The LHC as a proton-nucleus collider: Status and plans John Jowett Special thanks to: R. Alemany-Fernandez, P. Baudrenghien, C. Carli, E. Carlo-Giraldo, S. Hancock, R. Jones, D. Manglunki, J. Wenninger, and many others in ABP, BI, OP, RF groups. 1 J.M. Jowett, Workshop on Prospects of p-Pb collisions during the 2012 LHC HI run, CERN 17/10/2011 p Pb

Upload: others

Post on 25-Jun-2020

2 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: The LHC as a proton-nucleus collider: Status and plans › event › 154544 › contributions › ...Plan of talk Brief history The revolution frequency problem –Moving long-range

The LHC as a proton-nucleus collider:

Status and plans John Jowett

Special thanks to:

R. Alemany-Fernandez, P. Baudrenghien, C. Carli, E. Carlo-Giraldo, S. Hancock, R. Jones,

D. Manglunki, J. Wenninger, and many others in ABP, BI, OP, RF groups.

1 J.M. Jowett, Workshop on Prospects of p-Pb collisions during the 2012 LHC HI run, CERN

17/10/2011

p Pb

Page 2: The LHC as a proton-nucleus collider: Status and plans › event › 154544 › contributions › ...Plan of talk Brief history The revolution frequency problem –Moving long-range

Plan of talk

Brief history

The revolution frequency problem

– Moving long-range beam-beam effects

Status of preparation of LHC systems

Feasibility test in 2011

– Goals

– Possible bonus: some physics

Possible p-Pb run in 2012

J.M. Jowett, Workshop on Prospects of p-Pb collisions during the 2012 LHC HI run, CERN 17/10/2011 2

Page 3: The LHC as a proton-nucleus collider: Status and plans › event › 154544 › contributions › ...Plan of talk Brief history The revolution frequency problem –Moving long-range

Before Jan 2011: Vox clamantis in deserto

Not part of “LHC Baseline” … no resources.

CERN Workshop in 2005 (link)

– Physics case, experiments’ performance, …

– Reviewed RHIC experience with d-Au in 2002-3 (T. Satogata)

– Schemes for LHC injector operation (C. Carli)

– LHC operation, beam dynamics concern identified (JMJ)

– Executive summary of accelerator part (in 2011 report)

LHC Project Report 928 (= paper at EPAC 2006)

Key systems groups kept aware meanwhile

– Eyes open for any showstoppers

Requested by ALICE for 2012

– First Pb-Pb run successful. If not 2012 then would otherwise be much later because of shutdown schedule, energy increase.

– Discussion at Chamonix workshop, Jan 2011.

– ATLAS and CMS heavy-ion groups

– Some resources now available: OP, RF, BI, … collaborating on implementation and operation

Fellow to work on beam dynamics in ABP arrived … today

J.M. Jowett, Workshop on Prospects of p-Pb collisions during the 2012 LHC HI run, CERN 17/10/2011 3

Page 4: The LHC as a proton-nucleus collider: Status and plans › event › 154544 › contributions › ...Plan of talk Brief history The revolution frequency problem –Moving long-range

J.M. Jowett, Workshop on Prospects of p-Pb collisions during the 2012 LHC HI run, CERN 17/10/2011 4

Relation between Beam Momenta

LHC accelerates protons through the momentum range

– Use this as reference, measure of magnetic

field in main bending magnets

The two-in-one magnet design of the LHC (unlike RHIC) fixes the relation between momenta of

beams in the two rings

0.45 TeV (injection from SPS) 7 TeV (collision)pp

Pbp

where 82, 208 for fully strippe

d Pb in LHCQ Z

pp

A

Z

Page 5: The LHC as a proton-nucleus collider: Status and plans › event › 154544 › contributions › ...Plan of talk Brief history The revolution frequency problem –Moving long-range

J.M. Jowett, Workshop on Prospects of p-Pb collisions during the 2012 LHC HI run, CERN 17/10/2011 5

Critical difference between RHIC and LHC

RHIC: Independent bending field for the two beams

LHC: Identical bending field in both apertures of two-in-one dipole

Page 6: The LHC as a proton-nucleus collider: Status and plans › event › 154544 › contributions › ...Plan of talk Brief history The revolution frequency problem –Moving long-range

J.M. Jowett, Workshop on Prospects of p-Pb collisions during the 2012 LHC HI run, CERN 17/10/2011 6

RF Frequency for p and Pb

RFRF

p

RF RF

RF frequency , ,

where the harmonic number , 35640 in LHC

hf

T p m Q

h h

RF frequencies needed to keep p or Pb on stable central orbit of constant length C are different at low energy.

