the lifecycle of grants: environmental review november 7, 2012
TRANSCRIPT
![Page 1: The Lifecycle of Grants: Environmental Review November 7, 2012](https://reader038.vdocument.in/reader038/viewer/2022110116/551b4e8c550346dd1a8b5dca/html5/thumbnails/1.jpg)
The Lifecycle of Grants:Environmental Review
November 7, 2012
![Page 2: The Lifecycle of Grants: Environmental Review November 7, 2012](https://reader038.vdocument.in/reader038/viewer/2022110116/551b4e8c550346dd1a8b5dca/html5/thumbnails/2.jpg)
Tim Allen and Cecilia Castillo
Office of Community Development
(614) 466-2285
www.development.ohio.gov
![Page 3: The Lifecycle of Grants: Environmental Review November 7, 2012](https://reader038.vdocument.in/reader038/viewer/2022110116/551b4e8c550346dd1a8b5dca/html5/thumbnails/3.jpg)
Training Materials
• Environmental Review Flowchart
• ER Levels Information Sheets
• *New* Environmental Review Worksheets
![Page 4: The Lifecycle of Grants: Environmental Review November 7, 2012](https://reader038.vdocument.in/reader038/viewer/2022110116/551b4e8c550346dd1a8b5dca/html5/thumbnails/4.jpg)
www.development.ohio.gov
![Page 5: The Lifecycle of Grants: Environmental Review November 7, 2012](https://reader038.vdocument.in/reader038/viewer/2022110116/551b4e8c550346dd1a8b5dca/html5/thumbnails/5.jpg)
![Page 6: The Lifecycle of Grants: Environmental Review November 7, 2012](https://reader038.vdocument.in/reader038/viewer/2022110116/551b4e8c550346dd1a8b5dca/html5/thumbnails/6.jpg)
www.hud.gov
![Page 7: The Lifecycle of Grants: Environmental Review November 7, 2012](https://reader038.vdocument.in/reader038/viewer/2022110116/551b4e8c550346dd1a8b5dca/html5/thumbnails/7.jpg)
www.hud.gov
![Page 8: The Lifecycle of Grants: Environmental Review November 7, 2012](https://reader038.vdocument.in/reader038/viewer/2022110116/551b4e8c550346dd1a8b5dca/html5/thumbnails/8.jpg)
Basics of a Part 58 Review
Applying HUD’s Floodplain Management and Wetlands
Protection Standards
![Page 9: The Lifecycle of Grants: Environmental Review November 7, 2012](https://reader038.vdocument.in/reader038/viewer/2022110116/551b4e8c550346dd1a8b5dca/html5/thumbnails/9.jpg)
Training Outline
• Environmental Review Basics
• Levels of Review
![Page 10: The Lifecycle of Grants: Environmental Review November 7, 2012](https://reader038.vdocument.in/reader038/viewer/2022110116/551b4e8c550346dd1a8b5dca/html5/thumbnails/10.jpg)
Environmental Review Background
• National Environmental Policy Act of 1969, as
amended (NEPA)
• Housing and Community Development Act of 1974
• HUD ER Regulations: 24 CFR Part 58
![Page 11: The Lifecycle of Grants: Environmental Review November 7, 2012](https://reader038.vdocument.in/reader038/viewer/2022110116/551b4e8c550346dd1a8b5dca/html5/thumbnails/11.jpg)
Other Environmental Laws
• National Historic Preservation Act: 1966
• Sole Source Aquifers: 1974
• Farmlands Protection Policy Act: 1981
• Endangered Species Act: 1973
• Floodplain Management: 1977
• Wetlands: 1977
• Wild and Scenic Rivers: 1968
• Clean Air Act: 1970
![Page 12: The Lifecycle of Grants: Environmental Review November 7, 2012](https://reader038.vdocument.in/reader038/viewer/2022110116/551b4e8c550346dd1a8b5dca/html5/thumbnails/12.jpg)
Other Environmental Laws
• Certain types of HUD projects require compliance with other environmental laws
• For these projects, compliance with related environmental laws will form the core of the environmental review process
![Page 13: The Lifecycle of Grants: Environmental Review November 7, 2012](https://reader038.vdocument.in/reader038/viewer/2022110116/551b4e8c550346dd1a8b5dca/html5/thumbnails/13.jpg)
Applicability
• All HUD-funded activities - including those funded with Program Income - require an environmental review.
