrying out in a variety

of ways, commonly including: mail questionnaires, personally administered

questionnaires, telephone and internet questionnaires. The choice of questionnaire

communication methods may depend on personal preference, cost, time constraints,

potential response rates or many other criterions. Table 3-2 compares and

summarises these approaches by Frazer & Lawley (2000):

Table 3-2 Comparison of Questionnaire Communication Methods

Criteria Mail questionnaire Personally

administered questionnaire

Telephone questionnaire

Internet questionnaire

Cost Low High Moderate Very low Speed Slow Immediate Immediate Fast

Geographical dispersing High Very low Medium Very high

Length of questionnaire Long Long

(30-60 minutes) Medium

(10-30 minutes) Long

(4-12 pages) Question

complexity Moderate Simple to complex Simple only Simple to moderate

Recall data Good Poor Moderate Good Respondent anonymity Possible Not possible Not possible Possible

Rapport with respondents None High Moderate None

Interviewer bias None High Medium None Need for

interviewer supervision

No Yes Yes No

Response rate Low Very high Moderate Moderate

Reviewing the above features of the various methods, the mail questionnaire was

chosen to achieve the first research objective which was to identify potential

problems and limitations of BAS between design and maintenance in the building

industry. The proposed respondents were spread geographically around the major

capital cities of Australia and were invited to participate in this research. Personally

administering of survey and telephone questionnaires were not options. In addition,

the cost of these is much higher than of mail questionnaires. The Internet method is

Page 117: THE INTEGRATION BETWEEN DESIGN AND MAINTENANCE …eprints.qut.edu.au/16058/1/Frank_Lin_Thesis.pdf · the integration between design and maintenance of office building automation:

CHAPTER 3 RESEARCH METHODOLOGIES AND RESEARCH PROCESSES DEVELOPMENT

99

similar to the mail approach, however it currently needs extra support by the web

server and internet access which is related to either respondents’ preference or their

computer literacy; thus this method will not be suitable until Internet access is as

common as telephone access.

Amongst other advantages, the mail questionnaire allows the author to review the

obtained data, provides a good length of questionnaire, allows respondent anonymity

and is unbiased. All of those features directly contribute to obtaining good data and

affect the response rate. Nonetheless, the slow speed of response and prospectively

low response rate will need to strategically improve as allocating sufficient response

time and utilising effective communication techniques with prior contact by letter or

telephone; using visual aids to increase respondent interest and improve recall; and

instigating follow-ups to raise response rates (Kervin, J.1992). In this research, a

questionnaire-based industry survey has targeted both design consultants and facility

managers of existing buildings to identify practical issues and concerns.

Page 118: THE INTEGRATION BETWEEN DESIGN AND MAINTENANCE …eprints.qut.edu.au/16058/1/Frank_Lin_Thesis.pdf · the integration between design and maintenance of office building automation:

CHAPTER 3 RESEARCH METHODOLOGIES AND RESEARCH PROCESSES DEVELOPMENT

100

3.2.4 Case Study Method

The case study is one of the many research methods which can provide an intensive

examination of a single instance of a phenomenon of interest. In such process, the

researcher can explore in depth a program, an event, an activity, a process, or one or

more individuals to examine a research problem in the exploratory stages (Kervin

1992; Creswell 2003). The use of the case study for research purposes is becoming

increasingly widespread in management research. A wide range of information

gathering techniques can be used in case studies including available documents,

observation, presence, participation, or even intervention in the actual process

(Gummesson, E. 1991; Kervin, J.1992; Welman, Jc. & Kruger, Sj. 2001).

Research in the social science and management spheres usually involves asking and

obtaining answers to questions through conducting surveys of people by using

questionnaires, interviews and case studies; while there is a finite amount of

resources available for carrying out the field work, a choice of research method is

necessary. The choice is between a broad but shallow study at one extreme and a

narrow and deep study at the other, or an intermediate position which can be

illustrated as in Figure 3-3 (Fellows and Liu, 2003 ).

The case study method in this research is expected to produce findings extracted

from the history and experience of the selected office building. It will not only

facilitate the exploration of the research focus and enhance the deficiency of the

Breadth of study

Dep

th o

f stu

dy

(a)

(c)

(b)

(a) Questionnaire (b) Case study (c) Interviews

Figure 3-3: Breadth v. Depth in ‘Question-based’ Studies

Page 119: THE INTEGRATION BETWEEN DESIGN AND MAINTENANCE …eprints.qut.edu.au/16058/1/Frank_Lin_Thesis.pdf · the integration between design and maintenance of office building automation:

CHAPTER 3 RESEARCH METHODOLOGIES AND RESEARCH PROCESSES DEVELOPMENT

101

industry survey, but also learn from their experience and introduce the building

integration practice. The case study method can be used (Gummesson 1991):

o To derive general conclusions from a limited number of cases with high

reliability thus can be replicated by others.

o To arrive at specific conclusions regarding a single case because this “case

history” is of particular interest.

o A case research is a useful strategy for studying processes and also for

explanatory purposes.

o Provide an opportunity for holistic view of a process to further generate

theory for initiating change.

o Apply as an emergency approach to serve as a basis for fruitful theoretical

developments and also provide guidelines for salutary advice.

Thus, case study method as in Figure 3-3 can be used for in-depth investigation into

the research focus and for verifying the reliability of the surveys.

3.2.5 Data Analysis

The purpose of analysing the data is to provide information about variables and,

usually, relationships between them. Data may be regarded as ‘raw facts and figures’

which information is facts and figures which are expressed in forms suitable to assist

a decision maker. Information directly supports decisions. Accordingly, the purpose

of data analysis is to provide evidence of relationships and to aid understanding to

support decision making (Fellows and Liu 2003).

After data are obtained through questionnaires and observation, they need to be

edited and analysed in a flow of processes as shown in Figure 3-4.

Page 120: THE INTEGRATION BETWEEN DESIGN AND MAINTENANCE …eprints.qut.edu.au/16058/1/Frank_Lin_Thesis.pdf · the integration between design and maintenance of office building automation:

CHAPTER 3 RESEARCH METHODOLOGIES AND RESEARCH PROCESSES DEVELOPMENT

102

Data analysis can be manually done, but is now routinely done with some software

programs such as SPSS and MS Excel to generate information (Sekaran, U. 2003)

such as:

• SPSS: can be used to create surveys (questionnaire design) through the SPSS

Data Entry Builder to analyse the data collected. It can turn data into relevant

results and transforms the data into information. It offers analytic applications,

data mining and text mining, and comprehensive statistical analysis software

that support the decision making processes. Generally, it displays in text,

chart, table and graph forms that is suitable for the analysis of the facts and

compares the relevant factors.

• MS Excel: can be used to analyse the statistical analysis to display data and

analysis in the forms of charts and graphs. Data analysis and probability are

some of the most important functionalities in this software package. It is a

member of the spreadsheet family of software. It can be used to store

information in columns and rows which can then be organized and/or

processed. Spreadsheets can help organise information, or reordering records

according to a numeric field. However, it is more often used for calculating,

to calculate some statistical measures from a list of numbers.

Figure 3-4: Flow Diagram of Data Analysis Process

Data analysis

Gathering data

Editing data Handling blank responses Coding data Categorising data Creating data file Programming

Discussion Research question

answered?

Proposition testing

Appropriate statistical

manipulations

Feel for data

Mean Standard deviation Correlations Frequency distribution

Quality of data

Reliability Validity

Interpretation of results

SPSS

MS EXCEL

DATA COLLECTION

Page 121: THE INTEGRATION BETWEEN DESIGN AND MAINTENANCE …eprints.qut.edu.au/16058/1/Frank_Lin_Thesis.pdf · the integration between design and maintenance of office building automation:

CHAPTER 3 RESEARCH METHODOLOGIES AND RESEARCH PROCESSES DEVELOPMENT

103

During the research development process there were three fields of data that needed

to be gathered. They were the data from literature, data from the professional survey,

and findings from the case study.

In accordance with these research findings and survey results, analysis and

knowledge extractions will be used to format and create a support for the design and

maintenance decision-making to form guidelines which could provide support during

the building’s life-cycle. The collated survey data will be analysed through the

utilization of the statistical analysis software SPSS (V11.5 & 12.0) and supplemented

by Microsoft Excel to generate the graphic results for advanced analysis and

application.

3.2.6 Knowledge Acquisition Knowledge Acquisition is the extraction and formulation of knowledge derived from

existing sources, especially from experts. The process of acquiring knowledge

involves:

(1) identification of knowledge requirements, and

(2) selection of the most appropriate acquisition techniques such as knowledge

elicitation and knowledge acquisition techniques.

However, there are no definite techniques for expert knowledge acquisition which

can guarantee complete success (Brandon et al 1988). Generally, data and

information collected should be analysed (selected, differentiated, dissected, broken

up) and synthesised (integrated, combined, recasted, formulated, reorganised) to gain

knowledge pertaining the definition, classification, description, application,

recognition, awareness, understanding and problem solving of the subject area (Hart

1998). The process of knowledge elicitation is often difficult and time consuming for

the following reasons (Brandon et al 1988):

◊ Human knowledge is very complex and can be messy and ill-formulated.

◊ Humans find it very difficult to articulate what knowledge they have and how

they use it to solve problems.

◊ The more expert someone becomes at a task, the more ‘unconscious’ his

knowledge becomes.

◊ An expert’s verbal comments or actions need careful interpretation to extract

what underlying knowledge may be inferred from them.

Page 122: THE INTEGRATION BETWEEN DESIGN AND MAINTENANCE …eprints.qut.edu.au/16058/1/Frank_Lin_Thesis.pdf · the integration between design and maintenance of office building automation:

CHAPTER 3 RESEARCH METHODOLOGIES AND RESEARCH PROCESSES DEVELOPMENT

104

◊ The existing knowledge acquisition techniques are often of limited applicability.

To apply decision support, sufficient information and relevant knowledge are needed.

Particularly, in the office building context, design and maintenance integration shares

design information as well as maintenance experience and procedure based practice.

These require extensive information and routing following consultation patterns.

During the decision support process, the interactive communication between the

users and the knowledge engineers or computer based system relies on sufficient

knowledge to support and provide inference reaction as suggestions and guidelines.

The required knowledge encompasses:

◊ The facts including the needs and expectations of the building participants.

◊ Information in relation to the explanations of the design and maintenance

phenomena.

◊ Possible strategies or approach to the research issues.

The knowledge which can be utilised for problem solving and provided for decision

making needs to be extracted by following a logical sequence during the process. The

relevant knowledge which can be systematically acquired needs to be collated. Based

on the industry survey and case study, the results can provide the base for these

knowledge acquisitions. Furthermore, knowledge extraction in relation to the current

BAS issues in the research context might be through the strategic methods detailed in

the previous sections to collect and analyse. Then the extracted knowledge will be

used to formulate a knowledge database and generate the guidelines for the decision

making support.

According to Turban et al (2001), the methods of knowledge acquisition can be

classified in three categories: manual, semi-automatic, and automatic:

◊ Manual methods are basically structured around some kind of interview which

include interviewing (structured, semi structured, unstructured), tracking the

reasoning process, and observing; the knowledge is elicited from the expert or

other sources and then coded it in the knowledge base.

◊ Semiautomatic methods are divided into two categories: to support the experts

by allowing them to build knowledge bases with little or no help from

knowledge engineers, and to help knowledge engineers by allowing them to

execute the necessary tasks.

Page 123: THE INTEGRATION BETWEEN DESIGN AND MAINTENANCE …eprints.qut.edu.au/16058/1/Frank_Lin_Thesis.pdf · the integration between design and maintenance of office building automation:

CHAPTER 3 RESEARCH METHODOLOGIES AND RESEARCH PROCESSES DEVELOPMENT

105

◊ In automatic methods, the roles of both the expert and the knowledge engineers

are minimised or even eliminated.

Generally, knowledge can be elicitated either from the existed documentation and

current experts’ experience or observation from the practice by manual or computer

aided. In this research, the knowledge required might be through the integrated

approach as in Figure 3-5 to achieve.

Utilising the induction and deduction methods knowledge extraction from the

research findings, information of practice, survey results and case studies can be used

to formulate the design guidelines and checklist for design and maintenance to form

a database to include:

• Knowledge from research findings: this is collected from the desk research

that will include know-how from experts, published findings and others.

• Knowledge from survey results: this is obtained and analyzed through the

activities of professional surveys and analysis.

• Knowledge from practice: this can be extracted from the candidate’s

experience and case studies, and also can be added to later by the users to

keep the knowledge up to date.

Figure 3-5: Integrated Knowledge Acquisition

Experts (Survey)

Documented Knowledge

Case histories and examples

Induction System

Knowledge

Base Elicitation

Coding

Computer-aided (Interactive)

Knowledge Engineer

Broken lines designate optional interactions)

Page 124: THE INTEGRATION BETWEEN DESIGN AND MAINTENANCE …eprints.qut.edu.au/16058/1/Frank_Lin_Thesis.pdf · the integration between design and maintenance of office building automation:

CHAPTER 3 RESEARCH METHODOLOGIES AND RESEARCH PROCESSES DEVELOPMENT

106

3.2.7 System Development Because of the different types and categories of DSS, there is no single best approach

to DSS development. Development is a very deliberate and orderly approach to

making a system a reality and a methodology is needed to provide the structure for

the system development (Turban et al 2001). All system developments follow

essentially the same fundamental process, called the system developmental life cycle

(SDLC), and there are many “traditional” SDLCs for information systems, including

DSS. A traditional SDLC consists of four fundamental phases- planning, analysis,

design, and implementation- which lead to a deployed system as in Figure 3-6:

A methodology is a formalised approach to implement the SDLC (i.e., it is a list of

steps and deliverables). There are many different systems development

methodologies each one of which is unique with its specific emphasis including:

“Structured design methodologies such as waterfall and parallel development to

produce a solid, well-thought-out system, “Rapid Application Development (RAD)

methodologies such as phased and prototype (Prototyping, Throwaway Prototyping)

development to speed up easier development, and a new emerging “Agile

development methodologies” such as Extreme programming (XP), scrum, and the

dynamic systems development method (DSDM) to emphasise simple, iterative

application development. The choice of methodology is influenced by the criteria in

Table 3-3 by the user requirements, familiarity with the base technology, system

Figure 3-6: The Traditional System Development Life Cycle (SDLC) (Waterfall Development from Dennis and Wixom, 2003)

halla
This figure is not available online. Please consult the hardcopy thesis available from the QUT Library
Page 125: THE INTEGRATION BETWEEN DESIGN AND MAINTENANCE …eprints.qut.edu.au/16058/1/Frank_Lin_Thesis.pdf · the integration between design and maintenance of office building automation:

CHAPTER 3 RESEARCH METHODOLOGIES AND RESEARCH PROCESSES DEVELOPMENT

107

complexity, and the need for system reliability, time pressures, and the need to see

progress on the time schedule:

Table 3-3: Criteria for Selecting a Methodology (Dennis and Wixom, 2003)

Dennis and Wixom further comment these methodologies:

◊ Structured design methodologies: adopt a formal step-by-step approach to the

SDLC that moves logically from one phase to the next.

◊ Rapid application development (RAD): is a newer approach to systems

development that emerged in the 1990s, most RAD methodologies recommend

that analysts use special techniques and computer tools to speed up the analysis,

design, and implementation phases, such as CASE (computer-aided software

engineering) tools, JAD (joint application design) sessions, fourth-generation/

visual programming languages that simplify and speed up programming (e.g.,

Visual Basic), and code generators.

◊ Agile Development: is still emerging today, and it is typically used in

conjunction with object-oriented methodologies. XP requires a great deal of

discipline; otherwise projects may become unfocused and chaotic.

In this research the attempt to explore the process integration is often faced with

unclear user requirements. It needs quick short time responses and interactions. Thus

the prototype methodology must comply with the necessities of performing the

analysis, design, and implementation phases concurrently so that all three phases are

performed repeatedly in a cycle until the system is completed as illustrated in Figure

3-7. The key advantage of prototyping is that it can very quickly provide a system for

the users to interact with, even if it is not ready for widespread use at first. This helps

halla
This figure is not available online. Please consult the hardcopy thesis available from the QUT Library
Page 126: THE INTEGRATION BETWEEN DESIGN AND MAINTENANCE …eprints.qut.edu.au/16058/1/Frank_Lin_Thesis.pdf · the integration between design and maintenance of office building automation:

CHAPTER 3 RESEARCH METHODOLOGIES AND RESEARCH PROCESSES DEVELOPMENT

108

with more quick refinement of real requirements.

The developmental prototyping methodology is based on iterative refinement of a

prototype. Its structure is shown as in Figure 3-8, and this refinement process usually

results in faster system development than a conventional development methodology

under some or all conditions as: some portion of the requirements cannot be fully

specified independently of architectural or detailed design, or technical feasibility for

some unknown or uncertain system functions. Prototype development tools are

powerful enough to create a fully functional system (Satzinger et al. 2002).

Figure 3-7: The Prototyping Methodology

Planning

Design

Analysis Implementation

System Prototype

System

Implementation

Figure 3-8: The Developmental Prototyping Methodology

Planning Design and Implementation

Architectural Design

Prototype Construction

Prototype Testing & Evaluation

Prototype Analysis & Design Additional

Implementation (if necessary)

System

System Prototype

?

Analysis

Page 127: THE INTEGRATION BETWEEN DESIGN AND MAINTENANCE …eprints.qut.edu.au/16058/1/Frank_Lin_Thesis.pdf · the integration between design and maintenance of office building automation:

CHAPTER 3 RESEARCH METHODOLOGIES AND RESEARCH PROCESSES DEVELOPMENT

109

Several key methodologies as above which could be utilised in this research, where

their advantageous features would comply with the objective necessities during the

research process, and their disadvantages will also have little affect on the results.

The Developmental Prototyping Methodology can be employed to iteratively

develop a prototype system until it becomes the final system. However, successful

prototyping tools employ a highly interactive application development, which

requires system developers to employ tools with power, flexibility, and

developmental efficiency. Many of the modern “visual programming tools such as

Microsoft Visual Basic and PowerBuilder, they make it Functional, make it Pretty,

and make it Fast- FPF principle” satisfy these requirements (Satzinger et al 2002).

Compromising the strengths and weakness of the methodologies, in addition to the

deployment of the effective techniques and approaches, the comprehensive design of

the research could be the alternative and could guide the research to achieve its aims.

The next chapter has detailed the process of the research design and development.

Page 128: THE INTEGRATION BETWEEN DESIGN AND MAINTENANCE …eprints.qut.edu.au/16058/1/Frank_Lin_Thesis.pdf · the integration between design and maintenance of office building automation:

CHAPTER 3 RESEARCH METHODOLOGIES AND RESEARCH PROCESSES DEVELOPMENT

110

3.3 Research Design and Development

3.3.1 Schedule Planning for the Research

There are three essential tasks in research design and development:

Firstly, on-going literature reviews in the office building automation context,

revelant information and research findings of the design and maintenance are

essential. The study encompasses the exploration of design and maintenance

integration, possible alternatives to improve their interaction, the examination of the

decision making process in design, and its implementation in the maintenance stage.

The strategies of the maintenance practice to facilitate design effectiveness and

improve the reliability of maintenance are also included.

Secondly, survey of the industry professionals and the practical operations, and case

study of office building project will be essential for data collection. Data analysis and

knowledge extraction provide for knowledge base formulation.

Thirdly, a pilot system and prototype model will be developed to demonstrate the

integration concept and the potential of a computerised support application. It will be

develped as a design and maintenance decision-making tool, which will allow the

users to update the information as they gain experiences and have access to more

literature.

Page 129: THE INTEGRATION BETWEEN DESIGN AND MAINTENANCE …eprints.qut.edu.au/16058/1/Frank_Lin_Thesis.pdf · the integration between design and maintenance of office building automation:

CHAPTER 3 RESEARCH METHODOLOGIES AND RESEARCH PROCESSES DEVELOPMENT

111

3.3.2 Overview of Each Research Stage

This research intends to demonstrate the potential of computer based system

development and provide a new concept and approach for the building industry and

academic studies as well. The research process can be broken down into six stages:

Stage1. Literature review

Literature review of the research has demonstrated what is needed in practice and the

status of industry. On-going literature study focusing on the evaluation and

exploration of existing research findings in office building automation practices, as

well as the problems and limitations are the central issues in this stage. The revelant

approaches to facilitate the integration between design and maintenance should be

broadly investigated.

Stage2. Survey and case study

Based on the findings of the literature review, the barriers and limitations in the

context of design and maintenance should be identified by the use a survey of

industry professionals and case studies. Understanding the current state of the office

building automation based on the literature reviews and professional surveys would

be the critical tasks for the development of this research. The survey sample size

should be over a hundred with an expectation of a minimum of 32 usable reponses

and an expected response rate of 30% for a mail questionnaire to provide sufficient

data. Some effective techniques can be employed for improving the rates of response

such as sending follow-up letters, providing the respondent with self-addressed

stamped return envelopes, and notification in advance about the forthcoming survey.

Two kinds of professionals were selected under certain benchmarks to be surveyed.

These benchmarks include the author’s experience of at least 15 years in the field of

specialization, substantial practical contributions to a related field, and

comprehensive understanding of the interdisciplinary relationships in the related

fields. The information and knowledge collections in the design and maintenance

areaswere considered while selecting potential experts.

In this stage a single case of an office building will be selected and studied to collect

Page 130: THE INTEGRATION BETWEEN DESIGN AND MAINTENANCE …eprints.qut.edu.au/16058/1/Frank_Lin_Thesis.pdf · the integration between design and maintenance of office building automation:

CHAPTER 3 RESEARCH METHODOLOGIES AND RESEARCH PROCESSES DEVELOPMENT

112

information for validating the BAS status and integration practice. The sample office

building to be selected should have been completed over ten years and built in the

Intelligent Building (IB) with BAS application to support the required information.

Stage3. Data collection, analysis, knowledge extraction and guideline

development

Using the collected information from the industry surveys and case study, the major

step will be the data analysis and knowledge extraction to complete an knowledge

datbase; then guidelines will be generated to support decision making. Knowledge

extraction through the inductive and deductive approach in the research context can

raise the awareness and understanding of the concept of integration and provide

operational strategies and guidance for the research focus.

Stage4. Prototype decision support system design and programming

This stage specifies the technical requirements for the design of a prototype decision

support system to facilitate the generation of practical decision support. Initially, a

pilot system has been explored and tested. Once the pilot system has been examined,

the redefined and improved procedures will become the basis for a prototype system

development.

Using a relational database and object-oriented programming tools, programming

work must be done at this stage to facilitate the system development. The

programming is necessary to provide three essential elements for the system as:

• The basic function of decision support will be established.

• The guidelines of decision support for the design and maintenance of building

automation system will be applied in the prototype system.

• The resource flexibility in accepting updated information would be a special

feature in the system, which will have the facility for users to add new

information from their experience and practical examples.

Stage5. System test and debugging

The prototype system of the project must be checked for operation of capability and

potential “bugs”. Final testing and modifications would be very essential work for

Page 131: THE INTEGRATION BETWEEN DESIGN AND MAINTENANCE …eprints.qut.edu.au/16058/1/Frank_Lin_Thesis.pdf · the integration between design and maintenance of office building automation:

CHAPTER 3 RESEARCH METHODOLOGIES AND RESEARCH PROCESSES DEVELOPMENT

113

this task. The analysis of the system will include the examination of overall

performance, the limitations and potentials for the further development. How to

validate the outcome of research is a critical issue of this project. Validation of the

prototype system operation will be advantageous for the system development that

could be a potential tool for the practice.

Stage6. Presentation of Results

This stage involves the compilation of the final report over-viewing the methodology

and findings of the various stages. The prototype decision support system and the

dissertation and its presentation will be done.

The overall research design and development process can be illustrated as in Figure

3-9.

Page 132: THE INTEGRATION BETWEEN DESIGN AND MAINTENANCE …eprints.qut.edu.au/16058/1/Frank_Lin_Thesis.pdf · the integration between design and maintenance of office building automation:

CHAPTER 3 RESEARCH METHODOLOGIES AND RESEARCH PROCESSES DEVELOPMENT

114

Figure 3-9: Research Design and Development

Page 133: THE INTEGRATION BETWEEN DESIGN AND MAINTENANCE …eprints.qut.edu.au/16058/1/Frank_Lin_Thesis.pdf · the integration between design and maintenance of office building automation:

CHAPTER 3 RESEARCH METHODOLOGIES AND RESEARCH PROCESSES DEVELOPMENT

115

3.3.3 Prototype System Design and Development

In this research, the developmental prototyping methodology will be adopted to

develop the prototype decision support system. In the research context, the

integration would facilitate the sharing of information between design and

maintenance utilising a computerised knowledge-based decision support system. A

conceptual model of knowledge integration is illustrated as in Figure 3-10.

Integration

Figure 3-10: Conceptual Model of Knowledge Integration

Decision Support SystemInterface

Knowledge- based Database

Design

Maintenance

Qualitative

Survey Data analysis and Evaluation

Case study

Design / Maintenance

Guidelines

Page 134: THE INTEGRATION BETWEEN DESIGN AND MAINTENANCE …eprints.qut.edu.au/16058/1/Frank_Lin_Thesis.pdf · the integration between design and maintenance of office building automation:

CHAPTER 3 RESEARCH METHODOLOGIES AND RESEARCH PROCESSES DEVELOPMENT

116

This model will help make decisions which ensure design effectiveness, and

eventually improve the reliability of maintenance for the building’s automation. The

intention of the project is to develop a new integrated approach providing the

knowledge support with guidelines for the design of building automation, and to

improve maintainability during the practical implementation processes, with an

eventual goal of building performance improvement.

Once the results of enquiries were input into the proposed system, it was

interactively analysed by means of the human-machine interface to generate

solutions associated with the design/maintenance aspect. Through the

interaction/dialog between users and the proposed system, solutions can be

generated. Data flows and managing procedures are outlined as in Figure 3-11:

A knowledge-based prototype system provides both functions of supporting and

updating. Therefore this research intends not only to provide computer-based

guidelines for design and maintenance practice, but also to provide knowledge

support together with updating from practical experience.

Design &

Maintenance Information

Decision making engine

Design and Maintenance strategies & guidelines:

- Performance - Energy consumption -Comfort

Interaction between design and maintenance Evaluation criteria Life cycle cost analysis Strategic solutions

In- built Original Database

Knowledge based support model

Survey results Know-how Findings

Strategic solutions

Updateable database

Users

Analysis/ Evaluation Guidelines Reference

Interaction/ Dialog

Interface

Figure 3-11: Data Flow and Design/ Maintenance Structure

Page 135: THE INTEGRATION BETWEEN DESIGN AND MAINTENANCE …eprints.qut.edu.au/16058/1/Frank_Lin_Thesis.pdf · the integration between design and maintenance of office building automation:

CHAPTER 3 RESEARCH METHODOLOGIES AND RESEARCH PROCESSES DEVELOPMENT

117

3.3.4 Hardware and Software Specification

During the process of designing the decision support system and its development, in

addition to the planning phase detailed in the previous sections, the design phase is

also the time to begin selecting and acquiring the hardware and software that will be

needed for future development. The hardware and software specification needed to

support the system development is detailed in Table 3-4:

Table 3-4: Hardware and Software Specification Specification Standard Client Standard Web

Server Standard Application Server

Standard Database Server

Operation System

Windows Internet Explorer

Windows Windows Windows

Special Software

Active X Components Microsoft .Net Framework

IIS Web Server Net Components

Microsoft Visual Basic, Visual Studio.Net, Access Net Components

SQL Server Net Components

Hardware 20-gig disk drive Pentium 3 above 17-inch Monitor

40-gig disk drive Pentium 4

40-gig disk drive Pentium 4

200-gig disk drive Quad Pentium

Network Always-on Broadband preferred Dial-up at 56kbps possible with some performance loss

Dual 100 Mbps Ethernet

Dual 100 Mbps Ethernet

Dual 100 Mbps Ethernet

3.3.5 Programming

Programming works for the implementation and development of the system used

Microsoft Based software such as Windows XP as the Windows operation system,

MS Access as the knowledge based database and MS Visual Basic, Visual

Studio.NET as the programming tool for creating the inference engines and

knowledge based decision support and visual interactive interface.

Page 136: THE INTEGRATION BETWEEN DESIGN AND MAINTENANCE …eprints.qut.edu.au/16058/1/Frank_Lin_Thesis.pdf · the integration between design and maintenance of office building automation:

CHAPTER 3 RESEARCH METHODOLOGIES AND RESEARCH PROCESSES DEVELOPMENT

118

3.3.6 Validation and Verification

Generally, once a system has been developed or knowledge has been extracted, they

will have to be evaluated (Hopkin 1993). There are several methods has been utlised

such as validation and verification (Usama et al 1996). Validation is a process of

testing whether the outcomes satisfy the expected requirements. Verification is a

process of confronting a hypothesis against evidence in order to decide its truth

value. Deutsh (1982) defined both validation and verification. “Validation” is “ An

activity that ensures that the software end product contains the features and

performance attributes prescribed by its requirements specification”. “Verification”

is “An activity that ensures that the results of successive steps in the software

development cycle correctly enhance the intentions of the previous step”. In practice,

this definition will probably have to be extended beyond theory or a hypotheses to

include conclusions, recommendations, practices, and procedures (Carroll &

Campbell 1989). According to turban et al (2001), verification is to ensure that the

sytem works or subsantiating that the system is functioning according to its

specifications; validation deals with the performance of the system (e.g. how it

compares with the expert knowledge), that is, substantiating that the sytem performs

with an acceptable level of accurancy. Simply stated, validation is building the right

system. Verification is building the system right. In software quality assurance,

validation is the assurance of customer acceptance; verification is the assurance of

technical correctness (smith et al 1993).

There are several sources of data that might support verification and validation

processes compiled by Hopkin (1993) such as: comparing domains (relate data

gathered in one domain to data gathered in another), interdisciplinary comparisions

(verify and validate findings by using data from another discipline as criteria), plans

and their realisation (compare plans and their realisation), prediction (depends on

explict and implict predictions), expert opinion (either the expert opinion is

compared with other data, or the opinions of several experts are compared to

ascertain the extent of agreement between them), user acceptance (measures of user

acceptability and attitudes), case histories (obtain case histories of actual incidents

and accounts of practical experience with the system), standards (standards,

guidelines, data in handbooks), human and machine comparions, errors and failures.

Page 137: THE INTEGRATION BETWEEN DESIGN AND MAINTENANCE …eprints.qut.edu.au/16058/1/Frank_Lin_Thesis.pdf · the integration between design and maintenance of office building automation:

CHAPTER 3 RESEARCH METHODOLOGIES AND RESEARCH PROCESSES DEVELOPMENT

119

Therefore, once the prototype system has been created, it was to be verified and

tested to determine its effectiveness and validate its performance before instigating

further development of the overall integration decision support system. The range of

verification and testing will include the logic managing sequence and debugging of

the computer program. The validation will compare the outcomes with the case study

and professional knowledge to confirm its accuracy.

Page 138: THE INTEGRATION BETWEEN DESIGN AND MAINTENANCE …eprints.qut.edu.au/16058/1/Frank_Lin_Thesis.pdf · the integration between design and maintenance of office building automation:

CHAPTER 3 RESEARCH METHODOLOGIES AND RESEARCH PROCESSES DEVELOPMENT

120

3.4 Summary

In this chapter, the research development processes have been outlined and discussed

to justify its feasibility for the research objectives. With the assistance of appropriate

research methodology, research objectives can be met by means of phased methods

to collate data, analyse, extract, induce/ deduce knowledge, generate guidelines and

develop a computer-based prototype decision system. The whole structure of

research design and development is illustrated in Figure 3-12:

Prototype System

Research Design and Planning

Literature Reviews

Methodology Design

IndustrySurvey

CaseStudy

Prototype Decision Support SystemDesign and Development

BuildingSelection

SystemDesign & PlanningSurvey Design

ParticipantsSelection

DataCollection

Pilot Design

SurveyAdministration

DataCompilation

KnowledgeDatabaseMailing

Questionnaires

DataAnalysis

Inference Engine

Lessons

Findings

Example Demonstration

Prototype Design

Validation

Application

Knowledge ExtractionKnowledge Extraction

KnowledgeDatabases:GuidelinesChecklists

Dissemination of Research Findings:Articles and Thesis

Dissemination of Research Findings:Articles and Thesis

Further Research

Reponses

Analyse and Induced Results

Deduction

Further System Development

Reasoning

FunctionModel

Data Collection

Establish Aims and Objectives

Identify the Problems

Preliminary Literature Search and Problems Exploration

Researcher'sprofessionalexperience

andbackground

Interface

Figure 3-12: Overview of the Research Design and Development

Page 139: THE INTEGRATION BETWEEN DESIGN AND MAINTENANCE …eprints.qut.edu.au/16058/1/Frank_Lin_Thesis.pdf · the integration between design and maintenance of office building automation:

CHAPTER 4 SURVEY, DATA ANALYSIS AND CASE STUDY

121

4.1 Introduction 4.2 The Questionnaire Survey 4.2.1 Total Survey Response 4.2.2 Composition of Respondents 4.2.3 BAS Design Questionnaire Response Analysis 4.2.3.1 The Needs 4.2.3.2 Products 4.2.3.3 Design Issues 4.2.3.4 Assessment 4.2.4 BAS Maintenance Questionnaire Response Analysis 4.2.4.1 Overall Status 4.2.4.2 Management 4.2.4.3 Technical Issues 4.2.4.4 Assessment 4.2.5 Summary of the Survey Results and Suggestions 4.3 Survey Results in relation to Literature Study 4.4 The Case study 4.4.1 Outline of the Case Study 4.4.2 Building Automation System in the "Asia Business Centre" Office Building 4.4.3 Progress of the Design-built, Operation and Maintenance 4.4.4 Example of Process Integration 4.4.5 Demonstrated case study in relation to Design and Maintenance 4.4.6 Lessons from the Case Study 4.4.7 Findings from the Case Study 4.5 Comparison of the Literatures, Surveys and Case Study 4.6 Summary 4.6.1 Implication from the Literature, survey and Case Study 4.6.2 Recommendations, for the Better Design and Maintenance

CHAPTER 4 SURVEY, DATA ANALYSIS AND CASE STUDY

The Integration between Design and Maintenance of Office Building Autom

ation: A Decision Support Approach

Page 140: THE INTEGRATION BETWEEN DESIGN AND MAINTENANCE …eprints.qut.edu.au/16058/1/Frank_Lin_Thesis.pdf · the integration between design and maintenance of office building automation:

CHAPTER 4 SURVEY, DATA ANALYSIS AND CASE STUDY

122

4.1 Introduction

Chapter 2 discussed some of the facts and factors impacting current office buildings

and predicted potential trends for future practice. In order to verify these findings to

produce first hand data as the basis of the knowledge bank, this research has adopted

questionnaire surveys and case study to identify key design and maintenance (D&M)

characteristics of Office Building Automation Systems (BAS).

The questionnaire survey questions encompass two main aspects: BAS design for the

designers/ design consultants, and BAS maintenance for the building developers/

owners and facilities managers. Survey questions in the design category consist of

four main parts: “The Need”, “The Products”, “Design issues”, and “Assessment”.

For maintenance, they include four main subjects of “Overall status”,

“Management”, “Technical issues”, and “Assessment” which are outlined as in

Figure 4-0.

The raw data for the survey has been collated and analysed and key findings

summarized in the following sections. In addition, the case study has been carried out

using an office building which has been operating for more than ten years. Its

integration examples and discovered limitations during the process have

demonstrated a typical situation during the boom of high rise office building

construction in Asia in the nineties. This will provide valuable lessons for the

assessment of the current status of office building.

Assessment

Overall Status

Technical Issues

Management MAINTENANCE

Figure 4-0: Outline of the Questionnaire Survey

Products

Assessment

DESIGN

The Needs

Design Issues

Page 141: THE INTEGRATION BETWEEN DESIGN AND MAINTENANCE …eprints.qut.edu.au/16058/1/Frank_Lin_Thesis.pdf · the integration between design and maintenance of office building automation:

CHAPTER 4 SURVEY, DATA ANALYSIS AND CASE STUDY

123

4.2 The Questionnaire Survey

This section reports on the data collected from respondents who completed and

returned the questionnaires through the mailed survey. Data obtained were then

edited and coded accordingly to ensure that it was valid, applicable and easily scored.

Not Applicable (N/A) responses or missing values were excluded from the analysis.

Only data relevant to the research objectives were tabulated and analysed using SPSS

(Version 11.5 and 12.1) and Microsoft word, Excel (2003).

4.2.1 Total Survey Response

This part of analysed results provides a general view of the survey. It includes total

survey response rates and the composition of participants.

Table 4-1: Survey Response Rate

Type Sent Out Return useable Return Unclaimed Not Return

Designers/ design consultants 55 26 (47.3%) 3 (3%) 26 (47%)

Builders/ Developer/ Facilities managers 50 16 (32%) 2 (2%) 32 (64%)

Total (%) 105 42 (40%) 5 (5%) 58 (55%)

Return useableReturn UnclaimedNot Return

Figure 4-1: Survey Response Rate

As shown in Table 4-1 and Figure 4-1, 105 questionnaires were sent out through the

mail to a relatively equal spread over two different categories of respondent, namely

Designers/ design consultants and Builders/Developer/ Facilities managers. Over a

period of three months, a total of 47 questionnaires were returned, representing a

45% response rate; 5 questionnaires were marked “unclaimed”, representing 5%; the

40%

Page 142: THE INTEGRATION BETWEEN DESIGN AND MAINTENANCE …eprints.qut.edu.au/16058/1/Frank_Lin_Thesis.pdf · the integration between design and maintenance of office building automation:

CHAPTER 4 SURVEY, DATA ANALYSIS AND CASE STUDY

124

useable rate was 40%; meanwhile 58 questionnaires were not returned (55%). The

questionnaire response rate and usable response rate can be calculated as the follows:

4.2.2 Composition of Respondents

Designers and design consultants had the highest response rate with a total of 47.3%

(or 26 responses) out of 55. This is followed by responses from Builders/Developer/

Facilities managers with 32% (or 16 responses) out of 50 as in Table 4-1.

Unfortunately, non-respondents’ views were unable to be examined. This might infer

that they were less interested in the topic, or felt that they could not respond

meaningfully nor had association with the BAS. In addition, these non-respondents,

unclaimed and not applicable responses, and missing values were removed, using

SPSS and MS Excel, the cleaned-up data has been analysed in accordance with the

categorised design and maintenance professionals respectively as in the following

sections.

1) Total Responsive Rate

= Total Questionnaires Return X 100% Total Questionnaires Sent Out

= 47 X 100% 105

= 45 %

2) Total Usable Questionnaires

= Total of questionnaires return- Return unclaimed = 47- 5 = 42

3) Total Usable Response Rate

= Total Usable Questionnaires X 100% Total Questionnaires Sent Out

= 42 X 100% 105

= 40 %

Page 143: THE INTEGRATION BETWEEN DESIGN AND MAINTENANCE …eprints.qut.edu.au/16058/1/Frank_Lin_Thesis.pdf · the integration between design and maintenance of office building automation:

CHAPTER 4 SURVEY, DATA ANALYSIS AND CASE STUDY

125

4.2.3 BAS Design Questionnaire Response Analysis

In the aspect of BAS design, the questionnaire primarily focused on the four specific

subjects as “The Need”, “Products”, “Design issues”, and “Assessment” detailed in

Appendix A to verify and extract the design views, practical experience and

knowledge from the designers and design consultants. The results of the design

professional survey can be analysed with the code system as in Figure 4-2:

The Needs

Importance of BAS to people (DA01)

Role/ awareness of BAS (DA02)

Main considerations in design stage (DA03)

Major factors of consideration (DA04)

Realisation requirement/ specification (DA05)

Regulation and specification (DA06)

Products

Availability of BAS (DB01)

Access of information (DB02)

Importance to meet requirement (DB03)

Deliver information (DB04)

Responses/ feedback (DB05)

Design Issues

Importance of systems (DC01)

System’s problem (DC02)

Need for CAD/ decision support (DC03)

Integration suitability (DC04)

Importance of integration (DC05)

sensor type control application (DC06)

Cost and performance (DC07)

Assessment

Assessment (DD01)

Reasons of poor performance (DD02)

Information support (DD03)

Affection to energy consumption (DD04)

Communication with facility managers (DD05)

Figure 4-2: Outline of the Design Questionnaire Survey

Page 144: THE INTEGRATION BETWEEN DESIGN AND MAINTENANCE …eprints.qut.edu.au/16058/1/Frank_Lin_Thesis.pdf · the integration between design and maintenance of office building automation:

CHAPTER 4 SURVEY, DATA ANALYSIS AND CASE STUDY

126

4.2.3.1 The Needs

From results of this survey, the ranking of the importance of office building

automation systems (BAS) in relation to the clients, building owners and developers

is different. It revealed that the clients and owners of buildings are more interested in

BAS than building developers. Generally, the developers were more focused on first

costs and sale profits, rather than on the BAS life cycle benefits for the building

operation and maintenance as in Table 4-2 (Appendix D: Code DA01).

Table 4-2: Importance of BAS Preference

0

2

4

6

8

10

12

14

16

18

Low BelowAverage

Average AboveAverage

High

ClientsBuilding OwnersBuilding Developers

Importance Low Below

Average Average Above Average High

Clients 1 1 2 16 6 Building Owners 1 1 6 10 8 Building Developers 4 10 6 4 2

The designers can mostly relate to the benefits of BAS in office building and are

aware of the BAS responsibilities for building maintenance during the design stage

as in Figure 4-3 (Appendix D: Code DA02). The awareness and understanding of

benefits and tasks of BAS will create a good design as well as easy maintenance.

Benefits of BAS on the building operation and maintenance

HighAbove AverageAverageBelow AverageLow

Freq

uenc

y

14

12

10

8

6

4

2

0

4

12

8

11

Responsibility for building maintenance during BAS design stage

HighAbove AverageAverageBelow AverageLow

Freq

uenc

y

14

12

10

8

6

4

2

0

2

10

12

11

Figure 4-3: Benefits and Responsibility of BAS

Page 145: THE INTEGRATION BETWEEN DESIGN AND MAINTENANCE …eprints.qut.edu.au/16058/1/Frank_Lin_Thesis.pdf · the integration between design and maintenance of office building automation:

CHAPTER 4 SURVEY, DATA ANALYSIS AND CASE STUDY

127

They believe that the BAS is relevant to the performance and cost of the building,

especially in relation to the building life-cycle cost. Their major considerations with

BAS during the design stage include four aspects: easy operation/ maintenance,

meeting regulation, performance of systems and meeting client requirements.

Conversely, designers were not very interested in the reliability and price or cost of

the system during the design stage is shown in Table 4-3 (Appendix D: Code DA03).

These considerations will affect the BAS design quality.

Table 4-3: Major Consideration of BAS Preference

Main considerations Frequency % 1 Easy operation and maintenance 18 27.3 2 Meet regulation 14 21.2 3 Meet client requirement 14 21.2 4 Performance of systems 12 18.2 5 Price/ cost 6 9.1 6 Reliability 2 3.0

Total 66 100.0

Designers consider BAS highly relevant to the performance of building, especially in

association with the life-cycle cost as in Table 4-4 (Appendix D: Code DA04). It

implies that BAS design, taking into consideration of the life-cycle cost as well as the

performance of building, will contribute to maintenance costs reduction.

Table 4-4: BAS in relation to Building Performance and the Life Cycle Cost

BAS Low Below Average Average Above

Average High

Building performance 1 1 12 8 4

Building life cycle cost 1 1 6 16 2

In practice, the designers obtained the requirements and specifications of the BAS

product mainly from the product manufacturer. Alternatively, they accessed from the

feedback of previous users, client discussions, consultants’ or sub-contractor’s

recommendations and statistical information as in Table 4-5 and Figure 4-4

(Appendix D: Code DA05). The BAS specifications should not only rely on the

provision of information from the product manufacturers, but also needs refer to

other sources to learn and compare the real status of the application to allow for

adequate decision making.

Page 146: THE INTEGRATION BETWEEN DESIGN AND MAINTENANCE …eprints.qut.edu.au/16058/1/Frank_Lin_Thesis.pdf · the integration between design and maintenance of office building automation:

CHAPTER 4 SURVEY, DATA ANALYSIS AND CASE STUDY

128

Figure 4-5: Affects of the Regulations and Specifications

Table 4-5: Sources of BAS Requirements and Specifications

Sources Frequency

From Product Manufacturer 12

Feedback from previous use 6

Client Discussion 4

Consultant, subcontractor Recommendation 4

From Statistical Information 2

From Product Manufacturer

Feedback from previous use

Client Discussion

Consultant, subcontractorRecommendationFrom Statistical Information

Figure 4-4: Sources of BAS Requirements and Specifications

The current building regulations and BAS product specifications have had the greaest

impact on the BAS design as shown in Figure 4-5 (Appendix D: Code DA06). It

implies that updated building regulation and product specification would be needed

to assure the quality of design. The sources of the regulation and specification should

be abundant and updated.

Current building regulation sufficient for BAS design

HighAbove AverageAverageBelow AverageLow

Freq

uenc

y

12

10

8

6

4

2

01

9

10

2

4

Product specification appropriate for design requirement

HighAbove AverageAverageBelow AverageLow

Freq

uenc

y

12

10

8

6

4

2

0

4

6

10

2

4

Page 147: THE INTEGRATION BETWEEN DESIGN AND MAINTENANCE …eprints.qut.edu.au/16058/1/Frank_Lin_Thesis.pdf · the integration between design and maintenance of office building automation:

CHAPTER 4 SURVEY, DATA ANALYSIS AND CASE STUDY

129

Figure 4-6: Availabilities of the Products, Information and Records

4.2.3.2 Products

BAS products selection relies on having sufficient information. In practice, the

information of BAS products and relevant performance information is readily

available and will be provided by the vendors during the design stage. The designers

can easily access new or current information in relation to the product pros/cons and

applications, however the historical records in practical usages are likely to be

insufficient for the designers as shown in Figure 4-6 (Appendix D: Code DB01,

DB02). It shows that historical records are not easily kept and updated, and that there

is a need for an effective method to collation and storage.

BAS products readily available from vendors

HighAbove AverageAverageBelow AverageLow

Freq

uenc

y

12

10

8

6

4

2

0

2

8

10

4

2

BAS products equipped with adequate performance instructions

HighAbove AverageAverageBelow AverageLow

Freq

uenc

y

20

10

0 12

16

43

New or to-date information of product

HighAbove AverageAverageBelow AverageLow

Freq

uenc

y

20

10

02

16

6

11

Sufficient information relating product pro/cons, and application

HighAbove AverageAverageBelow AverageLow

Freq

uenc

y

12

10

8

6

4

2

01

11

8

4

2

Sufficient data on historical records in practical usages

HighAbove AverageAverageBelow AverageLow

Freq

uenc

y

14

12

10

8

6

4

2

0 1

3

12

4

6

Page 148: THE INTEGRATION BETWEEN DESIGN AND MAINTENANCE …eprints.qut.edu.au/16058/1/Frank_Lin_Thesis.pdf · the integration between design and maintenance of office building automation:

CHAPTER 4 SURVEY, DATA ANALYSIS AND CASE STUDY

130

The BAS design is critically be affected by several factors including the feedback

from previous users, availability of up-to-date information, communication with

building owners and the facility managers as shown in Figure 4-7 (Appendix D:

Code DB03). From the designer’s responses, it reflects that the BAS design requires

effective information including relevant information and feedback, and

communication with the practical maintenance personnel to collect information.

Feedback from previous use for BAS design

MostMoreFairlyLessLeast

Freq

uenc

y

12

10

8

6

4

2

0

4

1010

11

Availability of to-date information for BAS design

MostMoreFairlyLessLeast

Freq

uenc

y

12

10

8

6

4

2

0

6

10

44

2

Communication with facility managers

MostMoreFairlyLessLeast

Freq

uenc

y

12

10

8

6

4

2

0

4

10

6

4

2

Communication with building owners

MostMoreFairlyLessLeast

Freq

uenc

y

12

10

8

6

4

2

0

2

1010

3

1

According to the responses, it is not compulsorily to request the designers to deliver

information or manuals of BAS operation and service to the facility managers or

management agency of the building as shown in Figure 4-8 (Appendix D: Code

DB04). The provision of the information and service support impacts on the practical

maintenance after building delivery, hence it is necessary to build a systematic

system or approach to provide support and service.

Figure 4-7: Factors Affecting Design

Page 149: THE INTEGRATION BETWEEN DESIGN AND MAINTENANCE …eprints.qut.edu.au/16058/1/Frank_Lin_Thesis.pdf · the integration between design and maintenance of office building automation:

CHAPTER 4 SURVEY, DATA ANALYSIS AND CASE STUDY

131

Deliver information or manuals of BAS to maintenance

NoYes

Freq

uenc

y

14

12

10

8

6

4

2

0

1313

Moreover, the feedback from the facilities managers in relation to the current status

does not become a necessary procedure in the operation and maintenance process as

shown in Figure 4-9 (Appendix D: Code DB05), so historical records can not be

effectively utilised. Meanwhile, the timely support and service may also not be

available and is reflected in the new design and application. Therefore, both sides-

design and maintenance would need a strategy to bridge and compensate this

shortcoming.

Response from maintenance

NoYes

Freq

uenc

y

16

14

12

10

8

6

4

2

0

11

15

4.2.3.3 Design Issues

The building systems such as HVAC, electrical power/ lighting system Fire/ security

systems and lifts/escalator are both independent and interrelated. These are more

complicated and important than the parking equipment/ parking systems and water

Figure 4-9: Feedback from the Facilities Manager

Figure 4-8: Designer providing Information to the Facilities Manager

Page 150: THE INTEGRATION BETWEEN DESIGN AND MAINTENANCE …eprints.qut.edu.au/16058/1/Frank_Lin_Thesis.pdf · the integration between design and maintenance of office building automation:

CHAPTER 4 SURVEY, DATA ANALYSIS AND CASE STUDY

132

supply/ drainage system in the office building as shown in Table 4-6 (Appendix D:

Code DC01). All of the systems need to be adequately designed and maintained to

ensure overall building performance and a comfortable environment to meet the

occupants’ expectations during the life of the building.

Table 4-6: Importance of the Building Systems (Designer views)

Importance Low Below Average Average Above

Average High

HVAC/energy management 1 3 2 6 14

Electrical power/ Lighting system 1 1 4 2 18

Fire/ Security systems 2 4 4 4 12

Lifts/Escalator 1 1 6 8 10 Parking equipment /Parking system 2 6 8 6 4

Water supply/Drainage 2 2 12 2 8

The application of the parking equipment /parking systems, water supply/drainage

systems are normally more troublesome than the other building systems. However

HVAC system presents the more critical problems during the service than the others

as shown in Table 4-7 (Appendix D: Code DC02). Problems such as shutdown and

malfunction will result in the discomfortable of occupants and complaints. Therefore,

in addition to adequate design, maintenance should be scheduled in conjuction with

the execution of the appropriate maintenance strategies.

Table 4-7: Troubles in the Building Systems

Troublesome Critical Trouble

More Trouble Troublesome Few Trouble Trouble

Free HVAC/energy management 4 2 10 6 4

Electrical power/ Lighting system 1 1 12 8 4

Fire/ Security systems 1 1 14 8 2

Lifts/Escalator 1 3 12 8 2 Parking equipment /Parking system 1 3 18 2 2

Water supply/Drainage 1 5 16 2 2

Page 151: THE INTEGRATION BETWEEN DESIGN AND MAINTENANCE …eprints.qut.edu.au/16058/1/Frank_Lin_Thesis.pdf · the integration between design and maintenance of office building automation:

CHAPTER 4 SURVEY, DATA ANALYSIS AND CASE STUDY

133

The requirement of decision support tools for BAS design has gained a high ranking

in the level of necessity as well as in the computer aided design (CAD) utilisation in

practice as shown in Figure 4-10 (Appendix D: Code DC03). Hence, the

development of decision support tools to compare with what CAD has done to ease

design decision making.

Requirement of CAD

HighAbove AverageAverageBelow AverageLow

Freq

uenc

y

14

12

10

8

6

4

2

0

Requirement of Decision support system

HighAbove AverageAverageBelow AverageLow

Freq

uenc

y

14

12

10

8

6

4

2

0

The integration between different building systems has several benefits such as

increasing their effectiveness, decreasing energy consumption, increasing comfort,

etc. In the survey, the HVAC, electrical power/ lighting systems, security system,

and lifts/escalator have been shown as being more suitable than fire and parking

systems for the integration in BAS as shown in Figure 4-11 (Appendix D: Code

DC04). It implies that system integration, if adequate and effective, will facilitate

energy conservation, security and safety, and comfort. It also relates to the need for

adequate coverage of these aspects in design and maintenance practice.

Figure 4-10: Necessity of the Decision Support System and CAD

Page 152: THE INTEGRATION BETWEEN DESIGN AND MAINTENANCE …eprints.qut.edu.au/16058/1/Frank_Lin_Thesis.pdf · the integration between design and maintenance of office building automation:

CHAPTER 4 SURVEY, DATA ANALYSIS AND CASE STUDY

134

HVACSecurity

Lifts/Escalator

FireParking system

Electrical power/Lighting system

Shading system

Natural lighting system

Ventilation system

System Integration

0

5

10

15

20

25

Freq

uenc

y

In spite of the variation of the integration requirements, generally, there are several

general functionalities such as performance, effectiveness, efficiency, energy

conservation, and comfort/ health. In this survey, these are as important as the free

maintenance or easy management during the integration process in office buildings

as shown in Table 4-8 (Appendix D: Code DC05).

Table 4-8: Functionalities of the Integration Functionalities of

Integration Low Below Average Average Above

Average High

Performance/ Effectiveness/ Efficiency 1 1 6 6 12

Energy conservation 1 1 2 10 12 Comfort/ Healthy 1 3 4 10 8 Free maintenance/ Easy management 4 2 2 12 6

Among the various types of sensors, the major control applications are temperature,

smoke/ air and light sensor, the second preference is for humidity sensors, and

pressure sensors, as shown in Figure 4-12 (Appendix D: Code DC06). It becomes

obvious that the major controls are the HVAC, fire safety and lighting systems for

energy conservation, safety and comfort.

Figure 4-11: Suitability of the System Integration

Page 153: THE INTEGRATION BETWEEN DESIGN AND MAINTENANCE …eprints.qut.edu.au/16058/1/Frank_Lin_Thesis.pdf · the integration between design and maintenance of office building automation:

CHAPTER 4 SURVEY, DATA ANALYSIS AND CASE STUDY

135

The designers and building developers have different concerns about cost and

performance. There is little consistency aspects of cost, or technical support in

relation to performance as shown in Table 4-9 (Appendix D: Code DC07).

Generally, the designers are more focussed on performance and the developers are

focussed on the costs.

Table 4-9: Concerns of the Cost and Performance

Cost and Performance Low Below Average Average Above

Average High

Consistency between designers/ developers 2 8 8 4 4

Technical support 2 4 14 5 1

4.2.3.4 Assessment

Evaluating the BAS design practice, it was found that the requirements of clients are

mostly met either in the performance/ efficiency after delivery or in the instruction

manuals during the delivery stage, as well as the balance of BAS cost between design

requirements and client’s budget. However, concerning the availability of evaluation

tools, designers are dissatisfied with the current status for assessing the BAS as

Temperature Light Humidity Smoke Air Pressure

SensorType

0

5

10

15

20

25

30

Freq

uenc

y

Figure 4-12: Sensor Applications

Page 154: THE INTEGRATION BETWEEN DESIGN AND MAINTENANCE …eprints.qut.edu.au/16058/1/Frank_Lin_Thesis.pdf · the integration between design and maintenance of office building automation:

CHAPTER 4 SURVEY, DATA ANALYSIS AND CASE STUDY

136

shown in Table 4-10 (Appendix D: Code DD01). Thus the applicability of BAS

might not effectively reflect the real situation.

Table 4-10: Assessment of the BAS Design

Assessment Low Below Average Average Above

Average High

BAS meeting requirement 1 1 10 4 10

Performance/ efficiency 1 1 10 10 4

Instruction/ manual 1 1 10 10 4 Balance of BAS cost between design requirements and client’s budget

1 1 12 4 8

Evaluation tools for BAS 1 3 12 8 2

The major reasons causing poor BAS performance, include: lack of instruction,

inappropriate operation, improper maintenance, and a design deficiency/ shortage.

Nonetheless, owing to insufficient historical data, it is physically difficult to assess

the situation in relation to unsuitable materials, elements and systems application as

shown in Table 4-11: (Appendix D: Code DD02). It implies that historical records

are needed for effective assessement and management during the building process. In

addition, to sustain high performance in building systems, design is as important as

maintenance.

Table 4-11: Reasons of the Poor BAS Performance (Design Views) Reasons of poor

performance Low Below Average Average Above

Average High

Lack of instruction 1 1 8 6 10

Inappropriate operation 2 3 9 8 4

Improper maintenance 1 1 10 10 4 Design deficiency/ shortage 2 6 6 8 4

Unsuitable material/elements/systems 2 4 16 2 2

The provision of up-to-date instructions on the use of BAS from the vendors or

manufactures is not very satisfactory to the designers. They passively provide

Page 155: THE INTEGRATION BETWEEN DESIGN AND MAINTENANCE …eprints.qut.edu.au/16058/1/Frank_Lin_Thesis.pdf · the integration between design and maintenance of office building automation:

CHAPTER 4 SURVEY, DATA ANALYSIS AND CASE STUDY

137

maintenance suggestions or guidelines to the facility managers of buildings or

provide a consulting service. It reflects that the longitudinal integration between such

diverse professionals as designers, products providers and facility managers in

building industry is not sufficient to provide support and communication during the

operation and maintenance processes as shown in Figure 4-13 (Appendix D: Code

DD03). So the process integration across the different phases such as design and

maintenance has the potential to facilitate the communication and support which will

improve BAS applications.

obtian the to-date instruction of BAS from the vendors or manufactu

NoYes

Freq

uenc

y

16

14

12

10

8

6

4

2

0

12

14

Provide the maintenance suggestion or guidelines to facility manager

NoYes

Freq

uenc

y

16

14

12

10

8

6

4

2

0

14

12

Adequate operation and maintenance are commonly recognised along with

environmentally friendly design as being able to improve energy conservation. In

addition to factors such as the selection of the applicable BAS, suitable BAS

integration is also crucially in minimising energy consumption as shown in Table

4-12 (Appendix D: Code DD04). Energy conservation is an overall result of the

energy saving attempts, and relies on the process integration such as design with

maintenance, and system integration such as BAS with building systems to enhance

the integral efficiencies.

Table 4-12: Factors Affecting to Energy Conservation

Affection to energy conservation Least Less Fair More Most

Energy conservation design 1 1 2 8 14

Selection of applicable BAS 1 1 12 6 6

BAS integration 1 3 12 2 8

Adequate operation and maintenance 1 1 12 2 10

Figure 4-13: Communication between Different Parties

Page 156: THE INTEGRATION BETWEEN DESIGN AND MAINTENANCE …eprints.qut.edu.au/16058/1/Frank_Lin_Thesis.pdf · the integration between design and maintenance of office building automation:

CHAPTER 4 SURVEY, DATA ANALYSIS AND CASE STUDY

138

The communication between different parties in the building process affects the

effectiveness of the building service. In practice, from the survey, it was found that

the designers normally meet with the building facility managers during the design

and delivery stages, or as problems occur, but rarely provides life-cycle service after

building delivery as per Figure 4-14 and Table 4-13 (Appendix D: Code DD05).

Table 4-13: Communication between Designer and Facilities Manager

Design stage 18 (33%)

Delivery stage 12 (22%)

After delivery 6 (11%)

Problems happening 16 (30%)

Never 2 (4%)

In this case, the lack of support after building delivery would logically result in

asking for support as problem occurs. It also revealed that the demand for an

enhancement in communication, not only during the design stage, but also after

delivery throughout the whole building process. Primarily, the support and feedback

is needed during the operation and maintenance stages to prevent and reduce the

failure and damage of systems, and breakdown losses.

Consequently, with respect to the integration of design and maintenance, the

enhancement of communication is a critical step. Sufficient communication can help

02468

101214161820

Design stage

Delivery stage

After delivery

ProblemshappeningNever

Figure 4-14: Communication between Designer and Facilities Manager

Page 157: THE INTEGRATION BETWEEN DESIGN AND MAINTENANCE …eprints.qut.edu.au/16058/1/Frank_Lin_Thesis.pdf · the integration between design and maintenance of office building automation:

CHAPTER 4 SURVEY, DATA ANALYSIS AND CASE STUDY

139

overcome some of inherent challenges such as fragmented entities, and the life- time

duration of the building process. It also can build a bridge between the two,

effectively connecting them into one composite team.

4.2.4 BAS Maintenance Questionnaire Response Analysis

The BAS maintenance survey mainly includes four aspects as the “Overall status”,

“Management”, “Technical issues”, “Assessment” detailed as Appendix B for the

office building maintenance professionals. The results of the maintenance

professional survey can be analysed as shown in Figure 4-15:

Overall Status

BAS function (MA01)

Problems/ Troubles (MA02)

Reasons 0f poor BAS performance (MA03)

Regulations and Specifications (MA04)

Standard Operation Procedures (Sops) provided (MA05)

Expectations of clients (MA06)

Management

Responsibility (MB01)

Evaluation (MB02)

Importance (MB03)

Systems Integration (MB04)Problem Solving (MB05)

Situation (MB06)

Importance (MC01)

Responses (MC02)

Security (MC03)

Access Control System (MC04)

Sensor type control (MC05)

Technical Issues

Assessment

Information (MD01)

Minimize energy consumption (MD02)

Evaluation (MD03)

Who assessment/ evaluation (MD04)

Importance of BAS (MD05)

Importance (MD06)

When communication (MD07)

Figure 4-15: Outline of the Maintenance Questionnaire Survey

Page 158: THE INTEGRATION BETWEEN DESIGN AND MAINTENANCE …eprints.qut.edu.au/16058/1/Frank_Lin_Thesis.pdf · the integration between design and maintenance of office building automation:

CHAPTER 4 SURVEY, DATA ANALYSIS AND CASE STUDY

140

4.2.4.1 Overall Status

Building maintainers generally are satisfied with ‘smart/ intelligent’ features of the

Building Automation System (BAS) and a comfortable/ healthy work environment,

as well as with the BAS maintenance; but are unlikely to be satisfied with the energy

conservation required to comply with the occupant’s expectations as per Figure 4-16

and Table 4-14 (Appendix E: Code MA01). It implies that BAS functions can

improve the comfort and ease of undertaking the maintenance tasks. However,

energy conservation is still a challenge.

0

1

2

3

4

5

6

Dissatisfied Satisfied VerySatisfied

'Smart/ intelligent' featuresComfortable/ healthyBAS maintenanceEnergy consumption

Table 4-14: BAS Features and Functions

BAS Function Dissatisfied Somewhat Satisfied Satisfied Fairly

Satisfied Very

Satisfied 'Smart/ intelligent' features 1 2 5 2 6

Comfortable/ healthy 1 1 4 6 4

BAS maintenance 1 5 2 2 6

Energy consumption 1 6 2 6 1

Figure 4-16: BAS Features and Functions

Page 159: THE INTEGRATION BETWEEN DESIGN AND MAINTENANCE …eprints.qut.edu.au/16058/1/Frank_Lin_Thesis.pdf · the integration between design and maintenance of office building automation:

CHAPTER 4 SURVEY, DATA ANALYSIS AND CASE STUDY

141

The problems of building systems can be categorised into three classes as electrical,

mechanical and control/ monitoring problems including individual electrical systems

out of order/ malfunctioning, individual mechanical systems out of order/

malfunctioning, and automatic operation/ monitoring systems downtime. The result

of surveys associated with the less dissatisfaction with the BAS maintenance as

shown in Figure 4-14 might reflect having good maintenance and could also reflect

the lack of historical data to reveal the real maintenance situation such as the

problems record as shown in Table 4-15 (Appendix E: Code MA01, MA02) which

mostly holded less problem records .

Table 4-15: Problems of the Building Systems Problems/Troubles Least Less Fairly More Most

Electrical systems 2 10 2 1 1

Mechanical systems 4 6 4 1 1 Automatic operation/ monitoring systems 4 8 2 1 1

In practice, it has generally been recognised that the reasons for poor BAS

performance mainly include inappropriate operation, improper maintenance, lack of

instruction, design deficiency/ shortage and unsuitable systems, but the last reason

would have less affect than the previous four reasons as shown in Table 4-16

(Appendix E: Code MA03). This result is similar with the results from the design

view as shown in Table 4-11 (Appendix D: Code DD02). Operation and maintenance

(O/M) requires on-going support and service during the building life. In addition to

design deficiencies, inappropriate O/M as well as the lack of support primarily

affects the BAS performance.

Table 4-16: Reasons of the Poor BAS Performance (Maintenance Views) Reasons of poor

performance Low Below Average Average Above

Average High

Lack of instruction 1 1 2 10 2

Inappropriate operation 1 2 2 10 1

Improper maintenance 1 1 2 11 1

Design deficiency/ shortage 1 5 2 4 4 Unsuitable material/elements/systems 2 6 4 2 2

Page 160: THE INTEGRATION BETWEEN DESIGN AND MAINTENANCE …eprints.qut.edu.au/16058/1/Frank_Lin_Thesis.pdf · the integration between design and maintenance of office building automation:

CHAPTER 4 SURVEY, DATA ANALYSIS AND CASE STUDY

142

Basically, the building regulations/codes and product specification directly influence

the BAS operation and maintenance tasks. In the survey, it is confirmed that these

instructions are effective for the O/M process as per Figure 4-17 and Table 4-17

(Appendix E: Code MA04). However, to meet with the increasing expectations of

occupants, the O/M of BAS needs more information on current product application,

pros/ cons, and historical data to work effectively.

0

2

4

6

8

10

12

14

16

Ineffective SomewhatEffective

Average Effective VeryEffective

Product specificationBuilding regulation/ codes

Affection Ineffective Somewhat Effective Average Effective Very

Effective Building regulation/ codes 2 1 7 5 1

Product specification 1 1 8 5 1

Additionally, Standard Operation Procedures (SOPs) of O/M are essential. With

these, the regular O/M tasks can be executed consistently and effectively. SOPs can

be generated as the need arises in accordance with the requirements. In practice,

SOPs are mainly designed/ provided by design consultants and maintenance

consultants. On the other hand, some of SOPs are prepared by facility managers and

design-construction mechanical contractors as shown in Figure 4-18 (Appendix E:

Code MA05).

Figure 4-17: Effects of the Building Regulation and Product Specification

Table 4-17: Affects of the Building Regulation and Product Specification

Page 161: THE INTEGRATION BETWEEN DESIGN AND MAINTENANCE …eprints.qut.edu.au/16058/1/Frank_Lin_Thesis.pdf · the integration between design and maintenance of office building automation:

CHAPTER 4 SURVEY, DATA ANALYSIS AND CASE STUDY

143

Design consultants

40%

Maintenance consultants

30%

Facility manager

20%

Design& construction mechanical contractor

10%

The survey revealed a fact that operation/ maintenance SOPs in practice are mostly

formulated by designers and maintenance consultants. This causes implications for

the effectiveness and performance of building systems relying on support from

professionals associated with the design and maintenance in the practical

implementation. Especially under the rapidly changing environments and the

increasing expectations of clients, the occupants are highly demanding of the

building functions and performance as well as energy conservation and comfort,

which is shown as per Figure 4-19 and Table 4-18 (Appendix E: Code MA06):

0

5

10

15

20

25

30

35

40

45

Low BelowAverage

Average AboveAverage

High

Performance/ Effectiveness/Responsiveness

Minimisation of energyconsumption

Friendliness/ Comfort/Convenience

Feasibility/ Adaptability/Accessibility

Expectations Low Below Average Average Above

Average High

Feasibility/ Adaptability/ Accessibility

1 1 2 4 8

Friendliness/ Comfort/ Convenience

1 1 1 1 12

Minimisation of energy consumption

1 1 2 2 10

Performance/ Effectiveness/ Responsiveness

1 1 1 3 10

Table 4-18: Expectations of the Clients

Figure 4-18: Operation/ Maintenance SOP Provision Source

Figure 4-19: Expectations of the Clients

Page 162: THE INTEGRATION BETWEEN DESIGN AND MAINTENANCE …eprints.qut.edu.au/16058/1/Frank_Lin_Thesis.pdf · the integration between design and maintenance of office building automation:

CHAPTER 4 SURVEY, DATA ANALYSIS AND CASE STUDY

144

The needs and expectations of the occupants will drive the design and maintenance

more effectively and bring about highly efficient building services via adequate

management.

4.2.4.2 Management

Generally, after building delivery, the responsibilities of BAS can be divided into

three parts: operation, maintenance and developing/ reconfiguring. The BAS

operation relies on in-house qualified staff. The maintenance and developing/

reconfiguring tasks mostly rely on the contract services, and partly on management

professionals as per Figure 4-20 and Table 4-19 (Appendix E: Code MB01).

05

10152025

In-house qualifiedstaff

Contract services Managementprofessional

Developing/ ReconfiguringMaintenanceOperation

Responsibilities In-house qualified staff Contract services Management

professional Operation 12 2 2

Maintenance 2 12 2 Developing/ Reconfiguring 2 9 5

Evaluating current BAS management, the current O/M instruction/ manual has been

found sufficient. The existing integrated BAS is less adequate for building operation

and maintenance, furthermore, the BAS integration strategy is not very supportive of

BAS management as shown in Table 4-20 (Appendix E: Code MB02). It implies that

the current systems integration is not adequately performing their functions and

potential integration benefits.

Figure 4-20: Responsibilities of BAS O/M Process

Table 4-19: Responsibilities of BAS O/M Process

Page 163: THE INTEGRATION BETWEEN DESIGN AND MAINTENANCE …eprints.qut.edu.au/16058/1/Frank_Lin_Thesis.pdf · the integration between design and maintenance of office building automation:

CHAPTER 4 SURVEY, DATA ANALYSIS AND CASE STUDY

145

Table 4-20: Evaluation of the BAS Management

Evaluation Not at all Somewhat So Fairly More Definitely

Current instruction/ manual 2 2 2 6 4

Existing integrated BAS 1 2 6 6 1 BAS integration strategy 1 6 4 4 1

In the office building maintenance stage, several indicators such as churn rate

(number of times employee change work location per year) and maintenance rate are

reflected in the maintenance costs. Those are mostly the concern of the building

maintainers. Generally, the application of computers in facilities management is not

very popular. In addition, the communications between building occupiers and

design consultants are relative poor as per Figure 4-21 and Table 4-21 (Appendix E:

Code MB03). It appears that the facilities maintenance and management did not get

help from the computer application or support from the design consultants.