No problem in terms of hardware as LHC has independent RF systems in each ring.

fRF(Pb)

fRF(p)

Page 7: The LHC as a proton-nucleus collider: Status and plans › event › 154544 › contributions › ...Plan of talk Brief history The revolution frequency problem –Moving long-range

Which is Beam 1 and which is Beam 2 ?

Initial preference for ALICE spectrometer asymmetry:

Beam 1=p, Beam 2=Pb

Assume this for definiteness in rest of this talk.

But switching of the beams between the two

rings is important and requested

– Clearly equally feasible, just some setup time

J.M. Jowett, Workshop on Prospects of p-Pb collisions during the 2012 LHC HI run, CERN 17/10/2011 7

Page 8: The LHC as a proton-nucleus collider: Status and plans › event › 154544 › contributions › ...Plan of talk Brief history The revolution frequency problem –Moving long-range

Distorting the Closed Orbit

2

p

p

p

p

2

p

2 2

, , 1

( )where is a fractional momentum deviation and

the phase-slip factor , 1 , 55.8 for LHC optics.

Moves beam on

1 1

to off-momentum orb

(

it,

1 )

l

T

T

C mcT p m Q

c Qp

p Qp

Qp

Qp

mc

onger for 0.

Horizontal offset given by dispersion: .x

x D s

J.M. Jowett, Workshop on Prospects of p-Pb collisions during the 2012 LHC HI run, CERN 17/10/2011 8

Additional degree of freedom: adjust length of closed orbits to compensate different speeds of

species.

– Done by adjusting RF frequency

Page 9: The LHC as a proton-nucleus collider: Status and plans › event › 154544 › contributions › ...Plan of talk Brief history The revolution frequency problem –Moving long-range

J.M. Jowett, Workshop on Prospects of p-Pb collisions during the 2012 LHC HI run, CERN 17/10/2011 9

Momentum offset required through ramp

22 22Pb

p Pb p2 2

p

Minimise aperture needed by .4

Tmc

mp Z

Limit in normal operation (1 mm in arc QD)

Limit with pilot beams

Revolution frequencies must be equal for collisions at top energy.

Lower limit on energy of p-Pb collisions, E=2.7 Z TeV.

RF frequencies must be unequal for injection, ramp!

Moving long-range beam-beam encounters may be a problem (cf RHIC).

2% - would move beam by 35 mm in QF!!

Page 10: The LHC as a proton-nucleus collider: Status and plans › event › 154544 › contributions › ...Plan of talk Brief history The revolution frequency problem –Moving long-range

Wolfram Fischer 10

Example – beam lifetimes with (Br)d = (Br)Au 2003

beam-beam effect during injection, d and Au with same rigidity,

frf = 44 kHz, vertical separation=10mm Aside: RHIC is the 1st bunched beam hadron collider exhibiting strong-strong effects

[W. Fischer, et al., “Observation of Coherent Beam-Beam Modes in RHIC”, BNL C-A/AP/75 (2002)]

Page 11: The LHC as a proton-nucleus collider: Status and plans › event › 154544 › contributions › ...Plan of talk Brief history The revolution frequency problem –Moving long-range

Beam envelopes around ALICE at injection

J.M. Jowett, Workshop on Prospects of p-Pb collisions during the 2012 LHC HI run, CERN 17/10/2011 11

Crossing angle from spectrometer and external bump separates beams vertically everywhere except at IP (also in physics).

Parallel separation also separates beams horizontally at the IP during injection, ramp, squeeze.

Other experiments vary ..

