the miniboone horn
DESCRIPTION
The MiniBooNE Horn. Ioanis Kourbanis For The MiniBooNE Collaboration. Outline. List of people Horn characteristics Horn Power Supply Horn Striplines Highlights of Horn Construction and Assembly Horn Testing Horn Changeover Future Plans. List of People. C. Anderson - PowerPoint PPT PresentationTRANSCRIPT
![Page 1: The MiniBooNE Horn](https://reader035.vdocument.in/reader035/viewer/2022062321/568138e9550346895da09c8c/html5/thumbnails/1.jpg)
NBI 14-19 March 2002
The MiniBooNE Horn
Ioanis Kourbanis
For
The MiniBooNE Collaboration
![Page 2: The MiniBooNE Horn](https://reader035.vdocument.in/reader035/viewer/2022062321/568138e9550346895da09c8c/html5/thumbnails/2.jpg)
NBI 14-19 March 2002
Outline
List of people Horn characteristics Horn Power Supply Horn Striplines Highlights of Horn Construction and Assembly Horn Testing Horn Changeover Future Plans
![Page 3: The MiniBooNE Horn](https://reader035.vdocument.in/reader035/viewer/2022062321/568138e9550346895da09c8c/html5/thumbnails/3.jpg)
NBI 14-19 March 2002
List of People• C. Anderson
• L. Bartotzek (Bartoszek Engineering)
• L. Bartelson
• L. Bugel
• C. Jensen
• H. Le
• B. Markel (Markel & Associates)
• J. Misek
• F. Nezrick
• H. Pfeffer
• R. Reilly
• D. Snee
• M. Sorel
• E. Zimmerman
![Page 4: The MiniBooNE Horn](https://reader035.vdocument.in/reader035/viewer/2022062321/568138e9550346895da09c8c/html5/thumbnails/4.jpg)
NBI 14-19 March 2002
Horn Characteristics
We are using one horn with a narrow neck and a conical inner conductor (BNL Design) designed to run at a current of 170 KA.
The horn is made out of Al alloy 6061-T6 and is excited by a 143 sec current pulse. Keep the voltage at the PS below 10 KV (use solid state SCR’s
instead of thyristors) Reduce the current pulse width as much as possible to avoid
excessive heating of the horn . Keep the voltage at the horn as low as possible (small inductance).
The horn will operate at an average rep rate of 5 Hz. Total average power deposited in the horn is 2.4 KW.
![Page 5: The MiniBooNE Horn](https://reader035.vdocument.in/reader035/viewer/2022062321/568138e9550346895da09c8c/html5/thumbnails/5.jpg)
NBI 14-19 March 2002
3-D Model of the Horn
![Page 6: The MiniBooNE Horn](https://reader035.vdocument.in/reader035/viewer/2022062321/568138e9550346895da09c8c/html5/thumbnails/6.jpg)
NBI 14-19 March 2002
Horn Power Supply
The Power Supply consists of a Capacitor bank (1,344 F) discharged through an inductive load by an SCR switch. The system has a separate circuit for energy recovery.
The circuit is divided into 16 parallel capacitors, each with its own SCR switch.
![Page 7: The MiniBooNE Horn](https://reader035.vdocument.in/reader035/viewer/2022062321/568138e9550346895da09c8c/html5/thumbnails/7.jpg)
NBI 14-19 March 2002
Horn PS Parameters
DESIGN OPERATION
Pulse Amplitude(KA)
250 170
Rep. Rate(Hz)
7.5 5.0
Circuit Inductance(microH)
1.78 1.33
Operating Voltage(kV)
9.5 5.4
Average Power(kW)
62 19
![Page 8: The MiniBooNE Horn](https://reader035.vdocument.in/reader035/viewer/2022062321/568138e9550346895da09c8c/html5/thumbnails/8.jpg)
NBI 14-19 March 2002
Power Supply Schematic
![Page 9: The MiniBooNE Horn](https://reader035.vdocument.in/reader035/viewer/2022062321/568138e9550346895da09c8c/html5/thumbnails/9.jpg)
NBI 14-19 March 2002
Power Supply View (Front)
![Page 10: The MiniBooNE Horn](https://reader035.vdocument.in/reader035/viewer/2022062321/568138e9550346895da09c8c/html5/thumbnails/10.jpg)
NBI 14-19 March 2002
Power Supply View (Back)
![Page 11: The MiniBooNE Horn](https://reader035.vdocument.in/reader035/viewer/2022062321/568138e9550346895da09c8c/html5/thumbnails/11.jpg)
NBI 14-19 March 2002
Horn Stripline Balanced design (odd number of conductors) to
minimize forces. The conductor spacing is 1 inch. Fluted alumina
insulators with a 2 inch creepage length were used to separate the conductors.
