the meaford energy - planning inspectorate... · mel will procure and own the electrical connection...
TRANSCRIPT
The Meaford Energy
Planning Act 2008
PINS Reference Number: Document Reference Number:
Lead Author: Meaford Energy Limited
Revision: Date:
MEAFORD ENERGY CENTRE u Grid Connection Statement
2
CONTENTS 1. INTRODUCTION ................................................................
2. SUMMARY OF THE ELECTRICAL CONNECTION AND GRID CONNECTION
3. DESCRIPTION OF GENERATION ................................
4. ELEMENTS OF THE ELECTRICAL CONNECTION AND GRID CONNECTION
5. LAND RIGHTS ................................................................
6. INSTALLATION AND CONSTRUCTION DETAILS
7. RESPONSIBILITIES FOR DESIGNING AND BUILDING THE ELECTRICAL CONNECTION
8. CONCLUSION ................................................................
9. GLOSSARY ................................................................
Grid Connection Statement
................................................................................................
SUMMARY OF THE ELECTRICAL CONNECTION AND GRID CONNECTION ................................
................................................................................................
ELEMENTS OF THE ELECTRICAL CONNECTION AND GRID CONNECTION................................
................................................................................................
INSTALLATION AND CONSTRUCTION DETAILS ............................................................................................
RESPONSIBILITIES FOR DESIGNING AND BUILDING THE ELECTRICAL CONNECTION ................................
................................................................................................
................................................................................................
........................................... 4
................................................... 5
................................................... 6
.................................................... 6
............................................... 8
............................ 8
.................................. 9
............................................. 10
.................................................. 11
MEAFORD ENERGY CENTRE u Grid connection Statement
Grid connection Statement
3
MEAFORD ENERGY CENTRE u Grid Connection Statement
4
1. INTRODUCTION
1.1. This document accompanies the Application by Meaford Energy Limited (MEL) to the Secretary of State under the Planning Act 2008 (the PA 2008) for the Meaford Power Station) Order (the Order) granting powers to construct, operate and maintain the Meaford Energy Centre (the MEC) on land within Meaford Business Park (MBP), between Barlaston and Stone in Staffordshire (the Scheme).
1.1. Meaford Energy Limited (MEL) is applying to the Secretary of State for a development
consent order (DCO) under the Planning Act 2008 (the PA 2008).proposed Meaford (Gas Fired Power Station) Order (the Order) is for powers to construct, operate and maintain the Meaford Energy Centre (the MEC) on land within the Meaford Business Park (MBP), between Barlaston and Stone in Staffordshire (the Scheme).
1.2. The MBP Site is an area of previously
two coal-fired power stations (Meaford 'A' and Meaford 'B') now demolished. The MBP Site occupies a low-lying position between the River Trent and the Trent and Mersey Canal and has outline planning permission for warehousing, industrial, offices and business support activities.
1.3. The Scheme constitutes a Nationally Significant Infrastructure Project (NSIP) by virtue of
section 14(1)(a) and section 15 of the PA 2008 which includes within the definition of an NSIP any onshore generating station in England or Wales of 50 MWUnder section 31 PA 2008, a Development Consent Order (DCO) is required to develop an NSIP. Under section 37 PA 2008relevant Secretary of State (SoS)
1.4. The Scheme comprises:
• a combined cycle gas turbine (CCGT) power station complex (the Power Station Complex)
(work numbered 1 in Schedule 1 of the Order);• an integral electrical connection (the Electrical Connection)
1 of the Order); • the integral gas connection (the Gas Connection) and AGI (work numbered 2 in Schedule 1
of the Order); • the Northern Access Road works (work numbered 4 in Schedule 1 of the Order); • the temporary and permanent Laydown Areas (Work numbered 5 in Schedule 1 to t
Order); • replacement, maintenance or refurbishment of existing surface water drainage (work
numbered 6 in Schedule 1 of the Order);• the landscaping works (work numbered 7 in Schedule 1 of the Order).
Grid Connection Statement
This document accompanies the Application by Meaford Energy Limited (MEL) to the Secretary of State under the Planning Act 2008 (the PA 2008) for the Meaford Power Station) Order (the Order) granting powers to construct, operate and maintain the Meaford Energy Centre (the MEC) on land within Meaford Business Park (MBP), between Barlaston and Stone in Staffordshire (the Scheme).
d (MEL) is applying to the Secretary of State for a development consent order (DCO) under the Planning Act 2008 (the PA 2008). The Application for the proposed Meaford (Gas Fired Power Station) Order (the Order) is for powers to construct,
ntain the Meaford Energy Centre (the MEC) on land within the Meaford Business Park (MBP), between Barlaston and Stone in Staffordshire (the Scheme).
The MBP Site is an area of previously-developed or ‘brownfield’ land occupied formerly by power stations (Meaford 'A' and Meaford 'B') now demolished. The MBP
lying position between the River Trent and the Trent and Mersey Canal and has outline planning permission for warehousing, industrial, offices and business
The Scheme constitutes a Nationally Significant Infrastructure Project (NSIP) by virtue of section 14(1)(a) and section 15 of the PA 2008 which includes within the definition of an NSIP any onshore generating station in England or Wales of 50 MWe capacity or more.
a Development Consent Order (DCO) is required to develop an Under section 37 PA 2008, this can only granted if an application is made for it to the
levant Secretary of State (SoS).
a combined cycle gas turbine (CCGT) power station complex (the Power Station Complex) (work numbered 1 in Schedule 1 of the Order); an integral electrical connection (the Electrical Connection) (work numbered 3 in Schedule
integral gas connection (the Gas Connection) and AGI (work numbered 2 in Schedule 1
the Northern Access Road works (work numbered 4 in Schedule 1 of the Order); the temporary and permanent Laydown Areas (Work numbered 5 in Schedule 1 to t
replacement, maintenance or refurbishment of existing surface water drainage (work numbered 6 in Schedule 1 of the Order); the landscaping works (work numbered 7 in Schedule 1 of the Order).
This document accompanies the Application by Meaford Energy Limited (MEL) to the Secretary of State under the Planning Act 2008 (the PA 2008) for the Meaford (Gas Fired Power Station) Order (the Order) granting powers to construct, operate and maintain the Meaford Energy Centre (the MEC) on land within Meaford Business Park (MBP), between
d (MEL) is applying to the Secretary of State for a development The Application for the
proposed Meaford (Gas Fired Power Station) Order (the Order) is for powers to construct, ntain the Meaford Energy Centre (the MEC) on land within the Meaford
Business Park (MBP), between Barlaston and Stone in Staffordshire (the Scheme).
developed or ‘brownfield’ land occupied formerly by power stations (Meaford 'A' and Meaford 'B') now demolished. The MBP
lying position between the River Trent and the Trent and Mersey Canal and has outline planning permission for warehousing, industrial, offices and business
The Scheme constitutes a Nationally Significant Infrastructure Project (NSIP) by virtue of section 14(1)(a) and section 15 of the PA 2008 which includes within the definition of an
e capacity or more. a Development Consent Order (DCO) is required to develop an
this can only granted if an application is made for it to the
a combined cycle gas turbine (CCGT) power station complex (the Power Station Complex)
(work numbered 3 in Schedule
integral gas connection (the Gas Connection) and AGI (work numbered 2 in Schedule 1
the Northern Access Road works (work numbered 4 in Schedule 1 of the Order); the temporary and permanent Laydown Areas (Work numbered 5 in Schedule 1 to the
replacement, maintenance or refurbishment of existing surface water drainage (work
1.5. A description of the Scheme is provided in chapters oStatement (ES) (document reference 6.2).
1.6. The Power Station Complex would be fuelled by natural gas and would have an electrical generation capacity of up to 299 megawatts (MWe).exported to the National Grid via an existing local distribution network electricity substation (Barlaston Substation) at MBP, beside the Power Station Complex.
1.7. This document forms part of the suite of
with section 37 of the PA 2008 and the Infrastructure Planning (Applications: Prescribed Forms and Procedure) Regulations 2009 (APFP Regulations). The Application seeks the making of the Order, which would confer the powers required to construct, operate and maintain the MEC.
2. SUMMARY OF THE ELECTRICAL CONNECTION
2.1. The Scheme will export electricity
via underground cables running to the west of the proposed Power Stationbe designed to enable a single generator circuit to be shut down for maintenance without affecting the operation of the remaining connections.