Page 12: The LHC as a proton-nucleus collider: Status and plans › event › 154544 › contributions › ...Plan of talk Brief history The revolution frequency problem –Moving long-range

ALICE – Separation at injection - CMS

J.M. Jowett, Workshop on Prospects of p-Pb collisions during the 2012 LHC HI run, CERN 17/10/2011 12

Page 13: The LHC as a proton-nucleus collider: Status and plans › event › 154544 › contributions › ...Plan of talk Brief history The revolution frequency problem –Moving long-range

ATLAS - Separation at injection - LHCb

J.M. Jowett, Workshop on Prospects of p-Pb collisions during the 2012 LHC HI run, CERN 17/10/2011 13

Page 14: The LHC as a proton-nucleus collider: Status and plans › event › 154544 › contributions › ...Plan of talk Brief history The revolution frequency problem –Moving long-range

Long-range beam-beam effects

J.M. Jowett, Workshop on Prospects of p-Pb collisions during the 2012 LHC HI run, CERN 17/10/2011 14

,

2 2

0 00

2 2

For separations , , the (angular) beam-beam kick on a particle of

charge , due to an opposing

, where / (4 )

and gives rise to

2 ( , )

beam of total charge

pertu

(

,

i

)

s

x y

x y

ZNr x yr e mc

x y

Z

p p

e

x y

e N

ò

2 2

, 0, , , 2 2 2

rbative betatron tune-shi

( , )(

fts

)

4 ( )

2

x y x y

x y x y x y

x yZNrQ p

x y

LHC separation configurations were chosen to minimise the tune effects in physics (“footprint”).

Page 15: The LHC as a proton-nucleus collider: Status and plans › event › 154544 › contributions › ...Plan of talk Brief history The revolution frequency problem –Moving long-range

Example: beam-beam for Pb around ALICE

J.M. Jowett, Workshop on Prospects of p-Pb collisions during the 2012 LHC HI run, CERN 17/10/2011 15

Dashed lines are “normal” position of encounters which will move 15 cm along IR on next turn …

Page 16: The LHC as a proton-nucleus collider: Status and plans › event › 154544 › contributions › ...Plan of talk Brief history The revolution frequency problem –Moving long-range

Overlap knock-out resonances ?

J.M. Jowett, Workshop on Prospects of p-Pb collisions during the 2012 LHC HI run, CERN 17/10/2011 16

,

Bunch harmon

p Pb

1,2,

transve

ic

rse mode

,

s

Encounter points move at speed 1734 m/s 0.15 m/turn2

Hamiltonian is no longer periodic in .

Excites modulational resonances

x y

x x y y

m

v vV

s

m Q m Q p k

6

p Pb

3. 10 at injection,decreases in ram

891 or at most 3564

p

; , , ,

Known as "overlap knock-out resonances" at the ISR.

However with LHC tunes, 64.3, 59.3, only ext

2

remely

x y

x x

m m p kv

Q

v

Q

c

high-order resonance conditions can be satisfied.

(similar in RHIC, W. Fischer).

We are nevertheless looking at calculations of driving term

Very unlikely

s,

compensatio

to

n b

be a problem

etween

IRs, etc.

Page 17: The LHC as a proton-nucleus collider: Status and plans › event › 154544 › contributions › ...Plan of talk Brief history The revolution frequency problem –Moving long-range

Diffusion models

Naively regarding the kicks as purely random

– Works fairly well for RHIC data (W. Fischer)

Better calculate combination of beam-beam kicks on a particle on a given turn as the encounters move

– Add them up with proper betatron phases

Partial compensations

– Take out static component (closed-orbit) from long-term averaging and look at fluctuations around it

– RMS fluctuation gives emittance growth rate ?

– Other resonant effects? Work ongoing

Assuming pseudo-random

Spectral analysis can confirm

Implement detailed collision schedule

J.M. Jowett, Workshop on Prospects of p-Pb collisions during the 2012 LHC HI run, CERN 17/10/2011 17

2, 2

0 , ,

11 ( ) ( )

2

where [..] denotes mean-square deviation

gives an emittance doubling time around 40 min

x yn

x y x y

df s p s

dt

Page 18: The LHC as a proton-nucleus collider: Status and plans › event › 154544 › contributions › ...Plan of talk Brief history The revolution frequency problem –Moving long-range

Build of beam-beam kicks around ring

J.M. Jowett, Workshop on Prospects of p-Pb collisions during the 2012 LHC HI run, CERN 17/10/2011 18

Horizontal and vertical, kicks represented in normalised betatron phase space.