0

5

10

15

20

25

30

Low BelowAverage

Average AboveAverage

High

Communicationsbetween occupiers/design consultantsComputer applications

Maintenance rates

Churn rate

Importance Low

Below Average Average Above

Average High

Churn rate 1 1 12 1 1 Maintenance rates 1 2 6 6 1 Computer applications 2 4 4 2 4 Communications between occupiers/ design consultants

2 4 4 4 2

Comparatively, if the building systems integration is adequate, it will facilitate the

building performance and energy conservation. Among the building systems, to meet

the design requirements and client expectations, the systems suitable for integration

Figure 4-21: Maintenance of the BAS

Table 4-21: Maintenance of the BAS

Page 164: THE INTEGRATION BETWEEN DESIGN AND MAINTENANCE …eprints.qut.edu.au/16058/1/Frank_Lin_Thesis.pdf · the integration between design and maintenance of office building automation:

CHAPTER 4 SURVEY, DATA ANALYSIS AND CASE STUDY

146

include electrical power/ lighting, security system, lifts/escalator, fire system, and

HVAC, there is less need for the parking system to be integrated as shown in Table

4-22 (Appendix E: Code MB04). Additionally, one of the factors in consideration of

the system integration is focusing on the simpler operation to provide of ease

maintenance. Hence, adequate integration design directly affects maintenance

efficiency.

The surveys have shown that the building maintainers are mostly concerned with the

effectiveness of problem solving procedures for dealing with the complaints of

building occupants, and tracking/ solving problems of BAS as per Figure 4-22 and

Table 4-23 (Appendix E: Code MB05). It proves that most occupant complaints are

due to discomfort, which can be the caused by ineffective problem solving, tracking

and dealing with complaints. Thus, customer orientation is important as well as

sustainable maintenance.

0

5

10

15

20

25

Least Less Fairly More Most

Tracking solving problemsDealing complaintsProblem solving procedures

Problem Solving Least Less Fairly More Most Problem solving procedures 1 2 6 6 1 Dealing complaints 1 3 4 6 2 Tracking solving problems 1 2 4 8 1

System Integration Preference Electrical power/ Lighting 14 Security 12 Lifts 12 Fire 12 HVAC 10 Parking system 6

Figure 4-22: Problem Solving of the BAS

Table 4-23: Problem Solving of the BAS

Table 4-22: Integration of the Building Systems

Page 165: THE INTEGRATION BETWEEN DESIGN AND MAINTENANCE …eprints.qut.edu.au/16058/1/Frank_Lin_Thesis.pdf · the integration between design and maintenance of office building automation:

CHAPTER 4 SURVEY, DATA ANALYSIS AND CASE STUDY

147

The building maintainers have obtained the applicable instructions from the

designers, venders or manufactures, as well as feedback of the problems/ complaints

from building occupants as well. Conversely they did not relatively deliver problems

in relation to BAS operation and maintenance to the designers as in Table 4-24

(Appendix E: Code MB06).

Communication Yes No Deliver problems to designers 8 8 Applicable instruction 10 6 Problems/ complaints feedback from occupants 13 3

These facts imply that the maintainers did not expect to gain support from the

designers, either beause of the lack of communication or good relationships between

them. Hence, the close communication between design and maintenance is

necessary.

Table 4-24: Communication between Design and O/M

Page 166: THE INTEGRATION BETWEEN DESIGN AND MAINTENANCE …eprints.qut.edu.au/16058/1/Frank_Lin_Thesis.pdf · the integration between design and maintenance of office building automation:

CHAPTER 4 SURVEY, DATA ANALYSIS AND CASE STUDY

148

4.2.4.3 Technical Issues

In practice, office buildings occupants biggest concerns are the fan coil units

equipped with individual controllers and humidity control in their space. Especially,

they regard energy conservation as a critical consideration in relation to HVAC

operation as shown in Figure 4-23 and Table 4-25 (Appendix E: Code MC01). The

expectation of comfort is also important for the occupants. It is important at the same

time to reduce energy consumption. Accordingly, the design and maintenance needs

to balance and optimise the both expectations.

0

2

4

6

8

10

12

14

16

Least Less Fairly More Most

Energy consumptionHumidity ControlFan coil control

Importance Least Less Fairly More Most Fan coil control 4 2 6 3 1 Humidity Control 4 2 4 5 1 Energy consumption 1 1 1 7 6

Most occupants of the office buildings are concerned about inadequate temperature/

humidity control, lack of individual control and air quality, likewise the noise from

HVAC system has not been a worry as per Figure 4-24 and Table 4-26 (Appendix E:

Code MC02). It implies that the occupants expect to be able to control the working

environment of their own occupied space to increase the comfort, and do not expect

to have acoustic noise complaints.

Figure 4-23: Importance of the HVAC Controls

Table 4-25: Importance of the HVAC Controls

Page 167: THE INTEGRATION BETWEEN DESIGN AND MAINTENANCE …eprints.qut.edu.au/16058/1/Frank_Lin_Thesis.pdf · the integration between design and maintenance of office building automation:

CHAPTER 4 SURVEY, DATA ANALYSIS AND CASE STUDY

149

0%

500%

1000%

1500%

2000%

2500%

1 2 3 4 5

Noise from HVAC system

Lack of individual control

Inadequate temperature/humidity controlComplaints Not enoughfresh airResponses

Responses 0% 25% 50% 75% 100%Complaints Not enough fresh air 2 6 2 5 1 Inadequate temperature/ humidity control 2 2 4 7 1 Lack of individual control 1 5 2 7 1 Noise from HVAC system 2 10 2 1 1

With respect to the security and fire system, an overall security system is generally

required and installed with a secure separate power supply for office buildings. In

addition, the security system interface is also needed to integrate with the fire

systems and building management systems. For instance they are all closed doors,

automatically released in case of a fire alarm and outfitted the direct CCTV cameras

as shown in Table 4-27 (Appendix E: Code MC03). This is a typical system

integration, which integrates the security systems with fire systems to accomplish an

automatic response and action.

Integration Preference Yes No Security system with separate power supply 13 3 Security system interfaced with the fire systems 12 4

Figure 4-24: Responses of the HVAC Application

Table 4-26: Responses of the HVAC Application

Table 4-27: Integration Preference of the Security System

Page 168: THE INTEGRATION BETWEEN DESIGN AND MAINTENANCE …eprints.qut.edu.au/16058/1/Frank_Lin_Thesis.pdf · the integration between design and maintenance of office building automation:

CHAPTER 4 SURVEY, DATA ANALYSIS AND CASE STUDY

150

On the other hand, office buildings are normally accessed by using smart cards, key

codes or manual ID cards and have CCTV presence detectors in the security systems

as in Table 4-28 (Appendix E: Code MC04). Currently, this type of security system

has been commonly applied to the office building. It will continue to be developed

along with the advanced ICT technologies to enhance the security and ease the

access management.

Table 4-28: Access Management of Office Building Utilities Least Less Fairly More Most

Access control smart cards/key code/ ID cards 1 1 2 10 2

CCTV presence detectors and archiving 1 1 8 4 2

The various sensor controls which are key elements of BAS, such as smoke and

temperature sensors are more common in office building applications, which is

similar with the designer’s views as in Figure 4-12. Other sensors as humidity,

pressure, air and light sensors which are also equipped to increase the occupant’s

comfort and decrease energy consumption. The preference of the sensor controls is

shown as in Table 4-29 (Appendix E: Code MC05).

Sensor Types Preference Temperature 14 Smoke 10 Humidity 6 Pressure 6 Air 4 Light 3

Table 4-29: Preference of the Sensor Controls

Page 169: THE INTEGRATION BETWEEN DESIGN AND MAINTENANCE …eprints.qut.edu.au/16058/1/Frank_Lin_Thesis.pdf · the integration between design and maintenance of office building automation:

CHAPTER 4 SURVEY, DATA ANALYSIS AND CASE STUDY

151

4.2.4.4 Assessment

From the survey, the building maintainers are mostly satisfied with the support of

new or up-to-date information, sufficient instruction/ manuals for BAS operation and

maintenance, and historic records of BAS operations as well. The current

maintenance support is shown as in Table 4-30 (Appendix E: Code MD01). It

indicates that the support of maintenance is important as well as the historic records

which rely on the maintainer and is gathered by computerised aids.

Table 4-30: Satisfaction of the Maintenance Support

Requirements Insufficient Somewhat Sufficient Average Sufficient Very

SufficientInformation of maintenance 1 3 8 2 2

Instruction/ manual 1 1 4 8 2 Historic records 1 3 4 6 2

The maintainers are basically concerned with those factors which minimise energy

consumption including the energy conservation design in BAS, applicable BAS,

applicable BAS integration and adequate operation/ maintenance as shown in Table

4-31 (Appendix E: Code MD02), This is similar to the designer views as shown in

Table 4-12. This indicates that the design and maintenance have the same consensus

and responsililities to achieve energy conservation.

Table 4-31: Factors Affecting to Energy Conservation Affection to

energy conservation

Low Below Average Average Above

Average High

Energy conservation design

1 1 2 8 4

Selection of applicable BAS 1 1 4 9 1

BAS integration 1 1 4 9 1

Adequate operation and maintenance

1 1 2 4 8

Page 170: THE INTEGRATION BETWEEN DESIGN AND MAINTENANCE …eprints.qut.edu.au/16058/1/Frank_Lin_Thesis.pdf · the integration between design and maintenance of office building automation:

CHAPTER 4 SURVEY, DATA ANALYSIS AND CASE STUDY

152

0

2

4

6

8

10

12

14

Facility manager Design consultant

Frequency

In practice, the evaluation of BAS is carried out over different durations categorised

as monthly, seasonally, half-yearly, and yearly periods. Normally, it is often done by

monthly or yearly as shown in Figure 4-25 (Appendix E: Code MD03). These

periods are considered the necessary inspection and maintenance routines in order to

sustain the functions of facilities. Normally, the evaluation of BAS should be

scheduled to become the regular tasks.

0

1

2

3

4

5

6

7

Monthly Seasonally Half-yearly Yearly

The BAS evaluation is exclusively the responsibility of the facility manager, or

alternatively by the design consultants as shown in Figure 4-26 (Appendix E: Code

MD04). The BAS evaluation is the responsibility of the maintenance staff as well as

the designers across the whole building process.

From the facility managers’ point of view, the building systems as HVAC/energy

management systems, electrical power/ lighting systems, fire/ security systems, and

lifts/escalator are more important than the parking equipment /parking systems and

Figure 4-25: Preference of the Maintenance Duration

Figure 4-26: Responsibility of the BAS Evaluation

Page 171: THE INTEGRATION BETWEEN DESIGN AND MAINTENANCE …eprints.qut.edu.au/16058/1/Frank_Lin_Thesis.pdf · the integration between design and maintenance of office building automation:

CHAPTER 4 SURVEY, DATA ANALYSIS AND CASE STUDY

153

water supply/drainage systems as shown in Table 4-32 (Appendix E: Code MD05).

This is similar to the designer views as shown in Table 4-6. The results indicate that

the awareness and understanding of the importance of the building systems can result

in an integrated solution.

Table 4-32: Importance of the Building Systems (Maintenance views) Importance from maintenance

view Low Below Average Average Above

Average High

HVAC/energy management 1 1 1 5 8 Electrical power/ Lighting system 1 1 1 3 10

Fire/ Security systems 1 1 4 2 8 Lifts/Escalator 1 1 2 4 8 Parking equipment /Parking system 2 6 4 3 1

Water supply/Drainage 4 4 2 4 2

The maintainers consider that the following factors are very significant to the BAS

application in the office building, such as applicable BAS which meet the

requirement of clients, the performance/ efficiency of BAS after delivery, the balance

of BAS costs between the design requirements and the client’s budget, availability of

the evaluation tools for BAS as shown in Table 4-33 (Appendix E: Code MD06).

This is similar to the designer views as shown in Table 4-10.

Table 4-33: Assessment of the BAS Application

Assessment Least Less Fairly More Most BAS meeting requirement 1 1 1 7 6 Performance/ efficiency 1 1 1 5 8 Balance of BAS cost between design requirements and client’s budget 1 1 2 10 2

Evaluation tools for BAS 1 1 6 6 2

Page 172: THE INTEGRATION BETWEEN DESIGN AND MAINTENANCE …eprints.qut.edu.au/16058/1/Frank_Lin_Thesis.pdf · the integration between design and maintenance of office building automation:

CHAPTER 4 SURVEY, DATA ANALYSIS AND CASE STUDY

154

The Maintainers of the office building only closely communicated with designers

during the design and delivery stages where problem occurred. However, they rarely

kept contact with each other after delivery for support in the practical operation and

maintenance as shown in Figure 4-27 (Appendix E: Code MD07). This is similar to

the designer views as shown in Table 4-14.

0

2

4

6

8

10

12

14 Design stage

Delivery stage

After delivery

ProblemshappeningNever

Figure 4-27: Supports between Design and Maintenance

The lack of communication after building delivery is quite similar to the response

from designers. The lack of support for design and maintenance are apparently

caused by the lack of a systematic mechanism. The results intrinsically reflected that

the design and maintenance professionals did not maintain a close communication

for most periods of building life, only in the initial building stage. As a result,

historical data and information in relation to practical BAS performance and

application was not available. Generally the situation is that building industry is still

staying close to the product manufacturing position, focusing more on the building

production, instead of the customer orientation and life cycle considerations for

facilitating BAS performance improvement and energy conservation.

Page 173: THE INTEGRATION BETWEEN DESIGN AND MAINTENANCE …eprints.qut.edu.au/16058/1/Frank_Lin_Thesis.pdf · the integration between design and maintenance of office building automation:

CHAPTER 4 SURVEY, DATA ANALYSIS AND CASE STUDY

155

4.2.5 Summary of the Survey Results and Suggestions

Summarising the survey results in the design and maintenance aspects, four aspects

of findings can be outlined as the following:

• Industry status and awareness of the office building automation:

o Lack of support after delivery

o Demand relative communication and support

o Feedback is insufficient

• Design and maintenance limitations:

o Rare support from designers after building delivery except as the

problems occurrence

o Lack of the historical data and records

o Expectations in energy conservation and comfort are still a challenge

• The needs of the guidelines and decision support tools:

o Up-to-date instructions and guidelines are needed

o Lack of the evaluation tools and computerised decision support tools

o High response rates in asking support as problems occur

• Integration approach:

o Integration approach is needed

o System integration can help minimise the energy consumption

o Process integration across the diverse professionals can gain help

Page 174: THE INTEGRATION BETWEEN DESIGN AND MAINTENANCE …eprints.qut.edu.au/16058/1/Frank_Lin_Thesis.pdf · the integration between design and maintenance of office building automation:

CHAPTER 4 SURVEY, DATA ANALYSIS AND CASE STUDY

156

From the open-ended question of the questionnaire survey, the design and

maintenance professionals also provide their practical experience and suggestions in

the facilitation of design/ maintenance relationships and efficiency improvement as

the follows:

• Industry status and awareness in office building automation:

o Thorough understanding of the system to be adapted (including

documented feedback from other users).

o BAS is an ongoing Operation expense and Capital expense (OPEX/

CAPEX) balance, and where the building developers are going to

on-sell quickly they are typically much more interested in reduced

CAPEX than OPEX, therefore less inclined to install expensive BAS.

The probable exception is A grade/ premium office space.

o Make it cheaper. Developers look at cost and what they have done

before, don’t want to change.

• Design and maintenance limitations:

o Use clever sub-consultants.

o By having simple robust systems- reliability and minimum needs for

maintenance and avoiding total reliance on BAS, it must also be

equipped with good back-up systems.

• The needs of the guidelines and decision support tools:

o Develop designs with the use of all tools available and latest

information.

o Comprehensive maintenance manuals together with formal instruction

from supplier would need to be provided for building managers/

facilitators.

o Good service is needed.

o Needs more available post-occupancy data and benchmark data.

• Integration approach:

o Direct contracts between building owners and BAS contractors.

o Building owners need to have their maintenance staff attending during

the design stage of their developments.

o Close liaison among builders/ designers/ suppliers/ client is essential.

Page 175: THE INTEGRATION BETWEEN DESIGN AND MAINTENANCE …eprints.qut.edu.au/16058/1/Frank_Lin_Thesis.pdf · the integration between design and maintenance of office building automation:

CHAPTER 4 SURVEY, DATA ANALYSIS AND CASE STUDY

157

4.3 Survey Results in relation to Literature Study

In conclusion, the induction from this industry professional questionnaire survey, the

results have verified the findings of the literature studies. Their comparison can be

illustrated in four aspects as in Table 4-34:

• Industry status and awareness of the office building automation

• Design and maintenance limitations

• The needs of the guidelines and decision support tool

• Integration approach

Table 4-34: Comparison of the Induced Survey Results with Literature Findings

Relevant subjects Literature findings Induced survey results

Industry status and awareness of the office building automation

◊ Building designers and maintainers are working independently with less communication and support during the building life.

◊ In life cycle cost considerations, collaboration between design and maintenance can help to improve the relationship.

◊ Lack of support after delivery

◊ Demand of enhancing the communication and support

◊ High response rates in asking for support as problems occur

◊ Feedback is insufficient

Design and maintenance limitations

◊ Designers should extend their service for minimizing future maintenance

◊ The maintenance manager is able to assist the designer with providing building maintenance experience

◊ Rare support from designers after building delivery excepting problems occurrence

◊ Lack of the historical data and records

◊ Satisfaction of the expectation in energy conservation and comfort are still a challenge

The needs of the guidelines and decision support tool

◊ The design should consider maintenance and operation by providing applicable specifications and instructions during early design stage.

◊ Up-to-date instructions and guidelines are needed

◊ Lack of the evaluation tools and computerised decision support tools

Integration approach

◊ Process integration between different parties can help to increase the effectiveness and efficiency; it would be a potential approach.

◊ System integration can help minimise the energy consumption

◊ Process integration across the diverse professionals can gain help

Page 176: THE INTEGRATION BETWEEN DESIGN AND MAINTENANCE …eprints.qut.edu.au/16058/1/Frank_Lin_Thesis.pdf · the integration between design and maintenance of office building automation:

CHAPTER 4 SURVEY, DATA ANALYSIS AND CASE STUDY

158

From the above comparisons, the industry professional surveys have verified the

limitation and problems of the office building automation applications. These results

are more valuable and can be further utilised for knowledge extraction, and

demonstrates the potential integration approach, which should be explored and

developed. All of these findings and results imply that the professional surveys could

extend and expand their survey scopes for more advanced investigation. Even so, the

above efforts still need a real case to demonstrate the key subjects in the context of

design and maintenance. Thus, the following section will introduce and present a

case study for in depth verification.

Page 177: THE INTEGRATION BETWEEN DESIGN AND MAINTENANCE …eprints.qut.edu.au/16058/1/Frank_Lin_Thesis.pdf · the integration between design and maintenance of office building automation:

CHAPTER 4 SURVEY, DATA ANALYSIS AND CASE STUDY

159

4.4 The Case study

Findings and results of the literature reviews and professional survey revealed that

the building automation systems (BAS) has been popularly employed in office

buildings as a major element. However, for the numerous high rise office buildings,

does BAS realise the effective operation and performance? To really understanding

the ramification, it needs to be done by reviewing a real case. This section will

present a detailed case study analysis based on practical activities of the integration

between design and maintenance.

A real office building case has been selected in accordance with the needs of

research and information provided. That is the “Asia Business Centre” office

building which is located in Kaohsiung, southen part of Taiwan R.O.C. It has

presented a real practical example of the integrated building design and

maintenance, and provided a comparison to verify the situation of building

automation in a high-rise office building.

This case study could be used as a model of the conceptual design studies for other

tall building projects, in which the process integration is given importance during the

preliminary stages of design and the post-occupant concerns. Such early emphasis on

whole building integration in the design and maintenance process could lead to the

efficient design solutions and avoid expensive design modifications at a later stage.

Especially, it can be utilised to assure and enhance the performance of building

systems in the maintenance process.

4.4.1 Outline of the Case Study The “Asia Business Center” is a modern high rise office building equipped with

sophisticated infrastructure and a central distributed HVAC system, electrical power

and lighting systems, and security/ fire systems etc. It has been run for ten years with

the high occupancy that was typical of the market. The office building profile and

features are illustrated and shown as in Table 4-35 (Appendix C):

Page 178: THE INTEGRATION BETWEEN DESIGN AND MAINTENANCE …eprints.qut.edu.au/16058/1/Frank_Lin_Thesis.pdf · the integration between design and maintenance of office building automation:

CHAPTER 4 SURVEY, DATA ANALYSIS AND CASE STUDY

160

Table 4-35: Profile of the ‘Asia Business Centre’ Office Building

(Courtesy: the Great Country Construction Group)

Category Building Data Location Kaohsiung, Taiwan ROC Floors Above ground: 28 (Basement levels: 4) Structure SRC (partly SRC, RC) Gross floor area 45,408m2 (488,768sq.ft.) Gross lettable area 34,056m2 (366,576sq.ft.) Parking spaces 169 (partly mechanical) Elevators 5 passenger units; 1 emergency unit Completion Date July 1994 Lettable area per floor (standard floors)

1,419m2 (15,274sq.ft.)

Ceiling height (standard floors) 3.60m Under floor PVD Box 3 way under floor duct system HVAC system Interior: Floor-by-floor A/C; Perimeter:

Air-cooled packaged A/C

Page 179: THE INTEGRATION BETWEEN DESIGN AND MAINTENANCE …eprints.qut.edu.au/16058/1/Frank_Lin_Thesis.pdf · the integration between design and maintenance of office building automation:

CHAPTER 4 SURVEY, DATA ANALYSIS AND CASE STUDY

161

Office utilisation and main tenants: This office building primarily provides office

space. The main tenants encompass a variety of companies such as:

o Life insurance companies,

o Trading companies,

o International companies,

o Shipping cooperations,

o Engineering and construction companies,

o Property and real estate companies,

o Musical instrument companies,

o Interior decoration and furniture companies,

o Information technology companies and ISP,

o Marketing and advertising companies,

o Financial companies (bank, credit card service, consultants),

o Stock exchange companies,

o Seven-Eleven market, etc.

Independent management institution for the maintenance:

Before the building delivery, the developer, the Great Country Construction Group,

instituted and set up an independent building management corporation to train staff

for further management of the building and to carry out the commissioning tasks for

quality assurance and warranty service after delivery. At the delivery stage, this

helped the building owners in organising the future building management committee.

At the same time, it initiated a contract with this committee to carry out the building

management and maintenance works, and to provide building and hospility services.

The purpose of the authorised institution is mainly:

o to integrate the design-build and maintenance process during the

design-construction-management stage,

o to coordinate and communicate the technical tasks between designer,

facilities constructors and providers after building delivery,

o to manage the future maintenance tasks for the building life, and

o to train the management personnel and to plan and write up the

standard operation procedures (SOP) for the building operation and

maintenance from end of construction to O/M duration.

Page 180: THE INTEGRATION BETWEEN DESIGN AND MAINTENANCE …eprints.qut.edu.au/16058/1/Frank_Lin_Thesis.pdf · the integration between design and maintenance of office building automation:

CHAPTER 4 SURVEY, DATA ANALYSIS AND CASE STUDY

162

4.4.2 Building Automation System in the “Asia Business Centre”

Office Building

The “Asia Business Centre” is representative office building during the boom of

building automation in Asia region, and was designed and built from 1989 to 1994,

equipped with building automation systems so-called 5A- Building Automations and

building systems, features of which are illustrated in the following Table 4-36

(Appendix C):

Table 4-36: Features of the “Asia Business Centre” 5A-Building Automations

Types Features Descriptions Electrical power system

o Electrical power automatic control o Back up generator start testing regularly,

operation monitoring and automatic recording

HVAC

o On/off sequence automatic control of cooling tower, chillers, and pump

o Optimised on/off duration control of chillers and coolers

o AC utilisation automatic counting of payment o Ventilation intake/ outtake regular O/F and

energy saving operation control of the roof and parking area

Lighting system

o Regular O/F and energy saving operation and control in public zone lighting circuit

o Lighting system regular control in the envelope of building, parking area and landscaping garden

Water/ drainage system

o Water capacity monitoring and alerting of the water reservoirs and tank

o Water capacity monitoring and alerting of the waste water

o Monitoring on the operation of pumps Escalator equipment

o Regular O/F control o Emergency automatic control and treatment

Parking management

o Monitoring and control of parking o Door security and automatic control o Traffic light automatic control

Fire system o Fire alarm and monitoring

Building Automation (BA)

Building management o Computerised integrated management system

Page 181: THE INTEGRATION BETWEEN DESIGN AND MAINTENANCE …eprints.qut.edu.au/16058/1/Frank_Lin_Thesis.pdf · the integration between design and maintenance of office building automation:

CHAPTER 4 SURVEY, DATA ANALYSIS AND CASE STUDY

163

Table 4-36: Features of the 'Asia Business Centre' (Continued) Types Features Descriptions

o Security management system

o Door card security control

o Data network service system

o Pre-allocation space

o Mail management system

o Mailing automatic alerting

Office Automation (OA)

o Pre-allocation OA underfloor duct box

o Power, voice and data (PVD) box

o Pre-allocation fibre communication channel

o the satellite communication receiving channel

o Pre-allocation information intelligence process data network

o Pre-allocation space Communication Automation (CA)

o Pre-allocation Telecommunication AV equipment zone

o Pre-allocation space

o Door management system

o Door card/ password

o CCTV monitoring system

o Installing in the public outlets and parking area

o Emergency broadcasting system

o Linking with fire and security systems

o Fire and Security protection system

o Automatic alarm system

Security Automation (SA)

o Mechanical monitoring system

o Fire alerting and extinguisher monitoring

o Intake air and smoke discharge regular start testing

o Computer control mechanical maintenance

o Fire system maintenance listing o Generator maintenance listing o Escalator maintenance listing

o Computer control BAS maintenance

o BAS maintenance listing

o Computer control printing report such as cleaning and

o maintenance listing

o Cooling tower cleaning listing o Water/ drainage pumps

maintenance listing o Drinking water cleaning and

filtering, and Water reservoir tank cleaning listing

o Computer management personnel information

o New staff and off staff door card password management

o Patrol monitoring o Computer listing

service payments and receipts

o AC expenditure and water/ electrical expenditure listing

Management Automation (MA)

o Visiting I/O management

o Personnel visiting management

Page 182: THE INTEGRATION BETWEEN DESIGN AND MAINTENANCE …eprints.qut.edu.au/16058/1/Frank_Lin_Thesis.pdf · the integration between design and maintenance of office building automation:

CHAPTER 4 SURVEY, DATA ANALYSIS AND CASE STUDY

164

4.4.3 Practice of the Design-build, Operation and Maintenance

From 1989 to 1994, and 1998 to 2002, the author has experienced the complete

progress of “Asia Business Centre” building development from the building

design-build to the operation and maintenance process. The building was designed

and built, and then it was managed and maintained after delivery by a building

management company which was set up by the developer’s group as a sub-company.

The “Asia Business centre” office building project was designed and planned from

the Spring of 1989. Construction started at the end of 1989, and was completed in

July 1994, and the building was handed over to the various building owners. Among

the four years the project there were numerous detailed design modifications until the

end of the construction.

Facts pertaining the design and maintenance in this project can be summarised as

follows:

◊ Requirments and specification designated: Since the building units of the

project have been sold at the outset of the design stage, the construction had to

be built in accordance with the contracts between developer and clients to

meet the initial commitments and building specifications. The design was

according to the best specification of products in that period which was likely

popular by the clients, thus the sale rate of the building was 100% sold within

the three months.

◊ Unpredictable change: however, the final delivery rate of the building units

was decreased to 80%, as some clients’ retracted and there was an economic

downturn. The other reason was the market for office space market also

declined during that period.

◊ Quality control and management: during the construction period, the

developer incorporated with the sub-constructor who constructed the building.

Product quality control and management was carried out in accordance with

the ISO 9000, step by step for each stage of the construction and system

installation stage.

Page 183: THE INTEGRATION BETWEEN DESIGN AND MAINTENANCE …eprints.qut.edu.au/16058/1/Frank_Lin_Thesis.pdf · the integration between design and maintenance of office building automation:

CHAPTER 4 SURVEY, DATA ANALYSIS AND CASE STUDY

165

◊ Building commissioning: with respect to the operation and maintenance

(O/M), the office building was running and managed by the building

management company set up by the developer from the Spring of 1993 which

was running and pre-delivering the major facilities such as BAS, HVAC,

Parking system, … etc,. The in-advance delivery and participative progress

did help the further management of the building and made if possible to train

the maintenance personnel.

◊ Customer- orientation: the building was running and providing a variety of

services. The services was likely compliance with the designated functions

and the client expectations.

◊ BAS benefits: the hospitality service and building system management did

benefit from the BAS application.

◊ Relationships: there were close relationships between designers and

maintainers, building systems sub-contractors.

As a result, the management of the building in the initial occupied stage was very

successful. The “Asia Business Centre” office building has a good reputation in the

southen part of Taiwan. However, along with the rapid growth of business activities,

as the occupancy of the units was increasing, the designated facilities were becoming

inadequate to cope with the expectation of the occupants and exposed several

deficiencies after the delivery. The situation has verified, but it is difficult to predict

likely the future change and demand to meet the client’s expectation.

Nonetheless, the process of integration between building design and maintenance in

this office building project was successful and is ideal to use as an integration

example.

Page 184: THE INTEGRATION BETWEEN DESIGN AND MAINTENANCE …eprints.qut.edu.au/16058/1/Frank_Lin_Thesis.pdf · the integration between design and maintenance of office building automation:

CHAPTER 4 SURVEY, DATA ANALYSIS AND CASE STUDY

166

4.4.4 Example of Process Integration

This section will outline the features of integration in the case “the Asia Business

Centre” office building including process integration and building system

integration.

This case has practiced process integration between design and construction, then

design and maintenance. It has resulted in a great effectiveness and good

performance during the construction period, and the latter operation and maintenance

process as:

In the design stage: the developer has close discussions with the designers and

subcontractors to embed the future management and maintenance

considerations into the design specifications and construction requirements.

During the construction process: the project team continued to review the

building design including drawing and system specifications and to monitor the

practical construction progress to find out potential or possible problems in the

operation of building, and to optimise the detailed design. In the mean time the

detailed design had also taken into account the subsystems compromising the

building structure and facilities.

Hand-over and after delivery: in addition to the technical information and the

building construction drawings, the developer produced a hand-over book to

demonstrate the features and functionalities of building, and related services and

supports such as the emergency contacts and the design and maintenance

professional details, and key O/M operation and maintenance manual. After

delivery, the building units were managed and maintained by the authorised

management corporation to carry out maintenance tasks and provide hospitality

service to support business activities including public functional utilities, gym

equipment, entertainment, business club, post, business service centre, etc.

Consequently, the building has shaped and sustained a good work environment and

effective building performance with which the building owners and occupants are

Page 185: THE INTEGRATION BETWEEN DESIGN AND MAINTENANCE …eprints.qut.edu.au/16058/1/Frank_Lin_Thesis.pdf · the integration between design and maintenance of office building automation:

CHAPTER 4 SURVEY, DATA ANALYSIS AND CASE STUDY

167

happy, since it has created several benefits such as high rental rates compared to the

other similar office buildings.

The successful process integration of this project presents a good experience,

instruction and guidance for the study. Additionally, the building also has several

systems integration, for instance:

◊ The building facilities include mechanical, electrical, plumbing, fire

protection and environmental systems.

◊ There was lighting control integrated with BAS, and BAS with the

electronic variable air volume boxes, which provides the calculations of

energy use for the chiller plant to facilitate the energy conservation.

◊ The information associated with a variety of operation and control systems,

such as HVAC, electrical power systems, lighting systems, security systems,

parking management systems, water drainage systems, which automatically

report to the central building management system and interface with the fire

safety system.

◊ Additionally, all major electrical and utility systems, as well as the back-up

power supply, were designed to be monitored and metered.

◊ Although within the building it was possible to tie in the security network as

well, the engineers chose to maintain it as a separate system.

In this case, the design template allows for even greater integration in the future as

required. This case can be viewed as a model of the current trends in design for

integrating automated systems and potential for process integration between design

and maintenance.

Page 186: THE INTEGRATION BETWEEN DESIGN AND MAINTENANCE …eprints.qut.edu.au/16058/1/Frank_Lin_Thesis.pdf · the integration between design and maintenance of office building automation:

CHAPTER 4 SURVEY, DATA ANALYSIS AND CASE STUDY

168

4.4.5 Example of Design and Maintenance Interface

Reviewing the design and maintenance subjects in this case, several findings can be

used to verify the literature study and industry survey for advanced knowledge

extraction. Those findings were outlined and categorised into three aspects:

1. Responsibility distinction:

Designer:

o Provide specification for the selection of BAS equipments and systems

o Guidelines and checklists of installation , operations and maintenance

o Construction and installation monitoring and auditing

o Commissioning

o Operation and maintenance instruction

o Preparations of the technical information and relevant guidelines

o Technical supporting to maintainers

Maintainer: facilities manager

o Commissioning

o Standard operation procedures (SOP) preparation and implementation

o Checklists preparation and implementation

o Feedback the operation/ maintenance status, and problems

o Consulting/ meeting with designer

2. Implications of integration between design and maintenance:

o Infrastructure: designer should take into consideration the public

telecommunication infrastructure of the building site: broadband, fibre,

and integrated with the development of the city urban project.

o Intercom and information communication technology (ICT) equipment

and systems installation space has to consider the future expansion.

o Elevator installation, replacement and retrofit have to comply with the

capacity of the building.

o The layout/ installation/ maintenance of cooling tower and ventilation

space should consider the requirements of easy cleaning and

maintenance ,

o Backup generator installation space: consideration their easy installation,

disassembly and maintenance

Page 187: THE INTEGRATION BETWEEN DESIGN AND MAINTENANCE …eprints.qut.edu.au/16058/1/Frank_Lin_Thesis.pdf · the integration between design and maintenance of office building automation:

CHAPTER 4 SURVEY, DATA ANALYSIS AND CASE STUDY

169

o Fire and ventilation integration: smoke detector, fresh air regulator/

damper and shut off should be appropriate.

o Elevator operation time control and scheduling, stop and return design

need to be optimized.

o Elevator layout and capacity consideration and prediction for occupied

growth.

o Security management utilizing the door card and sensor are helpful for

easy operation and maintenance.

o Automatic sensor control in lighting system is advantageous for energy

saving during the non-business hours.

o Occupant interior/ workspace design and intercom and

telex-communication equipment/ system installation management need

to be considered during the design stage.

3. Limitations:

o In this case, as there were no heating applications in HVAC, it therefore

could not provide information on heating subjects.

o Design: it was difficult to predict the future needs and changes in

practice. For instance, escalator design did not meet the occupied growth

which has caused crowds of people waiting for the lifts during the peak

business time. BAS for the optimisation of lift stops has encountered a

challenge to meet the occupant’s expectation.

o Building system design specification was not easy to comply with the

infrastructure of the building environment. For instance, the World Wide

Web (WWW) has led to wide diffusion and application in recent years.

It blocks the original closed BAS control and monitoring systems. It also

affects the maintenance effectiveness.

o Building internal ICT infrastructure could not comply with the

occupant’s needs for the various business parities. For instance, stock

exchange company uses a huge number communication channels which

has challenged with the original design maximum of ICT infrastructure.

It also has caused the difficulties in maintenance.

Page 188: THE INTEGRATION BETWEEN DESIGN AND MAINTENANCE …eprints.qut.edu.au/16058/1/Frank_Lin_Thesis.pdf · the integration between design and maintenance of office building automation:

CHAPTER 4 SURVEY, DATA ANALYSIS AND CASE STUDY

170

4.4.6 Lessons Learned

The case study has provided an actual case of the process integration activities in the

design, construction and management to show how the work can be done through the

integration mechanism and early comprehensive considerations and interaction as

following:

• Maintainers participating in the building design stage as early as possible.

• Equipping with an applicable assessment and decision support tool to assist

the regular operation and maintenance.

• Keeping historic records for the building management.

• Establishing a program for good relationships between design and

maintenance including feedback and support mechanisms.

• Implementing the building commissioning.

• Renovating and improving the building systems to keep pace with the

advanced technologies and the regulations.

The optimal management of office building relies on the close relationship between

design and maintenance, thus the maintenance should integrate with design taking

the responsibility of understanding the designated specifications and be able to

perform the functionalities and capabilities of the building systems.

The trend of new technology innovation has emerged, but if the infrastructure on site

can not cope with the ICT growth, the BAS design should be able to provide the

allocation space or to retain the ducts for future installation and expansion. For

example, in this case there was a pre-allocation of space for the communication and

satellite system installation to allow for flexibilities and expansion.

The success of the office building management relies on the cooperation between

design and maintenance, comprehensive planning and the facilities maintainers early

participation during the design stage. These are critical key factors for the

implementation of integration activities. Continuing development and renovation will

be necessary for the building life time. Assessment and decision support tools are

also needed for the building design and management including operation and

maintenance.

Page 189: THE INTEGRATION BETWEEN DESIGN AND MAINTENANCE …eprints.qut.edu.au/16058/1/Frank_Lin_Thesis.pdf · the integration between design and maintenance of office building automation:

CHAPTER 4 SURVEY, DATA ANALYSIS AND CASE STUDY

171

4.4.7 Findings from the Case Study

Based on the efforts from BAS advanced development and neo- ICT tools, the office

building performance could be further promoted through the process integration

between traditionally fragmented sectors such as design and maintenance, which

have respectively unique features. To support a working environment that includes

fully integrated designs, lean construction, interoperability, sustainable infrastructure,

coordinated construction and optimised operation and maintenance of facilities

should be the essential theme for future activities in the building industry. Achieving

these goals will require a series of attempts and explorations, especially focusing on

the building process integration by means of the development of integrated decision

support for knowledge incorporated applications to reduce the gaps. In addition, the

interoperable strategies and guidance for the middle and high level decision making

would also be necessary during the building life.

The integration adventure in this case study has scoped the following aspects:

◊ Integration between design and maintenance

◊ BAS design and maintenance decision making strategies

◊ BAS quality management and commissioning guidance

◊ Decision support application

The discussion of the above case study has provided a valuable view of the process

integration between design, construction and maintenance to ensure that the relevant

tasks can be implemented as was the design intention for the life of the building.

Furthermore, the building developer could apply contract tools to undertake process

quality control, commissioning and warranty service after delivery to ensure the

quality of the building systems. In brief, the case study is a demonstrated example of

the process integration between design and maintenance of office building

automation.

Page 190: THE INTEGRATION BETWEEN DESIGN AND MAINTENANCE …eprints.qut.edu.au/16058/1/Frank_Lin_Thesis.pdf · the integration between design and maintenance of office building automation:

CHAPTER 4 SURVEY, DATA ANALYSIS AND CASE STUDY

172

4.5 Expanded Comparison of the Literatures,

Surveys and Case study

Relevant subjects Literature Findings Induced Survey Results Case Study

Industry status and awareness of office building automation

◊ Building designers and maintainers are working independently with less communication and support during the building life.

◊ In life cycle cost consideration, collaboration between design and maintenance can help to improve the relationship.

◊ Lack of support after delivery

◊ Demand of enhancing the communication and support

◊ High response rate in asking support as problems occurrence

◊ Feedback is insufficient

◊ The evidence of integration mechanism provides a good experience for process integration.

◊ The benefits of integration also have been proved. Feedback and support are sufficient during the process.

Design and maintenance limitations

◊ Designers should extend their service for minimizing future maintenance

◊ The maintenance manager is able to assist the designer with providing building maintenance experience

◊ Rare support from designers after building delivery except when problems occur

◊ Lack of historical data and records

◊ Satisfaction of the expectations of energy conservation and comfort are still a challenge

◊ Support from the designers does not end after delivery, especially during the warranty period.

◊ Historical data has been recorded by means of the computerised management system.

◊ Satisfaction by the occupants was supported by the hospitality service program and maintenance management.

The needs of the guidelines and decision support tools

◊ The design should consider maintenance and operation by providing applicable specifications and instructions during early design stage.

◊ Up-to-date instruction and guidelines are needed

◊ Lack of evaluation tools and computerised decision support tools

◊ Intimate relationships between designers and developer and occupants are the major factors of success.

Integration approach

◊ Process integration between different parties can help to increase the effectiveness and efficiency; it would be a potential approach.

◊ System integration can help increase the building performance and minimise energy consumption.

◊ Process integration across the diverse professionals can gain help.

◊ Applicable system integration and building process integration can help energy conservation and maintenance staff.

Table 4-37: Expanded Comparison of Literature Study, Surveys and Case Study

Page 191: THE INTEGRATION BETWEEN DESIGN AND MAINTENANCE …eprints.qut.edu.au/16058/1/Frank_Lin_Thesis.pdf · the integration between design and maintenance of office building automation:

CHAPTER 4 SURVEY, DATA ANALYSIS AND CASE STUDY

173

Several findings in Table 4-37 have been disclosed from the literature reviews and

confirmed with the results of industry survey in this research. These specific issues

are also verified by the case study as in Figure 4-28. In brief, these include:

◊ the necessity of raising awareness and understanding of the importance of

process integration between design and maintenance,

◊ the needs of applicable guidance and operational supports in practice in the

office building automation context.

Literature Study Industry

Survey

Research Objectives

Case Study Objective 1:

Barriers & Limitations

Objective 1: Generate Guidelines

Objective 1: Develop Computerised Decision Support

General Status of Office Building Industry: IB, BAS, Design & Maintenance

Required Information

Potential Approach Process Integration Decision Support TQM, BC, LCC

Design and Maintenance Support

Close Communi-cation

Current Instruction & Support

Strategies Development

Design and Maintenance Practice

Integration Practice

Quality Management

• Awareness and understanding the D/M process integration

• Strategic guidance

• Practical support

Figure: 4-28 Outlines of the Research Process

Next Steps

Page 192: THE INTEGRATION BETWEEN DESIGN AND MAINTENANCE …eprints.qut.edu.au/16058/1/Frank_Lin_Thesis.pdf · the integration between design and maintenance of office building automation:

CHAPTER 4 SURVEY, DATA ANALYSIS AND CASE STUDY

174

4.6 Summary

4.6.1 Implication from the Literature, survey and Case Study

The building occupant’s expectations for energy conservation and comfort are still a

challenge, as well as the requirements of the building performance. BAS is the brain

of the office building, and plays a key role in these critical issues. In addition to the

system integration of BAS, the process integration across different phases has shown

potential feasibilities to improve these issues. In the research context, there is a need

to develop an approach for improvement during the BAS design and maintenance

process.

4.6.2 Recommendations for the Better Design and Maintenance

Subsequently, this survey and case study have presented a number of valuable facts

of the practice and validation of the literature study. They also suggest that in

addition to the horizontal integration between different building services as HVAC,

power/ lighting system, fire/ security system, etc., the vertical integration of process

and support between diverse professionals such as design and maintenance would be

a potential approach in the building automation in an attempt to optimise the

performance of buildings and minimizing energy consumption.

It also has complied with the trend of development and research in the BAS field,

especially while technologies has been promoted and provided various support tools

for building design and maintenance services.

To reach better design and maintenance, several recommendations to enhance the

effectiveness and effeciencies of design and maintenance in the office building

automation are summarised as the follows:

o Balance the building initial costs with the developer’s budgets during the

design stage for the life cycle building costs.

o Early cooperation and direct relationship/ close liaison during the BAS

design stage, especially focusing on the long term communication between

design and maintenance.

o Provide the adequate tools for decision making during the design and

Page 193: THE INTEGRATION BETWEEN DESIGN AND MAINTENANCE …eprints.qut.edu.au/16058/1/Frank_Lin_Thesis.pdf · the integration between design and maintenance of office building automation:

CHAPTER 4 SURVEY, DATA ANALYSIS AND CASE STUDY

175

maintenance periods.

o Develop an adequate support system to provide reference to the latest

information, instruction related design and maintenance, documented

feedback/ post occupancy data and benchmark data collection.

o Understanding the quality of BAS product/ system is important as well as

the quality of process as design and maintenance.

o Reduce the need for maintenance by means of adequate strategies and

employing experience during application and providing after- service.

In accordance with the survey results and analysis merged with above suggestions,

alternatives and decisions for the improvement will rely on adequate information and

knowledge, therefore knowledge extraction is necessary. However, it must be

stressed that this research is an exploration. As such the knowledge extraction and

guidance described in the following chapters intend to develop and pilot a way for

contributing knowledge to the building automation field. This would not be a

substitute for the statutory building regulations or act of government. Therefore, the

following chapters (Ch. 5 & 6) will further extract knowledge and generate

applicable guidelines. The survey results analysed using the code system has been

introduced to make it to look up and search details in the Appendix D and E. The

code system will also be used to instruct in the advanced knowledge induction/

deduction, and guidance listing as well.

Page 194: THE INTEGRATION BETWEEN DESIGN AND MAINTENANCE …eprints.qut.edu.au/16058/1/Frank_Lin_Thesis.pdf · the integration between design and maintenance of office building automation:

CHAPTER 4 SURVEY, DATA ANALYSIS AND CASE STUDY

176

Page 195: THE INTEGRATION BETWEEN DESIGN AND MAINTENANCE …eprints.qut.edu.au/16058/1/Frank_Lin_Thesis.pdf · the integration between design and maintenance of office building automation:

CHAPTER 5 KNOWLEDGE EXTRACTION

177

5.1 Introduction 5.2 Knowledge Extraction from Design Professionals 5.2.1 Knowledge Extraction in "The Needs” 5.2.2 Knowledge Extraction in "Products” 5.2.3 Knowledge extraction in "Design issues” 5.2.4 Knowledge extraction in "Assessment” 5.3 Knowledge Extraction from Maintenance Professionals 5.3.1 Knowledge Extraction in "Overall Status” 5.3.2 Knowledge Extraction in "Management 5.3.3 Knowledge Extraction in "Technical Issues" 5.3.4 Knowledge extraction in "Assessment” 5.4 Decision Making Procedure 5.4.1 Decision Making Process 5.4.2 Decision Making Checklists 5.5 Summary of the Knowledge Extraction

CHAPTER 5 KNOWLEDGE EXTRACTION

The Integration between Design and Maintenance of Office Building Autom

ation: A Decision Support Approach

Page 196: THE INTEGRATION BETWEEN DESIGN AND MAINTENANCE …eprints.qut.edu.au/16058/1/Frank_Lin_Thesis.pdf · the integration between design and maintenance of office building automation:

CHAPTER 5 KNOWLEDGE EXTRACTION

178

5.1 Introduction

In this chapter, the data and facts, collected and analysed from the industry surveys

detailed in Chapter 4, will further be extracted by the inductive and deductive

methods. In the research context, the knowledge has been extracted, primarily

deduced with codes from the induced results of the surveys relating to design and

maintenance, then induced relevant knowledge rules to formulate a knowledge base

for decision support applications. The inductive and deductive methods will drive the

knowledge extraction through the process. In order to describe the knowledge

extraction process, an example relating to the data how to generate knowledge has

been illustrated in Figure 5-1. From this example, the inductive and deductive

knowledge can be expanded to extract the rest of issues with respect to design and

maintenance, which has been illustrated in the following sections and collated in the

Appendix D and E.

Induction Results

Figure 5-1: Example of the Inductive and Deductive Process

The Needs

Importance of BAS to people (DA01)

Role/ awareness of BAS (DA02)

DAR01 The clients and owners of buildings are more interested in BAS than building developers. Generally, the developers were more focused on first costs and sale profits, rather than on the BAS life cycle benefits for the building operation and maintenance

DAR02 The designers can mostly relate to the benefits of BAS in office building and are aware of the BAS responsibilities for building maintenance during the design stage

What is BAS?

Raising the awareness of BAS benefits for the building life to the whole building participants (KDA0101), (KDA0201)

Some of the participants in the building process are not really recognising what BAS is?

Deduction Issues Reasoning Knowledge Subjects

0

2

4

6

8

10

12

14

16

18

Low BelowAverage

Average AboveAverage

High

ClientsBuilding OwnersBuilding Developers

Benefits of BAS on the building operation and maintenance

HighAbove AverageAverageBelow AverageLow

Freq

uenc

y

14

12

10

8

6

4

2

0

4

12

8

11

Responsibility for building maintenance during BAS design stage

HighAbove AverageAverageBelow AverageLow

Freq

uenc

y

14

12

10

8

6

4

2

0

2

10

12

11

Client (occupants), Building owner Building developer

Awareness/ benefits, Responsibility

Questionnaire Surveys

§4.2.3.1

Appendix A

§5.2.1

Page 197: THE INTEGRATION BETWEEN DESIGN AND MAINTENANCE …eprints.qut.edu.au/16058/1/Frank_Lin_Thesis.pdf · the integration between design and maintenance of office building automation:

CHAPTER 5 KNOWLEDGE EXTRACTION

179

An outline of the knowledge extraction and deductive and inductive process starting

from the survey results has been illustrated in Figure 5-2:

Figure 5-2: Outline of the Knowledge Extraction

Design Issues

DESIGN knowledge

The Needs

Assessment

Products

MAINTENANCE knowledge

Technical Issues

Management

Overall Status

Assessment

Knowledge rules

DESIGN & MAINTENANCE KNOW

LEDGE

Page 198: THE INTEGRATION BETWEEN DESIGN AND MAINTENANCE …eprints.qut.edu.au/16058/1/Frank_Lin_Thesis.pdf · the integration between design and maintenance of office building automation:

CHAPTER 5 KNOWLEDGE EXTRACTION

180

5.2 Knowledge Extraction from Design Professionals With respect to BAS design issues, four specific subjects as “The Need”, “Products”,

“Design issues”, and “Assessment” have been discussed and shown in Chapter 5

which detailed the data analysis of the surveys. This section will discuss the process

that further extract knowledge and induce knowledge rules to formulate a knowledge

base for decision support applications as illustrated in Figure 5-3.

KNOWLEDGE

Products

(DB01)

(DB02)

(DB03)

(DB04)

(DB05)

The Needs

(DA01)

(DA02)

(DA03)

(DA04)

(DA05)

(DA06)

Assessment

Design Issues

(DD01)

(DD02)

(DD03)

(DD04)

(DD05)

(DC06)

(DC07)

(DC01)

(DC02)

(DC03)

(DC04)

(DC05)

DESIGN

Figure 5-3: Outline of the Design Knowledge Extraction

Knowledge rules

Page 199: THE INTEGRATION BETWEEN DESIGN AND MAINTENANCE …eprints.qut.edu.au/16058/1/Frank_Lin_Thesis.pdf · the integration between design and maintenance of office building automation:

CHAPTER 5 KNOWLEDGE EXTRACTION

181

5.2.1 Knowledge Extraction in “The Needs” The induction results of “The Needs” as DAR01-DAR06 are illustrated as in Figure

5-4:

Based on these induction results of the data analysis, the knowledge extraction can

be undertaken from the design point of view to explore the current client’s needs and

expectations, and reflect the situation of office building industry. Through the

inductive/ deductive methods, the findings eventually can be concluded (as in Figure

5-5) into four major headings:

What is BAS?

What is Intelligent Building?

Strategies for high performance and life cycle cost considerations

Need to specify the applicable and constructible BAS specification

Client (occupants), Building owner, Building developer

The Needs

Importance of BAS to people (DA01)

Role/ awareness of BAS (DA02)

Awareness/ benefits, Responsibility

Main considerations in design stage (DA03)

Meet regulation/ Easy operation and maintenance/ Performance of systems/ Meet client requirement

Major factors of consideration (DA04)

Building performance, Building life-cycle cost

Realisation requirement/ specification (DA05)

From statistical information/ product manufacturer/ Feedback from previous use

Regulation and specification (DA06)

Building regulation, Product specification

DAR01

DAR02

DAR03

DAR04

DAR05

DAR06

Figure 5-4: Induction Results of “The Needs” from the Design Issues

Page 200: THE INTEGRATION BETWEEN DESIGN AND MAINTENANCE …eprints.qut.edu.au/16058/1/Frank_Lin_Thesis.pdf · the integration between design and maintenance of office building automation:

CHAPTER 5 KNOWLEDGE EXTRACTION

182

What is BAS? Raising the awareness of BAS benefits for the building life to the whole building participants (KDA0101), (KDA0201)

BAS requirements and specifications (KDA0301)

BAS performance focuses and embeds the life- cycle -cost consideration into design (KDA0401)

In the building life cycle, the building performance and costs are equally essential.

The sources of BAS requirements and specifications (KDA0501)

The advanced technology and high expectation of the end users have asked the rapid response of the building requirements.

BAS regulations and product specifications need to be complied and become a basic requirement (KDA0601)

The regulations and specifications are the qualified and standard requirements of the building process and products.

DAR01

DAR02

DAR03

DAR04

DAR05

DAR06

Some of the participants in the building process are not really recognising what BAS is?

Rapidly advanced technology and high expectation of the end users have formed the requirements of building.

Strategies for high performance and life cycle cost considerations

Need to specify the applicable/ constructible BAS specification

Figure 5-5: Deduction of “The Needs” from the Design Issues

Induction Results Deduction Issues Reasoning Knowledge Subjects

What is Intelligent Building?

Page 201: THE INTEGRATION BETWEEN DESIGN AND MAINTENANCE …eprints.qut.edu.au/16058/1/Frank_Lin_Thesis.pdf · the integration between design and maintenance of office building automation:

CHAPTER 5 KNOWLEDGE EXTRACTION

183

The knowledge rules induced from “The Needs” of BAS design are listed as in Table 5-1:

Table 5-1: Induced Knowledge Rules in relation to “The Needs” Rule Code IF THEN

R01DA01 Developers are less focusing on BAS They will need to learn the BAS benefits

R02DA02 Designers mostly realise the BAS benefits and BAS responsibilities for the building maintenance

They will facilitate good BAS designs

R03DA03 Designers are not very interested in the reliability and price or cost of the BAS.

They will affect the BAS design quality and need to learn the life-cycle cost of the BAS.

R04DA03 BAS design quality is low BAS reliability is low R05DA03 BAS design quality is high BAS reliability is high

R06DA03

Designers consider the BAS meeting with the regulation and easy operation and maintenance, performance of the systems, and the client requirements.

They will facilitate good BAS designs

R07DA04 BAS designs take into consideration of the life-cycle cost and performance of the building

They will contribute to the maintenance costs reduction

R08DA05 BAS design requirements and product specifications are provided by the product manufacturers.

These will provide the current BAS product for design application.

R09DA05

BAS design requirements and product specifications are obtained from the feedback of the previous user, client discussion, and sub-contractor's recommendation and statistical information

These will facilitate good BAS designs

R10DA06 BAS designs are in accordance with the building regulation and product specification

These will assure the quality of the BAS designs

Importance of BAS to clientsAverageUnder average100Importance of BAS to building ownerAverage6420

S to t e pe o a ce o bue age860 S to t e e cyc e cost o bue ageU de a e age00

Realise the requirement and specificat20

Page 202: THE INTEGRATION BETWEEN DESIGN AND MAINTENANCE …eprints.qut.edu.au/16058/1/Frank_Lin_Thesis.pdf · the integration between design and maintenance of office building automation:

CHAPTER 5 KNOWLEDGE EXTRACTION

184

5.2.2 Knowledge Extraction in “Products” The induction results of “Products” as DBR01-DBR05 are illustrated as in Figure

5-6:

Based on these induction results in the aspect of the products, the knowledge

extraction can be deduced and concluded as in Figure 5-7 under two major headings:

Select and ensure appropriate, reliable and applicable BAS products.

Building process integration.

DBR01

Products

Availability of BAS (DB01)

Access of information (DB02)

New/ to-date information, Product pros/cons,

Historical practical records

Importance of meeting requirement (DB03)

Feedback from previous use, Availability of to-date information,

Communication with building owners and facility managers

Deliver information (DB04) Deliver information

Responses/ feedback (DB05) Responses/ feedback

DBR02

DBR03

DBR04

DBR05

BAS products available, Performance Information

Figure 5-6: Induced Results of “Products” from Design Issues

Page 203: THE INTEGRATION BETWEEN DESIGN AND MAINTENANCE …eprints.qut.edu.au/16058/1/Frank_Lin_Thesis.pdf · the integration between design and maintenance of office building automation:

CHAPTER 5 KNOWLEDGE EXTRACTION

185

Communication with the product vendors is needed during the design stage. (KDB0102)

Relationship enhancement between designers and building participants are helpful to the building service and application (KDB0302)

The BAS design directly affect the future building operation and management.

BAS design and maintenance beyond the basic regulations and codes can optimise the building performance and service. (KDB0401)

Close relationships can facilitate enhancements and learning between the different parties.

Integration of building process ia a possible alternative for the building management. (KDB0501)

The integration has been recognised as the potential strategies either in the systems integration or in the building process integration.

DBR01

DBR02

DBR03

DBR04

DBR05

Keep the information updated will ensure the design can be sustainable for the needs.

Updated product information and application historic records are needed during the design stage (KDB0101), (KDB0201), (KDB0301)

Select and

ensure appropriate, reliable and applicable

BAS products.

Building process

integration

The basic regulations and codes are the base of the practice. Beyond them can dominate to meet the needs of end users.

Figure 5-7: Deduced Results of “Products” from the Design Issues

Deduction Issues Reasoning Knowledge Subjects Induction Results

Page 204: THE INTEGRATION BETWEEN DESIGN AND MAINTENANCE …eprints.qut.edu.au/16058/1/Frank_Lin_Thesis.pdf · the integration between design and maintenance of office building automation:

CHAPTER 5 KNOWLEDGE EXTRACTION

186

The knowledge rules induced from the “Products” of BAS design are listed as in

Table 5-2:

Table 5-2: Induced Knowledge Rules in relation to “Products” of BAS Design Rule Code IF THEN

R11DB01 BAS designs support by the update product information and the historical records.

These will facilitate good BAS designs

R12DB01 BAS designers communicate with the product vendors.

These will facilitate good BAS designs

R13DB02 BAS designs support by the information of the product pros/ cons

These will facilitate good BAS designs

R14DB03 BAS designers communicate with the building owners and the facilities managers.

They will support the building maintenance.

R15DB03 BAS designs gain information from the previous use.

These will help the new building designs.

R16DB04

Designers deliver the information and manual of BAS operation and maintenance to facilities managers.

They will support the building maintenance.

R17DB05 Responses and feedbacks provide by the facilities managers.

These will help the new building designs.

R18DB05 Responses and feedbacks provided by the facilities managers.

These will facilitate the building process integration.

Current building regulation sufficient foLow6420Product specification appropriateUnder averageLow420

Page 205: THE INTEGRATION BETWEEN DESIGN AND MAINTENANCE …eprints.qut.edu.au/16058/1/Frank_Lin_Thesis.pdf · the integration between design and maintenance of office building automation:

CHAPTER 5 KNOWLEDGE EXTRACTION

187

5.2.3 Knowledge extraction in “Design issues” The induction results of “Design issues” as DCR01-DCR07 are illustrated as in

Figure 5-8:

From this induction result (DCR01-DCR07), the results in the aspect of design issues

can be deduced and concluded under seven major headings shown as in Figure 5-9:

Intelligent Buildings with BAS, and their benefits.

Strategies for sustainable maintenance

ICT and DSS applications

Building system Integration

Strategies for smart design for high performance and optimising operation

and maintenance

Sensors in relation with BAS

Communication and integration, decision support

HVAC/energy management, Electrical power/ Lighting system, Fire/ Security systems, Lifts/Escalator, Parking equipment

Design Issues

Importance of systems (DC01)

System’s problem (DC02)

Need for CAD/ decision support (DC03)

CAD based softwares, Decision support tools

Integration suitability (DC04)

Security/ Lifts/ escalator/ Fire/ Parking system/ Electrical power/ Lighting system

Importance of integration (DC05)

Performance/ Effectiveness/ Efficiency, Energy conservation Comfort/ Healthy, Free maintenance/ Easy management

sensor type control application (DC06)

Temperature/ Light/ Humidity/ Smoke/ Air/ Pressure

DCR01

DCR02

DCR03

DCR04

DCR05

DCR06

Cost and performance (DC07)

Consistency designers/ developers, Technical support DCR07

HVAC/energy management, Electrical power/ Lighting system, Fire/ Security systems, Lifts/Escalator, Parking equipment

Figure 5-8: Induced results of “Design Issues”

Page 206: THE INTEGRATION BETWEEN DESIGN AND MAINTENANCE …eprints.qut.edu.au/16058/1/Frank_Lin_Thesis.pdf · the integration between design and maintenance of office building automation:

CHAPTER 5 KNOWLEDGE EXTRACTION

188

Figure 5-9: Deduced Results of “Design Issues”

The various building systems will satisfy the needs of the occupants and as the premises of the office buildings.

Building systems has been the major players of the office buildings (KDC0101)

Electrical building systems are more complicated than mechanical systems need more maintenance and management. (KDC0201)Needs the BAS design and decision support computerised tools in the building process. (KDC0301)

Computerised tools are good assistants for the practice; moreover, the building projects are more complicate for meeting the needs.

Building systems’ integration is helpful for the building management. (KDC0401)

Integration the different systems has produced good outcomes for the building service.

Objectives of the BAS integration (KDC0501)

These objectives are the expectations of the end users.

Sensor controls are the key component in BAS (KDC0601)

Sensors are one of the major elements in BAS, which play a key role in the sensitive response the change and meets the needs.

DCR01

DCR02

DCR03

DCR04

DCR05

DCR06

Lack of communication and the sufficient support in relation to the cost and performance of BAS between designers and developers. (KDC0701)

Lack of the applicable platform and support for communication between designers and developers.

DCR07

Electrical operation is an invisible environment needs to operate and take care preventively.

Intelligent Buildings with BAS, and their benefits

Strategies for sustainable maintenance ICT and DSS applications

Building system Integration Strategies for smart design for high performance and optimising operation and maintenance Sensors in relation with BAS

Communication and integration, decision support

Deduction Issues Reasoning Knowledge Subjects Induction Results

Page 207: THE INTEGRATION BETWEEN DESIGN AND MAINTENANCE …eprints.qut.edu.au/16058/1/Frank_Lin_Thesis.pdf · the integration between design and maintenance of office building automation:

CHAPTER 5 KNOWLEDGE EXTRACTION

189

The knowledge rules induced from the “Design Issues” are listed as in Table

5-3:

Table 5-3: Induced Knowledge Rules in relation to “Design Issues”

Rule Code IF THEN

R19DC01

Building systems design and maintain adequately.

These will ensure the overall building performance and comfortable environment.

R20DC02 Building systems occur problems These will result in the occupant uncomfortable and complaints.

R21DC03 BAS designs support by the decision support tools

These will facilitate good BAS designs

R22DC04 The integration of the building systems is appropriate

It will save energy, increase security and comfort.

R23DC05 The integration of the building systems is appropriate

It will increase the building performance, effectiveness and efficiency.

R24DC05 The integration of the building systems is appropriate

It will ease maintenance of the building.

R25DC06 Application of sensors for the control and monitoring of the building systems.

It will save energy, increase security and comfort.

R26DC06 Application of sensors for the control and monitoring of the building systems.

It will ease maintenance of the building.

R27DC07 BAS designs support by the information of product cost and performance.

These will facilitate good BAS designs

R28DC07 Designers intimately communicate with the building developers.

These will facilitate good BAS designs

Page 208: THE INTEGRATION BETWEEN DESIGN AND MAINTENANCE …eprints.qut.edu.au/16058/1/Frank_Lin_Thesis.pdf · the integration between design and maintenance of office building automation:

CHAPTER 5 KNOWLEDGE EXTRACTION

190

5.2.4 Knowledge extraction in “Assessment” The induction results of “Assessment” as DDR01-DDR05 are illustrated as in Figure

5-10:

From this induction results (DDR01-DDR05), the results in the aspect of assessment

can be deduced and concluded under six major headings shown as in Figure 5-11:

Building assessment, optimising operational and maintenance practices

Select suitable building maintenance strategies.

Select applicable and reliable BAS products

Building process integration

The status of office building and BAS application

Strategies for sustainable maintenance and security/ fire system design

BAS meeting requirement, Performance/ efficiency, Instruction/ manual, Balance of BAS cost between design requirements and client’s budget, Evaluation tools for BAS

Assessment

Assessment (DD01)

Reasons of poor performance (DD02)

Lack of instruction, Inappropriate operation, Improper maintenance, Design deficiency/shortage, Unsuitable material/ elements/ systems Information

support (DD03) Instruction from the vendors, Suggestion or guidelines Affection to

energy consumption (DD04)

Energy conservation design, Selection BAS, BAS integration, Adequate operation and maintenance Communication

with facility managers (DD05)

Design stage/ Delivery stage/ After delivery/ Problems happening/ Never

DDR01

DDR02

DDR03

DDR04

DDR05

Figure 5-10: Induced Results of “Assessment” from the Design Issues

Page 209: THE INTEGRATION BETWEEN DESIGN AND MAINTENANCE …eprints.qut.edu.au/16058/1/Frank_Lin_Thesis.pdf · the integration between design and maintenance of office building automation:

CHAPTER 5 KNOWLEDGE EXTRACTION

191

Figure 5-11: Deduced Results of “Assessment” from the Design Issues

Evaluation has the functions: to qualify the building status, to examine the performance of the systems and to facilitate the energy conservation.

Building system evaluation is the major step to ensure the high building performance and energy conservation (KDD0101)

Building maintenance needs applicable strategies (KDD0201)

Various strategies of maintenance have their specific purpose and have their pros and cons, limitations and advantages.

Building process integration needs enhancement in practice. (KDD0301)

It is still a challenge for the traditional building process, hopefully process integration will breakthrough the bottle neck of the practice in the life cycle considerations.

How to optimise the high building performance and energy conservation? (KDD0401)

High performance and energy conservation are the needs of the end users during the building life.

How to promote the relationships between different parities of the building process? (KDD0501)

Close relationships can interdigitate enhancements and learning between the different parties, and improve the problems and effective supports.

DDR01

DDR02

DDR03

DDR05

BAS design needs to embed the maintenance consideration. (KDD0202)

How to enhance operation and maintenance? (KDD0402)

Select suitable building maintenance strategies.

The status of office building and BAS application

Design activities are directly impact on the life time operation and maintenance. Building

process integration

Operation and maintenance are the major process of the building services in relation to the building performance and energy conservation.

Strategies for sustainable maintenance and security/ fire system design

Building process integration

Deduction Issues Reasoning Knowledge Subjects Induction Results

Building assessment, optimising operation al and maintenance practices

DDR04

Page 210: THE INTEGRATION BETWEEN DESIGN AND MAINTENANCE …eprints.qut.edu.au/16058/1/Frank_Lin_Thesis.pdf · the integration between design and maintenance of office building automation:

CHAPTER 5 KNOWLEDGE EXTRACTION

192

The knowledge rules induced from “Assessment” of design are listed as in Table 5-4:

Table 5-4: Induced Knowledge Rules in relation to “Assessment” Rule Code IF THEN

R29DD01 Application of the assessment tools for the BAS.

It will verify the performance of building and energy conservation.

R30DD02 Poor BAS performance It will decrease the building performance.

R31DD02 Poor BAS performance It will increase energy consumption

R32DD02 Poor BAS performance It will affect the building maintenance.

R33DD02 Lack of instruction It will result in inappropriate operation and maintenance of the building systems.

R34DD02 Operation of the building systems is inappropriate

It will decrease the building performance.

R35DD02 The maintenance of the building systems is improper.

It will decrease the building performance.

R36DD02 The maintenance of the building systems is improper.

It will increase the maintenance costs.

R37DD02 Designs have deficiencies or shortages It will decrease the building performance.

R38DD02 Designs have deficiencies or shortages It will increase energy consumption

R39DD03 Designers provide instruction and guidelines to facilities managers.

They will help the building maintenance.

R40DD04 Operation and maintenance are adequate.

These will facilitate the energy conservation.

R41DD04 Energy conservation designs These will facilitate the energy conservation.

R42DD04 Selection BAS is appropriate It will facilitate the energy conservation.

R43DD04 Adequate BAS integration with building systems

It will facilitate the energy conservation.

R44DD05 Designers intimately communicate with facilities managers after building delivery.

They will help the building maintenance.

Page 211: THE INTEGRATION BETWEEN DESIGN AND MAINTENANCE …eprints.qut.edu.au/16058/1/Frank_Lin_Thesis.pdf · the integration between design and maintenance of office building automation:

CHAPTER 5 KNOWLEDGE EXTRACTION

193

5.3 Knowledge Extraction from Maintenance

Professionals With respect to BAS Maintenance issues, four specific subjects as “Overall status”,

“Management”, “Technical issues”, and “Assessment” have been discussed and

shown in Chapter 4 which detailed the data analysis of the surveys. This section will

further extract knowledge and induce knowledge rules to formulate a knowledge

base for decision support applications as illustrated in Figure 5-12.

KNOWLEDGE

Knowledge rules

Figure 5-12: Outline of the Maintenance Knowledge Extraction

Overall Status

(MA01)

(MA02)

(MA03)

(MA04)

(MA05)

(MA06)

Management

(MB01)

(MB02)

(MB03)

(MB04)

(MB05)

(MB06)

Assessment

Technical Issues

(MC01)

(MC02)

(DC03)

(MC04)

(MC05)

(MD01)

(MD02)

(MD03)

(MD04)

(MD05)

(MD06)

(MD07)

MAINTENANCE

Page 212: THE INTEGRATION BETWEEN DESIGN AND MAINTENANCE …eprints.qut.edu.au/16058/1/Frank_Lin_Thesis.pdf · the integration between design and maintenance of office building automation:

CHAPTER 5 KNOWLEDGE EXTRACTION

194

5.3.1 Knowledge Extraction in “Overall Status” The induction results of “Overall status” as MAR01-MAR06 are illustrated as in

Figure 5-13:

Based on these induction results of the data analysis detailed in Chapter 5, the

knowledge extraction can be undertaken from the maintenance point of view to

explore the current client’s needs and expectations. Through the induction/ deduction

method, the findings eventually can be concluded as in Figure 5-14 under nine major

headings:

What is intelligent building with BAS?