2.2. New infrastructure is required in order to establish an embedded so that the Scheme can export electricity to the distribution and transmission networks. Electrical Connection forms thatresponsibility of MEL to secure the land rights and development consent for and to deliver. The overall grid connection infrastructure will comprise the following elementsworks required to make the connection are based on feasibility sprovided and discussions between MEL, WPD and N(NGeT))): 2.2.1. underground cables between the MEC
substation (these works are the responsibility of MELApplication);
2.2.2. works required at Barlaston substation
the responsibility of WPD as 2.2.3. potential works required at Burslem, Stagefields and Whitfield substatio
fault levels do not exceed 95% of the switchgear ratingsresponsibility of WPD as
2.2.4. potential works required at Cellarhead substation to ensure
capacity (these works are the responsibility of NGeT)
2.3. With the exception of the Electrical Connectionand which are the responsibility of MEL
MEAFORD ENERGY CENTRE u Grid connection Statement
A description of the Scheme is provided in chapters one and four of the Environmental Statement (ES) (document reference 6.2). The Power Station Complex would be fuelled by natural gas and would have an electrical generation capacity of up to 299 megawatts (MWe). The electricity generated would be
to the National Grid via an existing local distribution network electricity substation (Barlaston Substation) at MBP, beside the Power Station Complex.
forms part of the suite of Application documents submitted in accordance of the PA 2008 and the Infrastructure Planning (Applications: Prescribed
Forms and Procedure) Regulations 2009 (APFP Regulations). The Application seeks the making of the Order, which would confer the powers required to construct, operate and
OF THE ELECTRICAL CONNECTION AND GRID CONNECTION
The Scheme will export electricity into Western Power Distribution’s (WPD) 132 kV network via underground cables running to the existing Barlaston substation, immediately to the
tation Complex. The connections into the WPD network will be designed to enable a single generator circuit to be shut down for maintenance without affecting the operation of the remaining connections.
nfrastructure is required in order to establish an embedded connection into the grid so that the Scheme can export electricity to the distribution and transmission networks.
lectrical Connection forms that part of the overall grid connection that woulresponsibility of MEL to secure the land rights and development consent for and to deliver.
infrastructure will comprise the following elementsworks required to make the connection are based on feasibility studies, information provided and discussions between MEL, WPD and National Grid Electricity Transmission plc
between the MEC switchgear and the existing Barlaston (these works are the responsibility of MEL and form part of the
works required at Barlaston substation to enable the connection (these works are the responsibility of WPD as the distribution network operator);
otential works required at Burslem, Stagefields and Whitfield substatiofault levels do not exceed 95% of the switchgear ratings (these works are the responsibility of WPD as the distribution network operator); and
otential works required at Cellarhead substation to ensure the reverse power flowworks are the responsibility of NGeT).
Electrical Connection works that are contained withand which are the responsibility of MEL (being numbered work 3, being the underground
Grid connection Statement
5
ne and four of the Environmental
The Power Station Complex would be fuelled by natural gas and would have an electrical The electricity generated would be
to the National Grid via an existing local distribution network electricity sub-
documents submitted in accordance of the PA 2008 and the Infrastructure Planning (Applications: Prescribed
Forms and Procedure) Regulations 2009 (APFP Regulations). The Application seeks the making of the Order, which would confer the powers required to construct, operate and
into Western Power Distribution’s (WPD) 132 kV network immediately to the
The connections into the WPD network will be designed to enable a single generator circuit to be shut down for maintenance without
connection into the grid so that the Scheme can export electricity to the distribution and transmission networks. The
that would be the responsibility of MEL to secure the land rights and development consent for and to deliver.
infrastructure will comprise the following elements (the below tudies, information
rid Electricity Transmission plc
switchgear and the existing Barlaston and form part of the
(these works are
otential works required at Burslem, Stagefields and Whitfield substations to ensure (these works are the
the reverse power flow
contained within the Order the underground
MEAFORD ENERGY CENTRE u Grid Connection Statement
6
cables between the MEC switchgear and referred to above would constitute permitted development for either WPD or NGeT.
2.4. This document summarises how MEL proposes to secure the land rights and
consent in order to deliver the Electrical Connection and the parties' progress on the necessary connection agreements in order to secure the delivery of the works referred to in paragraphs 2.2.2 to 2.2.4 above.
3. DESCRIPTION OF GENERATION 3.1. The Scheme is a Combined Cycle Gas Turbine. The Scheme will be fired on natural gas
which would be obtained from System (NTS). The proposed connection point System (LTS) which is supplied from the NTS. taken account of the demand of the pressure available from the established is described in the Gas Connection Statement (document reference
3.2. The Scheme will have a maximum output of WPD’s network (as distribution network operator)exported into the National Grid’s transmission network. The Scheme will have three generators and a startup and shutdown sequence scheme which will ensure the voltage step change is less than 3% so as to comply with standard Engineering Recommendation P28.
3.3. MEL will procure and own the electrical connection cables and the generator bays up boundary of the Barlaston substation. WPD will procure and own the equipment within the Barlaston, Burslem, Stagefields and Whitfield substations. equipment within Cellarhead substation.
4. ELEMENTS OF THE ELECTRICAL
4.1. MEL has engaged with WPD as distribution network operator options for the provision of a connection feasibility study for the connection. This study concluded that capacity is available at the adjoining Barlaston substation MEL and NGeT have had discussions regardthe transmission network, including reverse power flows. Connection will be into the distribution network100MWe, NGeT need to be party to an
Grid Connection Statement
cables between the MEC switchgear and the existing Barlaston substation), the other works would constitute permitted development for either WPD or NGeT.
This document summarises how MEL proposes to secure the land rights and consent in order to deliver the Electrical Connection and the parties' progress on the necessary connection agreements in order to secure the delivery of the works referred to in
above.
ined Cycle Gas Turbine. The Scheme will be fired on natural gas from National Grid’s gas network, the National Transmission
connection point is on the lower pressure Local Transmission System (LTS) which is supplied from the NTS. The consideration of gas connection hataken account of the demand of the Power Station Complex and maximum capacity pressure available from the established network in the area. Connection to the gas network is described in the Gas Connection Statement (document reference 8.2)
The Scheme will have a maximum output of up to 299MWe which will be exported into (as distribution network operator), of which a maximum of 99MWe, will be
to the National Grid’s transmission network. The Scheme will have three and a startup and shutdown sequence scheme which will ensure the voltage
step change is less than 3% so as to comply with standard Engineering Recommendation
MEL will procure and own the electrical connection cables and the generator bays up the Barlaston substation. WPD will procure and own the equipment within the
Barlaston, Burslem, Stagefields and Whitfield substations. NGeT will procure and own the equipment within Cellarhead substation.
ELEMENTS OF THE ELECTRICAL CONNECTION AND GRID CONNECTION
WPD as distribution network operator and NGeT connection for the Scheme. MEL and WPD undertook a joint
feasibility study for the connection. This study concluded that capacity is available at the adjoining Barlaston substation (as shown on the plan below), subject to reconfigurationMEL and NGeT have had discussions regarding any effects that this Scheme would have on
including reverse power flows. Although the onnection will be into the distribution network, as the generation capacity is greater than
100MWe, NGeT need to be party to any connection.
the other works would constitute permitted development for either WPD or NGeT.
This document summarises how MEL proposes to secure the land rights and development consent in order to deliver the Electrical Connection and the parties' progress on the necessary connection agreements in order to secure the delivery of the works referred to in
ined Cycle Gas Turbine. The Scheme will be fired on natural gas National Grid’s gas network, the National Transmission
on the lower pressure Local Transmission The consideration of gas connection has
and maximum capacity and Connection to the gas network
which will be exported into , of which a maximum of 99MWe, will be
to the National Grid’s transmission network. The Scheme will have three and a startup and shutdown sequence scheme which will ensure the voltage
step change is less than 3% so as to comply with standard Engineering Recommendation
MEL will procure and own the electrical connection cables and the generator bays up to the the Barlaston substation. WPD will procure and own the equipment within the
will procure and own the
in relation to MEL and WPD undertook a joint
feasibility study for the connection. This study concluded that capacity is available at the , subject to reconfiguration.
ing any effects that this Scheme would have on Although the Electrical
as the generation capacity is greater than
Plan of Barlaston Substation in relation to the Order Limits
4.2. New infrastructure is required in order to establish an embedded
Scheme can export electricity to the distribution and transmission networks. The infrastructure upgrades will comprise the following elements: 4.2.1. up to three underground cables
switchgear and the existing Barlaston substationto the Order (document referenceElectrical Connection/works referred to at paragraph
4.2.2. works required at Barlaston substation, carried out
include: a) expand the existing 132kV
a bus section breaker, within the existing substation compoundb) reconnect the existing Boothen/Stagefields 132kV to the
system after the expansion described above
MEAFORD ENERGY CENTRE u Grid connection Statement
in relation to the Order Limits
New infrastructure is required in order to establish an embedded connection Scheme can export electricity to the distribution and transmission networks. The infrastructure upgrades will comprise the following elements:
to three underground cables of up to 200m in length between the MEC switchgear and the existing Barlaston substation (numbered work 3
document reference 3.1)), to be constructed by MELElectrical Connection/works referred to at paragraph 2.2.1 above).
works required at Barlaston substation, carried out by WPD, which will typically
expand the existing 132kV mesh busbar system with new 132kV feeder bays and a bus section breaker, within the existing substation compound; reconnect the existing Boothen/Stagefields 132kV to the extended
fter the expansion described above
Grid connection Statement
7
connection so that the Scheme can export electricity to the distribution and transmission networks. The
00m in length between the MEC 3 in Schedule 1
be constructed by MEL (i.e. the
which will typically
busbar system with new 132kV feeder bays and
extended mesh busbar
MEAFORD ENERGY CENTRE u Grid Connection Statement
8
(i.e. the works referred to at paragraph
4.2.3. Potential works required at Burslem, Stagefields and Whitfield substations to ensure fault levels do not exceed 95% of the switchgear ratings, including
a) Installing reactors to b) Installing higher impedance transformersc) replacement of existing equipment (i.e. the works referred to at paragraph
4.2.4. Potential works required at Cellarhead substation, carried out by
the reverse power flow can be exported into NGeT’s 400kV transmission network, including changing, if required,works referred to at paragraph
5. LAND RIGHTS 5.1. MEL is not seeking compulsory acquisition
between the Scheme and Barlaston substation. MEL has secured the necessary land rights voluntarily from the existing land owner.
