The MSC-CI section. Agenda : LHC Quick status of LHC NC status + cryomagnet coordination Overview of ICIT work Components storage Components procurements Section support to MP3 and patrol - PowerPoint PPT PresentationTRANSCRIPT
The MSC-CI section
29/10/2009 JPh Tock MSC-CI
Agenda :
LHC Quick status of LHC NC status + cryomagnet coordination Overview of ICIT work Components storage Components procurements Section support to MP3 and patrol SMI2 status and proposal for storage X-ray tomography and its mock-up Possible/Likely interventions for future shutdown: Section participation to new inner triplet Cryostats - French collaboration QDXS Interconnections Cryogenics collimatorSPLCERN/France collaboration
The MSC-CI section
29/10/2009 JPh Tock MSC-CI
LHC : Quick status of LHC
Successful injection test
All sectors < 2 K
Leak in 3-4 !!
Powering steps : 72 %
Start 2nd half of November at reduced energy (2 kA ; 1.18 TeV)
The MSC-CI section
29/10/2009 JPh Tock MSC-CI
LHC NC status + cryomagnet coordination (Role to be officialised ?)
MB, SSS and IC NCR’s status in LHC
After last interconnection’s closure there were still many open NCR’s:
• MB: 215
• SSS: 438
• IC: 17
The aim of this job is to point out the REAL NCR’s that shall be treated during next shutdown, and to CLOSE all solved NCR’s.
The MSC-CI section
29/10/2009 JPh Tock MSC-CI
LHC NC status + cryomagnet coordination
MB, SSS and IC NCR’s status in LHCAfter a BIG work of sorting and treating, the NCR’s still open are as follows:
• MB: 63 (152 solved)• SSS: 55 (383 solved)• IC: 4 (13 solved)
All the open ones were addressed to concerned colleagues.Most of them are in progress, BUT:69 (!) need to be closed by CRG. At least 4 reminders were sent (the 1st one on July 14th….), no reaction at all!
ELQA team (Richard Mompo and Giorgio D’angelo) and ICQA team (Christian Scheuerlein) reacted very fast, despite the big pressure they have to perform electrical tests in the tunnel.
The MSC-CI section
29/10/2009 JPh Tock MSC-CI
LHC NC status + cryomagnet coordination
MB, SSS and IC NCR’s status in LHC
The MSC-CI section
29/10/2009 JPh Tock MSC-CI
LHC LHC CRYOMAGNETS MAINTENANCE WEB SITE
Created by José Pereira Lopes TE-MCS-MNC
The MSC-CI section
29/10/2009 JPh Tock MSC-CI
LHC Overview of ICIT work since December 2008 to now
Inspections of magnets taken out from LHC tunnel
(endoscopy, video, pictures, removing unwanted objects, cleaning) - SMA18, Bld.904; results assigned to Vincent
Baglin (VAC).
Preinspections of magnets on SMI2 (visual inspection of
extremities, flanges thickness measurement; SC cables checking, endoscopy and
reflectometry of beamlines).
Preinspections of interconnections before assembly
work in sectors 1-2, 3-4, 6-7 (general condition after transport
to the LHC tunnel, IC length measurement).
Inspections of interconnections before closure (cleanness,
presence of protection shells, general conditon of equipment).
US test of bus-bars (sec. 3-4, 4-5, 5-6, 6-7)
Analysis of US test results of LHC main bus bar splices
obtained during repair works of sector 3-4 (summary and comparison of present and
previous US measurements) (by P. Dziewonski)
QQBI.13L5
SSS227 M2
MB 2192 M2
Anna Wozniak (ICIT-HNINP) – Section Meeting - Shutdown 2009
The MSC-CI section
29/10/2009 JPh Tock MSC-CI
LHC Overview of ICIT work since December 2008 to now
Anna Wozniak (ICIT-HNINP) – Section Meeting - Shutdown 2009
Endoscopy of beamlines in the tunnel (cut PIM, blocked RF ball, suspicious places; inner triplets) and removing unwanted objects
(plastics, MLI pieces).
Endoscopy of connection cryostats (checking supports
position, bus-bars and isolation condition, assistance during
special plastic support installation). Checked CC:
E.11R3, E.11L4, E.11R5, E.5L6, E.11L6, E.11R6, E.11L7.
Endoscopy of other instalation, i.e. endoscopy of pipes in SPS
water cooling system (by P.Borowiec), endoscopy of power supply system in AMS Satelite (by P.Borowiec; A.Wozniak, R.Haber)
Beam lines reflectometry in LHC tunnel – sec. 3-4,
from QQBI.20R3 to QBQI.32R3 (by P. Borowiec)
Documentation of all tasks in MTF, updating MTF data, reporting ICIT
tasks on weekly coordination meetings.
