the pelamis wave energy converter ocean power_m._the_pelamis... · the pelamis wave energy...

51
OCEAN POWER DELIVERY LTD. www.oceanpd.com The Pelamis Wave Energy Converter - An update on performance and operational aspects Max Carcas Business Development Director

Upload: vohuong

Post on 04-Apr-2018

265 views

Category:

Documents


15 download

TRANSCRIPT

Page 1: The Pelamis Wave Energy Converter OCEAN POWER_M._The_Pelamis... · The Pelamis Wave Energy Converter ... THE PELAMIS WEC Concept −Articulated cylinder ... - Pelamis selected by

OCEAN POWERDELIVERY LTD. www.oceanpd.com

The Pelamis Wave Energy Converter- An update on performance and operational aspects

Max CarcasBusiness Development Director

Page 2: The Pelamis Wave Energy Converter OCEAN POWER_M._The_Pelamis... · The Pelamis Wave Energy Converter ... THE PELAMIS WEC Concept −Articulated cylinder ... - Pelamis selected by

- Incorporated January 1998- £7.5m VC investment 2002-2004- £2.5m support from UK DTI- Based in Edinburgh- Combined ‘wave’ experience of

over 50 years- 32 full-time personnel

OCEAN POWER DELIVERY

OCEAN POWERDELIVERY LTD.www.oceanpd.com

Page 3: The Pelamis Wave Energy Converter OCEAN POWER_M._The_Pelamis... · The Pelamis Wave Energy Converter ... THE PELAMIS WEC Concept −Articulated cylinder ... - Pelamis selected by

Environmental:• Global warming• EU/UK Kyoto commitments

Socio-economic:• Hidden costs of conventional generation• Renewables increasingly affordable• Industrial-economic potential

ENERGY POLICY DRIVERS

UK ENERGY POLICY OBJECTIVES:

Security of supply:• Electricity demand

continuing to rise• Existing power plants

reaching end of life• UK to be net importer

of gas in <5 years

Hydro 1%

Other fuels 2½%Imports

3%

Oil 1%

Gas37%

Coal33½%

Nuclear22%

0

10

20

30

40

50

60

70

80

92 93 94 95 96 97 98 99 00 01

GW

Coal fired

Combined Cycle Gas Turbine

Oil fired

Mixed/dual fired

Nuclear

Hydro

Renewable & Other

Gen

. Cap

acity

Ave

. Dem

and

OCEAN POWERDELIVERY LTD.www.oceanpd.com

Page 4: The Pelamis Wave Energy Converter OCEAN POWER_M._The_Pelamis... · The Pelamis Wave Energy Converter ... THE PELAMIS WEC Concept −Articulated cylinder ... - Pelamis selected by

• Today >40GW installed,8GW last year

• Fastest growth area inelectricity generatingindustry

• Denmark: >20,000employed, $3-4bn inexports

• Costs of generationhave fallen by ~80% asmarket has grown

• In the UK firstcommercial wind farmwas only developed 12years ago

WIND POWER

OCEAN POWERDELIVERY LTD.www.oceanpd.com

Growth in Global Market for Wind Turbines

0

1000

2000

3000

4000

5000

6000

7000

8000

9000

1983

1985

1987

1989

1991

1993

1995

1997

1999

2001

2003

MW

inst

alle

d p

er y

ear

0

5000

10000

15000

20000

25000

30000

35000

40000

45000

Cu

mm

ula

tive

MW

MW installed per yearCumulative MW installed

Source: BTM Consult Aps

Page 5: The Pelamis Wave Energy Converter OCEAN POWER_M._The_Pelamis... · The Pelamis Wave Energy Converter ... THE PELAMIS WEC Concept −Articulated cylinder ... - Pelamis selected by

WHY WAVE ENERGY?

Huge Resource & Market- Most dense renewable resource- UK ~50-80TWh/year

~15-25% UK demand>£20bn CapEx

- World >2000TWh/year>£500bn CapEx

OCEAN POWERDELIVERY LTD.www.oceanpd.com

Page 6: The Pelamis Wave Energy Converter OCEAN POWER_M._The_Pelamis... · The Pelamis Wave Energy Converter ... THE PELAMIS WEC Concept −Articulated cylinder ... - Pelamis selected by

WHY WAVE ENERGY?

Forecastability

-Numerous calibratedWIND-WAVE models

-Existing offshoreforecasting services

-Immunity to localclimatic effects

- Small hourly &diurnal variation

Wave height (ft)

Peak period (sec)

Wave forecast images courtesy of LOLA

OCEAN POWERDELIVERY LTD.www.oceanpd.com

Page 7: The Pelamis Wave Energy Converter OCEAN POWER_M._The_Pelamis... · The Pelamis Wave Energy Converter ... THE PELAMIS WEC Concept −Articulated cylinder ... - Pelamis selected by

WHY OFFSHORE…?- Best resource in deep water >50m- Plenty of space plus high ‘power-density’- Minimal environmental impact- Minimum visual intrusion

OCEAN POWERDELIVERY LTD.www.oceanpd.com

SOUTH UISTVariation of wave energy resource with water depth

0

20

40

60

80

0 20 40 60 80 100 120

Water depth (m)