How to sustain the comfort and healthy requirements?

What is current BAS situation and future development?

How to minimise the energy consumption?

How to optimise operation and maintenance?

Strategies for sustainable maintenance

Strategies for smart design and system integration

Selection of applicable and reliable BAS products

Strategies for high performance, energy conservation and comfort

'Smart/ intelligent' features, Comfortable/ healthy, BAS maintenance, Energy consumption

Overall Status

BAS function (MA01)

Problems/ Troubles (MA02)

Electrical systems, Mechanical systems, Automatic operation/ monitoring systems

Reasons for poor BAS performance (MA03)

Design deficiency/ shortage, Inappropriate operation, Improper maintenance, Lack of instruction, Unsuitable material/ elements/systems

Regulations and Specifications (MA04)

Building regulation/ codes, Product specification

Standard Operation Procedures (Sops) provided (MA05)

In-house qualified staff, Design consultants, Maintenance consultants, Facility manager

Expectations of clients (MA06)

Feasibility/ Adaptability/ Accessibility, Friendliness/ Comfort/ Convenience, Minimisation of energy consumption, Performance/ Effectiveness/ Responsiveness

MAR01

MAR02

MAR03

MAR04

MAR05

MAR06

Figure 5-13: Induction Results of “Overall Status” from the Maintenance Issues

Page 213: THE INTEGRATION BETWEEN DESIGN AND MAINTENANCE …eprints.qut.edu.au/16058/1/Frank_Lin_Thesis.pdf · the integration between design and maintenance of office building automation:

CHAPTER 5 KNOWLEDGE EXTRACTION

195

What is intelligent building and BAS?

Smart and intelligent building and BAS are commonly accepted by the building occupants and maintenance professionals. (KMA0101)

The conditions of the office building reflect that the performance and problem prevention can be through good maintenance and management. (KMA0201)

Maintainers needs applicable operation and maintenance instructions

Either the design specifications and functions are not effectively pass onto the maintainers or they are not competent in facilities maintenance.

BAS design needs to be enhanced. (KMA0303)

Lack of the energy conservation design or strategies to minimise the energy consumption.

Building codes and specifications are the base of optimising the BAS (KMA0401)

Office buildings can be maintained to sustain the performance of building, and comfortable and healthy workplace to meet the needs of the users

MAR01

MAR02

MAR03

MAR04

MAR05

MAR06

Smart and intelligent buildings provide the methods and equipment to satisfy the needs of users.

Office buildings should be maintained to sustain the comfortable and healthy workplace to meet the needs of the users

What is current BAS situation and future development?

How to minimise the energy consumption?

Figure 5-14: Deduction of “Overall Status” from the Maintenance Issues

How to sustain the comfort and healthy requirements?

Induction Results Deduction Issues Reasoning Knowledge Subjects

How to optimise operation and maintenance?

Strategies for sustainable maintenance

Strategies for smart design and systems integration

The operation and maintenance instructions are the basic documents for action and management.

Sustainable competencies of maintenance rely on regular training such as on- job training.

BAS can be designed well to meet with the needs in the light of the rapid growing technology innovation and products development.

Training of the maintenance skills is needed. (KMA0302)

BAS designers should extend their service for the building life to sustain the quality of the building systems (KMA0501)

To optimise the building performance need to over enhance the requirements by using the reliable BAS products.

Technical competencies need continued training and support by the designers and related professionals such as the product manufacturers and BAS professionals.

Selection of applicable and reliable BAS products

Office buildings should sustain the requirements of high performance, energy conservation and comfort. (KMA0601)

To facilitate the high performance and energy conservation and comfort can meet the expectations of the end users.

Strategies for high performance, energy conservation and comfort

Energy consumption is still a challenge for the client expectations. (KMA0104)

BAS maintenance is currently needed to meet the design intentions. (KMA0103)

The requirements of the comfortable/ healthy environment are needed. (KMA0102)

Page 214: THE INTEGRATION BETWEEN DESIGN AND MAINTENANCE …eprints.qut.edu.au/16058/1/Frank_Lin_Thesis.pdf · the integration between design and maintenance of office building automation:

CHAPTER 5 KNOWLEDGE EXTRACTION

196

The knowledge rules induced from the “Overall Status” are listed as in Table 5-5:

Table 5-5: Induced Knowledge Rules in relation to “Overall Status” of Maintenance

Rule Code IF THEN

R45MA01 BAS maintenance is appropriate It will facilitate energy conservation

R46MA01 BAS maintenance is appropriate It will facilitate comfortable/ healthy environment.

R47MA01 BAS maintenance is appropriate It will enhance the smart/ intelligent features.

R48MA02 Poor maintenance of building electrical systems It will increase energy consumption.

R49MA02 Poor maintenance of building electrical systems

It will affect the comfort environment.

R50MA02 Poor maintenance of building electrical systems

It will affect the performance of building

R51MA02 Poor maintenance of building mechanical systems It will increase energy consumption.

R52MA02 Poor maintenance of building mechanical systems

It will affect the comfort environment.

R53MA02 Poor maintenance of building mechanical systems

It will affect the performance of building

R54MA02 Poor maintenance of BAS It will increase energy consumption.

R55MA02 Poor maintenance of BAS It will affect the comfort environment.

R56MA02 Poor maintenance of BAS It will decrease the performance of building

R57MA04 The BAS maintenance complies with the building regulation/ codes

It will assure the quality of BAS maintenance

R58MA04 The BAS maintenance complies with the product specification.

It will assure the quality of BAS maintenance

R59MA05 BAS maintenance is in accordance with the standard operation procedures (SOPs)

It will result in the quality of BAS maintenance.

R60MA06 The building systems are feasible/ adaptable/ accessible

These will meet with the occupants' expectations

R61MA06 The building systems are friendly/ comfortable/ convenient

These will meet with the occupants' expectations

R62MA06 The building systems are designed to minimise the energy consumption

These will meet with the occupants' expectations

R63MA06 The building systems are effective/ responsive.

These will meet with the occupants' expectations

Smart/intelligent features of BASsatisfylittle satisfy3210Comfortable/ healthy work envirosatisfylittle satisfy3210BAS maintenance meeting the dsatisfylittle satisfy3210Energy comsumption meets the little satisfy3210

uto at c ope at o / o to geast0

Page 215: THE INTEGRATION BETWEEN DESIGN AND MAINTENANCE …eprints.qut.edu.au/16058/1/Frank_Lin_Thesis.pdf · the integration between design and maintenance of office building automation:

CHAPTER 5 KNOWLEDGE EXTRACTION

197

5.3.2 Knowledge Extraction in “Management” The induction results of “Management” as MBR01-MBR06 are illustrated as in

Figure 5-15:

Based on these induction results in relation to the products, the knowledge extraction

can be deduced and concluded as in Figure 5-16 under nine major headings:

Strategies for sustainable maintenance

Select suitable professionals

Optimise the operation and maintenance

Building system integration

Select suitable maintenance strategies

ICT and DSS application and support

Relationships between design and maintenance

Promote healthy, comfortable and sustainable environments

Building process integration

Figure 5-15: Induced Results of “Management” from the Maintenance Issues

Management

Responsibility (MB01)

Evaluation (MB02)

Current instruction/ manual, Existing integrated BAS, BAS integration strategy

Importance (MB03)

Churn rate, Maintenance rate, Computer applications, Communications occupiers/ design consultants

Systems Integration (MB04)

HVAC/ Security/Lifts/Fire/Electrical power/ Lighting/ Parking

Problem Solving (MB05)

The problem solving procedures, Dealing complaints, Tracking solving problems

MBR01

MBR02

MBR03

MBR04

MBR05

a) In-house qualified staff (b) Contracted services (c) Management professional, Operation Maintenance, Developing/ Reconfiguring

MBR06Situation (MB06)

Deliver problems, Applicable instruction, Problems/ complaints feedback

Page 216: THE INTEGRATION BETWEEN DESIGN AND MAINTENANCE …eprints.qut.edu.au/16058/1/Frank_Lin_Thesis.pdf · the integration between design and maintenance of office building automation:

CHAPTER 5 KNOWLEDGE EXTRACTION

198

BAS operations need applicable support and maintenance instruction to sustain the quality of the buildings. (KMB0101)

The BAS instruction and manuals need to be current and to be effective. (KMB0201)

The right selection of maintenance contractors and professionals can assure the quality of the building maintenance.

Communication between building maintainers and designers is needed. (KMB0303)

Updated BAS instruction and manuals can enhance the effective operation and maintenance.

The problem solving procedures, dealing with the complaints and tracking problem solving are core issues of building management. (KMB0501)

MBR01

MBR04

MBR05

BAS operation and maintenance instruction can direct a correct and consistent process.

BAS contracted and management professionals are critical for the building life. (KMB0102)

Strategies for sustainable maintenance

Optimise the operation and maintenance

Free or effective maintenance can facilitate the performance of buildings and save costs as well.

Figure 5-16: Deduced Results of “Management” from the Maintenance issues

Deduction Issues Reasoning Knowledge Subjects Induction Results

MBR06

BAS designers provide their service for the building. (KMB0601)

Select suitable professionals

BAS system integration is needed to improve and increase the awareness of benefits. (KMB0202)

BAS integration is essential for the office building to facilitate the performance and energy conservation and comfort.

Building system integration

BAS effective maintenance is needed to ease the implement (KMB0301)

Feedback from the building maintainers to the designers is needed. (KMB0602)

Building systems integration is advantageous for the building management and performance enhancement. (KMB0401)

Computer aided management is needed (KMB0302)

Feedback can present reference for building system design and support.

Computer aided support can promote the effectiveness and performance of building systems, and management as well.

The relatively communications are helpful for the operation and maintenance between designers and maintainers, and feedbacks from the maintainers are also promoting a good design.

Building life services are needed to effectively minimise the life cycle costs.

Dealing with the problems and complaints are basic requirements for ensuring the comfort.

The benefits of the systems integration can facilitate the building performance and save the life cycle costs.

Select suitable maintenance strategies

ICT and DSS application and support

Relationships between design and maintenance

Building system integration

Promote healthy, comfortable and sustainable environments

Building process and integration

Relationships between design and maintenance

MBR03

MBR02

Page 217: THE INTEGRATION BETWEEN DESIGN AND MAINTENANCE …eprints.qut.edu.au/16058/1/Frank_Lin_Thesis.pdf · the integration between design and maintenance of office building automation:

CHAPTER 5 KNOWLEDGE EXTRACTION

199

The knowledge rules induced from the “Management” are listed as in Table 5-6:

Table 5-6: Induced Knowledge Rules in relation to “Management”

Rule Code IF THEN

R64MB02 BAS integration is appropriate. It will result in the quality of BAS maintenance.

R65MB02 BAS integration is appropriate. It will facilitate energy conservation

R66MB02 BAS integration is appropriate. It will facilitate comfortable/ healthy environment.

R67MB02 BAS integration is appropriate. It will enhance the smart/ intelligent features.

R68MB03 BAS maintenance rates in the office building are high.

these will increase the maintenance costs.

R69MB03 Maintenance strategy is appropriate. It will reduce the BAS maintenance rate.

R70MB03 BAS maintenance rates in the office building is low.

These will decrease the maintenance costs.

R71MB03 BAS maintenance utilises the computer aids.

It will optimise the BAS maintenance and effectiveness.

R72MB03 Facilities managers often communicate with the occupants and designers.

These will meet with the occupants' expectations

R73MB04 Integration of the building systems is appropriate. It will facilitate energy conservation

R74MB04 Integration of the building systems is appropriate.

It will facilitate comfortable/ healthy environment.

R75MB04 Integration of the building systems is appropriate.

It will enhance the smart/ intelligent features.

R76MB05 Problem solving is effective. It will meet the occupant's expectations.

R77MB05 Dealing with complaints is effective. It will meet the occupant's expectations.

R78MB05 Tracking problem solving is effective. It will meet the occupant's expectations.

R79MB06 Maintenance supports by the designers and venders. It will ease the BAS maintenance

R80MB06 Occupants communicate complaints to facilities manager.

These will ease the BAS maintenance

R81MB06 Facilities managers deliver problems to designers. These will enhance the BAS design.

cExpectations of clients fromaverage420Expectations of clients fromaverage6420Expectations of clients fromaverageunder average6420cExpectations of clients fromaverage6420

operation responsibility forcontracted servicesIn house qualified s6420maintenance responsibilitycontracted servicesIn house qualified s6420Developping/ reconfiguringcontracted servicesIn house qualified s420current instruction/ manuala littlenot at all210Existing integrated BAS is a little3210

C u ate ( u be o t es ea e age60 S a te a ce ate t eu de a e age30Use o co pute app cat o sa e ageu de a e age0Co u cat o s bet ee bua e ageu de a e age0

e p ob e so g p ocedutt e30 ea g t t e co p a ts oatt e30 ac g/ so g p ob e s o S goodatt eF 0

e e p ob e s o S opees30

Syste s su tab e o t e teg3 5 63 5 60

Page 218: THE INTEGRATION BETWEEN DESIGN AND MAINTENANCE …eprints.qut.edu.au/16058/1/Frank_Lin_Thesis.pdf · the integration between design and maintenance of office building automation:

CHAPTER 5 KNOWLEDGE EXTRACTION

200

5.3.3 Knowledge Extraction in “Technical Issues” The induction results of “Technical Issues” as MCR01-MCR05 are illustrated as in

Figure 5-17:

From these induced results (MCR01-MCR05), results in the aspect of design issues

can be deduced and concluded as in Figure 5-18 under four major headings:

Promote health, comfort and sustainable environments

Sensors in relation with BAS

Strategies for security system/ fire system design and maintenance

BAS and building management

Fan coil control, Humidity Control, Energy consumption Importance (MC01)

Responses (MC02)

Security (MC03) Security system/ separate power supply, Security system interfaced with the fire systems

Access Control System (MC04)

Access control smart cards/key code/ID cards, CCTV presence detectors and archiving

Sensor type control (MC05)

Light/Temperature/Humidity/Smoke/Air/Pressure

MCR01

MCR02

MCR03

MCR04

MCR05

Complaints Not enough fresh air, Inadequate temperature/ humidity control, Lack of individual control, Noise from HVAC system

Figure 5-17: Induced Results of “Technical Issues”

Technical Issues

Page 219: THE INTEGRATION BETWEEN DESIGN AND MAINTENANCE …eprints.qut.edu.au/16058/1/Frank_Lin_Thesis.pdf · the integration between design and maintenance of office building automation:

CHAPTER 5 KNOWLEDGE EXTRACTION

201

Figure 5-18: Deduced Results of “Technical Issues”

Individual controls not only enhance the personal comfort and needs, but also minimise the energy consumption.

Equipped with applicable individual controls for HVAC is important for meeting the comfort and energy conservation. (KMC0101)

Various individual controls for HVAC are needed to facilitate comfort and energy conservation. (KMC0201)

Security system should be equipped with a separated power supply (KMC0301)

There are interactive relations between security and fire system during the operation.

Office buildings equipped with BAS are helpful for the management (KMC0401)

BAS provides tools for office building management.

The sensors are very helpful to meet the comfort and security requirements should be widely applied. (KMC0501)

The functions of the sensor.

MCR01

MCR02

MCR03

MCR04

MCR05

With respect to the security system, the power supply should be separated to avoid the building electrical power shutdown.

Promote health, comfort and sustainable environments

Strategies for security system/ fire system design and maintenance

BAS and building management

Sensors in relation with BAS

Deduction Issues Reasoning Knowledge Subjects Induction Results

Security system should be integrated with the fire systems and building management system. (KMC0302)

Page 220: THE INTEGRATION BETWEEN DESIGN AND MAINTENANCE …eprints.qut.edu.au/16058/1/Frank_Lin_Thesis.pdf · the integration between design and maintenance of office building automation:

CHAPTER 5 KNOWLEDGE EXTRACTION

202

The knowledge rules induced from the “Technical Issues” are listed as in Table 5-7:

Table 5-7: Induced Knowledge Rules in relation to the “Technical Issues”

Rule Code IF THEN

R82MC01 Office buildings apply individual controls.

These will facilitate energy conservation.

R83MC01 Office buildings apply individual controls.

These will facilitate comfortable/ healthy environment.

R84MC01 Office buildings apply individual controls.

These will enhance the smart/ intelligent features.

R85MC01 HVAC operation is appropriate. It will facilitate energy conservation

R86MC03 Security systems are equipped with separate power supply.

These will ensure the life safety and security.

R87MC03 Security systems are interfaced with the fire systems.

These will ensure the life safety and security.

R88MC04 Access control is equipped with smart cards/ key code/ ID cards.

It will enhance the smart/ intelligent features.

R89MC04 Access control is equipped with smart cards/ key code/ ID cards. It will ease security management.

R90MC04 CCTV presence detectors is archieving equipped.

It will enhance the smart/ intelligent features.

R91MC04 CCTV presence detectors is archiving equipped.

It will ease the security management.

Fan coil units in their own conlittleleast3210Complaints inadequate temp25%0%420Complaints lack of individual25%420

c

Page 221: THE INTEGRATION BETWEEN DESIGN AND MAINTENANCE …eprints.qut.edu.au/16058/1/Frank_Lin_Thesis.pdf · the integration between design and maintenance of office building automation:

CHAPTER 5 KNOWLEDGE EXTRACTION

203

5.3.4 Knowledge extraction in “Assessment” The induction results of “Assessment” as MDR01-MDR07 are illustrated as in

Figure 5-19:

From these induced results (MDR01-MDR07), results in the aspect of assessment

can be deduced and concluded as in Figure 5-20 under seven major headings:

Smart design for sustainable maintenance

Strategies for high performance, energy conservation and comfort

Select suitable maintenance strategies

Optimise the operation and maintenance

Building systems and BAS

Select applicable and reliable BAS products

Building process and service integration

Information, Instruction/ manual, Historic records

Assessment

Information (MD01)

Minimize energy consumption (MD02)

Energy conservation design, BAS, BAS integration, BAS integration

Evaluation (MD03)

Monthly/ Seasonally/ Half-Yearly/ Yearly

Who assessment/ evaluation (MD04)

Facility manager/Design consultant

Importance of BAS (MD05)

HVAC/Energy management, Electrical power system/ Lighting system, Fire/ Security system, Lifts/ Escalator

MDR01

MDR02

MDR03

MDR04

MDR05

Figure 5-19: Induced Results of “Assessment” from the Maintenance Issues

Importance (MD06)

BAS meeting requirements, Performance/ efficiency, Balance between requirements/ budget, Evaluation tools for BAS, Water supply/Drainage, Parking equipment /Parking system

MDR06

When communication (MD07)

Design stage/ Delivery stage/ After delivery/ Problems happening/ Never

MDR07

Page 222: THE INTEGRATION BETWEEN DESIGN AND MAINTENANCE …eprints.qut.edu.au/16058/1/Frank_Lin_Thesis.pdf · the integration between design and maintenance of office building automation:

CHAPTER 5 KNOWLEDGE EXTRACTION

204

Figure 5-20: Deduced Results of “Assessment” from the Maintenance issues

Up-to-date information can provide effective operation and

Updated information and sufficient instruction are needed for the operation and maintenance. (KMD0101)

The historical records of BAS operation are helpful for the building management. (KMD0102)

The benefits of the historical record.

The BAS evaluations should be carried out in different periods as necessary. (KMD0301)

Applicable evaluation periods can do effectively the maintenance tasks and prevent problems.

Well qualified facilities managers are needed and BAS evaluation tools as well. (KMD0401)

They are the main executers for maintaining the building systems, and the evaluation tools can help them to ensure the performance of buildings.

HVAC/ energy management system, electrical power/ lighting system, fire/ security system and lifts/ escalator are core systems in the office buildings should be particularly focused on. (KMD0501)

Those building systems are the core systems for the building electrical and mechanical operations to provide the service and needs of the occupants.

MDR01

MDR02

MDR03

MDR04

MDR05

Reduction of the energy consumption will rely on the energy conservation design in BAS, selection applicable BAS, BAS integration and good operation and maintenance. (KMD0201)

Smart design for sustainable maintenance

Select suitable maintenance strategies

Those factors are the key issues for the minimisation of the energy consumption.

Strategies for high performance, energy conservation and comfort

Optimise the operation and maintenance

Building systems and BAS

Deduction Issues Reasoning Knowledge Subjects Induction Results

Communications between building maintainers and designers are needed, especially, after building delivery. (KMD0701)

The facilities maintainers can obtain sufficient support from designers and feedback the maintenance experience to designers.

MDR07 Building process and integration

BAS design and maintenance should focus on the building performance and sustainable evaluation tools, the comfort of the users, and budget balance with the needs. (KMD0601)

Application of suitable BAS are not only effective in the building operation and maintenance, but also save the initial building costs.

MDR06

Select applicable and reliable BAS products

Page 223: THE INTEGRATION BETWEEN DESIGN AND MAINTENANCE …eprints.qut.edu.au/16058/1/Frank_Lin_Thesis.pdf · the integration between design and maintenance of office building automation:

CHAPTER 5 KNOWLEDGE EXTRACTION

205

The knowledge rules induced from the “Assessment” are listed as in Table 5-8:

Table 5-8: Induced Knowledge Rules in relation to the “Assessment” of the

Maintenance

Rule Code IF THEN

R92MD01 Maintainers support by up-to-day information and instruction/ manual. These will ease maintenance.

R93MD01 Maintainers support by the historical records. These will ease maintenance.

R94MD03 Maintenance is scheduling as monthly and yearly.

It will assure the quality of BAS maintenance

R95MD04 BAS evaluation is carried out by the facilities manager.

It will assure the quality of BAS maintenance

R96MD04 BAS evaluation is supported by the evaluation tools.

It will assure the quality of BAS maintenance

New or to date informatFair suficientEnough420Historic records of BASFair suficientEnough3210

e gy co se at o dea e age0pp cab e Sa e age60dequate ope at o a da e ageu de a e age0

Page 224: THE INTEGRATION BETWEEN DESIGN AND MAINTENANCE …eprints.qut.edu.au/16058/1/Frank_Lin_Thesis.pdf · the integration between design and maintenance of office building automation:

CHAPTER 5 KNOWLEDGE EXTRACTION

206

5.4 Decision Making Procedure

5.4.1 Decision Making Process

Decision-making is an activity of deciding on the appropriate action under particular

conditions or situations. It is reliant on information in the sense that information is

seen as reducing uncertainty in decision-making; information is data interpreted in

some context by some particular person or group, on which as information relies on

data, good decision making is reliant on good (accuracy, age, time horizon, level of

summarisation, completeness, accessibility, and relevance) data (Beynon-Davies, P.

2002). There are four general stages in any decision making process as illustrated in

Figure 5-21 (Simon, H. 1960):

The above illustration has a number of explicit feedback loops implying that most

decision-making is iterative. For instance, at the design phase the questions may arise

that require further intelligence gathering. Most human decision-making appears to

be satisfying rather than rational behaviour, since they normally make decisions in a

limited amount of time, based on limited information and with a limited ability to

process information (Beynon-Davies, P. 2002).

Decision-making

Intelligence

Design

Choice

Implementation

Information

Decision

Figure 5-21: The Decision–making Process

Page 225: THE INTEGRATION BETWEEN DESIGN AND MAINTENANCE …eprints.qut.edu.au/16058/1/Frank_Lin_Thesis.pdf · the integration between design and maintenance of office building automation:

CHAPTER 5 KNOWLEDGE EXTRACTION

207

Reviewing the decision making process, the early stage of building design is an art as

well as a science; the later stages of the design process tend to be narrower and more

defined. The office building automation design and maintenance relating to the BAS

practical application is more artificial. Hence, the decision could be made along a

more scientific path. It can be carried out in a general process in the following

steps: (1). Assess the situation (2). Identify choices of possible decisions (3). Make

decision (4). Validate the decision, the process and the results.

(1). Assess the situation: Subjects, Questions/ problems

◊ Consider decision to be made (in the form of a question)

◊ Identify critical factors involved in decision

◊ Review what is known about each factor

◊ Check for what is not known about each factor

◊ Discover resources for fact-finding

◊ Complete fact-finding

(2). Identify choices of possible decisions: Descriptions and analysis

◊ List feasible, realistic and possible decision

◊ Note positive and negative consequences for each with rationale

◊ Eliminate decisions of lesser value through rationale

(3). Make decision: Find strategies/ solutions

◊ Choose the applicable strategies/ solutions

◊ Realise the advantages and disadvantages

(4). Validate and discuss:

◊ Certify the decision process and results

◊ Discuss pros and cons

Page 226: THE INTEGRATION BETWEEN DESIGN AND MAINTENANCE …eprints.qut.edu.au/16058/1/Frank_Lin_Thesis.pdf · the integration between design and maintenance of office building automation:

CHAPTER 5 KNOWLEDGE EXTRACTION

208

5.4.2 Decision Making Checklists

To effective decision making, a step-by-step checklists as the follows can help the

decision makers to accomplish the process.

(1) Assessment Step:

Questions Q 1 Q 2 Q 3 Q 4

A. Decision to be made (questions):

B. Critical factors involved

C. Information known

D. Information needed (unknown)

E. Resources for fact-finding

F. Answers to each question

(2) Identification Step:

Possible Decisions

Negative Consequences

Positive Consequences Others

Decision #1

Decision #2

(3) Make decision:

Priority Choice Advantages Disadvantages #1 #2 #3 #4

(3) Validation Step:

Final decision with rationale

First Choice

Second Choice

Third Choice

Fourth Choice

Validate decision:

Page 227: THE INTEGRATION BETWEEN DESIGN AND MAINTENANCE …eprints.qut.edu.au/16058/1/Frank_Lin_Thesis.pdf · the integration between design and maintenance of office building automation:

CHAPTER 5 KNOWLEDGE EXTRACTION

209

During the decision making process, the revelant information with respect to the

critical factors of the problems or questions should be firstly gathered and assessed.

They will include known and unknown information, and relevant resources.

Identification step will list the possible solutions and strategies and their negative and

positive consequences. Once the possible solutions and strategies have been listed,

they can be ordered under the priorities with their advantages and disadvantages.

Consequently, the decisions can be reviewed and finalised by means of the validation

of the process and results. The best possible choice at this time can be revised as

more information about problems, thus a new decision might become a better choice.

Page 228: THE INTEGRATION BETWEEN DESIGN AND MAINTENANCE …eprints.qut.edu.au/16058/1/Frank_Lin_Thesis.pdf · the integration between design and maintenance of office building automation:

CHAPTER 5 KNOWLEDGE EXTRACTION

210

5.5 Summary of the Knowledge Extraction The knowledge gained from deduced survey results with respect to design and

maintenance professionals and practice has been systematically extracted and

illustrated along with the knowledge rules. The knowledge extraction associated with

the integration context of design and maintenance has been summarised as listed in

Table 5-9. The variables relating to the knowledge rules have been summarized with

codes as listed in Table 5-10. The knowledge rules which will be formulated a

knowledge base can be used for the decision support application as listed in Table

5-11. The Knowledge inference flow is illustrated as in Figure 5-23.

The knowledge extraction process has produced more focused issues on design

compared to feedbacks from maintenance to design. This is because that the research

focuses aim at the integration between design and maintenance, during the

integration progress most strategies rely on the support and service from design

phase. Meanwhile, if the design knowledge can be effectively applied for the

maintenance practice, it will be worthier than maintenance feedbacks to design for

the new project.

In conclusion, the extracted knowledge can be further categorised into three pillars:

(1) Strategies for raising awareness and understanding (2) General strategies and (3)

Operational checklists illustrated as in Figure 5-22.

Page 229: THE INTEGRATION BETWEEN DESIGN AND MAINTENANCE …eprints.qut.edu.au/16058/1/Frank_Lin_Thesis.pdf · the integration between design and maintenance of office building automation:

CHAPTER 5 KNOWLEDGE EXTRACTION

211

In addition to raising the awareness and understanding of the integration between

design and maintenance, regarding office building automation performance and

energy conservation and comfort, the guide should be expanded from information

and generated from actual operations to help improve the status of integration in the

office building industry, eventually to satisfy the objectives of this research. The

guide will be described and illustrated in these three pillars detailed in the next

chapter.

Strategies for Raising

awareness and

understanding

BAS and building management Building systems and BAS Building systems integration Communication and integration, decision support ICT and DSS applications Relationships between design and maintenance The status of office building and BAS future development. What is BAS? What is intelligent building with BAS and their benefits?

General Strategies

Need to specify the applicable BAS specification Optimise the operation and maintenance Promote healthy, comfortable and sustainable environments Strategies for high performance, energy conservation and

comfort Strategies for security system/ fire system design and

maintenance Strategies for smart design and systems integration Strategies for sustainable maintenance Strategies for high performance and life cycle cost

considerations

Operational Checklists

How to minimise the energy consumption? How to optimise operation and maintenance? Select applicable and reliable BAS and appropriate products. Select suitable maintenance strategies Select appropriate professionals Sensors in relation with BAS Smart design for sustainable maintenance Building assessment, optimising the operation and maintenance

practice

Figure 5-22: Summary of Knowledge Extraction

Page 230: THE INTEGRATION BETWEEN DESIGN AND MAINTENANCE …eprints.qut.edu.au/16058/1/Frank_Lin_Thesis.pdf · the integration between design and maintenance of office building automation:

CHAPTER 5 KNOWLEDGE EXTRACTION

212

Table 5-9: Summary of knowledge extraction associated with the integration context of design and maintenance

MEET

ING

OCCU

PANT

S’

EXPE

CTAT

IONS

Secu

rity

Life

Saf

ety

Com

fort

& H

ealth

y En

viro

nmen

t

Mai

nten

ance

Cos

ts

Ener

gy C

onse

rvat

ion

Perf

orm

ance

Smar

t & In

telli

gent

Fe

atur

es

Out

put

Perf

orm

ance

as

des

igne

d

Low

m

aint

enan

ce

rate

Ener

gy

savi

ng

Mee

ting

regu

latio

n/

prod

uct

spec

ifica

tions

Feed

back

Proc

ess

Secu

rity

man

agem

ent

Pres

ence

de

tect

ion

BA

S m

aint

enan

ce,

Ade

quat

e H

VAC

O

/M

Com

pute

r aid

s ap

prop

riate

m

aint

enan

ce

stra

tegy

B

uild

ing

syst

em

mai

nten

ance

Ass

essm

ent t

ools

Prob

lem

Sol

ving

MAIN

TENA

NCE

EASY

, SUS

TAIN

ABLE

MAI

NTEN

ANCE

Inpu

t

Qua

lity

Des

ign

Supp

orts

of

guid

elin

es,

SOPs

Inst

ruct

ions

H

isto

rical

re

cord

s

Prob

lem

s

Out

put

Acc

essi

ble

Inte

grat

ed,

Res

pons

ive

Effic

ient

Effe

ctiv

e,

Com

forta

ble

Cos

ts

redu

ctio

n

Qua

lity

de

sign

,

Ener

gy

cons

erva

tion

Mee

ting

regu

latio

n/

prod

uct

spec

ifica

tions

Qua

lity

Des

ign

Proc

ess

Acc

ess s

mar

t de

sign

, Se

curit

y in

terf

aced

w

ith fi

re

syst

ems

Syst

ems

inte

grat

ion

Sens

or

cont

rol/

mon

itorin

g,

Indi

vidu

al

cont

rol

Life

cyc

le

cost

s co

nsid

erat

ion

Ener

gy

cons

erva

tion

desi

gn

BA

S in

tegr

atio

n,

BA

S se

lect

ion

Prob

lem

So

lvin

g

DESI

GN

QUAL

ITY,

SMA

RT D

ESIG

N

Inpu

t

Nee

ds o

f the

ow

ners

/ oc

cupa

nts

Proc

ess

inte

grat

ion

cons

ider

atio

n

Reg

ulat

ions

/ C

odes

, H

isto

rical

re

cord

s

Prod

ucts

co

sts,

His

toric

al

reco

rds

Req

uire

men

ts

of th

e ow

ners

/ oc

cupa

nts

Poor

bui

ldin

g sy

stem

s,

BA

S

Prob

lem

s

Stat

us o

f cur

rent

offi

ce

build

ing

auto

mat

ion

Inde

pend

ent a

nd

frag

men

tal d

esig

n an

d m

aint

enan

ce

Hig

h m

aint

enan

ce c

osts

Nee

ds o

f com

forta

ble

and

secu

rity

and

heal

thy

envi

ronm

ents

Firs

t cos

t men

talit

y

Lack

of l

ife ti

me

inst

ruct

ion

and

hist

oric

al re

cord

s

Des

ign

Def

icie

ncy/

Sh

orta

ge

Req

uire

men

ts o

f sm

art

and

inte

llige

nt

perf

orm

ance

Page 231: THE INTEGRATION BETWEEN DESIGN AND MAINTENANCE …eprints.qut.edu.au/16058/1/Frank_Lin_Thesis.pdf · the integration between design and maintenance of office building automation:

CHAPTER 5 KNOWLEDGE EXTRACTION

213

Table 5-10: Variables with Codes of the Knowledge Variables Codes

Access control is equipped with smart cards/ key code/ ID cards ACS HVAC operation is appropriate AHVACO BAS & building systems integration is appropriate. AI BAS maintenance is appropriate AM Maintenance strategy is appropriate AMS Operation is appropriate AO Affect the performance of building BP Building systems occur problems BSP Contribute to the maintenance costs reduction DMC Designers consider the BAS meeting with the client requirements. MR Facilitate comfortable/ healthy environment. CS Designers mostly realise the BAS benefits DB Dealing complaints is effective DC Designers intimately communicate with the building developers. DCD BAS design requirements and product specifications obtain from the client discussion DRCD BAS design communicates with the building owners and the facilities managers. DCF BAS design requirements and product specifications obtain from the sub-contractor's recommendation DCR BAS design communicates with the product vendors. DCV Designers deliver the information and manual of BAS operation and maintenance. DDI Decrease energy consumption. DE Decrease energy consumption. DEC BAS design feedbacks from the previous use. DFU BAS design requirements and product specifications obtain from the feedback of the previous user DFU Developers are less focusing on BAS DLBAS BAS designs take into consideration of the life-cycle cost DLCC Decrease the maintenance costs. DMC Decrease the building performance. DP BAS design requirements and product specifications provide by the product manufacturers. DPM Designers consider the BAS meeting with the regulation DR BAS responsibilities for the building maintenance DRM BAS design in accordance with the building regulation and product specification DRS Design has a deficiency or shortage DS BAS design supports by the information of product cost and performance DSCP Designers provide instruction and guidelines to facilities managers DSF BAS design supports by the historical records. DSH BAS design requirements and product specifications obtain from the statistical information DSI BAS design supports by the information of the product pros/ cons DSPC BAS design supports by the update product information. DSPI BAS design supports by the decision support tools DST Energy conservation design ECD BAS evaluation is carried out by the facilities manager ECF Ease maintenance. EM Designers consider the BAS meeting with easy operation and maintenance EOM The building systems are effective/ Responsive. ER Ease security management. ESM BAS evaluation is supported by the evaluation tools EST The building systems are feasible/ adaptable/ accessible FAA The building systems are friendly/ comfortable/ convenient FCC Facilities managers often communicate with the designers. FCD Facilities managers often communicate with the occupants FCO

c

Page 232: THE INTEGRATION BETWEEN DESIGN AND MAINTENANCE …eprints.qut.edu.au/16058/1/Frank_Lin_Thesis.pdf · the integration between design and maintenance of office building automation:

CHAPTER 5 KNOWLEDGE EXTRACTION

214

Facilities managers deliver problems to designers. FDP Responses and feedbacks provide from the facilities managers. FF BAS maintenance rate in the office building is high. HMR BAS reliability is high HR Office buildings apply individual controls IC Ensure the comfortable environment. ICE Affect energy conservation IE Increase energy consumption. IEC Result in inappropriate operation and maintenance of the building systems. IM Increase the maintenance costs. IMC Operation of the building systems is inappropriate IO Increase the building performance, effectiveness and efficiency. IP Need to learn the BAS benefits LB Lack of instruction LI BAS maintenance rate in the office building is low LMR BAS design quality is low LQD BAS reliability is low LR BAS maintenance utilises the computer aids MCA BAS maintenance complies with the building regulation/ codes MCR Meet with the occupants' expectations ME BAS maintenance complies with the product specification. MS Maintenance is scheduling as monthly and yearly MSC Maintainers support by the designers and venders MSD Maintainers support by the historical records MSH Maintainers support by up-to-day information and instruction/ manual MSI BAS maintenance is in accordance with the standard operation procedures (SOPs) MSOP Help the new building design. ND Result in the occupant uncomfortable and complaints. OC Occupants respond complaints to facilities manager. OFF CCTV presence detectors and archiving is equipped. PD Facilitate the building process integration. PI Poor maintenance of BAS PM Poor maintenance of building electrical systems PME Poor maintenance of building mechanical systems PMM Poor BAS performance PP Designers consider the BAS meeting with performance of the systems PS Problem solving is effective. PS Produce a good BAS design QD Assure the quality of BAS maintenance QM Reduce the BAS maintenance rate RM Selection BAS is appropriate SBAS Application of sensors for the control and monitoring of the building systems SC

Security system is interfaced with the fire systems SF

Enhance the smart/ intelligent features SI Ease security management SM Security system is equipped with separated power supply SP Ensure the life safety and security SS Tracking problem solving is effective TPS Verify the energy conservation. VE Verify the performance of building VP

Tracking/ solving problems of BAS goodfairlittleF 420

Deliver problems of BAYes3210

a co u ts t e ott eeast30Co p a ts adequate5%0%0Co p a ts ac o d5%0

c

Page 233: THE INTEGRATION BETWEEN DESIGN AND MAINTENANCE …eprints.qut.edu.au/16058/1/Frank_Lin_Thesis.pdf · the integration between design and maintenance of office building automation:

CHAPTER 5 KNOWLEDGE EXTRACTION

215

Table 5-11: Induced Knowledge Rules of BAS Design and Maintenance Rule Code IF THEN

R01DA01 Developers are less focusing on BAS They will need to learn the BAS benefits

R02DA02 Designers mostly realise the BAS benefits and BAS responsibilities for the building maintenance

They will facilitate good BAS designs

R03DA03 Designers are not very interested in the reliability and price or cost of the BAS.

They will affect the BAS design quality and need to learn the life-cycle cost of the BAS.

R04DA03 BAS design quality is low BAS reliability is low R05DA03 BAS design quality is high BAS reliability is high

R06DA03

Designers consider the BAS meeting with the regulation and easy operation and maintenance, performance of the systems, and the client requirements.

They will facilitate good BAS designs

R07DA04 BAS designs take into consideration of the life-cycle cost and performance of the building

They will contribute to the maintenance costs reduction

R08DA05 BAS design requirements and product specifications are provided by the product manufacturers.

These will provide the current BAS product for design application.

R09DA05

BAS design requirements and product specifications are obtained from the feedback of the previous user, client discussion, and sub-contractor's recommendation and statistical information

These will facilitate good BAS designs

R10DA06 BAS designs are in accordance with the building regulation and product specification

These will assure the quality of the BAS designs

R11DB01 BAS designs support by the update product information and the historical records.

These will facilitate good BAS designs

R12DB01 BAS designers communicate with the product vendors.

These will facilitate good BAS designs

R13DB02 BAS designs support by the information of the product pros/ cons

These will facilitate good BAS designs

R14DB03 BAS designers communicate with the building owners and the facilities managers.

They will support the building maintenance.

R15DB03 BAS designs gain information from the previous use.

These will help the new building designs.

R16DB04

Designers deliver the information and manual of BAS operation and maintenance to facilities managers.

They will support the building maintenance.

R17DB05 Responses and feedbacks provide by the facilities managers.

These will help the new building designs.

R18DB05 Responses and feedbacks provided by the facilities managers.

These will facilitate the building process integration.

R19DC01

Building systems design and maintain adequately.

These will ensure the overall building performance and

Importance of BAS to cAverageUnder average100Importance of BAS to bAverage6420

S to t e pe o a cee age860 S to t e e cyc e coe ageU de a e age00

ea se t e equ e e0

Cu e t bu d g egu ato60 oduct spec cat o apU de a e ageo0

Page 234: THE INTEGRATION BETWEEN DESIGN AND MAINTENANCE …eprints.qut.edu.au/16058/1/Frank_Lin_Thesis.pdf · the integration between design and maintenance of office building automation:

CHAPTER 5 KNOWLEDGE EXTRACTION

216

comfortable environment.

R20DC02 Building systems occur problems These will result in the occupant uncomfortable and complaints.

R21DC03 BAS designs support by the decision support tools

These will facilitate good BAS designs

R22DC04 The integration of the building systems is appropriate

It will save energy, increase security and comfort.

R23DC05 The integration of the building systems is appropriate

It will increase the building performance, effectiveness and efficiency.

R24DC05 The integration of the building systems is appropriate

It will ease maintenance of the building.

R25DC06 Application of sensors for the control and monitoring of the building systems.

It will save energy, increase security and comfort.

R26DC06 Application of sensors for the control and monitoring of the building systems.

It will ease maintenance of the building.

R27DC07 BAS designs support by the information of product cost and performance.

These will facilitate good BAS designs

R28DC07 Designers intimately communicate with the building developers.

These will facilitate good BAS designs

R29DD01 Application of the assessment tools for the BAS.

It will verify the performance of building and energy conservation.

R30DD02 Poor BAS performance It will decrease the building performance.

R31DD02 Poor BAS performance It will increase energy consumption

R32DD02 Poor BAS performance It will affect the building maintenance.

R33DD02 Lack of instruction It will result in inappropriate operation and maintenance of the building systems.

R34DD02 Operation of the building systems is inappropriate

It will decrease the building performance.

R35DD02 The maintenance of the building systems is improper.

It will decrease the building performance.

R36DD02 The maintenance of the building systems is improper.

It will increase the maintenance costs.

R37DD02 Designs have deficiencies or shortages It will decrease the building performance.

R38DD02 Designs have deficiencies or shortages It will increase energy consumption

R39DD03 Designers provide instruction and guidelines to facilities managers.

They will help the building maintenance.

R40DD04 Operation and maintenance are adequate.

These will facilitate the energy conservation.

R41DD04 Energy conservation designs These will facilitate the energy conservation.

R42DD04 Selection BAS is appropriate It will facilitate the energy conservation.

R43DD04 Adequate BAS integration with building systems

It will facilitate the energy conservation.

R44DD05 Designers intimately communicate with facilities managers after building delivery.

They will help the building maintenance.

R45MA01 BAS maintenance is appropriate It will facilitate energy

Page 235: THE INTEGRATION BETWEEN DESIGN AND MAINTENANCE …eprints.qut.edu.au/16058/1/Frank_Lin_Thesis.pdf · the integration between design and maintenance of office building automation:

CHAPTER 5 KNOWLEDGE EXTRACTION

217

conservation

R46MA01 BAS maintenance is appropriate It will facilitate comfortable/ healthy environment.

R47MA01 BAS maintenance is appropriate It will enhance the smart/ intelligent features.

R48MA02 Poor maintenance of building electrical systems

It will increase energy consumption.

R49MA02 Poor maintenance of building electrical systems

It will affect the comfort environment.

R50MA02 Poor maintenance of building electrical systems

It will affect the performance of building

R51MA02 Poor maintenance of building mechanical systems

It will increase energy consumption.

R52MA02 Poor maintenance of building mechanical systems

It will affect the comfort environment.

R53MA02 Poor maintenance of building mechanical systems

It will affect the performance of building

R54MA02 Poor maintenance of BAS It will increase energy consumption.

R55MA02 Poor maintenance of BAS It will affect the comfort environment.

R56MA02 Poor maintenance of BAS It will decrease the performance of building

R57MA04 The BAS maintenance complies with the building regulation/ codes

It will assure the quality of BAS maintenance

R58MA04 The BAS maintenance complies with the product specification.

It will assure the quality of BAS maintenance

R59MA05 BAS maintenance is in accordance with the standard operation procedures (SOPs)

It will result in the quality of BAS maintenance.

R60MA06 The building systems are feasible/ adaptable/ accessible

These will meet with the occupants' expectations

R61MA06 The building systems are friendly/ comfortable/ convenient

These will meet with the occupants' expectations

R62MA06 The building systems are designed to minimise the energy consumption

These will meet with the occupants' expectations

R63MA06 The building systems are effective/ responsive.

These will meet with the occupants' expectations

R64MB02 BAS integration is appropriate. It will result in the quality of BAS maintenance.

R65MB02 BAS integration is appropriate. It will facilitate energy conservation

R66MB02 BAS integration is appropriate. It will facilitate comfortable/ healthy environment.

R67MB02 BAS integration is appropriate. It will enhance the smart/ intelligent features.

R68MB03 BAS maintenance rates in the office building are high.

these will increase the maintenance costs.

R69MB03 Maintenance strategy is appropriate. It will reduce the BAS maintenance rate.

R70MB03 BAS maintenance rates in the office building is low.

These will decrease the maintenance costs.

R71MB03 BAS maintenance utilises the computer aids.

It will optimise the BAS maintenance and effectiveness.

Smart/intelligent featuresatisfylittle satisfy3210Comfortable/ healthy wsatisfylittle satisfy3210BAS maintenance meesatisfylittle satisfy3210Energy comsumption mlittle satisfy3210

uto at c ope at o /east0

c pectat o s o c e tsa e age0 pectat o s o c e tsa e age60 pectat o s o c e tsa e ageu de a e age60c pectat o s o c e tsa e age60

ope at o espo s b tyco t acted se cesouse qua ed s60 a te a ce espo s bco t acted se cesouse qua ed s60 e e opp g/ eco guco t acted se cesouse qua ed s0cu e t st uct o / aa tt eot at a0 st g teg ated Sa tt e30

Page 236: THE INTEGRATION BETWEEN DESIGN AND MAINTENANCE …eprints.qut.edu.au/16058/1/Frank_Lin_Thesis.pdf · the integration between design and maintenance of office building automation:

CHAPTER 5 KNOWLEDGE EXTRACTION

218

R72MB03 Facilities managers often communicate with the occupants and designers.

These will meet with the occupants' expectations

R73MB04 Integration of the building systems is appropriate.

It will facilitate energy conservation

R74MB04 Integration of the building systems is appropriate.

It will facilitate comfortable/ healthy environment.

R75MB04 Integration of the building systems is appropriate.

It will enhance the smart/ intelligent features.

R76MB05 Problem solving is effective. It will meet the occupant's expectations.

R77MB05 Dealing with complaints is effective. It will meet the occupant's expectations.

R78MB05 Tracking problem solving is effective. It will meet the occupant's expectations.

R79MB06 Maintenance supports by the designers and venders. It will ease the BAS maintenance

R80MB06 Occupants communicate complaints to facilities manager.

These will ease the BAS maintenance

R81MB06 Facilities managers deliver problems to designers.

These will enhance the BAS design.

R82MC01 Office buildings apply individual controls.

These will facilitate energy conservation

R83MC01 Office buildings apply individual controls.

These will facilitate comfortable/ healthy environment.

R84MC01 Office buildings apply individual controls.

These will enhance the smart/ intelligent features.

R85MC01 HVAC operation is appropriate. It will facilitate energy conservation

R86MC03 Security systems are equipped with separate power supply.

These will ensure the life safety and security.

R87MC03 Security systems are interfaced with the fire systems

These will ensure the life safety and security.

R88MC04 Access control is equipped with smart cards/ key code/ ID cards

It will enhance the smart/ intelligent features.

R89MC04 Access control is equipped with smart cards/ key code/ ID cards It will ease security management.

R90MC04 CCTV presence detectors is archieving equipped.

It will enhance the smart/ intelligent features.

R91MC04 CCTV presence detectors is archiving equipped.

It will ease the security management.

R92MD01 Maintainers support by up-to-day information and instruction/ manual. These will ease maintenance.

R93MD01 Maintainers support by the historical records. These will ease maintenance.

R94MD03 Maintenance is scheduling as monthly and yearly.

It will assure the quality of BAS maintenance

R95MD04 BAS evaluation is carried out by the facilities manager.

It will assure the quality of BAS maintenance

R96MD04 BAS evaluation is supported by the evaluation tools.

It will assure the quality of BAS maintenance

Churn rate (number of taverage6420BAS maintenance rate under average3210Use of computer applicaverageunder average210Communications betweaverageunder average210

e p ob e so g ptt e30 ea g t t e co p aatt e30 ac g/ so g p ob e s o S goodatt eF 0

e e p ob e s oes30

Systems suitable for the2 3 4 5 61 2 3 4 5 6210

a co u ts t e ott eeast30Co p a ts adequate5%0%0Co p a ts ac o d5%0

c

c

e o to date o ata su c e toug0 sto c eco ds o Sa su c e toug30

e gy co se at o dea e age0pp cab e Sa e age60dequate ope at o a da e ageu de a e age0

Page 237: THE INTEGRATION BETWEEN DESIGN AND MAINTENANCE …eprints.qut.edu.au/16058/1/Frank_Lin_Thesis.pdf · the integration between design and maintenance of office building automation:

CHAPTER 5 KNOWLEDGE EXTRACTION

219

EXPECTATIONS

DLCC

Effective/Efficient

Friendly

Comfortable

EnergyConservation

Safe/ Security

Smart/Intellignetfeatures

EST

QD

QM

DC

TPS

PS

IC

AHVACO

ECD

SMSS

SP

SF

ACS SI

PP

PM

PME

PMM

BSP

Accessible

AI

AMMCA

ESTECF

MSI

MSH

MSD

MSC

LMR

MCR

AMS DSF MSOP

SC

SBAS

DRS

DSH

DSPCDSPI

DSCP DPM

DDIDCFDCD

DFUDRCD DCR DSI

DRM DBRBAS

SC

Figure 5-23: Knowledge Inference Flow

Page 238: THE INTEGRATION BETWEEN DESIGN AND MAINTENANCE …eprints.qut.edu.au/16058/1/Frank_Lin_Thesis.pdf · the integration between design and maintenance of office building automation:

CHAPTER 5 KNOWLEDGE EXTRACTION

220

Page 239: THE INTEGRATION BETWEEN DESIGN AND MAINTENANCE …eprints.qut.edu.au/16058/1/Frank_Lin_Thesis.pdf · the integration between design and maintenance of office building automation:

CHAPTER 6 GUIDELINES DEVELOPMENT

221

6.1 Introduction 6.2 Strategies for Raising Awareness and Understanding 6.2.1 Principles of Process Integration between Design and Maintenance 6.2.2 Building Life Cycle Process 6.2.3 Responsibilities and Capabilities of Design and Maintenance

6.2.4 Understand the High Performance and Energy Conservation of Office Building 6.2.5 Employ Strategic Process Integration for BAS Design and Maintenance 6.2.6 BAS Components

6.3 General Strategies for Promoting Design and Maintenance Integration 6.3.1 Select Suitable Design Professionals 6.3.2 Specify the Applicable and Constructible BAS Specification 6.3.3 Ensure Appropriate Product/Systems Integration 6.3.4 Integrate Systems with Infrastructure Functionality 6.3.5 Optimise Operational and Maintenance Practices 6.3.6 Select Appropriate Maintenance Strategy 6.3.7 Facilitate Building Commissioning for Better Results 6.3.8 Strategies for High Performance, Energy Conservation and Comfort 6.3.9 Energy Efficient HVAC Design 6.3.10 Select Energy Efficient Lighting and Electric Lighting Controls 6.3.11 Minimise Energy Consumption 6.3.12 Promote Healthy and Comfortable Environments 6.3.13 Strategies for Security/Fire System Design and Maintenance 6.3.14 Embed Life- Cycle Cost Analysis (LCCA) into Consideration 6.4 Operational Checklists 6.4.1 Checklists for Building Automation System Implementation 6.4.2 Select Applicable and Reliable Building Automation Systems and Products 6.4.3 Execute BAS Maintenance Schedule checklist 6.4.4 Checklist for BAS Design 6.4.5 Checklist for BAS Installation 6.4.6 Checklist for BAS Commissioning 6.4.7 Checklist for BAS Maintenance 6.4.8 Apply Life- Cycle Cost Analysis (LCCA) 6.4.9 Project Delivery System (PDS) 6.5 Summary

CHAPTER 6 GUIDELINES DEVELOPMENT

The Integration between Design and Maintenance of Office Building Autom

ation: A Decision Support Approach

Page 240: THE INTEGRATION BETWEEN DESIGN AND MAINTENANCE …eprints.qut.edu.au/16058/1/Frank_Lin_Thesis.pdf · the integration between design and maintenance of office building automation:

CHAPTER 6 GUIDELINES DEVELOPMENT

222

6.1 Introduction

Conclusions from the previous chapters have demonstrated three necessities to

further highlight conceptions and develop applicable strategies and checklists. This

chapter will extend the results of survey and case study by deploying the extracted

knowledge to generate a number of general strategies and operation checklists to

improve application and then to form a knowledge database for the platform

development of computerised decision support.

Expectations for performance, energy conservation and occupants comfort have

become key issues for the office buildings development in recent years, as confirmed

and verified in the previous chapters of this thesis. The gratification of these

expectations are eventually judged by the building occupants. Therefore, building

owners and managers are interested in having satisfied tenants. In addition, they are

also interested in safety, systems reliability, and efficiency of building operation and

maintenance. These should be the design goals set for the design and implementation

teams.

Keeping the BAS smart and sustainable for maintenance is a challenge in office

buildings. It can be seen from the professional surveys detailed in Chapter 5: the lack

of consensus as to its importance and the lack of effective support tools during the

decision making phase, either in the design or maintenance stage. In addition, it also

reflected the needs of the applicable strategies for the process. In BAS practice, there

are several strategies and principles that should be taken into consideration during

the integration of design and maintenance processes.

The right decisions come from having sufficient and adequate information from

using basic principles and applicable strategies. BAS design for the controlled

devices and subsystems do not operate in vacuum. It must be associated and

conciliated with the building systems and the structure.

Therefore the first basic rule of BAS design is to make the building suitable for the

process or to ensure comfort requirements. The second rule is that a BAS must be

properly designed to satisfy the processes or comfort requirements. For instance, the

best HVAC system cannot overcome inherent deficiencies in the building. Only

Page 241: THE INTEGRATION BETWEEN DESIGN AND MAINTENANCE …eprints.qut.edu.au/16058/1/Frank_Lin_Thesis.pdf · the integration between design and maintenance of office building automation:

CHAPTER 6 GUIDELINES DEVELOPMENT

223

when these criteria have been satisfied can a suitable BAS be applied (Roger W.

Haines & C. Lewis W. 1998).

Discussed in the previous chapters, several strategic methods encompassing the

Building Commissioning (BC), Total Quality Management (TQM) and Life Cycle

Cost Analysis (LCCA) are effective and applicable for the improvement of building

processes including design and maintenance. Based on the author’s experience in

quality control and quality assurenace of the aeronautical vehicle maintenance and

construction/ building management, the effective application of the management

techniques and program can enhance the quality to ensure the system performance.

The following sections will step into the practical executive application by

introducing the principles, strategies and checklists with embedding TQM, BC and

LCC concepts, principles and techniques.

In this research the knowledge extraction from the design and maintenance practice,

BAS product specification, relevant regulation and BAS technology application

which are essential for improving the practice, have been compiled and listed as in

the following guidelines and checklists. They can be primarily categorised into

conceptual strategies, general strategies and operational checklists covering seven

aspects:

(1) Integration concepts and principles,

(2) Smart design and integration,

(3) Sustainable maintenance,

(4) Performance, energy conservation of building and comfort,

(5) Fire/ security system,

(6) Life cycle costing consideration,

(7) BAS design and maintenance implementation.

Page 242: THE INTEGRATION BETWEEN DESIGN AND MAINTENANCE …eprints.qut.edu.au/16058/1/Frank_Lin_Thesis.pdf · the integration between design and maintenance of office building automation:

CHAPTER 6 GUIDELINES DEVELOPMENT

224

The following guidelines and checklists have been designed in the form of the

standard operation procedure (SOP) for easy application and update which includes

Title”, “Code”, “Purpose”, “Scope of Application”, “Process”, “References”,

“Version”, “Published Date”, “Revised Date”, “Published Authority” and “Note”.

During the application the users can check the titles related to the subjects, and then

find the guidance lists to follow. The guidelines and checklists have been shown with

the code system as in Figure 6-0, and they can be used as a base for further extension

or expansion.

Strategies for Raising

Awareness and Understanding

BAS and building management Building systems and BAS Building systems integration Communication and integration, decision

support ICT and DSS applications Relationships between design and

maintenance The status of office building and BAS

current situation and future development. What is BAS? What is intelligent building with BAS and

their benefits? What is Intelligent Building?

General Strategies

Need to specify the applicable and constructible BAS specifications

Optimise the operation and maintenance Promote healthy, comfortable and

sustainable environments Strategies for high performance buildings Strategies for high performance, energy

conservation and comfort Strategies for security system/ fire system

design and maintenance Strategies for smart design and systems

integration Strategies for smart design for high

performance and optimising operation and maintenance

Strategies for sustainable maintenance Strategies for high performance and life

cycle cost considerations

Operational Checklists

How to minimise energy consumption? How to optimise operation and

maintenance? Select applicable and reliable BAS and

ensure appropriate products. Select suitable maintenance strategies Select suitable professionals Sensors in relation with BAS Smart design for sustainable maintenance Building assessment, optimising the

operation and maintenance practice Project delivery system

G001 G002 G003 G004 G005 G006 G007 G008

G009 G010 G011 G012 G013 G014 G015 G016 G017

G027G028 G029 G030 G031 G032 G033 G034

G018 G019G020 G021 G022 G023 G024 G025 G026

Figure 6-0: Guideline Development

Page 243: THE INTEGRATION BETWEEN DESIGN AND MAINTENANCE …eprints.qut.edu.au/16058/1/Frank_Lin_Thesis.pdf · the integration between design and maintenance of office building automation:

CHAPTER 6 GUIDELINES DEVELOPMENT

225

6.2 Strategies for Raising Awareness and

Understanding

Before executing the strategies and operational checklists, a complete and

understanding of the office building status in energy conservation, performance

expectations and strategic process integration and related issues are necessary. The

guidelines with the codes have been outlined as in Figure 6-1:

The following sections will explain the generation of Guidelines G001-G008 in

details.

Strategies for

Raising Awareness and Understanding

Responsibilities and capabilities of design and maintenance

G001 Principles of the integration

Attributes of high-performance and energy conservation in office building

Building life cycle process

Benefits of process integration

Types of HVAC Systems and controls

Components of building control systems

Elements of sensor and actuator

G002

G004

G005

G006

G007

G008

G003

Figure 6-1: Outline of the Basic Guidelines

Page 244: THE INTEGRATION BETWEEN DESIGN AND MAINTENANCE …eprints.qut.edu.au/16058/1/Frank_Lin_Thesis.pdf · the integration between design and maintenance of office building automation:

CHAPTER 6 GUIDELINES DEVELOPMENT

226

6.2.1 Principles of Process Integration between Design and

Maintenance The implementation of process integration relies on sufficient understanding of the

principles of integration, and applies strategies and operational actions. In this

section, the principles of process integration will be firstly disclosed to raise an

awareness of integration mechanism. The integration principles associated with

different aspects are illustrated as in Guideline #01:

Guideline #01 Title: Principles of process integration Code: G001

Purpose To enhance the awareness and understanding of the objectives Application Whole building process

Process Integration

References §4.4 Version 1 Ed.

Pub. Date 1 OCT, 2004 Rev. Date

Pub. Authority QUT Note

Understanding the relationship

between design and maintenance

Identification of the needs

Integration Preparations

Motivation of Integration

Integrated Design and

Maintenance philosophy

Intelligent Building

Sustainable Building

Expectations: "User-friendly work

environment" "Future flexibility"

“Energy conservation” “High building performance”

Design

Maintenance

Integration Design and Maintenance Systematic/ strategic Alliances

Interdependent parties

Matrix Organisation Meeting

Strategic Methods

◊ Participants are educated about the issues ◊ Learned the prospective solutions ◊ Decisions are accelerated and verified ◊ Difficulties are diminished ◊ Design/ maintenance processes are interacted ◊ Important issues are explored

TQM, BC, LCC

Page 245: THE INTEGRATION BETWEEN DESIGN AND MAINTENANCE …eprints.qut.edu.au/16058/1/Frank_Lin_Thesis.pdf · the integration between design and maintenance of office building automation:

CHAPTER 6 GUIDELINES DEVELOPMENT

227

The purpose of process integration is to communicate closely between design and

maintenance throughout the building life process. The process integration facilitates

the exchange of ideas and information and allows integrated solutions, and

encourages “cross fertilizing” and addresses problems by brainstorming at the outset

of the building project. The process integration initiates from the needs and

expectations through the strategic alliances to integrate the building phases as design

and maintenance for the designated objectives. In the decision stage, the integration

will refer relevant information and focus on the targets to undertake necessary

activities including matrix organization constituting and meeting. Eventually, an

execution team organised by the interdependent parties with intimate communication

will accomplish the missions via the strategic methods such as TQM, BC and LCC.

6.2.2 Building Life Cycle Process

Design and maintenance decisions need to be made as an integral part of a circular

building life-cycle process. Depending on the building project, all phases of the

life-cycle process can have their lifetime implications as illustrated in Guideline #02:

Guideline #02

Title Building life cycle process Code G002

Purpose To certify the relationship between different entities. Applications Whole building process

Process

References ASHRAE 2003; FCC 2001; §4.2.3.1 Version 1 Ed.

Pub. Date 1 OCT, 2004 Rev. Date

Pub. Authority QUT Note

Construction Commissioning

Construction Operation and Maintenance

O/M

Building Life Cycle Process

Design development, Specification,

Plan

Design

Page 246: THE INTEGRATION BETWEEN DESIGN AND MAINTENANCE …eprints.qut.edu.au/16058/1/Frank_Lin_Thesis.pdf · the integration between design and maintenance of office building automation:

CHAPTER 6 GUIDELINES DEVELOPMENT

228

The design and construction and maintenance of most office buildings are rooted in

similar design decisions, construction practices, and economic assumptions.

Optimism is an endless process, since there is an increasing expectation of

high-performance office buildings which can offer owners and users to increase

worker satisfaction and productivity, improve health and flexibility, and to enhance

energy and environmental performance. Realisation of the building life cycle process

can help optimise the initial investments in design, systems selection and installation,

furthermore, to ensure cost- effective operations and maintenance activities.

6.2.3 Responsibilities and Capabilities of Design and

Maintenance

The guidelines of the integration between design and maintenance for office building

automation can be applied for three different groups such as design, maintenance,

and building owner/ developer in accordance with their respective responsibilities

and capabilities. The practitioners from all parties should be assembled as a team or a

matrix team to execute and coordinate the tasks and missions during the process.

They will include:

• Architect, planner, BAS designer and consultants (Design)

• Facilities managers, and maintainers (Maintenance)

• Building Developers/ owner, occupants, and users (Building owners/

Developers)

The following guideline is associated with the responsibilities and capabilities of

these representatives which can be outlined as in Guideline #03:

Page 247: THE INTEGRATION BETWEEN DESIGN AND MAINTENANCE …eprints.qut.edu.au/16058/1/Frank_Lin_Thesis.pdf · the integration between design and maintenance of office building automation:

CHAPTER 6 GUIDELINES DEVELOPMENT

229

Guideline #03

Title Responsibilities and capabilities of design and maintenance Code G003

Purpose Distinguish the liabilities Application Design stage, operation and maintenance stage

Responsibilities and

Capabilities

References §4.4 Version 1 Ed.

Pub. Date 1 OCT, 2004 Rev. Date

Pub. Authority QUT Note

Realisation of the responsibilities and capabilities of the design and maintenance can

facilitate a better understanding of the liabilities of different phases among project

particpants. At the same time, it also might promote the support to others for the

smooth continuum of building process.

Design

Maintenance

Building owners/

Developers

◊ Compiling relevant technical information of design and maintenance ◊ Writing up the specification of BAS and standard operation

procedures ◊ Handing over documents of the building ◊ Coordinating the facilities specialists and systems providers ◊ Integrating the BAS with the building design ◊ Providing life time support for the building maintenance ◊ Providing technical support for building systems renewal

◊ Maintenance manager participating in the charter organised by the architectural designer

◊ Realising BAS specification and the function of designated systems ◊ Auditing the building commissioning ◊ Handing over the building systems from the designer ◊ Managing the maintenance management during the building life ◊ Coordinating the systems specialists and providers to maintain them ◊ Responding status of the building maintenance such as failures of

facilities and systems, technical problems

Assembling a committee for the building management Organising and participating in a charter including designers,

contractors, the developer or building owner during the design and construction stage

Training the managing officers and facilities maintainers to understand the facilities and functions of the building and to know how to operate and manage

Commissioning the building facilities to assure the quality of requirements during various project delivery

Decision making on the style of building maintenance and management as: Setting up an independent organisation to run and manage

the building Contracting a maintenance company to execute the

maintenance Outsourcing the maintenance specialists

Support

Feedback

Reflect

Consider

Page 248: THE INTEGRATION BETWEEN DESIGN AND MAINTENANCE …eprints.qut.edu.au/16058/1/Frank_Lin_Thesis.pdf · the integration between design and maintenance of office building automation:

CHAPTER 6 GUIDELINES DEVELOPMENT

230

6.2.4 Understand Comfort, Healthy and Energy Conservation of

Office Building

No matter how people describe what constitutes an "Intelligent office building",

occupants generally expect that office buildings can provide comfort, healthy

environment and energy conservation. Thus, to reach these expectations, office

buildings should have several attributes such as being integrated, flexible, safe,

healthy, comfortable, energy efficient, life cycle cost considerations, and properly

constructed and maintained. These attributes are described as in Guideline #04, their

associated HVAC systems and controls are listed as in Guideline #05:

Guideline #04

halla
This figure is not available online. Please consult the hardcopy thesis available from the QUT Library
Page 249: THE INTEGRATION BETWEEN DESIGN AND MAINTENANCE …eprints.qut.edu.au/16058/1/Frank_Lin_Thesis.pdf · the integration between design and maintenance of office building automation:

CHAPTER 6 GUIDELINES DEVELOPMENT

231

Office building should be innovated with the rapid advanced technology to meet the

client’s increasing expectations. After office buildings delivery and occupied,

maintenance through an insistent process of metering, monitoring and reporting to

inform maintenance operations and the feedback will be available to new design

efforts. Integrated, flexible and properly constructed/ maintained buildings with life

cycle cost consideration can sustain a high performance and energy conservation and

comfort environment.

Guideline #05

halla
This figure is not available online. Please consult the hardcopy thesis available from the QUT Library
Page 250: THE INTEGRATION BETWEEN DESIGN AND MAINTENANCE …eprints.qut.edu.au/16058/1/Frank_Lin_Thesis.pdf · the integration between design and maintenance of office building automation:

CHAPTER 6 GUIDELINES DEVELOPMENT

232

6.2.5 Employ Strategic Process Integration for BAS Design and

Maintenance

The fundamental concept of integration is to recognise that all building systems are

interdependent and building processes are interactive, and the effective integration of

both systems or processes is beneficial for the building’s life. The strategic

integration between design and maintenance allows people to communicate during

the decision making process. To promote the benefits of the process integration,

compareing it with the conventional process in office buildings to realise their pros

and cons is necessary. Conventional building design tends to be undertaken with

little interaction between the parties involved in the building life. The architect

creates a design and hands it on to the engineers who then design their systems,

sometimes independent of each other, before passing the design to the contractor.

The building owners and the users will then take over to operate and maintain these

building systems during the rest of the life of buildings.

In contrast, based on this inherent occupancy process and the above benefits of the

process integration, the integrated building design and maintenance approach could

incorporate all parties. They would be involved in the building project working

together from the start to coordinate and optimise the design of the building by

constantly communicating and supporting each other, to assure the technical

continuum and quality of service during the building’s lifetime.

Comparing the current independent conventional process with process integration,

the benefits of the process integration can be summarised as in Guideline #06:

Page 251: THE INTEGRATION BETWEEN DESIGN AND MAINTENANCE …eprints.qut.edu.au/16058/1/Frank_Lin_Thesis.pdf · the integration between design and maintenance of office building automation:

CHAPTER 6 GUIDELINES DEVELOPMENT

233

Guideline #06

Title Benefits of process integration Code G006

Purpose Aware of the benefits of process integration Application Whole building process

Benefits

References §2.2.7 Version 1 Ed.

Pub. Date 1 OCT, 2004 Rev. Date

Pub. Authority QUT Note

Based on the integrated building systems which has been installed in the building,

via strategic methods- BC, TQM, LCC as Guideline #01, the designers extend their

service and support to building operation and maintenance after building delivery.

BC, TQM and LCC are focusing on the customer’s satisfaction, commissioning the

gaps and life time costs as discussed in Section 2.6.2~ 2.6.4. The intimate

communication and support can facilitate the integration between design and

maintenance processes. Therefore, the ineffectiveness and inefficiency in the initial

◊ Optimised the design and system application

◊ Satisfying the needs/ functional requirements of the owners and occupants

◊ Improved occupant comfort and health

◊ Increased occupant productivity

◊ Energy efficiency ◊ Environmental

sustainability and positive environmental impact

◊ Low operating and maintenance costs

Benefits of process integration

Ineffective design and system installation resulting in excess capital investment and redundant costs

Failing to meet needs/ functional requirements of the owners and occupants

Occupant discomfort

Decreased occupant productivity

Poor energy performance

Harmful environmental impact

High operating and maintenance costs

Limitations of C

onventional Process

Page 252: THE INTEGRATION BETWEEN DESIGN AND MAINTENANCE …eprints.qut.edu.au/16058/1/Frank_Lin_Thesis.pdf · the integration between design and maintenance of office building automation:

CHAPTER 6 GUIDELINES DEVELOPMENT

234

investment, operation and maintenance, energy conservation, occupant’s comfort can

be enhanced and converted to the effectiveness and efficiency through the process

integration.