The MSC-CI section
29/10/2009 JPh Tock MSC-CI
LHC Overview of ICIT work since December 2008 to now
Anna Wozniak (ICIT-HNINP) – Section Meeting - Shutdown 2009
other 2%u-piece 3%
kapton 4%
bus bar 5%
tin filling 6%
sleeve 6%
vacuum 8%
spider 8%
spool pieces 11%
flange 14%
SC cable 14%
beam screen 19%
Paweł Borowiec
Anna Wozniak-Chrul
Ryszard Haber
Jerzy Brzezicki
Paweł Dziewonski
During Shutdown 2009 ICIT :
• inspected 55 magnets on surface;
• inspected 58 interconnections before assembly works;
• big amount of magnets in all sectors were under endoscopy investigations, ie. 2425 meters of beam line in sector 6-7 were inspected;
• 166 US tests were done in four sectors (3-4, 4-5, 5-6, 6-7);
As a result of these inspections 363 non-conformities were opened:
MSC-CI STOCKAGE BATI MENT 3153
TRAVEE 1R (droite) 1 2 3 4 5 6 7 8 9
MB-MB SSS-MB MB-SSS
D Thermiques I nf Thermiques I nf Thermiques I nf
39 15 35 51 21 50 35
C Thermiques Sup Thermiques
Sup Thermiques Sup
6 16 5 13 8 37 12 2 17
B
Thermiques Sup
Radiatif s Thermiques Sup
Radiatif s Radiatif s Support ecran rad
11 20 16 19 8 41 12 17 MB –MB 79Pcs MB-SSS 30Pcs
A
Protection W Radiatif s
Ecran Ther J umper
Protection W
Ecrans Th
triplets
Protection W
WB 16
WB 5
WQ 11
38 29
17 WB 7
15 WB 10
The MSC-CI sectionLHC Components storage
The MSC-CI section
29/10/2009 JPh Tock MSC-CI
LHC Components procurements (Nico)
Support post procurement• Visit to CASA last week to present our needs (107 + 90 units). • Good news: keep the same production line as for the series• Waiting for an offer end of October
Drawing No.Units Comment
LHCQBH_S0011 40 LHC spare
LHCQBH_S0019 20 LHC spare
LHCQQH_S0009 14 LHC spare
LHCQQH_S0022 10 LHC spare
LHCQBH_S0011 12Option for 60 additional units in
2010-2011
modified LHCQBH_S0019 6Option for 30 additional units in
2010-2011
CRISNA1003090093 modified cryo-dipole extremity
support
CRISNA1003090102 modified cryo-dipole central
support 107Total
FIXED SUPPORT POST for new triplet
March-December 2010 (evenly in monthly batches)
CRYO-DIPOLE CENTRAL - SUPPORT POST
INFN Post A
INFN Post B
March 2010
March 2010
May 2010
Delivery Schedule
CRYO-DIPOLE EXTREMITY - SUPPORT POSTMarch-December 2010
(evenly in monthly batches)
Support post type
March-December 2010 (evenly in monthly batches)
SLIDING SUPPORT POST for new triplet May 2010
SSS FIXED - SUPPORT POST
March-December 2010 (evenly in monthly batches)
SSS SLIDING - SUPPORT POST
The MSC-CI section
29/10/2009 JPh Tock MSC-CI
LHC Components procurements W bellows & Vacuum Vessel
W Bellows
Market Survey done with MME and completedGoal: Call for tender in Spring 2010 both for LHC spares and new inner triplets (Fixed dimensions !)
