the iocp, the southeast gateway, gi, and the program ...€¦ · program management office...

38
The IOCP, the Southeast Gateway, GI, and the Program Management Office September 12, 2017

Upload: others

Post on 02-Oct-2020

2 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: The IOCP, the Southeast Gateway, GI, and the Program ...€¦ · Program Management Office September 12, 2017 . 2 Integrated Overflow Control Plan (IOCP) The IOCP A $729 Million Plan

The IOCP, the

Southeast Gateway, GI, and the

Program Management Office

September 12, 2017

Page 2: The IOCP, the Southeast Gateway, GI, and the Program ...€¦ · Program Management Office September 12, 2017 . 2 Integrated Overflow Control Plan (IOCP) The IOCP A $729 Million Plan

2

Integrated Overflow Control Plan (IOCP)

The IOCP

A $729 Million Plan resulting from Federal EPA and DOJ action as a result of

the Clean Water Act and subsequent Combination Sewer Overflow (CSO)

legislation

• 2 Billion Gallons of CSO Reduced to 40 Million Gallons per year

• 45 Activations of CSO Reduced to 4 Activations per year

• 336 Contracted Projects

• 24 ½ Years of Design and Construction

Page 3: The IOCP, the Southeast Gateway, GI, and the Program ...€¦ · Program Management Office September 12, 2017 . 2 Integrated Overflow Control Plan (IOCP) The IOCP A $729 Million Plan

3

Integrated Overflow Control Plan (IOCP)

Page 4: The IOCP, the Southeast Gateway, GI, and the Program ...€¦ · Program Management Office September 12, 2017 . 2 Integrated Overflow Control Plan (IOCP) The IOCP A $729 Million Plan

4

The Bee Slough Build Out

Page 5: The IOCP, the Southeast Gateway, GI, and the Program ...€¦ · Program Management Office September 12, 2017 . 2 Integrated Overflow Control Plan (IOCP) The IOCP A $729 Million Plan

5

Southeast Gateway Today

Page 6: The IOCP, the Southeast Gateway, GI, and the Program ...€¦ · Program Management Office September 12, 2017 . 2 Integrated Overflow Control Plan (IOCP) The IOCP A $729 Million Plan

6

Southeast Gateway Post IOCP

Page 7: The IOCP, the Southeast Gateway, GI, and the Program ...€¦ · Program Management Office September 12, 2017 . 2 Integrated Overflow Control Plan (IOCP) The IOCP A $729 Million Plan

7

Southeast Gateway Design Considerations

Page 8: The IOCP, the Southeast Gateway, GI, and the Program ...€¦ · Program Management Office September 12, 2017 . 2 Integrated Overflow Control Plan (IOCP) The IOCP A $729 Million Plan

8

Southeast Gateway Design Considerations

Page 9: The IOCP, the Southeast Gateway, GI, and the Program ...€¦ · Program Management Office September 12, 2017 . 2 Integrated Overflow Control Plan (IOCP) The IOCP A $729 Million Plan

9

Southeast Gateway Design Considerations

Page 10: The IOCP, the Southeast Gateway, GI, and the Program ...€¦ · Program Management Office September 12, 2017 . 2 Integrated Overflow Control Plan (IOCP) The IOCP A $729 Million Plan

10

Southeast Gateway Design Considerations

Page 11: The IOCP, the Southeast Gateway, GI, and the Program ...€¦ · Program Management Office September 12, 2017 . 2 Integrated Overflow Control Plan (IOCP) The IOCP A $729 Million Plan

11

Cass Adams Interceptor

Page 12: The IOCP, the Southeast Gateway, GI, and the Program ...€¦ · Program Management Office September 12, 2017 . 2 Integrated Overflow Control Plan (IOCP) The IOCP A $729 Million Plan

12

Effluent Pumping Station

Page 13: The IOCP, the Southeast Gateway, GI, and the Program ...€¦ · Program Management Office September 12, 2017 . 2 Integrated Overflow Control Plan (IOCP) The IOCP A $729 Million Plan

13

Effluent Pumping Station

Page 14: The IOCP, the Southeast Gateway, GI, and the Program ...€¦ · Program Management Office September 12, 2017 . 2 Integrated Overflow Control Plan (IOCP) The IOCP A $729 Million Plan

14

Effluent Pumping Station

Page 15: The IOCP, the Southeast Gateway, GI, and the Program ...€¦ · Program Management Office September 12, 2017 . 2 Integrated Overflow Control Plan (IOCP) The IOCP A $729 Million Plan

15

Effluent Pumping Station

Page 16: The IOCP, the Southeast Gateway, GI, and the Program ...€¦ · Program Management Office September 12, 2017 . 2 Integrated Overflow Control Plan (IOCP) The IOCP A $729 Million Plan

16

East Treatment Plant

Page 17: The IOCP, the Southeast Gateway, GI, and the Program ...€¦ · Program Management Office September 12, 2017 . 2 Integrated Overflow Control Plan (IOCP) The IOCP A $729 Million Plan

17

Wetland Pump Station

Page 18: The IOCP, the Southeast Gateway, GI, and the Program ...€¦ · Program Management Office September 12, 2017 . 2 Integrated Overflow Control Plan (IOCP) The IOCP A $729 Million Plan

18

Wetland Underflow Pipe

Page 19: The IOCP, the Southeast Gateway, GI, and the Program ...€¦ · Program Management Office September 12, 2017 . 2 Integrated Overflow Control Plan (IOCP) The IOCP A $729 Million Plan

19

Constructed Wetland

Page 20: The IOCP, the Southeast Gateway, GI, and the Program ...€¦ · Program Management Office September 12, 2017 . 2 Integrated Overflow Control Plan (IOCP) The IOCP A $729 Million Plan