On a turn where encounters occur at the usual Ips

On later turns the resultant is different.

Page 19: The LHC as a proton-nucleus collider: Status and plans › event › 154544 › contributions › ...Plan of talk Brief history The revolution frequency problem –Moving long-range

Variation over ~100 turns

J.M. Jowett, Workshop on Prospects of p-Pb collisions during the 2012 LHC HI run, CERN 17/10/2011 19

Page 20: The LHC as a proton-nucleus collider: Status and plans › event › 154544 › contributions › ...Plan of talk Brief history The revolution frequency problem –Moving long-range

J.M. Jowett, Workshop on Prospects of p-Pb collisions during the 2012 LHC HI run, CERN 17/10/2011 20

Transverse Feedback

4 independent systems, 1 per plane and per ring

High bandwidth to act on individual bunches

Located in IP4, so no concerns about timing of p-Pb bunch passages.

Potentially very important for p-Pb:

– Damping any coherent oscillations driven by

the coherent dipole kicks from moving beam-beam encounters at injection and during ramp

Page 21: The LHC as a proton-nucleus collider: Status and plans › event › 154544 › contributions › ...Plan of talk Brief history The revolution frequency problem –Moving long-range

Outline of p-Pb physics cycle (Pb-p similar)

Nominal Pb beam (100 ns basic spacing)

Matching proton beam

– See injection scheme details (C. Carli)

Inject p beam in Ring 1, fRF for p

– Orbit, ramp established in advance

Inject Pb beam in Ring 2, fRF for Pb

– Orbit, ramp established in advance

Ramp both beams on central orbits

– Orbit feedback decouples RFs

Rephase RF and bring fRF together to lock

Squeeze, collide, (almost) as usual Pb-Pb

– Preliminary off-momentum set-up for 3.5 Z TeV?

J.M. Jowett, Workshop on Prospects of p-Pb collisions during the 2012 LHC HI run, CERN 17/10/2011 21

Page 22: The LHC as a proton-nucleus collider: Status and plans › event › 154544 › contributions › ...Plan of talk Brief history The revolution frequency problem –Moving long-range

Review of LHC systems

RF (P. Baudrenghien, A. Butterworth)

– Independent for two rings, OK

– Decouple radial control

Transverse Damper (ADT) (D. Valuch, W. Hofle)

– Independent for two rings, OK

– Possible variable Q reference should be OK

Beam instrumentation (R. Jones, E. Giraldo, …)

– Common BPMs identified as main concern at LMC50 – later slide

– All other BI independent for two beams

Orbit and tune feedback – very important

– Looks OK (J. Wenninger, R. Steinhagen)

Q/Q' systems are independent for both beams

Orbit feedback does not use common BPMs

Need to decouple radial control

Check possibility of variable Q reference ? J.M. Jowett, Workshop on Prospects of p-Pb collisions during the 2012 LHC HI run, CERN 17/10/2011 22

Page 23: The LHC as a proton-nucleus collider: Status and plans › event › 154544 › contributions › ...Plan of talk Brief history The revolution frequency problem –Moving long-range

Collimation

– Settings according to beam, mostly separate

– IR2 vertical tertiary collimators (TCTVs) require special consideration

ALICE zero-degree calorimeter (ZDC) shadowing with present location, we have to minimise real crossing angle

IR2 modification (see LMC 79) to move (new) TCTVs behind ZDC should be done for 2012 p-Pb run, otherwise may have to request open TCTs L2 (for incoming proton beam, as for Pb beam in 2010-11) – machine protection ?

J.M. Jowett, Workshop on Prospects of p-Pb collisions during the 2012 LHC HI run, CERN 17/10/2011 23

Page 24: The LHC as a proton-nucleus collider: Status and plans › event › 154544 › contributions › ...Plan of talk Brief history The revolution frequency problem –Moving long-range

BPMs (from Eva Calvo Giraldo, Rhodri Jones)

BPM sensitivities for B1 and B2 are completely independent (no limit of p intensity from this)

Strip-line monitors can have two types of issues:

– Both beams cross exactly at the same time

Located so cannot happen with 100 ns once the frequencies are cogged.

While frequencies separate, both beams will sometimes cross BPM at same time.