6.2.6 BAS Structure

The objective of a building automation system (BAS) is to achieve an optimal level

of control for occupant comfort while minimising energy use. These control systems

are the integrating components such as fans, pumps, heating/cooling equipment,

dampers, mixing boxes, and thermostats. Monitoring and optimising temperature,

pressure, humidity, and flow rates are key functions of modern building control

systems. Modern control systems have three basic key elements: sensors, controllers,

and the controlled devices as listed in Guideline #07:

Guideline #07

Title Components of BAS Code G07

Purpose To realise the major components of BAS Applications Whole building process

Components

References UNESCO 1984; Eyke, M. 1988; §2.5.2

Version 1 Ed. Pub. Date 1 OCT, 2004 Rev. Date

Pub. Authority QUT Note

Sensors Controllers Controlled Devices

BAS

DDC Controllers

Sensors/ Actuators

Controlled Devices

Page 253: THE INTEGRATION BETWEEN DESIGN AND MAINTENANCE …eprints.qut.edu.au/16058/1/Frank_Lin_Thesis.pdf · the integration between design and maintenance of office building automation:

CHAPTER 6 GUIDELINES DEVELOPMENT

235

There are increasing varieties and levels of sophistication of sensors available for use

with modern control systems such as sensors for sensoring temperature, humidity,

pressure, flow rate, and tracking indoor air quality, lighting level, and fire or smoke.

Controllers may be very simple, such as a thermostat where the sensor and controller

are usually co-located, to very sophisticated microprocessor based systems capable

of powerful analysis routines. Thermostat, sophisticated microprocessor based

systems compares a signal received from the sensor to a desired set point, and then

sends out a corresponding signal to the controlled device for action such as terminal

device receiving the signal from the controller, and air dampers, mixing boxes,

control valves, fans, pumps, and motors which control the building systems and

equipments.

The calibration of sensors in the BAS maintenance is an often ignored activity.

However, sensors should be calibrated regularly as sensors out of calibration can lead

to excess energy consumption. The key elements as sensors and actuators are listed

as in Guideline #08:

Guideline #08

The media of sensoring mostly vary as air/ water, humidity and pressure. These

sensors and actuators have a variety of applications for humidity as wet bulb

halla
This figure is not available online. Please consult the hardcopy thesis available from the QUT Library
Page 254: THE INTEGRATION BETWEEN DESIGN AND MAINTENANCE …eprints.qut.edu.au/16058/1/Frank_Lin_Thesis.pdf · the integration between design and maintenance of office building automation:

CHAPTER 6 GUIDELINES DEVELOPMENT

236

temperature or relative humidity (RH) sensors, for pressure as static pressure

transmitters, and for air and water as:

◊ Outside air temperature

◊ Mixed air temperature

◊ Return air temperature

◊ Discharge or supply air temperature

◊ Air and water flow rates

◊ Terminal unit dampers and flows.

◊ Heating water supply temperature

◊ Condenser entering water temperature

◊ Chilled water supply temperature

◊ Space temperature sensors

6.3 General Strategies for Promoting Design and

Maintenance Integration

The following sections will outline the strategies to promote the integration activities

between design and maintenance in office building automation contexts. These

strategies encompass smart design and sustainable maintenance, effective

performance and energy conservation, security and comfort, life cycle costing

consideration. These strategies will be helpful in facilitating the performance and

quality of office buildings by means of the guidance and the recommendations

provided within the categories of design and maintenance in this thesis.

Page 255: THE INTEGRATION BETWEEN DESIGN AND MAINTENANCE …eprints.qut.edu.au/16058/1/Frank_Lin_Thesis.pdf · the integration between design and maintenance of office building automation:

CHAPTER 6 GUIDELINES DEVELOPMENT

237

The general strategies are illustrated in the diagram associated with the specific

issues of BAS design and maintenance as in this outline of strategies:

General Strategies

Figure 6-2: Outline of the General Strategies

Strategies for Energy Efficient HVAC Design

Strategies for high performance, energy conservation and comfort

Strategies for the selection of light control Strategies for minimizing energy consumption

Strategies for promoting healthy and comfortable environments

Guidelines for the applications of LCCA

Strategies for optimising design and maintenance

Strategies for security/ fire system design and maintenance

Strategies for selection maintenance strategy

Strategies for building commissioning

Strategies for integrating with infrastructure

Tips for design professional selection strategy Strategies for designing BAS specification

Strategies for assuring the reliable systems

Tips for avoiding the pitfalls of BAS selection

Tips of specification design

Strategies for systems integration

Requirements of specification design

G009

G010

G012

G013

G014

G015

G016

G011

G017

G018

G020

G021

G022

G023

G024

G019

G025

G026

Page 256: THE INTEGRATION BETWEEN DESIGN AND MAINTENANCE …eprints.qut.edu.au/16058/1/Frank_Lin_Thesis.pdf · the integration between design and maintenance of office building automation:

CHAPTER 6 GUIDELINES DEVELOPMENT

238

6.3.1 Select Appropriate Design Professionals

The success of a building project relies on the base of acquiring a design

professional. It needs to start from the beginning with the selection of reliable

designers as well as the application of an integration process. The criteria of

selecting a suitable design professional for the office building project should

primarily consider the execution and completion of the project, especially for office

building automation system. During the selection process of a designer, their

expertise and experience is fundamental for technical subjects as well as the

non-technical key issues such as enthusiasm, responsibility, communication,

serviceability, reliability, etc.

It is important that the panels responsible for professional selections have an

understanding of the capabilities of BAS designers with the ability to compare the

potential designers using the criteria such as previous experience, confidence,

capacity to complete the work on time and to provide overall customer service. In

brief, the instructions for the designer selection are illustrated as in Guideline #09:

Page 257: THE INTEGRATION BETWEEN DESIGN AND MAINTENANCE …eprints.qut.edu.au/16058/1/Frank_Lin_Thesis.pdf · the integration between design and maintenance of office building automation:

CHAPTER 6 GUIDELINES DEVELOPMENT

239

Guideline #09

Title Tips for the design professional selection Code G009

Purpose Encompass major criteria for professional selection Application Initial design stage

References §4.4 Version 1 Ed.

Pub. Date 1 OCT, 2004 Rev. Date

Pub. Authority QUT Note

The selection of the design professionals should compare their strength and

weakness, professional expertise, associated with their experience to ensure the

suitability for the project. To help define the boundaries of professional

responsibility, adequate consultantions and outsourcing support can be useful to the

decision making of professional selection. The selection process can refer the related

association or organization to seek relevant information and guidelines about the

Design

Professional Selection

Strength and

Weakness

◊ One BAS designer is entrusted with providing all design services for the specific project, independent of their true strengths or weaknesses.

Outsourcing Support

◊ Architecture magazines and related publications provide a good source of information about the state of the design profession and the relative features of similar project works.

◊ The leading architecture periodicals as: Architectural Record, Architecture Magazine

◊ Former experience,

◊ Suitability

for the project.

Experience & Suitability

◊ Architects, ◊ BAS designers, ◊ HVAC designers, ◊ Electrical power

designers, ◊ Lighting designers, ◊ Security and fire

system designers, ◊ Related engineers

Professional Expertise Tips

Page 258: THE INTEGRATION BETWEEN DESIGN AND MAINTENANCE …eprints.qut.edu.au/16058/1/Frank_Lin_Thesis.pdf · the integration between design and maintenance of office building automation:

CHAPTER 6 GUIDELINES DEVELOPMENT

240

legal role of their members in the building design and construction process such as

the Australian associations.

6.3.2 Specify the Applicable and Constructible BAS

Specification

Optimised specification design of BAS not only help specify the needs and

requirements of systems to perform the functions of installed facilities and facilitate

the effectiveness of the system operations, but also gain the greater economy by

reducing life costs of the building. The building projects are normally unique and

specially planned for the particularfacilities and for BAS to achieve their designated

intentions, thus the BAS application should be designed through the specification

instructions for the procurement, installation and maintenance. The optimised

specifications provide a good template for system planning, procurement and system

selection, and easy to achieve the commissioning which will ensure the quality of

systems and the updating fundamental information. No sustained BAS specification

would be countenanced the risk of abnormal functions and difficulties for future

expansion. When ignored or not specified properly, these non-technical requirements

can also be a source of argument (Jeffrey Cosiol 2001), therefore the strategies for

designing BAS specification are summarised in Guideline #10, 11, 12:

Specification is a standard for execution to ensure the quality and meet the

requirements during the BAS installation and commissioning process. The designed

specification should consider the compromisation of the needs, execution

requirements as well as the concise terms, in addition, integration with the contract

tool for payment to ensure the quality of design as illustrated in Guideline #10.

Page 259: THE INTEGRATION BETWEEN DESIGN AND MAINTENANCE …eprints.qut.edu.au/16058/1/Frank_Lin_Thesis.pdf · the integration between design and maintenance of office building automation:

CHAPTER 6 GUIDELINES DEVELOPMENT

241

Tailored specification with the needs initiates the BAS application. Integrated

specification cecompassed the whole stages will ease the completion of tasks.

Clearly description of specification will reduce the arguments during the process and

compromise the requirements. A essential and useful tool is the contracted payment

which can ensure the quality and time requirements of the project.

halla
This figure is not available online. Please consult the hardcopy thesis available from the QUT Library
Page 260: THE INTEGRATION BETWEEN DESIGN AND MAINTENANCE …eprints.qut.edu.au/16058/1/Frank_Lin_Thesis.pdf · the integration between design and maintenance of office building automation:

CHAPTER 6 GUIDELINES DEVELOPMENT

242

Standard requirements of designing the specification will help the procurement,

installation, operation and maintenance process. It includes general conditions, BAS

design and future expansion requirements as illustrated in Guieline #11.

Guideline #11

halla
This figure is not available online. Please consult the hardcopy thesis available from the QUT Library
Page 261: THE INTEGRATION BETWEEN DESIGN AND MAINTENANCE …eprints.qut.edu.au/16058/1/Frank_Lin_Thesis.pdf · the integration between design and maintenance of office building automation:

CHAPTER 6 GUIDELINES DEVELOPMENT

243

To the specification design, the simple, instructive and acceptable specification is

handful. It encompasses several tips as the reviews of the factory testing, project

acceptance and testing requirements, basic contract practices, future expansion, and

specification preparation which are summaried as in Guideline #12.

Guideline #12

halla
This figure is not available online. Please consult the hardcopy thesis available from the QUT Library
Page 262: THE INTEGRATION BETWEEN DESIGN AND MAINTENANCE …eprints.qut.edu.au/16058/1/Frank_Lin_Thesis.pdf · the integration between design and maintenance of office building automation:

CHAPTER 6 GUIDELINES DEVELOPMENT

244

BAS has become one of the most important systems in office building, as a building

owner, or a facilities engineer, facing the growing range of products from BAS

manufactures and vendors that has made hundreds of systems available, it is essential

to concentrate on selecting the right system for the building. The following tips in

Guideline #13 could guide to avoid the most common mistakes.

Guideline #13

To avoid the possible pitfalls for BAS selection, several instructions are needed. As

such, the availability of most components as sensors, transducers, dampers, valves,

and actuators, as well as the DDC hardware can be provided. Localized training, the

product/ service and support are available from multiple sources and effectively

provided from the local area. The compatible products for the replacement are easily

halla
This figure is not available online. Please consult the hardcopy thesis available from the QUT Library
Page 263: THE INTEGRATION BETWEEN DESIGN AND MAINTENANCE …eprints.qut.edu.au/16058/1/Frank_Lin_Thesis.pdf · the integration between design and maintenance of office building automation:

CHAPTER 6 GUIDELINES DEVELOPMENT

245

available with having complete documentation to prevent continuum problems. It is

necessary to keep closely contacts between system maintainers and providers and

gain their support. In addition, it also needs to avoid multiple manufacturers’

products to keep liability with a single manufacturer for the total support. A reference

is required which is similar in size and scope to the system from other completed

systems for the quality check.

Moreover, reliability of BAS is a great concern for office building occupants.

Absence of reliability directly affects personal security and well-being. The building

systems should function without interruption, otherwise it will affect the safety,

health, and comfort of occupants, and reduce effectiveness.

Building occupants increasingly expect to work in comfort place without

breakdowns. Building and information system disorders will not be tolerated. The

workforce demand good working environments that enable them to do their best

work. This calls for systems that perform reliably with good maintenance support.

Building users must be able to rely on facility hardware and software for health, life,

safety, power, data, and voice delivery systems. These systems need to function

consistently and be properly maintained. When the work environments are supported

by functional and reliable systems that require minimal maintenance or downtime

and have back-up capabilities to ensure negligible loss of service, worker

productivity can be improved or maintained. The strategies for assuring the reliable

systems is summarised in Guideline #14:

Page 264: THE INTEGRATION BETWEEN DESIGN AND MAINTENANCE …eprints.qut.edu.au/16058/1/Frank_Lin_Thesis.pdf · the integration between design and maintenance of office building automation:

CHAPTER 6 GUIDELINES DEVELOPMENT

246

Guideline #14

In general, the building systems as HVAC, lighting, power supply, fire and security,

and ICT infrastructure are affected by their reliabilities. To assure that the systems

are reliable, these building systems not only rely on the right selection and

installation performance based systems in the initial design, but also on appropriate

maintenance strategy during the building life as utilizing the reliability- centred

maintenance (RCM).

halla
This figure is not available online. Please consult the hardcopy thesis available from the QUT Library
Page 265: THE INTEGRATION BETWEEN DESIGN AND MAINTENANCE …eprints.qut.edu.au/16058/1/Frank_Lin_Thesis.pdf · the integration between design and maintenance of office building automation:

CHAPTER 6 GUIDELINES DEVELOPMENT

247

6.3.3 Ensure Appropriate Product/ Systems Integration

Building systems, materials and products incorporated into a design must be

integrated to create a unified whole that achieves the desired functional purpose.

system integration comes from considering the characteristics and properties of each

system or product, its role and its needs for installation, requirements coordination

with other building systems and O&M serviceability. System integration is described

in Guideline #15:

Guideline #15

System integration initiates from the understanding the needs of occupants to explore

a variety of design solutions. With the consideration of the pros/ cons of each

alternative on the functional performance, it involves users to evaluate and

understand design implications/ functionalities. During the process of the system

integration, several strategies should be developed such as:

◊ Develop design concepts with a clear understanding facility's functional purpose,

halla
This figure is not available online. Please consult the hardcopy thesis available from the QUT Library
Page 266: THE INTEGRATION BETWEEN DESIGN AND MAINTENANCE …eprints.qut.edu.au/16058/1/Frank_Lin_Thesis.pdf · the integration between design and maintenance of office building automation:

CHAPTER 6 GUIDELINES DEVELOPMENT

248

◊ Address functional requirements and goals,

◊ Select appropriate systems and products with integrated design objectives.

◊ Select products/ systems that are compatible with design objectives.

◊ Realise the Owner's equipment requirements and integrate with the design.

◊ Anticipate the needs of the building maintenance as far as possible.

Finally, to assure the effective system integration, regular building systems

maintenance should be accomplished by using the Building Commissioning (BC)

approach and Total Quality Management (TQM) throughout the planning, design,

construction, operation, maintenance life cycle.

Page 267: THE INTEGRATION BETWEEN DESIGN AND MAINTENANCE …eprints.qut.edu.au/16058/1/Frank_Lin_Thesis.pdf · the integration between design and maintenance of office building automation:

CHAPTER 6 GUIDELINES DEVELOPMENT

249

6.3.4 Integrate Systems with Infrastructure Functionally

Information technology architecture calls for a effective, global, and secure

information technology infrastructure that will support the growing demands of

office buildings. Assuring flexibility to accommodate the dynamic nature of

telecommunications systems starts first and foremost with properly designed

pathways and spaces. The strategies for integrating with the infrastructure are listed

in Guideline #16:

Guideline #16

To construct an integrated, configurable, and distributable infrastructure for

comforming with the requirements of office building automation, the hardware and

software should be designed adequately. It encompasses data, information, voice,

video and power systems and interfaces such as:

halla
This figure is not available online. Please consult the hardcopy thesis available from the QUT Library
Page 268: THE INTEGRATION BETWEEN DESIGN AND MAINTENANCE …eprints.qut.edu.au/16058/1/Frank_Lin_Thesis.pdf · the integration between design and maintenance of office building automation:

CHAPTER 6 GUIDELINES DEVELOPMENT

250

◊ Distribute Uninterrupted Power Supply (UPS) for reliable power.

◊ Monitor work environmental conditions with central systems, but maximise

local control by occupants.

◊ Provide appropriate open riser space and manage wiring under floor or

vertically through patch panels.

◊ Conduct a multidiscipline plenum with structural, fire, networking, HVAC to

integrate systems in the floor.

◊ Provide flexibility using flexible connectors and design for expandability,

disassembility, re-cyclability and internet compatibility.

Page 269: THE INTEGRATION BETWEEN DESIGN AND MAINTENANCE …eprints.qut.edu.au/16058/1/Frank_Lin_Thesis.pdf · the integration between design and maintenance of office building automation:

CHAPTER 6 GUIDELINES DEVELOPMENT

251

6.3.5 Optimise Operational and Maintenance Practices

Throughout the building's life cycle, operation and maintenance should seek to

optimise the procedures and keep the process simple, enhance the training, be

equipped with automated devices and minimise the path of the activities in Guideline

#17:

Guideline #17

To reach the optimization of the design and maintenance, it needs to implement a

comprehensive, effective maintenance program to keep all building systems

functioning as intended by design and to provide operation and maintenance support

for facilities managers and maintenance personnel, and to use adequate sensors for

controlling the lighting and HVAC systems, and to support digital transfer to avoid

unnecessary air travel.

Sustainable maintenance can help the efficiency of the system’s functionality and

performance. However, for life cycle considerations an applicable maintenance

strategy would be needed for people to follow to effectively execute the regular

maintenance tasks and the maintenance continuum. The following section will

introduce several common strategies for maintenance.

halla
This figure is not available online. Please consult the hardcopy thesis available from the QUT Library
Page 270: THE INTEGRATION BETWEEN DESIGN AND MAINTENANCE …eprints.qut.edu.au/16058/1/Frank_Lin_Thesis.pdf · the integration between design and maintenance of office building automation:

CHAPTER 6 GUIDELINES DEVELOPMENT

252

6.3.6 Select Appropriate Maintenance Strategy

In order to execute effective maintenance for an office building, a suitable

maintenance strategy is essential for the BAS application and service, which should

be adequately selected. Varying strategies should take into consideration so that the

ones selected will correspond to the needs during the maintenance process. In brief,

the right choice relies on maintainers’ fully understanding the needs and

understanding the advantages and disadvantages of maintenance strategies.

They commonly include reactive maintenance, preventive maintenance, reliability

centred maintenance (RCM), and predictive maintenance approach. Reactive

maintenance is a run to failure maintenance. Preventive maintenance which is simply

the scheduling of regular maintenance actions to prevent the occurances of failures to

a product. Reliability centred maintenance (RCM) is a maintenance scheme based on

the reliability of the various components of the system or product in question.

Predictive maintenance approach attempts to detect the onset of equipment

degradation and to address the problems as they are identified.

An appropriate maintenance strategy could help ensure the performance and

functionalities of BAS and subsystems. Guideline #18 provides a snapshot of the

different strategies with their pros and cons assessed respectively.

Page 271: THE INTEGRATION BETWEEN DESIGN AND MAINTENANCE …eprints.qut.edu.au/16058/1/Frank_Lin_Thesis.pdf · the integration between design and maintenance of office building automation:

CHAPTER 6 GUIDELINES DEVELOPMENT

253

Guideline #18

Title Strategies for selection maintenance strategy Code G018

Purpose To carry out the maintenance tasks effectively Applications Operation and Maintenance stage

Strategies

Descriptions

Strategies Advantages Disadvantages

Reactive maintenance

◊ Has lower initial costs ◊ Requires fewer staff

◊ Increases costs due to unplanned downtime of equipment

◊ Increases labor costs, especially if overtime is needed for untimely repairs or replacement

◊ May increase costs associated with repair or replacement

◊ Is an inefficient use of staff resources

Preventive maintenance

◊ Is cost effective in many capital intensive processes and equipment

◊ Provides flexibility for the adjustment of maintenance

◊ Does not eliminate catastrophic failures

◊ Is more labor intensive

◊ Includes

Rea

ctiv

e Preventive

Predictive

maintenance

Reliability

centred m

aintenance (R

CM

)

Advantage

Advantage

Disadvantage

Disadvantage

Dis

adva

ntag

e

Disadvantag

Adv

anta

ge

Advantage

Page 272: THE INTEGRATION BETWEEN DESIGN AND MAINTENANCE …eprints.qut.edu.au/16058/1/Frank_Lin_Thesis.pdf · the integration between design and maintenance of office building automation:

CHAPTER 6 GUIDELINES DEVELOPMENT

254

timing ◊ Increases component life cycle ◊ Generates energy savings ◊ Reduces equipment and/or

process failures

performing unneeded maintenance activities

Reliability centred

maintenance (RCM)

◊ Provides increased component operational life and availability

◊ Allows for preventive/ corrective actions

◊ Results in decrease in equipment and/or process downtime

◊ Lowers costs for parts and labor ◊ Provides better product quality ◊ Improves worker and

environmental safety ◊ Raises worker morale ◊ Increases energy savings

◊ Increases investment in diagnostic equipment

◊ Increases investment in staff training

◊ Savings potential is readily seen by management

Predictive maintenance

approach

◊ Can be the most efficient maintenance program

◊ Lowers costs by eliminating unnecessary maintenance

◊ Minimises the frequency of overhauls

◊ Reduces probability of sudden equipment failures

◊ Focuses maintenance activities on critical system components

◊ Increases component reliability

◊ Can have significant startup costs associated with staff training and equipment needs

◊ Savings potential is not readily seen by management

References Abdul-Nour, G, et. Al.,(1998); WWWMS; ASHRAE 2003; Neubeck, K. (2004)

Version 1 Ed. Pub. Date 1 OCT, 2004 Rev. Date

Pub. Authority QUT Note

6.3.7 Facilitate Building Commissioning for Better Results

Building commissioning should be tailored to mach with the building project and

completed to assure meeting the requirements the quality of design. The strategies

for building commissioning can be summarised in Guideline #19:

Guideline #19

Title Strategies for building commissioning Code G019

Purpose To ensure the quality of building systems as the designed Applications Hand-over stage, Operation and Maintenance stage

Page 273: THE INTEGRATION BETWEEN DESIGN AND MAINTENANCE …eprints.qut.edu.au/16058/1/Frank_Lin_Thesis.pdf · the integration between design and maintenance of office building automation:

CHAPTER 6 GUIDELINES DEVELOPMENT

255

Strategies

Concepts Descriptions Scopes

◊ The HVAC Commissioning Process provides a blueprint for the commissioning of HVAC systems.

Activities

◊ Commissioning should begin during the earliest phases of project and design.

◊ It is essential that the assurance building systems meet design intent be captured as a premise for all activity.

◊ Building Commissioning must be a clear appreciation of the Scope, Cost, and Timing of activities.

◊ Commissioning requires identifying any operational deficiency. This process begins in the design phase and lasts at least one year after project completion (e.g. the warranty period). It also includes training of operational and maintenance staff.

Strategies

◊ The building owner typically hires an independent third party or qualified person to perform commissioning.

◊ Select the Commissioning Authority at or before the design stage of a project - Beginning in the design phase of a project can reduce changes and project delays.

◊ Hire an experienced Commissioning Agent (CA) ◊ Have a written Commissioning Plan - With a written

plan, all project participants can anticipate and plan for commissioning requirements and milestones.

◊ Document the results and findings of Commissioning - Documenting provides a record of the benefits - Can be used in the future for troubleshooting problems and optimising operating strategies.

Who Responsible

◊ Commissioning Agent should work directly for the Owner or the Owner's Construction Management representative where they can most objectively represent the owner's interest. The person taking this responsibility can be:

• Architect and Engineer (A/E) Construction Manager (CM)

• Contractor • Independent Agent

Applications

◊ From previous experience, the building construction management process is likely a continuous process of quality assurance (QA) from the design stage, procurement process, construction, hand over, and maintenance process which are in relation to the procedure audits such as document and procedure credit, process inspection and product audit.

◊ The more complex the building type and the more integrated the building systems, the more likely that a formal building Commissioning process will prove valuable.

References ASHRAE Guideline 1 Guideline for the Commissioning of HVAC Systems; Prowler 2004; Second National Conference on building Commissioning (1994); §4.4

Version 1 Ed. Pub. Date 1 OCT, 2004 Rev. Date

Pub. Authority QUT Note

Page 274: THE INTEGRATION BETWEEN DESIGN AND MAINTENANCE …eprints.qut.edu.au/16058/1/Frank_Lin_Thesis.pdf · the integration between design and maintenance of office building automation:

CHAPTER 6 GUIDELINES DEVELOPMENT

256

6.3.8 Strategies for ensuring the quality of design and

maintenance

The ensure the quality and performance of office buildings, the building process

from design to maintenance should need to have comprehensive plans and

alternatives. Initially, the design objectives and priorities need to define. A quality

assurance program would be helpful. Executing the role of facility management and

operations and monitoring post occupancy performance, it needs several approaches such as

Total Quality Management (TQM), Building Commissioning (BC) and maintenance strategy

such as Reliability Centered Maintenance (RCM) to ensure the quality meeting the occupant

expectations.

Guideline #20

halla
This figure is not available online. Please consult the hardcopy thesis available from the QUT Library
Page 275: THE INTEGRATION BETWEEN DESIGN AND MAINTENANCE …eprints.qut.edu.au/16058/1/Frank_Lin_Thesis.pdf · the integration between design and maintenance of office building automation:

CHAPTER 6 GUIDELINES DEVELOPMENT

257

halla
This figure is not available online. Please consult the hardcopy thesis available from the QUT Library
Page 276: THE INTEGRATION BETWEEN DESIGN AND MAINTENANCE …eprints.qut.edu.au/16058/1/Frank_Lin_Thesis.pdf · the integration between design and maintenance of office building automation:

CHAPTER 6 GUIDELINES DEVELOPMENT

258

6.3.9 Energy Efficient HVAC Design

Energy-efficient design utilising high-performance HVAC equipment often requires

more collaboration from the design team with the associated parties during the

process. Guideline# 21 lists the applicable guidance for HVAC during the decision

making process of design stage.

Guideline #21

Title Strategies for Energy Efficient HVAC Design Code G021

Purpose To facilitate the efficient design for energy conservation Applications Design stage, maintenance stage

Strategies

Strategies Descriptions Put all significant

factors together Factors such as: efficient lighting systems, daylight dimming

controls, energy conservation design Set goals as early

as possible ◊ Set the objectives at the outset of the project ◊ Emphasise communication ◊ Clarify goals to meet or exceed the minimum requirements

of codes or regulations during design stage ◊ Establish a quantitative goal for energy conservation ◊ Develop a written proposal that put into words of the goals.

"Right Size" HVAC system design to ensure efficiency

◊ Apply safety factors to a reasonable baseline. ◊ Accept the HVAC safety factors and load allowance stated in

ASHRAE/IES 90.1-1989 as an upper limit ◊ Exploit the energy analysis tools to eliminate excess

oversizing. Consider part-load

performance and reduce the load

◊ Select systems and equipments that can operate efficiently at part-load.

◊ Use BAS to avoid unnecessary peak demand charges. ◊ Explore thermal storage systems and examine alternate

sources for heating and cooling systems Plan for future

expansion ◊ Don't provide excess capacity today for a future load ◊ Provide the spare space required for additional equipment. ◊ Design distribution systems that can easily accept additional

equipment for the future expansion. Commission the

HVAC systems ◊ Building commissioning as ASHRAE Guideline 1 can help

facilitate the energy conservation Establish an

Operations and Maintenance plan

◊ Identify systems that can be properly maintained. ◊ Provide system interfaces to allow easily monitor and adjust. ◊ Compose systems control, operation, and maintenance

training plans ◊ Establish a written, comprehensive operation and

maintenance plan.

References ASHRAE/IES 90.1 (1989); ASHRAE Guideline 1; Graham, C. I. (2004); §4.4

Version 1 Ed. Pub. Date 1 OCT, 2004 Rev. Date

Pub. Authority QUT

Page 277: THE INTEGRATION BETWEEN DESIGN AND MAINTENANCE …eprints.qut.edu.au/16058/1/Frank_Lin_Thesis.pdf · the integration between design and maintenance of office building automation:

CHAPTER 6 GUIDELINES DEVELOPMENT

259

Note

In addition to the HVAC, the electrical power and lighting systems play a major part

in energy consumptions as well. In order to effectively achieve energy savings, the

selection of efficient lighting equipment and the adaptation of effective control

systems are essential. The following sections all present the strategies to this issue.

6.3.10 Select Energy Efficient Lighting Controls

The various electric lighting controls can be selected according to need. Selecting the

appropriate lighting controls will help the lighting systems provide both comfort and

energy conservation, which can be done by the enquiring of and coordinating with

the selected control manufacturer. It will help to avoid surprises during construction

and commissioning. The appropriate lighting controls can be selected in accordance

with Guideline #22:

Guideline #22

Title Strategies for the selection of lighting control Code G022

Main Features and Purpose

To effectively select the lighting control to facilitate the energy conservation

Applications Whole building process

Strategies

1. Properly circuiting design with the simple switches and relays to reduce the energy consumption

2. Selecting occupancy sensors to automatically turn on/off lights. 3. Selecting lighting control to automatically adjusting with the

daylight. 4. Considering the centralised or distributed controls for the

lights. a. Centralized control can integrate lighting controls with

mechanical or security systems. b. Distributed control can be equipped with the

emergency system References §4.4

Version 1 Ed. Pub. Date 1 OCT, 2004 Rev. Date

Pub. Authority QUT Note

Page 278: THE INTEGRATION BETWEEN DESIGN AND MAINTENANCE …eprints.qut.edu.au/16058/1/Frank_Lin_Thesis.pdf · the integration between design and maintenance of office building automation:

CHAPTER 6 GUIDELINES DEVELOPMENT

260

6.3.11 Minimise Energy Consumption

Energy conservation is a global concern owing to the uncertainty of oil supplies.

With concerns for energy are increasing and the impact of greenhouse gases on

world climate is rising, it is essential to find ways to reduce energy load, increase

efficiency, and utilise renewable fuel resources. During the BAS design and

development process, building projects must have a comprehensive, integrated

perspective to attain energy conservation as in Guideline# 23:

Guideline #23

Title Strategies for minimizing energy consumption Code G023

Purpose To ensure the energy conservation Applications Whole building process

Strategies

Descriptions

Tips Descriptions Specify Efficient HVAC and Lighting Systems

◊ Use energy efficient HVAC equipment and systems that meet ASHRAE 90.1 as the basis for energy efficiency and calculations.

◊ Use lighting systems that consume less than 1 watt/square foot for ambient lighting.

◊ Evaluate energy recovery systems that pre-heat or pre-cool in-coming ventilation air in office buildings.

◊ Investigate the use of integrated generation and delivery systems.

Optimise Building Performance and System Control Strategies

◊ Employ energy modelling programs early in the design process.

◊ Use sensors to control loads based on occupancy, schedule and/or the availability of natural resources such as daylight or natural ventilation.

◊ Evaluate the use of modular components such as boilers or chillers to optimize part-load efficiency and maintenance requirements.

◊ Evaluate the use of Direct Digital Controls. Monitor Project Performance

◊ Use a comprehensive, building commissioning plan throughout the life of the project.

◊ Use metering to confirm building energy and environmental performance through the life of the project.

References ASHRAE 90.1; WBDGMEC (2004); §2.6.3 Version 1 Ed.

Pub. Date 1 OCT, 2004 Rev. Date

Pub. Authority QUT Note

Specify Efficient

HVAC and Lighting

Optimise Building Performance and System Control

Strategies

Monitor Project Performance

Page 279: THE INTEGRATION BETWEEN DESIGN AND MAINTENANCE …eprints.qut.edu.au/16058/1/Frank_Lin_Thesis.pdf · the integration between design and maintenance of office building automation:

CHAPTER 6 GUIDELINES DEVELOPMENT

261

6.3.12 Promote Healthy and Comfortable Environments

Office building indoor environments can affect human health as well as occupant

comfort. BAS design and development must have a comprehensive, integrated

perspective that seeks to: maintain optimal thermal comfort, and create a high quality

environment to enhance worker health, comfort and performance. The strategies for

good design practice and sustainable maintenance can be summarised as in Guideline

# 24:

Guideline #24

Title Strategies for promoting healthy and comfortable environments Code G024

Purpose To ensure the designated functionalities comply with the users’ expectations

Applications Whole building process

Strategies

Descriptions

Tips Descriptions Maximise Natural Daylight

◊ Integrate day-lighting with the electric lighting system. ◊ Consider dimming controls that continuously adjust lighting levels to respond to daylight conditions.

Provide Quality Thermal and Ventilation Comfort

◊ At a minimum, comply with Australian codes and American Society of Heating, Refrigerating and Air Conditioning Engineers (ASHRAE) Standard 55- Thermal Environmental Conditions for Human Occupancy. ◊ Provide individual air and temperature controls to ensure adequate ventilation and comfort. ◊ Consider providing a temperature and humidity monitoring system to ensure optimal thermal comfort performance. ◊ Evaluate the use of access floors with displacement ventilation for flexibility, personal comfort, and energy savings. ◊ Utilise sensors to assess the air quality of spaces to adjust ventilation and real time monitoring of air quality. ◊ Design the ventilation system to exceed ASHRAE Standard 62- Ventilation for Acceptable Indoor Air Quality. ◊ Ensure that ventilation is effectively delivered and distributed. ◊ Consider separating thermal conditioning from ventilation.

Prevent Unwanted Moisture Accumulation

◊ Design the ventilation system to maintain the indoor relative humidity between 30% and 50%. ◊ Design to avoid water vapor condensation.

Create a High Quality Visual Environment

◊ Integrate natural and electric lighting with BAS ◊ Balance the quantity and quality of light. ◊ Provide individual controls to task lighting and adjustable ceiling light.

References ASHRAE Standard 55, 62; WDBGHC (2004); §2.6.1 Version 1 Ed.

Pub. Date 1 OCT, 2004 Rev. Date

Pub. Authority QUT Note

Maximise Natural Daylight

Provide Quality Thermal and Ventilation Comfort

Prevent Unwanted Moisture Accumulation

Create a High Quality Visual Environment

Page 280: THE INTEGRATION BETWEEN DESIGN AND MAINTENANCE …eprints.qut.edu.au/16058/1/Frank_Lin_Thesis.pdf · the integration between design and maintenance of office building automation:

CHAPTER 6 GUIDELINES DEVELOPMENT

262

6.3.13 Strategies for Security/ Fire System Design and

Maintenance

The application and installation of BAS can serve to improve the security and safety

by means of alarm and detection strategies, and communication systems. Backed by

advanced technologies, each design must be tailored to achieve functional

requirements on a case-by-case basis to select applicable safe systems and provide

security. Guideline# 25 is offered to stimulate security thinking by demonstrating

how security concepts and strategies may be applied.

Guideline #25

Preventive maintenance of the security system is essential whether the system is

basic, serving a small installation, or complex, incorporating supervisory circuits in a

high rise office building. Safety considerations for design and maintenance may

include: information and data safety, human safety, and protection from terrorism

etc. Fire warning and fire detection systems must be properly designed, installed and

maintained such as:

◊ Installation commissioning should be carry out wherever a fire alarm system is

intalled.

◊ Fire precautions in the design, construction and use should be in accordance with

the building regulations and Codes of Practice.

halla
This figure is not available online. Please consult the hardcopy thesis available from the QUT Library
Page 281: THE INTEGRATION BETWEEN DESIGN AND MAINTENANCE …eprints.qut.edu.au/16058/1/Frank_Lin_Thesis.pdf · the integration between design and maintenance of office building automation:

CHAPTER 6 GUIDELINES DEVELOPMENT

263

◊ Mechanical ventilation systems should be designed so that in a fire air is drawn

from protected escape routes and exits, or the system is closed down.

◊ When a pressure differential system is installed, it should be compatible with any

ventilation or air-conditioning systems in the building, should a fire break out.

◊ All fire doors should be fitted with an automatic self-closing device.

6.3.14 Life- Cycle Cost Analysis (LCCA)

The LCCA as described in Guideline# 26 provides a significantly better assessment

of the long-term cost-effectiveness of a project than alternative economic methods

that focus only on first costs or on operating-related costs in the short run.

Guideline #26

LCCA can be repeated throughout the design process if more detailed cost information

becomes available. Initially, construction costs are estimated by reference to historical data

or cost estimating guides and databases. Non-fuel operating costs, and maintenance and

repair costs are often more difficult to estimate than other building expenditures. Operating

schedules, standards of maintenance vary from building to building; there is great variation

in these costs even for buildings of the same type and age. Supplier quotes and published

estimating guides sometimes provide information on maintenance and repair costs. Therefore,

in the building life cycle, the historical records of building maintenance costs should be

established.

halla
This figure is not available online. Please consult the hardcopy thesis available from the QUT Library
Page 282: THE INTEGRATION BETWEEN DESIGN AND MAINTENANCE …eprints.qut.edu.au/16058/1/Frank_Lin_Thesis.pdf · the integration between design and maintenance of office building automation:

CHAPTER 6 GUIDELINES DEVELOPMENT

264

6.4 Operational Checklists

The following sections will present sample checklists as the demonstration for the

action guide and exploration for the integration template of design and maintenance.

The outline of the operational checklists is shown in Figure 6-3.

Operational Checklists

G028

G030

G032

G033

Figure 6-3: Outline of the Operational Checklists

Life Cycle Cost calculation

Checklist for sensor and actuator maintenance

Steps of BAS selection

Checklist for BAS commissioning

G031 Checklist for BAS maintenance

G027 Checklist for BAS design

G029 Checklist for BAS installation

G034 Project Delivery System

Page 283: THE INTEGRATION BETWEEN DESIGN AND MAINTENANCE …eprints.qut.edu.au/16058/1/Frank_Lin_Thesis.pdf · the integration between design and maintenance of office building automation:

CHAPTER 6 GUIDELINES DEVELOPMENT

265

6.4.1 Checklists for Building Automation System

Implementation

Comfort, safety and energy conservation of modern office buildings is controlled and

maintained by whole building management systems. These building management

systems include building control systems and the control of building systems such as

(1) Heating, Ventilating and Air-conditioning systems (HVAC) and their associated

systems, (2) Security and Fire systems, and (3) Building Automation System (BAS).

BAS is the brain of the whole building management system. BAS operates and

monitors the connected HVAC systems and security/ fire systems by a series of

programs and also provide information on the building control conditions to the

building operation and maintenance personnel, and/or directly to the customers to

meet with the expectation of occupants and the requirements of energy conservation.

In general the building systems alone can seldom provide adequate environmental

conditions if there is no interaction with other systems. To assure the desired

environmental conditions are meeting with occupant’s expectations, the building has

to be designed from the early stages with the end goals in mind - which is occupancy

comfort, safety, reliability and economical building operation. Architects,

mechanical and control engineers, and building maintainers should, as one team, be

participating in the whole design, installation, maintenance and turn over to the

building owner to deliver an expected building environment to the occupants.

In order to guide effective BAS implementation, the checklists were designed and

based on the Building Commissioning (BC), Total Quality Management (TQM) and

Life Cycle Cost Analysis (LCCA) (Portland 1994; Boed, V. 1996, Sieglinde, F.

2004), and the author’s experience in quality control and quality assurenace of the

aeronautical vehicle maintenance and construction/ building management. During the

BAS implementation process, the checklists can be used as a design and maintenance

tool to assure orderly progress during individual phases of the building project.

Checklists in this section contain items that require attention at each phase of the

project, as well as tips from design development through to maintenance

implementation. Individual checklists were developed for each phase of the project

and can be developed throughout the entire system implementation process.

Page 284: THE INTEGRATION BETWEEN DESIGN AND MAINTENANCE …eprints.qut.edu.au/16058/1/Frank_Lin_Thesis.pdf · the integration between design and maintenance of office building automation:

CHAPTER 6 GUIDELINES DEVELOPMENT

266

Checklists are simple and valuable tools of providing an reminder and are used in

many critical operations (MCCABE 1998). For example:

◊ In the field of aeronautical vehicle operation and maintenance, the checklists

are popularly used to check the routine or complicated operation and

maintenance works. Airline pilots do their pre-flight checks with checklists- a

process they do before every take-off, during every flight. That would not be

they could not remember which procedures to check, but to assure that all the

important items are checked. They repeat the process throughout the most

important ground and flight operations (Boed, V. 1996).

◊ In the building construction and management field, the facilities managers can

use checklists accompanied with video camera for recording inspection of

facilities during the maintenance process which can be used for trouble

shooting and feed back to the designer during the whole building life.

For building automation systems implementation, checklists should be developed for

every phase of the project - design, installation, commissioning and maintenance.

This approach also encourages teamwork throughout the whole building process,

which results in a historical record that contains inputs from mechanical, controls and

facilities engineers. It will optimise the use of design, mechanical and controls

systems in the building, and minimise the cost coming from wrong decisions

throughout the implementation process. Focusing on quality to sustain the

performance, checklist application will result in delivering a functioning building to

the owner. The application of checklists will reliably maintain design parameters

under designed conditions, and assure optimum first costs as well as operating and

maintenance costs throughout the life cycle of the building.

The construction and building management process is regarded as a quality assurance

process from the management view. Checklists should be used as tools to assure

quality at every step of the systems implementation. Since every building and system

is tailored for the proposed functions and purposes, the checklists should also need to

be customised for the given building project.

Checklists included in this thesis only demonstrate several integration practice

between design and maintenance for office building automation. These checklists can

Page 285: THE INTEGRATION BETWEEN DESIGN AND MAINTENANCE …eprints.qut.edu.au/16058/1/Frank_Lin_Thesis.pdf · the integration between design and maintenance of office building automation:

CHAPTER 6 GUIDELINES DEVELOPMENT

267

not encompass the whole BAS field. The following sections are a compilation of

selected checklists that have the most impact on building processes. They are divided

into two major stages- design and maintenance. A full section of activities and

checklists related to BAS’s system software development, operation, testing and

validation are left out from this thesis. Nevertheless, they deserve to be taken into

consideration since they are often least attention by architects, design and

maintenance consultants, facilities managers and owners.

6.4.2 Select Applicable and Reliable Building Automation Systems and Products

While some of the building system problems can be traced back to poor installation

on the part of the contractor, it is far more likely that the system selected was not

matched to the needs of the facility. In these cases, the owner, the facility maintainer

and the system designer did not do their work properly. They simply selected a

particular system, and then forced it onto the facility. It was quick and simple. But

the “quick and simple” approach does not work well when it comes to BAS

installations. Although the application and purpose of BAS may vary, the selection

process remains essentially the same. It is far better to make the adequate selection of

a BAS as in Guide# 27 at the outset of the design stage than to make do during

maintenance.

Page 286: THE INTEGRATION BETWEEN DESIGN AND MAINTENANCE …eprints.qut.edu.au/16058/1/Frank_Lin_Thesis.pdf · the integration between design and maintenance of office building automation:

CHAPTER 6 GUIDELINES DEVELOPMENT

268

Guideline #27

A BAS cannot compensate for poorly performing systems, nor can correct design

errors, improperly set up systems or poor maintenance. Analysing the financial

impact of control systems and knowing what's needed for the facility are the key first

steps toward picking the right system for a new BAS.

halla
This figure is not available online. Please consult the hardcopy thesis available from the QUT Library
Page 287: THE INTEGRATION BETWEEN DESIGN AND MAINTENANCE …eprints.qut.edu.au/16058/1/Frank_Lin_Thesis.pdf · the integration between design and maintenance of office building automation:

CHAPTER 6 GUIDELINES DEVELOPMENT

269

6.4.3 Checklist for BAS Design

BAS design has to provide the operating logic, alarm and reporting requirements and

to meet the level of desired automation expected by the owner. The example of the

BAS design checklist demonstrated in Guideline# 28 might be modified according to

needs.

Guideline #28

Title Checklist for BAS design Code G028

Purpose To ensure the BAS design meeting with the owner’s expectations Applications Whole building process

Checklists

Key check points of BAS design as:

1. Designer should ommunicate with the building owner to confirm the expectations and requirements.

2. Control and monitoring points should meet with the needs of clients.

3. BAS specification should be conformed with needs of clients.

4. BAS design consider the energy conservation and balance with the comfort expectation.

5. Sensor and actuator should be layed out adequately to reduce the overlap and redundant.

6. Designer should consider the operation and maintenance requirements and costs.

7. BAS design should consider the technology development and future expansion to pre-allocate space of the new system installation.

8. Training should be considered in the design planning and hand-over.

9. Documentation of the design is critical during the whole building process.

References §4.2.3 Version 1 Ed.

Pub. Date 1 OCT, 2004 Rev. Date

Pub. Authority QUT Note

Page 288: THE INTEGRATION BETWEEN DESIGN AND MAINTENANCE …eprints.qut.edu.au/16058/1/Frank_Lin_Thesis.pdf · the integration between design and maintenance of office building automation:

CHAPTER 6 GUIDELINES DEVELOPMENT

270

6.4.4 Checklist for BAS Installation

For a demonstration of design and maintenance, a checklist such as Guideline# 29

for BAS installation, is presented as an example which can be modified in

accordance with the needs.

Guideline #29

Title Checklist for BAS installation Code G029

Purpose To ensure the installation meeting with the requirements of design Applications Whole building process

Checklists

Key ckeck points of BAS installation as:

1. Specifications of the BAS hardware and software should be reviewed and followed.

2. BAS intallation quantity should be checked before and after works to ensure the equipment completion and functioning.

3. BAS software should be installed and run test to ensure that their functionalities are working.

4. Installation of the sensors and actuators should be checked and tested.

5. The list of BAS control and monitoring points should be kept and checked.

6. BAS associated infrastructure and communication system should be checked and tested.

7. Emergency power supply should be installed adequately and run test.

8. Initial set up value of BAS systems should be kept and ckecked.

9. Grounding and insulation of BAS systems should be checked. 10. Documents of the hardware and software should be kept.

References §4.4 Version 1 Ed.

Pub. Date 1 OCT, 2004 Rev. Date

Pub. Authority

QUT

Note

BAS installation should focus on hardware such as DDC, sensors (space, duct, water),

control valves and actuators, dampers, power supplies and transformers,

communication wiring, and software including application software and points list,

documentation.

Page 289: THE INTEGRATION BETWEEN DESIGN AND MAINTENANCE …eprints.qut.edu.au/16058/1/Frank_Lin_Thesis.pdf · the integration between design and maintenance of office building automation:

CHAPTER 6 GUIDELINES DEVELOPMENT

271

6.4.5 Checklist for BAS Commissioning

To ensure the success of BAS installation, the commissioning activities are essential,

especially during the hand-over and warrenty periods. BAS commissioning includes

the final adjustment, calibration, and tuning of the various components. This process

requires the participation of the building owner, a commissioning agent, the designer,

a manufacturer's representative, and building maintenance personnel. The example

demonstrated in Guideline# 30 is a short version of a checklist for BAS

commissioning.

Guideline #30

Title Checklist for BAS commissioning Code G030

Purpose To ensure the BAS quality Applications Hand-over, warranty periods, operation and maintenance stage

Checklists

Key check points of BAS commissioning as:

1. Documentation: It initiates from the design stage. It includes general information and specifications, and technical manuals of installation. It should be hand-over to the occupants.

2. Trainning: Design team associated with the relevant technical contractors should take the responsibilities to train the staff and personnel of the operation and maintenance (O/M).

3. Emergeny treatment: Emergency training and equipments should be especially focused.

4. Operational calibration: It should become regular works. 5. Reporting: feedback and problem reflection and tracking

should become the regular works. References §4.4

Version 1 Ed. Pub. Date 1 OCT, 2004 Rev. Date

Pub. Authority QUT Note

BAS commissioning should check the control and alarm items, reporting, scheduling

and emergency strategies including their operation, verified Set-points, constant

alarm limits, operating interface, and documentation.

Page 290: THE INTEGRATION BETWEEN DESIGN AND MAINTENANCE …eprints.qut.edu.au/16058/1/Frank_Lin_Thesis.pdf · the integration between design and maintenance of office building automation:

CHAPTER 6 GUIDELINES DEVELOPMENT

272

6.4.6 Checklist for BAS Maintenance

The example demonstrated in Guideline# 31 is a short version of a checklist for BAS

maintenance.

Guideline #31

Title Checklist for BAS maintenance Code G031

Purpose To execute the BAS maintenance for sustaining their designed functionalities.

Applications Operation and maintenance stage

Checklists

Key check points of BAS maintenance as:

1. Check control and monitoring system as designed calibarion

and functionality.

2. Check and verify the conditions of BAS system and report.

3. Check power supply and UPS linkage and testing.

4. Simulate emergency shut-down handling.

5. Manually handle BAS functionalities under emergency

shut-down.

6. Test smoke alarm system and security alarm regularly

References §4.2.4 Version 1 Ed.

Pub. Date 1 OCT, 2004 Rev. Date

Pub. Authority

QUT

Note

BAS maintenance should check the status of: temperature control, pump control, DP

Control, condensation alarm, reset schedule, alarm reporting, emergency shut-down,

power supply, and specific items to verify their condition as being normal or broken,

calibration, repair or replace, or waiting for check.

Page 291: THE INTEGRATION BETWEEN DESIGN AND MAINTENANCE …eprints.qut.edu.au/16058/1/Frank_Lin_Thesis.pdf · the integration between design and maintenance of office building automation:

CHAPTER 6 GUIDELINES DEVELOPMENT

273

6.4.7 Execute BAS Maintenance Schedule checklist

Maintenance of the sensors and actuators of BAS should be executed regularly in

accordance with the manufacturers instructions to maintain their performance and

functionalities as in Guideline #32.

Guideline #32

Title Schedule of checklist for sensor and actuator maintenance Code G032

Purpose To regularly execute the maintenance tasks Applications Operation and Maintenance stage

Checklists

Key check points of the schedule for sensor and actuator maintenance:

1. Overall visual inspection to make sure all equipment operating safely: daily

2. Check time clocks after every power outage: daily 3. Verify control schedules software that schedules are

accurate for season and occupancy : daily 4. Verify all set-points are accurate for season and

occupancy : daily 5. Check all gauges to make sure readings as designed:

weekly 6. Check schedules: weekly 7. Check all dead-bands for accuracy as designed: monthly 8. Calibrate time clocks for accuracy: half-yearly 9. Check all sensors such as temperature, pressure, humidity,

smoke, flow as designed: half-yearly 10. Calibrate all sensors: yearly

References §4.2.4

Version 1Ed. Pub. Date 1 Oct, 2004 Rev. Date

Pub. Authority QUT Note

Page 292: THE INTEGRATION BETWEEN DESIGN AND MAINTENANCE …eprints.qut.edu.au/16058/1/Frank_Lin_Thesis.pdf · the integration between design and maintenance of office building automation:

CHAPTER 6 GUIDELINES DEVELOPMENT

274

6.4.8 Apply Life- Cycle Cost Analysis (LCCA)

The practical application of LCCA can start from the Life-Cycle Cost calculation

after identifying all costs by year and amount and discounting them to present value.

These amounts are added together to arrive at total life-cycle costs for each

alternative as in Guideline #33:

Guideline #33

LCCA can be applied to any capital investment decision in which relatively higher

initial costs are attempted to reduce future costs. It is particularly suitable for the

evaluation of building design alternatives that satisfy a required level of building

performance but may have different initial investment costs, different operating and

maintenance and repair costs, and possibly different lifespans.

LCCA provides a significantly better assessment of the long-term cost-effectiveness

of a project than alternative economic methods that focus only on first costs or on

operating-related costs in the short term.

halla
This figure is not available online. Please consult the hardcopy thesis available from the QUT Library
Page 293: THE INTEGRATION BETWEEN DESIGN AND MAINTENANCE …eprints.qut.edu.au/16058/1/Frank_Lin_Thesis.pdf · the integration between design and maintenance of office building automation:

CHAPTER 6 GUIDELINES DEVELOPMENT

275

6.4.9 Project Delivery System (PDS)

During the life time of building development process, building project contracts are

designed to shift the principal contractor’s focus to the performance of the building

construction (Fujitsu C. and BRC, 1998). Clients of today’s building construction

have many different project delivery systems (PDS) to select from. According to CSI

(2005), project delivery is the contractual relationships between the owner, archi-

tect/engineer (A/E), contractor(s), and the management services utilized to design and

construct a project. Project delivery moves a project from a concept to a completed

facility.

PDS is defined as a set of procedures and relationships by which a project is

delivered to an owner (Dorsey R.W. 1996). Project delivery systems for building

construction can exhibit many different forms such as “Traditional design-bid-build”,

“design-negotiate-build”, “construction management”, “Design and Construct”, and

“Owner build such as ‘Build, Own Transfer (BOT)’, ‘Build, Own, Operate and

Transfer (BOOT)’ or ‘Public Private Partnerships (PPP)’” (Mohyla, L. V 1996;

Hampson, K. et al. 2001) . Each delivery method can have variations in terms of

contract payments (such as lump sum, unit price, and cost plus,) scheduling (such as

fast-track), and number of contracts (such as single or multiple-prime contracts).

Competitive market forces compel most owners to select a project delivery system that

will achieve a balance between the factors of project extent, risk, cost, and time (CSI

2005).

There are two essential issues to be considered when choosing a project delivery

system. First is to be realistic about the nature of the project, for example, the risks,

the budget constraints, the unknowns, the time constraints, the expectation of quality,

the level of client involvement. The second is to assess the various project delivery

strategies against the above criteria (Hampson, K. et al. 2001; CSI 2005). In building

construction practice, there are many types of project delivery systems to be applied,

but no single ideal one. Generally, a good PDS enables various tasks and procedures

to be executed efficiently and provides a mechanism for co-ordination and control.

Project delivery rules and procedures ensure that tasks get done and are carried out

efficiently. Good system ensures that information flows and decisions are taken.

Thus the success of a project relies on effective coordinating of design and

Page 294: THE INTEGRATION BETWEEN DESIGN AND MAINTENANCE …eprints.qut.edu.au/16058/1/Frank_Lin_Thesis.pdf · the integration between design and maintenance of office building automation:

CHAPTER 6 GUIDELINES DEVELOPMENT

276

construction and of main contractors and specialist sub- contractors. This highlights

the importance of project delivery as well as the focus on technical elements in this

research to extend the scope to more than management issues. Realising the benefits

and limitations of various project delivery systems (as described in Table 6.1) will

help make decision for the projects.

Table 6.1: Implications of the PDS for design and maintenance

PDS Implications of D/M Benefits Limitations

Fully documented “traditional” design-bid- build

◊ An architect/ designer and the building contractor plays little task of the project after the design-build project completion.

◊ The building contractor usually has no role in the on-going operation and maintenance of the building either, as the builder is contracted purely to construct the building.

(1) Roles and responsibilities are well established and known for all participants in the building industry.

(2) Design has been completed before bidding, the project schedules can be established in advance.

(3) With design-bid--build, the owner has a separate contract with an A/E firm for the design and the construction stage.

(4) Owners can be actively and fully involved in the project design, and realize the greatest amount of control.

(5) Competitive bidding can reduce costs, and also creates a cumulative savings on the entire work involved.

(1) The competitive bidders may tempt to bid the project with little or no profit, and may affect the quality of construction.

(2) The errors, discrepancies, and contradictory information may lead to change orders, claims, and disputes with the contractor.

(3) Competitive bidding provided the lowest cost allows little margin for error to rework which will affect the efficiency of construction and maintenance.

(4) The shortness of the time forces bidders to respond quickly without proper consideration, it may cause the dilemma between quality and cost.

Design-negotiate-build

◊ In negotiating cost and contract details of a design negotiate-build project delivery, a construction contract may achieve mutual benefits to the parties involved in the project.

◊ The negotiated

(1) The owner can select a firm based upon the experience, expertise, and interest in the project, as well as the firm’s reputation and financial capacity.

(2) This contract can be developed to include contractor as a team member during the design process. The early participation

(1) Modifications to design documents may become change orders that affect time and cost, and may lead to claims and disputes.

(2) Negotiated agreements may limit some responsibilities, and require additional time for

Page 295: THE INTEGRATION BETWEEN DESIGN AND MAINTENANCE …eprints.qut.edu.au/16058/1/Frank_Lin_Thesis.pdf · the integration between design and maintenance of office building automation:

CHAPTER 6 GUIDELINES DEVELOPMENT

277

firms may become participants on the project team earlier in the process and may influence design, product selection, constructability, and operation/ maintenance.

permits the A/E to benefit from the contractor’s advice, and may facilitate product selections, choice of construction techniques.

(3) The negotiation process allows participants to have a better knowledge of the work required.

coordination, detailed progress.

(3) It lacks the mechanism to assure the quality and performance during the building life time process.

Construction management

◊ Construction management is effectively applied to a construction project from conception to completion for controlling project time, cost, and risk.

◊ Construction management can supplement the owners’ or developers’ role in the project.

◊ Construction management can be used for most projects that require extensive coordination between disciplines as design, construction and maintenance.

(1) Construction management provides basic and intensive services such as: information management, coordination, cost and time management, quality assurance, construction-site safety, and commissioning. These can help achieve an effective design and communication.

(2) The fast track scheduling encourages design decisions to be made and documented earlier through the cooperation between the construction manager, A/E, and contractor owner.

(1) The additional level of authority resulting from the use of a construction manager requires communication, reporting, and other contract adminis-tration paperwork for processing and record keeping.

(2) For overall contract administration effi-ciency, it can be time consuming and expensive for the A/E and the contrac-tor(s).

(3) The owner is relying heavily on the expertise and professional integrity of the construction manager, A/E, and contractor to deliver a project.

Design and construct

◊ The building contractor is responsible for both the design and construction, either engaging designers, or having them integrated.

◊ In this PDS, the building contractor usually has no role in the on-going

(1) The single-contract for design and construction offers more control over project timing and costs.

(2) With the fast-track scheduling method, the design-builder is able to maximize the value of the project in the shortest time for the least cost.

(3) The contractor can

(1) Preparation of the project description may be a difficult task for the owner, particular for the complex projects.

(2) The owner’s project should clearly indicate necessary requirements, including the design documentation, as well as quality assur-ance/quality control requirements.

Page 296: THE INTEGRATION BETWEEN DESIGN AND MAINTENANCE …eprints.qut.edu.au/16058/1/Frank_Lin_Thesis.pdf · the integration between design and maintenance of office building automation:

CHAPTER 6 GUIDELINES DEVELOPMENT

278

operation and maintenance of the building, being purely responsible for design and construction.

influence product selections by provid-ing information regarding cost, availability, and performance.

(4) The design-builder may also have specialized information regarding design and constructability of project.

(3) Dispute resolution may require maintaining historic records for use if dis-putes arise.

(4) The design-builder may have increased risk due to expanded roles in design and construction to make assurances to meet the owner’s expectations.

Owner build such as ‘Build, Own Transfer (BOT)’, ‘Build, Own, Operate and Transfer (BOOT)’ or ‘Public Private Partnerships (PPP)’

◊ In this PDS, Build, Own, Operate and Public Private are responsible for the design and construction, and then Partnerships (PPP) the operation and maintenance of the facility, usually for twenty or thirty years.

◊ After a period the building may be transferred the ownership to an eventual owner, or they may continue ownership. Thus mostly, design and maintenance tasks are supervised under same control organisation.

(1) Most owners are large corporate entities and contractor/developer with financial backing to absorb the risk of problems or other losses during process.

(2) The owner with flexibility can effectively and efficiently complete projects by controlling whole project with mutually beneficial business relationships.

(3) The owner can select contractors with suc-cessful records of work for building.

(4) The developer and contractor have a strong motive to be interested in the benefits of a BAS.

(1) The control of the project afforded to the owner by functioning as the contractor also trans-fers much of the risk for project comple-tion and quality to the owner.

(2) In order to relieve the primary risk of not being able to complete the project, the contractor is often required to provide performance and payment bonding. However, this does not mean that the entire project is bonded.

(3) Usually, there is no option for errors, discrepancies, or omissions from the construction documents.

Practically, the quality and performance of a building often can be easily

demonstrated through the technical features of the facilities and building systems.

However, the efficiency of management during the process is commonly difficult to

assess. Notwithstanding, the management issue in the process of project delivery is

also essential to ensure the quality and sustainability of the building project during

the delivery process. For most projects, recognising the role and responsibilities of

developer will help improve building project delivery to facilitate the design and

maintenance works. This can be summarised as:

Page 297: THE INTEGRATION BETWEEN DESIGN AND MAINTENANCE …eprints.qut.edu.au/16058/1/Frank_Lin_Thesis.pdf · the integration between design and maintenance of office building automation:

CHAPTER 6 GUIDELINES DEVELOPMENT

279

◊ Select suitable project delivery system (PDS) for the projects.

◊ Compare benefits and limitations of different types of PDS.

◊ Find consultants to make decision of PDS for supporting smart design to ease

maintenance.

◊ Compromise the commercial benefits and environment impacts in the life

cycle consideration

Recognising the relationships between different stakeholders, the role of developers

and their responsibilities will help all stakeholders to realise and appreciate many

respective focus and interests such as capital costs, sell benefits, or operation and

maintenance costs. Designers initially play an essential role help the selection of the

applicable project PDS through the design specification and consultation during the

design stage. A right PDS decision will facilitate the project not only in the

effectiveness of design and construction, but also in the efficiency of the on-going

operation and maintenance. The commissioning in different types of project delivery

during design and maintenance process and BAS applications should be considered

their commercial benefits of the quality and performance as selling fast as a motive

and life time cost decreasing during the design stage. For various project delivery

types, the adequate consideration will aid the execution of project. Generally, it will

be advantageous for better design and maintenance decision if the consideration on

different type of project delivery as described in Guideline #34.

Page 298: THE INTEGRATION BETWEEN DESIGN AND MAINTENANCE …eprints.qut.edu.au/16058/1/Frank_Lin_Thesis.pdf · the integration between design and maintenance of office building automation:

CHAPTER 6 GUIDELINES DEVELOPMENT

280

Guideline #34

Title Project Delivery System in D/M Process Code G034

Purpose To instruct the efficient project delivery Applications Design and Maintenance stage

Checklists

- Fully documented “traditional” design-bid-build ◊ In a traditional design-bid-build delivery method, commissioning is

needed to provide services throughout the project, and makes design decisions and the best interests of the owner.

◊ It is necessary that the contractor provides a completed project that meets the requirement of the contract in the bidding price and ensures the construction works as designed.

◊ After project delivery of construction, operation and maintenance D/M should consider further development of the effective commissioning activities to ensure the quality and performance of building systems.

- Design-negotiate-build ◊ In negotiated contracts, construction excellence and time are usually the

primary considerations. In addition, the life time service should be considered during the negotiated process.

◊ Negotiated contracts can be beneficial if parties involved understand their roles and respect the roles of others.

◊ The key to successful negotiated contracts is compromising to achieve balanced results and forming a cohesive team relationship among the owner, the contractor, and the A/E.

◊ The commissioning activities are necessary between project delivery process to ensure the quality and performance of building.

- Construction management ◊ The roles of the parties involved in a construction management contract

should be carefully defined in their respective contracts. ◊ The potential for conflict between parties should be evaluated to provide

management services through the processes. ◊ The construction management allows owners to control the project from

beginning to end with a higher level of assurance. ◊ The construction management can be considered to extend their

commissioning and support services for the life time process by the contracts to ensure the quality and performance of building.

- Design and construct ◊ This method should be used primarily where contracts can be

negotiated. ◊ The project should be clearly and completely defined the building

requirements for the owner. ◊ The roles of the parties involved in a design-build contract should be

carefully defined in the contract. ◊ Design-build organizations should provide benefits that some owners

desire, including specialized expertise during design, economy in cost and time, and maximized value of the finished project.

◊ It should be considered to extend their commissioning and support services for the life time process to ensure the quality and performance.

- Owner build such as ‘Build, Own Transfer (BOT)’, ‘Build, Own, Operate and Transfer (BOOT)’ or ‘Public Private Partnerships (PPP)’

◊ Balance between capital building cost and O/M costs will ensure the quality and performance of the project.

◊ The efficiency and effectiveness of whole project require an independent

Page 299: THE INTEGRATION BETWEEN DESIGN AND MAINTENANCE …eprints.qut.edu.au/16058/1/Frank_Lin_Thesis.pdf · the integration between design and maintenance of office building automation:

CHAPTER 6 GUIDELINES DEVELOPMENT

281

agency to monitor and review. ◊ The management for the whole project should provide commissioning

and support services between different participants to ensure the quality and performance of building.

◊ The applications and installation of BAS should be considered their effectiveness and applicability.

◊ After project transfer, the commissioning activities should continue to ensure the quality and performance of building.

References §6.4.9 Version 1Ed.

Pub. Date 1 Jun., 2005 Rev. Date

Pub. Authority QUT Note

In the project development process and commercial process, the building projects

through the lifecycle process such as design and maintenance require adequate

commissioning to ensure the quality of process not only in the technical aspects, but

also in the management issues. It implicates that the various project delivery systems

influence the efficiencies of the process. As a result, the integration of design and

maintenance can be effectively enhanced through carrying out the distinguished role

of the key stakeholders.

Page 300: THE INTEGRATION BETWEEN DESIGN AND MAINTENANCE …eprints.qut.edu.au/16058/1/Frank_Lin_Thesis.pdf · the integration between design and maintenance of office building automation:

CHAPTER 6 GUIDELINES DEVELOPMENT

282

6.5 Summary

The above guidelines for office building automation have provided several feasible

and strategic solutions for high level decision making regarding BAS design and

maintenance. For different types of project delivery, adequate commissioning

activities and distinctive responsibilities of building phases and key stakeholders can

help facilitate the effectiveness and efficiency of building process. The guidelines,

including strategies and checklists for design/ maintenance of the building

automation, have explored a way of integration to create a mutual platform between

different building processes during the implementation of office building project.

These guidelines provide important information/ instruction and a communication

template for the designers, operation and maintenance (O&M) personnel, and

building developers/ owners. As part of the hand over documentation during the

delivery and continuum, these guidelines will become an invaluable resource for

building maintenance for re-testing and re-calibrating the building operating

parameters, and design references. These will also be a good source of information

for years after the job is completed for design engineers involved with building

systems or renovation of building automation. The study is a basic integration

practice for the building processes; it could be spanned over the whole of the

building’s life to improve the performance of office building, minimise energy

consumption, and enhance security and comfort as well.

Basically, the guidelines is extracted from the principles and concepts of the BAS

knowledge and practice, and it should be updated in accordance with technology

innovations and changing environments. On the other hand, in order to easily and

effectively employ the guidelines for the BAS decision making, computerised tools

would be an applicable, and a more efficient and effective way. Therefore one of the

major parts of this study is to create an example of a decision support model for the

execution of decision making in design and maintenance. This will be detailed in the

following section. The list of guidelines for optimising design and maintenance to

provide operational references for high performance, energy conservation and

comfort decision making is illustrated in Figure 6-4, which can be integrated with the

knowledge rules detailed in Chapter 5 for decision support application as in Figure

6-5.

Page 301: THE INTEGRATION BETWEEN DESIGN AND MAINTENANCE …eprints.qut.edu.au/16058/1/Frank_Lin_Thesis.pdf · the integration between design and maintenance of office building automation:

CHAPTER 6 GUIDELINES DEVELOPMENT

283

G028 Checklist for BAS design

G033 Life Cycle Cost calculation

G032 Schedule of Checklist for sensor and actuator

G027 Steps of BAS selection

G029 Checklist for BAS installation

G031 Checklist for BAS maintenance

G030 Checklist for BAS commissioning

G014 Strategies for assuring the reliable systems G013 Tips for avoiding the pitfalls of BAS selection

G012 Tips of specification design

G015 Strategies for systems integration

G021 Strategies for Energy Efficient HVAC Design

G020 Strategies for high performance, energy conservation and comfort

G022 Strategies for the selection of light control

G023 Strategies for minimizing energy consumption

G024 Strategies for promoting healthy and comfortable environments

G026 Guidelines for the applications of LCCA

G017 Strategies for optimising design and maintenance

G025 Strategies for security/ fire system design and maintenance

HIGH PERFORMANCE, ENERGY CONSERVATION AND COMFORTABLE OFFICE BUILDINGS

Figure 6-4: Guideline Application Flow

G011 Requirements of Specification design

G018 Strategies for selection maintenance strategy

G019 Strategies for building commissioning

General Strategies

G010 Strategies for designing the specification

G009 Tips for design professional selection strategy

Strategies for Raising Awareness and Understanding

Operational Checklists

G003 Responsibilities and capabilities of design and maintenance

G002 Building life cycle process

G004 Attributes of high-performance and energy conservation office building

G006 Benefits of the process integration

G005 Types of HVAC Systems and control

G007 Components of building control system

G008 Elements of sensor and actuator system

G001 Principles of the integration

G016 Strategies for integrating with infrastructure

G034 Project Delivery System

Page 302: THE INTEGRATION BETWEEN DESIGN AND MAINTENANCE …eprints.qut.edu.au/16058/1/Frank_Lin_Thesis.pdf · the integration between design and maintenance of office building automation:

CHAPTER 6 GUIDELINES DEVELOPMENT

284

EXPECTATIONSDLCC

Effective/Efficient

Friendly

Comfortable

EnergyConservation

Safe/ Security

Smart/Intellignetfeatures

EST

QD

QM

DC

TPS

PS

IC

AHVACO

ECD

SMSS

SP

SF

ACS SI

PP

PM

PME

PMM

BSP

Accessible

AI

AMMCA

EST

ECF

MSI

MSH

MSD

MSC

LMR

MCR

AMS DSF MSOP

SC

SBAS

DRSDSHDSPCDSPIDSCP DPM

DDIDCFDCD

DFUDCD DCR DSI

DRM

DB

RBAS

G002, G003, G004, G005, G006, G009,G010, G011, G016, G028, G029, G030

G012G027

G001G013G014G015

G003G004

G016G018

G030G031G032

G017

G019G021G024

G004

G026G033

G019G020G022G022

G025

G016

SCG026

G007G008

The integrated guidelines with the knowledge rules as in Figure 6-5 can be utilised to

explore feasible solutions. For decision making in office building automation, the

process can be done manually for the design and maintenance subjects. These

findings might also be used to develop a computer based decision support prototype.

The development of prototype decision support will be demonstrated in the following

chapter.