![Page 14: The Lifecycle of Grants: Environmental Review November 7, 2012](https://reader038.vdocument.in/reader038/viewer/2022110116/551b4e8c550346dd1a8b5dca/html5/thumbnails/14.jpg)
Documentation
• Grantees must maintain an environmental review file for each activity that documents decision-making and process
![Page 15: The Lifecycle of Grants: Environmental Review November 7, 2012](https://reader038.vdocument.in/reader038/viewer/2022110116/551b4e8c550346dd1a8b5dca/html5/thumbnails/15.jpg)
Environmental Review Timing
• Start early!
• Grantees may not commit
funds, or enter into contracts,
until the State of Ohio issues a
Release of Funds.
![Page 16: The Lifecycle of Grants: Environmental Review November 7, 2012](https://reader038.vdocument.in/reader038/viewer/2022110116/551b4e8c550346dd1a8b5dca/html5/thumbnails/16.jpg)
ER Overview
• Project Scope
• Determine Level of Environmental Review
• Conduct Environmental Review
• Public Notices
• RROF and/or Certification
![Page 17: The Lifecycle of Grants: Environmental Review November 7, 2012](https://reader038.vdocument.in/reader038/viewer/2022110116/551b4e8c550346dd1a8b5dca/html5/thumbnails/17.jpg)
Project Aggregation (58.32) Define Projects for Review
Environmental Assessment (58.36)
Environmental Assessment Checklist
Statutory Checklist
Make a FONSI (58.40(g)(1))
Publish Combined Notice
Categorical Exclusion (58.35)
Fully Exempt (58.34)
Statutory Checklist
Compliance with 58.5 and 58.6 Authorities
No Compliance – CE/ Exempt
(58.34(a)(12))
Compliance with 58.6 Authorities
Publish NOI/RROF
Local Comment Period (7 days)
Local Comment Period (15 days)
Submit EXEMPT certification to State
Submit RROF and copy of Notice to State
Submit RROF and copy of Notice to State
State Comment Period (15 days)
State Comment Period (15 days)
Release of Funds by State
Proceed with Project
Submit CE not Subject to 58.5 certification to
State
45
30
7
Make a FOSI (58.40(g)(2))
Submit CE/EX certification to State
7
ER Impact
Contact OHCP
CE not subject to 58.5 (58.35(b))
7
Approximate # of days to get release once initial review has been completed
![Page 18: The Lifecycle of Grants: Environmental Review November 7, 2012](https://reader038.vdocument.in/reader038/viewer/2022110116/551b4e8c550346dd1a8b5dca/html5/thumbnails/18.jpg)
Determine Scope of Project
• Identify Activities
• Aggregate Related Activities for ER
(per 24 CFR 58.32)
![Page 19: The Lifecycle of Grants: Environmental Review November 7, 2012](https://reader038.vdocument.in/reader038/viewer/2022110116/551b4e8c550346dd1a8b5dca/html5/thumbnails/19.jpg)
Determine Level of Review
• Exempt
• Categorical Exclusion
• Environmental Assessment
![Page 20: The Lifecycle of Grants: Environmental Review November 7, 2012](https://reader038.vdocument.in/reader038/viewer/2022110116/551b4e8c550346dd1a8b5dca/html5/thumbnails/20.jpg)
Exempt
• No environmental review, consultation, or other action under NEPA
• Includes: Environmental and other studies, Administration, Public services, Purchase of tools, Engineering or design costs, Training…
![Page 21: The Lifecycle of Grants: Environmental Review November 7, 2012](https://reader038.vdocument.in/reader038/viewer/2022110116/551b4e8c550346dd1a8b5dca/html5/thumbnails/21.jpg)
Project Aggregation (58.32) Define Projects for Review
Environmental Assessment (58.36)
Environmental Assessment Checklist
Statutory Checklist
Make a FONSI (58.40(g)(1))
Publish Combined Notice
Categorical Exclusion (58.35)
Fully Exempt (58.34)