– Then orbit can have errors 5.5 mm (10% bunch intensity ratio, unlikely), or ~1 mm (50% bunch intensity ratio, more likely).

– False triggers: see next slide …

J.M. Jowett, Workshop on Prospects of p-Pb collisions during the 2012 LHC HI run, CERN 17/10/2011 24

Page 25: The LHC as a proton-nucleus collider: Status and plans › event › 154544 › contributions › ...Plan of talk Brief history The revolution frequency problem –Moving long-range

BPMs (continued)

– False triggers:

– possible for bunch intensities close to the high end of each sensitivity mode range (B2 port of monitor sees B1-induced signals), can trigger acquisitions in the wrong channel, degrading orbit precision.

– Nevertheless with bunch intensities of 1e10 p/bunch and ~6e9 charge/bunch, there will be no false triggers.

Common BPMs: disabled on the orbit feedback system most of the time.

– Only used in squeeze.

Ghost bunches:

– Simulations showed that they could lead to an

error of up to ~120 μm.

(More detail in notes from E. Giraldo)

J.M. Jowett, Workshop on Prospects of p-Pb collisions during the 2012 LHC HI run, CERN 17/10/2011 25

Page 26: The LHC as a proton-nucleus collider: Status and plans › event › 154544 › contributions › ...Plan of talk Brief history The revolution frequency problem –Moving long-range

Machine Protection (preliminary!)

Most protection issues dealt with independently in the two rings, either for p or Pb

Eg, either beam becomes unstable, losses

Injection: must avoid trying to inject wrong beam in wrong ring

– Since SPS is phase-locked, impossible to pass

momentum acceptance of transfer lines

– Protect SPS and transfer lines with software interlocks – detailed scheme being implemented

J.M. Jowett, Workshop on Prospects of p-Pb collisions during the 2012 LHC HI run, CERN 17/10/2011 26

Page 27: The LHC as a proton-nucleus collider: Status and plans › event › 154544 › contributions › ...Plan of talk Brief history The revolution frequency problem –Moving long-range

Injection

Nominal Pb beam has 592 bunches, 100 ns minimum bunch spacing

p-Pb collisions in LHC will be done with a special

proton filling scheme, designed to match the Pb beam

– Other p-p schemes are different

– Schemes worked out in 2005 by K. Schindl and

C. Carli

– This beam is now ready in the injectors (S. Hancock et al in PS)

Useful flexibility in bunch intensity available

J.M. Jowett, Workshop on Prospects of p-Pb collisions during the 2012 LHC HI run, CERN 17/10/2011 27

Page 28: The LHC as a proton-nucleus collider: Status and plans › event › 154544 › contributions › ...Plan of talk Brief history The revolution frequency problem –Moving long-range

System Status Date for test Possible issues

BPM - BPM sensitivities for B1 and B2 are completely independent. - Two independent RF systems used to trigger BPMs

1 . Both beams cross exactly at the same time in these monitors Issue only until cogging is done Solution: disable common BPMs until cogging is done 2. False triggers: NO with bunch intensities of 1e10 p/bunch (p+)and ~6e9p/bunch (Pb)

RF RF settings completely independent for each ring

RF Rephasing 28.08.2011 (MD3) Last test in Oct 2010 showed high beam losses during rephasing

Feedback Fully decoupled radial loop - p+p+: 05.09.2011 (Start up after TS) - p+Pb: MD4 Nov

Interlocks for MP Protect TL&LHC from wrong particle injection

- 28.08.2011 (MD3) - SIS interlock by Jorg in place - Injection line TT10 settings consistent after TS

Timing: Particle type & Accelerator Mode

-Two telegram words to define the circulating particle type: Proton, Pb82, Ar18, D, Xe54 - Accelerator Mode: PROTON ION PHYSICS

- In place after the September TS

J.M. Jowett, Workshop on Prospects of p-Pb collisions during the 2012 LHC HI run, CERN

17/10/2011

28

From R. Alemany

Page 29: The LHC as a proton-nucleus collider: Status and plans › event › 154544 › contributions › ...Plan of talk Brief history The revolution frequency problem –Moving long-range

Proton-lead feasibility study in 2011

Remarks:

– This is a new way to operate LHC, very little previous experience in other hadron colliders

– We do not know if it will work!