The test stripline piece, along with a clamped joint, were corona tested.
The inductance of the final stripline was measured to be 18.5 nH/m.
![Page 12: The MiniBooNE Horn](https://reader035.vdocument.in/reader035/viewer/2022062321/568138e9550346895da09c8c/html5/thumbnails/12.jpg)
NBI 14-19 March 2002
View of the Long Stripline Section
![Page 13: The MiniBooNE Horn](https://reader035.vdocument.in/reader035/viewer/2022062321/568138e9550346895da09c8c/html5/thumbnails/13.jpg)
NBI 14-19 March 2002
View of a Stripline Joint
![Page 14: The MiniBooNE Horn](https://reader035.vdocument.in/reader035/viewer/2022062321/568138e9550346895da09c8c/html5/thumbnails/14.jpg)
NBI 14-19 March 2002
View of the Small Stripline Section
![Page 15: The MiniBooNE Horn](https://reader035.vdocument.in/reader035/viewer/2022062321/568138e9550346895da09c8c/html5/thumbnails/15.jpg)
NBI 14-19 March 2002
Construction and Assembly Highlights
Forged Outer Conductor The water sprayers were vibration isolated from
the Horn Outer Conductor. Solid connections from the striplines to the Horn. The Horn Inner Conductor was welded at
Fermilab using a programmable TIG welding machine.
![Page 16: The MiniBooNE Horn](https://reader035.vdocument.in/reader035/viewer/2022062321/568138e9550346895da09c8c/html5/thumbnails/16.jpg)
NBI 14-19 March 2002
Outer Conductor after Forging
![Page 17: The MiniBooNE Horn](https://reader035.vdocument.in/reader035/viewer/2022062321/568138e9550346895da09c8c/html5/thumbnails/17.jpg)
NBI 14-19 March 2002
Outer Conductor after Machining
![Page 18: The MiniBooNE Horn](https://reader035.vdocument.in/reader035/viewer/2022062321/568138e9550346895da09c8c/html5/thumbnails/18.jpg)
NBI 14-19 March 2002
Outer Conductor after Welding
![Page 19: The MiniBooNE Horn](https://reader035.vdocument.in/reader035/viewer/2022062321/568138e9550346895da09c8c/html5/thumbnails/19.jpg)
NBI 14-19 March 2002
Water Manifolds
![Page 20: The MiniBooNE Horn](https://reader035.vdocument.in/reader035/viewer/2022062321/568138e9550346895da09c8c/html5/thumbnails/20.jpg)
NBI 14-19 March 2002
Water Truss
![Page 21: The MiniBooNE Horn](https://reader035.vdocument.in/reader035/viewer/2022062321/568138e9550346895da09c8c/html5/thumbnails/21.jpg)
NBI 14-19 March 2002
Water Truss and Water Manifolds
![Page 22: The MiniBooNE Horn](https://reader035.vdocument.in/reader035/viewer/2022062321/568138e9550346895da09c8c/html5/thumbnails/22.jpg)
NBI 14-19 March 2002
Water Truss Bellows Detail
![Page 23: The MiniBooNE Horn](https://reader035.vdocument.in/reader035/viewer/2022062321/568138e9550346895da09c8c/html5/thumbnails/23.jpg)
NBI 14-19 March 2002
Water Connection Detail
![Page 24: The MiniBooNE Horn](https://reader035.vdocument.in/reader035/viewer/2022062321/568138e9550346895da09c8c/html5/thumbnails/24.jpg)
NBI 14-19 March 2002
Outer Conductor with Water Truss
![Page 25: The MiniBooNE Horn](https://reader035.vdocument.in/reader035/viewer/2022062321/568138e9550346895da09c8c/html5/thumbnails/25.jpg)
NBI 14-19 March 2002
Water Drain Connection
![Page 26: The MiniBooNE Horn](https://reader035.vdocument.in/reader035/viewer/2022062321/568138e9550346895da09c8c/html5/thumbnails/26.jpg)
NBI 14-19 March 2002
Water Nozzle Detail
![Page 27: The MiniBooNE Horn](https://reader035.vdocument.in/reader035/viewer/2022062321/568138e9550346895da09c8c/html5/thumbnails/27.jpg)
NBI 14-19 March 2002
Twist Transitions
![Page 28: The MiniBooNE Horn](https://reader035.vdocument.in/reader035/viewer/2022062321/568138e9550346895da09c8c/html5/thumbnails/28.jpg)
NBI 14-19 March 2002
Inner Conductor Before Welding
![Page 29: The MiniBooNE Horn](https://reader035.vdocument.in/reader035/viewer/2022062321/568138e9550346895da09c8c/html5/thumbnails/29.jpg)
NBI 14-19 March 2002
Hand Scraping before Welding
![Page 30: The MiniBooNE Horn](https://reader035.vdocument.in/reader035/viewer/2022062321/568138e9550346895da09c8c/html5/thumbnails/30.jpg)
NBI 14-19 March 2002