Statutory Checklist
Compliance with 58.5 and 58.6 Authorities
No Compliance – CE/ Exempt
(58.34(a)(12))
Compliance with 58.6 Authorities
Publish NOI/RROF
Local Comment Period (7 days)
Local Comment Period (15 days)
Submit EXEMPT certification to State
Submit RROF and copy of Notice to State
Submit RROF and copy of Notice to State
State Comment Period (15 days)
State Comment Period (15 days)
Release of Funds by State
Proceed with Project
Submit CE not Subject to 58.5 certification to
State
45
30
7
Make a FOSI (58.40(g)(2))
Submit CE/EX certification to State
7
ER Impact
Contact OHCP
CE not subject to 58.5 (58.35(b))
7
Approximate # of days to get release once initial review has been completed
![Page 22: The Lifecycle of Grants: Environmental Review November 7, 2012](https://reader038.vdocument.in/reader038/viewer/2022110116/551b4e8c550346dd1a8b5dca/html5/thumbnails/22.jpg)
Admin, Planning, andFair Housing
• Some OCD programs include an Environmental Review Documentation and Certification Form for General Administration, Planning, and Fair Housing in the program application
• This document constitutes an environmental release for these three activities
![Page 23: The Lifecycle of Grants: Environmental Review November 7, 2012](https://reader038.vdocument.in/reader038/viewer/2022110116/551b4e8c550346dd1a8b5dca/html5/thumbnails/23.jpg)
File Guide
![Page 24: The Lifecycle of Grants: Environmental Review November 7, 2012](https://reader038.vdocument.in/reader038/viewer/2022110116/551b4e8c550346dd1a8b5dca/html5/thumbnails/24.jpg)
![Page 25: The Lifecycle of Grants: Environmental Review November 7, 2012](https://reader038.vdocument.in/reader038/viewer/2022110116/551b4e8c550346dd1a8b5dca/html5/thumbnails/25.jpg)
![Page 26: The Lifecycle of Grants: Environmental Review November 7, 2012](https://reader038.vdocument.in/reader038/viewer/2022110116/551b4e8c550346dd1a8b5dca/html5/thumbnails/26.jpg)
Categorical Exclusion
• Category of activities for which no
environmental impact statement or
environmental assessment and Finding
of No Significant Impact (FONSI) under
NEPA is required.
![Page 27: The Lifecycle of Grants: Environmental Review November 7, 2012](https://reader038.vdocument.in/reader038/viewer/2022110116/551b4e8c550346dd1a8b5dca/html5/thumbnails/27.jpg)
Categorical Exclusion
Subject to§ 58.5
Subject to§ 58.5
Not subject to§ 58.5
Not subject to§ 58.5
• Subdivided by required compliance with “related laws and authorities” (24 CFR 58.5)
![Page 28: The Lifecycle of Grants: Environmental Review November 7, 2012](https://reader038.vdocument.in/reader038/viewer/2022110116/551b4e8c550346dd1a8b5dca/html5/thumbnails/28.jpg)
Other Environmental Laws
• National Historic Preservation Act: 1966
• Sole Source Aquifers: 1974
• Farmlands Protection Policy Act: 1981
• Endangered Species Act: 1973
• Floodplain Management: 1977
• Wetlands: 1977
• Wild and Scenic Rivers: 1968
• Clean Air Act: 1970
![Page 29: The Lifecycle of Grants: Environmental Review November 7, 2012](https://reader038.vdocument.in/reader038/viewer/2022110116/551b4e8c550346dd1a8b5dca/html5/thumbnails/29.jpg)
Categorical Exclusion,Subject to Sec. 58.5
• Public facilities
improvements,
Architectural
barriers, certain
Rehabilitation,
Acquisition…
![Page 30: The Lifecycle of Grants: Environmental Review November 7, 2012](https://reader038.vdocument.in/reader038/viewer/2022110116/551b4e8c550346dd1a8b5dca/html5/thumbnails/30.jpg)
“Individual Action”
• Up to four dwelling units where there is a maximum of four units on any one site