5.2. Work which may be required to the distribution or transmission network can be undertaken
on land already in the ownership and contro
6. INSTALLATION AND CONSTRUCTION DETAILS
Cable Installation
6.1. Cable installation will be carried out in an excavated trench with cable directly buried in the trench (open cut method). The cable bedding wilsubject to existing conditions and the location of existing buried services. Once the cables are installed cable protection cover slabs will be placed over the cables. Finally the trench will be backfilled and final reinstatement undertakenof the connection no cable joints should be required.
Substation works
6.2. Pursuant to their statutory duties under the Electricity Act 1989, it will be the responsibility of WPD (as DNO) and NGeT to determine the technical works that may be required within their current networks of substations in order to accommodate the ElectriAs noted above and below, WPD and NGeT have the permitted development and land rights in order to undertake whatever technical works may be required. any necessary substation works can be carried out by WPD and NGeT withiof the construction period for the Scheme.
Grid Connection Statement
the works referred to at paragraph 2.2.2 above).
Potential works required at Burslem, Stagefields and Whitfield substations to ensure fault levels do not exceed 95% of the switchgear ratings, including:
limit fault level contribution; Installing higher impedance transformers; replacement of existing equipment
the works referred to at paragraph 2.2.3 above).
Potential works required at Cellarhead substation, carried out by NGeTthe reverse power flow can be exported into NGeT’s 400kV transmission network,
, if required, one or more of the existing grid transformersworks referred to at paragraph 2.2.4 above).
MEL is not seeking compulsory acquisition over land required for the Electrical Che Scheme and Barlaston substation. MEL has secured the necessary land rights
voluntarily from the existing land owner.
Work which may be required to the distribution or transmission network can be undertaken on land already in the ownership and control of the operators.
INSTALLATION AND CONSTRUCTION DETAILS
Cable installation will be carried out in an excavated trench with cable directly buried in the The cable bedding will be laid typically at 1m under
subject to existing conditions and the location of existing buried services. Once the cables are installed cable protection cover slabs will be placed over the cables. Finally the trench will be backfilled and final reinstatement undertaken. Due to the relatively short distance of the connection no cable joints should be required.
Pursuant to their statutory duties under the Electricity Act 1989, it will be the responsibility of WPD (as DNO) and NGeT to determine the technical works that may be required within their current networks of substations in order to accommodate the Electrical Connection. As noted above and below, WPD and NGeT have the permitted development and land rights in order to undertake whatever technical works may be required. MEL considers that any necessary substation works can be carried out by WPD and NGeT within the timescale of the construction period for the Scheme.
Potential works required at Burslem, Stagefields and Whitfield substations to ensure
NGeT, to ensure the reverse power flow can be exported into NGeT’s 400kV transmission network,
one or more of the existing grid transformers (i.e the
Electrical Connection he Scheme and Barlaston substation. MEL has secured the necessary land rights
Work which may be required to the distribution or transmission network can be undertaken
Cable installation will be carried out in an excavated trench with cable directly buried in the l be laid typically at 1m underground level,
subject to existing conditions and the location of existing buried services. Once the cables are installed cable protection cover slabs will be placed over the cables. Finally the trench
Due to the relatively short distance
Pursuant to their statutory duties under the Electricity Act 1989, it will be the responsibility of WPD (as DNO) and NGeT to determine the technical works that may be required within
cal Connection. As noted above and below, WPD and NGeT have the permitted development and land
MEL considers that n the timescale
7. RESPONSIBILITIES FOR DESIGNING AND BUILDING THE
7.1. MEL is seeking consent within the Order for
the MEC and the Barlaston substaparagraph 2.2.1 above.
7.2. MEL is not seeking consent within the Order for the alterations to WPD’s substations
NGeT’s Cellarhead substation (i.eFrom the studies undertaken, the works required to these substationsthe Electrical Connection, would be undertaken using Permitted Development rights of WPD or NGeT, as appropriate.
7.3. MEL is in the process of applying application for a connection during the examination of the Application based upon the findings of a joint feasibility studystatement of works which will incorporate the works referred to at paragraphs 2.2.3 as required.
7.4. After obtaining a Connection Offer
Embedded Generation Agreement (BEGA)and is confident that both agreements will be en
7.5. MEL is responsible for designing and installing the 132kV underground cables between the MEC switchgear and the Barlaston substationto at paragraph 2.2.1 above). As explained above, MPL has already secured the land rights for these works and is seeking development consent for these works in the the Scheme (document reference 3.
7.6. WPD will be responsible for designing and building the will typically include:
a) expand the existing 132kV a bus section breaker, within the existing substation compo
b) reconnect the existing Boothen/Stagefields 132kV to the system after the expansion described aboveparagraph 2.2.2 above)
7.7. As noted above, MEL considers that these works would be carried out using WPD’s
permitted development rights and within an area over which WPD already has the necessary land rights.
7.8. WPD will be responsible for designing and building the alterations to the following
substations at Burslem, Stagefields and Whitfield to ensure fault levels do not exceed 95% of the switchgear ratings. The works will typically
a) installing reactors to limit fault level contribution
MEAFORD ENERGY CENTRE u Grid connection Statement
RESPONSIBILITIES FOR DESIGNING AND BUILDING THE ELECTRICAL CONNECTION
consent within the Order for that part of the Electrical Connection the MEC and the Barlaston substation (numbered work 3) i.e. the works referred to at
MEL is not seeking consent within the Order for the alterations to WPD’s substations (i.e. the works referred to at paragraphs 2.2.2 to the works required to these substations in order
, would be undertaken using Permitted Development rights of , as appropriate.
ss of applying for a Connection Agreement with WPD. MEL will make an application for a connection during the examination of the Application based upon the
joint feasibility study of August 2014. The Connection Offer will incorporate a which will incorporate the works referred to at paragraphs
Connection Offer from WPD, MEL will apply to NGeT Embedded Generation Agreement (BEGA). MEL is in discussions with both WPD and NGeT and is confident that both agreements will be entered into in due course.
responsible for designing and installing the 132kV underground cables between the MEC switchgear and the Barlaston substation (i.e. numbered work 3 and the works referred
As explained above, MPL has already secured the land rights for these works and is seeking development consent for these works in the
(document reference 3.1).
WPD will be responsible for designing and building the alterations to the substation
expand the existing 132kV mesh busbar system with new 132kV feeder bays and a bus section breaker, within the existing substation compound; and
reconnect the existing Boothen/Stagefields 132kV to the extendedafter the expansion described above (i.e. the works referred to at
above).
As noted above, MEL considers that these works would be carried out using WPD’s permitted development rights and within an area over which WPD already has the
WPD will be responsible for designing and building the alterations to the following Burslem, Stagefields and Whitfield to ensure fault levels do not exceed 95%
. The works will typically include: reactors to limit fault level contribution;
Grid connection Statement
9
CONNECTION
onnection between the works referred to at
MEL is not seeking consent within the Order for the alterations to WPD’s substations or to 2.2.4 above).
in order to facilitate , would be undertaken using Permitted Development rights of
. MEL will make an application for a connection during the examination of the Application based upon the
ffer will incorporate a which will incorporate the works referred to at paragraphs 2.2.2 and
for a Bilateral MEL is in discussions with both WPD and NGeT
responsible for designing and installing the 132kV underground cables between the the works referred
As explained above, MPL has already secured the land rights for these works and is seeking development consent for these works in the draft Order for
alterations to the substation which
busbar system with new 132kV feeder bays and and
extended mesh busbar the works referred to at
As noted above, MEL considers that these works would be carried out using WPD’s permitted development rights and within an area over which WPD already has the
WPD will be responsible for designing and building the alterations to the following Burslem, Stagefields and Whitfield to ensure fault levels do not exceed 95%
MEAFORD ENERGY CENTRE u Grid Connection Statement
10
b) installing higher impedance transformers
c) replacement of existing equipmentabove).
7.9. As noted above, MEL considers that these works would be carried out using WPD’s permitted development rights and within an area over which WPD already has the necessary land rights.
7.10. NGeT will be responsible for designing and installing replacement equipment
substation, to rectify any reverse power flow electricity into the 400kV transmission networkreplacing, if required, one or more of the grid transformersparagraph 2.2.4 above). As noted above, MEL considers that these out using NGeT’s permitted development rights and within an area over which NGeT already has the necessary land rights.
8. CONCLUSION
8.1. MEL is required to submit a statement Regulations confirming "who will be responsible for designing and building the connection to the electricity grid".
8.2. MEL considers that this document 8.2.1. MEL is in the process of securing the necessary
and NGeT regarding connection of its up to 299MW output from the Scheme to the local distribution network;
8.2.2. These agreements will provide that WPD and NGeT will design and build certain
elements of the wider connectionand NGeT have the necessary permitted development and land rights for these works to be undertaken;
8.2.3. MEL has secured the necessary land and rights in order to allow it to construct
numbered work 3 (the Electrical Cthe DCO for the Scheme in this regard.