Vacuum vessels
Market Survey done with MME and completedGoal: Call for tender in Spring 2010
In parallel, MS for new inner triplets done with CEA/CNRS
The MSC-CI section
29/10/2009 JPh Tock MSC-CI
LHC Section support to MP3 and patrol:
* MP3 shifts : Andrea & JPhilippeWill increase as some members are not available anymore
* Patrols : Alain & (Arnaud)
The MSC-CI section
29/10/2009 JPh Tock MSC-CI
LHC SMI2 (Michel)
Projet: Extension SMI2
Premier projet:375m2 jumellé avec SMI2Budget 800KCHF
SMI2
Bat Actuel 200m2
Deuxième projet450m2 a la place
du Bat 3194Budget 400KCHF
The MSC-CI sectionLHC SMI2 (Michel)
The MSC-CI section
29/10/2009 JPh Tock MSC-CI
LHC X-ray tomograph
• System Now Under Calibration Test on CERN Mockup at RAYSCAN• Phase 1 Commissioning Tests at RAYSCAN on 19 and 20 November• Phase 2 Commissioning Tests at CERN During Week 51• Final Commissioning in the LHC Tunnel During January 2010 access time
The MSC-CI section
29/10/2009 JPh Tock MSC-CI
LHC X-ray tomograph mock-up
The MSC-CI section
29/10/2009 JPh Tock MSC-CI
LHC Possible/Likely interventions for future shutdown:
Repair of connection cryostats in 4 sectors if warmed-up (2-3,4-5, 7-8, 8-1)Consolidation of 6 kA splices if validated (Chamonix, WG)Leak in 3-4: localisation, repair and check of geometryInstallation of DN200 (3.5 sectors) Who ?Investigation on open electrical NCs in warmed-up sectorsInstallation of DN160 on 2 SAM (if asked by cryo) (L2, L8)Open issues identified during HWC and operation
To be preliminary defined end of January
MSC-CIMSC-CIMSC-CI MSC-CI MSC-CIUS? (MSC-CI) MSC-CI
MSC-LMF
MSC-LMF
MSC-LMF
MSC-LMF
MSC-CI
MSC-ML
US
MSC-CI
MSC-CI
MSC-CI
MSC-CI
MSC-CI
MSC-CI
TE-CRG
MSC-CI
MSC-CI
US
Q1Q2aQ2bQ3D1 CP
QDXS
USDFX
CryoExt
SC Link
QRL
29/10/2009 JPh Tock MSC-CI
Cryostats : L Williams (CNRS)IC : A Vande CraenQDXS : N Bourcey
The MSC-CI sectionNew Inner Triplets : Section participation - Regular meetings within the section
CRYOSTAT (Q1,Q2A,Q2B,Q3,D1)
CRYOSTAT (Q1,Q2A,Q2B,Q3,D1)
Triplet Cryostat Particularities
• Based on, and as far as possible, using LHC Arc Cryostat Components , tooling and methods
• The cryostat body is well advanced, interface details will be adjusted to suit the interconnects etc.
• Identical cryostat length and cross-section for all 4 quadrupoles, and the D1• Shorter cryostat components for the CP• Some similarities concerning the envelope thermal insulation of the QDSX• The MS tooling set will be upgraded (preserving its original function) to be able
to cryostat Q1 Q2A Q2B Q3 CP and D1. To be reinstalled in SMI2 after modification
• Some part of the CNRS dipole tooling may be incorporated eg: the electric winch•
NIT : CNRS Collaboration
Orsay le 07/10/2009
NIT : CNRS Collaboration
Ressources de l'Accord Technique SLHC-CNRS
0
2
4
6
8
10
12
T4 T1 T2 T3 T4 T1 T2 T3 T4 T1 T2 T3 T4
2008 2009 2010 2011
Homm
es.m
ois
WP1 Outillage prévues en 2008
WP1 Outillage effectuées
WP2 Prototype prévues en 2008
WP2 Prototype effectuées
WP3 Série prévues en 2008
WP3 Série effectuées
• IPNO has launched their Market Survey for Triplet Vacuum Vessels• Bottom Tray extrusions are in house• Procurement of support posts is underway• Superinsulation Blankets to be obtained - probably from Jehier• Elastomer seals are acceptable in the radiation environment for ~ 10 yrs• The cold/warm transitions not yet designed• Complete cryostat design to be reviewed as part of the triplet cryo-magnet chain in January 2010.• The cold/warm transitions not yet designed
PROCUREMENT
The MSC-CI section
29/10/2009 JPh Tock MSC-CI
New Inner Triplets : QDXS (Nico)
• First integration studies done BY EN-MEF
• Discussion launched with TE-CRG to collect their experience and understand cryogenics requirements
Courtesy of S.Maridor
• Discussion launched with EN-MME to start first modelisation
Courtesy of B.Vullierme
The MSC-CI section
29/10/2009 JPh Tock MSC-CI
New Inner Triplets : Interconnection
• Size of lines
• Necessary clearance
• Position of lines
• Design for pressure
Transversal section
The MSC-CI section
29/10/2009 JPh Tock MSC-CI
New Inner Triplets : Interconnection
Longitudinal section• Global view
• Details (technical solutions)
The MSC-CI section
29/10/2009 JPh Tock MSC-CI
Cryogenics collimator
Modification of SC dispersion suppressors to accommodate additional collimators(“cryo-collimators”)
halo
2012 :
The MSC-CI section
29/10/2009 JPh Tock MSC-CI
SPL:
PSB
SPS
Linac4
LP-SPL
PS
LHC / sLHC
Out
put e
nerg
y
160 MeV
1.4 GeV4 GeV
26 GeV50 GeV
450 GeV
7 TeV
Linac250 MeV
LP-SPL: Low Power-Superconducting Proton Linac (4 GeV)PS2: High Energy PS (~ 5 to 50 GeV – 0.3 Hz)sLHC: “Super-luminosity” LHC (up to 1035 cm-2s-1)
Proton flux / Beam power
PS2
Courtesy of R.Garoby
31
Motivation and Objectives fora cryo-module prototype
Motivation: Construction of a prototype cryomodule as a major milestone in support to the TDR and project proposal (including costing) in 2012.