• Five or more housing units developed on scattered sites when the sites are more than 2,000 feet apart and there are not more than four housing units on any one site
![Page 31: The Lifecycle of Grants: Environmental Review November 7, 2012](https://reader038.vdocument.in/reader038/viewer/2022110116/551b4e8c550346dd1a8b5dca/html5/thumbnails/31.jpg)
“Individual Action”
• Clarification of Individual Action (on Housing units) as a Categorical Exclusion, Subject to Sec. 58.5
• New construction, development, demolition, acquisition, disposition, or refinancing
![Page 32: The Lifecycle of Grants: Environmental Review November 7, 2012](https://reader038.vdocument.in/reader038/viewer/2022110116/551b4e8c550346dd1a8b5dca/html5/thumbnails/32.jpg)
Project Aggregation (58.32) Define Projects for Review
Environmental Assessment (58.36)
Environmental Assessment Checklist
Statutory Checklist
Make a FONSI (58.40(g)(1))
Publish Combined Notice
Categorical Exclusion (58.35)
Fully Exempt (58.34)
Statutory Checklist
Compliance with 58.5 and 58.6 Authorities
No Compliance – CE/ Exempt
(58.34(a)(12))
Compliance with 58.6 Authorities
Publish NOI/RROF
Local Comment Period (7 days)
Local Comment Period (15 days)
Submit EXEMPT certification to State
Submit RROF and copy of Notice to State
Submit RROF and copy of Notice to State
State Comment Period (15 days)
State Comment Period (15 days)
Release of Funds by State
Proceed with Project
Submit CE not Subject to 58.5 certification to
State
45
30
7
Make a FOSI (58.40(g)(2))
Submit CE/EX certification to State
7
ER Impact
Contact OHCP
CE not subject to 58.5 (58.35(b))
7
Approximate # of days to get release once initial review has been completed
![Page 33: The Lifecycle of Grants: Environmental Review November 7, 2012](https://reader038.vdocument.in/reader038/viewer/2022110116/551b4e8c550346dd1a8b5dca/html5/thumbnails/33.jpg)
![Page 34: The Lifecycle of Grants: Environmental Review November 7, 2012](https://reader038.vdocument.in/reader038/viewer/2022110116/551b4e8c550346dd1a8b5dca/html5/thumbnails/34.jpg)
![Page 35: The Lifecycle of Grants: Environmental Review November 7, 2012](https://reader038.vdocument.in/reader038/viewer/2022110116/551b4e8c550346dd1a8b5dca/html5/thumbnails/35.jpg)
![Page 36: The Lifecycle of Grants: Environmental Review November 7, 2012](https://reader038.vdocument.in/reader038/viewer/2022110116/551b4e8c550346dd1a8b5dca/html5/thumbnails/36.jpg)
![Page 37: The Lifecycle of Grants: Environmental Review November 7, 2012](https://reader038.vdocument.in/reader038/viewer/2022110116/551b4e8c550346dd1a8b5dca/html5/thumbnails/37.jpg)
Project Aggregation (58.32) Define Projects for Review
Environmental Assessment (58.36)
Environmental Assessment Checklist
Statutory Checklist
Make a FONSI (58.40(g)(1))
Publish Combined Notice
Categorical Exclusion (58.35)
Fully Exempt (58.34)
Statutory Checklist
Compliance with 58.5 and 58.6 Authorities
No Compliance – CE/ Exempt
(58.34(a)(12))
Compliance with 58.6 Authorities
Publish NOI/RROF
Local Comment Period (7 days)
Local Comment Period (15 days)
Submit EXEMPT certification to State
Submit RROF and copy of Notice to State
Submit RROF and copy of Notice to State
State Comment Period (15 days)
State Comment Period (15 days)
Release of Funds by State
Proceed with Project
Submit CE not Subject to 58.5 certification to
State
45
30
7
Make a FOSI (58.40(g)(2))
Submit CE/EX certification to State
7
ER Impact
Contact OHCP
CE not subject to 58.5 (58.35(b))