Grid Connection Statement
nstalling higher impedance transformers; and
replacement of existing equipment (i.e. the works referred to at paragraph
As noted above, MEL considers that these works would be carried out using WPD’s permitted development rights and within an area over which WPD already has the
will be responsible for designing and installing replacement equipmentreverse power flow constraints which would prohibit
400kV transmission network. This work would typically ireplacing, if required, one or more of the grid transformers (i.e. the works referred to at
As noted above, MEL considers that these works would be carried out using NGeT’s permitted development rights and within an area over which NGeT already has the necessary land rights.
MEL is required to submit a statement (this document) pursuant to regulation 6 of the APFP Regulations confirming "who will be responsible for designing and building the connection
document provides confirmation to the Secretary of State that:
L is in the process of securing the necessary connection agreements with WPD and NGeT regarding connection of its up to 299MW output from the Scheme to the local distribution network;
These agreements will provide that WPD and NGeT will design and build certain connection. Where this is required, MEL considers that WPD
and NGeT have the necessary permitted development and land rights for these works to be undertaken;
MEL has secured the necessary land and rights in order to allow it to construct 3 (the Electrical Connection) and is seeking development consent under
the DCO for the Scheme in this regard.
the works referred to at paragraph 2.2.3
As noted above, MEL considers that these works would be carried out using WPD’s permitted development rights and within an area over which WPD already has the
will be responsible for designing and installing replacement equipment at Cellarhead prohibit the export of
. This work would typically involve the works referred to at
works would be carried out using NGeT’s permitted development rights and within an area over which NGeT
pursuant to regulation 6 of the APFP Regulations confirming "who will be responsible for designing and building the connection
provides confirmation to the Secretary of State that:
connection agreements with WPD and NGeT regarding connection of its up to 299MW output from the Scheme to the
These agreements will provide that WPD and NGeT will design and build certain this is required, MEL considers that WPD
and NGeT have the necessary permitted development and land rights for these
MEL has secured the necessary land and rights in order to allow it to construct onnection) and is seeking development consent under
9. GLOSSARY
Full Text Acronym Above Ground Installation
AGI
Above Ordnance Datum
AOD
Air Cooled Condenser
-
Air Quality Limit Value Regulations 2010
-
Air Quality Management Area
AQMA
Air Quality Management Plan
AQMP
Air Quality Modelling and Assessment Unit
AQMAU
Air Quality Strategy AQS
Ancient Woodland -
Annual Average Daily Traffic
AADT
Application -
Applications: Prescribed Forms and Procedure Regulations
APFP
Asbestos Containing Material
ACM
Automatic Traffic Count
ATC
Automatic Urban and Rural Network
AURN
Best Available Technique
BAT
MEAFORD ENERGY CENTRE u Grid connection Statement
Notes Compound where the Gas Connection connects to the Local Transmission System (work numbered 2A in Schedule 1 of the Order). Height of land surface above sea level.
A direct dry cooling system where the steam is condensed and returned condensate to the boiler without water loss. Situated within the Power Station Complex. UK regulations to limit the levels of air borne polluemitted from industries.
An area designated by a local authority as being at risk of not meeting air quality standards. A plan developed to improve the air quality in the air qualitmanagement area. An Environment Agency team that targets air quality related issues. The AQS for England, Scotland, Wales and Northern Ireland provides details of national air quality standards and objectives for a number of local air pollutants.A woodland that has existed continuously since 1600 or before. Measurement unit for the total volume of vehicle traffic to indicate how busy the road is. The DCO application for the Scheme made to the Secretary of State under the Planning Act 2008. The Infrastructure Planning Regulations 2009, as amendewhich prescribe various matters in connection with the making of an application for development consent under the Planning Act 2008. Any material containing more than 1% asbestos.
Means of determining traffic levels in the vicinity.
Air quality monitoring site.
The most effective and advanced stage in the development of activities and their methods of operation which indithe practical suitability of particular techniques for providing the basis for emission limit values and other permit conditions designed to prevent and, where that is
Grid connection Statement
11
Compound where the Gas Connection connects to the Local Transmission System (work numbered 2A in Schedule 1 of
A direct dry cooling system where the steam is condensed and returned condensate to the boiler without water loss.
UK regulations to limit the levels of air borne pollutants
An area designated by a local authority as being at risk of
A plan developed to improve the air quality in the air quality
An Environment Agency team that targets air quality
The AQS for England, Scotland, Wales and Northern Ireland quality standards and
objectives for a number of local air pollutants. A woodland that has existed continuously since 1600 or
Measurement unit for the total volume of vehicle traffic to
The DCO application for the Scheme made to the Secretary
The Infrastructure Planning Regulations 2009, as amended, which prescribe various matters in connection with the making of an application for development consent under
Any material containing more than 1% asbestos.
determining traffic levels in the vicinity.
The most effective and advanced stage in the development of activities and their methods of operation which indicates the practical suitability of particular techniques for providing the basis for emission limit values and other permit conditions designed to prevent and, where that is
MEAFORD ENERGY CENTRE u Grid Connection Statement
12
Full Text Acronym
Biodiversity Action Plan
BAP
British Geological Survey
BGS
BS 4142 -
BS 8233 -
BS5228 -
CAoL Guidance -
Canal Bridge 101 or Canal Bridge No.101
-
Carbon Dioxide CO2
Carbon Monoxide CO
Chamber of Commerce
CoC
Civil Aviation Authority
CAA
Classified Turning Counts
CTC
Coal Authority -
Construction Industry Research and Information Association
CIRIA
Code of Construction Practices
CoCP
Combined Cycle Gas Turbine
CCGT
Combined Heat and Power
CHP
Commercial and Industrial waste
C&I
Common Bird Census CBC
Grid Connection Statement
Notes not practicable, to reduce emissions and the impact on the environment as a whole. Plan concerned with the protection of identified species and habitats. The UK public body responsible for all aspects of geoscience. Method for Rating Industrial Noise Affecting Residential and Industrial Areas (1997). Guidance on sound insulation and noise reduction for buildings (2014). Code of Practice for Noise and Vibration Control on Construction and Open Sites 2009 (2009). Department of Communities and Local Government guidance ‘Planning Act 2008: Guidance related to procedures for the compulsory acquisition of land’ (September 2013). The bridge known as Malkin's Bridge traversing the Trent and Mersey Canal at Grid Reference SJ 889 370. A primary greenhouse gas emitted through human activities as well as natural sources. One of the combustion products discharged by CCGT power stations. A network of businesses to represent business interests.
A statutory corporation that oversees and regulates civil aviation in the UK. Measurement of vehicle traffic in particular at junctions.
A non-governmental body that manages coal mining operations and coal reserves throughout the UK. -
A guidance document that sets out standards and procedures for managing environmental impact of constructing major schemes. A form of power station that uses an efficient combination of gas and steam turbines to generate electricity.A means of using waste heat generated by power station e.g. through a local heat distribution network.A type of waste from businesses that does not include construction and demolition waste. A standardised methodology to map breeding bird
not practicable, to reduce emissions and the impact on the
Plan concerned with the protection of identified species
The UK public body responsible for all aspects of
Method for Rating Industrial Noise Affecting Mixed
Guidance on sound insulation and noise reduction for
Code of Practice for Noise and Vibration Control on
ment of Communities and Local Government guidance ‘Planning Act 2008: Guidance related to procedures for the compulsory acquisition of land’
The bridge known as Malkin's Bridge traversing the Trent and Mersey Canal at Grid Reference SJ 889 370. A primary greenhouse gas emitted through human activities
ducts discharged by CCGT power
A network of businesses to represent business interests.
A statutory corporation that oversees and regulates civil
Measurement of vehicle traffic in particular at junctions.
governmental body that manages coal mining operations and coal reserves throughout the UK.
A guidance document that sets out standards and procedures for managing environmental impact of
A form of power station that uses an efficient combination gas and steam turbines to generate electricity.
A means of using waste heat generated by power station e.g. through a local heat distribution network. A type of waste from businesses that does not include
A standardised methodology to map breeding bird
Full Text Acronym
Committee on the Medical Effects of Air Pollutants
COMEAP
Conceptual Site Model
CSM
Conservation Areas CA
Construction Stage -
Construction and Demolition Waste
C&D
Construction Environmental Management Plan
CEMP
Construction Traffic Management Plan
CTMP
Construction Travel Plan
CTP
dB(A) -
Decibel dB Decommissioning Stage
-
Department for Energy and Climate Change
DECC
Department for Environment, Food
DEFRA
MEAFORD ENERGY CENTRE u Grid connection Statement
Notes territories. An advisory body that advises the UK government on all matters concerning the health effects of air pollutants.