Welding Sample
![Page 31: The MiniBooNE Horn](https://reader035.vdocument.in/reader035/viewer/2022062321/568138e9550346895da09c8c/html5/thumbnails/31.jpg)
NBI 14-19 March 2002
Large Weld
![Page 32: The MiniBooNE Horn](https://reader035.vdocument.in/reader035/viewer/2022062321/568138e9550346895da09c8c/html5/thumbnails/32.jpg)
NBI 14-19 March 2002
Small Diameter Weld
![Page 33: The MiniBooNE Horn](https://reader035.vdocument.in/reader035/viewer/2022062321/568138e9550346895da09c8c/html5/thumbnails/33.jpg)
NBI 14-19 March 2002
Inspecting the Small Diameter Weld
![Page 34: The MiniBooNE Horn](https://reader035.vdocument.in/reader035/viewer/2022062321/568138e9550346895da09c8c/html5/thumbnails/34.jpg)
NBI 14-19 March 2002
Radiography of Weld
![Page 35: The MiniBooNE Horn](https://reader035.vdocument.in/reader035/viewer/2022062321/568138e9550346895da09c8c/html5/thumbnails/35.jpg)
NBI 14-19 March 2002
Radiography of Large Weld
![Page 36: The MiniBooNE Horn](https://reader035.vdocument.in/reader035/viewer/2022062321/568138e9550346895da09c8c/html5/thumbnails/36.jpg)
NBI 14-19 March 2002
Moving the Inner Conductor from The Welding Machine
![Page 37: The MiniBooNE Horn](https://reader035.vdocument.in/reader035/viewer/2022062321/568138e9550346895da09c8c/html5/thumbnails/37.jpg)
NBI 14-19 March 2002
Inserting the Inner into the Outer Conductor
![Page 38: The MiniBooNE Horn](https://reader035.vdocument.in/reader035/viewer/2022062321/568138e9550346895da09c8c/html5/thumbnails/38.jpg)
NBI 14-19 March 2002
Horn Testing
The horn was pulsed for the first time on 07/27/01. The horn test was completed on 02/12/02 after completing 11M pulses
at full current. We completed horn magnetic field measurements. Completed a series of vibration measurements. Things we were monitoring:
Total current Current in the four striplines feeding the horn Total voltage Cooling water supply and return temperatures Horn temperatures
![Page 39: The MiniBooNE Horn](https://reader035.vdocument.in/reader035/viewer/2022062321/568138e9550346895da09c8c/html5/thumbnails/39.jpg)
NBI 14-19 March 2002
Overview of MI-8 Test Area
![Page 40: The MiniBooNE Horn](https://reader035.vdocument.in/reader035/viewer/2022062321/568138e9550346895da09c8c/html5/thumbnails/40.jpg)
NBI 14-19 March 2002
Horn module overview
![Page 41: The MiniBooNE Horn](https://reader035.vdocument.in/reader035/viewer/2022062321/568138e9550346895da09c8c/html5/thumbnails/41.jpg)
NBI 14-19 March 2002
Stripline Configuration at the TSB
![Page 42: The MiniBooNE Horn](https://reader035.vdocument.in/reader035/viewer/2022062321/568138e9550346895da09c8c/html5/thumbnails/42.jpg)
NBI 14-19 March 2002
Current and Voltage Profiles
![Page 43: The MiniBooNE Horn](https://reader035.vdocument.in/reader035/viewer/2022062321/568138e9550346895da09c8c/html5/thumbnails/43.jpg)
NBI 14-19 March 2002
Horn Magnetic Field Measurement
![Page 44: The MiniBooNE Horn](https://reader035.vdocument.in/reader035/viewer/2022062321/568138e9550346895da09c8c/html5/thumbnails/44.jpg)
NBI 14-19 March 2002
Horn Temperature Profiles with Different Sprayer Configurations
![Page 45: The MiniBooNE Horn](https://reader035.vdocument.in/reader035/viewer/2022062321/568138e9550346895da09c8c/html5/thumbnails/45.jpg)
NBI 14-19 March 2002
Correlation between Horn and Water Return Temperatures
![Page 46: The MiniBooNE Horn](https://reader035.vdocument.in/reader035/viewer/2022062321/568138e9550346895da09c8c/html5/thumbnails/46.jpg)
NBI 14-19 March 2002
Horn Vibration Spectrum
![Page 47: The MiniBooNE Horn](https://reader035.vdocument.in/reader035/viewer/2022062321/568138e9550346895da09c8c/html5/thumbnails/47.jpg)
NBI 14-19 March 2002
Horn Axial Displacement vs. Time
![Page 48: The MiniBooNE Horn](https://reader035.vdocument.in/reader035/viewer/2022062321/568138e9550346895da09c8c/html5/thumbnails/48.jpg)
NBI 14-19 March 2002
Horn Changeover
The horn module is expected to be highly radioactive (30 Rad/hr at 2 ft).