7
Approximate # of days to get release once initial review has been completed
![Page 38: The Lifecycle of Grants: Environmental Review November 7, 2012](https://reader038.vdocument.in/reader038/viewer/2022110116/551b4e8c550346dd1a8b5dca/html5/thumbnails/38.jpg)
![Page 39: The Lifecycle of Grants: Environmental Review November 7, 2012](https://reader038.vdocument.in/reader038/viewer/2022110116/551b4e8c550346dd1a8b5dca/html5/thumbnails/39.jpg)
Project Aggregation (58.32) Define Projects for Review
Environmental Assessment (58.36)
Environmental Assessment Checklist
Statutory Checklist
Make a FONSI (58.40(g)(1))
Publish Combined Notice
Categorical Exclusion (58.35)
Fully Exempt (58.34)
Statutory Checklist
Compliance with 58.5 and 58.6 Authorities
No Compliance – CE/ Exempt
(58.34(a)(12))
Compliance with 58.6 Authorities
Publish NOI/RROF
Local Comment Period (7 days)
Local Comment Period (15 days)
Submit EXEMPT certification to State
Submit RROF and copy of Notice to State
Submit RROF and copy of Notice to State
State Comment Period (15 days)
State Comment Period (15 days)
Release of Funds by State
Proceed with Project
Submit CE not Subject to 58.5 certification to
State
45
30
7
Make a FOSI (58.40(g)(2))
Submit CE/EX certification to State
7
ER Impact
Contact OHCP
CE not subject to 58.5 (58.35(b))
7
Approximate # of days to get release once initial review has been completed
![Page 40: The Lifecycle of Grants: Environmental Review November 7, 2012](https://reader038.vdocument.in/reader038/viewer/2022110116/551b4e8c550346dd1a8b5dca/html5/thumbnails/40.jpg)
![Page 41: The Lifecycle of Grants: Environmental Review November 7, 2012](https://reader038.vdocument.in/reader038/viewer/2022110116/551b4e8c550346dd1a8b5dca/html5/thumbnails/41.jpg)
![Page 42: The Lifecycle of Grants: Environmental Review November 7, 2012](https://reader038.vdocument.in/reader038/viewer/2022110116/551b4e8c550346dd1a8b5dca/html5/thumbnails/42.jpg)
Project Aggregation (58.32) Define Projects for Review
Environmental Assessment (58.36)
Environmental Assessment Checklist
Statutory Checklist
Make a FONSI (58.40(g)(1))
Publish Combined Notice
Categorical Exclusion (58.35)
Fully Exempt (58.34)
Statutory Checklist
Compliance with 58.5 and 58.6 Authorities
No Compliance – CE/ Exempt
(58.34(a)(12))
Compliance with 58.6 Authorities
Publish NOI/RROF
Local Comment Period (7 days)
Local Comment Period (15 days)
Submit EXEMPT certification to State
Submit RROF and copy of Notice to State
Submit RROF and copy of Notice to State
State Comment Period (15 days)
State Comment Period (15 days)
Release of Funds by State
Proceed with Project
Submit CE not Subject to 58.5 certification to
State
45
30
7
Make a FOSI (58.40(g)(2))
Submit CE/EX certification to State
7
ER Impact
Contact OHCP
CE not subject to 58.5 (58.35(b))
7
Approximate # of days to get release once initial review has been completed
![Page 43: The Lifecycle of Grants: Environmental Review November 7, 2012](https://reader038.vdocument.in/reader038/viewer/2022110116/551b4e8c550346dd1a8b5dca/html5/thumbnails/43.jpg)
Notice of Intent to Request Release of Funds (NOI/RROF)
• Newspaper of general circulation, non-legal section
• ERR must be complete prior to publication
• 7-day comment period
• Submit RROF to State
• 15-day objection period
![Page 44: The Lifecycle of Grants: Environmental Review November 7, 2012](https://reader038.vdocument.in/reader038/viewer/2022110116/551b4e8c550346dd1a8b5dca/html5/thumbnails/44.jpg)