Could be strongly limited in intensity/luminosity

No resources for study (will change on 15/10/2011)

Discussed at CERN Machine Advisory Committee https://indico.cern.ch/contributionDisplay.py?contribId=12&confId=149070

Aims:

– Inject and ramp with unequal RF frequencies

Possible bonus, if all goes extremely well:

– Re-phase RF to collide beams at proper IPs and make a few hours collisions

J.M. Jowett, Workshop on Prospects of p-Pb collisions during the 2012 LHC HI run, CERN 17/10/2011 29

Page 30: The LHC as a proton-nucleus collider: Status and plans › event › 154544 › contributions › ...Plan of talk Brief history The revolution frequency problem –Moving long-range

p-Pb filling

Beam 1: 100 ns proton beam, ~1010 p/bunch

– Should be something close to Nominal Pb scheme

Beam 2: start with a few (probably 2) Pb

bunches for MP reasons

– If we succeed in ramping and manually re-phasing the RF, this could give 1 (or 0)

collision/turn in each experiment

– More than this is unlikely but not impossible

– Need to clarify conditions for declaring Stable Beams

J.M. Jowett, Workshop on Prospects of p-Pb collisions during the 2012 LHC HI run, CERN 17/10/2011 30

Page 31: The LHC as a proton-nucleus collider: Status and plans › event › 154544 › contributions › ...Plan of talk Brief history The revolution frequency problem –Moving long-range

Potential luminosity

In 2011 feasibility test

J.M. Jowett, Workshop on Prospects of p-Pb collisions during the 2012 LHC HI run, CERN 17/10/2011 31

20 0 Pb

2

Pb

26 -2 -1 8 10

44 *

10 cm s (1 colliding bunch, ~10 Pb/bunch, ~10 p/bunch

nominal emittance 1.5 m)

but some emittance blow-up, intensity loss likely,

c Pb p b b

n

k N N f k N fL

5

combined factor 3 ?

1.8 barn

10 events/h ?

Possibly higher if we have time to try some bunch trains.

Page 32: The LHC as a proton-nucleus collider: Status and plans › event › 154544 › contributions › ...Plan of talk Brief history The revolution frequency problem –Moving long-range

Potential luminosity (2)

In possible 2012 physics run at 3.5 Z TeV

But we should really wait until after the feasibility

test to say anything meaningful.

– (With extreme optimism, using full proton intensity we can dream of factors ~15 more

…).

J.M. Jowett, Workshop on Prospects of p-Pb collisions during the 2012 LHC HI run, CERN 17/10/2011 32

20 0 Pb

2

Pb

28 -2 -1 8 10

44 *

3 10 cm s (~300 colliding bunch, ~10 Pb/bunch, ~10 p/bunch

nominal emittance 1.5 m)

but reduction factors almost certainly apply

c Pb p b b

n

k N N f k N fL

Page 33: The LHC as a proton-nucleus collider: Status and plans › event › 154544 › contributions › ...Plan of talk Brief history The revolution frequency problem –Moving long-range

Accessible energies and CM rapidities

J.M. Jowett, Workshop on Prospects of p-Pb collisions during the 2012 LHC HI run, CERN 17/10/2011 33

p-p Pb-Pb p-Pb

/ TeVE 0.45-7 287-574 (2.7-7,287-574)

/ TeVNE 0.45-7 1.38-2.76 (2.7-7, 1.38-2.76)

/ TeVs 7-14 73.8-1148 48.9-126.8

NN /TeVs 7-14 0.355-5.52 3.39-8.79

CMy 0 0 -2.20

NNy 0 0 +0.46

p p

p Pb

Pb Pb

0 1 2 3 4 5 6 70

2

4

6

8

10

12

14

p p TeV c

s NN

TeV

1 2

1 2

1 2

1 2

1 2

Charges , in rings with magnetic

field set for protons of momentum

2 ,

1log

2

p

NN p

NN

Z Z

p

Z Zs c p

A A

Z Ay

A Z

Possible range of collision energies Minimum p-Pb energy for equal revolution frequency.