A model that identifies the possible pathways by which a contaminant from a particular source can affect a particulareceptor. An area of special architectural and historic interest designated by the local planning authority. The construction stage of the Scheme begins with works, which will include site set-up and groundworks and will take in the region of 3-6 months. Following construction of the Power Station Complex, Gand Electrical Connection will be undertaken over a period of approximately 18 months, with commissioning taking in the region of six months. A type of construction waste as identified by the Environment Agency. A plan by the contractor describing how the environmental impacts of construction activities of a project will be minimised and mitigated. A plan by the construction contractor for managing construction traffic that is submitted to the relevantHighway Authority for approval A plan by the construction contractor for managing staff travel during the construction stage of a project (e.g. car sharing, public transport) that is submitted to the relevant Highway Authority for approval. A-weighted decibel – a correction applied to each frequency between 20 Hz and 20 kHz that effectively represents the way the human ear works. Logarithmic scale for measuring sound levels.After a notional lifetime of 35 years, the plant Scheme would be decommissioned and the revert to open bare ground. The Electrical likely to be dismantled along with the Complex. The existing gas pipes are likely to be left inorder to avoid the adverse environmental effects associated with their removal, with the gas supply divertedGovernment department responsible for energy policy.
The UK Government department responsible for environmental protection, food production and standards,
Grid connection Statement
13
An advisory body that advises the UK government on all matters concerning the health effects of air pollutants.
A model that identifies the possible pathways by which a contaminant from a particular source can affect a particular
An area of special architectural and historic interest
The construction stage of the Scheme begins with enabling up and groundworks and
6 months. Following this, Gas Connection
onnection will be undertaken over a period 18 months, with commissioning taking in
A type of construction waste as identified by the
ing how the environmental impacts of construction activities of a project will be
A plan by the construction contractor for managing construction traffic that is submitted to the relevant
A plan by the construction contractor for managing staff travel during the construction stage of a project (e.g. car sharing, public transport) that is submitted to the relevant
a correction applied to each frequency between 20 Hz and 20 kHz that effectively represents the
Logarithmic scale for measuring sound levels. the plant for the
would be decommissioned and the MEC Site will lectrical Connection is
likely to be dismantled along with the Power Station re likely to be left in-situ in
order to avoid the adverse environmental effects associated with their removal, with the gas supply diverted. Government department responsible for energy policy.
The UK Government department responsible for environmental protection, food production and standards,
MEAFORD ENERGY CENTRE u Grid Connection Statement
14
Full Text Acronym and Rural Affairs Department for Transport
DfT
Deposition -
Design Manual for Roads and Bridges
DMRB
Determinand -
Development Consent Order
DCO
Electrical Connection -
Electricity Market Reform
EMR
Electric and Magnetic Fields
EMF
Emission -
Emission Limit Value ELV
Energy Efficiency Directive 2012
-
English Heritage EH
English Heritage Archives
EHA
Environment Agency EA
Environmental EHO
Grid Connection Statement
Notes agriculture, fisheries and rural communities in the UK. Government department responsible for transport.
The main pathway for removing pollutants from the atmosphere, by settling on land. A suite of technical documents produced by the Highways Agency that include guidance for environmental appraisal that are also used for non-highways schemes and as such are commonly used in EIA. A substance or parameter that is determined analytically, e.g. arsenic concentration in soil, pH of water, concentration of a particular gas in air quality modelling.An order made under the Planning Act 2008 granting development consent for a Nationally Significant Infrastructure Project The integral underground cable circuit connecting the Power Station Complex to the existing Barlaston Substation (numbered work 3 in Schedule 1 to the Order and as shown on the Works Plan). UK government's policy to reform the electricity market. The policy aims to deliver a low carbon energy and reliable supplies for the UK, while minimise costs to consumers. EMF’s comprise electric and magnetic fields. Electric fields are the result of voltages applied to electrical conductors and equipment. Magnetic fields are produced by the flow of electric current. The direct or indirect release of substances, vibrations, heat or noise from individual or diffuse sources into air, water oronto land, e.g. pollution may be discharged into the atmosphere from a stack or vent. Legal enforcement limit on the physical, chemical or biological characteristics of a point source of emission to water or air. The Directive establishes a framework of measures for the promotion of energy efficiency within the European Union. The executive non-departmental public body that advises the public and other bodies on the care of the historic environment in England. A public archive of architectural and archaeological records.
The non-departmental government body responsible for protection and enhancement of the environment in England and Wales. A local authority health professional responsible for
agriculture, fisheries and rural communities in the UK. Government department responsible for transport.
The main pathway for removing pollutants from the
A suite of technical documents produced by the Highways include guidance for environmental appraisal
highways schemes and as such
A substance or parameter that is determined analytically, e.g. arsenic concentration in soil, pH of water,
ration of a particular gas in air quality modelling. An order made under the Planning Act 2008 granting development consent for a Nationally Significant
The integral underground cable circuit connecting the Power Station Complex to the existing Barlaston Substation (numbered work 3 in Schedule 1 to the Order and as shown
he electricity market. The policy aims to deliver a low carbon energy and reliable supplies for the UK, while minimise costs to consumers. EMF’s comprise electric and magnetic fields. Electric fields
oltages applied to electrical conductors and equipment. Magnetic fields are produced by the flow of
The direct or indirect release of substances, vibrations, heat or noise from individual or diffuse sources into air, water or onto land, e.g. pollution may be discharged into the
Legal enforcement limit on the physical, chemical or biological characteristics of a point source of emission to
The Directive establishes a framework of measures for the promotion of energy efficiency within the European Union.
departmental public body that advises s on the care of the historic
A public archive of architectural and archaeological records.
departmental government body responsible for he environment in England
A local authority health professional responsible for
Full Text Acronym Health Officer Environmental Impact Assessment
EIA
Environmental Permit
EP
Environmental Permitting Regulations
EPR
Environmental Protection Act 1990
EPA
Environmental Quality Standards
EQS
Environmental Statement
ES
Environmentally Sensitive Area
ESA
Flood Defence Consent
FDC
Flood Risk Assessment
FRA
Full Time Equivalents FTE
Gas Connection -
Gas Turbine GT
Great Crested Newt GCN Groundwater Source Protection Zone
GSPZ
Guidance for the Environmental Assessment of Road
GEART
MEAFORD ENERGY CENTRE u Grid connection Statement
Notes carrying out measures for protecting public healthThe process of assessing the likely significant environmental impacts of a proposed project as part of gaining planning consent. A permit required in accordance with the Environmental Permitting Regulations. The Environmental Permitting (England and Wales) Regulations 2010 (SI 2010/675) as amended that regulates practices that have pollution potential through a permitting system. The Act that covers, amongst other things, the regulatcontaminated land in the UK. The concentration of a particular pollutant or group of pollutants in water, sediment or biota which should not be exceeded in order to protect human health and the environment. The document which reports the process, findings and recommendations of the EIA carried out to assess the environmental impacts of the Scheme informed by the Scoping Opinion. A designation for agricultural areas needing special protection by virtue of their landscape, wildlife or historical value. A consent required by the Environment Agency, for construction or maintenance work on over, under or near a main river (usually within 8-10 metres). An assessment that determines the risk of flooding to a proposed project. The equivalent number of full time jobs provided by a project - e.g. two half-time jobs equates to one FTE.The integral gas pipeline connecting the Power Station Complex to the Local Transmission System, including the Above Ground Installation, (numbered works 2A and 2B in Schedule 1 to the Order and as shown on the Works Plans). A turbine driven by hot combustion gases at high temperature. A species of newt protected by European Legislation.Areas around groundwater abstraction sources that are defined in order to help protect drinking water from contamination. The IEMA guidance on the environmental assessment of road traffic.
Grid connection Statement
15
carrying out measures for protecting public health. significant environmental
impacts of a proposed project as part of gaining planning
A permit required in accordance with the Environmental
ntal Permitting (England and Wales) Regulations 2010 (SI 2010/675) as amended that regulates practices that have pollution potential through a permitting
The Act that covers, amongst other things, the regulation of
The concentration of a particular pollutant or group of pollutants in water, sediment or biota which should not be exceeded in order to protect human health and the
The document which reports the process, findings and recommendations of the EIA carried out to assess the environmental impacts of the Scheme informed by the
agricultural areas needing special protection by virtue of their landscape, wildlife or historical
A consent required by the Environment Agency, for construction or maintenance work on over, under or near a
An assessment that determines the risk of flooding to a
The equivalent number of full time jobs provided by a one FTE.
The integral gas pipeline connecting the Power Station Complex to the Local Transmission System, including the
, (numbered works 2A and 2B in Schedule 1 to the Order and as shown on the Works Plans).