Figure 6-5: Integrated Knowledge Rules with Guidelines

Page 303: THE INTEGRATION BETWEEN DESIGN AND MAINTENANCE …eprints.qut.edu.au/16058/1/Frank_Lin_Thesis.pdf · the integration between design and maintenance of office building automation:

CHAPTER 7 DEVELOPMENT OF DECISION SUPPORT SYSTEM

285

7.1 Introduction 7.1.1 Overview of Decision Support Systems 7.1.2 Structure of Decision Support Systems 7.2 Pilot System Testing 7.2.1 Introduction 7.2.2 Objectives 7.2.3 Methodology Adopted in the System Development 7.2.4 Development Process 7.2.5 Illustration of the Pilot System 7.2.6 Discussion 7.3 Prototype System Development 7.3.1 Development of SBASpro Knowledge Base 7.3.2 Model 7.4 Running SBASpro Model and Examples 7.4.1 Evaluation Model 7.4.2 Practice BAS Decision Support 7.4.3 Decision Support Application and Development 7.4.4 SBASpro Demonstration 7.5 Validation 7.6 Discussion

CHAPTER 7 DEVELOPMENT OF DECISION SUPPORT SYSTEM

The Integration between Design and Maintenance of Office Building Autom

ation: A Decision Support Approach

Page 304: THE INTEGRATION BETWEEN DESIGN AND MAINTENANCE …eprints.qut.edu.au/16058/1/Frank_Lin_Thesis.pdf · the integration between design and maintenance of office building automation:

CHAPTER 7 DEVELOPMENT OF DECISION SUPPORT SYSTEM

286

Page 305: THE INTEGRATION BETWEEN DESIGN AND MAINTENANCE …eprints.qut.edu.au/16058/1/Frank_Lin_Thesis.pdf · the integration between design and maintenance of office building automation:

CHAPTER 7 DEVELOPMENT OF DECISION SUPPORT SYSTEM

287

7.1 Introduction

This section presents the development of a prototype decision support system in

order to effectively employ the knowledge based database detailed in Chapters: 5 and

6. The development includes two stages: the first stage is pilot system testing to

explore the feasibility of decision support alternative; the second stage is to

accomplish design of the whole model of prototype decision support system to

integrate the design and maintenance knowledge extracted from the professional

survey and experienced case study.

Decisions and decision making are crucial for any action, especially for the complex

nature of the construction industry. Top quality and successful decision making

requires sufficient understanding of the problems we are facing. In nowadays'

dynamic and rapidly changing environment we need applicable methods and tools

for improving changes for successful decisions. Integrated decision support is a

research exploration where methods and tools are developed to model in order to

provide enhanced decision support for office building participants.

The model has been designated as namely Supporting Building Automation System

Pro (SBASpro). The SBASpro model consists of six major functions including

decision making quiz, hot topics, case study, evaluation, links and search as shown in

the homepage of model program. The knowledge was extracted from the

questionnaires which were conducted to the selected relevant professionals in the

field of building automation of the office building design, construction and

maintenance, and was verified by an experienced case study to enhance its reliability;

then it is formulated a knowledge database for the further system development. The

structure and development of the SBASpro model are described with a demonstrated

example of using SBASpro to practice the integration between design and

maintenance in the office building context.

The potential benefits of using SBASpro during the design stages are also discussed:

Designers could benefit from the previous experts’ knowledge and experience

through the knowledge based database built in the decision support system model. A

Page 306: THE INTEGRATION BETWEEN DESIGN AND MAINTENANCE …eprints.qut.edu.au/16058/1/Frank_Lin_Thesis.pdf · the integration between design and maintenance of office building automation:

CHAPTER 7 DEVELOPMENT OF DECISION SUPPORT SYSTEM

288

self evaluation could facilitate the fine-tuning of project and could help learn from

the previous experience.

The SBASpro model can assist in documenting successes and improvement of the

decision making for the BAS design; and it may also provide the reference during the

commissioning/maintenance period after occupation, thereby identifying right

strategies in building operation.

This research asserts that there is a need for designers to assess information and

instructions of office building automation, the model developments would enable

designers to improve a BAS design decision, and maintainers to realize and meet the

expectations of clients and users. Development of a decision support system model

could provide designers and maintainers or building developers/ owners a working

platform to integrate the building process of office buildings automation.

7.1.1 Overview of Decision Support Systems

Decision support systems are computer tools that can be used to model the expertise

of humans in a specific domain. Expertise in knowledge has generally been acquired

through discipline and experience over a period of time in a specific domain and is

heuristic in nature. Decision support systems provide a technique to model the rea-

soning processes of experts and use their knowledge to support specific decision

purpose. Such systems can be used by non-experts to improve decision making

capabilities. Decision support systems can also be used by professionals as

knowledgeable assistants. Decision support systems are used to propagate scarce

knowledge resources for improved consistency of results. Such systems could

function better than a single human expert in making value judgments in a specific

area of expertise.

Decision support systems are best known as self-contained entities that exist quite

separately from other computer-aided design systems. Important is the notion of

embedding explicit knowledge of the kind that is encoded in decision support

systems within more general computer design tools. The development of the decision

support system developed in the research is to integrate knowledge with relevant

D/M of office building automation, make inferences, arrive at conclusions, and

explain its conclusions.

Page 307: THE INTEGRATION BETWEEN DESIGN AND MAINTENANCE …eprints.qut.edu.au/16058/1/Frank_Lin_Thesis.pdf · the integration between design and maintenance of office building automation:

CHAPTER 7 DEVELOPMENT OF DECISION SUPPORT SYSTEM

289

7.1.2 Structure of Decision Support System

The development of the SBASpro decision support system based on the

developmental prototyping methodology is illustrated as in Figure 7-0:

Prototype System

Prototype Decision Support SystemDesign and Development

SystemDesign & Planning

Pilot Design

KnowledgeDatabase

Inference Engine

Example Demonstration

Prototype Design

Validation

Application

Further System Development

FunctionModel

Interface

Knowledgeacquisition

The SBASpro model is composed of two major parts: (1) the development

environment; and (2) the consultation (run time) environment. The developmental

environment is used to build the components and to introduce knowledge into the

system. The development environment contains components that facilitate the

creation of decision support systems: knowledge acquisition facility, inference en-

gine, and knowledge base such as:

• The knowledge acquisition facility provides a way to store experts’

qualitative knowledge to address a given requirement.

• The inference engine controls the reasoning process and decides how the

stored knowledge will be implemented.

Development Environm

ent

Consultation E

nvironment

Figure 7-0: The Structure of Decision Support System

Page 308: THE INTEGRATION BETWEEN DESIGN AND MAINTENANCE …eprints.qut.edu.au/16058/1/Frank_Lin_Thesis.pdf · the integration between design and maintenance of office building automation:

CHAPTER 7 DEVELOPMENT OF DECISION SUPPORT SYSTEM

290

The consultation environment is used to obtain expert knowledge and advice. The

consultation environment contains components that facilitate the use of the model

and provides the users with expert advice and answers their queries. There is an

interface, explanation facility, and recommended action facility as:

• The interface: allows human-machine and machine-machine communication

and interaction. The human-machine interface should be as simple and easy

as possible. The machine-machine interface must allow for communication

with other computer programs (e.g., databases and graphical interfaces).

• The explanation facility knowledge: is being applied and why a certain

decision support system is following a specific line of reasoning. This

explains why and how such conclusions were reached.

• The recommended action facility: allows revision of some of the system’s

reasoning processes by the users who learn to make additions and

modifications to the system.

In simplification, the system development initiates from the program environment

study, then, pilots a simple example to explore the feasibilities of research intentions.

Once the pilot system has been tested and reviewed, the prototype system will be

developed. The structure of the system development is illustrated as in Figure 7-1.

Figure 7-1: The Structure of System Development

Design and Implementation

Architectural Design

Pilot System Construction

Pilot System Testing & Evaluation

Pilot System & Design Prototype

System Design & Consturction

Validation

System Prototype

?

Program Environment Study

Page 309: THE INTEGRATION BETWEEN DESIGN AND MAINTENANCE …eprints.qut.edu.au/16058/1/Frank_Lin_Thesis.pdf · the integration between design and maintenance of office building automation:

CHAPTER 7 DEVELOPMENT OF DECISION SUPPORT SYSTEM

291

7.2 Pilot System Testing

7.2.1 Introduction

This section presents a pilot system testing of the proposed decision support system.

The pilot system testing as a platform would be advantageous for creating the whole

system during the research process. This prototype system program has been tested

for Windows environment. In the aspect of research scope, the research focused on

the elements related to the high-level decision making in the office building

automation for the practitioners such as designers, design and maintenance (D/M)

consultants, facilities managers, and developers or owner representatives. The system

concentrated on the most important parts of building automation system associated

with HVAC, electrical power system, lighting system, fire and security system.

In order to demonstrate a typical decision support system, the pilot system has

adopted a simple element —“sensor”, which is a principle element of Building

Automation System (BAS). The pilot system will serve as a working platform, which

can be duplicated and expanded as necessary during the progress of research, it could

also be updated and modified, eventually to develop a practical decision making tool

for the office building automation.

7.2.2 Objectives

The main objective of the pilot system is to explore the feasibility for the proposed

intention of the decision support in optimising the performance and enhancing the

lifetime value of office building automation. The pilot system which has been created

will help the research to reach the following objectives:

• To pre-test the methodology of the system design

• To create a template for the creation of initial knowledge database, model

database and interaction interface

• To set up a platform for the research to easily feed the knowledge

extracted from the collated data and information into the database

Page 310: THE INTEGRATION BETWEEN DESIGN AND MAINTENANCE …eprints.qut.edu.au/16058/1/Frank_Lin_Thesis.pdf · the integration between design and maintenance of office building automation:

CHAPTER 7 DEVELOPMENT OF DECISION SUPPORT SYSTEM

292

7.2.3 Methodology Adopted in the System Development

The methodology adopted for the development of the decision support was based on

the developmental prototyping methodology detailed in Chapter 3 section 3.2.8 as:

• System development: includes planning, analysis, and design,

Implementation (prototype testing and validation).

• Knowledge: extracted from the literature reviews, professional survey

questionnaires and case study to create knowledge based database.

• Programming: by means of Microsoft visual Basic 6.0 and Access XP to

create a computerised decision support template and interface as a

working platform during the process.

7.2.4 Development Process

The process of the pilot system development is summarised as the following:

Planning and Analysis:

o Literature reviews

o Desk research on the problems and potential of office building

automation (theories and case study)

o Building industry survey- professional questionaries

o Case study- experience in the BAS office building design and

maintenance

o Analysis and knowledge extraction to formulate knowledge database

o Guidelines of design and maintenance of office building automation

Design and Implementation:

o Design and testing of the pilot system

o Pilot system construction (Programming)

o Pilot system testing and validation

Page 311: THE INTEGRATION BETWEEN DESIGN AND MAINTENANCE …eprints.qut.edu.au/16058/1/Frank_Lin_Thesis.pdf · the integration between design and maintenance of office building automation:

CHAPTER 7 DEVELOPMENT OF DECISION SUPPORT SYSTEM

293

7.2.5 Illustration of the Pilot System

The pilot system has been initially designed and programmed with a user friendly

interface to guide the whole system development. It focuses on the exploration of the

feasibility of the prototype system and presents an applicable decision support

solution for the integration between design and maintenance of office building

automation. The exploration stage has adapted an essential element- sensor in the

office building automation as the simulating example to create a knowledge

database. The programming of the interface has enlisted MS Visual Basic software,

integrated with MS Access as database. It has been demonstrated as shown in

Figures 7-2, 7-3 & 7-4 and Appendix F.

Figure 7-2: Pilot System (1)- Information Retrieval Process

Page 312: THE INTEGRATION BETWEEN DESIGN AND MAINTENANCE …eprints.qut.edu.au/16058/1/Frank_Lin_Thesis.pdf · the integration between design and maintenance of office building automation:

CHAPTER 7 DEVELOPMENT OF DECISION SUPPORT SYSTEM

294

Figure 7-3: Pilot System (2)- Information Retrieval Process

Figure 7-4: Pilot System(3)- Retrieval Result

Page 313: THE INTEGRATION BETWEEN DESIGN AND MAINTENANCE …eprints.qut.edu.au/16058/1/Frank_Lin_Thesis.pdf · the integration between design and maintenance of office building automation:

CHAPTER 7 DEVELOPMENT OF DECISION SUPPORT SYSTEM

295

7.2.6 Discussion

The pilot system has tested the function of integration between design and

maintenance in a simple case of sensor selection, which is an element of BAS.

However, in reviewing the program, it reveals that it did only show the basic

retrieval function. In addition, the knowledge is also quite simple. Therefore, to

develop the complete decision support system, advanced functions such as

comparison, updating, searching and extraction should be embodied together with

more comprehensive knowledge base to provide applicable support for decision

making during the process. Thus the development of whole system would be

continually programming with the following goals to enhance functions and

database, to create an easy operated and up-datable platform and interface for the

advanced development:

• Striving for simplicity

• Maintaining consistency

• Identifying toolbar button functions

On the other hand, the basic Windows operating environment has been tested as

above by means of Visual Basic 6; however it was limited in a closed scope only

applicable to the individual application. To consider the future extensive purposes

and development for broad and prompt support linking with Internet, the

programming tools might be extended to utilise the next generation programming

tool as Visual Studio.Net including Visual Basic.NET, ADO.NET, and ASP.NET for

the advanced expansion.

Page 314: THE INTEGRATION BETWEEN DESIGN AND MAINTENANCE …eprints.qut.edu.au/16058/1/Frank_Lin_Thesis.pdf · the integration between design and maintenance of office building automation:

CHAPTER 7 DEVELOPMENT OF DECISION SUPPORT SYSTEM

296

7.3 Prototype System Development

This section presents the advanced procedures of the SBASpro model including

knowledge extraction and analysis, knowledge-base development, decision trees,

demo of the model, and validation.

7.3.1 Development of SBASpro Knowledge Base

SBASpro’s knowledge base models the procedure of consultation for professional

advices. It can be categorised into four design and maintenance knowledge bases

such as “Trend (Overall status)”, “Design issues (Technical)”, “Products

(Maintenance)”, and “Assessment”. The initial knowledge base stored in the

SBASpro was extracted from the questionnaire’s results, the knowledge base can be

modified and updated by the user’s inputs utilising the updating function.

The relationships established through the previous stages were implemented together

in the form of ‘‘production rules.’’ From the analysis of the professional

questionnaires and case study, the results were used to construct the knowledge base

on the model. The knowledge base was then constructed in the form of production

rules, which comprised a set of rules, each consisting of a left side (a pattern that

determines the applicability of the rule) and a right side (that describes the action to

be performed if the rule is applied) of the rule equation, for example:

The knowledge base was incorporated into the program in the form of IF-THEN

rules. The knowledge extraction was encoded to form the function rules in the

knowledge base.

Rule: for the selection of a applicable control/ monitoring system

If a medium office building and apply control/ monitoring points below 500

Then it might be reasonable

Page 315: THE INTEGRATION BETWEEN DESIGN AND MAINTENANCE …eprints.qut.edu.au/16058/1/Frank_Lin_Thesis.pdf · the integration between design and maintenance of office building automation:

CHAPTER 7 DEVELOPMENT OF DECISION SUPPORT SYSTEM

297

7.3.2 Model

After the successful demonstration run on the computer, the SBASpro model was

similarly completed and validated through the following steps:

1. The rules covering the full scope of the SBASpro model was tested.

2. The execution rules were added to complete the program.

3. Validation of the SBASpro model was similarly carried out as for the demo.

The structure of the SBASpro model indicates the importance of continuous

interactions between users and the model as the main stream of data flow to perform

the evaluation. The system architecture of the SBASpro, which can be divided into

four units as bellows:

Knowledge acquisition user interface: This interface provides for users to achieve

knowledge and modify the knowledge base.

Evaluation user interface: This interface provides a channel for end-users to

evaluate the concepts and questions and to obtain solutions, then to search the

guidelines.

Knowledge base: This knowledge base contains a case base that stores previous

cases and knowledge including the professional database and guidelines.

Inference processes: This unit includes all inference processes that derive a final

solution from a given question and extend to search the supports.

Page 316: THE INTEGRATION BETWEEN DESIGN AND MAINTENANCE …eprints.qut.edu.au/16058/1/Frank_Lin_Thesis.pdf · the integration between design and maintenance of office building automation:

CHAPTER 7 DEVELOPMENT OF DECISION SUPPORT SYSTEM

298

7.4 Running SBASpro Model and Example

SBASpro is developed on a personal computer environment under MS Windows XP

with an Intel Pentium 4, 1.6G processor and 512 MB of RAM. It can be run on the

MS Windows XP and 2000 with Intel Pentium 3, 800M processor above and 256

RAM. To satisfy the functions of model as described, three software programs

supporting the dynamic data exchange (DDE) used to develop the prototype. The

employed software packages are MS Access TM, and MS Visual Studio.Net TM.

SBASpro employs MS Access TM to manage the case base as a database to easily

transfer the case base’s data into another format. The SBASpro system uses a

knowledge-based application development system that provides a rule induction

algorithm to construct ‘if-then’ rules from cases, to provide a rule induction function

to organize domain expert’s knowledge and to provide rule-based reasoning. The

user interface and control procedures in the pilot prototype system are developed by

Microsoft Visual Basic TM and in the SBASPRO are developed by Visual

Basic .NET, Visual Studio.Net (ADO.Net and ASP.Net).

SBASpro has been designed for the high level (managers) decision making to

practice decision support. To simulate the practical decision making process in the

office building automation design and maintenance, the users can familiarise the

integrated template of decision making process and know how to employ and

accumulate the expert knowledge for the practice; meanwhile, it can also be used to

realise the relationships of design and maintenance, and learn the associated

strategies, guidelines and action checklists. SBASpro application can start from the

basic operation of example demonstrated as the following sections.

Page 317: THE INTEGRATION BETWEEN DESIGN AND MAINTENANCE …eprints.qut.edu.au/16058/1/Frank_Lin_Thesis.pdf · the integration between design and maintenance of office building automation:

CHAPTER 7 DEVELOPMENT OF DECISION SUPPORT SYSTEM

299

7.4.1 Evaluation Model

(1). Criteria rule

Rule 1: Taking the surveyed professional/ expert questionnaire results (means value) as an initial criterion to decide the answer which is pass or fail.

Rule 2: If answer is greater than or equal to the means value, then it is accounted as “pass”.

Rule 3: If answer is less than the means value, then it is accounted as “fail”.

Rule 4: If it fails, then get a message; else try again.

Rule 5: If it passes, then get a recommendation or guideline/checklist.

(2). Knowledge database: Extracted from literature study and professional

questionnaire survey in the form as in Table 7-1:

Table 7-1: Expression of the Knowledge Base

Questions: Q1, Q2, Q3, Q4

Answers: A1, A2, A3, A4

Criteria: Pass/ Fail

Results: Errors (Do it again) / Minor modification

Actions: Guidelines/ recommendation/ checklists/ strategies

Page 318: THE INTEGRATION BETWEEN DESIGN AND MAINTENANCE …eprints.qut.edu.au/16058/1/Frank_Lin_Thesis.pdf · the integration between design and maintenance of office building automation:

CHAPTER 7 DEVELOPMENT OF DECISION SUPPORT SYSTEM

300

(3). Evaluation process is demonstrated as in Figure 7-5.

Answers

Message Fail

Pass

Guidelines/ Recommendations/ Checklists/ Strategies

Questions

Questionnaires results Criteria

Figure 7-5: Evaluation Process

END

Start

Page 319: THE INTEGRATION BETWEEN DESIGN AND MAINTENANCE …eprints.qut.edu.au/16058/1/Frank_Lin_Thesis.pdf · the integration between design and maintenance of office building automation:

CHAPTER 7 DEVELOPMENT OF DECISION SUPPORT SYSTEM

301

7.4.2 Example of BAS Decision Support

In order to test and validate the system model, demonstrating a specific example is

necessary. Building Automation System (BAS) practice usually starts from the needs

and requirements, current status to the future expansion. The example was selected to

demonstrate the decision making mechanism of the model as:

“How to select a suitable control and monitoring system for a given office building

or a group of buildings?”

(1) Information behind the example is outlined as in Figure 7-6 (Source: Elmahdy, A.

H. 2004).

Figure 7-6: Information behind the Example

halla
This figure is not available online. Please consult the hardcopy thesis available from the QUT Library
Page 320: THE INTEGRATION BETWEEN DESIGN AND MAINTENANCE …eprints.qut.edu.au/16058/1/Frank_Lin_Thesis.pdf · the integration between design and maintenance of office building automation:

CHAPTER 7 DEVELOPMENT OF DECISION SUPPORT SYSTEM

302

(2) Decision support process is described as follows (Source: Elmahdy, A. H. 2004):

1. Starting text for the system:

“SBASpro will help you select a suitable system for a given office

building to ensure the high performance, energy conservation and

comfort.”

2. What is the given office building?

• Class A: Medium/ Large or 10000-20000 m2 floor areas

• Class B: A group of buildings/ Larger buildings and some building

complexes

• Class C: 20 buildings or more/ Building complexes

• Class D: Small office building/ buildings in a wide geographical area

of a single location

3. What suitable control and monitoring systems/ functions are required?

• As in Table 7-1 (Supported from the knowledge database)

4. How many control and monitoring points are needed?

• Below 100

• 100-200, Below 500

• 500-1500, Below 2000

• Exceed 2000

5. What maintenance strategy is suitable?

• Reactive maintenance

• Preventive maintenance

• Reliability Centred Maintenance (RCM)

• Predictive maintenance approach

(Supported from the knowledge database)

6. What guideline can be provided?

(Supported from the database of guidelines)

7. Overall recommendations:

Summary the user’s situation and selection, then gain a recommendation

for the choice and guidance of execution.

Page 321: THE INTEGRATION BETWEEN DESIGN AND MAINTENANCE …eprints.qut.edu.au/16058/1/Frank_Lin_Thesis.pdf · the integration between design and maintenance of office building automation:

CHAPTER 7 DEVELOPMENT OF DECISION SUPPORT SYSTEM

303

(3) Control and monitoring points in relation to the application is listing in Table 7-2

(Source: Elmahdy, A. H. 2004).

Table 7-2: The Application of the Control and Monitoring Points

Disadvantages

halla
This figure is not available online. Please consult the hardcopy thesis available from the QUT Library
halla
This figure is not available online. Please consult the hardcopy thesis available from the QUT Library
Page 322: THE INTEGRATION BETWEEN DESIGN AND MAINTENANCE …eprints.qut.edu.au/16058/1/Frank_Lin_Thesis.pdf · the integration between design and maintenance of office building automation:

CHAPTER 7 DEVELOPMENT OF DECISION SUPPORT SYSTEM

304

(5) The control and monitoring functions is summarised as in Table 7-4:

Table 7-4: List of the Control and Monitoring Functions (Source: Elmahdy, A. H. 2004)

halla
This figure is not available online. Please consult the hardcopy thesis available from the QUT Library
Page 323: THE INTEGRATION BETWEEN DESIGN AND MAINTENANCE …eprints.qut.edu.au/16058/1/Frank_Lin_Thesis.pdf · the integration between design and maintenance of office building automation:

CHAPTER 7 DEVELOPMENT OF DECISION SUPPORT SYSTEM

305

(6) The decision support process is illustrated as the flow chart in Figure 7-7:

Choice

What is the given office building?

What suitable control and monitoring systems/ functions are required?

Message

Select suitable control and monitoring systems/ functions

Start

NO

NO

YES

YES

Support

Support

Knowledge Extraction

Knowledge Extraction

How many controls and monitoring points are needed?

Choice

End

Selection of maintenance

strategy

Advantage/ Disadvantage

Support Knowledge Extraction

Recommendation/ Guidelines

NO

YES

Choice

Figure 7-7: Flow of Decision Support Example

Page 324: THE INTEGRATION BETWEEN DESIGN AND MAINTENANCE …eprints.qut.edu.au/16058/1/Frank_Lin_Thesis.pdf · the integration between design and maintenance of office building automation:

CHAPTER 7 DEVELOPMENT OF DECISION SUPPORT SYSTEM

306

(7) Running this example in the SBASpro, the demonstration is shown in the

following Figures 7-8 ~ 7-13.

Figure 7-8: Design and Maintenance Example Home

Figure 7-9: Building Type Selection

Page 325: THE INTEGRATION BETWEEN DESIGN AND MAINTENANCE …eprints.qut.edu.au/16058/1/Frank_Lin_Thesis.pdf · the integration between design and maintenance of office building automation:

CHAPTER 7 DEVELOPMENT OF DECISION SUPPORT SYSTEM

307

Figure 7-10: Control and Monitoring Points Selection and Decision Support

Figure 7-11: Recommendation and Guidelines

Page 326: THE INTEGRATION BETWEEN DESIGN AND MAINTENANCE …eprints.qut.edu.au/16058/1/Frank_Lin_Thesis.pdf · the integration between design and maintenance of office building automation:

CHAPTER 7 DEVELOPMENT OF DECISION SUPPORT SYSTEM

308

Figure 7-12: Maintenance Strategy Selection

Figure 7-13: Guidelines of the Selected Maintenance Strategy

Page 327: THE INTEGRATION BETWEEN DESIGN AND MAINTENANCE …eprints.qut.edu.au/16058/1/Frank_Lin_Thesis.pdf · the integration between design and maintenance of office building automation:

CHAPTER 7 DEVELOPMENT OF DECISION SUPPORT SYSTEM

309

7.4.3 Decision Support Application and Development

Following the structured decision making process, the decision support can be

categorized into two stages as in Table 7-5:

Table 7-5: Decision Support Application Application

stages Functions Purposes

• Example Demonstration • Simple Quiz Testing and training • Hot Topics Decision support • Links Decision support

Basic decision support

• Information Retrieval Decision support • BAS design/ Maintenance

knowledge quiz Raising the awareness and understanding

• Professional/ Guidelines search Decision support

Advanced decision support

• Modification/ new information Updating

The development of SBASpro can base on the above functions and purposes to

extend and modify. In addition, the model provides an updateable function, thus, the

users can create their own knowledge database and do modification during the

process.

7.4.4 SBASpro Demonstration

In addition to the decision support example, SBASpro has basically explored the

decision support approach in the aspects of the learning and decision making

practice, which is composed of six main utilities such as: (1) general D/M Quiz, (2)

Evaluation, (3) Search, (4) Update, (5) Hot Topics and (6) Links. It also includes a

demo of video clip to demonstrate the practical operation and application.

The following demonstrations will illustrate the SBASpro operations and

applications as in Figures 7-14 ~ 7-31 and Appendix G. They have shown the

complete functionalities in the type of the static images, it can also be operated in the

accompanied SBASpro software program to explore and exercise the high lever

decision making process.

Page 328: THE INTEGRATION BETWEEN DESIGN AND MAINTENANCE …eprints.qut.edu.au/16058/1/Frank_Lin_Thesis.pdf · the integration between design and maintenance of office building automation:

CHAPTER 7 DEVELOPMENT OF DECISION SUPPORT SYSTEM

310

(1) General D/M Quiz: It is an initial warm-up step to realise the integration concept

and learn the evaluation process of the system as in Figure 7-14 & 7-15.

Figure 7-14: General Quiz

Figure 7-15: Quiz Result

Page 329: THE INTEGRATION BETWEEN DESIGN AND MAINTENANCE …eprints.qut.edu.au/16058/1/Frank_Lin_Thesis.pdf · the integration between design and maintenance of office building automation:

CHAPTER 7 DEVELOPMENT OF DECISION SUPPORT SYSTEM

311

(2) Evaluation: It can be used to evaluate the BAS design and maintenance issues to

verify the concept and practical situations to explore the guidance as in Figure 7-16 ~

7-19.

Figure 7-16: Evaluation Home

Figure 7-17: Evaluation End

Page 330: THE INTEGRATION BETWEEN DESIGN AND MAINTENANCE …eprints.qut.edu.au/16058/1/Frank_Lin_Thesis.pdf · the integration between design and maintenance of office building automation:

CHAPTER 7 DEVELOPMENT OF DECISION SUPPORT SYSTEM

312

Figure 7-18: Evaluation Result

Figure 7-19: Evaluation Guideline

Page 331: THE INTEGRATION BETWEEN DESIGN AND MAINTENANCE …eprints.qut.edu.au/16058/1/Frank_Lin_Thesis.pdf · the integration between design and maintenance of office building automation:

CHAPTER 7 DEVELOPMENT OF DECISION SUPPORT SYSTEM

313

(3) Search: It can be used to search the professionals of the design and maintenance,

and guidance of the design and maintenance issues as in Figure 7-20 ~ 7-23.

Figure 7-20: Search Home

Figure 7-21: Professional Search Result

Page 332: THE INTEGRATION BETWEEN DESIGN AND MAINTENANCE …eprints.qut.edu.au/16058/1/Frank_Lin_Thesis.pdf · the integration between design and maintenance of office building automation:

CHAPTER 7 DEVELOPMENT OF DECISION SUPPORT SYSTEM

314

Figure 7-22: Guideline Search

Figure 7-23: Guideline Search Result

Page 333: THE INTEGRATION BETWEEN DESIGN AND MAINTENANCE …eprints.qut.edu.au/16058/1/Frank_Lin_Thesis.pdf · the integration between design and maintenance of office building automation:

CHAPTER 7 DEVELOPMENT OF DECISION SUPPORT SYSTEM

315

(4) Update: It can be used to update the knowledge database of the professional and

guidelines, which are updateable for the users to add and modify the information as

in Figure 7-24 & 7-25.

Figure 7-24: Update Home

Figure 7-25: Update Result

Page 334: THE INTEGRATION BETWEEN DESIGN AND MAINTENANCE …eprints.qut.edu.au/16058/1/Frank_Lin_Thesis.pdf · the integration between design and maintenance of office building automation:

CHAPTER 7 DEVELOPMENT OF DECISION SUPPORT SYSTEM

316

(5) Hot Topics: It includes the recent issues of the BAS design and maintenance,

which provides the information and research findings for the users as in Figure 7-26

& 7-27.

Figure 7-26: Hot Topics Home

Figure 7-27: Hot Topic Example

Page 335: THE INTEGRATION BETWEEN DESIGN AND MAINTENANCE …eprints.qut.edu.au/16058/1/Frank_Lin_Thesis.pdf · the integration between design and maintenance of office building automation:

CHAPTER 7 DEVELOPMENT OF DECISION SUPPORT SYSTEM

317

(6) Links: It can be links to intranet and internet of the World Wide Web (WWW) for

exploring the wide range information as in Figure 7-28 & 7-29.

Figure 7-28: Links Home

Figure 7-29: Links Result

Page 336: THE INTEGRATION BETWEEN DESIGN AND MAINTENANCE …eprints.qut.edu.au/16058/1/Frank_Lin_Thesis.pdf · the integration between design and maintenance of office building automation:

CHAPTER 7 DEVELOPMENT OF DECISION SUPPORT SYSTEM

318

(7) Help: It includes the introduction and a demo of video clips to demonstrate the

operation procedure as in Figure 7-30 & 7-31.

Figure 7-30: Help Home

Figure 7-31: Help- Operation procedure

Page 337: THE INTEGRATION BETWEEN DESIGN AND MAINTENANCE …eprints.qut.edu.au/16058/1/Frank_Lin_Thesis.pdf · the integration between design and maintenance of office building automation:

CHAPTER 7 DEVELOPMENT OF DECISION SUPPORT SYSTEM

319

7.5 Verification and validation

In software quality assurance, the assurance of customer acceptance is essential as

well as the assurance of technical correctness. To assure the system that is building

right and run well, the process of verification and validation are necessary.

Validation is the best practice for checking user’s inputs and response. Validating a

system requires an understanding of the sequence of operation that must be executed

to achieve a goal. The validation is carried out by examining how the system

operates at run time. The demonstration was first developed for testing purposes. It is

structurally a complete decision support system but on a smaller scale. The purpose

of developing a demonstration was to ensure that the system was capable of

producing valid results that professionals would reach. The demonstration was

applied to practice a decision making and learned an integration D/M process of the

BAS application in a specific example.

The validation of the demonstration was carried out by taking a hypothetical case of

an office building and manually checking the outcome by applying the rules

developed from the extracted knowledge of the professionals during the surveys.

The computational SBASpro working program was distributively installed and run

for the same hypothetical case. The computational demo provided an evaluation of

performance and energy conservation identical to the one reached by the manual

method. The validation test of the run time operation is summarised and listed in

Table 7-6.

The prototype of the SBASpro and the outline of the guidelines have been delivered

to the previous participants of the mailing questionnaires and the building

management agency to review the applicability for the practice. The preliminary

responses have reported that it is a new decision support approach which has the

potential in practice and commercialising opportunities. Their comments and

suggestions are concluded as the follows:

1. The project outline has introduced an integration concept and an approach to

fill the gaps between design and maintenance.

Page 338: THE INTEGRATION BETWEEN DESIGN AND MAINTENANCE …eprints.qut.edu.au/16058/1/Frank_Lin_Thesis.pdf · the integration between design and maintenance of office building automation:

CHAPTER 7 DEVELOPMENT OF DECISION SUPPORT SYSTEM

320

2. The guideline is a good instruction for the BAS design and maintenance.

Especially, it is good for building developer to realise the benefits of BAS

application during building life time process.

3. Application of the prototype decision support tool:

a. It is a new attempt for bridging the design and maintenance phases.

b. It is a useful template to establish own knowledge database to

accumulate the historical records.

c. It is also a good training tool to learn BAS application.

d. It is an easy tool with a friendly interface.

4. Suggestions:

a. The guideline should provide cost information for the procurement

practice and various examples for reference.

b. The prototype decision support tool should be developed for the Web

application to gain simultaneous supports, particularly, for the

knowledge base update.

c. Can it have a commercial package?

Reviewing the prototype system development and testing, the windows application

has run in the .NET Framework with a self- supportive environment. However, with

the widespread deployment of browsers in organizations, Web solutions are growing

in popularity as an alternative to Windows applications. Web applications can be

accessed in an identical manner whether a user is at work or at home. One especially

attractive advantage of a Web application over a Windows application is that the

client workstation for a Web application does not require the .NET Framework. It is

unlike that when running a Windows application, the client workstation must have

the .NET Framework installed. Nonetheless, the positive and supportive comments

have encouraged the further research and development.

Page 339: THE INTEGRATION BETWEEN DESIGN AND MAINTENANCE …eprints.qut.edu.au/16058/1/Frank_Lin_Thesis.pdf · the integration between design and maintenance of office building automation:

CHAPTER 7 DEVELOPMENT OF DECISION SUPPORT SYSTEM

321

Table 7-6: Validity Testing of SBASpro Prototype Model

Type of Validation

Test Component/ Functionality

Validity Testing Notes

When several fields must be entered before the form can be processed

Input Expected Output

Actual output

If required information is missing, the form is returned to the user unprocessed.

Demonstration example

Select check box and support buttons

Reveal next check box and information/ strategies

As required

Test completed

D/M Quiz Check questions

Succeed or fail As required

Test completed

Evaluation Check D/M issues and search guidelines

Reveal the results

As required

Test completed

Search Check interested issues

Reveal the required professionals and relevant guidelines

As required

Test completed

Update Add and update the established professionals and guidelines

Reveal the modified results

As required

Test completed

Hot Topics Click issues Reveal information

As required

Test completed

Completeness check

Links Click Web site

Reveal the result of linking

As required

Test completed

When data are related Input Expected

Output Actual output

As data are incorrect, it can report error to the user for correction.

Demonstration example

Check each box

Reveal correspondent information

As required

Test completed

D/M Quiz Check each question

Reveal correspondent results

As required

Test completed

Evaluation Check each D/M issue

Reveal correspondent recommendation and guidelines

As required

Test completed

Consistency checks (Ensure combinations of data are valid)

Search Check each function

Reveal D/M professionals

As required

Test completed

Page 340: THE INTEGRATION BETWEEN DESIGN AND MAINTENANCE …eprints.qut.edu.au/16058/1/Frank_Lin_Thesis.pdf · the integration between design and maintenance of office building automation:

CHAPTER 7 DEVELOPMENT OF DECISION SUPPORT SYSTEM

322

and guidelines Update Check each

utility on the screen

Reveal modified results

As required

Test completed

Hot Topics Check each topics

Reveal correspondent information

As required

Test completed

Links Check each established Web site

Reveal correspondent Web link

As required

Test completed

When data are available to be checked

Input Expected Output

Actual output

Perform database checks only after the data have passed the previous checks

Demonstration example

Check building type

Reveal correspondent information and strategy guidelines

As required

Test completed

D/M Quiz Check each question

Reveal correspondent result

As required

Test completed

Evaluation Check D/M issues

Reveal correspondent guideline

As required

Test completed

Search Check each professional and guideline search

Reveal correspondent results

As required

Test completed

Update Check each utility

Reveal the modified results

As required

Test completed

Hot Topics Check each issue

Reveal correspondent information

As required

Test completed

Database checks (Compare data against a database to ensure they are correct)

Links N/A N/A N/A N/A

Page 341: THE INTEGRATION BETWEEN DESIGN AND MAINTENANCE …eprints.qut.edu.au/16058/1/Frank_Lin_Thesis.pdf · the integration between design and maintenance of office building automation:

CHAPTER 7 DEVELOPMENT OF DECISION SUPPORT SYSTEM

323

7.6 Discussion

From the above demonstration and validation, the SBASpro model could be run for a

variety of possible modifications and the evaluation of decision making results

assessed for BAS design and maintenance. A SBASpro model was developed and

simulated the evaluation and reasoning process carried out by professionals in the

field of office building automation. The SBASpro model has explored several

capabilities and feasibilities as:

o To provide explanations of knowledge, it can be applied for the various

design and maintenance applications

o To point out the deficiencies for users to revisit and enhance, it provides a

comparison of results after revisit made.

o To facilitate useful decision support, it can be to evaluate the outcomes to a

building design and maintenance evaluation.

o To provide the feasibility of updating, knowledge database can be modified

in terms of the experience and advanced knowledge during the life time of

the practice.

Test runs of the SBASpro model reveal that the functionalities and scopes of

application have provided several decision support utilities. However, it runs

primarily to demonstrate the functionalities for user education purpose and to

simulate the integration feasibilities, not yet includes practical support for industry. It

was also constrained in the fields of the technical and management issues as well as

lack of the historical records of costing which should be essential part in the aspect of

the life cycle consideration of the buildings. Decision making is hard to predict for

the future change, especially in the shortage of the historical and holistic data related

to the cost of BAS. However, it could be able to use the “update” utility of the

program to modify information to compensate this shortage.

Nevertheless, the SBASpro model has explored the possibility of the process

integration and decision support by deploying the computerized programming that

has established and provided an interactive communicating platform for the design

and maintenance practice with an updateable utility which could balance the system

shortage and endow with functionality enhancement. It also has designed by the next

Page 342: THE INTEGRATION BETWEEN DESIGN AND MAINTENANCE …eprints.qut.edu.au/16058/1/Frank_Lin_Thesis.pdf · the integration between design and maintenance of office building automation:

CHAPTER 7 DEVELOPMENT OF DECISION SUPPORT SYSTEM

324

generation programming tools- Visual Studio.NET which can be further applied for

the Web application development to provide the advanced decision support.

Page 343: THE INTEGRATION BETWEEN DESIGN AND MAINTENANCE …eprints.qut.edu.au/16058/1/Frank_Lin_Thesis.pdf · the integration between design and maintenance of office building automation:

CHAPTER 8 CONCLUSIONS

325

8.1 Introduction 8.2 Conclusions Relating to Research Objectives 8.3 Reviews 8.3.1 Reviews and Improvement in Design and Maintenance Practice 8.3.2 Reviews of the Decision Support System Development 8.4 Limitations 8.5 Recommendations 8.6 Conclusions 8.7 Contributions 8.8 Implications and Further Research

CHAPTER 8 CONCLUSIONS

The Integration between Design and Maintenance of Office Building Autom

ation: A Decision Support Approach

Page 344: THE INTEGRATION BETWEEN DESIGN AND MAINTENANCE …eprints.qut.edu.au/16058/1/Frank_Lin_Thesis.pdf · the integration between design and maintenance of office building automation:

CHAPTER 8 CONCLUSIONS

326

8.1 Introduction

The research was motivated by the experience in the office building industry. The

ineffective and redundant practice prevails in the construction building fields and

processes. Problem identification and research objectives were reviewed in Chapter

1. These objectives led the development of an appropriate research approach

described in Chapter 3. The achievement of the assured objectives is described in this

chapter through the conclusions, contributions and implications of this research.

This research was initiated to collect data on the office building automation practice

regarding the integration between different building phases. An extensive literature

review revealed that building performance and effectiveness is influenced by the

building systems as well as the building processes. This research contributes to

knowledge in the management field as well as the building design and maintenance

practice.

This chapter concludes the thesis by considering the implications of the research

findings and compare the research objectives.

Firstly, it examines the limitations of the research process and assesses its

impact on the research results.

Secondly, this chapter provides a discussion of the implications for the

knowledge and practice.

Finally, it presents several suggestions for future research.

Page 345: THE INTEGRATION BETWEEN DESIGN AND MAINTENANCE …eprints.qut.edu.au/16058/1/Frank_Lin_Thesis.pdf · the integration between design and maintenance of office building automation:

CHAPTER 8 CONCLUSIONS

327

This chapter puts up on previous research developments of the integration between

design and maintenance of office building automation. In Section 8.2, reviews are

divided into three sections, based on the objectives. Verification of the improvement

in design and maintenance has been summarised in Section 8.3. Limitations of the

study are described in Section 8.4. Section 8.5 provides several recommendations for

additional research. Finally, Section 8.6 concludes the thesis with a brief summary of

findings. Section 8.7 presents the contributions to the body of knowledge and

implications to knowledge and industry. Section 8.8 implicates an outlook to the

future research. Three types of findings from the research will be presented in the

latter sections:

• Conclusions: review the results of the surveys and case study and the

computer based prototype program. Results were derived from the industry

survey using the approach described in Chapter 3. Chapter 4 and 5 provide

data analysis to verify the questions raised at the beginning of this survey

when the research objectives were formulated. In particular, they confirm the

questions that structured the objectives of this research.

• Contributions are both for knowledge and building industry.

• Implications are listed for researchers and building industry practice. This

decision support approach including a computer based prototype system is a

platform for the process integration between different building phases.

Page 346: THE INTEGRATION BETWEEN DESIGN AND MAINTENANCE …eprints.qut.edu.au/16058/1/Frank_Lin_Thesis.pdf · the integration between design and maintenance of office building automation:

CHAPTER 8 CONCLUSIONS

328

8.2 Conclusions Relating to Research Objectives

It is possible to illustrate the conclusion that the objectives of the research were

achieved, which were: (1) understanding how the process integration is affecting the

office building performance, energy conservation and comfort; (2) understanding the

effective guidelines are facilitating the practice; (3) the development of the prototype

computer based decision support system can enhance the practical decision making.

The first objective of the research was to identify problems and limitations of BAS

between design and maintenance. The achievement of the second objectives was

being established a series of guidelines for the improvement of design and

maintenance of office building automation. The third objective was to develop a

prototype decision support system to demonstrate the potential of integrating design

and maintenance tasks of office building automation. Although the prototype

decision support system is created in a demonstration purpose, the integration

exploration may also be a new direction for the knowledge and practice. Conclusions

relating the three objectives are described in Sections 8.2.1, 8.2.2, and 8.2.3.

8.2.1 Objective 1:

“To identify the problems and limitations of building automation practice

between the design and maintenance phases.”

Through the literature study, industry survey and case study, this research has

identified the problems of design and maintenance practice, including lack of close

communication in providing life time services and support, insufficient historical

records and effective integration alternatives. This research also shows that “First

cost mentality” affects the design and maintenance under both time and budget

pressures. The findings have been discussed in Chapter 2, 4 and 5. This research has

accomplished the first objective.

8.2.2 Objective 2: “To establish a guide for effective enhancement between design and maintenance

of office building automation system.”

Through the industry survey, data analysis, knowledge extraction and guideline

development, guidelines in relation to the enhancement of effective design and

Page 347: THE INTEGRATION BETWEEN DESIGN AND MAINTENANCE …eprints.qut.edu.au/16058/1/Frank_Lin_Thesis.pdf · the integration between design and maintenance of office building automation:

CHAPTER 8 CONCLUSIONS

329

maintenance in the office building automation context have been generated. It

includes raising awareness and understanding, general strategies and operational

checklists. The outcomes has been produced and detailed in Chapter 5 and 6. This

research has accomplished the second objective.

8.2.3 Objective 3: “To develop a computerised decision support prototype for ease in integrating the

design and maintenance in office building automation.”

Through using of the developmental prototyping decision support method, a

computer-based prototype decision support model has been explored and

demonstrated. It demonstrates that an example: how to select BAS for the proposed

office building to practice the decision making. In addition, the model also creates

several utilities to show the functions of decision support. The development of the

model has been demonstrated in Chapter 7. This research has accomplished the third

objective.

Consequently, Reviewed the proposed plans with the outcomes as above, the

research has accomplished the proposed objectives as shown in Figure 8-1.

Data Analysis Knowledge Extraction Guidelines

Checklists Performance

Literature Study Industry

Survey

Research Objectives

Case Study Objective 1:

Barriers & Limitations

Objective 2: Generate Guidelines

Objective 3: Develop Computerised Decision Support

General Status of Office Building Industry: IB, BAS, Design & Maintenance

Required Information

Potential Approach Process Integration Decision Support TQM, BC, LCC

Design and Maintenance Support

Close Communi- cation

Current Instruction & Support

Strategies Development

Example of Design and Maintenance

Integration Practice

Quality Management

Quality Design and Maintenance Energy Conservation

Security and Comfort

Strategies for Raising Awareness & Understanding General Strategies Operational Checklists

Figure 8-1: Accomplishment of the Research Process

Page 348: THE INTEGRATION BETWEEN DESIGN AND MAINTENANCE …eprints.qut.edu.au/16058/1/Frank_Lin_Thesis.pdf · the integration between design and maintenance of office building automation:

CHAPTER 8 CONCLUSIONS

330

8.3 Reviews

8.3.1 Reviews of the Improvement in Design and Maintenance

Practice

The research objectives aim at the identification of design and maintenance (D/M)

problems and limitations in practice to establish guidelines and develop a decision

support tool. The research has pinpointed the problems analysed in Chapter 2: lack of

effective communication and understanding which has been confirmed by means of

the professional surveys. The outcomes of the industry status and reasons for the

problems have also been deduced and detailed in Chapter 4. They were also verified

by a case study leading to a possible approach for the problem solving which has

been detailed in section 4.4. Based on the findings of the industry professional

survey, as well as lessons learned from the case study and the clarified expectations

of the practice, the knowledge extraction has composed a knowledge base to provide

manual decision support approach, meanwhile to formulate a knowledge database

with inference rules for the further development of decision support system which

has been detailed as a guide in chapter 5, 6. These outcomes disclose the process

integration is a feasible alternative. The process integration can be used to create a

working platform, further undertake the development of a computer-based decision

support model which was discussed in Chapter 7. Subsequently, the research has

accomplished its objectives through the knowledge-based decision support

development including: prototype system design and development, industry surveys

and case study, establishing a D/M database, knowledge extraction and

programming.

Consequently, the intended D/M integration knowledge based decision support has

been developed and detailed in Chapter 4, 5 and 6. It would have a practiced

integration decision support approach to explore the alternatives for improving the

practice, but it is a start for the improvements in the office building process. In this

research, a series of guidelines and checklists has demonstrated an example for the

BAS decision making. It can serve as an integration platform and as a tool for

improving the communication between design and maintenance, to further enhance

the integrated benefits of office building automation.

Page 349: THE INTEGRATION BETWEEN DESIGN AND MAINTENANCE …eprints.qut.edu.au/16058/1/Frank_Lin_Thesis.pdf · the integration between design and maintenance of office building automation:

CHAPTER 8 CONCLUSIONS

331

Over-viewing the development of automation in construction, the advanced

information and communication technologies have provided tools to develop

interoperable alternatives for the integration between building design and

maintenance, while the other essential matters require actual experience, since the

best programs require people to execute them. In this research, the strategies and

checklists developed as in Chapter 6 have been designed for decision making

illustrated as in Figure 8-2 and 8-3. These decision support diagrams outline the

office building automation status and expectations of occupants. They also illustrate

and verify the decision making process for the design and maintenance concerns. In

practice they also could be modified and updated to meet the practice, and a

knowledge database established as well. These are rather useful template for the

research contexts and practice.

Hence, optimising building processes for performance enhancement and

maintainability could be done through the effective process integration between

design and maintenance. The integration process would have the effects and benefits

of enhancement building performance, energy conservation and comfort.

Predicatively, the integration between different processes would be forming a new

trend in practice.

Page 350: THE INTEGRATION BETWEEN DESIGN AND MAINTENANCE …eprints.qut.edu.au/16058/1/Frank_Lin_Thesis.pdf · the integration between design and maintenance of office building automation:

CHAPTER 8 CONCLUSIONS

332

Page 351: THE INTEGRATION BETWEEN DESIGN AND MAINTENANCE …eprints.qut.edu.au/16058/1/Frank_Lin_Thesis.pdf · the integration between design and maintenance of office building automation:

CHAPTER 8 CONCLUSIONS

333

EXPECTATIONS

DLCC

Effectiveness/Efficiency

Comfort

EnergyConservation

Safe/ Security

Smart/Intellignetfeatures

EST

QD

QM

DC

TPS

PS

IC

AHVACO

ECD

SMSS

SP

SF

ACS SI

PP

PM

PME

PMM

BSP

AI

AMMCA

EST

ECF

MSI

MSH

MSDMSCLMR

MCR

AMSDSFMSOP

SC

SBAS

DRSDSHDSPCDSPIDSCP DPM

DDIDCFDCD

DFU

DCD

DCR

DSI

DRM

DB

RBAS

G002, G003, G004, G005, G006, G009,G010, G011, G016, G028, G029, G030

G012G027

G001G013G014G015

G003G004

G016G018

G030G031G032

G017

G019G021G024

G004

G026G033

G019G020G021G022

G025

G016

SC

G002 Building life cycle processG003 Responsibilities and capabilities of design and maintenanceG004 Attributes of high-performance and energy conservation office buildingG005 Types of HVAC Systems and controlG006 Benefits of the process integrationG009 Tips for design professional selection strategyG010 Strategies for designing the specificationG011 Requirements of Specification designG016 Strategies for integrating with infrastructureG028 Checklist for BAS designG029 Checklist for BAS installationG030 Checklist for BAS commissioning

G012 Tips of specification designG027 Steps of BAS selection

G001 Principles of the integrationG013 Tips for avoiding the pitfalls of BAS selectionG014 Strategies for assuring the reliable systemsG015 Strategies for systems integration

G003 Responsibilities and capabilities of design and maintenanceG004 Attributes of high-performance and energy conservation office building

G016 Strategies for integrating with infrastructureG018 Strategies for selection maintenance strategy

G030 Checklist for BAS commissioningG031 Checklist for BAS maintenanceG032 Schedule of Checklist for sensor and actuator

G019 Strategies for building commissioningG021 Strategies for Energy Efficient HVAC DesignG024 Strategies for promoting healthy and comfortable environments

G004 Attributes of high-performance and energy conservation office buildingG019 Strategies for building commissioningG020 Strategies for high performance,energy conservation and comfortG021 Strategies for Energy Efficient HVAC DesignG022 Strategies for the selection of light control

G026 Guidelines for the applications of LCCAG033 Life Cycle Cost calculation

G025 Strategies for security/ fire system design and maintenance

G017 Strategies for optimizing design and maintenance

G016 Strategies for integrating with infrastructure

G007 Components of building control systemG008 Elements of sensor and actuator system

G007G008

G017G017 Strategies for optimizing design and maintenance

Figure 8-2: Overviews of Decision Support Flow (1)

Page 352: THE INTEGRATION BETWEEN DESIGN AND MAINTENANCE …eprints.qut.edu.au/16058/1/Frank_Lin_Thesis.pdf · the integration between design and maintenance of office building automation:

CHAPTER 8 CONCLUSIONS

334

Figure 8-3: Overviews of Decision Support Flow (2)

EXPECTATIONS

DLCC BAS designs take into consideration ofthe life-cycle cost

Effectiveness/Efficiency

Comfort

EnergyConservation

Safe/ Security

Smart/Intellignetfeatures

EST BAS evaluation is supported by the evaluation tools.

QD Producea good BAS

design

QM Assure the quality ofBAS maintenance

DC Dealing complaints is effective

TPSTracking problem solving is effective

PS Designers consider the BAS meetingwith performance of the systems

IC Office buildings apply individual controls

AHVACO HVAC operation is appropriate

ECD Energy conservation design

SM Eeasesecurity

management

SS Ensurethe life safetyand security

SP Security system is equipped with separated powersupply

SF Security system is interfaced with the fire systems

ACS Access control is equippedwith smart cards/ key code/ ID

cards

SI Enhancethe smart/intelligentfeatures

PP Poor BAS performance

PM Poor maintenance of BAS

PME Poor maintenance ofbuilding electrical systems

PMM Poor maintenance ofbuilding mechanical systems

BSP Buildingsystems occur

problems

AI BAS & buildingsystems integration is

appropriate.

AM BAS maintenance isappropriate

MCA BASmaintenanceutilises the

computer aids

ESTBAS evaluation is supported by theevaluation tools

ECF BAS evaluation is carried out bythe facilities manager

MSI Maintainers support by up-to-dayinformation and instruction/ manual

MSH Maintainers support by thehistorical records

MSD Maintainers support by thedesigners and venders

MSC Maintenance is scheduling asmonthly and yearly

LMR BAS maintenance rate in theoffice building is low

MCR BAS maintenance complies withthe building regulation/ codes

AMSMaintenance

strategy isappropriate

DSF Designersprovide

instruction andguidelines to

facilitiesmanagers

MSOP BASmaintenance is in

accordance with thestandard operationprocedures (SOPs)

SC Application of sensors forthe control and monitoring of

the building systems

SBASSelection BASis appropriate

DRS BAS design in accordance with the building regulation and product specification

DSH BAS design supports by the historical records

DSPC BAS design supports by the information of the product pros/ cons

DSPI BAS design supports by the update product information

DSCP BAS design supports by the information ofproduct cost and performance

DPM BAS design requirements and product specificationsprovide by the product manufacturers

DDI Designersdeliver the

information andmanual of BASoperation andmaintenance.

DCF BAS designcommunicates withthe building owners

and the facilitiesmanagers

DCD Designersintimately

communicatewith the building

developers

DFU BAS design requirements and product specificationsobtain from the feedback of the previous user

DCD Designers intimately communicate with thebuilding developers

DCR BAS design requirements and product specificationsobtain from the sub-contractor's recommendation

DSI BAS design requirements and productspecifications obtain from the statistical information

DRM BAS responsibilities for the buildingmaintenance

DB Designers mostly realise the BAS benefits

RBAS Selection BAS is appropriate

G002, G003, G004, G005,G006, G009, G010, G011,G016, G028, G029, G030

G012G027

G001G013G014G015

G003G004

G016G018

G030G031G032

G017

G019G021G024

G004

G026

G033

G019G020G021G022

G025

G016

SC Application of sensors for the control and monitoring ofthe building systems

G002 Building life cycle processG003 Responsibilities and capabilities of design and maintenanceG004 Attributes of high-performance and energy conservation office buildingG005 Types of HVAC Systems and controlG006 Benefits of the process integrationG009 Tips for design professional selection strategyG010 Strategies for designing the specificationG011 Requirements of Specification designG016 Strategies for integrating with infrastructureG028 Checklist for BAS designG029 Checklist for BAS installationG030 Checklist for BAS commissioning

G012 Tips of specification designG027 Steps of BAS selection

G001 Principles of the integrationG013 Tips for avoiding the pitfalls of BAS selectionG014 Strategies for assuring the reliable systemsG015 Strategies for systems integration

G003 Responsibilities and capabilities of design and maintenanceG004 Attributes of high-performance and energy conservation office building

G016 Strategies for integrating with infrastructureG018 Strategies for selection maintenance strategy

G030 Checklist for BAS commissioningG031 Checklist for BAS maintenanceG032 Schedule of Checklist for sensor and actuator

G019 Strategies for building commissioningG021 Strategies for Energy Efficient HVAC DesignG024 Strategies for promoting healthy and comfortable

environments

G004 Attributes of high-performance and energy conservation office building

G019 Strategies for building commissioningG020 Strategies for high performance,energy conservation and

comfortG021 Strategies for Energy Efficient HVAC DesignG022 Strategies for the selection of light control

G026 Guidelines for the applications of LCCAG033 Life Cycle Cost calculation

G025 Strategies for security/ fire system design andmaintenance

G017 Strategies for optimizing design and maintenance

G016 Strategies for integrating with infrastructure

G007 Components of building control systemG008 Elements of sensor and actuator system

G007G008

G017G017 Strategies for optimizing design and maintenance

Page 353: THE INTEGRATION BETWEEN DESIGN AND MAINTENANCE …eprints.qut.edu.au/16058/1/Frank_Lin_Thesis.pdf · the integration between design and maintenance of office building automation:

CHAPTER 8 CONCLUSIONS

335

8.3.2 Reviews of the Decision Support System Development

Along with the research development, to ease practice and learn the decision support

process, a computer based decision support program has also been developed and

detailed in Chapter 7 which has developed several utilities to show the support

functions such as evaluation capability and functionality of the BAS evaluation,

information retrieval, updating and BAS professionals and guidelines search. It has

also provided a demonstrated example for the basic application on the program. The

developed program has explored an integration decision support approach which

utilises the current popular personal computer software MS Access and next

generation object- oriented programming tool MS Visual Studio.Net to develop an

integration platform for use in the office building automation contexts. However, it

should be seen as a prototype of a decision support tool which could be further

developed through the enhancements in the function model and knowledge database.

Page 354: THE INTEGRATION BETWEEN DESIGN AND MAINTENANCE …eprints.qut.edu.au/16058/1/Frank_Lin_Thesis.pdf · the integration between design and maintenance of office building automation:

CHAPTER 8 CONCLUSIONS

336

8.4 Limitations

From the above verification and discussion, the research has created a platform for

the integration between different building process- design and maintenance, which

has experimented with a closed system- SBASpro windows application to support

the decision making for the BAS design and maintenance. In spite of the

contributions and implications of knowledge and practice, several limitations of this

research should be examined. These limitations are partly from the shortage of data

sources and partly from the inherent computerised decision support applications.

They can be concluded as follows:

Data and information: the survey information was analysed in light of Australian

construction and management companies, and the case study example selected from

Taiwan. Subsequently, the development of the guidelines will be limited and can

only be served as a model or initiated to further explore the global applications.

Functionalities: Reviewing the development of the decision support prototype, it

should only be established as an experimental platform; since the knowledge stored

in the system was just explored for the high level decision making support that could

be enhanced and extended for application of multilevel decision making. In addition,

it could be the future development to advance their functionalities for global

application on an extensive scale. Current prototype program has been designed and

distributed for Windows applications on personal computers. However, in a network

environment, the web applications have seen widespread deployment around the

world. Thus the web application of the program would be the next step in the further

development for more extensive applications and sophisticated knowledge support.

Page 355: THE INTEGRATION BETWEEN DESIGN AND MAINTENANCE …eprints.qut.edu.au/16058/1/Frank_Lin_Thesis.pdf · the integration between design and maintenance of office building automation:

CHAPTER 8 CONCLUSIONS

337

8.5 Recommendations

Concluded from the above verification and discussion, the recommendations for the

research and the presentation of the thesis have been suggested as:

• The BAS knowledge database could be enhanced and spread to the practical

execution for the various decision- making levels.

• The computerised decision support approach could be developed for the

practical applications and extended to the web applications.

Page 356: THE INTEGRATION BETWEEN DESIGN AND MAINTENANCE …eprints.qut.edu.au/16058/1/Frank_Lin_Thesis.pdf · the integration between design and maintenance of office building automation:

CHAPTER 8 CONCLUSIONS

338

8.6 Conclusions

From the literature study, the office building industry has made advances in

developments along with the technology innovations affecting the working process

and building systems. However, their efforts was mostly limited and only facilitated

by building system innovations which have produced more integrated activities and

products enhancing the effective functionalities in office building.

Nonetheless, the whole environmental expectations for office buildings are growing,

the building performance improvement and enhancement not only relies on building

system advances and integration, but also on the lifetime of the building process

integration to integrate support and service. However, from this research it has

become obvious that the integration of design and maintenance was still in the

conceptual stage, far from the practical solutions.

Reviewing the office building status, the building performance and energy

conservation and health/ comfort expectations, these are still a challenge. In this

research, the aims and objectives targeting on raising the awareness and

understanding of the importance of process integration, guidelines compilation and

computerised decision support exploration have resulted in outcomes such as a

prototype decision support system, guidelines and checklists through literature study,

industry surveys and the case study which provided first hand information to confirm

the limitations and learned from the case study.

Additionally, the research has also extracted the knowledge from those with

professional expertise and experience in the office building industry. This research

has presented a comprehensive analysis and explored an integration template for

practical use by developing a set of guidelines and a computerised decision support

prototype.

In conclusion, this research has explored the problems and limitations existing in

design and maintenance, and analysed the major possible reasons. It has also

presented an alternative for the integration of design and maintenance in the high

level decision making process such as the guidelines and strategies/ checklists for the

process integration between design and maintenance, and an updateable decision

Page 357: THE INTEGRATION BETWEEN DESIGN AND MAINTENANCE …eprints.qut.edu.au/16058/1/Frank_Lin_Thesis.pdf · the integration between design and maintenance of office building automation:

CHAPTER 8 CONCLUSIONS

339

support tool- SBASpro which might provide a feasible solution for the research

proposition:

“Could possible alternatives be created to help the improvement of the problems

which exist between the design and maintenance of office building automation during

the lifetime of buildings?”

This research has confirmed and verified the problems, and has provided the

alternatives with a series of knowledge extractions, guideline development and

computer-based decision support exploration. Moreover, it has also presented

contributions to the current knowledge base and to industry.

DESIGN MAINTENANCE

INTEGRATION

Page 358: THE INTEGRATION BETWEEN DESIGN AND MAINTENANCE …eprints.qut.edu.au/16058/1/Frank_Lin_Thesis.pdf · the integration between design and maintenance of office building automation:

CHAPTER 8 CONCLUSIONS

340

8.7 Contributions

This research has provided several contributions to the knowledge and industry as

the follows:

• Explored and promoted the integration concept for design and maintenance

of office building automation system (BAS).

• Developed and tested a new approach of BAS design and maintenance

integration.

• Produced a computerised decision support environment for integrated

consideration of design and maintnenace issues in relation to BAS.

• Generated practical guidelines for BAS design and maintenance practice.

• Explored object-oriented software applications integrated with the database

that crosses traditional professional fragmented design and maintenance.

• Created an integration platform for further extending the value of a prototype

decision support system for the building industry.

• Produced three refereed papers for conference publication and presentation

and prepared two more papers related to research outcomes for journal

publication for the enrichments of literature.

Page 359: THE INTEGRATION BETWEEN DESIGN AND MAINTENANCE …eprints.qut.edu.au/16058/1/Frank_Lin_Thesis.pdf · the integration between design and maintenance of office building automation:

CHAPTER 8 CONCLUSIONS

341

8.8 Implications and Further Research

The limitations of the research in the knowledge database and functionalities of the

decision support model have highlighted the potential for advanced study and

development.

Therefore, the next step for further research would lead to broader and wide-ranging

applications to provide more comprehensive information to enhance the functions in

terms of the developed SBASpro program for both the academic field and the

building industry to improve the performance and energy conservation of office

building design and maintenance such as:

◊ Enhancement of the functionality and BAS design and maintenance

knowledge database

◊ Development of the practical software application package, even commercial

version through the joint venture with the industry.

◊ Web application development

Page 360: THE INTEGRATION BETWEEN DESIGN AND MAINTENANCE …eprints.qut.edu.au/16058/1/Frank_Lin_Thesis.pdf · the integration between design and maintenance of office building automation:

CHAPTER 8 CONCLUSIONS

342

DESIGN MAINTENANCE

Source: Skidmore Owings & Merrill LLP 18 Fortune Oct. 2004

Freedom Tower

INTEGRATION

Page 361: THE INTEGRATION BETWEEN DESIGN AND MAINTENANCE …eprints.qut.edu.au/16058/1/Frank_Lin_Thesis.pdf · the integration between design and maintenance of office building automation:

BIBLIOGRAPHY

343

BIBLIOGRAPHY

The Integration between Design and Maintenance of Office Building Autom

ation: A Decision Support Approach

Page 362: THE INTEGRATION BETWEEN DESIGN AND MAINTENANCE …eprints.qut.edu.au/16058/1/Frank_Lin_Thesis.pdf · the integration between design and maintenance of office building automation:

BIBLIOGRAPHY

344

Addis, T. R. (1985). Designing knowledge- based systems. London: Kogan Page,.

Agosti, M., Crestani, F., & Melucci, M. (1996). Design and implementation of a tool

for the automatic construction of hypertexts for information retrieval.

Information Processing & Management, 32(4), pp. 459-476.

Ahamed, S. V., & Lawrence, V. B. (1997). Intelligent broadband multimedia

networks: generic aspects and architectures: wireless, ISDN, current and

future intelligent networks. Boston, MA: Kluwer Academic Publishers.

Alegria, C. (1990). Meet the hotel of the future. Energy & Automation, 12(1), pp.

20-23.

Allen, B. (1996). An integrated approach to Smart House technology for people with

disabilities. Medical Engineering & Physics, 18(3), pp. 203-206.

Ancevic, M. (1997). Intelligent building system for airport. Ashrae Journal-

American Society of Heating Refrigerating and Air-Conditioning Engineers,

39(11), pp. 31-32, 34-35.

Andersson, B., Kantrowitz, M., Albrand, P., Webster, T., Adegran, M., & Kammerud,

R. (1987). Effects of occupant issues on the energy performance of two

existing passive commercial buildings. Building and Environment, 22(1), pp.

13-48.

Anon, E. (1988). Third International Conference on Installation Engineering -

designing and maintaining successful systems. IEE Conference Publication.

Anon, E. (1990). 1990 Annual Meeting of the American Society of Heating,

Refrigerating and Air-Conditioning Engineers, Technical and Symposium

Papers. ASHRAE Transactions.

Anon, E. (1990). Colloquium on Control in Building Energy Management Systems.

IEE Colloquium (Digest).

Anon, E. (1997). Proceedings of the 1997 ASHRAE Winter Meeting. ASHRAE

Transactions, 103(1).

Anon, E. (1998). Proceedings of the 1998 International Conference on Control. Part

2 (of 2). IEE Conference Publication, pp. 883-1727.

Anon. (1984). BUILDINGS. Engineering News-Record, 212(2), pp. 78-79, 81-82.

Anon. (1986). SUCCESSFUL ENERGY MANAGEMENT REQUIRES A HUMAN

'INTERFACE'. Energy Management Technology, 10(4), pp. 38-41.

Anon. (1989). Integrated home automation. EPRI Journal, 14(8), pp. 24-31.

Applebaum, M. A., & Bushby, S. T. (1998). 450 Golden Gate Project: BACnet's first

Page 363: THE INTEGRATION BETWEEN DESIGN AND MAINTENANCE …eprints.qut.edu.au/16058/1/Frank_Lin_Thesis.pdf · the integration between design and maintenance of office building automation:

BIBLIOGRAPHY

345

large-scale test. ASHRAE Journal, 40(7), pp. 23-30.

Argent, R. M., & Grayson, R. B. (2001). Design of information systems for

environmental managers: an example using interface prototyping.

Environmental Modelling & Software, 16(5), pp. 433-438.

Arnold, V., Collier, P. A., Leech, S. A., & Sutton, S. G. (2004). Impact of intelligent

decision aids on expert and novice decision-makers' judgments. Accounting

& Finance, 44(1), pp. 1-26.

Ashurst, J., Ashurst, N., & Heritage, E. (1988.). Practical building conservation.

Aldershot: Gower Technical.

Augenbroe, G. (2002). Trends in building simulation. Building and Environment,

37(8-9), pp. 891-902.

Augenbroe, G., & Winkelmann, F. (1990). Integration of simulation into building

design the need for a joint approach. Sol Eng 1990 Twelfth Annu Int Sol

Energ Conf; Published by Publ by American Soc of Mechanical Engineers

(ASME), New York, NY, USA, pp. 247-255.

Ayres, R., & Zuscovitch, E. (1990). Technology and information: chain reactions and

sustainable economic growth. Technovation, 10(3), pp. 163-183.

Azegami, M., & Fujiyoshi, H. (1993). A systematic approach to intelligent building

design. IEEE Communications Magazine, 31(10),pp. 46-48.

Baker, N., & Standeven, M. (1996). Thermal comfort for free-running buildings.

Energy and Buildings, 23(3), pp. 175-182.

Balaguer, C., Abderrahim, M., Navarro, J. M., Boudjabeur, S., Aromaa, P., Kahkonen,

K., et al. (2002). Future Home: An integrated construction automation

approach. Ieee Robotics & Automation Magazine, 9(1), pp. 55-66.

Balaras, C. A. (2002). TOBUS -- A European method and software for office

building refurbishment. Energy and Buildings, 34(2), pp. 111-112.

Balaras, C. A., Dascalaki, E., Gaglia, A., & Droutsa, K. (2003). Energy conservation

potential, HVAC installations and operational issues in Hellenic airports.

Energy and Buildings, 35(11), pp. 1105-1120.

Balaras, C. A., Droutsa, K., Argiriou, A. A., & Wittchen, K. (2002). Assessment of

energy and natural resources conservation in office buildings using TOBUS.

Energy and Buildings, 34(2), pp. 135-153.

Bannikov, I. I. (1993). Some problems concerning the theory of intelligent processes.

Kibernetika i Sistemnyj Analis, pp. 171-174.

Page 364: THE INTEGRATION BETWEEN DESIGN AND MAINTENANCE …eprints.qut.edu.au/16058/1/Frank_Lin_Thesis.pdf · the integration between design and maintenance of office building automation:

BIBLIOGRAPHY

346

Barelli, L., & Bidini, G. (2004). Development of an energetic diagnosis method for

the buildings: example of the Perugia University. Energy and Buildings, 36(1),

pp. 81-87.