![Page 45: The Lifecycle of Grants: Environmental Review November 7, 2012](https://reader038.vdocument.in/reader038/viewer/2022110116/551b4e8c550346dd1a8b5dca/html5/thumbnails/45.jpg)
![Page 46: The Lifecycle of Grants: Environmental Review November 7, 2012](https://reader038.vdocument.in/reader038/viewer/2022110116/551b4e8c550346dd1a8b5dca/html5/thumbnails/46.jpg)
![Page 47: The Lifecycle of Grants: Environmental Review November 7, 2012](https://reader038.vdocument.in/reader038/viewer/2022110116/551b4e8c550346dd1a8b5dca/html5/thumbnails/47.jpg)
![Page 48: The Lifecycle of Grants: Environmental Review November 7, 2012](https://reader038.vdocument.in/reader038/viewer/2022110116/551b4e8c550346dd1a8b5dca/html5/thumbnails/48.jpg)
![Page 49: The Lifecycle of Grants: Environmental Review November 7, 2012](https://reader038.vdocument.in/reader038/viewer/2022110116/551b4e8c550346dd1a8b5dca/html5/thumbnails/49.jpg)
Categorical Exclusion,Not Subject to Sec. 58.5
• Tenant-based rental assistance,
Supportive services, Operating
costs, certain Economic
Development activities…
![Page 50: The Lifecycle of Grants: Environmental Review November 7, 2012](https://reader038.vdocument.in/reader038/viewer/2022110116/551b4e8c550346dd1a8b5dca/html5/thumbnails/50.jpg)
Project Aggregation (58.32) Define Projects for Review
Environmental Assessment (58.36)
Environmental Assessment Checklist
Statutory Checklist
Make a FONSI (58.40(g)(1))
Publish Combined Notice
Categorical Exclusion (58.35)
Fully Exempt (58.34)
Statutory Checklist
Compliance with 58.5 and 58.6 Authorities
No Compliance – CE/ Exempt
(58.34(a)(12))
Compliance with 58.6 Authorities
Publish NOI/RROF
Local Comment Period (7 days)
Local Comment Period (15 days)
Submit EXEMPT certification to State
Submit RROF and copy of Notice to State
Submit RROF and copy of Notice to State
State Comment Period (15 days)
State Comment Period (15 days)
Release of Funds by State
Proceed with Project
Submit CE not Subject to 58.5 certification to
State
45
30
7
Make a FOSI (58.40(g)(2))
Submit CE/EX certification to State
7
ER Impact
Contact OHCP
CE not subject to 58.5 (58.35(b))
7
Approximate # of days to get release once initial review has been completed
![Page 51: The Lifecycle of Grants: Environmental Review November 7, 2012](https://reader038.vdocument.in/reader038/viewer/2022110116/551b4e8c550346dd1a8b5dca/html5/thumbnails/51.jpg)
![Page 52: The Lifecycle of Grants: Environmental Review November 7, 2012](https://reader038.vdocument.in/reader038/viewer/2022110116/551b4e8c550346dd1a8b5dca/html5/thumbnails/52.jpg)
![Page 53: The Lifecycle of Grants: Environmental Review November 7, 2012](https://reader038.vdocument.in/reader038/viewer/2022110116/551b4e8c550346dd1a8b5dca/html5/thumbnails/53.jpg)
Runway Clear Zones
Coastal Barriers
Flood Insurance
![Page 54: The Lifecycle of Grants: Environmental Review November 7, 2012](https://reader038.vdocument.in/reader038/viewer/2022110116/551b4e8c550346dd1a8b5dca/html5/thumbnails/54.jpg)
![Page 55: The Lifecycle of Grants: Environmental Review November 7, 2012](https://reader038.vdocument.in/reader038/viewer/2022110116/551b4e8c550346dd1a8b5dca/html5/thumbnails/55.jpg)
![Page 56: The Lifecycle of Grants: Environmental Review November 7, 2012](https://reader038.vdocument.in/reader038/viewer/2022110116/551b4e8c550346dd1a8b5dca/html5/thumbnails/56.jpg)
Environmental Assessment
• All projects not
Categorically Excluded
or Exempt (e.g. New
construction, Significant
Rehabilitation, etc.)