A turbine driven by hot combustion gases at high
A species of newt protected by European Legislation. Areas around groundwater abstraction sources that are
in order to help protect drinking water from
The IEMA guidance on the environmental assessment of
MEAFORD ENERGY CENTRE u Grid Connection Statement
16
Full Text Acronym Traffic Guidance on Transport Assessment
GTA
Guidelines for Landscape and Visual Impact Assessment, 3rd Edition
GLVIA
Habitat Regulations Assessment
HRA
Habitat Suitability Index
HSI
Health and Safety Executive
HSE
Heat Recovery Steam Generator
HRSG
Heavy Goods Vehicle HGV
Highway Authority HA
Highways Agency HA
Historic Environmental Record
HER
Home and Communities Agency
HCA
Hover - Indices of Multiple Deprivation
IMD
Industrial Emissions Directive
IED
Infrastructure Planning Commission
IPC
Institute of Acoustics IOA
Institute of Air Quality Management
IAQM
Grid Connection Statement
Notes
Department for Transport guidance dated March 2007 on the preparation of Transport Assessments as archived 22 October 2014 and replaced by NPPG “Transport evidence bases in plan making” Guidance produced by the Landscape Institute and the Institute for Environmental Management and Assessment dated 17 April 2013
An assessment required under the European Directive 92/43/EEC. A method for assessing the suitability of ponds for their potential to support Great Crested Newts. The non-departmental government body responsible for workplace safety in the UK. A means of recovering heat energy from hot exhaust gases in order to produce steam for driving a turbine.A truck that when laden has a total weight of more than 3500 kg. The relevant highway authority responsible for the noncore road network (i.e. roads other than trunk roads and motorways), usually the county council in twoareas. The executive agency of the Department for Transport responsible for the core road network in England.The record held by the local planning authority of known archaeological sites, buildings and landscapes of relevance to the historic environment. The executive non-departmental public body responsible for housing and regeneration across England. Also the regulator of registered social housing providers. An otter’s day nest or resting site. An index to measure deprived areas in the wards of English local authorities. EU Directive on industrial emissions that came into force in January 2011. The public body that previously examined applications for development consent to build Nationally Significant Infrastructure Projects, abolished through the Localism Act 2011 with the role replaced by PINS. Professional body for Acoustics, Noise and Vprofessionals. IAQM is a professional body for air quality professionals.
March 2007 on the preparation of Transport Assessments as archived 22 October 2014 and replaced by NPPG “Transport evidence
Guidance produced by the Landscape Institute and the Institute for Environmental Management and Assessment
An assessment required under the European Directive
A method for assessing the suitability of ponds for their
departmental government body responsible for
A means of recovering heat energy from hot exhaust gases in order to produce steam for driving a turbine. A truck that when laden has a total weight of more than
responsible for the non-core road network (i.e. roads other than trunk roads and motorways), usually the county council in two-tier authority
The executive agency of the Department for Transport ork in England.
The record held by the local planning authority of known archaeological sites, buildings and landscapes of relevance
ental public body responsible for housing and regeneration across England. Also the regulator of registered social housing providers.
An index to measure deprived areas in the wards of English
EU Directive on industrial emissions that came into force in
iously examined applications for development consent to build Nationally Significant Infrastructure Projects, abolished through the Localism Act
Professional body for Acoustics, Noise and Vibration
IAQM is a professional body for air quality professionals.
Full Text Acronym Institute of Environmental Management and Assessment
IEMA
Institute of Gas Engineers and Managers
IGEM
Integrated Pollution Prevention and Control Directive
IPPC
ISO 9613-2 -
Joint Nature Conservation Committee
JNCC
Kilovolt kV LA10 -
LA90 -
LAeq - LAmax -
Landscape Character Assessment
LCA
Landscape Character Assessment Guidance for England and Scotland
LCAG
Land Plan -
MEAFORD ENERGY CENTRE u Grid connection Statement
Notes IEMA is a professional body for environmental professionals that provides industry guidance on many topics including EIA.
IGEM is a chartered professional body, licensed by the Engineering Council.
The EU Directive (2008/1/EC) incorporated into UK law by the Environmental Permitting Regulations on prevention and control of industrial emissions. The Directive aims to achieve a high level protection of the environment through measures to prevent or, where that is not reduce emissions to air, water and land from activities listed in Annex I of the Directive (e.g. energy industries, production and processing of metals, mineral industry, chemical industry, intensive pig and poultry farming, waste management, some food and drink industries etc.). Acoustics- Attenuation of sound during propagation outdoors – Part 2: General method of calculation.The public body that advises the UK government and devolved administrations on UK-wide and international nature conservation. A measure of electrical potential. A-weighted noise level exceeded for 10% of the measurement period. A-weighted noise level exceeded for 90% of the measurement period. A-weighted equivalent continuous sound level.A-weighted maximum sound pressure level recorded over a given period. An assessment used to understand and articulate the character of a landscape, by identifying what give a locality it’s 'sense of place' and what makes it different from neighbouring areas carried out pursuant to the Landscape Character Assessment Guidance for England and Scotland. Guidance on Landscape Character Assessment issued by The Countryside Agency (now Natural England) and Scottish Natural Heritage dated 2002.
The plan showing the land required for the Scheme which is to be the subject of the power to acquire new rights, to extinguish or suspend existing rights and/or impose restrictive covenants submitted with the Application (Document Reference 2.2).
Grid connection Statement
17
IEMA is a professional body for environmental professionals provides industry guidance on many topics including
IGEM is a chartered professional body, licensed by the
(2008/1/EC) incorporated into UK law by the Environmental Permitting Regulations on prevention and control of industrial emissions. The Directive aims to achieve a high level protection of the environment through measures to prevent or, where that is not practicable, to reduce emissions to air, water and land from activities listed in Annex I of the Directive (e.g. energy industries, production and processing of metals, mineral industry, chemical industry, intensive pig and poultry farming, waste
t, some food and drink industries etc.). Attenuation of sound during propagation
Part 2: General method of calculation. The public body that advises the UK government and
wide and international
weighted noise level exceeded for 10% of the
weighted noise level exceeded for 90% of the
weighted equivalent continuous sound level. weighted maximum sound pressure level recorded over a
An assessment used to understand and articulate the character of a landscape, by identifying what give a locality it’s 'sense of place' and what makes it different from neighbouring areas carried out pursuant to the Landscape
for England and Scotland. Guidance on Landscape Character Assessment issued by The Countryside Agency (now Natural England) and Scottish
plan showing the land required for the Scheme which is to be the subject of the power to acquire new rights, to extinguish or suspend existing rights and/or impose restrictive covenants submitted with the Application
MEAFORD ENERGY CENTRE u Grid Connection Statement
18
Full Text Acronym Large Combustion Plant Directive
LCPD
Laydown Areas -
Lead Local Flood Authority
LLFA
Light Duty Vehicles LDV Listed Building
Local Development Framework
LDF
Local Enterprise Partnership
LEP
Local Nature Reserve LNR
Local Transmission System
LTS
Local Transport Plan LTP
Grid Connection Statement
Notes European legislation to reduce acidification, ground level ozone and particles throughout Europe by controlling emissions of sulphur dioxide, nitrogen oxides and from large combustion plants in power stations. The temporary (Work numbered 5A on the Works Plansand temporary/permanent (Work numbered Works Plans) laydown areas required for the Scheme. The Laydown Area shown on the Works Plan and numbered Work 5A in Schedule 1 to the Order is the southern laydown area located in the southern part of the Order Limits andwill be up to 0.6ha in size. It will be used during construction of the Scheme only. The Laydown Area shown on the Works Plan and numbered Work 5B in Schedule 1 to the Order is the primary laydown area for the Scheme and will be up to 1.8ha in size and located immediately to the north of the Power Station Complex. It will be used during construction of the Scheme and for maintenance activities during operation. The authority responsible for developing, maintaining and applying a strategy for local flood risk management in their areas and maintaining a register of flood risk assets. Vehicles with a weight less than 3.5 tonnes (gross weight).A building that has been placed on the statutory list of buildings of Special Architectural or Historic Interest and protected by the Planning (Listed Building and Conservation Areas) Act 1990 (as amended). A spatial planning strategy introduced by the Planning and Compulsory Purchase Act 2004. A sub-regional body responsible for setting strategic direction and implementation of economic development.Statutory designation for places with wildlife or geological features that are of special interest locally. The Local Transmission System which transports gas from National Transmission System off-takes towards and between urban areas. In the area of the Schemethe PL1134 Barlaston to Sandon. A plan by a local Highway Authority that sets out a strategy for the future of transport in its area. The LTPadministrative area of the Scheme is the Staffordshire Local Transport Plan 3, adopted by Staffordshire County Council in 2011.
European legislation to reduce acidification, ground level ozone and particles throughout Europe by controlling emissions of sulphur dioxide, nitrogen oxides and from
on the Works Plans) Work numbered 5B on the
required for the Scheme.
The Laydown Area shown on the Works Plan and numbered southern laydown
located in the southern part of the Order Limits and be used during
The Laydown Area shown on the Works Plan and numbered primary laydown
ha in size and located immediately to the north of the Power Station
It will be used during construction of the Scheme and for maintenance activities during operation.
The authority responsible for developing, maintaining and applying a strategy for local flood risk management in their areas and maintaining a register of flood risk assets.
onnes (gross weight). A building that has been placed on the statutory list of buildings of Special Architectural or Historic Interest and
Planning (Listed Building and Conservation
A spatial planning strategy introduced by the Planning and
regional body responsible for setting strategic development.