In order to reduce the Radiation Exposure to under 100 mR/hr at 1 ft, the shielding requirement is 5” of steel on all sides.
Because of the crane lifting capacity, two separate coffins (an inner and an outer ) will be used.
The inner coffin has 1.5’’ thick walls except from the top cover and the front door (5” thick).
The outer coffin has 3.5” thick walls and is open at the top and the front.
![Page 49: The MiniBooNE Horn](https://reader035.vdocument.in/reader035/viewer/2022062321/568138e9550346895da09c8c/html5/thumbnails/49.jpg)
NBI 14-19 March 2002
Horn Changeover (2)
The radioactive horn module will be stored inside the two coffins in the Target Service Building in the old Proton Line.
Four coffins (two inner and two outer coffins) will be needed for a changeover.
A detailed procedure outlining all the steps for a changeover has been written and reviewed.
Total estimated time for a changeover is 2 weeks.
![Page 50: The MiniBooNE Horn](https://reader035.vdocument.in/reader035/viewer/2022062321/568138e9550346895da09c8c/html5/thumbnails/50.jpg)
NBI 14-19 March 2002
Inner Coffin
![Page 51: The MiniBooNE Horn](https://reader035.vdocument.in/reader035/viewer/2022062321/568138e9550346895da09c8c/html5/thumbnails/51.jpg)
NBI 14-19 March 2002
Outer Coffin
![Page 52: The MiniBooNE Horn](https://reader035.vdocument.in/reader035/viewer/2022062321/568138e9550346895da09c8c/html5/thumbnails/52.jpg)
NBI 14-19 March 2002
Initial Configuration
![Page 53: The MiniBooNE Horn](https://reader035.vdocument.in/reader035/viewer/2022062321/568138e9550346895da09c8c/html5/thumbnails/53.jpg)
NBI 14-19 March 2002
Inner and Outer Coffins
![Page 54: The MiniBooNE Horn](https://reader035.vdocument.in/reader035/viewer/2022062321/568138e9550346895da09c8c/html5/thumbnails/54.jpg)
NBI 14-19 March 2002
Open Inner Coffin Door
![Page 55: The MiniBooNE Horn](https://reader035.vdocument.in/reader035/viewer/2022062321/568138e9550346895da09c8c/html5/thumbnails/55.jpg)
NBI 14-19 March 2002
Position the Coffins next to the Horn Module
![Page 56: The MiniBooNE Horn](https://reader035.vdocument.in/reader035/viewer/2022062321/568138e9550346895da09c8c/html5/thumbnails/56.jpg)
NBI 14-19 March 2002
Pull the Horn Module in the Coffin
![Page 57: The MiniBooNE Horn](https://reader035.vdocument.in/reader035/viewer/2022062321/568138e9550346895da09c8c/html5/thumbnails/57.jpg)
NBI 14-19 March 2002
Close Inner Coffin Door
![Page 58: The MiniBooNE Horn](https://reader035.vdocument.in/reader035/viewer/2022062321/568138e9550346895da09c8c/html5/thumbnails/58.jpg)
NBI 14-19 March 2002
Future Plans
We have started disassembling the Power Supply and the Striplines.
The horn modules will be stored in the inner coffin. Plan to install the horn in the target pile on May 7. We estimate to be ready for a horn changeover test on May
15. We should be ready for beam on June 15. We have started ordering the large pieces for a spare horn.