Relations between these numbers are a simple consequence of the two-in-one magnet design

Page 34: The LHC as a proton-nucleus collider: Status and plans › event › 154544 › contributions › ...Plan of talk Brief history The revolution frequency problem –Moving long-range

Commissioning and run schedule

Different from 2010, now available and will be kept updated:

– http://lhc-commissioning.web.cern.ch/lhc-commissioning/commissioning-ions.htm

– Must commission ALICE squeeze

– Interruption by Technical Stop

Delays not impossible …

– Commissioning and p-Pb feasibility test are

interleaved of necessity (beam availability)

J.M. Jowett, Workshop on Prospects of p-Pb collisions during the 2012 LHC HI run, CERN 17/10/2011 34

Page 35: The LHC as a proton-nucleus collider: Status and plans › event › 154544 › contributions › ...Plan of talk Brief history The revolution frequency problem –Moving long-range

Schedule in 2011

J.M. Jowett, Workshop on Prospects of p-Pb collisions during the 2012 LHC HI run, CERN 17/10/2011 35

Set up p beam, Pb injection, test injection of Pb on p (2 shifts designated MD)

Time to think … review p-Pb

Set up ALICE squeeze with protons, aperture measurement

Test ramp of p-Pb, while p still available from injectors, possible collisions

Use of physics time for MD will of course be minimised, but this is a very tight schedule.

Pb beam, ramp, squeeze, crossing angles, collimation in two instalments

Page 36: The LHC as a proton-nucleus collider: Status and plans › event › 154544 › contributions › ...Plan of talk Brief history The revolution frequency problem –Moving long-range

Conclusions (1)

Operational cycle for physics taking shape

Matching p beam ready in injectors

– Flexibility on intensity available

Check-out of all LHC systems complete

– No showstoppers for p-Pb

Machine protection, ~OK

Main uncertainty remains beam dynamics

– Overlap knock-out resonances very unlikely to

be a problem

– Possible diffusive emittance growth ?

Studies advancing …

J.M. Jowett, Workshop on Prospects of p-Pb collisions during the 2012 LHC HI run, CERN 17/10/2011 36

Page 37: The LHC as a proton-nucleus collider: Status and plans › event › 154544 › contributions › ...Plan of talk Brief history The revolution frequency problem –Moving long-range

Conclusions (2)

Feasibility test this year is crucial

– Plan carefully, interleaved with Pb-Pb commissioning

– New, more complicated mode of LHC operation

– Risks of being cut short by limited time …

We must be very cautious about projections for

2012

– Today’s discussion could usefully define minimum performance acceptable for physics

Go-ahead from Chamonix workshop ?

– 6-10 February 2012

J.M. Jowett, Workshop on Prospects of p-Pb collisions during the 2012 LHC HI run, CERN 17/10/2011 37

Page 38: The LHC as a proton-nucleus collider: Status and plans › event › 154544 › contributions › ...Plan of talk Brief history The revolution frequency problem –Moving long-range

A second opinion: CERN Machine Advisory

Committee, August 2011

J.M. Jowett, Workshop on Prospects of p-Pb collisions during the 2012 LHC HI run, CERN 17/10/2011 38

Possible Proton Lead running in 2012

Findings:

Asymmetric proton-lead operation is considered for 2012 pending a successful test at the end of 2011. In the test it is planned to demonstrate injection and acceleration of the proton and lead beams with unequal revolution frequencies, a condition necessitated by the equal magnetic fields in both rings due to the 2-in-1-magnet design. The checkout of all system (rf, instrumentation, collimation, machine protection) is almost complete, and no showstoppers were found. Perhaps most importantly the test will also allow evaluating the beam dynamics issues stemming from unequal revolution frequencies, which have been found detrimental in RHIC when operating under such conditions.

Comments:

The dominating beam dynamics effect from unequal revolution frequencies is likely emittance growth due to the modulated long-range beam-beam interactions. Estimates for RHIC for d-Au operation with unequal revolution frequencies give a time to double the emittance of order minutes. Applying the same analysis to the LHC case one would expect an emittance growth effect that is an order of magnitude smaller with the proposed bunch intensities.

With the detailed LHC calculations to estimate the emittance growth completed, comparison with the measured emittance growth in the planned test will be possible. Since an order of magnitude more protons are available than requested for the physics program, the detrimental effects on the lead beam can be enhanced and evaluated over a wide intensity range.