Statutory designation for places with wildlife or geological
The Local Transmission System which transports gas from takes towards and
between urban areas. In the area of the Scheme, the LTS is
A plan by a local Highway Authority that sets out a strategy for the future of transport in its area. The LTP for the administrative area of the Scheme is the Staffordshire Local Transport Plan 3, adopted by Staffordshire County Council
Full Text Acronym Local Wildlife Site LWS
Made Ground -
Maintenance -
Manual for Streets MfS
Meaford Business Park
MBP
MBP Site -
Meaford Energy Centre (also referred to as the "Scheme")
MEC
MEC Site (also referred to as the "Site")
-
Meaford Energy Limited
MEL
Megawatts of electrical power
MWe
Megawatts of thermal power
MWth
Milligrams per normal cubic metre
mg/ Nm3
Multi Agency Geographical Information for the Countryside
MAGIC
National Character Area
NCA
MEAFORD ENERGY CENTRE u Grid connection Statement
Notes Wildlife rich sites selected for their local nature conservation value. Man-made deposits artificially placed comprising a wide variety of material e.g. concrete, brick etc previously developed sites. Maintenance can comprise inspections, repair, adjustments or alterations, removal, refurbishments, reconstruction, replacements and improvements. The guidance produced by the Department for Transport and Department for Communities and Local Government on road layout and balancing the needs of different road users, with a focus on residential roads, dated 29 March 2007.The business park with extant planning permission bearing planning references: 1998/35897/OUTMay 2007, 2010/13609/EXT and 2014/21379/EXTO)110,000 sqm of commercial, warehousing and business support activities on the MBP Site within which the majority of the Scheme will be constructed. The location of Meaford Business Park. The construction, operation, maintenance and eventual decommissioning of the Power Station Complex, the Gas Connection and the Electrical Connection, the construction and use of the Northern Access Road, the Laydown Areasand landscaping (Work numbered 7 in Schedule 1 to the Order). The area in which the Scheme will be constructed, operated and decommissioned as defined by the Order Limits.
The applicant for the Application and the developer of the Scheme. Measurement of electrical power.
Measurement of thermal power.
Unit of concentration of emission limit values.
A web-based mapping browser showing various geographical designations e.g. nature conservation sites, heritage sites.
Distinct natural areas of England, defined by a unique combination of landscape, biodiversity, geodiversity and cultural and economic activity.
Grid connection Statement
19
Wildlife rich sites selected for their local nature
made deposits artificially placed comprising a wide variety of material e.g. concrete, brick etc - typical of
Maintenance can comprise inspections, repair, adjustments reconstruction,
The guidance produced by the Department for Transport and Department for Communities and Local Government on road layout and balancing the needs of different road users,
n residential roads, dated 29 March 2007. The business park with extant planning permission (and
1998/35897/OUT and issued 1 2010/13609/EXT and 2014/21379/EXTO)) for
l, warehousing and business support activities on the MBP Site within which the majority
construction, operation, maintenance and eventual Power Station Complex, the Gas
, the construction Access Road, the Laydown Areas
and landscaping (Work numbered 7 in Schedule 1 to the
The area in which the Scheme will be constructed, operated and decommissioned as defined by the Order Limits.
cant for the Application and the developer of the
of emission limit values.
based mapping browser showing various geographical designations e.g. nature conservation sites,
reas of England, defined by a unique combination of landscape, biodiversity, geodiversity and
MEAFORD ENERGY CENTRE u Grid Connection Statement
20
Full Text Acronym National Cycle Network
NCN
National Grid Company
NGC
National Monuments Record
NMR
National Nature Reserve
NNR
National Planning Policy Framework
NPPF
National Planning Practice Guidance
NPPG
National Policy Statements
NPS
National Transmission System
NTS
Nationally Significant Infrastructure Project
NSIP
National Air Traffic Control Services
NATS
Natural England NE
Nitrate Vulnerable Zone
NVZ
Nitrous oxides NOx
Noise Policy Statement for England
NPSE
Noise Sensitive Receptor
NSR
Non-Technical Summary
NTS
Northern Access Road
Grid Connection Statement
Notes A network of signed and promoted cycle routes across the UK. National Grid's principal operations are the ownership and operation of regulated electricity and gas infrastructure networks. Currently known as English Heritage Archive.
Statutory designations, where places with wildlife or geological features that are significant at a national level.The National planning policy framework for England, dated March 2012 The Planning Practice Guidance web based resource for England first introduced in March 2014 (and which largely superseded planning policy statements (PPGs)) providing guidance on National planning policy and the operation of the planning system Overarching legislative policy concerning the planning and consenting of NSIPs in the UK. The strategic natural gas pipeline serving the UK.
As defined by the Planning Act 2008, which includes within the definition of an NSIP any onshore generating station in England and Wales of 50 Mwe capacity or above.-
The non-departmental government body responsibleEngland's natural environment. A designated area where land drains into and contributes to nitrate found in nitrate-polluted waters. One of the combustion products discharged by CCGT power stations . Policy that sets out the long term vision of government noise policy.
Receptors principally residential dwellings (existing or for which planning consent is being sought/ has been given)and any building used for long term residential purposes (such as nursing home). The non-technical summary of the Environmental Statement. The existing haul road to the MBP Site located off Meaford Road in the borough of Staffordshire being upgraded pursuant to the Order (work numbered 4 in Schedule 1 of the Order).
A network of signed and promoted cycle routes across the
Grid's principal operations are the ownership and operation of regulated electricity and gas infrastructure
ces with wildlife or geological features that are significant at a national level. The National planning policy framework for England, dated
e Guidance web based resource for England first introduced in March 2014 (and which largely superseded planning policy statements (PPGs)) providing guidance on National planning policy and the operation of
Overarching legislative policy concerning the planning and
The strategic natural gas pipeline serving the UK.
g Act 2008, which includes within the definition of an NSIP any onshore generating station in England and Wales of 50 Mwe capacity or above.
departmental government body responsible for
A designated area where land drains into and contributes to
One of the combustion products discharged by CCGT power
Policy that sets out the long term vision of government
Receptors principally residential dwellings (existing or for which planning consent is being sought/ has been given) and any building used for long term residential purposes
technical summary of the Environmental
The existing haul road to the MBP Site located off Meaford Road in the borough of Staffordshire being upgraded pursuant to the Order (work numbered 4 in Schedule 1 of
Full Text Acronym Okta -
Operation - Order -
Order Land -
Order Limits -
Ordnance Survey OS Otter Faeces Spraint Overhead Line OHL Part II A - Annual Average Flow Rate for surface water runoff
QBAR
Particulate Matter PM
Pathway -
Peak Particle Velocity PPV
PEIR site boundary
Percentage Heavy Goods Vehicles
%HGV
Permitted Development
-
Personal Protective Equipment
PPE
Pipeline Inspection Gauge
PIG
Planning Act 2008 PA 2008
Planning PINS
MEAFORD ENERGY CENTRE u Grid connection Statement
Notes A unit used in expressing the extent of cloud cover, equal to one eighth of the sky. The routine day to day functioning of the MEC. The Meaford Energy (Gas Fired Power Station) Order, being the development consent order to be made by the Secretary of State authorising the Scheme, a draft of which is submitted with the Application (Document Reference 3.1) The land shown on the Land Plan which is within the Order Limits The limits shown on the Works Plans within which the Scheme may be carried out. National mapping agency for Great Britain - Network of overhead electricity transmission linesThe section of EPA 1990 that deals with contaminated land.-
Very small solid particles discharged by CCGT power stations. The route by which contamination moves from a source to a given receptor. A term used to measure vibration through aWhen a vibration is measured, the point at which the measurement takes place can be considered to have a particle velocity. The wider site boundary identified for environmental survey purposes within the Preliminary Environmental Information Report. Percentage of traffic that is classified as Heavy Goods Vehicles in a 16hr period. Development that is deemed under legislation to have planning consent without the need to obtain planning permission. Equipment a person may wear to protect themselves from risks e.g. high-visibility jackets, gloves, steboots. Pipeline cleaning device.
England and Wales legislation which established the legal framework to apply for, examine and determine applications for Nationally Significant InfrastProjects. Executive agency supported by the Department for
Grid connection Statement
21
A unit used in expressing the extent of cloud cover, equal to
The routine day to day functioning of the MEC. The Meaford Energy (Gas Fired Power Station) Order, being the development consent order to be made by the Secretary of State authorising the Scheme, a draft of which is submitted with the Application (Document Reference 3.1) The land shown on the Land Plan which is within the Order
The limits shown on the Works Plans within which the
Network of overhead electricity transmission lines The section of EPA 1990 that deals with contaminated land.
Very small solid particles discharged by CCGT power
The route by which contamination moves from a source to
A term used to measure vibration through a solid surface. When a vibration is measured, the point at which the measurement takes place can be considered to have a
The wider site boundary identified for environmental survey vironmental Information
Percentage of traffic that is classified as Heavy Goods
Development that is deemed under legislation to have planning consent without the need to obtain planning
Equipment a person may wear to protect themselves from visibility jackets, gloves, steel toe capped
England and Wales legislation which established the legal framework to apply for, examine and determine applications for Nationally Significant Infrastructure
Executive agency supported by the Department for
MEAFORD ENERGY CENTRE u Grid Connection Statement
22
Full Text Acronym Inspectorate
Pollution Prevention Guidance
PPG
Polycyclic Aromatic Hydrocarbon
PAH
Potential Contaminant Linkages
PCL
Power Station Complex
-
Preliminary Environmental Information Report
PEIR
Public Right of Way PRoW
Pulverised Fuel Ash PFA Rail Bridge 104 -
Receptor -
Registered Parks and Gardens
-
Remediation -
River Basin Management Plan
RBMP
Scheduled Ancient Monument
SAM
SCC Highway Works
-
Grid Connection Statement
Notes Communities and Local Government which deals with planning appeals, national infrastructure, planning applications, examinations of local plans and other planning related and specialist casework in England and Wales. Environment Agency published guidance on pollution prevention and best practice. One of the combustion products discharged by CCGT power stations. The existence of a contamination source and a receptor where a pathway is also present linking the two.