Barnard, N. (1995). Condition-based maintenance for building services. Fuel and

Energy Abstracts, 36(5), pp. 363.

Barney Burroughs, H. E. (1997). Filtration: An investment in IAQ. HPAC Heating,

Piping, Air Conditioning, 69(8), pp. 55-58, 63-65.

Bauer, C. J. (1987). ENERGY MANAGEMENT SYSTEMS: TRENDS AND

ADVANCES. Construction Specifier, 40(6), pp. 50-63.

Bazillion, R. J., & Braun, C. (1995). Academic libraries as high-tech gateways: a

guide to design and space decisions. Chicago: American Library Association.

Becker, R. (1997). Performance evaluation of an intelligent hybrid floor-collector

system. Automation in Construction, 6(5-6), pp. 427-436.

Beckmann, D. (1994). Munich airport - a model of control system integration.

Strategic Planning for Energy and the Environment, 14(2), pp. 61-71.

Bellante De Martiis, G., Del Vecchio, R., & Graziani, A. (1994). The intelligent

building, well-being and the computerization of libraries. Annali di Igiene:

Medicina Preventiva e di Comunita, 6(4-6), pp. 971-980.

Bennett, R., Lee, A., Syphers, G., & Scott, A. (2000). Portland's green building

initiative and an application of the LEED [trademark] rating system.

Proceedings ACEEE Summer Study on Energy Efficiency in Buildings, 9, pp.

9.13-19.24.

Berube, R. E. (1990). Proceedings of the 2nd Annual Broadband Exposition and the

14th Fiber Optic Communications and Local Area Networks Exposition -

BROADBAND '90. Proc 2 Annu Broadband Expo 14 Fiber Opt Common

Local Area Network Expo BROADBAND 90; Published by Information

Gatekeepers Inc, Boston, MA, USA.

Bhatt, G. D., & Zaveri, J. (2002). The enabling role of decision support systems in

organizational learning. Decision Support Systems, 32(3), pp. 297-309.

Birtles, A. B., & Grigg, P. (1997). Energy efficiency of buildings: Simple appraisal

method. Building Services Engineering Research & Technology, 18(2), pp.

109-114.

Bluyssen, P. M., & Cox, C. (2002). Indoor environment quality and upgrading of

European office buildings. Energy and Buildings, 34(2), pp. 155-162.

Page 365: THE INTEGRATION BETWEEN DESIGN AND MAINTENANCE …eprints.qut.edu.au/16058/1/Frank_Lin_Thesis.pdf · the integration between design and maintenance of office building automation:

BIBLIOGRAPHY

347

Brackney, L., & Shoureshi, R. (1994). Fuzzy-based self-organizing control for

building systems. Proceedings of the American Control Conference, 3, pp.

3060-3064.

Brandon, P. S., Basden, A., Hamilton, I., Stockeley, J. (1988). Expert Systems The

Strategic Planning of Construction Projects, NBS Services Ltd, Newcastle

upon Tyne, pp. 21-24.

Brandon, P. S., & Watson, I. D. (1993). Intelligent systems for the management of

buildings. Building Research and Information, 21(4), pp. 239-242.

Brooks, R. A. (1991). Intelligence without representation. Artificial Intelligence,

47(1-3), pp. 139-159.

Brown, A. G. P. (2003). Visualization as a common design language: connecting art

and science. Automation in Construction, 12(6), pp. 703-713.

Bruegge, B., Fenton, T., Kim, T. W., Pravia, R., Sharma, A., Fernandes, B., et al.

(1997). Turning light bulbs into objects. Proceedings of the Conference on

Object-Oriented Programming Systems, Languages, and Applications,

OOPSLA, pp. 10-15.

Bryzek, J., Mallon, J. R. J., & Grace, R. (1989). Consumer applications of silicon

sensors. Sensors (Peterborough, NH), 6(6), pp. 20-22.

Businaro, U. L. (1994). ICT and the new urban development. Linkage and Countries;

IFIP Transactions A: Computer Science and Technology, pp. 241-248.

Caccavelli, D., & Gugerli, H. (2002). TOBUS -- a European diagnosis and

decision-making tool for office building upgrading. Energy and Buildings,

34(2), pp. 113-119.

Caine, R. B. (1987). TELECOMMUNICATIONS FOR BUILDINGS - A

STEP-BY-STEP APPROACH FOR DESIGN. Electr Syst Des, 67(4), pp.

28-30, 32.

Carr, R. I., Lee, H.-S., & Ioannou, P. G. (1994). Interactive cost estimating during

design. Computing in Civil Engineering (New York), pp. 1556-1563.

Carruthers, P. J. (1996). Energy management through maintenance. Fuel and Energy

Abstracts, 37(3), pp. 235.

Cassar, M. (1994). Preventive conservation and building maintenance. Museum

Management and Curatorship, 13(1), pp. 39-47.

Cavedon, L., Rao, A., & Wobcke, W. (1997). Intelligent agent systems: theoretical

and practical issues: based on a workshop held at PRICAI'96, Cairns,

Page 366: THE INTEGRATION BETWEEN DESIGN AND MAINTENANCE …eprints.qut.edu.au/16058/1/Frank_Lin_Thesis.pdf · the integration between design and maintenance of office building automation:

BIBLIOGRAPHY

348

Australia, and August 26-30, 1996. Berlin New York: Springer.

Chan, M., Hariton, C., Ringeard, P., & Campo, E. (1995). Smart house automation

system for the elderly and the disabled. Proceedings of the IEEE

International Conference on Systems, Man and Cybernetics, 2, pp.

1586-1589.

Chang, S. K., Jungert, E., & Tortora, G. (1996). Intelligent image database systems.

Singapore River Edge, NJ: World Scientific.

Chao, C. Y. H., & Wan, M. P. (2004). Airflow and air temperature distribution in the

occupied region of an underfloor ventilation system. Building and

Environment, 39(7), pp. 749-762.

Chau, K. W., Cao, Y., Anson, M., & Zhang, J. (2003). Application of data warehouse

and Decision Support System in construction management. Automation in

Construction, 12(2), pp. 213-224.

Chen, C.-H., & Occena, L. G. (1999). A knowledge sorting process for a product

design expert system. Expert Systems, 16(3), pp. 170-182.

Chenoweth, T., Dowling, K. L., & St. Louis, R. D. (2004). Convincing DSS users

that complex models are worth the effort. Decision Support Systems, 37(1),

pp. 71-82.

Choo, H. J., Hammond, J., Tommelein, I. D., Austin, S. A., & Ballard, G. (2004).

DePlan: a tool for integrated design management. Automation in

Construction, 13(3), pp. 313-326.

Christenson, R. E., Spencer, B. F. J., Johnson, E. A., & Seto, K. (2000). Coupled

building control using 'smart' damping strategies. Proceedings of SPIE - The

International Society for Optical Engineering, 3985, pp. 482-490.

Chudley, R. (1981.). The maintenance and adoption of buildings. London; New York:

Longman.

Chun, D. A., Seo, J., & Haas, C. T. (1997). Leveling technologies for building

construction. Managing Engineered Construction in Expanding Global

Markets; ASCE Construction Congress Proceedings, pp. 1030-1037.

Citherlet, S., & Hand, J. (2002). Assessing energy, lighting, room acoustics, occupant

comfort and environmental impacts performance of building with a single

simulation program. Building and Environment, 37(8-9), pp. 845-856.

Clapp, M. D. (1996). 75 Years in control: A profile of Satchwell control systems.

GEC Review, 11(3), pp. 152-158.

Page 367: THE INTEGRATION BETWEEN DESIGN AND MAINTENANCE …eprints.qut.edu.au/16058/1/Frank_Lin_Thesis.pdf · the integration between design and maintenance of office building automation:

BIBLIOGRAPHY

349

Clapp, M. D. (1996). Building management systems past, present & future.

Measurement & Control, 29(10), pp. 294-297.

Clapp, M. D., & Blackmun, G. (1992). Automatic engineering of building

management systems. GEC Review, 8(1), pp. 40-46.

Clapp, M. D., & Churches, K. (1993). Future of building services management and

control systems. GEC Review, 8(2), pp. 93-101.

Clark, G., & Mehta, P. (1997). Artificial intelligence and networking in integrated

building management systems. Automation in Construction, 6(5-6), pp.

481-498.

Clements-Croome, T. D. J. (1997). What do we mean by intelligent buildings?

Automation in Construction, 6(5-6), pp. 395-400.

Cole, R. J., & Kernan, P. C. (1996). Life-Cycle Energy Use in Office Buildings.

Building and Environment, 31(4), pp. 307-317.

Committee, L. A. M. S. a. C. (1981). Terotechnology and the Maintenance of Local

Authority Buildings.

Cordoba, J., Macias, M., & Espinosa, J. M. (1998). Study of the potential savings on

energy demand and HVAC energy consumption by using coated glazing for

office buildings in Madrid. Energy and Buildings, 27(1), pp. 13-19.

Cornick, S. M., Leishman, D. A., & Thomas, J. R. (1990). Incorporating building

regulations into design systems. An object-oriented approach. ASHRAE

Transactions, pp. 542-549.

Costantino, C. A., & Merchant, C. S. (1996). Designing conflict management systems:

a guide to creating productive and healthy organizations (1st ed.). San

Francisco: Jossey-Bass Publishers.

Cronolly, E. (1997). Low energy buildings design--the EDAS experience. Fuel and

Energy Abstracts, 38(6), pp. 449.

Croome, D. J. (1990). Building services engineering. The invisible architecture.

Building Services Engineering Research & Technology, 11(1), pp. 27-31.

Cross, T. B. (1985). SMART BUILDINGS FOR INTELLIGENT PEOPLE. AFIPS

Conference Proceedings, 54, pp. 383-387.

Dai, R., & Wang, J. (1993). Exploration of giant intelligent systems. Zidonghua

Xuebao/Acta Automatica Sinica, 19(6), pp. 645-655.

D'Aprix, R. M. (1996). Communicating for change: connecting the workplace with

the marketplace (1st ed.). San Francisco, Calif: Jossey-Bass Publishers.

Page 368: THE INTEGRATION BETWEEN DESIGN AND MAINTENANCE …eprints.qut.edu.au/16058/1/Frank_Lin_Thesis.pdf · the integration between design and maintenance of office building automation:

BIBLIOGRAPHY

350

Date, C. J. (2000). An introduction to database systems (7th ed.). Reading, MA:

Addison-Wesley.

Davies, M. (1987). Intelligent buildings. London: Pidgeon Audio Visual.

Davis-Stemp, S. (1986). Decision support systems. Montvale, N.J.: National

Association of Accountants.

De Wilde, P., Augenbroe, G., & van der Voorden, M. (2002). Design analysis

integration: supporting the selection of energy saving building components.

Building and Environment, 37(8-9), pp. 807-816.

De Wilde, P., Augenbroe, G., & Van Der Voorden, M. (2002). Managing the selection

of energy saving features in building design. Eng Const Arch Manage, 9(3),

pp. 192-208.

Deitel H.M., Deitel P.J., & Nieto T.R. (2002) Visual Basic.NET : how to program

Prentice Hall.

Deng, Z.-G., & Hu, H. (2001). A framework for mobile-service based co-ordination

of embedded web agents in intelligent buildings. IEEE/ASME International

Conference on Advanced Intelligent Mechatronics, AIM, 1, pp. 284-289.

Dessouky, Y. M., & Bayer, A. (2002). A simulation and design of experiments

modeling approach to minimize building maintenance costs. Computers &

Industrial Engineering, 43(3), pp. 423-436.

Ding, W., Minegishi, Y., Hasemi, Y., & Yamada, T. (2004). Smoke control based on a

solar-assisted natural ventilation system. Building and Environment, 39(7), pp.

775-782.

Drigas, A., Kouremenos, S., Vrettos, S., Vrettaros, J., & Kouremenos, D. (2004). An

expert system for job matching of the unemployed. Expert Systems with

Applications, 26(2), pp. 217-224.

Driscoll, A., & Hynes, B. (1991). Intelligent buildings. Australian Refrigeration, Air

Conditioning and Heating, 45(1), 11, pp. 13-16.

Dubin, F. S. (1989). HVAC, lighting and other design trends in intelligent buildings.

Strategic Planning and Energy Management, 9(1), pp. 38-50.

Dubin, F. S. (1990). Intelligent buildings. HVAC, lighting, and other design trends.

Construction Specifier, 43(2), pp. 50-57.

Dyer, M. J. (1988). Quality in intelligent installations. IEE Conference Publication,

pp. 82-86.

Eberly, D. A. (1995). Energy cost savings at a 19-building corporate headquarters

Page 369: THE INTEGRATION BETWEEN DESIGN AND MAINTENANCE …eprints.qut.edu.au/16058/1/Frank_Lin_Thesis.pdf · the integration between design and maintenance of office building automation:

BIBLIOGRAPHY

351

facility. Strategic Planning for Energy and the Environment, 15(2), pp. 64-77.

Edquist, C. (1997). Systems of innovation: technologies, institutions, and

organizations. London Washington: Pinter.

Elger, D., & Russell, P. (2003). The virtual campus: a new place for (lifelong)

learning? Automation in Construction, 12(6), pp. 671-676.

El-Rewini, H., Shriver, B. D., Nunamaker, J. F., Sprague, R. H., Lynn, M. S.,

University of Hawaii. College of Business Administration., et al. (1996).

Proceedings of the Twenty-ninth Hawaii International Conference on System

Sciences. Washington: IEEE Computer Society Press.

Engdahl, F., & Svensson, A. (2003). Pressure controlled variable air volume system.

Energy and Buildings, 35(11), pp. 1161-1172.

Engineers, C. I. o. B. S. (2000.). Guide to ownership, operation and maintenance of

building services. London: Chartered Institution of Building Services

Engineers.

Angler, F., & Jaussi, A. W. (1998). Intelligent substation automation - monitoring and

diagnostics in HV switchgear installations. ABB Review, pp. 19-26.

Enright, M. J., Scott, E. E., & Dodwell, D. (1997). The Hong Kong advantage. Hong

Kong New York: Oxford University Press.

Establishment, B. R. (1977.). Building defects and maintenance: essential

information from the Building Research Establishment. [2nd ed.]. Lancaster

[etc.]; New York: Construction Press.

Feldman, E. B. (1975). Building design for maintainability. New York:

McGraw-Hill.

Feng, D. S. (1998). Intelligent controller with the cloning problem for building

systems. Proceedings of the IEEE International Conference on Intelligent

Processing Systems, ICIPS, 1, pp. 653-655.

Ferrer-Dura, R. (1996). Super intelligent building based on expert systems.

Informacion Tecnologica, 7(4), pp. 65-70.

Fick, G., Sprague, R. H., & International Institute for Applied Systems Analysis.

(1980). Decision support systems: issues and challenges: proceedings of an

international task force meeting, June 23-25, 1980. Oxford; New York:

Pergamon Press.

Finley, M. R. J., Karakura, A., & Nbogni, R. (1991). Survey of intelligent building

concepts. IEEE Communications Magazine, 29(4), pp. 18-23.

Page 370: THE INTEGRATION BETWEEN DESIGN AND MAINTENANCE …eprints.qut.edu.au/16058/1/Frank_Lin_Thesis.pdf · the integration between design and maintenance of office building automation:

BIBLIOGRAPHY

352

Finley, M. R. J., Nbogni, R. N., & Karakura, A. (1990). Human factors

considerations in the intelligent building. Proc 2 Annu Broadband Expo 14

Fiber Opt Common Local Area Network Expo BROADBAND 90; Published

by Publ by Information Gatekeepers Inc, Boston, MA, USA, pp. 179.

Fisher, D. M. (1985). INTELLIGENT BUILDING: HOW CLOSE IS IT? Specifying

Engineer, 54(3), pp. 50-59.

Flax, B. M. (1991). Intelligent Buildings. IEEE Communications Magazine, April, pp.

24-27.

Flourentzou, F., Genre, J. L., & Roulet, C.-A. (2002). TOBUS software -- an

interactive decision aid tool for building retrofit studies. Energy and

Buildings, 34(2), pp. 193-202.

Fox, S., Marsh, L., & Cockerham, G. (2002). How building design imperatives

constrain construction productivity and quality. Eng Const Arch Manage,

9(5-6), pp. 378-387.

Freeburg, T. A. (1991). Enabling technologies for wireless in-building network

communications-four technical challenges, four solutions. IEEE

Communications Magazine, 29(4), pp. 58-64.

Fu, L.-C., & Shih, T.-J. (2000). Holonic supervisory control and data acquisition

kernel for 21st century intelligent building system. Proceedings - IEEE

International Conference on Robotics and Automation, 3, pp. 2641-2646.

Fuchs, R. (1998). Visions become reality. Betonwerk und Fertigteil-Technik/Concrete

Precasting Plant and Technology, 64(8), pp. 22-25.

Fujii, K., Komori, T., Fukuma, Y., & Oikawa, M. (1991). Systems integration

(automation systems). Nippon Steel Technical Report, pp. 60-66.

Gann, D. M. (1990). High-technology buildings and the information economy.

Habitat International, 14(2-3), pp. 171-176.

Gann, D. M. (1991). Buildings for the Japanese information economy:

Neighbourhood and resort offices. Futures, 23(5), pp. 469-481.

Gibson, E. J. (1978.). Developments in building maintenance. London: Applied

Science Publishers.

Ginzberg, M. J., Reitman, W. R., & Stohr, E. A. (1982). Decision support systems:

proceedings of the NYU Symposium on Decision Support Systems, New York,

21-22 May, 1981. Amsterdam; New York: North-Holland Pub. Co.

Greenup, P., Bell, J. M., & Moore, I. (2001). Importance of interior daylight

Page 371: THE INTEGRATION BETWEEN DESIGN AND MAINTENANCE …eprints.qut.edu.au/16058/1/Frank_Lin_Thesis.pdf · the integration between design and maintenance of office building automation:

BIBLIOGRAPHY

353

distribution in buildings on overall energy performance. Renewable Energy,

22(1), pp. 45-52.

Grove, R. (2000). Internet-based expert systems. Expert Systems, 17(3), pp. 129-135.

Hamilton, G., Harrison, A., & Britain), B. S. R. a. I. A. G. (1986) Expert systems for

the construction and building services industry. Bracknell, Berkshire: BSRIA.

Hara, E. H. (1986). FIBER OPTIC DISTRIBUTION SYSTEM FOR INTEGRATED

MULTI - SERVICES IN CANADA - AN APPROACH THROUGH

INTELLIGENT BUILDINGS. Conference Record - International Conference

on Communications, pp. 802-807.

Hara, E. H. (1986). FIBER OPTIC NETWORK DESIGN FOR INTEGRATED

SERVICES IN INTELLIGENT BUILDINGS. IEEE Communications

Magazine, 24(12), pp. 29-35.

Hara, E. H. (1986). INTEGRATED BROAD-BAND SERVICE - THE

INTELLIGENT BUILDING STRATEGY. IEEE Journal on Selected Areas in

Communications, SAC-4(4), pp. 619-624.

Harrington-Lynn, J. (1998). Intermittent heating: Equations in CIBSE Building

Energy Code Part 2(a). Building Services Engineering Research &

Technology, 19(4), pp. 249-250.

Hartman, T. (1989). Intelligent building design demands. Heating, Piping & Air

Conditioning, 61(11), pp. 67-70.

Hastak, M. (1998). Advanced automation or conventional construction process?

Automation in Construction, 7(4), pp. 299-314.

Hazemi, R., Hailes, S., & Wilbur, S. (1998). The digital university: reinventing the

academy. Berlin New York: Springer.

Hechmann, D. C. (2001). Raising the bar for LonWorks. HPAC Heating, Piping,

Air-Conditioning Engineering, pp. 109-112.

Hendrix, J. (2001). Seven keys to successful systems-integration projects. HPAC

Heating, Piping, Air-Conditioning Engineering, pp. 122-125.

Hensen, J. L. M., Lamberts, R., & Negrao, C. O. R. (2002). Building performance

simulation at the start of the 3rd millennium. Building and Environment,

37(8-9), pp. 765-767.

Herbert, P. (1995). Flexible solution to IT needs. Computer Bulletin (London, 1986),

7(3), pp. 10-11.

Hicks, T. W., & Von Neida, B. (2000). An evaluation of America's first ENERGY

Page 372: THE INTEGRATION BETWEEN DESIGN AND MAINTENANCE …eprints.qut.edu.au/16058/1/Frank_Lin_Thesis.pdf · the integration between design and maintenance of office building automation:

BIBLIOGRAPHY

354

STAR[registered trademark] buildings: The class of 1999. Proceedings

ACEEE Summer Study on Energy Efficiency in Buildings, 4, pp. 4177-4185.

Hintz, J. (2001). Building controls: Taking up the knowledge-management challenge.

HPAC Heating, Piping, Air-Conditioning Engineering, pp. 116-117.

Hoberecht, K. L., & Swain, R. W. (1988). Creating an intelligent building.

Healthcare Executive, 3(6), pp. 30-32.

Hollinger, C. A. (2001). Realistic expectations of interoperability. HPAC Heating,

Piping, Air-Conditioning Engineering, pp. 101-104.

Holmes, R., Droop, C., & Mellor, P. (1985.). A coding system for building

maintenance. Ascot, Berks: The Chartered Institute of Building.

Holsapple, C. W., & Whinston, A. B. (1987). Decision support systems: theory and

application. Berlin; New York: Springer-Verlag.

Hong, J. (1993). Theory of knowledge discovery and its implementation. Zidonghua

Xuebao/Acta Automatica Sinica, 19(6), pp. 663-669.

Horitake, H. (1990). Intelligent buildings displaying diverse development. Looking

at developments in the NTT group. NTT Review, 2(3), pp. 62-66.

Husaunndee, A., Vaezi-Nejad, H., & Visier, J. C. (2001). Use of simulation tools for

design and test of control and energy management systems in intelligent

buildings. International Journal of Solar Energy, 21(2-3), pp. 111-130.

Hutchinson, B. D., Barton, J., & Ellis, N. (1975.). Maintenance and repair of

buildings and their internal environment. London: Newnes-Butterworths.

Hutt, B. C. (1990). Control in building energy management systems. IEE Colloquium

(Digest).

Hutton, G. (1995). Building Maintenance: The H + R 'Curator' and Building

Monitoring Systems. Museum Management and Curatorship, 14(1), pp.

92-98..

Inoue, Y., Sugiura, S., Murakami, K., & Kotera, N. (1995). Thermal comfort and

climate control. ASHRAE Journal, 37(10), pp. 28-32.

Institute of Refrigeration Heating and Air-Conditioning Engineers of New Zealand.

Technical Conference. (1992). The Institute of Refrigeration, Heating and Air

Conditioning Engineers of New Zealand: proceedings of IRHACE Technical

Conference held in Dunedin, New Zealand, on Friday 20th March 1992.

Auckland, N.Z.: The Institute.

Inui, M., Samui, J., Kubota, T., Ujigawa, M., Takai, H., Kanasaki, T., et al. (1987).

Page 373: THE INTEGRATION BETWEEN DESIGN AND MAINTENANCE …eprints.qut.edu.au/16058/1/Frank_Lin_Thesis.pdf · the integration between design and maintenance of office building automation:

BIBLIOGRAPHY

355

EVALUATION OF OFFICE ENVIRONMENT BY OFFICE WORKERS.

Takenaka Technical Research Report, pp. 1-15.

Ishibashi, M., Ishikawa, K., Hira, T., & Ito, M. (1993). Internetworked

PBX-computer systems for intelligent building applications. IEEE

Communications Magazine, 31(10), pp. 50-51.

Ivanovich, M. (1999). Superior buildings for the 21st century: a new millennium

resolution. HPAC Heating, Piping, Air Conditioning, 71(5), pp. 85-87.

Ivanovich, M., & Gustavson, D. (1999). Future of intelligent buildings is now. HPAC

Heating, Piping, Air Conditioning, 71(5), pp. 73-79.

Iwaki, H., Yamakawa, H., & Mita, A. (2001). Health monitoring system using

FBG-based sensors for a 12-story building with column dampers.

Proceedings of SPIE - The International Society for Optical Engineering,

4330, pp. 471-478.

Judkoff, R., & Farhar, B. C. (2000). Lessons learned: Five years of home energy

rating systems (HERS) and energy-efficient mortgages (EEMs) in the pilot

states. Proceedings ACEEE Summer Study on Energy Efficiency in Buildings,

9, pp. 9.201-209.214.

Kartam, N. A. (1999). Design/construction integration: issues and illustrative

prototype. Eng Const Arch Manage, 6(3), pp. 299-314.

Kashiwamura, T., Koga, H., & Murakami, Y. (1991). Telecommunications aspects of

intelligent buildings. IEEE Communications Magazine, 29(4), pp. 28-32,

39-40.

Keen, P. G. W., & Morton, M. S. S. (1978). Decision support systems: an

organizational perspective. Reading, Mass.: Addison-Wesley Pub. Co.

Kell, A. (1996). Intelligent buildings now. ElectroTechnology, October/November, pp.

26-27.

Kendall, J. (1994). Object oriented techniques for lifecycle modelling of complex

control systems. IEE Colloquium (Digest), 4/1-4/7.

Kennington, J., & Monagan, P. F. (1993). COMBINE: The HVAC-design prototype.

Building and Environment, 28(4), pp. 453-463.

Kersten, G. E., Mikolajuk, Z., & Yeh, A. G. O. (2000). Decision support systems for

sustainable development: a resource book of methods and applications.

Boston: Kluwer Academic.

Keyes, J. (2000). Internet management (2000 ed.). Boca Raton, Fla: Auerbach.

Page 374: THE INTEGRATION BETWEEN DESIGN AND MAINTENANCE …eprints.qut.edu.au/16058/1/Frank_Lin_Thesis.pdf · the integration between design and maintenance of office building automation:

BIBLIOGRAPHY

356

Kishimoto, T., & Suzuki, G. (1993). Virtual offices. IEEE Communications Magazine,

31(10), pp. 36-38.

Kitagawa, Y., & Midorikawa, M. (1998). Seismic isolation and passive

response-control buildings in Japan. Smart Materials and Structures, 7(5), pp.

581-587.

Kolokotsa, D., Kalaitzakis, K., Stavrakakis, G., Sutherland, G., & Ey taxias, G. (2001).

Local operating networks technology aiming to improve building energy

management system performance satisfying the user’s preferences.

International Journal of Solar Energy, 21(2-3), pp. 219-242.

Kreager, P. S. (1991). The intelligent building telecommunications infrastructure.

IEEE Communications Magazine, 29(4), pp. 42-48.

Krishnamoorthy, C. S., & Rajeev, S. (1996). Artificial intelligence and expert

systems for engineers. Boca Raton: CRC Press.

Kroner, W. M. (1997). An intelligent and responsive architecture. Automation in

Construction, 6(5-6), pp. 381-393.

Kua, H. W., & Lee, S. E. (2002). Demonstration intelligent building - a methodology

for the promotion of total sustainability in the built environment. Building

and Environment, 37(3), pp. 231-240.

Kujuro, A. (1989). Developments in the NTT intelligent building system. NTT

Review, 1(4), pp. 74-83.

Kujuro, A., & Matsushima, O. (1990). NTT's intelligent building systems for today.

NTT Review, 2(3), pp. 67-75.

Kujuro, A., & Yasuda, H. (1993). Systems evolution in intelligent buildings. IEEE

Communications Magazine, 31(10), pp. 22-26.

Kumar, R., Ramesh, S., & Kaushik, S. C. (2003). Performance evaluation and energy

conservation potential of earth-air-tunnel system coupled with

non-air-conditioned building. Building and Environment, 38(6), pp. 807-813.

Kuwata, Y., Igarashi, H., Horima, H., Ogata, K., Saito, A., & Shishido, T. (1989).

Feasible optical cable designs with additional functions for LAN applications.

Proceedings of International Wire and Cable Symposium, pp. 338-343.

Lee, J. (2000). Networked building systems: the revolution is upon us. HPAC

Heating, Piping, Air-Conditioning Engineering, 72(10), pp. 61-62, 64-65,

67-68.

Lee, J.-H., & Hashimoto, H. (1999). Intelligent Space, its past and future. IECON

Page 375: THE INTEGRATION BETWEEN DESIGN AND MAINTENANCE …eprints.qut.edu.au/16058/1/Frank_Lin_Thesis.pdf · the integration between design and maintenance of office building automation:

BIBLIOGRAPHY

357

Proceedings (Industrial Electronics Conference), 1, pp. 126-131.

Lee, R. B. M. M., 2nd ed., Blackwell. (1987). Building Maintenance Management.

(2nd ed.).

Lee, W. L., Yik, F. W. H., Jones, P., & Burnett, J. (2001). Energy saving by realistic

design data for commercial buildings in Hong Kong. Applied Energy, 70(1),

pp. 59-75.

Lehto, M. (1990). Intelligent house in Finland in future society. VTT Symposium

(Valtion Teknillinen Tutkimuskeskus), pp. 219-227.

Li, R. (1996). International standard for intelligent buildings. Asia Engineer, 24(2),

pp. 21-22.

Li, Z., & Zhang, H. (2003). Intelligent systems research in China. Expert Systems,

20(2), pp. 51-59.

Liebowitz, J. (2000). Building organizational intelligence: a knowledge management

primer. Boca Raton, Fla.: CRC Press.

Lima, F. M. A. (1997). The intelligent building and its influence on the design

process. [St. Lucia, Qld.].

Ling, T. W., Ram, S., & Lee, M. L. (1998). Conceptual modeling - ER ‘98: 17th

International Conference on Conceptual Modeling, Singapore, November

16-19, 1998: proceedings. Berlin New York: Springer.

Little, J. D. C., & Cassettari, M. N. (1984). Decision support systems for marketing

managers. New York, N.Y.: AMA Membership Publications Division

American Management Associations.

Liu, M. (1996). Reducing building energy costs using improved operation strategies

for constant-volume air-handling systems. Fuel and Energy Abstracts, 37(5),

pp. 379.

Lockau, J. (1996). Avoid the unexpected. Use a 3D CAD model before building or

maintenance. Fuel and Energy Abstracts, 37(5), pp. 350.

Loveday, D. L., & Virk, G. S. (1992). Artificial intelligence for buildings. Applied

Energy, 41(3), 201-221.

Loveday, D. L., Virk, G. S., Cheung, J. Y. M., & Azzi, D. (1997). Intelligence in

buildings: The potential of advanced modelling. Automation in Construction,

6(5-6), pp. 447-461.

Lowry, G. (1996). User evaluation of installed building management systems. IEE

Colloquium (Digest).

Page 376: THE INTEGRATION BETWEEN DESIGN AND MAINTENANCE …eprints.qut.edu.au/16058/1/Frank_Lin_Thesis.pdf · the integration between design and maintenance of office building automation:

BIBLIOGRAPHY

358

Lowry, G. (2002). Modelling user acceptance of building management systems.

Automation in Construction, 11(6), pp. 695-705.

Lu, N., Liang, J., & You, J. (2000). Design and implementation of building intelligent

management system. Shanghai Jiaotong Daxue Xuebao/Journal of Shanghai

Jiaotong University, 34(7), pp. 928-931.

Luo, R. C., & Kay, M. G. (1995). Multisensor integration and fusion for intelligent

machines and systems. Norwood, N.J: Ablex Pub,.

Mallick, F. H. (1996). Thermal comfort and building design in the tropical climates.

Energy and Buildings, 23(3), pp. 161-167.

Mansell, R., Wehn, U., & United Nations Commission on Science and Technology

for Development. (1998). Knowledge societies: information technology for

sustainable development. Oxford New York: Published for and on behalf of

the United Nations by Oxford University Press.

Marakas, G. M. (1999). Decision support systems in the twenty-first century. Upper

Saddle River, N.J.: Prentice Hall.

Marion R. Finley, J. A. K. R. l. N. (1991). Survey of Intelligent Building Concepts.

IEEE Communications Magazine, April 1991.

Marks, W. (1997). Multicriteria Optimisation of Shape of Energy-Saving Buildings.

Building and Environment, 32(4), pp. 331-339.

Martinaitis, V., Rogoza, A., & Bikmaniene, I. (2004). Criterion to evaluate the

"twofold benefit" of the renovation of buildings and their elements. Energy

and Buildings, 36(1), pp. 3-8.

Martinez-Bejar, R., Ibanez-Cruz, F., Compton, P., & Cao, T. M. (2001). An

easy-maintenance, reusable approach for building knowledge-based systems:

application to landscape assessment. Expert Systems with Applications, 20(2),

pp. 153-162.

Maslin, N., Vaughan, R., BBC-TV., BBC Education & Training., & Diverse (Firm).

(1990). The Intelligent island [[video recording]

Mathews, E. H., & Richards, P. G. (1993). An efficient tool for future building design.

Building and Environment, 28(4), pp. 409-417.

Mathews, E. H., & van Heerden, E. (1999). Tool for integrated HVAC, building,

energy and control analysis. Part 2: Control simulations with QUICKcontrol.

Building and Environment, 34(4), pp. 451-467.

Mathews, E. H., van Heerden, E., & Arndt, D. C. (1999). Tool for integrated HVAC,

Page 377: THE INTEGRATION BETWEEN DESIGN AND MAINTENANCE …eprints.qut.edu.au/16058/1/Frank_Lin_Thesis.pdf · the integration between design and maintenance of office building automation:

BIBLIOGRAPHY

359

building, energy and control analysis. Part 1: Overview of QUICKcontrol.

Building and Environment, 34(4), pp. 429-449.

Matsumoto, F. (1987). DEVELOPMENT OF NTT INTELLIGENT BUILDING

SYSTEM. Japan Telecommunications Review, 29(4), pp. 95-101.

Matsunawa, K., Iizuka, H., & Tanabe, S.-i. (1995). Development and application of

an underfloor air-conditioning system with improved outlets for a 'smart'

building in Tokyo. ASHRAE Transactions, 101(2), pp. 887-901.

Matulionis, R. C., & Freitag, J. C. (1991.). Preventive maintenance of buildings. New

York: Van Nostrand Reinhold.

Maver, T., & Petric, J. (2003). Sustainability: real and/or virtual? Automation in

Construction, 12(6), pp. 641-648.

Maybury, M. T., & Wahlster, W. (1998). Readings in intelligent user interfaces. San

Francisco, CA: Morgan Kaufmann Publishers.

Mayo, T., & Sinha, R. (1997). R-2000 and Advanced Houses: The Canadian

experience. Journal of Thermal Insulation and Building Envelopes, 21, pp.

91-111.

McCartney, K. J., & Nicol, J. F. (2002). Developing an adaptive control algorithm for

Europe. Energy and Buildings, 34(6), pp. 623-635.

McClelland, S. (1988). Intelligent buildings: an IFS executive briefing. Bedford: IFS.

McElroy, M. W. (1995). New applications for voice/data cabling systems. EC&M:

Electrical Construction and Maintenance, 94(5).

McHenry, D., & Gerek, M. (1997). Data center. Military Engineer, 89(583), pp.

30-31.

MCPC. (1988). Life cycle costing. Measurement and Cost Planning Committee,

National Public Works Conference.

Meth, C. (1995). Where will smart homes get their smarts? Electronic Design,

43(19).

Miller, B. J. (2001). Facility capacity constraints present a strategic planning

opportunity. Health Care Strategic Management, 19(11), pp. 12.

Mills, E. D. (1981). Building maintenance and preservation: A guide for design and

management. Building and Environment, 16(3), pp. 229-230.

Mills, E. D. (1996). Building maintenance and preservation: a guide for design and

management (2nd ed. ed.). Oxford; Boston: Butterworth-Heinemann.

Mills, E. D., Building Centre (London, E., & Britain), B. C. T. G. (1980.). Building

Page 378: THE INTEGRATION BETWEEN DESIGN AND MAINTENANCE …eprints.qut.edu.au/16058/1/Frank_Lin_Thesis.pdf · the integration between design and maintenance of office building automation:

BIBLIOGRAPHY

360

maintenance and preservation: a guide for design and management. London;

Boston: Butterworths.

Ming, S., & Lockley, S. R. (1997). Data exchange system for an integrated building

design system. Automation in Construction, 6(2), pp. 147-155.

Mizoguchi, F., Hiraishi, H., & Nishiyama, H. (1999). Human-robot collaboration in

the smart office environment. IEEE/ASME International Conference on

Advanced Intelligent Mechatronics, AIM, pp. 79-84.

Mizukura, I. (1990). Conceptual design of system integration for intelligent building

systems and services. Mitsubishi Electric Advance, 50, pp. 2-7.

Mohamed Eshaq, A. R., & Karboulonis, P. (2003). Design considerations for the

design of an advanced VR interface for knowledge management and its

relevance to CAD. Automation in Construction, 12(5), pp. 501-507.

Morimoto, T., & Hashimoto, Y. (2000). Intelligent control for greenhouse automation,

oriented by the concepts of SPA and SFA - an application to a post-harvest

process. Computers and Electronics in Agriculture, 29(1), pp. 3-20.

Motro, A., & Smets, P. (1997). Uncertainty management in information systems:

from needs to solutions. Boston: Kluwer Academic.

Moynihan, G. P., Bowers, J. H., Fonseca, D. J., & Ray, P. S. (2002). A

knowledge-based approach to maintenance project planning. Expert Systems,

19(2), pp. 88-98.

Mumma, S. A., & Bolin, R. J. (1997). Energy optimized-ventilation constrained

variable air volume system control. Automation in Construction, 6(5-6), pp.

463-470.

Murray, S. E., & White, B. S. (1999). Critical care assessment handbook.

Philadelphia: W.B. Saunders.

Muspratt, M. A. (1989). Hi-tech for home and office. Computers in Industry, 12(4),

pp. 355-366.

Myers, C. (1997). Intelligent buildings require a smart pitch. Facilities Design &

Management, 16(9), pp. 52-55.

Nassar, K., Thabet, W., & Beliveau, Y. (2003). A procedure for multi-criteria

selection of building assemblies. Automation in Construction, 12(5), pp.

543-560.

Niederjohn, S. (2001). Data visualization: The new BAS tool. ASHRAE Journal,

43(4), pp. 23, 25-28.

Page 379: THE INTEGRATION BETWEEN DESIGN AND MAINTENANCE …eprints.qut.edu.au/16058/1/Frank_Lin_Thesis.pdf · the integration between design and maintenance of office building automation:

BIBLIOGRAPHY

361

Nielsen, T. R., Duer, K., & Svendsen, S. (2001). Energy performance of glazings and

windows. Solar Energy, 69(6), pp. 137-143.

Nikolopoulos, C. (1997). Expert systems: introduction to first and second generation

and hybrid knowledge based systems. New York: M. Dekker.

Nordman, B., Meier, A., & Piette, M. A. (2000). PC and monitor night status: Power

management enabling and manual turn-off. Proceedings ACEEE Summer

Study on Energy Efficiency in Buildings, 7, pp. 7.89-87.99.

Norman, P. M. (2004). Knowledge acquisition, knowledge loss, and satisfaction in

high technology alliances. Journal of Business Research, 57(6), pp. 610-619.

Novak, P. (2001). Energy and buildings in the 21 century: Role of the architects in

country energy use. International Journal for Housing Science and Its

Applications, 25(4), pp. 293-299.

Nussbaum, G. M. (1997). Enterprise networking grows up. The intelligent building

gets a new nervous system. Health Facilities Management, 10(6), pp. 36-38,

40-41.

Olsen, E. L., & Chen, Q. Y. (2003). Energy consumption and comfort analysis for

different low-energy cooling systems in a mild climate. Energy and Buildings,

35(6), pp. 560-571.

Orihara, A., Nozaki, K., Kobayashi, N., Oguri, M., Tajima, S., & Inoue, M. (1997).

Autonomous decentralized system platform under multi-vendor environments

in building automation. Proceedings of the International Symposium on

Autonomous Decentralized Systems, pp. 409-415.

Otani, S., Hiraishi, H., Midorikawa, M., Teshigawara, M., Fujitani, H., & Saito, T.

(2000). Development of smart systems for building structures. Proceedings of

SPIE - The International Society for Optical Engineering, 3988, pp. 2-9.

Otto, K. (2001). Maximizing the value of open systems. HPAC Heating, Piping,

Air-Conditioning Engineering, pp. 113-115.

Papamichael, K., LaPorta, J., & Chauvet, H. (1997). Building Design Advisor:

automated integration of multiple simulation tools. Automation in

Construction, 6(4), pp. 341-352.

Parekh, A., Mullally-Pauly, B., & Riley, M. (2000). The EnerGuide for houses

program - A successful Canadian home energy rating system. Proceedings

ACEEE Summer Study on Energy Efficiency in Buildings, 2, pp. 2229-2240.

Perkins, D. N. (1994). The intelligent eye: learning to think by looking at art. Santa

Page 380: THE INTEGRATION BETWEEN DESIGN AND MAINTENANCE …eprints.qut.edu.au/16058/1/Frank_Lin_Thesis.pdf · the integration between design and maintenance of office building automation:

BIBLIOGRAPHY

362

Monica, CA: Getty Center for Education in the Arts.

Piette, M. A., Khalsa, S. K., & Haves, P. (2000). Use of an information monitoring

and diagnostic system to improve building operations. Proceedings ACEEE

Summer Study on Energy Efficiency in Buildings, 7, pp. 7.101-107.112.

Piirainen, H. (1990). Intelligent building - development project. VTT Symposium

(Valtion Teknillinen Tutkimuskeskus), pp. 83-90.

Pikcilingis, E. (1994). Whole house control utilizing a true computer network. Digest

of Technical Papers - IEEE International Conference on Consumer

Electronics, pp. 106-107.

Porteous, J. M. (1995). Intelligent buildings and their effect on the security industry.

IEEE Annual International Carnahan Conference on Security Technology,

Proceedings, pp. 186-188.

Pugh, D. B. (1988). Cable management systems for raised floors. IEE Conference

Publication, pp. 63-66.

Pye, M. E., & Russell, T. D. (1996). Intelligent energy management systems. An

operator view. IEE Conference Publication, pp. 154-159.

Rahman, M., & Lui, W. S. (1995). Energy conservation through building

management. IEEE International Engineering Management Conference, pp.

364-369.

Rasdorf, W. J., & Kutay, A. R. (1982). Maintenance of integrity during concurrent

access in a building design database. Computer-Aided Design, 14(4), pp.

201-207.

Reddy, T. A., Liu, M., & Claridge, D. E. (1998). A study of energy use and

satisfactory zone ventilation of different outdoor air ventilation strategies for

terminal reheat variable air volume systems. Energy and Buildings, 29(1), pp.

65-75.

Rhodes, P. C. (1993). Decision support systems: theory and practice.

Henley-on-Thames, England: Waller.

Richardson, R. (1999). Facilities corner: The Intelligent building. What to expect.

Information Executive, 3(8), pp. 11.

Ries, R., & Mahdavi, A. (2001). Integrated computational life-cycle assessment of

buildings. Journal of Computing in Civil Engineering, 15(1), pp. 59-66.

Ritchie, B. (1994). Building management system integration the total solution.

National Conference Publication - Institution of Engineers, Australia,

Page 381: THE INTEGRATION BETWEEN DESIGN AND MAINTENANCE …eprints.qut.edu.au/16058/1/Frank_Lin_Thesis.pdf · the integration between design and maintenance of office building automation:

BIBLIOGRAPHY

363

2(94/11), pp. 757-760.

Robinson, R. (1995). Twin towers of Kuala Lumpur. IEEE Spectrum, 32(10), 44-47.

Rose, T. (2000). High maintenance, low budget (The $4 billion backlog of work

needed on the 1888 Old-Executive-Office-Building is stagnant). Preservation,

52(5), pp. 16-16.

Rousseau, P. G., & Mathews, E. H. (1993). Needs and trends in integrated building

and HVAC thermal design tools. Building and Environment, 28(4), pp.

439-452.

Rousseau, P. G., & Mathews, E. H. (1996). A new integrated design tool for naturally

ventilated buildings. Energy and Buildings, 23(3), pp. 231-236.

Rubin, A., (1991) ). Intelligent building technology in Japan Commercial Building

Systems. National Institute of Standards and Technology (U.S.), United States.

Dept. of Commerce. & Electric Power Research Institute. Gaithersbury, MD.:

U.S. Dept. of Commerce, National Institute of Standards.

Rubinstein, F., Johnson, S., & Pettler, P. (2000). IBECS: An integrated building

environmental communications system- It's not your father's network.

Proceedings ACEEE Summer Study on Energy Efficiency in Buildings, 7, pp.

7.137-137.146.

Ryu, S.-K., Han, T.-H., & Ryu, J.-W. (1997). Study on the multi-hierarchical

maintenance system of electrical demand facilities for building intelligent.

Proceedings of the SICE Annual Conference, pp. 1057-1060.

S, M. L. (1988). Intelligent building: an IFS executive briefing. IFS Publications.

Sack, T. F. (1971). A complete guide to building and plant maintenance (2d ed.).

Englewood Cliffs, N.J.: Prentice-Hall.

Sacks, R., Warszawski, A., & Kirsch, U. (2000). Structural design in an automated

building system. Automation in Construction, 10(1), pp. 181-197.

Sage, A. P., & Rouse, W. B. (1999). Handbook of systems engineering and

management. New York: J. Wiley & Sons.

Samuel Rashkin, R. A. (2000). If home energy ratings are the solution for energy

efficient new homes, what's the problem? Proceedings ACEEE Summer Study

on Energy Efficiency in Buildings, 2, pp. 2279-2285.

Saviotti, P. (1996). Technological evolution, variety, and the economy. Aldershot,

Hants, UK Brookfield, Vt: E. Elgar,.

Schibuola, L. (1999). Simplified evaluation of building energy requirement for air

Page 382: THE INTEGRATION BETWEEN DESIGN AND MAINTENANCE …eprints.qut.edu.au/16058/1/Frank_Lin_Thesis.pdf · the integration between design and maintenance of office building automation:

BIBLIOGRAPHY

364

conditioning. International Journal of Energy Research, 23(9), pp. 741-750.

Schillinger, J. E., Vu, T., & Bellin, P. (1999). Airborne fungi and bacteria -

Background levels in office buildings. Journal of Environmental Health,

62(2), pp. 9-14.

Schneider, S., Swanson, J., & Woo, P.-Y. (1997). Remote telephone control system.

IEEE Transactions on Consumer Electronics, 43(2), pp. 103-111.

Schofield, J. A. (1995). Home automation takes off. Design News (Boston), 50(7).

Sekhar, S. C., Tham, K. W., & Cheong, D. (2002). Ventilation characteristics of an

air-conditioned office building in Singapore. Building and Environment,

37(3), pp. 241-255.

Sekhar, S. C., Tham, K. W., & Cheong, K. W. (2003). Indoor air quality and energy

performance of air-conditioned office buildings in Singapore. Indoor Air,

13(4), pp. 315-331.

Sequerth, J., & DeFranks, T. (1987). 'INTELLIGENT' FEATURES UPGRADE

FACILITIES. American City & County, 102(3), pp. 42, 44, 46-48.

Serro, C., & Nunes, R. (1992). Services architecture in SEIS--A system for

intelligent buildings. 6th Mediterranean Electrotechnical Conference;

Published by Publ by IEEE, Piscataway, NJ, USA, pp. 558-561.

Sharples, S., Callaghan, V., & Clarke, G. (1999). Multi-agent architecture for

intelligent building sensing and control. Sensor Review, 19(2), pp. 135-140.

Shaviv, E. (1999). Integrating energy consciousness in the design process.

Automation in Construction, 8(4), pp. 463-472.

Shaviv, E., & Shaviv, G. (1978). Designing buildings for minimal energy

consumption. Computer-Aided Design, 10(4), pp. 239-247.

Shen, L. Y., Lu, W., Shen, Q., & Li, H. (2003). A computer-aided decision support

system for assessing a contractor's competitiveness. Automation in

Construction, 12(5), pp. 577-587.

Sher, N. C. (1985). MICROELECTRONICS FOR THE INTELLIGENT BUILDING.

VLSI Electronics, Microstructure Science, 9, pp. 367-384.

Sherif, M. H. (2002). Intelligent homes: a new challenge in telecommunications

standardization. IEEE Communications Magazine, 40(1), pp. 8.

Shiba, K., Mase, S., Yabe, Y., & Tamura, K. (1998). Active/passive vibration control

systems for tall buildings. Smart Materials and Structures, 7(5), pp. 588-598.

Shibuki, M., Sakurai, N., & Mukai, H. (1993). Fiber-optic CCTV system. NTT

Page 383: THE INTEGRATION BETWEEN DESIGN AND MAINTENANCE …eprints.qut.edu.au/16058/1/Frank_Lin_Thesis.pdf · the integration between design and maintenance of office building automation:

BIBLIOGRAPHY

365

Review, 5(5), pp. 25-31.

Shoureshi, R., Brackney, L., & DeRoo, B. (1996). Fuzzy-based energy management

system for large buildings. Proceedings of the ASME Dynamic Systems and

Control Division; American Society of Mechanical Engineers, Dynamic

Systems and Control Division (Publication) DSC, 58, pp. 797-804.

Shoureshi, R., Torcellini, P., & Rahmani, K. (1992). Intelligent occupant comfort

control system. Intelligent Control Systems -1992; American Society of

Mechanical Engineers, Dynamic Systems and Control Division (Publication)

DSC, 45, pp. 105-111.

Simmonds, P. (1994). Intelligent building design. Engineered Systems, 11(6), pp.

30-34.

Singh, M. G. (1987). Fault detection & reliability : knowledge based & other

approaches (1st ed.). Oxford Oxfordshire New York: Pergamon Press.

Singh, M. G., & Trave-Massuyes, L. (1991). Decision support systems and

qualitative reasoning: proceedings of the IMACS International Workshop on

Decision Support Systems and Qualitative Reasoning, Toulouse, France,

13-15 March 1991. Amsterdam: North-Holland.

Slaughter, E. S. (1997). Characteristics of existing construction automation and

robotics technologies. Automation in Construction, 6(2), pp. 109-120.

Smeallie, P. H. (1990). Preparing for the electronically enhanced office building.

Construction Specifier, 43(2), pp. 60-63, 65-66.

Smeulders, A. W. M., & Jain, R. (1997). Image databases and multi-media search.

Singapore River Edge, NJ: World Scientific.

Smith, S. (1997). The integration of communications networks in the intelligent

building. Automation in Construction, 6(5-6), pp. 511-527.

Smith, S. H., Boiarski, A. A., & Rider, D. G. (1992). Calibration approach for smart

structures using embedded sensors. Experimental Techniques, 16(2), pp.

25-31.

So, A. T. P., Chan, W. L., & Tse, W. L. (1998). Building automation on the

information superhighway. ASHRAE Transactions, 104(2), pp. 176-191.

Sriram, R. D. (1997). Intelligent systems for engineering: a knowledge-based

approach. London New York: Springer.

Stillman, D. I. (1985). ENERGY USE IN THE INTELLIGENT BUILDING.

Consulting Engineer (Barrington, Ill), 65(4), pp. 44-47.

Page 384: THE INTEGRATION BETWEEN DESIGN AND MAINTENANCE …eprints.qut.edu.au/16058/1/Frank_Lin_Thesis.pdf · the integration between design and maintenance of office building automation:

BIBLIOGRAPHY

366

Stum, K. (2000). Importance of commissioning 'green' buildings. IEEE Transactions

on Engineering Management, 47(1).

Syagga, P. M. (1996). Building maintenance and technology in tropical climates :

Clive Briffet (ed.), Singapore University Press, Singapore, 1995, 191 pp, np.

Habitat International, 20(2), pp. 331-333.

Tan, K. H., & Platts, K. (2003). Linking Objectives to Actions: A Decision Support

Approach Based on Cause-Effect Linkages. null, 34(3), pp. 569-593.

Thierauf, R. J. (1982). Decision support systems for effective planning and control :

a case study approach. Englewood Cliffs, N.J.: Prentice-Hall.

Thomas, V. C. (1990). Intelligent computer programs for building services

engineering design. ASHRAE Transactions, pp. 523-541.

Thompson, G. (1998). Intelligent buildings: a self regulating environment. World

Hospitals and Health Services: the Official Journal of the International

Hospital Federation, 34(3), pp. 41-42.

Thuan, N. K. (1987). INTEGRATED BUILDING SERVICES. INTELEC,

International Telecommunications Energy Conference (Proceedings), pp.

385-392.

Timmermans, H. J. P. (1997). Decision support systems in urban planning. London:

E. & F.N. Spon.

Todesco, G. (1996). Super-efficient buildings: How low can you go? ASHRAE

Journal, 38(12), pp. 35-40.

Tompkins, N. J. A. (1997). Facilities planning: A vision for the 21st century. IIE

Solutions, 29(8), pp. 18-19.

Torrance, V. (1997). Building process summary. Automation in Construction, 6(1),

pp. 11-16.

Tse, W. L., Chan, W. L., & Lai, S. S. (2003). Emergency lighting monitoring system

using LonWorks. Automation in Construction, 12(5), pp. 617-629.

Turban, E., & Aronson, J. E. (1998). Decision support systems and intelligent

systems (5th ed.). Upper Saddle River, N.J.: Prentice Hall.

Tzafestas, S. G. (1989). Knowledge-based system diagnosis, supervision, and control.

New York: Plenum Press.

Tzafestas, S. G. (1999). Advances in manufacturing: decision, control, and

information technology. New York: Springer.

Ullah, M. B., & Lefebvre, G. (2000). Estimation of annual energy-saving

Page 385: THE INTEGRATION BETWEEN DESIGN AND MAINTENANCE …eprints.qut.edu.au/16058/1/Frank_Lin_Thesis.pdf · the integration between design and maintenance of office building automation:

BIBLIOGRAPHY

367

contribution of an automated blind system. ASHRAE Transactions, 106 (PA,

pp. 408-418.

Uras, H. M., & Aktan, H. M. (1993). Hybrid energy-dissipation device for intelligent

buildings. Experimental Mechanics, 33(1), pp. 15-20.

Urashima, H. (1993). Modern multi-split system air conditioners for buildings.

Hitachi Review, 42(2), pp. 67-70.

van der Linden, K., Boerstra, A. C., Raue, A. K., & Kurvers, S. R. (2002). Thermal

indoor climate building performance characterized by human comfort

response. Energy and Buildings, 34(7), pp. 737-744.

Viljoen, A., Dubiel, J., Wilson, M., & Fontoynont, M. (1997). Investigations for

improving the daylighting potential of double-skinned office buildings. Solar

Energy, 59(4-6), pp. 179-194.

Vine, E., Lee, E., Clear, R., DiBartolomeo, D., & Selkowitz, S. (1998). Office worker

response to an automated venetian blind and electric lighting system: A pilot

study. Energy and Buildings, 28(2), pp. 205-218.

Virk, G. S., Azzi, D., Azad, A. K. M., & Loveday, D. L. (1998). Recursive models for

multi-roomed BMS applications. IEE Conference Publication, pp.

1682-1687.

Von Karczewski, C. (2000). Prestressed hollowcore flooring units: An architectural

solution to intelligent building services. Betonwerk und

Fertigteil-Technik/Concrete Precasting Plant and Technology, 66(3), pp.

86-90.

Wagner, W. P., Najdawi, M. K., & Chung, Q. B. (2001). Selection of knowledge

acquisition techniques based upon the problem domain characteristics of

production and operations management expert systems. Expert Systems, 18(2),

pp. 76-87.

Wang, S., & Xie, J. (2002). Integrating Building Management System and facilities

management on the Internet. Automation in Construction, 11(6), pp. 707-715.

Wang, S., & Xu, X. (2004). Optimal and robust control of outdoor ventilation airflow

rate for improving energy efficiency and IAQ. Building and Environment,

39(7), pp. 763-773.

Wang, Z., Zhang, H., Zhang, B., Kang, B., Yang, K., Zhang, L., et al. (1998). Study

on the design for building automation system based on PLCS. Proceedings of

the International Conference on Energy and Environment, ICEE, pp. 62-69.

Page 386: THE INTEGRATION BETWEEN DESIGN AND MAINTENANCE …eprints.qut.edu.au/16058/1/Frank_Lin_Thesis.pdf · the integration between design and maintenance of office building automation:

BIBLIOGRAPHY

368

Warrell-Davies, M., Pidgeon, M., Cohn, L., & Pidgeon Audio Visual. (1987).

Intelligent buildings [[kit]

Watson, H. J., & Sprague, R. H. (1986). Decision support systems: putting theory

into practice. Englewood Cliffs, N.J.: Prentice-Hall.

Watson, H. J., & Sprague, R. H. (1989). Decision support systems: putting theory

into practice (2nd ed.). Englewood Cliffs, N.J.: Prentice-Hall.

Webster, A. C. (1994). Technological advance in Japanese building design and

construction. New York, N.Y: ASCE Pressers.

Wessel, D. J. (1992). Air-conditioning system retrofit for an historic office building.

ASHRAE Journal, 34(7), pp. 38, 40-42.

West, S. (2001). Improving the sustainable development of building stock by the

implementation of energy efficient, climate control technologies. Building

and Environment, 36(3), pp. 281-289.

Wijayatunga, P. D. C., Fernando, W. J. L. S., & Ranasinghe, S. (2003). Lighting

energy efficiency in office buildings: Sri Lanka. Energy Conversion and

Management, 44(15), pp. 2383-2392.

Wilkinson, R. J. (2002). Interoperable controls: Giving owners what they really want.

HPAC Heating, Piping, Air-Conditioning Engineering, 74(2), pp. 11.

Williams, G., Doughty, K., & Bradley, D. A. (1998). Systems approach to achieving

CarerNet - an integrated and intelligent telecare system. IEEE Transactions

on Information Technology in Biomedicine, 2(1), pp. 1-9.

Williams, W. E. (1987). Intelligent buildings. The Psychiatric Hospital, 18(1), pp.

27-31.

Willis, S., & Jaunzens, D. (1998). Controlling intelligent buildings - a user

perspective. IEE Conference Publication, pp. 1706-1709.

Winchcombe, R. (1989). Have DDCs lived up to their reputation? Australian

Refrigeration, Air Conditioning and Heating, 43(12), pp. 31, 33.

Wittchen, K. B., & Brandt, E. (2002). Development of a methodology for selecting

office building upgrading solutions based on a test survey in European

buildings. Energy and Buildings, 34(2), pp. 163-169.

Wong, A. C. W., & So, A. T. P. (1998). Building automation in the 21st century. IEE

Conference Publication, pp. 819-824.

Wong, N. H., & Jan, W. L. S. (2003). Total building performance evaluation of

academic institution in Singapore. Building and Environment, In Press,

Page 387: THE INTEGRATION BETWEEN DESIGN AND MAINTENANCE …eprints.qut.edu.au/16058/1/Frank_Lin_Thesis.pdf · the integration between design and maintenance of office building automation:

BIBLIOGRAPHY

369

Uncorrected Proof.

Wright, A. (1994). Technology and tradition. Renewable Energy, 5(1), pp. 22-33.

Wright, G. (1998). Refining systems integration. Building Design & Construction,

39(5), pp. 70-74.

Xue, H., Chou, S. K., & Zhong, X. Q. (2004). Thermal environment in a confined

space of high-rise building with split air conditioning system. Building and

Environment, 39(7), pp. 817-823.

Yamazaki, Y., & Maeda, J. (1998). The SMART system: an integrated application of

automation and information technology in production process. Computers in

Industry, 35(1), pp. 87-99.

Yasuda, A. K. a. H. (1993). Systems Evolution of Intelligent Buildings -

Technologies for furthering the progress of intelligent buildings. IEEE

Communications Magazine, 24.

Yokota, K. (1990). Intelligent building system for the JBP Oval. Mitsubishi Electric

Advance, 50, pp. 12-14.

Yoshida, H., & Kumar, S. (2001). Development of ARX model based off-line FDD

technique for energy efficient buildings. Renewable Energy, 22(1), pp. 53-59.

Zaheer-Uddin, M. (1993). Optimal, sub-optimal and adaptive control methods for the

design of temperature controllers for intelligent buildings. Building and

Environment, 28(3), pp. 311-322.

Page 388: THE INTEGRATION BETWEEN DESIGN AND MAINTENANCE …eprints.qut.edu.au/16058/1/Frank_Lin_Thesis.pdf · the integration between design and maintenance of office building automation:

BIBLIOGRAPHY

370

Page 389: THE INTEGRATION BETWEEN DESIGN AND MAINTENANCE …eprints.qut.edu.au/16058/1/Frank_Lin_Thesis.pdf · the integration between design and maintenance of office building automation:

REFERENCES

371

REFERENCES

The Integration between Design and Maintenance of Office Building Autom

ation: A Decision Support Approach

Page 390: THE INTEGRATION BETWEEN DESIGN AND MAINTENANCE …eprints.qut.edu.au/16058/1/Frank_Lin_Thesis.pdf · the integration between design and maintenance of office building automation:

REFERENCES

372

Abdu'l-Baha (2001) Writings of Abdu'l-Baha Volume: 173, pp. 131

Abdul-Nour, G., Beaudoin, H., Ouellet, P., Rochette, R., & Lambert, S. (1998). A

reliability based maintenance policy; a case study. Computers & Industrial

Engineering, 35(3-4), pp. 591-594.

Abplanalp, W., Hribar, R., & Jacobi, A. (1992). Building automation systems

guarantee reliable bank services. Sulzer Technical Review, 74(3), pp. 27-31.

Agenda 21 (1999) Agenda 21 on sustainable construction CIB Report Publication

237

AGO (Australian Greenhouse Office) (1999a) Australian Commercial Building

Sector Greenhouse Gas Emissions 1990-2010, Executive Summary Report

1999, Commonwealth of Australia.

ABS (Australian Bureau of Statistics) (2003) Year Book Australia- Construction

Special Article - Construction and the environment cat. no. 1301.0, ABS,

Canberra. Commonwealth of Australia.

Ahuja, A. (1994). Finding the opportunities in integration. Consulting-Specifying

Engineer, 16(3)

Akihiko Kujuro and Hiroshi Yauda (1993) Systems Evolution in Intelligent

Buildings IEEE Communications Magazine

Alexander, K. (1996). Facilities management: theory and practice (1st Ed.). London

New York: E & FN Spon.

Allehaux, D., & Tessier, P. (2002). Evaluation of the functional obsolescence of

building services in European office buildings. Energy and Buildings, 34(2),

pp. 127-133.

Albert T.P. So , A. C. W. W., K-c. Wong. (1999). A new definition of intelligent

buildings for Asia. Facilities, 17 (12/13), pp. 485-491.

Albert T.P. So and K.C. Wong (2002) On the quantitative assessment of intelligent

buildings V20 7/8 pp. 288-295

Alter, S. (1980). Decision support systems : current practice and continuing

challenges. Readings, Mass.: Addison-Wesley Pub.

Amato A., A. and Eaton, K.J., (1998) A comparative Environmental Life Cycle

Assessment of Modern Office Buildings. SCI Publication 182.

Arditi, D., & Gunaydin, H. M. (1997). Total quality management in the construction

process. International Journal of Project Management, 15(4 SU -), pp.

235-243.

Page 391: THE INTEGRATION BETWEEN DESIGN AND MAINTENANCE …eprints.qut.edu.au/16058/1/Frank_Lin_Thesis.pdf · the integration between design and maintenance of office building automation:

REFERENCES

373

Arditi David (1999) “Designing Building for Maintenance: Designers’ Perspective”

Journal of Architectural Engineering, pp. 107-116.

Arditi, D., and Messiha, H. (1996) “Life –cycle in municipal projects.” J. Infrastruct.

Sys., ASCE, 2(1), pp. 5-14.

Arditi, D., and Nawakorawit, M. (1999) Designing Buildings fro Maintenance:

Designers’ Perspective Journal of Architectural Engineering Dec. pp.

107-116.

Armstrong, J. H., & Britain), B. S. R. a. I. A. G. (1986). Inspection of building

services plant and equipment: a review of current practice. Bracknell,

Berkshire: Building Services Research and Information Association.

Armstrong, J. H., & Britain), B. S. R. a. I. A. G. (1990). Operating and maintenance

manuals for building services installations (2nd Ed.). Bracknell, Berkshire:

Building Services Research and Information Association.

Arkin H. Paciuk M. (1997) “Evaluating intelligent buildings according to level of

service systems integration” Automation in Construction, Volume 6, pp.

471-479

ASHRAE (2003) ASHRAE handbook : heating, ventilating, and air-conditioning

systems and equipment. (IP ed.).American Society of Heating, R. a. A.-C. E.

2003 Atlanta, GA :: ASHRAE,. pp. 38.1-38.5

Ashworth, A. (1989) Life Cycle Costing - a practical tool, Cost Engineering. March.

Atkin, B. (1987). 'INTELLIGENT' STRUCTURES: BUILDINGS THAT THINK.

International Construction, 26(10), pp. 61.

Atkin, B. (1988). Intelligent buildings: applications of IT and building automation to

high technology construction projects. Aldershot, Eng.: Avebury Technical.

Auckland, J. (1995). Open and shut case for intelligent buildings. Heating and Air

Conditioning Journal, pp. 16-17.

BACNet http://www.bacnet.org/

Baier, R. D. (1999). Customer service made easy: deliver what office tenants want.

HPAC Heating, Piping, Air Conditioning, 71(9), pp. 41-45.

Baker, L. G., Brouwer, A. H. M., & Rabuska, R. (2001). Integrated predictive

adaptive control of heating, cooling ventilation, daylighting and electrical

lighting in buildings. International Journal of Solar Energy, 21(2-3), pp.

203-218.

Barrie Chanter & Peter Swallow (1996) Building Maintenance management, Oxford;

Page 392: THE INTEGRATION BETWEEN DESIGN AND MAINTENANCE …eprints.qut.edu.au/16058/1/Frank_Lin_Thesis.pdf · the integration between design and maintenance of office building automation:

REFERENCES

374

Cambridge, Mass.: Blackwell Science, pp. 76-90.

BAS Load Management

http://www.advancedbuildings.org/main_t_load_build_automation_sys.htm

Beglinger, V., & Werner, W. (1992). Intelligent buildings - innovations and trends.

Sulzer Technical Review, 74(1), pp. 5-13.

Behnken, J. (2001). Building automation for multisite facilities. ASHRAE Journal,

43(6), pp. 53-54, 56-57.

Benner and Bjornskov (1994) Building Commissioning: Reliability, Persistence and

Change Second National Conference on Building commissioning, May 9-11,

1994, pp. 9.

Benroy, E. (1971) “Architects view of maintenance related to Design” Architect and

Surveyor 16 January/ February, pp. 14-16.

Bernaden, J. A., Neubauer, R. E., & Johnson Controls Inc. (1988). The Intelligent

building sourcebook. Lilburn, GA

Betts Martin, Fisher Martin A. and Koskela Lauri (1995) The Purpose and definition

of integration Integrated Construction Information

Beynon-Davies, P. (2002), Information Systems: An introduction to Informatics in

Organisations, Bath Press, Bath, pp. 89-91.

Blaha Michael and Premerlani William (1998) Object-Oriented Model and Design

for Database Application

Boed, Viktor (1996) Controls and Automation for Facilities Managers - Efficient

DDC Systems Implementation, CRC Press, 1-800-272-7737, Cat. No.: CH

7229

Bonczek, Holsapple & Whinston, (1981) CBI - Technical Infrastructure; p. 19

Bowyer, LT. (1985) Managing Building Maintenance. In Harlow, P. (cd.) Building

Maintenance - the Architect's Viewpoint. CIOB, Ascot.

Brandt, E., & Rasmussen, M. H. (2002). Assessment of building conditions. Energy

and Buildings, 34(2), pp. 121-125.

Building Maintenance and Repair Cost Reference (2003)

http://www.whitestoneresearch.com/book-specs.html

Burmahl, B. (1999). Smart and smarter. Intelligent buildings graduate to a new level.

Health Facilities Management, 12(6), pp. 22-24, 26, 28-30.

Bushby, S. T. (1997). BACnet: A standard communication infrastructure for

intelligent buildings. Automation in Construction, 6(5-6), pp. 529-540.

Page 393: THE INTEGRATION BETWEEN DESIGN AND MAINTENANCE …eprints.qut.edu.au/16058/1/Frank_Lin_Thesis.pdf · the integration between design and maintenance of office building automation:

REFERENCES

375

Caffrey, R. (1998). The intelligent C building - an ASHRAE opportunity. Intelligent

Buildings, ASHRAE technical data bulletin, pp. 1-9.

Caloz, J. W. (1999). Real intelligence. Building Operating Management, 46(5), 50.

David Nelson, AIA Clanton & Associates, Inc.

Carroll, J.M., & Lockhart, R. L. (1989) Artifacts as psychological theories: the case

of human-computr intraction. Beahviour and Information Technology, 8, pp.

247-256.

CII (1990) Total Quality Management: The Competitive Edge Constructin Industry

Institute, Bureau of Engineering Research The University of Texas at Austin

Chanter, B. and Swallow, P. (1996) Building Maintenance management, pp. 76-90.

Chau, K W et al., (2003) Application of data warehouse and Decision Support

System in Construction Management Automation in Construction. 12 no. 2,

Elsevier

Choi, D., (1995) Will you rent an office in an intelligent building? The IT Magazine,

pp. 14-20.

Choppin, J. (1991) Quality Through People. A Blueprint for Proactive Total Quality

Management. IFS Publications, UK.

Christain J. and Pandeya (1997) Cost Predictions of Facilities Journal of

Management in Engineering, Vol. 13, No. 1, pp. 52-61.

Christiansson Per (1999) Master of IT in the Building Process

(http://it.bt.aau.dk/it/education/master_it_open/mit_bit.pdf)

Christiansson, Per (2000) Information and Communication Technology, ICT, in the

Building Process- Competencies and Change,

http://it.bt.aau.dk/it/presentations/ida_14_9_2000.pdf

Christiansson Per (2004) IT in the Building Process IT in Civil Engineering Aalborg

University http://it.civil.auc.dk/it/education/overview.html

CIBSE (2000) Building Control Systems: CIBSE Guide H The Chartered Institution

of Building Services Engineers London,

Clive, B. (1990) “Balancing Design and Maintenance Issues” Building Maintenance

and Modernisation Worldwide volume II.

Coggan, D. A. (1997) “How can Buildings BE Intelligent?” American Technology

Magazine, February.