![Page 57: The Lifecycle of Grants: Environmental Review November 7, 2012](https://reader038.vdocument.in/reader038/viewer/2022110116/551b4e8c550346dd1a8b5dca/html5/thumbnails/57.jpg)
Project Aggregation (58.32) Define Projects for Review
Environmental Assessment (58.36)
Environmental Assessment Checklist
Statutory Checklist
Make a FONSI (58.40(g)(1))
Publish Combined Notice
Categorical Exclusion (58.35)
Fully Exempt (58.34)
Statutory Checklist
Compliance with 58.5 and 58.6 Authorities
No Compliance – CE/ Exempt
(58.34(a)(12))
Compliance with 58.6 Authorities
Publish NOI/RROF
Local Comment Period (7 days)
Local Comment Period (15 days)
Submit EXEMPT certification to State
Submit RROF and copy of Notice to State
Submit RROF and copy of Notice to State
State Comment Period (15 days)
State Comment Period (15 days)
Release of Funds by State
Proceed with Project
Submit CE not Subject to 58.5 certification to
State
45
30
7
Make a FOSI (58.40(g)(2))
Submit CE/EX certification to State
7
ER Impact
Contact OHCP
CE not subject to 58.5 (58.35(b))
7
Approximate # of days to get release once initial review has been completed
![Page 58: The Lifecycle of Grants: Environmental Review November 7, 2012](https://reader038.vdocument.in/reader038/viewer/2022110116/551b4e8c550346dd1a8b5dca/html5/thumbnails/58.jpg)
![Page 59: The Lifecycle of Grants: Environmental Review November 7, 2012](https://reader038.vdocument.in/reader038/viewer/2022110116/551b4e8c550346dd1a8b5dca/html5/thumbnails/59.jpg)
![Page 60: The Lifecycle of Grants: Environmental Review November 7, 2012](https://reader038.vdocument.in/reader038/viewer/2022110116/551b4e8c550346dd1a8b5dca/html5/thumbnails/60.jpg)
![Page 61: The Lifecycle of Grants: Environmental Review November 7, 2012](https://reader038.vdocument.in/reader038/viewer/2022110116/551b4e8c550346dd1a8b5dca/html5/thumbnails/61.jpg)
![Page 62: The Lifecycle of Grants: Environmental Review November 7, 2012](https://reader038.vdocument.in/reader038/viewer/2022110116/551b4e8c550346dd1a8b5dca/html5/thumbnails/62.jpg)
![Page 63: The Lifecycle of Grants: Environmental Review November 7, 2012](https://reader038.vdocument.in/reader038/viewer/2022110116/551b4e8c550346dd1a8b5dca/html5/thumbnails/63.jpg)
![Page 64: The Lifecycle of Grants: Environmental Review November 7, 2012](https://reader038.vdocument.in/reader038/viewer/2022110116/551b4e8c550346dd1a8b5dca/html5/thumbnails/64.jpg)
![Page 65: The Lifecycle of Grants: Environmental Review November 7, 2012](https://reader038.vdocument.in/reader038/viewer/2022110116/551b4e8c550346dd1a8b5dca/html5/thumbnails/65.jpg)
Runway Clear Zones
Coastal Barriers
Flood Insurance
![Page 66: The Lifecycle of Grants: Environmental Review November 7, 2012](https://reader038.vdocument.in/reader038/viewer/2022110116/551b4e8c550346dd1a8b5dca/html5/thumbnails/66.jpg)
Project Aggregation (58.32) Define Projects for Review
Environmental Assessment (58.36)
Environmental Assessment Checklist
Statutory Checklist
Make a FONSI (58.40(g)(1))
Publish Combined Notice
Categorical Exclusion (58.35)
Fully Exempt (58.34)
Statutory Checklist
Compliance with 58.5 and 58.6 Authorities
No Compliance – CE/ Exempt
(58.34(a)(12))
Compliance with 58.6 Authorities
Publish NOI/RROF
Local Comment Period (7 days)
Local Comment Period (15 days)
Submit EXEMPT certification to State
Submit RROF and copy of Notice to State
Submit RROF and copy of Notice to State
State Comment Period (15 days)
State Comment Period (15 days)
Release of Funds by State
Proceed with Project
Submit CE not Subject to 58.5 certification to
State
45
30
7
Make a FOSI (58.40(g)(2))
Submit CE/EX certification to State
7
ER Impact
Contact OHCP
CE not subject to 58.5 (58.35(b))
7
Approximate # of days to get release once initial review has been completed