Objectives:- Validate (and eventually improve) the design (thermal and thermo-
mechanics) and construction features;
- Demonstrate the construction capability on a full-scale machine cryomodule housing β=1 cavities and SC quadrupoles;
- Enable RF testing (cavities, couplers, tuners…) on a multi-cavity assembly in their real operating environment;
- Validate cryogenic cooling and acquire experience in operation;
- Learning of the critical assembly phases, in particular the preparation of a long string of cavities in clean room;
October 2009
French contribution (Accord Technique No2, Protocole K1597/DG)
In support to the SPL study:
Participate to the developpement and construction of the prototype cryo-module β=1.
• CNRS/IN2P3:– Participate to the detailed design and integration of the cryostat
– Supply of cryostat components for the cryo-module prototype.
• CEA:– Design and fabrication of two helium vessels for the beta=1 cavities
– Design and supply of the assembly tooling for the cryo-module prototype
Funding and resources (2009-2012)
• French contribution (CEA/CNRS):– M = 430 kCHF (267 kEuro)– P = ~7 FTE.year (3.5 cat.2, 3.5 cat.3)
• CERN part (Total-French contribution):– M = 870 kCHF (including 1.25FTE.year EN design jobs)– P = 9.5 FTE.year 4 FTE.year (cat.2); 5.5 FTE.year (cat.3)
missing resources still to be identified
Cat.4
SPL prototype cryo-module
V P
arm
a
JP
h T
ock
A V
an
de C
raen
A J
acq
uem
od
N B
ou
rcey
M S
ou
ch
et
A B
asta
rd
D.P
ere
z-C
ap
arr
os
(Sp
an
ish
Tra
inee)
TO
TA
L
Fell
ow
req
uest
(SP
L b
ud
get)
Cat.
2 r
eq
uest
MC
S-
CI
FS
U
2009 0.5 0.1 0.6
2010 0.5 0.1 0.2 0.2 0.2 1.0 2.2 1.0
2011 0.5 0.1 0.1 0.3 0.3 0.2 0.9 2.4 1.0 0.5
2012 0.5 0.2 0.4 0.3 0.3 0.2 0.1 2.0 0.5 TBD
Total (2010-2012) 2.0 0.4 0.7 0.8 0.8 0.4 0.1 2.0 7.2 2.0 1.0
Cat.2 Cat.3
The MSC-CI section
29/10/2009 JPh Tock MSC-CI
CERN French collaboration (Vittorio)
Protocole de Collaboration K1597/DG
• Contribution Exceptionnelle de la France en Nature aux Nouveaux Projets du CERN
• Signe’ en Decembre 2008
• 4 Accords Techniques: 1. Linac 42. SPL3. Nouveaux Aimants Supraconducteurs4. CLIC
• Valeur de la contribution: 11’258’900 Euros (hors TVA) dont:– 7’056’000 Euros en matériel– 4’202’900 Euros en main d’œuvre
1 ere Réunion du Comite’ de Suivi de Protocole, CERN, 9 juillet 2009
The MSC-CI section
29/10/2009 JPh Tock MSC-CI
CERN French collaboration (Vittorio)
Comité de Suivi de Protocole (CSP)
CERN CNRS CEA
Coordinateurs CSP V. Parma B. Launé A. Daël
Resp. technique AT No.1: LINAC 4 M. Vretenar A. Variola – LAL O. Napoly – SACM
Resp. technique AT No.2: SPL V. Parma P. Duthil – IPNO S. Chel – SACM
Resp. technique AT No.3: Aimants P.Fessia D. Reynet – IPNO JM. Rifflet – SACM
Resp. technique AT No.4: CLIC G. Geshonke A. Jeremie – LAPP F. Ardellier – SIS
Membres du Comité
Role du CSP:• mise en œuvre générale de la collaboration• veille à la cohérence des actions menées par les responsables des Accords Techniques • Recommande aux Parties les éventuelles propositions d’avenants• tient à jour l’inventaire des achats de biens et services et de l’utilisation du personnel du CEA
et du CNRS/IN2P3 dans le cadre des AT sur la base des relevés fournis par ces deux Parties.
Reunions du CSP:• (au moins) deux fois par an, à tour de rôle au CEA, au CERN ou au CNRS/IN2P3, et seront
présidées par le représentant de la Partie hôte.
Note importante:• Chaque Accord technique fait l’objet d’un suivi séparé par les responsables des AT.
1 ere Réunion du Comite’ de Suivi de Protocole, CERN, 9 juillet 2009
The MSC-CI section
29/10/2009 JPh Tock MSC-CI
Conclusion (JPhT)
+ ICIT : P Dziewonski, R Haber, A Wozniak
+ D Perez Caparros