the new urban office experience · the new urban office experience class a office or build to suit...
TRANSCRIPT
THENEW URBANOFFICE EXPERIENCE
CLASS A OFFICE OR BUILD TO SUIT CORPORATE CAMPUSA PERFECT CANVAS TO CREATE YOUR VISION
DELIVERY DATE - PROPOSED 2022-2023
This 10-story, 157,000 square-foot building includes:
• 10,880 square feet of street level retail.
• 14,200 SF Floor Plates - Divisible to 5,000 SF
• Second Floor - Floor Plate is 21,200 SF
• Underground parking spaces.
PHASE 1 NOW OPENPHASE 1 NOW OPEN
1/2 MILE WATERFRONT PARK
90’ CABLE-STAYED PIER
WATERFRONT RESTAURANT SPACE
A CURATED GROUND FLOOR RETAIL MIX
CLASS A OFFICE SPACE
APARTMENT HOMES AND CONDOMINIUMS
HOTEL INDIGO (2020)
MASTER PLANNED FOR 3,300 RESIDENTIAL UNITS AND 1.25 MILLION SF OF OFFICE
THEWATERFRONTVANCOUVERUSA.COM/OFFICE/BLOCK-2/
157,000 SF OFFICE BUILDING157,000 SF OFFICE BUILDINGNOW LEASING
TAMARA J. FULLER, CCIM, GRI, VICE PRESIDENT | 360.852.9624 | [email protected] DAREN DUKE, SENIOR VICE PRESIDENT | 503.499.0056 | [email protected] ANDERSON, ASSOCIATE | 360.852.9627 | [email protected] COMMUNITIESThe information contained herein has been obtained from sources we deem reliable. However, conceptual renderings are being shown and subject to refinement in design.
UNPRECEDENTED VIEWS OF WATERFRONT PARK AND THE COLUMBIA RIVER5 Minute Walk - To Downtown Vancouver, The Amtrak Station, Esther Short park, and the Vancouver Farmers Market
15 Minute Drive - To Portland International Airport
PHASE 1 OPENED 2018/UNDER CONSTRUCTION
AVAILABLE 2020
PHASE 3: 2021 AND BEYOND
TEMP SURFACEPARKING
BLOCK 5
TEMP SURFACEPARKING
BLOCK 7
TEMP SURFACEPARKING
BLOCK 11
TEMP SURFACEPARKING
BLOCK 10
BLOCK 12 (THE DON) Gramor Development• Twigs Bistro & Martini Bar• Barlows Public House• Maryhill Winery
BLOCK 9 (THE JEAN)Gramor Development• WildFin American Grill• DosAlas Latin Kitchen & Margarita Bar
Cable-Stayed Pier
WATERFRONT PARK
WATERFRONT PARKHeadwaters Wall Water Feature
BLOCK 4 Kirkland Development• El Gaucho• Naked Winery138 Room Hotel Indigo and 40 Unit Condominium BuildingUnder Construction
BLOCK 2
BLOCK 3Summit DevelopmentHigh-Rise Residential180 Apartment UnitsEarly 2020 Start
THE MURDOCK (BLOCK 6 EAST)
Gramor Development• Pizzeria sul Lago• OnPoint CCU
REDIVIVA (BLOCK 6 WEST)
Gramor Development• Stack 571 Burger & Whiskey Bar• Pepper Bridge Winery & Amavi Cellars• Brian Carter Cellars63 Apartments over Retail
RIVERWEST (BLOCK 8)
HSP Properties• Orangetheory Fitness207 Apartments over Retail
PORT OF VANCOUVERMarriott AC Hotel160 RoomsUnder Construction
BLOCK 15Interior Park
ESTHER SHORTPARK
FARMER’S MARKET
I-5 TOPORTLAND
DOWNTOWNVANCOUVER
I-5 TOSEATTLE
5
5
HILTON
VANCOUVERCONVENTION
CENTER
VANCOUVERLIBRARY
ESTH
ER S
T
CO
LUM
BIA
ST
COLUMBIA WAY
WATERFRONT WAY
GRA
NT
ST
BLOCK 13
BLOCK 14BLOCK 17
BLOCK 16
BLOCK 19
BLOCK 21
BLOCK 1
WA
TE
RF
RO
NT W
AY
BLOCK 20Jackson Square Properties248 ApartmentsConstruction start 2020
BLOCK 18The Springs LivingApprox. 300 Senior Living UnitsConstruction start August 2020
PHASE 1:OPENED 2018/ UNDER CONSTRUCTION
PHASE 2: AVAILABLE 2020
PHASE 3: 2021 AND BEYOND
THEWATERFRONTVANCOUVERUSA.COM/OFFICE/BLOCK-2/
TAMARA J. FULLER, CCIM, GRI, VICE PRESIDENT | 360.852.9624 | [email protected] DAREN DUKE, SENIOR VICE PRESIDENT | 503.499.0056 | [email protected] ANDERSON, ASSOCIATE | 360.852.9627 | [email protected] COMMUNITIESThe information contained herein has been obtained from sources we deem reliable. However, conceptual renderings are being shown and subject to refinement in design.
157,000 SF OFFICE BUILDING157,000 SF OFFICE BUILDINGNOW LEASING
PHASE 1 OPENED 2018/UNDER CONSTRUCTION
AVAILABLE 2020
PHASE 3: 2021 AND BEYOND
TEMP SURFACEPARKING
BLOCK 5
TEMP SURFACEPARKING
BLOCK 7
TEMP SURFACEPARKING
BLOCK 11
TEMP SURFACEPARKING
BLOCK 10
BLOCK 12 (THE DON) Gramor Development• Twigs Bistro & Martini Bar• Barlows Public House• Maryhill Winery
BLOCK 9 (THE JEAN)Gramor Development• WildFin American Grill• DosAlas Latin Kitchen & Margarita Bar
Cable-Stayed Pier
WATERFRONT PARK
WATERFRONT PARKHeadwaters Wall Water Feature
BLOCK 4 Kirkland Development• El Gaucho• Naked Winery138 Room Hotel Indigo and 40 Unit Condominium BuildingUnder Construction
BLOCK 2
BLOCK 3Summit DevelopmentHigh-Rise Residential180 Apartment UnitsEarly 2020 Start
THE MURDOCK (BLOCK 6 EAST)
Gramor Development• Pizzeria sul Lago• OnPoint CCU
REDIVIVA (BLOCK 6 WEST)
Gramor Development• Stack 571 Burger & Whiskey Bar• Pepper Bridge Winery & Amavi Cellars• Brian Carter Cellars63 Apartments over Retail
RIVERWEST (BLOCK 8)
HSP Properties• Orangetheory Fitness207 Apartments over Retail
PORT OF VANCOUVERMarriott AC Hotel160 RoomsUnder Construction
BLOCK 15Interior Park
ESTHER SHORTPARK
FARMER’S MARKET
I-5 TOPORTLAND
DOWNTOWNVANCOUVER
I-5 TOSEATTLE
5
5
HILTON
VANCOUVERCONVENTION
CENTER
VANCOUVERLIBRARY
ESTH
ER S
T
CO
LUM
BIA
ST
COLUMBIA WAY
WATERFRONT WAY
GRA
NT
ST
BLOCK 13
BLOCK 14BLOCK 17
BLOCK 16
BLOCK 19
BLOCK 21
BLOCK 1
WA
TE
RF
RO
NT W
AY
BLOCK 20Jackson Square Properties248 ApartmentsConstruction start 2020
BLOCK 18The Springs LivingApprox. 300 Senior Living UnitsConstruction start August 2020