The building element of the power station, including gas turbine building, Stack(s), HRSG(s), transformers, steam turbine building, admin/control building, heat interface building, pressure regulation installation, water tanks, car parking, internal site roads, workshop, water treatment plant, switchyard, switchgear room and surface and foul water drainage (please refer to Works numbered 1 and 6 in Schedule 1 to the Order). A report describing the preliminary environmental assessment during the pre-application process of an NSIP.
Paths on which the public have legally protected rights to pass. A solid waste product of coal fired power stations.The bridge known Railway Bridge 104 crossing the West Coast Mainline Railway at Grid reference SJ 891 371. An identified aspect of the environment - e.g. a resident, protected species, heritage asset, controlled water etc that may be affected by the Scheme and, as such, has been assessed as part of the EIA undertaken. Gardens and designed landscapes of special architectural and historic importance, placed on a national register by English Heritage. The clean up of contaminated soil to make it suitable and safe for future use. A management tool created by Environment Agency to use for integrated water resources management. A "nationally important" archaeological site or historic building, protected under the Ancient MonumentArchaeological Areas Act 1979. The construction of a new southern access by Staffordshire County Council to the MBP Site together with associated highway improvements including a new A34 Meaford Road
Communities and Local Government which deals with planning appeals, national infrastructure, planning applications, examinations of local plans and other planning
nd Wales. Environment Agency published guidance on pollution
One of the combustion products discharged by CCGT power
The existence of a contamination source and a receptor where a pathway is also present linking the two.
The building element of the power station, including gas turbine building, Stack(s), HRSG(s), transformers, steam urbine building, admin/control building, heat interface
building, pressure regulation installation, water tanks, car parking, internal site roads, workshop, water treatment plant, switchyard, switchgear room and surface and foul
er to Works numbered 1 and 6 in
A report describing the preliminary environmental application process of an NSIP.
Paths on which the public have legally protected rights to
A solid waste product of coal fired power stations. The bridge known Railway Bridge 104 crossing the West
SJ 891 371. e.g. a resident,
protected species, heritage asset, controlled water etc - that may be affected by the Scheme and, as such, has been
Gardens and designed landscapes of special architectural and historic importance, placed on a national register by
The clean up of contaminated soil to make it suitable and
A management tool created by Environment Agency to use
A "nationally important" archaeological site or historic building, protected under the Ancient Monuments and
The construction of a new southern access by Staffordshire County Council to the MBP Site together with associated highway improvements including a new A34 Meaford Road
Full Text Acronym
Scheme (also referred to as the "MEC")
-
Scoping Opinion -
Secretary of State SoS
Severn Trent Water STW Site (also referred to as the "MEC Site")
-
Site of Nature Conservation Interest
SNCI
Site of Special Scientific Interest
SSSI
Site Waste Management Plan
SWMP
Sound Power Level SWL Sound Pressure Level SPL
Special Area of Conservation
SAC
Special Landscape Areas
SLA
Special Protection Area
SPA
Stack -
Stafford Borough SBC
MEAFORD ENERGY CENTRE u Grid connection Statement
Notes roundabout, footpath/cycleway, lighting and landscaping at Meaford Road, Stone, Staffordshire to be carried out pursuant to the planning permission (bearing planning reference S.14/07) dated 16 January 2015. The construction, operation, maintenance and eventual decommissioning of the Power Station Complex, the Gas Connection and the Electrical Connection, the construction and use of the Northern Access Road, the Laydown Areas and landscaping (Work numbered 7 in Schedule 1 to the Order). The Scoping Opinion provided by the Secretary of State in April 2014 and included in the Appendices to the Environmental Statement (Document Reference 6.4 (section 5.1)). The decision maker for a NSIP application and head of the relevant government department. In the context of the Scheme the decision maker is the Secretary of State for Energy and Climate Change. - The area in which the Scheme will be constructed, operated and decommissioned as defined by the Order Limits. Non-statutory areas of local importance for nature conservation. A geological or biological conservation designation denoting a protected area in the UK. The strategic document dealing with the effective management of materials used for the construction and the operation of the Scheme ensuring that waste is considered at all stages of the Scheme. The SWMP will form part of the CEMP for the Scheme. The Sound Energy flow per unit of time. Logarithmic measure of the sound pressure of a relative to a reference value, the threshold of hearing.Area of protected habitats and species as defined in the European Union's Habitat Directive (92/43/EEC). Local designation to provide protection for locally significant and attractive landscapes. A designated area for birds under the European Union Directive on the Conservation of Wild Birds (2009/147/EC)The structure by which the exhaust gases and waste heat from the Scheme will be emitted to the atmosphere. . The borough council and relevant planning authority for the
Grid connection Statement
23
y, lighting and landscaping at to be carried out
bearing planning
maintenance and eventual decommissioning of the Power Station Complex, the Gas Connection and the Electrical Connection, the construction and use of the Northern Access Road, the Laydown Areas and landscaping (Work numbered 7 in Schedule 1 to the
The Scoping Opinion provided by the Secretary of State in included in the Appendices to the
Environmental Statement (Document Reference 6.4
application and head of the relevant government department. In the context of the Scheme the decision maker is the Secretary of State for
The area in which the Scheme will be constructed, operated and decommissioned as defined by the Order Limits.
statutory areas of local importance for nature
A geological or biological conservation designation denoting
The strategic document dealing with the effective management of materials used for the construction and the
eme ensuring that waste is considered at all stages of the Scheme. The SWMP will form part of the
Logarithmic measure of the sound pressure of a sound relative to a reference value, the threshold of hearing. Area of protected habitats and species as defined in the European Union's Habitat Directive (92/43/EEC).
vide protection for locally
A designated area for birds under the European Union 2009/147/EC)
s and waste heat from the Scheme will be emitted to the atmosphere. . The borough council and relevant planning authority for the
MEAFORD ENERGY CENTRE u Grid Connection Statement
24
Full Text Acronym Council Staffordshire County Council
SCC
Statement of Community Consultation
SoCC
SuDs Approval Body SAB Sulphur Oxides SOx
Sustainable Urban Drainage Systems
SuDS
Switchgear -
Tonnes per annum tpa Total Petroleum Hydrocarbons
TPH
Transport Analysis Guidance
TAG
Tree Preservation Order
TPO
Waste (England & Wales) Regulations 2011
-
Water Framework Directive
WFD
Water Resources Act 1991
WRA
Weighted Sound Reduction Index
Rw
Wildlife and Countryside Act 1981
World Health Organisation
WHO
Works Plans -
Zone of Theoretical ZTV
Grid Connection Statement
Notes area within which the MEC Site is located. The county council and Highway Authority for the area in which the MEC Site is located. A statement describing how an applicant proposes to consult the local community about a project.
- One of the combustion products discharged by CCGT power stations. -
The combination of switches, fuses or circuit breakers used to control, protect and isolate electrical equipment. Can be air-insulated or gas-insulated. Unit for measuring waste produced. One of the combustion products discharged by the type of power station proposed by the Scheme. Guidance from the Department for Transport on how to assess transportation schemes first published on 29 October 2013 and last updated on 10 November 2014. A written order made by the local authority which makes it an offence to intentionally damage or remove a tree protected by that order without the authority's permission. Legislations for the waste prevent, manintroduction of waste hierarchy. The regulations apply to England and Wales only. The Water Framework Directive is a European Union directive which commits EU member states to achieve good qualitative and quantitative status of all water bodies by 2015. Legislation to prevent and minimise pollution of water.
Single-number quantity which characterises the airborne sound insulation of a material or building element over a range of frequencies when tested in a laboratory.Legislation which protects animals, plants and certain habitats in the UK. A United Nations agency concerned with public health.
The plans showing the numbered Works referred to in the Order and submitted with the Application (Document Reference 2.3). A computer generated plan showing a maximum area of the
The county council and Highway Authority for the area in
A statement describing how an applicant proposes to
One of the combustion products discharged by CCGT power
The combination of switches, fuses or circuit breakers used equipment. Can be
One of the combustion products discharged by the type of
Guidance from the Department for Transport on how to assess transportation schemes first published on 29 October 2013 and last updated on 10 November 2014.
A written order made by the local authority which makes it an offence to intentionally damage or remove a tree protected by that order without the authority's permission. Legislations for the waste prevent, management and introduction of waste hierarchy. The regulations apply to
The Water Framework Directive is a European Union directive which commits EU member states to achieve good
ative status of all water bodies by
Legislation to prevent and minimise pollution of water.
number quantity which characterises the airborne ilding element over a
range of frequencies when tested in a laboratory. Legislation which protects animals, plants and certain
public health.
The plans showing the numbered Works referred to in the Order and submitted with the Application (Document
A computer generated plan showing a maximum area of the
Full Text Acronym Visibility
MEAFORD ENERGY CENTRE u Grid connection Statement
Notes surroundings within which a project could theoretically be viewed.
Grid connection Statement
25
ngs within which a project could theoretically be