Collis jill & Hussey Roger (2003) Business Research A practical guide for

undergraduate and postgraduate students 2nd Ed. Palgrave Macmillan, pp.

Page 394: THE INTEGRATION BETWEEN DESIGN AND MAINTENANCE …eprints.qut.edu.au/16058/1/Frank_Lin_Thesis.pdf · the integration between design and maintenance of office building automation:

REFERENCES

376

15.

Communication http://www.regent.edu/acad/schcom/phd/com707/def_com.html

Conway Brian (2004) Office Building The Planning Site, LLC

http://www.wbdg.org/design/index.php?cn=1.27&cx=0

Council on Tall Buildings and Urban Habitat (1995) Architecture of Tall buildings

McGraw-Hill, Inc. pp. 414.

Creswell John W. 2003 Research Design Quality, Quantitative, and Mixed Methods

Approaches Second Edition, Thousand Oaks, Cali. Sage Publications, pp. 7,

15.

CSI (2005) The project Resource Manual- CSI Manual of Practice Fifth Edition The

Construction Specification Institute McGraw-Hill P., pp. 3.1-3.46.

Culp, G. et al., (1993) Implementation TQM in consulting engineering firm. Journal

of Management in Engineeering, 1993, 9(4), pp. 340-366.

DEGW (1992) Intelligent Buildings in Europe European Intelligent Buildings Group

Deming, W. E. (1986) Out of the Crisis, MIT CAES, Cambridge.

Demkin, J. A. (2004) Security Planning and Design A Guide for Architects and

Building Design Professionals The American Institute of Architects

Deutsch Michael S. (1982) Software verification and validation : realistic project

approaches Prentice-Hall.

Dharwalkar Parmanand V. and Gatton Thomas M. (1995) An Object-Oriented

Building Model for CAD/ Schedule Integration. Computing in Civil

DOE (2004) Building Technologies program: Building Commissioning

http://www.eere.energy.gov/buildings/info/operate/buildingcommissioning.ht

ml

DOE (2004) Building Technologies Program Heating and Cooling Systems: Heating

and Cooling Systems

http://www.eere.energy.gov/buildings/info/components/hvac/

Donahue, J.L., (2001) Personal Communication, Energy Planning, Inc., January

Drogemuller Robin and Najjar George (1994) Integrating Design and Planning: A

Knowledge Based Approach, Australian Institute of Building Papers Vol. 5.

Dunaway, Robert B. (2002) The Book of Visual Studio. Net- A guide for Developers

No Starch Press, Inc.

Duthie, G. Andrew (2003) Microft ASP.NET Programming with Microsoft Visual

Basic. NET Step by Step Microsoft Press

Page 395: THE INTEGRATION BETWEEN DESIGN AND MAINTENANCE …eprints.qut.edu.au/16058/1/Frank_Lin_Thesis.pdf · the integration between design and maintenance of office building automation:

REFERENCES

377

Edward, D. M. (1980) Building maintenance and preservation A guide for design and

management pp. 2

EIBG (1994) EIBG Promotional Pamphlet

Eisele, J. & Kloft, E. (2003) High-Rise Manual Typology and Design, Construction

and Technology Birkhäuser- Publishers for Architecture German.

El-Bibany Hossam and Paulson, Jr. Boyd C. (1994) Collaborative Knowledge –

Integration Systems: A Tool for AEC Design, Management, and Coordination,

Microcomputers in Civil Engineering Vol. 9, pp. 29-40.

El-Bibany Hossam E. &Paulson Boyd C. (1999) A Parametrics Architecture for

Design, Management, and Coordination in a Collaborative AEC Environment

Computer-Aided Civil and Infrastructure Engineering 14, pp. 1-13

Ellis M.W. and Mathews E.H. (2002) Needs and Trends in Building and HVAC

System Design Tools, Building and Environment 37, pp. 461-470.

Elmahdy, A. H. (2004) CBD-214 Building Automation: An Overview of Central

Control and Monitoring Systems, National Research Council of Canada,

Division of Building Research.

Emblemsvag, J et al., (2003) Decision Support in Selecting Maintenance

Orgnaisation Journal of Quality in Maintenance Engineering MCB

University Press 9, no. 1, pp. 11-24.

Energy conservation http://www.nrdc.org/reference/glossary/e.asp

Eyke Maurice (1988) Building Automation Systems A practical Guide to Selection

and Implementation Oxford, Oxfordfshire : BSP Professional, pp.181.

Fellows, M. C. T.C.R. (2000) “Intelligent Building Systems in Hong Kong Offices”,

Facilities May/Jun.

Fellow, R. and Liu, A. (2003) “Research Methods for Construction”. Blackwell

Science Ltd., U.K. pp. 59, 109, 158

Feniosky Pena-Mora and Gyanesh Hari Dwivedi (2002) Multiple Device

Collaborative and Real Time Analysis System for Project Management in

Civil Engineering Journal of Computing in Civil Engineering V.16 (1) pp.

23-38

Fernandes, O. et al., (2003) A Decision Support Maintenance Management Sytem :

Development and Implementation International Journal of Quality &

Reliability Management MCB University Press 20, no. 8, pp. 965-979.

FFC (2001) Federal Facilities Council (FFC) Sustainable Federal Facilities: A Guide

Page 396: THE INTEGRATION BETWEEN DESIGN AND MAINTENANCE …eprints.qut.edu.au/16058/1/Frank_Lin_Thesis.pdf · the integration between design and maintenance of office building automation:

REFERENCES

378

to Integrating Value Engineering, Life-Cycle Costing, and Sustainable

Development, National Academies Press, pp. 17.

Fiordan, Rebecca M. Riordan (2002) Microsoft ADO. NET Step by Step Microsoft

Press

Fisher Martin A. and Aalami Florian (1996) Scheduling with Computer Interpretable

Flanagan, R. & Norman, G. (1989) Life Cycle Costing for Construction. Surveyors

Publications for the RICS, London.

Fletcher S.L., Popovic O. and Plank R.J. (2003) Designing for Future Reuse and

Recycling, http://www.mssa.org.my/newsletter/0202/news0202_09.htm

Frazer, L. and Lawley, M. (2000) “Questionnaire Design & Administration” John

Wiley & Sons Australia Ltd, Australia, pp. 3, 101.

Fujie, S, Mikami, Y, (1991) Construction aspects of intelligent building, IEEE

Communication Magazine, pp. 50-7.

Fujitsu C. and BRC, (1998) Information Technology in the Building & Construction

Industry: Current Status & Future Directions A report for the National

Building and Construction Committee Department of Industry, Science &

Resources Prepared by the Fujitsu Centre, Australian Graduate School of

Management & Building Research Centre, Faculty of the Built Environment

The University of New South Wales August 1998, pp. 16.

Garmonsway, G.N., (1969) The Penguin English Dictionary, Penguin,

Harmpndsworth, pp. 391, 585.

Gasparski, W. W. (2003). Designer's responsibility: methodological and ethical

dimensions. Automation in Construction, 12(6), pp. 635-640.

Gitlow, H. S., & Gitlow, S. J. (1994). Total quality management in action.

Englewood Cliffs, N.J: PTR Prentice Hall.

Goettel Bruce C. (1994) CadVisor (CAD Equipment Analysis and Selection System).

Computing in Civil Engineering. pp. 2140-2144.

Gomez-Senent, E., Chiner, M., Capuz, S., & Aragones, P. (1996). Methodology for

the design of intelligent buildings. Informacion Tecnologica, 7(4), pp. 57-64.

Goncalves R. Pimentao, J.; Vita M.; Sousa P., Silva H. and Garcao Steiger (1996)

Integrating applications for the construction industry using a STEP-BASED

Integration Platform (SIP). Construction on the Information Highway. CIB

Proceedings publication 198. pp. 21-240.

Graham Carl Ian (2004). High Performance HVAC Steven Winter Associates

Page 397: THE INTEGRATION BETWEEN DESIGN AND MAINTENANCE …eprints.qut.edu.au/16058/1/Frank_Lin_Thesis.pdf · the integration between design and maintenance of office building automation:

REFERENCES

379

http://www.wbdg.org/design/res-print.php?rp=18

Gratia, E., & De Herde, A. (2003). Design of low energy office buildings. Energy

and Buildings, 35(5), pp. 473-491.

Greste O.I. and Mauthuer P. (1997) Integration of Computer Aided Design,

Estimating, Cost Management and Planning. Construction Process

Re-engineering

GSA/FEMP "Building Commissioning Guide, V 2.1

Hall, G. T. (1984.). Revision notes on building maintenance and adaptation. London:

Butterworths.

Hall, S. (2001). Is your BAS ready for the future? HPAC Heating, Piping,

Air-Conditioning Engineering, pp. 119-121.

Hamilton G. and A. Harrison (1986) Expert systems for construction and building

services industry pp 20, Building Services Research and Information

Association.

Hampson, K., Peters, R. and Walker, D. (2001) Case study of the Acton Peninsula

development: research and case study of the construction of the National

Museum of Australia and the Australian Institute of Aboriginal and Torres

Strait Islander Studies: final report for Commonwealth of Australia,

Department of Industry, Science and Resources prepared by the QUT/CSIRO

and RMIT National research team Queensland University of Technology,

School of Construction Management and Property, July 2001, pp.36.

Harrison, A., Read, J., & Loe, E. (1998). Intelligent buildings in South East Asia.

London: E & FN Spon.

Hart Chris (1998). “Doing a literature review: realizing the social science research

imagination, Sage Publications Ltd., pp. 82, 111.

Hartkopf, V., Loftness, V., Mahdavi, A., Lee, S., & Shankavaram, J. (1997). An

integrated approach to design and engineering of intelligent buildings--The

Intelligent Workplace at Carnegie Mellon University. Automation in

Construction, 6(5-6), pp. 401-415.

Harrison Andrew, Loe Eric and Read James (1998) Intelligent Buildings in South

East Asia, pp. 1-4.

Hastak, M., & Vanegas, J. A. (1993). Decision support systems in construction

management. Computing in Civil and Building Engineering; Published by

Publ by ASCE, New York, NY, USA, pp. 1555-1562.

Page 398: THE INTEGRATION BETWEEN DESIGN AND MAINTENANCE …eprints.qut.edu.au/16058/1/Frank_Lin_Thesis.pdf · the integration between design and maintenance of office building automation:

REFERENCES

380

Hawkins, S. A. (1987). INTELLIGENT BUILDING AND ITS POTENTIAL FOR THE

UK. CME, Chartered Mechanical Engineer, 34(2), pp. 30-32.

Hensen, I. J. (1996) Application of Modelling and Simulation to HVAC Systems

Energy Systems Research Unit, ESRU UK.

Hoffmann T. (2004) Intelligent Buildings-Are We Finally Enabled? Johnson Controls,

Controls Group

http://www.johnsoncontrols.com/metasys/articles/article3.htm

Hopkin V.D. (1993) Verification and Validation: Cocepts, Issues, and Applications

Verification and Validation of Complex Ssytems: Human Factors Issues

Series F: Computer and Ssytems Sciences, Vol. 110, Springer-Verlag Berlin

Heidelberg, pp. 9-33.

Howard Mckew (2002) A Building’s Built-in Expert Engineered Systems, Aug 2002,

Vol. 19 issue 8, pp. 106.

http://www.facility-automation.com/CDA/ArticleInformation/features/BNP_

_Features__Item/0,2503,81477,00.html

Ian C. Graham, PE (2004) Steven Winter Associates

ICT

http://computing-dictionary.thefreedictionary.com/Information%20and%20C

ommunication%20Technology

IEEE 90 Institute of Electrical and Electronics Engineers. IEEE Standard Computer

Dictionary: A Compilation of IEEE Standard Computer Glossaries. New

York, NY: 1990.

Ito Kenji. (1995) Object-Oriented Scheduling Model for Integrated Schedule

Information from Design to Construction Management. Computing in Civil

Engineering Vol. 2, pp. 494-501.

Ito Kenji. (1994) Integrated System Environment Using An Object-Oriented Project

James Piper (2002) Selecting Building Automation Systems: step by step Building

Operation Management / September.

James, D.B. (1972) “Maintenance Manger- and Design” Building Maintenance 6

January, pp. 8-9.

Jeffrey Cosiol, PE (2001) How to Write a Good Specification for a Building

Automation System HPAC Engineering July 2001, pp. 11-12

Juran, J. M. (1988) Juran on Planning for Quality, The Free Press, New York.

Juran, J.M. (1992) Juran on Quality by Design, The Free Press, New York.

Page 399: THE INTEGRATION BETWEEN DESIGN AND MAINTENANCE …eprints.qut.edu.au/16058/1/Frank_Lin_Thesis.pdf · the integration between design and maintenance of office building automation:

REFERENCES

381

Juran, J.M. & Godfrey A. B.(1999) Juran’s Quality Handbook, McGraw-Hill.

Keen, P.G.W., and M.S.Scott Morton. (1978) Decision Support Systems: an

Organisational Perspective. Reading, MA:Addison-Wesley.

Kervin, John B. 1992 “Methods for Business Research” HarperCollins Publishers Inc.

pp. 52,53, 348, 421, 724.

Kruger, sj & Welman, jc (2002) Research Methodology 2nd Ed. Oxfor iniversity press,

pp. 29.

Kua H.W. & Lee S.E. (2002) Demonstration intelligent building—a methodology for

the promotion of total sustainability in the built environment, Building and

Environment V37, Issue 3, March 2002, pp. 231-240

LAMSAC (1981) Local Authorities Management Services and Computer Committee

Terotechnology and the Maintenance of Local Authority Buildings. London.

Larsson, Nils K. (1994) A survey of the State of Building Commissioning in Canada

Second National Conference on Building commissioning, May 9-11, 1994, pp.

2-7.

Latham, M. (1994) Constructing the team, HMSO.

Lee, R. (1987) Building Maintenance Management, 2nd ed., Blackwell Science Ltd,

Oxford.

Leu Sou-Sen and Tzeng Bing-Rong (2000) A CPM-Based Construction Quality

Inspection and Decision-Sid System Computer-Aided Civil and Infrastructure

Engineering

Life Cycle Costs & Benefits http://www.buildingdesign.co.uk/mech/zutec/zutec.html

Lin F. and Yang, J. (2003) “Smart Design for Sustainable Maintenance: A Decision

Support Based Integration Approach”, Proceedings of the SASBE 2003

Conference Brisbane, Australia, November.

Lin, F. and Yang, J. (2003) “The Integration between Design and Maintenance of

Office Building Automation: A Decision Support Approach”, Proceedings of

the ASPEC2003 Conference 685-94, Johor Bahru, Malaysia, August.

Lomas, L.C. (1970) Design and Maintenance Building, January 2, pp. 42.

LonWorks http://www.echelon.com/

Maio, F. Di. (2004) Towards a Better Environment (ENERC-C) The Energy

Technology Section the Delft University of Technology

Page 400: THE INTEGRATION BETWEEN DESIGN AND MAINTENANCE …eprints.qut.edu.au/16058/1/Frank_Lin_Thesis.pdf · the integration between design and maintenance of office building automation:

REFERENCES

382

http://www.ocp.tudelft.nl/et/Research/EnergyInBuiltEnvironment/Towards

BetterEnvironment/TowardsBetterEnvironment.htm

Matti H. (2000) Islands of Automation http://cic.vtti.fi/hannus/island.html

MCCABE Steven (1998) Quality Improvement Techniques in Construction The

Chartered Institute of Building Addison Wesley Longman Limited, pp. 124.

McGeorge Denny and Palmer Angela (2002) Construction Management new

directions 2nd ED. Blackwell Pub., pp. 66-67, 156-187.

Mckew, H. (2002) A Building’s Built-in expert Engineered Systems, Aug, Vol.19

issue 8, pp. 106.

Miresco Edmond T., Pomerol Jean-Charles. (1995) A Knowledge-Based Decision

Support System for Construction Project Management. Computing in Civil

Model with Multiple-Views, Proceedings of the First ASCE Congress on

Computing in Civil Engineering, pp. 1204- 1211.

Mohyla Lolita V. (1996) Construction in Australia Law and Project Delivery LBC

Information Services P., pp. 141-243.

Morad Ayman A., Beliveau Yvan J.(1989) CAD/CPM Data Interaction. Computing in

Civil Engineering (Computers in Engineering Practice), pp. 588-596.

Mostia, B. (2002) Design for maintainability

http://www.maintenanceworld.com/Articles/mostiab/design.htm

Nagasaku, C. and Oda, M. (1965) Planning and Execution of Quality Control. Juse

Press, Tokyo.

NEEC National Energy Efficiency Committee

http://www.neec.gov.sg/programmes/sub_programmes_building01.shtm

Nelson, D. (2004) Electric Lighting Controls Clanton & Associates, Inc.

http://www.wbdg.org/design/res-print.php?rp=12

Neubeck, K. (2004.). Practical reliability analysis. Upper Saddle River, N.J. Prentice

Hall, pp. 175-282

Nguyen Tang-Hung and Oloufa Amr A. (2001) Computer-Generated Building Data:

Topological Information Journal of Computing in Civil Engineering V. 15(4)

Norman D and Kurtz P.E.(1991) The future of building systems in the USA Second

CIBSE Australian Conference November 26-28 1991.

Norman, C. (1977) “Why Correct Buildings after They’ve Gone Wrong?” Buildings

Maintenance and Services, March, 23-24.

Novak Bob (2004) President of Energy Equipment and Control, Inc.

Page 401: THE INTEGRATION BETWEEN DESIGN AND MAINTENANCE …eprints.qut.edu.au/16058/1/Frank_Lin_Thesis.pdf · the integration between design and maintenance of office building automation:

REFERENCES

383

NRC. (1998) Stewardship of Federal Facilities: A Proactive Strategy for Managing

the Nation's Public Assets. Washington, D.C.: National Academy Press.

Olson David L. (1998) Decision Support Models & Expert Systems Dame

Publications, Inc., pp. 8-12.

Onesime, OCT etal., 2004 A Decision Support System for Supplier Selection Process

International Journal of Information Technology & Decision Making World

Scientific Publishing Company 03, no. 03: pp. 453-470.

Palmer, A. (1989) Construction Design Cost Optimisation, Chartered Quantity

Surveyor. February.

Parfitt M. K., Syal M.G., Khalvati M., and Bhatia S.. (1993) Computer-Integrated

Design Drawings and Construction Project Plans. Journal of Construction

Engineering and Management 119 (4), pp. 729-741.

Paulson Jr. B. C., (1995) Computer-Aided Project Planning and Management.

Computing in Civil and Building Engineering, pp. 31-38. Proceedings of the

international Symposium on Property Maintenance Management and

Modernisation 7-9 March Singapore

Pfeifer, R., & Scheier, C. (1999). Understanding intelligence. Cambridge, Mass.

London: MIT Press

Prowler Don (2004) Building Commissioning Donald Prowler and Associates

http://www.wbdg.org/design/resource.php?cn=3.8.2&cx=0&rp=8

Rampsey, J. & Roberts, H. (1992) Perspective on toal quality. Procedings of Total

Quality Forum IV, Novermber, Cincinnati, Ohio.

Riley M..J. and Pickering C. J. (1994) A New Automated System for Decision

Support in the Construction Industry Computing in Civil Engineering, pp.

523-530.

Rob Moult and Dave Matasek (2001) Building Automation Maximizing Green

Design through Building Automation Environmental Design and

Construction,

http://www.edcmag.com/edc/cda/articleinformation/features/bnp-features-ite

m

Rob Moult (2002) Roles of a Building Automation System in Maximizing Building

Performance Metasys® Building Automation Systems Johnson Controls,

Controls Group

http://www.johnsoncontrols.com/metasys/articles/article14_copy(1).htm

Page 402: THE INTEGRATION BETWEEN DESIGN AND MAINTENANCE …eprints.qut.edu.au/16058/1/Frank_Lin_Thesis.pdf · the integration between design and maintenance of office building automation:

REFERENCES

384

Roger W. Haines, C. Lewis Wilson (1998) HVAC Systems Design Handbook

McGraw-Hill, pp. 23, 82, 225, 443

Rolf Pfeifer and Christian Scheier (1999) The Study of Intelligence Understanding

Intelligence, pp. 6-12

Roodman D.M. and Lenssen N.(1995) Worldwatch Paper 124. A Building Revolution:

How Ecology and Health Concerns are Transforming Construction.

WorldWatch Institute

Roth, K. W. et al (2002) Energy Consumption Characteristics of Commercial

Building HVAC Systems Volume III: Energy Savings Potential Building

Technologies Program

Satzinger, John. W., Jackson, Robert. B., and Burd, Stephen. D. (2002) Systems

Analysis and Design in Changing World, 2 nd Ed. Thomson Learning, Inc.,

pp. 535-539.

Saunders, M., Lewis, P. and Thornhill, A. (2003). “Research Methods for Business

Students” 2nd Ed. Pearson Education Limited, Prentice Hall England, pp. 380-

411.

Saunders, M., Lewis, P. and Thornhill, A. (2003). “Research Methods for Business

Students” 3rd Ed. Pearson Education Limited, Prentice Hall England, pp. 282.

Sauter, V. L. (1997). Decision support systems: an applied managerial approach.

New York: John Wiley.Scheier, R. P. a. C. (1999). The Study of Intelligence.

In Understanding Intelligence, pp. 6-12.

Scheier, R. P. a. C. (1999). Understanding Intelligence: The MIT Press Cambridge,

Massachusetts London, England.

Scott S. (1997) Making Links between Design and the Construction Process.

Construction Process Re-engineering, pp. 605-614.

Scott Morton, Michael S. (1971) Management decision systems; computer-based

support for decision making. Boston, Division of Research, Graduate School

of Business Administration, Harvard University.

Second National Conference on Building Commissioning (1994) Second National

Conference on Building Commissioning May 9-11, 1994, TradeWinds Resort,

St. Petersburg Beach, FL / organized by Portland Energy Conservation, Inc.

Seeley, I. H. (1976.). Building maintenance (2nd ed.). London: Macmillan.

Seeley, I. H. (1987.). Building maintenance (3rd ed.). [Basingstoke]: Macmillan

Education.

Page 403: THE INTEGRATION BETWEEN DESIGN AND MAINTENANCE …eprints.qut.edu.au/16058/1/Frank_Lin_Thesis.pdf · the integration between design and maintenance of office building automation:

REFERENCES

385

Sekaran U. (2003) Research method for business A skill Building Approach (Fourth

edition), John Wiley & Sons Inc. USA, pp. 63-67, 237-327

Sendler (1996) CAD & Office Integration OLE for Design and Modeling A New

Technology for CA Software

Sieglinde F. (2004) National Institute of Standards and Technology (NIST)

http://www.wbdg.org/design/resource.php?cn=2.3.3&cx=0&rp=6)

Simon, H. (1960) The New Science of Management Decisions. Harper & Row, New

York.

Skidmore, Owings & Merrill (1988a), Energy Application: Guide to the Energy

Program

Skidmore, Owings & Merrill (1988b), HVAC Application: Loads Reference Guide

Skidmore, Owings & Merrill (1988c), HVAC Application: Ducts Reference Guide

Skidmore, Owings & Merrill (1988d), Lighting Application: Lights Reference Guide

Skidmore, Owings & Merrill (1988e), Power Application: Power Reference Guide

Skidmore, Owings & Merrill (1989), Piping Application: Pipes Reference Guide

Skidmore, Owings & Merrill (2004) Freedom Tower LLP 18 Fortune Oct. 2004

Smith, S. and Kandel, A. (1993) Verification and Validation of Rule-Based Expert

Systems CRC Press, Inc., pp.3-11.

So Albert Ting-pat and Chen Wai Lok (1999) Intelligent Building Systems Boston:

Kluwer Academic.

So, T, Tanaka, I., (1990) C&C systems infrastructure, NEC Research and

Development, 96, pp. 13-29

Stephen Drewer, and David Gann (1994) Smart Buildings Facilities, 12(13), pp.

19-24

Sullivan, G. P., Pugh, R., Melendez, A.P., & Hunt, W.D. (2004) The Operations and

Maintenance Best Practices: A Guide to Achieving Operational Efficiency

Pacific Northwest National Laboratory

Sullivan, L. (1896) Das groβe Bürogebäude, künstlerisch betrachtet. In: A.L.

Huxtable. Zeit für Wolkenkratzer oder die Kunst, Hochhäusr Zu bauen.

German

Syal M. G., Grobler F. and Willenbrock J. H. (1991) Computer-based Integration of

Design and Project Controls. Computing in Civil Engineering, pp. 779-788.

Tamblyn et al (1994) Commissioning a School: A Case Study Second National

Conference on Building commissioning, May 9-11, 1994, pp. 9.

Page 404: THE INTEGRATION BETWEEN DESIGN AND MAINTENANCE …eprints.qut.edu.au/16058/1/Frank_Lin_Thesis.pdf · the integration between design and maintenance of office building automation:

REFERENCES

386

Tang Ming Xi (1996) Integration of a Design Concept Learning Scheme within A

Knowledge-Based Design Support System. Computing in Civil Engineering

Proceeding of the third Congress held in Conjunction with AEC Systems.

TCP/IP http://www.webopedia.com/TERM/T/TCP_IP.html

Teicholz Paul and Fischer Martin (1994) Integrated Construction Technology

Journal of Construction Engineering and Management 120 (1), pp. 117-131.

Terry Hoffmann 2004 Intelligent Buildings: Are We Finally Enabled?

http://www.johnsoncontrols.com/metasys/articles/article3.htm

Thabet Walid Y., and Beliveau Yvan J.(1994) Representation of Vertical Constraints

Knowledge for Scheduling Multi-Story Projects. Proceedings of the First

Congress on Computing in Civil, pp. 349-355.

The Journal of Educational Psychology (1921), Vol. 12, pp. 123-147, 195-216

Thompson, E. (1975) “Don’t Shoot the Architect” DOE Building Maintenance 6th

National Building Maintenance Conference, London, November, pp. 33-36.

Tseng, Paul C. (1994) Total Building Commissioning and Construction Quality

Control- The New Perspective for Facility Commissioning Second National

Conference on Building commissioning, May 9-11, 1994, pp. 5.

Turban E. & Aronson, J. E. (2001) Decision Support and Intelligent System (Sixth

Edition) Prentice Hall, pp. 6-69, 94-127, 227-251.

UNEP (2003) Sustainable Building and Construction Industry and Environment

April-September 2003

UNESCO REGIONAL SEMINAR on BAS (1984) Proceedings of Unesco Regional

Seminar on Building Automation System (Management and Energy

Conservation), Faculty of Engineering, University of Malaya, 24th-26th

September 1984.

Usama, M. et al (1996) Advances in Knowlledge Discovery and Data Mining

Amercian Association for Artificial Intelligence AAAI Press/ The MIT Press,

pp. 588.

Vincent, K.O. & Joel, E.R. (1995) Principles of Total Quality, Kogan Page, London.

Welman, Jc, & Kruger, Sj. (2001) “Research Metholody” 2nd Edition Oxford

University Press Southern Africa, pp.182.

Willmott P (2002) The Role of Condition Monitoring in the Context of the

Maintenance Function- What Techniques are Available? Condition

Monitoring- Engineering the Practice, pp. 1-18.

Page 405: THE INTEGRATION BETWEEN DESIGN AND MAINTENANCE …eprints.qut.edu.au/16058/1/Frank_Lin_Thesis.pdf · the integration between design and maintenance of office building automation:

REFERENCES

387

WBDGEIB (2004) Sustainable WBDG Sustainable Committee

http://www.wbdg.org/design/index.php?cn=3.8&cx=0

WBDGHC (2004) Provide Comfortable Environments WBDG

http://www.wbdg.org/design/do-print.php?cn=2.6.5

WBDGII (2004) Integrate Technological Tools WBDG

http://www.wbdg.org/design/do-print.php?cn=2.6.1

WBDGMEC (2004) Minimise Energy Consumption WBDG

http://www.wbdg.org/design/do-print.php?cn=2.8.2

WBDGRS (2004) Assure Reliable Systems and Spaces WBDG

http://www.wbdg.org/design/do-print.php?cn=2.6.2

WDBGSI (2004) Ensure Appropriate Product/ Systems Integration WDBG

http://www.wbdg.org/design/do-print.php?cn=2.4.2

Wood, B. (1999). Intelligent Building Care. Facilities, 17 (5/6), pp. 189-194.

Wood, B. (2000) Sustainable Building Care Facilities management and Maintenance

International Symposium on Management and Maintenance CIBW70

Proceedings Brisbane 2000.

Wordnet 2.0 Overview for “office building”

http://www.cogsci.princeton.edu/cgi-bin/webwn?stage=1&word=office+build

ing

WWW2.6.4.2 Life Cycle Costs & Benefits

http://www.buildingdesign.co.uk/mech/zutec/zutec.html

WWWBAS Building Automation Systems

http://www.advancedbuildings.org/main_t_load_build_automation_sys.htm

LonWorks Building Autoamtion Benefits

http://www.echelon.com/solutions/building/benefits.htm

WWWEC Environment Vocabulary

http://www.tzafonet.org.il/kehil/sviva/envsite/edu/englishbook/appendix-a.do

c

WWWHC Predicted Mean Vote (PMV) control

http://global.daikin.com/global/our_product/sp_Inverter/3_techno.html#daiki

n8

WWWMPO Meet Performance Objectives WBDG

http://www.wbdg.org/design/do-print.php?cn=2.4.3

WWWICT Information and Communication Technology

Page 406: THE INTEGRATION BETWEEN DESIGN AND MAINTENANCE …eprints.qut.edu.au/16058/1/Frank_Lin_Thesis.pdf · the integration between design and maintenance of office building automation:

REFERENCES

388

http://foldoc.doc.ic.ac.uk/foldoc/foldoc.cgi?Information+and+Communication+Tech

nology

WWWLCCA 2004-2005 Whitestone Maintenance & Repair Cost Reference

http://www.whitestoneresearch.com/book-specs.html

WWWMS Maintenance Strategies

http://www.eere.energy.gov/femp/operations_maintenance/strategies/strat_rea

ctive.cfm

Yamazaki Yusuke (1994) An Object-Oriented Process Modelling to Support

Cooperative Planning in Industrialized Building Construction Project.

Computing in Civil Engineering, pp. 998-1004.

Yang, J and Lin, F. (1998) Bridging the Gap Between Design and Planning: A

Knowledge-based Decision Support Approach, Proceedings of 2nd

International Conference on Construction Project Management, Singapore,

pp. 318-25.

Yang, J. (1995) Computer-based Project Information Processing in the Australian

Construction Industry Australian Institute of Building, Papers Vol. 5, pp.

121-134.

Yang, J. (1996) "The Introduction of Information Technology aspects in Construction

Management Curriculum". AEESEAP VI-2, T3-9-1-4.

Yang, J. and Peng, H. (2001) “Decision support to the application of intelligent

building technologies” Renewable Energy 22, pp. 67-77.

Yang, J. and Skitmore, R. M. (1996) “Expert systems for construction management:

is the hype over?” Proceedings of International Conference on Construction

Information Technology, Sydney, pp. 131-6.

Yau N.-J., Melin J. W., Garrett J. H., Jr. and Kim S. (1991) An Environment for

Integrating Building Design, Construction Scheduling, and Cost Estimating.

Proceedings of the Seventh Conference on Computing in Civil Engineering

and Symposium on Data Bases, pp. 222-232.

Yimin Zhu, raja R. A. Issa, and Robert F.Cox (2001) Web-Based Construction

Document Processing Via Malleable Frame Journal of Computing in civil

Engineering V. 15 (3).

Zak, Diane (2002) Programming with Microftsoft Visual Basic. NET Course

Technology, a division of Thomson Learning, Inc.

Page 407: THE INTEGRATION BETWEEN DESIGN AND MAINTENANCE …eprints.qut.edu.au/16058/1/Frank_Lin_Thesis.pdf · the integration between design and maintenance of office building automation:

APPENDICES

The Integration between Design and Maintenance of Office Building Autom

ation: A Decision Support Approach

Appendix A Postal Questionnaire for Design Appendix B Postal Questionnaire for Maintenance Appendix C Case Study Information Appendix D Overview of BAS Design Knowledge Extraction Appendix E Overview of BAS Maintenance Knowledge Extraction Appendix F Demonstration of Pilot System Appendix G Demonstration of the Proptype Decision Support System Appendix H Proptype Decision Support System SBASpro

Page 408: THE INTEGRATION BETWEEN DESIGN AND MAINTENANCE …eprints.qut.edu.au/16058/1/Frank_Lin_Thesis.pdf · the integration between design and maintenance of office building automation:
Page 409: THE INTEGRATION BETWEEN DESIGN AND MAINTENANCE …eprints.qut.edu.au/16058/1/Frank_Lin_Thesis.pdf · the integration between design and maintenance of office building automation:

Appendix A

Appendix A

Postal Questionnaire for Design

The Integration between Design and Maintenance of Office Building Autom

ation: A Decision Support Approach

Page 410: THE INTEGRATION BETWEEN DESIGN AND MAINTENANCE …eprints.qut.edu.au/16058/1/Frank_Lin_Thesis.pdf · the integration between design and maintenance of office building automation:

Appendix A

Page 411: THE INTEGRATION BETWEEN DESIGN AND MAINTENANCE …eprints.qut.edu.au/16058/1/Frank_Lin_Thesis.pdf · the integration between design and maintenance of office building automation:

- 1 -

The aim of the survey is to identify Office Building Design and Maintenance characteristics of Building Automation System (BAS) for the improvement of building performance and design/ maintenance practice”. The survey questions consist of four main parts: The need, Products, Design issues, and Assessment. The information you provide in this survey will be kept strictly confidential and only used for research purposes. This questionnaire can be completed in 10-15 minutes. Please circle related rating or tick appropriate multiple choice (more than one can be chosen).

A. The need: 1. How do you rank the importance of office building BAS to the following people?

People Low-------------------HighClient (occupier) 1 2 3 4 5 Building owner 1 2 3 4 5 Building developer 1 2 3 4 5

2. How do you evaluate the role of BAS and its awareness among design and maintenance?

Role/ Awareness Low-------------------High Role and benefits of BAS on the building operation and maintenance 1 2 3 4 5 Responsibility for building maintenance during the BAS design stage 1 2 3 4 5

3. What are the main considerations during the BAS design stage? Meet regulation Easy operation and maintenance Performance of systems Meet client requirement Others (please specify):________________________________ 4. How do you assess the major factors of consideration during the BAS design stage?

Factors Low-------------------HighRelevant BAS to the performance of the building 1 2 3 4 5 Relevant BAS to the life-cycle cost of the building 1 2 3 4 5 Others (please specify): 1 2 3 4 5

5. How do you realise the requirement and specification of the BAS products?

From statistical information From product manufacturer Feedback from previous use Others (please specify): ___________________

6. How will building regulation and product specification affect the BAS design?

Regulation/Specification Low-------------------HighCurrent building regulation sufficient for BAS design 1 2 3 4 5 Product specification appropriate for design requirement 1 2 3 4 5

SURVEY OF THE BUILDING AUTOMATION SYSTEM (BAS) FOR OFFICE BUILDING IN AUSTRALIA

School of Construction Management and Property Queensland University of Technology

Brisbane, Australia

Page 412: THE INTEGRATION BETWEEN DESIGN AND MAINTENANCE …eprints.qut.edu.au/16058/1/Frank_Lin_Thesis.pdf · the integration between design and maintenance of office building automation:

- 2 -

B. Products: 1. How do you estimate the availability of BAS in the office building?

Products/Information Low-------------------HighBAS products readily available from vendors 1 2 3 4 5 BAS products equipped with adequate performance instructions 1 2 3 4 5

2. How do you weigh up the access of information during the BAS design stage?

Access information Low---------------------High New or to-date information of product 1 2 3 4 5 Sufficient information relating product pros/cons, and application 1 2 3 4 5 Sufficient data on historical records in practical usages 1 2 3 4 5

3. How important on the following measures for BAS design to meet present and future requirement?

Solutions Least--------------------Most Feedback from previous use 1 2 3 4 5 Availability of to-date information 1 2 3 4 5 Communication with facility managers 1 2 3 4 5 Communication with building owners 1 2 3 4 5 Others (please specify): 1 2 3 4 5

4. Do you deliver information or manuals of BAS operation and service to facility managers or

management agency of the buildings? Yes No 5. Do you receive responses from the design/ built building management agency regarding to the BAS

operation and service after buildings delivery? Yes No C. Design issues: 1. How do you rate the importance of BAS in relation to the following systems in an office building?

Systems Low---------------------High HVAC/energy management 1 2 3 4 5 Electrical power/ Lighting system 1 2 3 4 5 Fire/ Security systems 1 2 3 4 5 Lifts/Escalator 1 2 3 4 5 Parking equipment /Parking system 1 2 3 4 5 Water supply/Drainage 1 2 3 4 5 Others: (please specify) 1 2 3 4 5

2. How do you rate the BAS application in the following systems?

Systems Troublesome---Trouble free HVAC/energy management 1 2 3 4 5 Electrical power/ Lighting system 1 2 3 4 5 Fire/ Security systems 1 2 3 4 5 Lifts/Escalator 1 2 3 4 5 Parking equipment /Parking system 1 2 3 4 5 Water supply/Drainage 1 2 3 4 5

Page 413: THE INTEGRATION BETWEEN DESIGN AND MAINTENANCE …eprints.qut.edu.au/16058/1/Frank_Lin_Thesis.pdf · the integration between design and maintenance of office building automation:

- 3 -

3. What is the level of requirement for computer aided design (CAD) or decision support? Need Low---------------------High

CAD based softwares for BAS design 1 2 3 4 5 Decision support tools for BAS design 1 2 3 4 5

4. Which systems are suitable for the integration in BAS to save energy and increase comfort levels?

HVAC Security Lifts/ escalator Fire Parking system Electrical power/ Lighting Others________________

5. For the following aspects, how important in the integration of related BAS?

Importance Low---------------------High Performance/ Effectiveness/ Efficiency 1 2 3 4 5 Energy conservation 1 2 3 4 5 Comfort/ Healthy 1 2 3 4 5 Free maintenance/ Easy management 1 2 3 4 5 Others (Please specify) 1 2 3 4 5

6. Which type of sensors/ type of control do you design for the building automation systems?

Temperature Light Humidity Smoke Air Pressure Others___________

7. How do you weigh scales in relation to the technical and client requirement on the cost and

performance aspects? Situations Low---------------------High

Consistency between designers and building developers 1 2 3 4 5 Sufficient support in relation to the cost and performance of BAS 1 2 3 4 5

D. Assessment: 1. How do you assess the following factors in relation to BAS?

Factors Low---------------------High Applicable BAS meeting with the requirement of clients 1 2 3 4 5 Performance/ efficiency of BAS after delivery 1 2 3 4 5 Available and sufficient instruction/ manual during the delivery stage 1 2 3 4 5 Balance of BAS cost between design requirements and client’s budget 1 2 3 4 5 Availability of the evaluation tools for BAS 1 2 3 4 5

2. How do you rank the reasons resulting in poor BAS performance?

Reasons Low---------------------High Lack of instruction 1 2 3 4 5 Inappropriate operation 1 2 3 4 5 Improper maintenance 1 2 3 4 5 Design deficiency/shortage 1 2 3 4 5 Unsuitable material/elements/systems application 1 2 3 4 5 Others (Please specify): 1 2 3 4 5

Page 414: THE INTEGRATION BETWEEN DESIGN AND MAINTENANCE …eprints.qut.edu.au/16058/1/Frank_Lin_Thesis.pdf · the integration between design and maintenance of office building automation:

- 4 -

3. Please indicate your situation in the following questions: Situations Yes No

Has been provided the to-date instruction of BAS from the vendors or manufactures? Has provided the maintenance suggestion or guidelines to facility managers of buildings or consulting service during the operation?

4. How do you estimate the affection of the following factors to minimize energy consumption?

Key factors Least-----------------Most Energy conservation design in BAS 1 2 3 4 5 Selection of applicable BAS 1 2 3 4 5 Suitable BAS integration 1 2 3 4 5 Adequate operation and maintenance 1 2 3 4 5

5. When/How often do you meet/connect with the building facility managers? Design stage Delivery stage After delivery Problems happening

Never 6. In your opinion how can we improve the relationship and efficiency between BAS design and

maintenance? (Please elaborate) ____________________________________________________________________________________________ ____________________________________________________________________________________________ ____________________________________________________________________________________________ ____________________________________________________________________________________________ ____________________________________________________________________________________________

The following information is optional and will remain confidential at QUT:

Your Name: __________________________________Position:____________________________________

Company:________________________________________________________________________________

Would you like to receive further information on this research? Yes No

Your contact details: ______________________________________________________________________

______________________________________________________________________

Thank you for completing this questionnaire. The time and effort that you have spent is greatly appreciated!

(Please return the completed questionnaire using the prepaid envelope)

Page 415: THE INTEGRATION BETWEEN DESIGN AND MAINTENANCE …eprints.qut.edu.au/16058/1/Frank_Lin_Thesis.pdf · the integration between design and maintenance of office building automation:

Appendix B

Appendix B

Postal Questionnaire for Maintenance

The Integration between Design and Maintenance of Office Building Autom

ation: A Decision Support Approach

Page 416: THE INTEGRATION BETWEEN DESIGN AND MAINTENANCE …eprints.qut.edu.au/16058/1/Frank_Lin_Thesis.pdf · the integration between design and maintenance of office building automation:

Appendix B

Page 417: THE INTEGRATION BETWEEN DESIGN AND MAINTENANCE …eprints.qut.edu.au/16058/1/Frank_Lin_Thesis.pdf · the integration between design and maintenance of office building automation:

- 1 -

The aim of the survey is to identify Office Building Design and Maintenance characteristics of Building Automation System (BAS) for the improvement of building performance and design/ maintenance practice”. The survey questions consist of four main parts: Overall status, Management, Technical issues, Assessment. The information you provide in this survey will be kept strictly confidential and used only for research purposes. This questionnaire can be completed in 10-15 minutes. Please circle related rating or tick appropriate multiple choice (more than one can be chosen). Your response can be based on your general knowledge or experience on a specific office building, such as:

Building date: ____________________________No. of stories:________________________

Location/ Address _____________________________________________________________

A. Overall status: 1. How well does the building function in relation to the use of BAS?

Factors Dissatisfy---------Satisfy 'Smart/intelligent' features of Building Automation System (BAS) 1 2 3 4 5 Comfortable/healthy work environment 1 2 3 4 5 BAS maintenance meeting the design specification 1 2 3 4 5 Energy consumption meets the client requirement 1 2 3 4 5

2. How likely will the following problems occur during the building operation?

Problems/Troubles Least-----------------MostIndividual electrical systems out of order/ malfunctioning 1 2 3 4 5 Individual mechanical systems out of order/ malfunctioning 1 2 3 4 5 Automatic operation/ monitoring systems downtime 1 2 3 4 5

3. What is the chance for the following problems to cause poor BAS performance?

Reasons % Design deficiency/shortage 0 25 50 75 100 Inappropriate operation 0 25 50 75 100 Improper maintenance 0 25 50 75 100 Lacks of instruction 0 25 50 75 100 Unsuitable material/elements/systems 0 25 50 75 100 Others (please specify): 0 25 50 75 100

4. How do you evaluate the influence of the following on BAS maintenance?

Regulation/Specification Ineffective------EffectiveBuilding regulation/codes for BAS management 1 2 3 4 5 Product specification appropriate for BAS maintenance 1 2 3 4 5

SURVEY OF THE BUILDING AUTOMATION SYSTEM (BAS) FOR OFFICE BUILDING IN AUSTRALIA

School of Construction Management and Property Queensland University of Technology

Brisbane, Australia

Page 418: THE INTEGRATION BETWEEN DESIGN AND MAINTENANCE …eprints.qut.edu.au/16058/1/Frank_Lin_Thesis.pdf · the integration between design and maintenance of office building automation:

- 2 -

5. Standard Operation Procedures (SOPs) of maintenance were normally designed / provided by? In house qualified staff Design consultants Maintenance consultants Facility manager Others (please specify): _________________________

6. What are the levels of expectations of clients from BAS on the following issues?

Expectations Low------------------High Feasibility/ Adaptability/ Accessibility 1 2 3 4 5 Friendliness/ Comfort/ Convenience 1 2 3 4 5 Minimisation of energy consumption 1 2 3 4 5 Performance/ Effectiveness/ Responsiveness 1 2 3 4 5

B. Management: 1. Who is responsible for the BAS operation/ service after delivery?

Process (a) In-house qualified staff

(b) Contracted services

(c) Management professional

(d) Others __________

Operation Maintenance Developing/ Reconfiguring

2. How do you evaluate following observations?

Situations Not at all --Very Much So Current instruction/ manual is available and sufficient for BAS management 1 2 3 4 5 Existing integrated BAS is adequate for building operation and maintenance 1 2 3 4 5 BAS integration is strategic for BAS management 1 2 3 4 5

3. How do you evaluate importance of the following issues?

Questions Low-------------------HighChurn rate (number of times employee change work location per year) 1 2 3 4 5 BAS maintenance rate in the office building 1 2 3 4 5 Use of computer applications in facilities management 1 2 3 4 5 Communications between building occupiers and design consultants 1 2 3 4 5

4. Which systems are suitable for the integration on BAS to reflect design and client requirement?

HVAC Security Lifts Fire Electrical power/ Lighting Parking system MBAS Others _____________

5. How do you rate the effectiveness of problem solving?

Effectiveness Least-----------------Most The problem solving procedures 1 2 3 4 5 Dealing with the complaints of building occupants 1 2 3 4 5 Tracking/ solving problems of BAS 1 2 3 4 5

6. Please indicate your situation in the following questions:

Questions Yes NoDo you deliver problems of BAS operation and maintenance to the designers? Do you obtain the applicable instruction from the designers, venders or manufactures? Are there Problems/ complaints feedback from building occupants?

Page 419: THE INTEGRATION BETWEEN DESIGN AND MAINTENANCE …eprints.qut.edu.au/16058/1/Frank_Lin_Thesis.pdf · the integration between design and maintenance of office building automation:

- 3 -

C. Technical issues: 1. How important is the following?

Present situation Least---------------- Most Fan coil units in their own controller 1 2 3 4 5 Controlled humidity in the occupier space 1 2 3 4 5 Energy consumption in relation to HVAC system 1 2 3 4 5

2. How do you estimate the proportions of complaints responding from building users?

Complaints Proportions (%) Not enough fresh air 0 25 50 75 100 Inadequate temperature/ humidity control 0 25 50 75 100 Lack of individual control 0 25 50 75 100 Noise from HVAC system 0 25 50 75 100

3. Please answer the following questions:

Questions Yes NoIs there an overall security system with a secure separate power supply? Does the security system interface with the fire systems and building management systems? (e.g are all closed door automatically released in case of a fire alarm/ direct CCTV cameras?)

4. How do you evaluate importance of the following?

Control/ system Least---------------- Most Maintainability for access control using smart cards or key code or manual ID cards 1 2 3 4 5

How well CCTV presence detectors and archiving in security systems 1 2 3 4 5 5. Which type of sensors used/ type of control usually is applied for the buildings?

Light Temperature Humidity Smoke Air Pressure Others______

D. Assessment: 1. How do you weigh up the availability of information for BAS maintenance?

Availability of information Insufficient----SufficientNew or to-date information of maintenance 1 2 3 4 5 Instruction/ manual for BAS operation and maintenance 1 2 3 4 5 Historic records of BAS operation 1 2 3 4 5

2. How do you estimate the extent of the following factors to minimize energy consumption?

Factors Low-----------------High Energy conservation design in BAS 1 2 3 4 5 Applicable BAS 1 2 3 4 5 Applicable BAS integration 1 2 3 4 5 Adequate operation and maintenance 1 2 3 4 5

Page 420: THE INTEGRATION BETWEEN DESIGN AND MAINTENANCE …eprints.qut.edu.au/16058/1/Frank_Lin_Thesis.pdf · the integration between design and maintenance of office building automation:

- 4 -

3. How often is the BAS evaluation carried out? Monthly Seasonally Half-Yearly Yearly

4. Who will carry the assessment/evaluation of BAS? Facility manager Design consultant Others (Please specify)____________________

5. How do you rate the importance of BAS related to the following systems in office building?

Systems Low-------------------HighHVAC/Energy management system 1 2 3 4 5 Electrical power/ Lighting system 1 2 3 4 5 Fire/ Security system 1 2 3 4 5 Lifts/Escalator 1 2 3 4 5 Parking equipment /Parking system 1 2 3 4 5 Water supply/Drainage 1 2 3 4 5

6. How important are the following factors related to BAS?

Factors Least-----------------Most Applicable BAS meeting with the requirement of clients 1 2 3 4 5 Performance/ efficiency of BAS after delivery 1 2 3 4 5 Balance of BAS cost between design requirements and client’s budget 1 2 3 4 5 Availability of the evaluation tools for BAS 1 2 3 4 5

7. When did you meet/connect with the building/ BAS designers? Design stage Delivery stage After delivery Problems happening Never 8. In your opinion how can we improve the relationship and efficiency between BAS design and

maintenance? (Please elaborate)

____________________________________________________________________________________________ ____________________________________________________________________________________________

____________________________________________________________________________________________

The following information is optional and will remain confidential at QUT:

Your Name: ___________________________________Position____________________________________

Company:_________________________________________________________________________________

Would you like to receive further information on this research? Yes No

Your contact details: ______________________________________________________________________

______________________________________________________________________

Thank you for completing this questionnaire.

The time and effort that you have spent is greatly appreciated!

(Please return the completed questionnaire using the prepaid envelope)

Page 421: THE INTEGRATION BETWEEN DESIGN AND MAINTENANCE …eprints.qut.edu.au/16058/1/Frank_Lin_Thesis.pdf · the integration between design and maintenance of office building automation:

Appendix C

Appendix C

Case Study Information

The Integration between Design and Maintenance of Office Building Autom

ation: A Decision Support Approach

Page 422: THE INTEGRATION BETWEEN DESIGN AND MAINTENANCE …eprints.qut.edu.au/16058/1/Frank_Lin_Thesis.pdf · the integration between design and maintenance of office building automation:

Appendix C

Page 423: THE INTEGRATION BETWEEN DESIGN AND MAINTENANCE …eprints.qut.edu.au/16058/1/Frank_Lin_Thesis.pdf · the integration between design and maintenance of office building automation:
Page 424: THE INTEGRATION BETWEEN DESIGN AND MAINTENANCE …eprints.qut.edu.au/16058/1/Frank_Lin_Thesis.pdf · the integration between design and maintenance of office building automation:

2

Page 425: THE INTEGRATION BETWEEN DESIGN AND MAINTENANCE …eprints.qut.edu.au/16058/1/Frank_Lin_Thesis.pdf · the integration between design and maintenance of office building automation:

3

Page 426: THE INTEGRATION BETWEEN DESIGN AND MAINTENANCE …eprints.qut.edu.au/16058/1/Frank_Lin_Thesis.pdf · the integration between design and maintenance of office building automation:

4

Page 427: THE INTEGRATION BETWEEN DESIGN AND MAINTENANCE …eprints.qut.edu.au/16058/1/Frank_Lin_Thesis.pdf · the integration between design and maintenance of office building automation:

5

Page 428: THE INTEGRATION BETWEEN DESIGN AND MAINTENANCE …eprints.qut.edu.au/16058/1/Frank_Lin_Thesis.pdf · the integration between design and maintenance of office building automation:

6

Page 429: THE INTEGRATION BETWEEN DESIGN AND MAINTENANCE …eprints.qut.edu.au/16058/1/Frank_Lin_Thesis.pdf · the integration between design and maintenance of office building automation:

7

Page 430: THE INTEGRATION BETWEEN DESIGN AND MAINTENANCE …eprints.qut.edu.au/16058/1/Frank_Lin_Thesis.pdf · the integration between design and maintenance of office building automation:

8

Page 431: THE INTEGRATION BETWEEN DESIGN AND MAINTENANCE …eprints.qut.edu.au/16058/1/Frank_Lin_Thesis.pdf · the integration between design and maintenance of office building automation:

9

Page 432: THE INTEGRATION BETWEEN DESIGN AND MAINTENANCE …eprints.qut.edu.au/16058/1/Frank_Lin_Thesis.pdf · the integration between design and maintenance of office building automation:

Appendix D

Appendix D

Overview of

BAS Design Knowledge Extraction

The Integration between Design and Maintenance of Office Building Autom

ation: A Decision Support Approach

Page 433: THE INTEGRATION BETWEEN DESIGN AND MAINTENANCE …eprints.qut.edu.au/16058/1/Frank_Lin_Thesis.pdf · the integration between design and maintenance of office building automation:

Appendix D

Page 434: THE INTEGRATION BETWEEN DESIGN AND MAINTENANCE …eprints.qut.edu.au/16058/1/Frank_Lin_Thesis.pdf · the integration between design and maintenance of office building automation:

Survey Question

Categories

Survey Issues

Survey Codes Survey Objects Estimation Survey Results-

TableSurvey Results-

Graph Data Analysis- Induction Results Induction Codes Deduction Issues

Deduction Knowledge

CodesReasons and Descriptions

Extraction Knowledge

Subjects

Thesis Sections

Titles of the Guidelines

Guideline Codes

Client (occupants) Low/ High

Building owner Low/ High

Building developer Low/ High

Awareness/ benefits Low/ High

Responsibility Low/ High

3. Main considerations in design stage

DA03 Meet regulation/ Easy operation and maintenance/ Performance of systems/ Meet client requirement

Selection BAS is relevant to the performance and cost of the building, especially in relation to the building life-cycle cost. The major considerations with BAS during the design stage include four aspects: easy operation/ maintenance, meeting regulation, performance of systems and meeting client requirements. Conversely, designers were not very interested in the reliability and price or cost of the system during the design stage

DAR03 BAS requirements and specifications KDA0301 Rapid advanced technology and high expectation of the end users have formed the requirements of building.

What is BAS and intelligent building?

§6.2.6 Components of building control system

G007

Building performance Low/ High §6.3.2 Strategies for assuring the reliable systems

G014

Building life-cycle cost

Low/ High §6.4.8 Life Cycle Cost calculation

G033

5. Realisation requirement/ specification

DA05 From statistical information/ From product manufacturer/ Feedback from previous use

Selection The designers obtained the requirements and specifications of the BAS product mainly from the product manufacturer. Alternatively, they accessed from the feedback of previous users, client discussions, consultants’ or sub-contractor’s recommendations and statistical information. The BAS specifications should not only rely on the provision of information from the product manufacturers, but also needs refer to other sources to learn and compare the real status of the application to allow for adequate decision making.

DAR05 The sources of BAS requirements and specifications

KDA0501 The advanced technology and high expectation of the end users have asked the rapid response of the building requirements.

Specify the applicable and constructible BAS specification.

§6.3.2 Requirements of Specification design

G011

Building regulation Low/ High §6.3.2 Tips of specification design G012

Product specification Low/ High §6.4.2 Steps of BAS selection G027

BAS products available

Low/ High Update product information performance and application historic records are needed during the design stage

KDB0101 The BAS design is directly affecting the future building operation and management.

Select applicable and reliable BAS and ensure appropriate products.

§6.3.2 Strategies for assuring the reliable systems

G014 DBR01

DAR01

DAR02

DAR04

DAR06

DB01

1. Importance of BAS to people

DA01

2. Role/ awareness of BAS

DA02

4. Major factors of consideration

DA04

6. Regulation and specification

DA06

1. Availability of BAS

A. The need

B. Products

BAS regulations and product specifications need to compromise and as a basic requirements.

Appendix D: BAS Design Issues: Questionnaire Survey Data Analysis and Knowledge Extraction

The ranking of the importance of office building automation systems (BAS) in relation to the clients, building owners and developers is different. It revealed that the clients and owners of buildings are more interested in BAS than building developers. Generally, the developers were more focused on first costs and sale profits, rather than on the BAS life cycle benefits for the building operation and maintenance

The designers can mostly relate to the benefits of BAS in office building and are aware of the BAS responsibilities for building maintenance during the design stage. The awareness and understanding of benefits and tasks of BAS will create a good design as well as easy maintenance.

Designers consider BAS highly relevant to the performance of building, especially in association with the life-cycle cost. It implies that BAS design, taking into consideration of the life-cycle cost as well as the performance of building, will contribute to maintenance costs reduction.

The current building regulations and BAS product specifications have had the greaest impact on the BAS design. It implies that updated building regulation and product specification would be needed to assure the quality of design. The sources of the regulation and specification should be abundant and updated.

BAS products selection relies on having sufficient information. In practice, the information of BAS products and relevant performance information is readily available and will be provided by the vendors during the design stage.

Raising the awareness of BAS benefits for the building life to the whole building participants.

KDA0101 Some of the participants in the building process are not really recognising what BAS is?

What is BAS?

Raising the awareness of BAS benefits for the building life to the whole building participants.

KDA0201 Some of the participants in the building process are not really recognising what BAS is?

What is BAS?

§6.2.6 Components of building control system

G007

§6.2.6 Components of building control system

G007

BAS performance focus and embed the life- cycle -cost consideration into design.

KDA0401 In the building life cycle, the building performance and costs are equally essential.

Strategies for high performance and life cycle cost considerations

KDA0601 The regulations and specifications are the qualified and standard requirements of the building process and products.

Specify the applicable and constructible BAS specification.

Meet regulationEasy operation and maintenance

Performance of systems

Meet client requirement

Reliability and Invisibility

Price/client

Main consideration during the BAS design ...

0

5

10

15

20

Y Ax

is

he requirement and specification of BAS

2 7.7 7.7 7.72 7.7 7.7 15.48 30.8 30.8 46.22 7.7 7.7 53.84 15.4 15.4 69.24 15.4 15.4 84.64 15.4 15.4 100.0

26 100.0 100.0

From statistFrom produc3+4client discusconsultant, srecommend2+3Total

ValiequencPercenid Perc

umulativPercent

Realise the requi

Realise the requirement

2+3

consultant,

client discussion

3+4

From product mnufact

From statistical inf

Freq

uenc

y

10

8

6

4

2

0

Importance of BAS to clients

HighAbove AverageAverageBelow AverageLow

Freq

uenc

y

20

10

0

Importance of BAS to building owner

HighAbove AverageAverageBelow AverageLow

Freq

uenc

y

12

10

8

6

4

2

0

Importance of BAS to building developer

HighAbove AverageAverageBelow AverageLow

Freq

uenc

y

12

10

8

6

4

2

0

Benefits of BAS on the building operation and maintenance

HighAbove AverageAverageBelow AverageLow

Freq

uenc

y

14

12

10

8

6

4

2

0

4

12

8

11

Responsibility for building maintenance during BAS design stage

HighAbove AverageAverageBelow AverageLow

Freq

uenc

y

14

12

10

8

6

4

2

0

2

10

12

11

BAS to the performance of building

HighAbove AverageAverageBelow AverageLow

Freq

uenc

y

14

12

10

8

6

4

2

0

4

8

12

11

BAS to the life-cycle cost of building

HighAbove AverageAverageBelow AverageLow

Freq

uenc

y

20

10

02

16

6

11

Current building regulation sufficient for BAS design

HighAbove AverageAverageBelow AverageLow

Freq

uenc

y

12

10

8

6

4

2

01

9

10

2

4

Product specification appropriate for design requirement

HighAbove AverageAverageBelow AverageLow

Freq

uenc

y

12

10

8

6

4

2

0

4

6

10

2

4

BAS products readily available from vendors

HighAbove AverageAverageBelow AverageLow

Freq

uenc

y

12

10

8

6

4

2

0

2

8

10

4

2

Im portance of BAS to clients

1 3.81 3.82 7.716 61.56 23.126 100.0

LowBelow AverageAverageAbove AverageHighTotal

Frequency Percent

Importance of BAS to building owner

1 3.81 3.86 23.110 38.58 30.826 100.0

LowBelow AverageAverageAbove AverageHighTotal

Frequency Percent

Importance of BAS to building developer

4 15.410 38.56 23.14 15.42 7.726 100.0

LowBelow AverageAverageAbove AverageHighTotal

Frequency Percent

Benefits of BAS on the building operation and maintenance

1 3.81 3.88 30.812 46.24 15.426 100.0

LowBelow AverageAverageAbove AverageHighTotal

Frequency Percent

Responsibility for building maintenanceduring BAS design stage

1 3.81 3.812 46.210 38.52 7.726 100.0

LowBelow AverageAverageAbove AverageHighTotal

Frequency Percent

BAS to the performance of building

1 3.81 3.812 46.28 30.84 15.426 100.0

LowBelow AverageAverageAbove AverageHighTotal

Frequency Percent

BAS to the life-cycle cost of building

1 3.81 3.86 23.116 61.52 7.726 100.0

LowBelow AverageAverageAbove AverageHighTotal

Frequency Percent

Current building regulation sufficient for BAS design

4 15.42 7.710 38.59 34.61 3.826 100.0

LowBelow AverageAverageAbove AverageHighTotal

Frequency Percent

Product specification appropriate for design requirement

4 15.42 7.710 38.56 23.14 15.426 100.0

LowBelow AverageAverageAbove AverageHighTotal

Frequency Percent

BAS products readily available from vendors

2 7.74 15.410 38.58 30.82 7.726 100.0

LowBelow AverageAverageAbove AverageHighTotal

Frequency Percent

Appendix D page 1 of 5

Page 435: THE INTEGRATION BETWEEN DESIGN AND MAINTENANCE …eprints.qut.edu.au/16058/1/Frank_Lin_Thesis.pdf · the integration between design and maintenance of office building automation:

Performance Information

Low/ High Communication with the product vendors are needed during the design stage.

KDB0102 Keep the information updating will ensure the design can be sustainable for the needs.

Select applicable and reliable BAS and ensure appropriate products.

§6.3.8 Strategies for high performance, energy conservation and comfort

G020

New/ up-to-date information

Low/ High §6.3.2 Requirements of Specification design

G011

product pros/cons Low/ High §6.4.2 Steps of BAS selection G027

historical practical records

Low/ High §6.3.2 Tips for avoiding the pitfalls of BAS selection

G013

Feedback from previous use

Least/ Most Update product information performance and application historic records are needed during the design stage

KDB0301 The BAS design is directly affecting the future building operation and management.

Select applicable and reliable BAS and ensure appropriate products.

§6.3.2 Tips for avoiding the pitfalls of BAS selection

G013

Availability of up-to-date information

Least/ Most

Communication with building owners and facility managers

Least/ Most

Communication with building owners

Least/ Most

4. Deliver information

DB04 Deliver information Yes/ No According to the responses, it is not compulsorily to request the designers to deliver information or manuals of BAS operation and service to the facility managers or management agency of the building. The provision of the information and service support impacts on the practical maintenance after building delivery, hence it is necessary to build a systematic system or approach to provide support and service.

DBR04 BAS design and maintenance beyond the basic regulations and codes can optimise the building performance and service.

KDB0401 The basic regulations and codes are the base of the practice, only beyond them can dominate to meet the needs of end users.

Building process integration

§6.2.1 Principles of the integration G001

5. Responses/ feedback

DB05 Responses/ feedback Yes/ No Moreover, the feedback from the facilities managers in relation to the current status does not become a necessary procedure in the operation and maintenance process, so historical records can not be effectively utilised. Meanwhile, the timely support and service may also not be available and is reflected in the new design and application. Therefore, both sides- design and maintenance would need a strategy to bridge and compensate this shortcoming.

DBR05 Integration of building process are possible alternative for the building management.

KDB0501 The integration has been recognised as the potential strategies either in the systems integration or in the building process integration.

Building process integration

§6.2.3 Responsibilities and capabilities of design and maintenance

G003

HVAC/energy management

Low/ High §6.3.9 Strategies for Energy Efficient HVAC Design

G021

Electrical power/ Lighting system

Low/ High §6.3.8 Strategies for high performance, energy conservation and comfort

G020

Fire/ Security systems Low/ High §6.3.13 Strategies for security/ fire system design and maintenance

G025

Requirements of Specification design

G011 Relationship enhancement between designers and building participants are helpful to the building service and application

KDB0302 The closely relationships can interdigitate enhancements and learn between the different parties.

Building process integration

The BAS design is critically be affected by several factors including the feedback from previous users, availability of up-to-date information, communication with building owners and the facility managers. From the designer’s responses, it reflects that the BAS design requires effective information including relevant information and feedback, and communication with the practical maintenance personnel to collect information.

DB033. Importance to meet requirement

DBR03

Building systems has been the major players of the office buildings

KDC0101 The various building systems has recognised that may satisfy the needs of the occupants and as the premises of the office buildings.

BAS and intelligent building, and their benefits.

DBR02

DCR01

2. Access of information

DB02

DC011. Systems importance

C. Design issues

g g g

The designers can easily access new or current information in relation to the product pros/cons and applications, however the historical records in practical usages are likely to be insufficient for the designers. It shows that historical records are not easily kept and updated, and that there is a need for an effective method to collation and storage.

The building systems such as HVAC, electrical power/ lighting system Fire/ security systems and lifts/escalator are both independent and interrelated. These are more complicated and important than the parking equipment/ parking systems and water supply/ drainage system in the office building. All of the systems need to be adequately designed and maintained to ensure overall building performance and a comfortable environment to meet the occupants’ expectations during the life of the building.

§6.3.2

Update product information performance and application historic records are needed during the design stage

KDB0201 The BAS design is directly affecting the future building operation and management.

Select applicable and reliable BAS and ensure appropriate products.

BAS products equipped with adequate performance instructions

HighAbove AverageAverageBelow AverageLow

Freq

uenc

y

20

10

0 12

16

43

New or to-date information of product

HighAbove AverageAverageBelow AverageLow

Freq

uenc

y

20

10

02

16

6

11

Sufficient information relating productpro/cons, and application

2 7.74 15.48 30.8

11 42.31 3.8

26 100.0

LowBelow AverageAverageAbove AverageHighTotal

Frequency Percent

Sufficient information relating product pro/cons, and application

HighAbove AverageAverageBelow AverageLow

Freq

uenc

y

12

10

8

6

4

2

01

11

8

4

2

Sufficient data on historical records in practical usages

HighAbove AverageAverageBelow AverageLow

Freq

uenc

y

14

12

10

8

6

4

2

0 1

3

12

4

6

Feedback from previous use for BAS design

1 3.81 3.810 38.510 38.54 15.426 100.0

LeastLessFairlyMoreMostTotal

Frequency Percent

Feedback from previous use for BAS design

MostMoreFairlyLessLeast

Freq

uenc

y

12

10

8

6

4

2

0

4

1010

11

Sufficient data on historical records in practical usages

6 23.14 15.412 46.23 11.51 3.826 100.0

LowBelow AverageAverageAbove AverageHighTotal

Frequency Percent

Availability of up-to-date information for BAS design

2 7.74 15.44 15.4

10 38.56 23.1

26 100.0

LeastLessFairlyMoreMostTotal

Frequency Percent

Availability of up-to-date information for BAS design

MostMoreFairlyLessLeast

Freq

uenc

y

12

10

8

6

4

2

0

6

10

44

2

Communication with facility managers

MostMoreFairlyLessLeast

Freq

uenc

y

12

10

8

6

4

2

0

4

10

6

4

2

Communication with facility managers

2 7.74 15.46 23.110 38.54 15.426 100.0

LeastLessFairlyMoreMostTotal

Frequency Percent

Communication with building owners

1 3.83 11.510 38.510 38.52 7.726 100.0

LeastLessFairlyMoreMostTotal

Frequency Percent

Communication with building owners

MostMoreFairlyLessLeast

Freq

uenc

y

12

10

8

6

4

2

0

2

1010

3

1

Deliver information or manuals of BAS to maintenance

13 50.013 50.026 100.0

YesNoTotal

Frequency Percent

Deliver information or manuals of BAS to maintenance

NoYes

Freq

uenc

y

14

12

10

8

6

4

2

0

1313

Response from maintenance

15 57.711 42.326 100.0

YesNoTotal

Frequency Percent

Response from maintenance

NoYes

Freq

uenc

y

16

14

12

10

8

6

4

2

0

11

15

Importance of HVAC/energy management

1 3.83 11.52 7.76 23.1

14 53.826 100.0

LowBelow AverageAverageAbove AverageHighTotal

Frequency Percent

Importance of HVAC/energy management

HighAbove AverageAverageBelow AverageLow

Freq

uenc

y

16

14

12

10

8

6

4

2

0

Importance of Electrical pow er/lighting system

1 3.81 3.84 15.42 7.7

18 69.226 100.0

LowBelow AverageAverageAbove AverageHighTotal

Frequency Percent

Importance of Electrical power/lighting system

HighAbove AverageAverageBelow AverageLow

Freq

uenc

y

20

10

0

Importance of Fire/security systems

2 7.74 15.44 15.44 15.412 46.226 100.0

LowBelow AverageAverageAbove AverageHighTotal

Frequency Percent

Importance of Fire/security systems

HighAbove AverageAverageBelow AverageLow

Freq

uenc

y

14

12

10

8

6

4

2

0

BAS products equipped with adequateperformance instructions

3 11.54 15.416 61.52 7.71 3.826 100.0

LowBelow AverageAverageAbove AverageHighTotal

Frequency Percent

New or up-to-date information of product

1 3.81 3.86 23.1

16 61.52 7.7

26 100.0

LowBelow AverageAverageAbove AverageHighTotal

Frequency Percent

Appendix D page 2 of 5

Page 436: THE INTEGRATION BETWEEN DESIGN AND MAINTENANCE …eprints.qut.edu.au/16058/1/Frank_Lin_Thesis.pdf · the integration between design and maintenance of office building automation:

Lifts/Escalator Low/ High §6.3.8 Strategies for high performance, energy conservation and comfort

G020

Parking equipment /Parking system

Low/ High §6.3.13 Strategies for security/ fire system design and maintenance

G025

Water supply/Drainage

Low/ High §6.3.9 Strategies for Energy Efficient HVAC Design

G021

HVAC/energy management

Seriously Troublesome/ Trouble free

§6.3.9 Strategies for Energy Efficient HVAC Design

G021

Electrical power/ Lighting system

Seriously Troublesome/ Trouble free

§6.3.11 Strategies for minimizing energy consumption

G023

Fire/ Security systems Seriously Troublesome/ Trouble free

§6.3.13 Strategies for security/ fire system design and maintenance

G025

Lifts/Escalator Seriously Troublesome/ Trouble free

§6.3.8 Strategies for high performance, energy conservation and comfort

G020

Parking equipment /Parking system

Seriously Troublesome/ Trouble free

§6.3.13 Strategies for security/ fire system design and maintenance

G025

Water supply/Drainage

Seriously Troublesome/ Trouble free

§6.3.11 Strategies for minimizing energy consumption

G023

CAD based softwares Low/ High §6.2.4 Attributes of high-performance and energy conservation office building

G004

Decision support tools Low/ High §6.2.4 Attributes of high-performance and energy conservation office building

G004

4. Integration suitability

DC04 Security/ Lifts/ escalator/ Fire/ Parking system/ Electrical power/ Lighting system

Selection The integration between different building systems has several benefits such as increasing their effectiveness, decreasing energy consumption, increasing comfort, etc. In the survey, the HVAC, electrical power/ lighting systems, security system, and lifts/escalator have been shown as being more suitable than fire and parking systems for the integration. It implies that system integration, if adequate and effective, will facilitate energy conservation, security and safety, and comfort. It alsorelates to the need for adequate coverage of these aspects in design and maintenance practice.