![Page 67: The Lifecycle of Grants: Environmental Review November 7, 2012](https://reader038.vdocument.in/reader038/viewer/2022110116/551b4e8c550346dd1a8b5dca/html5/thumbnails/67.jpg)
Combined Notice:Finding of No Significant Impact (FONSI) & Notice of Intent to Request Release of
Funds (NOI/RROF)
• Newspaper of general circulation, non-legal section
• ERR must be complete prior to publication
• 15-day comment period
• Submit RROF to State
• 15-day objection period
![Page 68: The Lifecycle of Grants: Environmental Review November 7, 2012](https://reader038.vdocument.in/reader038/viewer/2022110116/551b4e8c550346dd1a8b5dca/html5/thumbnails/68.jpg)
![Page 69: The Lifecycle of Grants: Environmental Review November 7, 2012](https://reader038.vdocument.in/reader038/viewer/2022110116/551b4e8c550346dd1a8b5dca/html5/thumbnails/69.jpg)
![Page 70: The Lifecycle of Grants: Environmental Review November 7, 2012](https://reader038.vdocument.in/reader038/viewer/2022110116/551b4e8c550346dd1a8b5dca/html5/thumbnails/70.jpg)
![Page 71: The Lifecycle of Grants: Environmental Review November 7, 2012](https://reader038.vdocument.in/reader038/viewer/2022110116/551b4e8c550346dd1a8b5dca/html5/thumbnails/71.jpg)
![Page 72: The Lifecycle of Grants: Environmental Review November 7, 2012](https://reader038.vdocument.in/reader038/viewer/2022110116/551b4e8c550346dd1a8b5dca/html5/thumbnails/72.jpg)
![Page 73: The Lifecycle of Grants: Environmental Review November 7, 2012](https://reader038.vdocument.in/reader038/viewer/2022110116/551b4e8c550346dd1a8b5dca/html5/thumbnails/73.jpg)
![Page 74: The Lifecycle of Grants: Environmental Review November 7, 2012](https://reader038.vdocument.in/reader038/viewer/2022110116/551b4e8c550346dd1a8b5dca/html5/thumbnails/74.jpg)
![Page 75: The Lifecycle of Grants: Environmental Review November 7, 2012](https://reader038.vdocument.in/reader038/viewer/2022110116/551b4e8c550346dd1a8b5dca/html5/thumbnails/75.jpg)
![Page 76: The Lifecycle of Grants: Environmental Review November 7, 2012](https://reader038.vdocument.in/reader038/viewer/2022110116/551b4e8c550346dd1a8b5dca/html5/thumbnails/76.jpg)
![Page 77: The Lifecycle of Grants: Environmental Review November 7, 2012](https://reader038.vdocument.in/reader038/viewer/2022110116/551b4e8c550346dd1a8b5dca/html5/thumbnails/77.jpg)
Continued Relevance
• Bases environmental findings on a past environmental review record (ERR)
• Requires a re-evaluation of the original ERR
• Original ERR must have been conducted by the same responsible entity
![Page 78: The Lifecycle of Grants: Environmental Review November 7, 2012](https://reader038.vdocument.in/reader038/viewer/2022110116/551b4e8c550346dd1a8b5dca/html5/thumbnails/78.jpg)
Continued Relevance
• Phased projects, multi-year projects
• Grantees may cite Continued Relevance
for up to 6 years from the date of the
original release of funds
![Page 79: The Lifecycle of Grants: Environmental Review November 7, 2012](https://reader038.vdocument.in/reader038/viewer/2022110116/551b4e8c550346dd1a8b5dca/html5/thumbnails/79.jpg)
![Page 80: The Lifecycle of Grants: Environmental Review November 7, 2012](https://reader038.vdocument.in/reader038/viewer/2022110116/551b4e8c550346dd1a8b5dca/html5/thumbnails/80.jpg)
![Page 81: The Lifecycle of Grants: Environmental Review November 7, 2012](https://reader038.vdocument.in/reader038/viewer/2022110116/551b4e8c550346dd1a8b5dca/html5/thumbnails/81.jpg)
Questions?
ExemptExempt Categorical Exclusion, Subject to 58.5
Categorical Exclusion, Subject to 58.5
Environmental AssessmentEnvironmental Assessment
Continued RelevanceContinued Relevance Categorical Exclusion, Not Subject to 58.5
Categorical Exclusion, Not Subject to 58.5
Categorical Exclusion, Subsequently Exempt
Categorical Exclusion, Subsequently Exempt