20

Vertical Treatment Unit

Page 21: The IOCP, the Southeast Gateway, GI, and the Program ...€¦ · Program Management Office September 12, 2017 . 2 Integrated Overflow Control Plan (IOCP) The IOCP A $729 Million Plan

21

Southeast Gateway Post IOCP

Page 22: The IOCP, the Southeast Gateway, GI, and the Program ...€¦ · Program Management Office September 12, 2017 . 2 Integrated Overflow Control Plan (IOCP) The IOCP A $729 Million Plan

22

Southeast Gateway (Future)

Page 23: The IOCP, the Southeast Gateway, GI, and the Program ...€¦ · Program Management Office September 12, 2017 . 2 Integrated Overflow Control Plan (IOCP) The IOCP A $729 Million Plan

23

Southeast Gateway (Today)

Page 24: The IOCP, the Southeast Gateway, GI, and the Program ...€¦ · Program Management Office September 12, 2017 . 2 Integrated Overflow Control Plan (IOCP) The IOCP A $729 Million Plan

24

Southeast Gateway (Future)

Page 25: The IOCP, the Southeast Gateway, GI, and the Program ...€¦ · Program Management Office September 12, 2017 . 2 Integrated Overflow Control Plan (IOCP) The IOCP A $729 Million Plan

25

Southeast Gateway (Future)

Page 26: The IOCP, the Southeast Gateway, GI, and the Program ...€¦ · Program Management Office September 12, 2017 . 2 Integrated Overflow Control Plan (IOCP) The IOCP A $729 Million Plan

26

Southeast Gateway (Future)

Page 27: The IOCP, the Southeast Gateway, GI, and the Program ...€¦ · Program Management Office September 12, 2017 . 2 Integrated Overflow Control Plan (IOCP) The IOCP A $729 Million Plan

Composite Cost: $0.31/gal

$0.46

$0.45

$0.61

$0.39

$0.61

$0.17

$0.20

$0.38

Geology favorable(RIPR) Initiative overlap Commercial 9% CSO Volume 12% IOCP Cost

Page 28: The IOCP, the Southeast Gateway, GI, and the Program ...€¦ · Program Management Office September 12, 2017 . 2 Integrated Overflow Control Plan (IOCP) The IOCP A $729 Million Plan

28

IOCP – Green Infrastructure

Page 29: The IOCP, the Southeast Gateway, GI, and the Program ...€¦ · Program Management Office September 12, 2017 . 2 Integrated Overflow Control Plan (IOCP) The IOCP A $729 Million Plan

29

IOCP – Green Infrastructure

Page 31: The IOCP, the Southeast Gateway, GI, and the Program ...€¦ · Program Management Office September 12, 2017 . 2 Integrated Overflow Control Plan (IOCP) The IOCP A $729 Million Plan

31

IOCP – Green Infrastructure

Page 32: The IOCP, the Southeast Gateway, GI, and the Program ...€¦ · Program Management Office September 12, 2017 . 2 Integrated Overflow Control Plan (IOCP) The IOCP A $729 Million Plan

32

IOCP – Green Infrastructure

And Why??

- 5.3M Gallon Discrepancy Between “The Deal” and

the Recalibrated Models

- $35M cost if all additional tankage

- The Alternatives?

- Green Infrastructure at $20M +/-

Page 33: The IOCP, the Southeast Gateway, GI, and the Program ...€¦ · Program Management Office September 12, 2017 . 2 Integrated Overflow Control Plan (IOCP) The IOCP A $729 Million Plan

33

EWSU – Program Management Office (PMO)

Capital Planning and Project Execution

Capital Project Managers

IOCP Projects Manager

IOCP Construction Manager

Wastewater Capital Projects Manager

Water Capital Projects Manager

Page 34: The IOCP, the Southeast Gateway, GI, and the Program ...€¦ · Program Management Office September 12, 2017 . 2 Integrated Overflow Control Plan (IOCP) The IOCP A $729 Million Plan

34

EWSU - PMO

Capital Planning and Project Execution

25-Year Projections

50% IOCP ($729M)*

21% Non-IOCP ($300M)*

29% Water ($420M)*

*2015 Dollars

Page 35: The IOCP, the Southeast Gateway, GI, and the Program ...€¦ · Program Management Office September 12, 2017 . 2 Integrated Overflow Control Plan (IOCP) The IOCP A $729 Million Plan

35

EWSU - PMO

Utility Capital Project Development (15%)

Senior Designers

Land Surveyor

Project Development Manager (field)

Page 36: The IOCP, the Southeast Gateway, GI, and the Program ...€¦ · Program Management Office September 12, 2017 . 2 Integrated Overflow Control Plan (IOCP) The IOCP A $729 Million Plan

36

EWSU - PMO

Strategic Consultant Support

IOCP Program Management

Water Program Management

Project Design

Construction Engineering

Green Infrastructure Modeling

Page 37: The IOCP, the Southeast Gateway, GI, and the Program ...€¦ · Program Management Office September 12, 2017 . 2 Integrated Overflow Control Plan (IOCP) The IOCP A $729 Million Plan

37

EWSU - PMO

Strategic Consultant Support Selection

Statement of Interest (SOI)

EWSU.com; Engineering Department; 18-mo RFP

Selection Committee

Page 38: The IOCP, the Southeast Gateway, GI, and the Program ...€¦ · Program Management Office September 12, 2017 . 2 Integrated Overflow Control Plan (IOCP) The IOCP A $729 Million Plan

Michael Labitzke, P.E.

Deputy Director Utilities – PMO

[email protected]