The ManchesterNorth West Quadrant
project
Manchester North West Quadrant is the project we’ve set up to look at ways to ease congestion and make journey times more reliable between junctions 8 to 18 of the M60.
In 2014, the Department for Transport commissioned a study to help us better understand the problems in the area and identify how they could be fixed. Following the study, they tasked Highways England to develop some initial designs, and to talk to local authorities, environmental experts and key stakeholders to add to our understanding of local traffic issues.
Why this project is neededThe M60 plays an important role in keeping traffic moving and is one of the busiest in England with 180,000 journeys a day.
A huge amount of investment and growth is expected in the region with traffic set to increase as a result. We are working with partners, including Transport for the North, and thinking differently about how the network can be improved. The Manchester North West Quadrant project aims to:
� ensure the M60 can cope with a significant increase in local and long-distance journeys
� support growth and provide economic benefits in the North West.
� ensure the M60 can withstand unexpected events, exceptional demand and severe weather conditions.
What we are doing nextUsing the extensive information gathered, we are looking at ways to reduce congestion and future proof the road, considering benefits and potential impacts on motorists, the environment, our neighbours and the economy.
We’ll then identify a shortlist of options we believe will tackle the issues, before consulting with the public.
The project is still in the very early stages and at this point there is no commitment from the Department of Transport to continue or to build if the options don’t solve the current problems or offer value for money.
78
9
11
12
13
14
1516
17
18
19
3
2
20
10
5
6
12
3
4
5
6
27
26
25
24
23
98
22
21a10
11
2
3
M62
A57
M602
M62
M66
M60
M60
M60
M62
M58
M61
M61
M6
M6
M6
ManchesterManchesterSalfordSalford
WarringtonWarrington
St HelensSt Helens
WiganWigan
BoltonBolton
BuryBury
PrestwichPrestwich
StretfordStretford
SaleSale
IrlamIrlam
SwintonSwinton
FarnworthFarnworth
WalkdenWalkdenHindleyHindley
StandishStandish
GolborneGolborne
Newton-Le-Willows
Newton-Le-Willows
BirchwoodBirchwood
LeighLeigh
WesthoughtonWesthoughton
HorwichHorwich
AthertonAtherton
Radcli�eRadcli�e
© Crown copyright and database rights 2018 OS 100030649
M60 J17 – J18 capacityimprovements
14
9
10
17
18
12
13
M60 junction 14remodelling
M60 J12 and J13remodelling
M60 J12 – J18bypass
M62 to A57 Link Road
M60 J9 – J10 capacityimprovements
Manchester North West QuadrantHow we could reduce congestion
Hig
hway
s En
glan
d cr
eativ
e M
CR
18_0
089
If you need help accessing this or any other Highways England information,please call 0300 123 5000 and we will help you.
© Crown copyright 2019.
You may re-use this information (not including logos) free of charge in any format or medium, under the terms of the Open Government Licence. To view this licence: visit www.nationalarchives.gov.uk/doc/open-government-licence/write to the Information Policy Team, The National Archives, Kew, London TW9 4DU, or email [email protected].
Mapping (where present): © Crown copyright and database rights 2019 OS 100030649. You are permitted to use this data solely to enable you to respond to, or interact with, the organisation that provided you with the data. You are not permitted to copy, sub-licence, distribute or sell any of this data to third parties in any form.
This document is also available on our website at www.highwaysengland.co.ukFor an accessible version of this publication please call 0300 123 5000 and we will help you.
If you have any enquiries about this publication email [email protected] or call 0300 123 5000*. Please quote the Highways England publications code PR45/19.
Highways England creative job number MCR19_0127
*Calls to 03 numbers cost no more than a national rate call to an 01 or 02 number and must count towards any inclusive minutes in the same way as 01 and 02 calls.These rules apply to calls from any type of line including mobile, BT, other fixed line or payphone. Calls may be recorded or monitored.
Printed on paper from well-managed forests and other controlled sources when issued directly by Highways England.
Registered office Bridge House, 1 Walnut Tree Close, Guildford GU1 4LZHighways England Company Limited registered in England and Wales number 09346363
Where to get more information
Email: [email protected] Call: 0300 470 2216 Online: https://highwaysengland.co.uk/projects/manchester-north-west-quadrant/