DCR04 Building systems integration are helpful for the building management.

KDC0401 Integration the different systems has produced good outcomes for the building service.

Building system Integration

§6.3.4 Strategies for systems integration

G015

Performance/ Effectiveness/ Efficiency

Low/ High §6.3.9 Strategies for Energy Efficient HVAC Design

G021

Energy conservation Low/ High §6.3.12 Strategies for promoting healthy and comfortable environments

G024

Objectives of the BAS integration

Needs the BAS design and decision support computerised tools in the building process.

Electrical building systems are more complicate than mechanical systems need more maintenance and management.

KDC0201 Electrical operation is an invisible environment needed to operate and take care preventively.

Strategies for sustainable maintenance

Computerised tools are good assistants for the practice; moreover, the building projects are more complicate for meeting the needs.

ICT and DSS applications

DCR02

DCR03

DCR05

DC02

DC03

DC055. Importance of integration

3. Need for CAD/ decision support

2. System’s problem

The requirement of decision support tools for BAS design has gained a high ranking in the level of necessity as well as in the computer aided design (CAD) utilisation in practice. Hence, the development of decision support tools to compare with what CAD has done to ease design decision making.

The application of the parking equipment /parking systems, water supply/drainage systems are normally more troublesome than the other building systems. However HVAC system presents the more critical problems during the service than the others. Problems such as shutdown and malfunction will result in the discomfortable of occupants and complaints. Therefore, in addition to adequate design, maintenance should be scheduled in conjuction with the execution of the appropriate maintenance strategies.

In spite of the variation of the integration requirements, generally, there are several general functionalities such as performance, effectiveness, efficiency, energy conservation, and comfort/ health. In this survey, these are as important as the free maintenance or easy management during the integration process in office buildings.

KDC0501 These objectives are the expectations of the end users.

Strategies for smart design for high performance and optimising operation and maintenance

KDC0301

HVAC

Security

Lif ts/EscalatorFire Parking systemElectrical power/Lighting system

Shading systemNatural lighting system

Ventilation system

System Integration

0

5

10

15

20

25

Freq

uenc

y

Importance of lifts/escalator

1 3.81 3.86 23.18 30.810 38.526 100.0

LowBelow AverageAverageAbove AverageHighTotal

Frequency Percent

Importance of lifts/escalator

HighAbove AverageAverageBelow AverageLow

Freq

uenc

y

12

10

8

6

4

2

0

mportance of parking equipment/parking system

2 7.76 23.18 30.86 23.14 15.4

26 100.0

LowBelow AverageAverageAbove AverageHighTotal

Frequency Percent

Importance of parking equipment/parking system

HighAbove AverageAverageBelow AverageLow

Freq

uenc

y

10

8

6

4

2

0

Importance of water supply/drainage

2 7.72 7.712 46.22 7.78 30.826 100.0

LowBelow AverageAverageAbove AverageHighTotal

Frequency Percent

Importance of water supply/drainage

HighAbove AverageAverageBelow AverageLow

Freq

uenc

y

14

12

10

8

6

4

2

0

Application of HVAC

4 15.42 7.710 38.56 23.14 15.426 100.0

Seriouly troublesomeMost troublesomeTroublesomeFew troubleTrouble freeTotal

Frequency Percent

Application of HVAC

Trouble freeFew trouble

TroublesomeMost troublesome

Seriouly troublesome

Freq

uenc

y

12

10

8

6

4

2

0

Application of Electrical Pow er/ lighting system

1 3.81 3.812 46.28 30.84 15.426 100.0

Seriouly troublesomeMost troublesomeTroublesomeFew troubleTrouble freeTotal

Frequency Percent

Application of Electrical Power/ lighting system

Trouble freeFew trouble

TroublesomeMost troublesome

Seriouly troublesome

Freq

uenc

y

14

12

10

8

6

4

2

0

Application of Fire/ security systems

1 3.81 3.814 53.88 30.82 7.726 100.0

Seriouly troublesomeMost troublesomeTroublesomeFew troubleTrouble f reeTotal

Frequency Percent

Application of Fire/ security systems

Trouble freeFew trouble

TroublesomeMost troublesome

Seriouly troublesome

Freq

uenc

y

16

14

12

10

8

6

4

2

0

Application of lifts/escalator

1 3.83 11.512 46.28 30.82 7.726 100.0

Seriouly troublesomeMost troublesomeTroublesomeFew troubleTrouble f reeTotal

Frequency Percent

Application of lifts/escalator

Trouble freeFew trouble

TroublesomeMost troublesome

Seriouly troublesome

Freq

uenc

y

14

12

10

8

6

4

2

0

Application of parking equipment/parking system

1 3.83 11.518 69.22 7.72 7.726 100.0

Seriouly troublesomeMost troublesomeTroublesomeFew troubleTrouble f reeTotal

Frequency Percent

Application of parking equipment/parking system

Trouble freeFew trouble

TroublesomeMost troublesome

Seriouly troublesome

Freq

uenc

y

20

10

0

Application of water supply/drainage

1 3.85 19.216 61.52 7.72 7.726 100.0

Seriouly troublesomeMost troublesomeTroublesomeFew troubleTrouble freeTotal

Frequency Percent

Application of water supply/drainage

Trouble freeFew trouble

TroublesomeMost troublesome

Seriouly troublesome

Freq

uenc

y

20

10

0

Requirement of CAD

2 7.72 7.7

12 46.22 7.78 30.8

26 100.0

LowBelow AverageAverageAbove AverageHighTotal

Frequency Percent

Requirement of CAD

HighAbove AverageAverageBelow AverageLow

Freq

uenc

y

14

12

10

8

6

4

2

0

Requirement of Decision support system

2 7.72 7.712 46.24 15.46 23.126 100.0

LowBelow AverageAverageAbove AverageHighTotal

Frequency Percent

Requirement of Decision support system

HighAbove AverageAverageBelow AverageLow

Freq

uenc

y

14

12

10

8

6

4

2

0

Importance of performance/ effectiveness/efficiency to the integration of BAS

1 3.81 3.86 23.16 23.112 46.226 100.0

LowBelow AverageAverageAbove AverageHighTotal

Frequency Percent

Importance of performance/ effectiveness/ efficiency to the integratio

HighAbove AverageAverageBelow AverageLow

Freq

uenc

y

14

12

10

8

6

4

2

0

mportance of energy conservation to the integration of BAS

1 3.81 3.82 7.7

10 38.512 46.226 100.0

LowBelow AverageAverageAbove AverageHighTotal

Frequency Percent

Importance of energy conservation to the integration of BAS

HighAbove AverageAverageBelow AverageLow

Freq

uenc

y

14

12

10

8

6

4

2

0

Appendix D page 3 of 5

Page 437: THE INTEGRATION BETWEEN DESIGN AND MAINTENANCE …eprints.qut.edu.au/16058/1/Frank_Lin_Thesis.pdf · the integration between design and maintenance of office building automation:

Comfort/ Healthy Low/ High

Free maintenance/ Easy management

Low/ High §6.2.5 Benefits of the process integration

G006

6. sensor type control application

DC06 Temperature/ Light/ Humidity/ Smoke/ Air/ Pressure

Selection Among the various types of sensors, the major control applications are temperature, smoke/ air and light sensor, the second preference is for humidity sensors, and pressure sensors. It becomes obvious that the major controls are the HVAC, fire safety and lighting systems for energy conservation, safety and comfort.

DCR06 Sensor controls are the key component in BAS

KDC0601 Sensors are one of the major elements in BAS, which play a key role in the sensitive response the change and meets the needs.

Sensors in relation with BAS

§6.4.7 Schedule of Checklist for sensor and actuator maintenance

G032

Consistency between designers/ developers

Low/ High §6.3.14 Guidelines for the applications of LCCA

G026

Technical support Low/ High §6.2.3 Responsibilities and capabilities of design and maintenance

G003

BAS meeting requirement

Low/ High §6.4.7 Schedule of Checklist for sensor and actuator maintenance

G032

Performance/ efficiency

Low/ High §6.3.9 Strategies for Energy Efficient HVAC Design

G021

Instruction/ manual Low/ High

Balance of BAS cost between design requirements and client’s budget

Low/ High

Evaluation tools for BAS

Low/ High §6.4.5 Checklist for BAS commissioning

G030

Lack of instruction Low/ High Building maintenance needs applicable strategies

KDD0201 Various strategies of maintenance have their specific purpose and have their pros and cons, limitations and advantages.

Select suitable building maintenance strategies.

Inappropriate operation

Low/ High

Improper maintenance

Low/ High §6.4.6 Checklist for BAS maintenance

G031

Design deficiency/ shortage

Low/ High §6.4.3 Checklist for BAS design

G028

Unsuitable material/elements/systems

Low/ High §6.4.4 Checklist for BAS installation

G029

Lacks of communication and the sufficient support in relation to the cost and performance of BAS between designers and developers.

BAS design needs to embed the maintenance consideration.

DCR07

DDR01

DDR02

DD01

DD02

DC077. Cost and performance

2. Reasons of poor performance

1. Assessment D. Assessment

The designers and building developers have different concerns about cost and performance. There is little consistency aspects of cost, or technical support in relation to performance. Generally, the designers are more focussed on performance and the developers are focussed on the costs.

Evaluating the BAS design practice, it was found that the requirements of clients are mostly met either in the performance/ efficiency after delivery or in the instruction manuals during the delivery stage, as well as the balance of BAS cost between design requirements and client’s budget. However, concerning the availability of evaluation tools, designers are dissatisfied with the current status for assessing the BAS. Thus the applicability of BAS might not effectively reflect the real situation.

The major reasons causing poor BAS performance, include: lack of instruction, inappropriate operation, improper maintenance, and a design deficiency/ shortage. Nonetheless, owing to insufficient historical data, it is physically difficult to assess the situation in relation to unsuitable materials, elements and systems application. It implies that historical records are needed for effective assessement and management during the building process. In addition, to sustain high performance in building systems, design is as important as maintenance.

KDC0701 lacks of the applicable plateform and support for communication between designers and developers.

Communication and integration, decision support

Building system evaluation is the major step to verify the high building performance and energy conservation

KDD0101 Evaluation has the functions such as qualify the building present state, upgrade the systems examine the performance of the systems and facilitate the energy conservation.

Building assessment, optimising the operation and maintenance practice.

KDD0202 Design activities are directly impact on the life time operation and maintenance.

Select applicable and reliable BAS and products.

§6.3.2 Requirements of Specification design

G011

§6.3.2 Requirements of Specification design

G011

Im portance of comfort/ healthy to the integration of BAS

1 3.83 11.54 15.410 38.58 30.826 100.0

LowBelow AverageAverageAbove AverageHighTotal

Frequency Percent

Importance of comfort/ healthy to the integration of BAS

HighAbove AverageAverageBelow AverageLow

Freq

uenc

y

12

10

8

6

4

2

0

Importance of free maintenance/ easymanagement to the integration of BAS

4 15.42 7.72 7.712 46.26 23.126 100.0

LowBelow AverageAverageAbove AverageHighTotal

Frequency Percent

Importance of free maintenance/ easy management to the integration o

HighAbove AverageAverageBelow AverageLow

Freq

uenc

y

14

12

10

8

6

4

2

0

Type of sensor/ control design for BAS

4 15.46 23.12 7.72 7.74 15.44 15.42 7.72 7.7

26 100.0

1+21+2+41+3+4+5+61+51+41+2+3+4+5+61+2+3+4+51+2+4+5Total

Frequency Percent

Type of sensor/ control design for BAS

1+2+4+51+2+3+4+5

1+2+3+4+5+61+4

1+51+3+4+5+6

1+2+41+2

Freq

uenc

y

7

6

5

4

3

2

1

0

Consistency betw een designers adn building developers

2 7.78 30.88 30.84 15.44 15.4

26 100.0

LowBelow AverageAverageAbove AverageHighTotal

Frequency Percent

Consistency between designers adn building developers

HighAbove AverageAverageBelow AverageLow

Freq

uenc

y

10

8

6

4

2

0

44

88

2

Sufficient support to the cost and performance of BAS

2 7.74 15.4

14 53.85 19.21 3.8

26 100.0

LowBelow AverageAverageAbove AverageHighTotal

Frequency Percent

Sufficient support to the cost and performance of BAS

HighAbove AverageAverageBelow AverageLow

Freq

uenc

y

16

14

12

10

8

6

4

2

0 1

5

14

4

2

Applicable BAS meeting with the requiement of clients

1 3.81 3.810 38.54 15.410 38.526 100.0

LowBelow AverageAverageAbove AverageHighTotal

Frequency Percent

Applicable BAS meeting with the requiement of clients

HighAbove AverageAverageBelow AverageLow

Freq

uenc

y

12

10

8

6

4

2

0

Performance/ efficiency of BAS after delivery

1 3.81 3.8

10 38.510 38.54 15.4

26 100.0

LowBelow AverageAverageAbove AverageHighTotal

Frequency Percent

Performance/ efficiency of BAS after delivery

HighAbove AverageAverageBelow AverageLow

Freq

uenc

y

12

10

8

6

4

2

0

Available and sufficient instruction/ manualduring the delivery stage

1 3.81 3.8

10 38.510 38.54 15.4

26 100.0

LowBelow AverageAverageAbove AverageHighTotal

Frequency Percent

Available and sufficient instruction/ manual during the delivery stag

HighAbove AverageAverageBelow AverageLow

Freq

uenc

y

12

10

8

6

4

2

0

Balance of BAS cost between designrequirements and client's budget

1 3.81 3.812 46.24 15.48 30.826 100.0

LowBelow AverageAverageAbove AverageHighTotal

Frequency Percent

Balance of BAS cost between design requirements and client's budget

HighAbove AverageAverageBelow AverageLow

Freq

uenc

y

14

12

10

8

6

4

2

0

Availability of the evaluation tools for BAS

1 3.83 11.5

12 46.28 30.82 7.7

26 100.0

LowBelow AverageAverageAbove AverageHighTotal

Frequency Percent

Availability of the evaluation tools for BAS

HighAbove AverageAverageBelow AverageLow

Freq

uenc

y

14

12

10

8

6

4

2

0

Lack of instruction- Reason resulting inpoor BAS performance

1 3.81 3.88 30.86 23.110 38.526 100.0

LowBelow AverageAverageAbove AverageHighTotal

Frequency Percent

Lack of instruction- Reason resulting in poor BAS performance

HighAbove AverageAverageBelow AverageLow

Freq

uenc

y

12

10

8

6

4

2

0

Inappropriate operation- Reason resulting inpoor BAS performance

2 7.73 11.59 34.68 30.84 15.426 100.0

LowBelow AverageAverageAbove AverageHighTotal

Frequency Percent

Inappropriate operation- Reason resulting in poor BAS performanc

HighAbove AverageAverageBelow AverageLow

Freq

uenc

y

10

8

6

4

2

0

Improper maintenance- Reason resulting inpoor BAS performance

1 3.81 3.810 38.510 38.54 15.426 100.0

LowBelow AverageAverageAbove AverageHighTotal

Frequency Percent

Improper maintenance- Reason resulting in poor BAS performance

HighAbove AverageAverageBelow AverageLow

Freq

uenc

y

12

10

8

6

4

2

0

Design defficiency/ shortage- Reasonresulting in poor BAS performance

2 7.76 23.16 23.18 30.84 15.4

26 100.0

LowBelow AverageAverageAbove AverageHighTotal

Frequency Percent

Design defficiency/ shortage- Reason resulting in poor BAS performa

HighAbove AverageAverageBelow AverageLow

Freq

uenc

y

10

8

6

4

2

0

Unsitable mater ial/ elements/ systems application-Reason resulting in poor BAS performance

2 7.74 15.416 61.52 7.72 7.726 100.0

LowBelow AverageAverageAbove AverageHighTotal

Frequency Percent

Unsitable material/ elements/ systems application- Reason resulting i

HighAbove AverageAverageBelow AverageLow

Freq

uenc

y

20

10

0

Appendix D page 4 of 5

Page 438: THE INTEGRATION BETWEEN DESIGN AND MAINTENANCE …eprints.qut.edu.au/16058/1/Frank_Lin_Thesis.pdf · the integration between design and maintenance of office building automation:

Instruction from the vendors

Yes/ No §6.2.1 Principles of the integration

G001

Suggestion or guidelines

Yes/ No §6.2.5 Benefits of the process integration

G006

Energy conservation design

Least/ Most How to optimise the high building performance and energy conservation?

KDD0401 High performance and energy conservation are the needs of the end users during the building life.

The status of office building and BAS application

§6.3.11 Strategies for minimizing energy consumption

G023

Selection BAS Least/ Most §6.4.2 Steps of BAS selection G027

BAS integration Least/ Most §6.3.3 Strategies for systems integration

G015

Adequate operation and maintenance

Least/ Most §6.3.5 Strategies for optimising design and maintenance

G017

5.Communication with facility managers

DD05 Design stage/ Delivery stage/ After delivery/ Problems happening/ Never

Selection The communication between different parties in the building process affects the effectiveness of the building service. In practice, from the survey, it was found that the designers normally meet with the building facility managers during the design and delivery stages, or as problems occur, but rarely provides life-cycle service after building delivery.

DDR05 How to promote the relationships between different parities of the building process?

KDD0501 The closely relationships can interdigitate enhancements and learn between the different parties, and improve the problems and effective supports.

Building process integration

§6.4.3 Checklist for BAS design

G028

DDR04

DDR03

DD04

DD03

4. Affection to energy consumption

3. Information support

Adequate operation and maintenance are commonly recognised along with environmentally friendly design as being able to improve energy conservation. In addition to factors such as the selection of the applicable BAS, suitable BAS integration is also crucially in minimising energy consumption. Energy conservation is an overall result of the energy saving attempts, and relies on the process integration such as design with maintenance, and system integration such as BAS with building systems to enhance the integral efficiencies.

The provision of up-to-date instructions on the use of BAS from the vendors or manufactures is not very satisfactory to the designers. They passively provide maintenance suggestions or guidelines to the facility managers of buildings or provide a consulting service. It reflects that the longitudinal integration between such diverse professionals as designers, products providers and facility managers in building industry is not sufficient to provide support and communication during the operation and maintenance processes. So the process integration across the different phases such as design and maintenance has the potential to facilitate the communication and support which will improve BAS applications.

Building process integration needs enhancement in the practice.

KDD0301 It is still a challenge for the traditional building process, expectantly the process integration will breakthrough the neck bottle of the practice in the life cycle considerations.

Building process integration

How to enhance the well operation and maintenance?

KDD0402 Operation and maintenance are the major process of the building service that are in relation to the building performance and energy conservation.

Strategies for sustainable maintenance and security/ fire system design

0

5

10

15

20

Design stage

Deliver y stage

After deliver y

Problems

happening

Never

obtian the to-date instruction of BAS from the vendors or manufactur

NoYes

Freq

uenc

y

16

14

12

10

8

6

4

2

0

12

14

Provide the maintenance suggestion or guidelines to facility manager

NoYes

Freq

uenc

y

16

14

12

10

8

6

4

2

0

14

12

obtian the up-to-date instruction of BASfrom the vendors or manufactures

14 53.812 46.226 100.0

YesNoTotal

Frequency Percent

Provide the maintenance suggestion orguidelines to facility managers of buildingsor consulting service during the operation

12 46.214 53.826 100.0

YesNoTotal

Frequency Percent

Energy conservation design in BASto minimize energy consumption

1 3.81 3.82 7.78 30.8

14 53.826 100.0

LeastLessFairlyMoreMostTotal

Frequency Percent

Energy conservation design in BAS to minimize energy consumptio

MostMoreFairlyLessLeast

Freq

uenc

y

16

14

12

10

8

6

4

2

0

Selection of applicable BAS to minimize energy consumption

1 3.81 3.812 46.26 23.16 23.126 100.0

LeastLessFairlyMoreMostTotal

Frequency Percent

Selection of applicable BAS to minimize energy consumption

MostMoreFairlyLessLeast

Freq

uenc

y

14

12

10

8

6

4

2

0

Suitable BAS integration to minimize energy consumption

1 3.83 11.512 46.22 7.78 30.826 100.0

LeastLessFairlyMoreMostTotal

Frequency Percent

Suitable BAS integration to minimize energy consumption

MostMoreFairlyLessLeast

Freq

uenc

y

14

12

10

8

6

4

2

0

Adequate opearation and maintenanceto minimize energy consumption

1 3.81 3.8

12 46.22 7.7

10 38.526 100.0

LeastLessFairlyMoreMostTotal

Frequency Percent

Adequate opearation and maintenance to minimize energy consumpt

MostMoreFairlyLessLeast

Freq

uenc

y

14

12

10

8

6

4

2

0

Appendix D page 5 of 5

Page 439: THE INTEGRATION BETWEEN DESIGN AND MAINTENANCE …eprints.qut.edu.au/16058/1/Frank_Lin_Thesis.pdf · the integration between design and maintenance of office building automation:

Appendix E

Appendix E

Overview of

BAS Maintenance Knowledge Extraction

The Integration between Design and Maintenance of Office Building Autom

ation: A Decision Support Approach

Page 440: THE INTEGRATION BETWEEN DESIGN AND MAINTENANCE …eprints.qut.edu.au/16058/1/Frank_Lin_Thesis.pdf · the integration between design and maintenance of office building automation:

Appendix E

Page 441: THE INTEGRATION BETWEEN DESIGN AND MAINTENANCE …eprints.qut.edu.au/16058/1/Frank_Lin_Thesis.pdf · the integration between design and maintenance of office building automation:

Survey Question

CategoriesSurvey Issues Survey

Codes Survey Objects Estimation Survey Results- Table

Survey Results- Graph Data Analysis- Induction Results Induction

Codes Deduction IssuesDeduction Knowledge

CodesReasons and Descriptions

Extraction Knowledge

Subjects

Thesis Sections Titles of the Guidelines Guideline

Codes

Smart/ intelligent' features

Dissatisfied/ Very Satisfied

1. Smart and intelligent building and BAS are commonly accepted by the building occupantsand maintenance professionals.

KMA0101 Smart and intelligent buildings provide the methods and equipments to satisfy the needs of users.

What is intelligent building with BAS?

§6.2.6 Components of building control system

G007

Comfortable/ healthy Dissatisfied/ Very Satisfied

2.The requirements of the comfortable/ healthy environment are needed.

KMA0102 Office buildings should be maintained to sustain the comfortable and healthy workplace to meet the needs

How to sustain the comfort and healthy requirements?

§6.3.12 Strategies for promoting healthy and comfortable environments

G024

BAS maintenance Dissatisfied/ Very Satisfied

3. The BAS maintenance is currently not really meeting the design intentions.

KMA0103 Either the design specifications and functions are not effectively informed to the maintainers or they are less competency of facilities maintenance.

What is BAS and their functions? Current situation and future development.

§6.2.6 Components of building control system

G007

Energy consumption Dissatisfied/ Very Satisfied

4. The energy consumption is still a challenge for the client expectations.

KMA0104 Lacks of the energy conservation design or strategies to minimise the energy consumption.

How to minimise the energy consumption?

§6.3.11 Strategies for minimizing energy consumption

G023

Electrical systems Least/ Most §6.3.5 Strategies for optimising operation and maintenance

G017

Mechanical systems Least/ Most §6.3.5 Strategies for optimising operation and maintenance

G017

Automatic operation/ monitoring systems

Least/ Most §6.3.5 Strategies for optimising operation and maintenance

G017

Design deficiency/ shortage

Selections 1.Needs an applicable operation and maintenance instruction.

KMA0301 The operation and maintenance instructions are the basic documents for action and management.

How to optimise operation and maintenance practice?

§6.3.5 Strategies for optimising operation and maintenance

G017

Inappropriate operation Selections 2.Training of maintenance is needed. KMA0302 Sustainable competencies of maintenance rely on the regular trainingsuch as on- job training.

Strategies for sustainable maintenance

§6.3.6 Strategies for selection maintenance strategy

G018

Improper maintenance Selections §6.3.3 Strategies for systems integration

G015

Lacks of instruction Selections §6.3.3 Strategies for systems integration

G015

Unsuitable material/ elements/systems

Selections §6.3.3 Strategies for systems integration

G015

Building regulation/ codes

Ineffective/ Very Effective

Selection of applicable and reliable BAS products

§6.3.2 Tips for avoiding the pitfalls of BAS selection

G013

Product specification Ineffective/ Very Effective

Strategies for high performance buildings

§6.3.8 Strategies for high performance, comfort and energy conservation

G020

In practice, it has generally been recognised that the reasons for poor BAS performance mainly include inappropriate operation, improper maintenance, lack of instruction, design deficiency/ shortage and unsuitable systems, but the last reason would have less affect than the previous four reasons. Operation and maintenance (O/M) requires on-going support and service during the building life. In addition to design deficiencies, inappropriate O/M as well as the lack of support primarily affects the BAS performance.

Building maintainers generally are satisfied with ‘smart/ intelligent’ features of the Building Automation System (BAS) and a comfortable/ healthy work environment, as well as with the BAS maintenance; but are unlikely to be satisfied with the energy conservation required to comply with the occupant’s expectations. It implies that BAS functions can improve the comfort and ease of undertaking the maintenance tasks. However, energy conservation is still a challenge.

MAR04

MAR03

MA01

MA02

MA03

MA04

1.BAS function

2.Problems/ Troubles

3.Reasons of poor BAS performance

4.Regulations and Specifications

The problems of building systems can be categorised into three classes as electrical, mechanical and control/ monitoring problems including individual electrical systems out of order/ malfunctioning, individual mechanical systems out of order/ malfunctioning, and automatic operation/ monitoring systems downtime. The result of surveys associated with the some dissatisfaction with the BAS maintenance could be reflection of the lack of historical data and good management to reveal the real maintenance situation.

Appendix E: BAS Maintenance Issues: Questionnaire Survey Data Analysis and Knowledge Extraction

The well conditions of the office building reflect that the performance and the problems preventing can be through the good maintenance and management.

KMA0201 Office buildings can be maintained to sustain the performance of building, and comfortable and healthy workplace to meet the needs

How to optimise operation and maintenance?

MAR02

MAR01A. Overall status

Basically, the building regulations/codes and product specification directly influence the BAS operation and maintenance tasks. In the survey, it is confirmed that these instructions are effective for the O/M process. However, to meet with the increasing expectations of occupants, the O/M of BAS needs more information on current product application, pros/ cons, and historical data to work effectively.

3.BAS design is still needed to be enhanced. KMA0303 BAS can be designed well to meet with the needs in the light of the rapid growing technology innovation and products development.

Strategies for smart design and systems integration

Building codes and specifications are the base of optimising the BAS .

KMA0401 To optimise the building performance need to over enhance the requirements by using the reliable BAS products.

Sm art/intelligent features of BAS

1 6.32 12.55 31.32 12.56 37.516 100.0

DissatisfiedSomewhat Satisf iedSatisf iedFairly Satisf iedVery Satisf iedTotal

Frequency Percent

Smart/intelligent features of BAS

Very Satisfied

Fair ly Satisfied

Satisfied

Somew hat Satisfied

Dissatisfied

Freq

uenc

y

7

6

5

4

3

2

1

0

Comfortable/ healthy work environment

1 6.31 6.34 25.06 37.54 25.0

16 100.0

Dissatisf iedSomewhat Satisf iedSatisf iedFairly Satisf iedVery Satisf iedTotal

Frequency Percent

Comfortable/ healthy work environment

Very Satisfied

Fair ly Satisfied

Satisfied

Somew hat Satisfied

Dissatisfied

Freq

uenc

y

7

6

5

4

3

2

1

0

BAS maintenance meeting the design specification

1 6.35 31.32 12.52 12.56 37.516 100.0

Dissatisf iedSomewhat Satisf iedSatisf iedFairly Satisf iedVery Satisf iedTotal

Frequency Percent

BAS maintenance meeting the design specification

Very Satisfied

Fair ly Satisfied

Satisfied

Somew hat Satisfied

Dissatisfied

Freq

uenc

y

7

6

5

4

3

2

1

0

Energy comsumption meets the client requirement

1 6.36 37.52 12.56 37.51 6.316 100.0

Dissatisf iedSomewhat Satisf iedSatisf iedFairly Satisf iedVery Satisf iedTotal

Frequency Percent

Energy comsumption meets the client requirement

Very Satisfied

Fair ly Satisfied

Satisfied

Somew hat Satisfied

Dissatisfied

Freq

uenc

y

7

6

5

4

3

2

1

0

ndividual electrical systems out of order/ malfunctioning

2 12.510 62.52 12.51 6.31 6.3

16 100.0

LeastLessFairlyMoreMostTotal

Frequency Percent

Individual electrical systems out of order/ malfunctioning

MostMoreFairlyLessLeast

Freq

uenc

y

12

10

8

6

4

2

0

ndividual mechancial systems out of order/malfunctioning

4 25.06 37.54 25.01 6.31 6.316 100.0

LeastLessFairlyMoreMostTotal

Frequency Percent

Individual mechancial systems out of order/malfunctioning

MostMoreFairlyLessLeast

Freq

uenc

y

7

6

5

4

3

2

1

0

Automatic operation/ monitor ing systems downtime

4 25.08 50.02 12.51 6.31 6.316 100.0

LeastLessFairlyMoreMostTotal

Frequency Percent

Automatic operation/ monitoring systems downtime

MostMoreFairlyLessLeast

Freq

uenc

y

10

8

6

4

2

0

Design deficiency/ shortage

1 6.35 31.32 12.54 25.04 25.0

16 100.0

0%25%50%75%100%Total

Frequency Percent

Design deficiency/ shortage

100%75%50%25%0%

Freq

uenc

y

6

5

4

3

2

1

0

Inappropriate operation

1 6.32 12.52 12.5

10 62.51 6.3

16 100.0

0%25%50%75%100%Total

Frequency Percent

Inappropriate operation

100%75%50%25%0%

Freq

uenc

y

12

10

8

6

4

2

0

Improper maintenance

1 6.31 6.32 12.511 68.81 6.316 100.0

0%25%50%75%100%Total

Frequency Percent

Improper maintenance

100%75%50%25%0%

Freq

uenc

y

12

10

8

6

4

2

0

Lacks of instruction

1 6.31 6.32 12.510 62.52 12.516 100.0

0%25%50%75%100%Total

Frequency Percent

Lacks of instruction

100%75%50%25%0%

Freq

uenc

y

12

10

8

6

4

2

0

Unsuitable material/ element/ systems

2 12.56 37.54 25.02 12.52 12.516 100.0

0%25%50%75%100%Total

Frequency Percent

Unsuitable material/ element/ systems

100%75%50%25%0%

Freq

uenc

y

7

6

5

4

3

2

1

0

Building regulation/ codes for BAS management

Very Effective

Effective

Average

Somew hat Eff ective

Ineffective

Freq

uenc

y

8

6

4

2

0

Building regulation/ codes for BAS management

2 12.51 6.37 43.85 31.31 6.3

16 100.0

Inef fectiveSomewhat EffectiveAverageEffectiveVery EffectiveTotal

Frequency Percent

Product specification appropriate for BAS maintennace

1 6.31 6.38 50.05 31.31 6.3

16 100.0

IneffectiveSomew hat EffectiveAverageEffectiveVery EffectiveTotal

Frequency Percent

Product specification appropriate for BAS maintennace

Very Ef fective

Effective

Average

Somew hat Ef fective

Ineffective

Freq

uenc

y

10

8

6

4

2

0

Appendix E Page 1 of 5

Page 442: THE INTEGRATION BETWEEN DESIGN AND MAINTENANCE …eprints.qut.edu.au/16058/1/Frank_Lin_Thesis.pdf · the integration between design and maintenance of office building automation:

5.Standard Operation Procedures (Sops) provided

MA05 In-house qualified staff Design consultants Maintenance consultants Facility manager

Selections Standard Operation Procedures (SOPs) of O/M are essential. With these, the regular O/M tasks can be executed consistently and effectively. SOPs can be generated as the need arises in accordance with the requirements. In practice, SOPs are mainly designed/ provided by design consultants and maintenance consultants. On the other hand, some of SOPs are prepared by facility managers and design-construction mechanical contractors

MAR05 BAS designers should extend their service for the building life to sustain the quality of the building systems.

KMA0501 Technical competencies need to continue training and supports by the designers and related professionals suchas the product manufacturers and BAS professionals.

Strategies for high performance, energy conservation and comfort

§6.3.5 Strategies for optimising operation and maintenance

G017

Feasibility/ Adaptability/ Accessibility

Low/ High §6.2.4 Attributes of high-performance and energy conservation office building

G004

Friendliness/ Comfort/ Convenience

Low/ High §6.2.4 Attributes of high-performance and energy conservation office building

G004

Minimisation of energy consumption

Low/ High §6.3.8 Attributes of high-performance and energy conservation office building

G020

Performance/ Effectiveness/ Responsiveness

Low/ High §6.3.8 Attributes of high-performance and energy conservation office building

G020

Operation Not at all --Definitely

BAS operations need applicable support and maintenance instruction to sustain the quality of the buildings.

KMB0101 BAS operation and maintenance instruction can direct the correct and consistent process.

Strategies for sustainable maintenance

§6.2.3 Responsibilities and capabilities of design and maintenance

G003

Maintenance Not at all --Definitely

§6.3.6 Strategies for selection maintenance strategy

G018

Developing/ Reconfiguring

Not at all --Definitely

§6.3.6 Strategies for selection maintenance strategy

G018

Current instruction/ manual

Not at all --Definitely

The BAS instruction and manual are needed updated to keep effectiveness.

KMB0201 Updated BAS instruction and manual can enhance the effective operation and maintenance.

Optimise the operation and maintenance practices

§6.3.5 Strategies for optimising operation and maintenance

G017

Existing integrated BAS Not at all --Definitely

§6.3.3 Strategies for systems integration

G015

BAS integration strategy Not at all --Definitely

§6.3.4 Strategies for integrating with infrastructure

G016

Churn rate Low/ High BAS effective maintenance are needed to easethe implement.

KMB0301 Free or effective maintenance can facilitate the performance of buildings and save the costs as well.

Select suitable maintenance strategies

§6.3.6 Strategies for selection maintenance strategy

G018

Maintenance rate Low/ High Computer aided management are needed. KMB0302 Computer aided support can promote the effectiveness and performance of building systems, and management as well.

ICT and DSS application and support

§6.3.6 Strategies for selection maintenance strategy

G018

Computer applications Low/ High §6.2.3 Responsibilities and capabilities of design and maintenance

G003

Communications occupiers/ design consultants

Low/ High §6.2.1 Principles of the integration G001

In the office building maintenance stage, several indicators such as churn rate (number of times employee change work location per year) and maintenance rate are reflected in the maintenance costs. Those are mostly the concern of the building maintainers. Generally, the application of computers in facilities management is not very popular. In addition, the communications between building occupiers and design consultants are relative poor. It appears that the facilities maintenance and management did not get help from the computer application or support from the design consultants.

MBR02Evaluating current BAS management, the current O/M instruction/ manual has been found sufficient. The existing integrated BAS is less adequate for building operation and maintenance, furthermore, the BAS integration strategy is not very supportive of BAS management. It implies that the current systems integration is not adequately performing their functions and potential integration benefits.

After building delivery, the responsibilities of BAS can be divided into three parts: operation, maintenance and developing/ reconfiguring. The BAS operation relies on in house qualified staff. The maintenance and developing/ reconfiguring tasks mostly rely on the contract services, and partly on management professionals.

MBR01

MAR06

Communications between building maintainers and designers are need to enhance.

KMB0303 Relationships between designand maintenance

The relatively communications are helpful for the operation and maintenance between designers and maintainers, and feedbacks from the maintainers are also promoting the well design.

MA06

MB01

3.Importance

6.Expectations of clients

1.Responsibility

2.Evaluation

B. Management

MB02

MB03 MBR03

Under the rapidly changing environments and the increasing expectations of clients, the occupants are highly demanding of the building functions and performance as well as energy conservation and comfort.

Office buildings should sustain the requirements of the high performance and energy conservation and comfort.

KMA0601 To facilitate the high performance and energy conservation and comfort can meet the expectations of the end users.

Strategies for high performance, energy conservation and comfort

Selection BAS contracted and management professionals are critical for the building life.

KMB0102 The right selection of maintenance contractors and professionals can ensure the quality of the building maintenance.

Select suitable professionals

BAS system integration is needed to improve and increase the awareness of benefits.

KMB0202 BAS integration are essential for the office building which can facilitate the performance and energy conservation and comfort.

Building system integration

D e s i g

n

c o n s u

l t a n t s

4 0 %

M a i n t

e n a n c

e

c o n s u

l t a n t s

3 0 %

F a c i l i

t y

ma n a g

e r

2 0 %

D e s i g

n &

c o n s t

r u c t i

o n

me c h a

Expectations of clients from BAS feasibility/adaptability/ accessibility

1 6.31 6.32 12.54 25.08 50.016 100.0

LowBelow AverageAverageAbove AverageHighTotal

Frequency Percent

Expectations of clients from BAS feasibility/ adaptability/ accessibili

HighAbove AverageAverageBelow AverageLow

Freq

uenc

y

10

8

6

4

2

0

Expectations of clients from BASfriendliness/ comfort/ convience

1 6.31 6.31 6.31 6.312 75.016 100.0

LowBelow AverageAverageAbove AverageHighTotal

Frequency Percent

Expectations of clients from BAS friendliness/ comfort/ convience

HighAbove AverageAverageBelow AverageLow

Freq

uenc

y

14

12

10

8

6

4

2

0

Expectations of clients from BASminimisation of energy consumption

1 6.31 6.32 12.52 12.510 62.516 100.0

LowBelow AverageAverageAbove AverageHighTotal

Frequency Percent

Expectations of clients from BAS minimisation of energy consumptio

HighAbove AverageAverageBelow AverageLow

Freq

uenc

y

12

10

8

6

4

2

0

Expectations of clients from BASperformance/ effectiveness/ responsiveness

1 6.31 6.31 6.33 18.8

10 62.516 100.0

LowBelow AverageAverageAbove AverageHighTotal

Frequency Percent

Expectations of clients from BAS performance/ effectiveness/ respons

HighAbove AverageAverageBelow AverageLow

Freq

uenc

y

12

10

8

6

4

2

0

operation responsibility for BAS

12 75.02 12.5

2 12.5

16 100.0

In-house qualif ied staf fcontracted servicesmanagementprofessionalTotal

Frequency Percent

operation responsibility for BAS

management prof essio

contracted services

In-house qualif ied s

Freq

uenc

y

14

12

10

8

6

4

2

0

maintenance responsibility for BAS

2 12.512 75.0

2 12.5

16 100.0

In-house qualif ied staffcontracted servicesmanagementprofessionalTotal

Frequency Percent

maintenance responsibility for BAS

management prof essio

contracted services

In-house qualif ied s

Freq

uenc

y

14

12

10

8

6

4

2

0

Developping/ reconfiguring responsibility for BAS

2 12.59 56.3

5 31.3

16 100.0

In-house qualif ied staf fcontracted servicesmanagementprofessionalTotal

Frequency Percent

Developping/ reconfiguring responsibility for BAS

management prof essio

contracted services

In-house qualif ied s

Freq

uenc

y

10

8

6

4

2

0

current instruction/ manual is available andsufficient for BAS management

2 12.52 12.52 12.56 37.54 25.016 100.0

Not at allSomewhat SoFairlyMoreDefinitelyTotal

Frequency Percent

current instruction/ manual is available and sufficient for BAS manage

DefinitelyMoreFairlySomew hat SoNot at all

Freq

uenc

y

7

6

5

4

3

2

1

0

Existing integrated BAS is adequate forbuilding operation and maintenance

1 6.32 12.56 37.56 37.51 6.316 100.0

Not at allSomewhat SoFairlyMoreDefinitelyTotal

Frequency Percent

Existing integrated BAS is adequate for building operation and mainten

DefinitelyMoreFairlySomew hat SoNot at all

Freq

uenc

y

7

6

5

4

3

2

1

0

BAS integration is strategic for BAS management

1 6.36 37.54 25.04 25.01 6.316 100.0

Not at allSomew hat SoFairlyMoreDefinitelyTotal

Frequency Percent

BAS integration is strategic for BAS management

DefinitelyMoreFairlySomew hat SoNot at all

Freq

uenc

y

7

6

5

4

3

2

1

0

Churn rate (number of times employeechange work location per year)

1 6.31 6.312 75.01 6.31 6.316 100.0

LowBelow AverageAverageAbove AverageHighTotal

Frequency Percent

Churn rate (number of times employee change work location per yea

HighAbove AverageAverageBelow AverageLow

Freq

uenc

y

14

12

10

8

6

4

2

0

BAS maintenance rate in the office building

1 6.32 12.56 37.56 37.51 6.316 100.0

LowBelow AverageAverageAbove AverageHighTotal

Frequency Percent

BAS maintenance rate in the office building

HighAbove AverageAverageBelow AverageLow

Freq

uenc

y

7

6

5

4

3

2

1

0

Use of computer applications in facilities management

2 12.54 25.04 25.02 12.54 25.0

16 100.0

LowBelow AverageAverageAbove AverageHighTotal

Frequency Percent

Use of computer applications in facilities management

HighAbove AverageAverageBelow AverageLow

Freq

uenc

y

5

4

3

2

1

0

Communications between buildingoccupies and design consultants

2 12.54 25.04 25.04 25.02 12.516 100.0

LowBelow AverageAverageAbove AverageHighTotal

Frequency Percent

Communications between building occupies and design consultants

HighAbove AverageAverageBelow AverageLow

Freq

uenc

y

5

4

3

2

1

0

Appendix E Page 2 of 5

Page 443: THE INTEGRATION BETWEEN DESIGN AND MAINTENANCE …eprints.qut.edu.au/16058/1/Frank_Lin_Thesis.pdf · the integration between design and maintenance of office building automation:

4.System Integration MB04 HVAC/ Security/Lifts/Fire/Electrical power/ Lighting/ Parking system/MBAS

Selections Among the building systems, to meet the design requirements and client expectations, the systems suitable for integration include electrical power/ lighting, security system, lifts/escalator, fire system, and HVAC, there is less need for the parking system to be integrated.

MBR04 Building systems integration is advantageous for the building management and performanceenhancement.

KMB0401 The benefits of the systems integration can facilitate the building performance and save the life cycle costs.

Building systems integration §6.3.3 Strategies for systems integration

G015

The problem solving procedures

Least/ Most §6.3.12 Strategies for promoting healthy and comfortable environments

G024

Dealing complaints Least/ Most §6.3.12 Strategies for promoting healthy and comfortable environments

G024

Tracking solving problems

Least/ Most §6.3.12 Strategies for promoting healthy and comfortable environments

G024

Deliver problems Yes/ No BAS designers should sustain their service forthe building life to sustain the quality of the building systems.

KMB0601 Building life service are needed to effectively minimise the life cycle costs.

Building process integration §6.2.5 Benefits of the process integration

G006

Applicable instruction Yes/ No §6.2.1 Principles of the integration G001

Problems/ complaints feedback

Yes/ No §6.2.5 Benefits of the process integration

G006

Fan coil control Least/ Most §6.3.12 Strategies for promoting healthy and comfortable environments

G024

Humidity Control Least/ Most §6.3.12 Strategies for promoting healthy and comfortable environments

G024

Energy consumption Least/ Most §6.3.12 Strategies for promoting healthy and comfortable environments

G024

Complaints Not enough fresh air

0%/ 100% §6.3.12 Strategies for promoting healthy and comfortable environments

G024

Inadequate temperature/ humidity control

0%/ 100% §6.3.12 Strategies for promoting healthy and comfortable environments

G024

Lack of individual control

0%/ 100% §6.3.12 Strategies for promoting healthy and comfortable environments

G024

Noise from HVAC system

0%/ 100% §6.3.12 Strategies for promoting healthy and comfortable environments

G024

MC01

MC022.Responses

5.Problem Solving

6.Situation

1.Importance C. Technical issues

MB05

MB06

MCR01

MBR06

MBR05

MCR02

The surveys have shown that the building maintainers are mostly concerned with the effectiveness of problem solving procedures for dealing with the complaints of building occupants, and tracking/ solving problems of BAS. It proves that most occupant complaints are due to discomfort, which can be the caused by ineffective problem solving, tracking and dealing with complaints. Thus, customer orientation is important as well as sustainable maintenance.

The building maintainers have obtained the applicable instructions from the designers, venders or manufactures, as well as feedback of the problems/ complaints from building occupants as well. Conversely they did not relatively deliver problems in relation to BAS operation and maintenance to the designers.

In practice, office buildings occupants biggest concerns are the fan coil units equipped with individual controllers and humidity control in their space. Especially, they regard energy conservation as a critical consideration in relation to HVAC operation. The expectation of comfort is also important for the occupants. It is important at the same time to reduce energy consumption.

Most occupants of the office buildings are concerned about inadequate temperature/ humidity control, lack of individual control and air quality, likewise the noise from HVAC system has not been a worry. It implies that the occupants expect to be able to control the working environment of their own occupied space to increase the comfort, and do not expect to have acoustic noise complaints.

The problem solving procedures, dealing with the complaints and tracking problem solving are core issues of the building management.

KMB0501 Dealing with the problems and complaints are basic requirement for ensuring the comforts.

Promote healthy, comfortable and sustainable environments

Feedback from the building maintainers to the designers is needed.

KMB0602 Feedback can present reference for building system design and support.

Relationships between designand maintenance

Equipped with applicable individual controls for HVAC are important for meeting the comfort and energy conservation.

KMC0101 Individual controls are not only enhancing the personal comfort and needs, but also minimising the energy consumption.

Promote health, comfort and sustainable environments

Various individual controls for HVAC are needed to facilitate the comfort and energy conservation.

KMC0201 Individual controls are not only facilitating the personal comfort and needs, but also minimising the energy consumption.

Promote health, comfort and sustainable environments

Systems suitable for the integration on BA

Systems suitable for the integration on BAS to reflect design

1+2+3+4+52+3+4+5

1+52+3+4+5+6

1+2+3+4+5+6

Freq

uenc

y

5

4

3

2

1

0

The problem solving procedures

1 6.32 12.56 37.56 37.51 6.316 100.0

LeastLessFairlyMoreMostTotal

Frequency Percent

The problem solving procedures

MostMoreFairlyLessLeast

Freq

uenc

y

7

6

5

4

3

2

1

0

Dealing with the complaints of building occupants

1 6.33 18.84 25.06 37.52 12.5

16 100.0

LeastLessFairlyMoreMostTotal

Frequency Percent

Dealing with the complaints of building occupants

MostMoreFairlyLessLeast

Freq

uenc

y

7

6

5

4

3

2

1

0

Tracking/ solving problems of BAS

1 6.32 12.54 25.08 50.01 6.316 100.0

LeastLessFairlyMoreMostTotal

Frequency Percent

Tracking/ solving problems of BAS

MostMoreFairlyLessLeast

Freq

uenc

y

10

8

6

4

2

0

Deliver problems of BAS operationand maintenance to the designers

8 50.08 50.0

16 100.0

YesNoTotal

Frequency Percent

Deliver problems of BAS operation and maintenance to the designers

NoYes

Freq

uenc

y

10

8

6

4

2

0

Obtain the applicable instruction from thedesigners, vendeers or manufactures

10 62.56 37.516 100.0

YesNoTotal

Frequency Percent

Obtain the applicable instruction from the designers, vendeers or man

NoYes

Freq

uenc

y

12

10

8

6

4

2

0

Problems/ complaints feedback from building occupants

13 81.33 18.8

16 100.0

YesNoTotal

Frequency Percent

Problems/ complaints feedback from building occupants

NoYes

Freq

uenc

y

14

12

10

8

6

4

2

0

Fan coil units in their own controller

4 25.02 12.56 37.53 18.81 6.316 100.0

LeastLessFairlyMoreMostTotal

Frequency Percent

Fan coil units in their own controller

MostMoreFairlyLessLeast

Freq

uenc

y

7

6

5

4

3

2

1

0

Controlled humidity in the occupier space

4 25.02 12.54 25.05 31.31 6.316 100.0

LeastLessFairlyMoreMostTotal

Frequency Percent

Controlled humidity in the occupier space

MostMoreFairlyLessLeast

Freq

uenc

y

6

5

4

3

2

1

0

Energy consumption in relation to HVAC system

1 6.31 6.31 6.37 43.86 37.5

16 100.0

LeastLessFairlyMoreMostTotal

Frequency Percent

Energy consumption in relation to HVAC system

MostMoreFairlyLessLeast

Freq

uenc

y

8

6

4

2

0

Complaints- not enough fresh air

2 12.56 37.52 12.55 31.31 6.316 100.0

0%25%50%75%100%Total

Frequency Percent

Complaints- not enough fresh air

100%75%50%25%0%

Freq

uenc

y

7

6

5

4

3

2

1

0

Complaints- inadequate temperature/ humidity control

2 12.52 12.54 25.07 43.81 6.316 100.0

0%25%50%75%100%Total

Frequency Percent

Complaints- inadequate temperature/ humidity control

100%75%50%25%0%

Freq

uenc

y

8

6

4

2

0

Complaints- lack of individual control

1 6.35 31.32 12.57 43.81 6.316 100.0

0%25%50%75%100%Total

Frequency Percent

Complaints- lack of individual control

100%75%50%25%0%

Freq

uenc

y

8

6

4

2

0

Complaints- noise from HVAC system

2 12.510 62.52 12.51 6.31 6.3

16 100.0

0%25%50%75%100%Total

Frequency Percent

Complaints- noise from HVAC system

100%75%50%25%0%

Freq

uenc

y

12

10

8

6

4

2

0

Appendix E Page 3 of 5

Page 444: THE INTEGRATION BETWEEN DESIGN AND MAINTENANCE …eprints.qut.edu.au/16058/1/Frank_Lin_Thesis.pdf · the integration between design and maintenance of office building automation:

Security system/ separated power supply

Yes/ No Security system should be equipped the separated power supply

KMC0301 To ensure the security system can be carried out effectively and independently, the power supply shouldbe separated to avoid the building electrical power shutdown.

Strategies for security system design and maintenance

§6.3.13 Strategies for security/ fire system design and maintenance

G025

Security system interfaced with the fire systems

Yes/ No Security system should be integrated with the fire systems and building management system.

KMC0302 There are interactive relation between security and fire system during the operation.

Strategies for security system/ fire system design and maintenance

§6.3.13 Strategies for security/ fire system design and maintenance

G025

Access control smart cards/key code/ID cards

Least/ Most §6.2.6 Components of building control system

G007

CCTV presence detectors and archiving

Least/ Most §6.2.6 Components of building control system

G007

5.Sensor type control MC05 Light/Temperature/Humidity/Smoke/Air/Pressure

Selections The various sensor controls which are key elements of BAS, such as smoke and temperature sensors are more common in office building applications. Other sensors as humidity, pressure, air and light sensors which are also equipped to increase the occupant’s comfort and decrease energy consumption.

MCR05 The sensors are very helpful to meet the comfort and security requirements should be widely applied.

KMC0501 The functions of the sensor. Sensors in relation with BAS §6.4.7 Schedule of Checklist for sensor and actuator maintenance

G032

Information of maintenance

Insufficient/ Very Sufficient

The update information and sufficient instruction are needed for the operation and maintenance.

KMD0101 Up-to-date information can provide effective operation and maintenance

Smart design for sustainable maintenance

§6.2.4 Attributes of high-performance and energy conservation office building

G004

Instruction/ manual Insufficient/ Very Sufficient

§6.2.4 Attributes of high-performance and energy conservation office building

G004

Historic records Insufficient/ Very Sufficient

§6.2.4 Attributes of high-performance and energy conservation office building

G004

Energy conservation design

Low/ High §6.3.11 Strategies for minimizing energy consumption

G023

Selection Applicable BAS

Low/ High §6.3.2 Strategies for assuring the reliable systems

G014

BAS integration Low/ High §6.3.3 Strategies for systems integration

G015

Adequate operation/ maintenance

Low/ High §6.3.5 Strategies for optimising operation and maintenance

G017

3.Evaluation MD03 Monthly/ Seasonally/ Half-Yearly/ Yearly

Selections In practice, the evaluation of BAS is carried out over different durations categorised as monthly, seasonally, half-yearly, and yearly periods. Normally, it is often done by monthly or yearly. These periods are considered the necessary inspection and maintenance routines in order to sustain the functions of facilities. Normally, the evaluation of BAS should be scheduled to become the regular tasks.

MDR03 The BAS evaluations should be carried out in different periods as necessary.

KMD0301 Applicable evaluation periods can do effectively the maintenance tasks and prevent problems.

Select suitable maintenance strategies

§6.3.6 Strategies for selection maintenance strategy

G018

MD01

MD02

MC03

MC04

2.Minimize energy consumption

4.Access Control System

1.Information of maintenance

D. Assessment

3.Security

MDR01

MCR04

MCR03

The building maintainers are mostly satisfied with the support of new or up-to-date information, sufficient instruction/ manuals for BAS operation and maintenance, and historic records of BAS operations as well. The current maintenance support. It indicates that the support of maintenance is important as well as the historic records which rely on the maintainer and is gathered by computerised aids.

Office buildings are normally accessed by using smart cards, key codes or manual ID cards and have CCTV presence detectors in the security systems

MDR02The maintainers are basically concerned with those factors which minimise energy consumption including the energy conservation design in BAS, applicable BAS, applicable BAS integration and adequate operation/ maintenance

With respect to the security and fire system, an overall security system is generally required and installed with a secure separate power supply for office buildings. In addition, the security system interface is also needed to integrate with the fire systems and building management systems.

Office buildings equipped BAS are helpful for the management

KMC0401 BAS provides tools for office building management.

BAS and building management

The historical records of BAS operation are helpful for the building management.

KMD0102 The benefits of the historical record. Smart design for sustainable maintenance

To minimise the energy consumption will rely on the energy conservation design in BAS, selection applicable BAS, BAS integration and well operation and maintenance.

KMD0201 Those factors are the key issues for the minimisation of the energy consumption.

Strategies for high performance, energy conservation and comfort

Overall security system with a secure separate power supply

13 81.33 18.816 100.0

YesNoTotal

Frequency Percent

Overall security system with a secure separate power supply

NoYes

Freq

uenc

y

14

12

10

8

6

4

2

0

Security system interface with the firesystems and building manageemtn systems

12 75.04 25.0

16 100.0

YesNoTotal

Frequency Percent

Security system inter face with the fire systems and building manageemtn

NoYes

Freq

uenc

y

14

12

10

8

6

4

2

0

Maintainability for access control usingsmart cards or key code or manual ID cards

1 6.31 6.32 12.510 62.52 12.516 100.0

LeastLessFairlyMoreMostTotal

Frequency Percent

Maintainability for access control using smart cards or key code or ma

MostMoreFairlyLessLeast

Freq

uenc

y

12

10

8

6

4

2

0

CCTV presence detectors and archiving in security systems

1 6.31 6.38 50.04 25.02 12.5

16 100.0

LeastLessFairlyMoreMostTotal

Frequency Percent

CCTV presence detectors and archiving in security systems

MostMoreFairlyLessLeast

Freq

uenc

y

10

8

6

4

2

0

New or up-to-date information of maintenance

1 6.33 18.88 50.02 12.52 12.5

16 100.0

Insuff icientSomewhat Suff icientAverageSuff icientVery suff icientTotal

Frequency Percent

New or up-to-date information of maintenance

Very suf ficient

Sufficient

Average

Somew hat Suff icient

Insufficient

Freq

uenc

y

10

8

6

4

2

0

Instruction/ Manual for BAS operation and maintenance

1 6.31 6.34 25.08 50.02 12.5

16 100.0

Insuff icientSomewhat SufficientAverageSuff icientVery suf ficientTotal

Frequency Percent

Instruction/ Manual for BAS operation and maintenance

Very suf ficient

Sufficient

Average

Somew hat Suff icient

Insufficient

Freq

uenc

y

10

8

6

4

2

0

Historic records of BAS opeartation

1 6.33 18.84 25.06 37.52 12.5

16 100.0

Insuff icientSomew hat Suf ficientAverageSuff icientVery suff icientTotal

Frequency Percent

Historic records of BAS opeartation

Very sufficient

Sufficient

Average

Somew hat Sufficient

Insufficient

Freq

uenc

y

7

6

5

4

3

2

1

0

Energy conservation design in BAS

1 6.31 6.32 12.58 50.04 25.016 100.0

LowBelow AverageAverageAbove AverageHighTotal

Frequency Percent

Energy conservation design in BAS

HighAbove AverageAverageBelow AverageLow

Freq

uenc

y

10

8

6

4

2

0

Applicable BAS

1 6.31 6.34 25.09 56.31 6.3

16 100.0

LowBelow AverageAverageAbove AverageHighTotal

Frequency Percent

Applicable BAS

HighAbove AverageAverageBelow AverageLow

Freq

uenc

y

10

8

6

4

2

0

Adequate operation and maintenance

1 6.31 6.32 12.54 25.08 50.016 100.0

LowBelow AverageAverageAbove AverageHighTotal

Frequency Percent

Adequate operation and maintenance

HighAbove AverageAverageBelow AverageLow

Freq

uenc

y

10

8

6

4

2

0

Applicable BAS integration

1 6.31 6.34 25.09 56.31 6.316 100.0

LowBelow AverageAverageAbove AverageHighTotal

Frequency Percent

Applicable BAS integration

HighAbove AverageAverageBelow AverageLow

Freq

uenc

y

10

8

6

4

2

0

BAS evaluation carry out

7 43.82 12.52 12.55 31.316 100.0

MonthlySeasonallyHalf-yearlyYearlyTotal

Frequency Percent

BAS evaluation carry out

Year lyHalf-yearlySeasonallyMonthly

Freq

uenc

y

8

6

4

2

0

Appendix E Page 4 of 5

Page 445: THE INTEGRATION BETWEEN DESIGN AND MAINTENANCE …eprints.qut.edu.au/16058/1/Frank_Lin_Thesis.pdf · the integration between design and maintenance of office building automation:

4.Who assessment/ evaluation

MD04 Facility manager/Design consultant

Selections The BAS evaluation is exclusively the responsibility of the facility manager, or alternatively by the design consultants. The BAS evaluation is the responsibility of the maintenance staff as well as the designers across the whole building process.

MDR04 Well qualified facilities managers are needed and the BAS evaluation tools as well.

KMD0401 They are the main executers for maintaining the building systems, and the evaluation tools can help them to ensure the performance of buildings.

Optimise the operation and maintenance practices

§6.3.5 Strategies for optimising operation and maintenance

G017

HVAC/Energy management

Low/ High §6.2.6 Components of building control system

G007

Electrical power system/Lighting system

Low/ High §6.2.6 Components of building control system

G007

Fire/ Security system Low/ High §6.2.6 Components of building control system

G007

Lifts/Escalator Low/ High §6.2.6 Components of building control system

G007

Parking equipment /Parking system

Low/ High §6.2.6 Components of building control system

G007

Water supply/Drainage Low/ High §6.2.6 Components of building control system

G007

BAS meeting requirement

Least/ Most §6.4.2 Steps of BAS selection G027

Performance/ efficiency Least/ Most §6.3.2 Tips of specification design G012

Balance between requirements/ budget

Least/ Most §6.2.5 Requirements of Specification design

G006

Evaluation tools for BAS

Least/ Most §6.3.2 Tips for avoiding the pitfalls of BAS selection

G013

7.When communication

MD07 Design stage/ Delivery stage/ After delivery/ Problems happening/ Never

Selections The Maintainers of the office building only closely communicated with designers during the design and delivery stages where problem occurred. However, they rarely kept contact with each other after delivery for support in the practical operation and maintenance.

MDR07 Communications between building maintainers and designers are need to enhance, especially after building delivery.

KMD0701 The facilities maintainers can obtain the sufficient support and feedback the building experience to the designers.

Building process and service integration

§6.4.3 Checklist for BAS design G028

MD05

MD06

5.Importance of BAS

6.Importance Assessment

The maintainers consider that the following factors are very significant to the BAS application in the office building, such as applicable BAS which meet the requirement of clients, the performance/ efficiency of BAS after delivery, the balance of BAS costs between the design requirements and the client’s budget, availability of the evaluation tools for BAS.

MDR06

MDR05The building systems as HVAC/energy management systems, electrical power/ lighting systems, fire/ security systems, and lifts/escalator are more important than the parking equipment /parking systems and water supply/drainage systems. The results indicate that the awareness and understanding of the importance of the building systems can result in an integrated solution.

HVAC/ energy management system, electricalpower/ lighting system, fire/ security system and lifts/ escalator are core systems in the office buildings should be particularly focused.

KMD0501 Those building systems are the core systems for the building electrical and mechanical running to provide the service and needs for the occupants.

Building systems and BAS

BAS design and maintenance should focus on the building performance and sustainable evaluation tools, the comfort of the users, and budget balance with the needs.

KMD0601 Application the suitable BAS are not only effective the building operation and maintenance, but also save the initial building costs.

Select applicable and reliable BAS products

0

2

4

6

8

10

12

14Design stage

Delivery stage

After delivery

Problems

happening

Never

0

2

4

6

8

10

12

14

Facility manager Design consultant

Frequency

mportance of HVAC/ Energy management system

1 6.31 6.31 6.35 31.38 50.016 100.0

LowBelow AverageAverageAbove AverageHighTotal

Frequency Percent

Importance of HVAC/ Energy management system

HighAbove AverageAverageBelow AverageLow

Freq

uenc

y

10

8

6

4

2

0

Importance of Electrical power/ Lighting system

1 6.31 6.31 6.33 18.8

10 62.516 100.0

LowBelow AverageAverageAbove AverageHighTotal

Frequency Percent

Importance of Electrical power/ Lighting system

HighAbove AverageAverageBelow AverageLow

Freq

uenc

y

12

10

8

6

4

2

0

Importance of Fire/ Security system

1 6.31 6.34 25.02 12.58 50.0

16 100.0

LowBelow AverageAverageAbove AverageHighTotal

Frequency Percent

Importance of Fire/ Security system

HighAbove AverageAverageBelow AverageLow

Freq

uenc

y

10

8

6

4

2

0

Importance of Lifts/ escalator

1 6.31 6.32 12.54 25.08 50.016 100.0

LowBelow AverageAverageAbove AverageHighTotal

Frequency Percent

Importance of Lifts/ escalator

HighAbove AverageAverageBelow AverageLow

Freq

uenc

y

10

8

6

4

2

0

mportance of Parking equipment/ Parking system

2 12.56 37.54 25.03 18.81 6.316 100.0

LowBelow AverageAverageAbove AverageHighTotal

Frequency Percent

Importance of Parking equipment/ Parking system

HighAbove AverageAverageBelow AverageLow

Freq

uenc

y

7

6

5

4

3

2

1

0

Importance of Water supply/ drainage

4 25.04 25.02 12.54 25.02 12.516 100.0

LowBelow AverageAverageAbove AverageHighTotal

Frequency Percent

Importance of Water supply/ drainage

HighAbove AverageAverageBelow AverageLow

Freq

uenc

y

5

4

3

2

1

0

Applicable BAS meeting with the requirement of clients

1 6.31 6.31 6.37 43.86 37.516 100.0

LeastLessFairlyMoreMostTotal

Frequency Percent

Applicable BAS meeting with the requirement of clients

MostMoreFairlyLessLeast

Freq

uenc

y

8

6

4

2

0

Performance/ efficiency of BAS after delivery

1 6.31 6.31 6.35 31.38 50.016 100.0

LeastLessFairlyMoreMostTotal

Frequency Percent

Performance/ efficiency of BAS after delivery

MostMoreFairlyLessLeast

Freq

uenc

y

10

8

6

4

2

0

Banlance of BAS cost between designrequirements and client's budget

1 6.31 6.32 12.510 62.52 12.516 100.0

LeastLessFairlyMoreMostTotal

Frequency Percent

Banlance of BAS cost between design requirements and client's bud

MostMoreFairlyLessLeast

Freq

uenc

y

12

10

8

6

4

2

0

Availability of the evaluation tools for BAS

1 6.31 6.36 37.56 37.52 12.5

16 100.0

LeastLessFairlyMoreMostTotal

Frequency Percent

Availability of the evaluation tools for BAS

MostMoreFairlyLessLeast

Freq

uenc

y

7

6

5

4

3

2

1

0

Appendix E Page 5 of 5

Page 446: THE INTEGRATION BETWEEN DESIGN AND MAINTENANCE …eprints.qut.edu.au/16058/1/Frank_Lin_Thesis.pdf · the integration between design and maintenance of office building automation:

Appendix F

Appendix F

Demonstration of the Pilot System

The Integration between Design and Maintenance of Office Building Autom

ation: A Decision Support Approach

Page 447: THE INTEGRATION BETWEEN DESIGN AND MAINTENANCE …eprints.qut.edu.au/16058/1/Frank_Lin_Thesis.pdf · the integration between design and maintenance of office building automation:

Appendix F

Page 448: THE INTEGRATION BETWEEN DESIGN AND MAINTENANCE …eprints.qut.edu.au/16058/1/Frank_Lin_Thesis.pdf · the integration between design and maintenance of office building automation:

Appendix F

1. Homepage:

2. Content page:

3. Information retrieval- initial page:

4. Information retrieval- second page:

Page 449: THE INTEGRATION BETWEEN DESIGN AND MAINTENANCE …eprints.qut.edu.au/16058/1/Frank_Lin_Thesis.pdf · the integration between design and maintenance of office building automation:

Appendix F

5. Information retrieval- third page:

6. Information retrieval- fourth page:

7. Retrieval result: (End of the pilot system)

Page 450: THE INTEGRATION BETWEEN DESIGN AND MAINTENANCE …eprints.qut.edu.au/16058/1/Frank_Lin_Thesis.pdf · the integration between design and maintenance of office building automation:

Appendix G

Appendix G

Demonstration of the

Prototype Decision Support System

The Integration between Design and Maintenance of Office Building Autom

ation: A Decision Support Approach

Page 451: THE INTEGRATION BETWEEN DESIGN AND MAINTENANCE …eprints.qut.edu.au/16058/1/Frank_Lin_Thesis.pdf · the integration between design and maintenance of office building automation:

Appendix G

Page 452: THE INTEGRATION BETWEEN DESIGN AND MAINTENANCE …eprints.qut.edu.au/16058/1/Frank_Lin_Thesis.pdf · the integration between design and maintenance of office building automation:

Appendix G

(1) General D/M Quiz: It is an initial warm up step to realise the integration concept and learn the evaluation process of the system.

(2) Evaluation: It can be used to evaluate the BAS design and maintenance issues to verify the concept and practical situations to explore the guidance.

Page 453: THE INTEGRATION BETWEEN DESIGN AND MAINTENANCE …eprints.qut.edu.au/16058/1/Frank_Lin_Thesis.pdf · the integration between design and maintenance of office building automation:

Appendix G

Page 454: THE INTEGRATION BETWEEN DESIGN AND MAINTENANCE …eprints.qut.edu.au/16058/1/Frank_Lin_Thesis.pdf · the integration between design and maintenance of office building automation:

Appendix G

(3) Search: It can be used to search the professionals of the design and maintenance, and guidance of the design and maintenance issues.

Page 455: THE INTEGRATION BETWEEN DESIGN AND MAINTENANCE …eprints.qut.edu.au/16058/1/Frank_Lin_Thesis.pdf · the integration between design and maintenance of office building automation:

Appendix G

(4) Update: It can be used to update the knowledge database of the professional and guidelines, which are updateable for the users to add and modify the information.

(5) Hot Topics: It includes the recent issues of the BAS design and maintenance, which provides the information and research findings for the users

.

Page 456: THE INTEGRATION BETWEEN DESIGN AND MAINTENANCE …eprints.qut.edu.au/16058/1/Frank_Lin_Thesis.pdf · the integration between design and maintenance of office building automation:

Appendix G

(6) Links: It can be links to intranet and internet of the World Wide Web (WWW) for exploring the wide range information.

(7) Help: It includes the introduction and a demo of video clips to demonstrate the operation procedure.

Page 457: THE INTEGRATION BETWEEN DESIGN AND MAINTENANCE …eprints.qut.edu.au/16058/1/Frank_Lin_Thesis.pdf · the integration between design and maintenance of office building automation:
Page 458: THE INTEGRATION BETWEEN DESIGN AND MAINTENANCE …eprints.qut.edu.au/16058/1/Frank_Lin_Thesis.pdf · the integration between design and maintenance of office building automation:

Appendix H

Appendix H

Prototype Decision Support System

SBASpro

The Integration between Design and Maintenance of Office Building Autom

ation: A Decision Support Approach

Page 459: THE INTEGRATION BETWEEN DESIGN AND MAINTENANCE …eprints.qut.edu.au/16058/1/Frank_Lin_Thesis.pdf · the integration between design and maintenance of office building automation:

Appendix H

SBASpro Installation Guide

Attached CD: contains

MS.Net Framework1.1 & SDK packages and

Prototype of Office Building Automation Decision Support Pro (SBASpro )

First Step: Install MS.Net framework

1. Click “dotnetfx.exe” to install, then

2. Click “setup.exe” to install

Second Step: Install SBASpro

1. Click “setup.exe” to install

2. Make and select installation folder: C:\SBASpro\

3. Adjust the screen resolution to 1152 by 864 for the best resolution

Third Step: Apply SBASpro

1. Click “WindowsApplication1” from C:\SBASpro\

2. Help: provides demo of the utilities.