Mea

n p

ow

er (k

W/m

)

Page 8: The Pelamis Wave Energy Converter OCEAN POWER_M._The_Pelamis... · The Pelamis Wave Energy Converter ... THE PELAMIS WEC Concept −Articulated cylinder ... - Pelamis selected by

OFFSHORE TECHNOLOGY

The offshore/marine sector’scontribution:

“No major technical barriers to thedevelopment of wave energyprototypes have been identified.All issues raised under design,construction, deployment andoperation can be addressed bytransfer of technology from otherindustries, especially the offshoreindustry”

DTI Report - Wave Energy: Technology Transfer &R&D RecommendationsOve Arup, October 2000

OCEAN POWERDELIVERY LTD.www.oceanpd.com

Page 9: The Pelamis Wave Energy Converter OCEAN POWER_M._The_Pelamis... · The Pelamis Wave Energy Converter ... THE PELAMIS WEC Concept −Articulated cylinder ... - Pelamis selected by

THE PELAMIS WECConcept− Articulated cylinder− Self-referenced− Slack moored− Head-on to incident waves

Complete machine- 150m length- 3.5m diameter- 750kW rating- 2.7GWh p.a.

Power Conversion Module- 4 x hydraulic rams (2 heave, 2 sway)- 2 x 157kVA/ 125kW motor/generator sets- 250kW rating

OCEAN POWERDELIVERY LTD.www.oceanpd.com

Page 10: The Pelamis Wave Energy Converter OCEAN POWER_M._The_Pelamis... · The Pelamis Wave Energy Converter ... THE PELAMIS WEC Concept −Articulated cylinder ... - Pelamis selected by

KEY FEATURES

• Survivability – core theme…• 100% available technology• Hydraulic Power Take Off• Power smoothing• Tuneable• Maximum flexibility• Minimum work on-site• Off-site maintenance

OCEAN POWERDELIVERY LTD.www.oceanpd.com

POWER SMOOTHING

POWER LIMITING

Page 11: The Pelamis Wave Energy Converter OCEAN POWER_M._The_Pelamis... · The Pelamis Wave Energy Converter ... THE PELAMIS WEC Concept −Articulated cylinder ... - Pelamis selected by

DEVELOPMENT PATH

ExperimentalModelling- 14 tank test programmes- 5 test models at 80th, 50th,35th,33rd & 20th scales- Survivability characteristic validated- Numerical power predictions validated- Mooring dynamics validated- Further tank programmes

NumericalModelling- Frequency domain simulation- Time-domain simulation- Structural analysis- Power take-off & control- Mooring dynamics- Extreme load analysis

1/7th scale full systems

prototype

Independent Design

Verification

Full-scalePower

Conversion Module

Fu

ll-sc

ale,

pre

-pro

du

ctio

np

roto

typ

e

OCEAN POWERDELIVERY LTD.www.oceanpd.com

Page 12: The Pelamis Wave Energy Converter OCEAN POWER_M._The_Pelamis... · The Pelamis Wave Energy Converter ... THE PELAMIS WEC Concept −Articulated cylinder ... - Pelamis selected by

1/7th SCALE PROTOTYPE

-‘Full systems’ prototype- Same hydraulics system- Same control system- First tests October 2001- Concept verified at 1/7th scale

OCEAN POWERDELIVERY LTD.www.oceanpd.com

Page 13: The Pelamis Wave Energy Converter OCEAN POWER_M._The_Pelamis... · The Pelamis Wave Energy Converter ... THE PELAMIS WEC Concept −Articulated cylinder ... - Pelamis selected by

POWER CONVERSION MODULETEST-RIG

Successful verification of full-scale power take offsystem on land

OCEAN POWERDELIVERY LTD.www.oceanpd.com

Page 14: The Pelamis Wave Energy Converter OCEAN POWER_M._The_Pelamis... · The Pelamis Wave Energy Converter ... THE PELAMIS WEC Concept −Articulated cylinder ... - Pelamis selected by

DESIGN VERIFICATION

• Work undertaken by WS Atkins, Europe’spremier offshore design consultants

• All aspects of design and construction

• Assessed to same factors of safety asmanned offshore oil & gas installations

• Application of DNV/API offshore designcodes

• Fatigue and extreme load analysis overdesign life of machine (ULS, ALS, FLS)

• Verified and insured

OCEAN POWERDELIVERY LTD.www.oceanpd.com

Page 15: The Pelamis Wave Energy Converter OCEAN POWER_M._The_Pelamis... · The Pelamis Wave Energy Converter ... THE PELAMIS WEC Concept −Articulated cylinder ... - Pelamis selected by

FULL-SCALE PROTOTYPE• Machine is pre-production

prototype• Supported by UK DTI• Build/assembly through

managed subcontracts

• Initial sea trials behindvessel

• Testing at EMEC

• Power prediction• Connection/ detachment• Survivability, operability,

maintainability, reliability

OCEAN POWERDELIVERY LTD.www.oceanpd.com

Page 16: The Pelamis Wave Energy Converter OCEAN POWER_M._The_Pelamis... · The Pelamis Wave Energy Converter ... THE PELAMIS WEC Concept −Articulated cylinder ... - Pelamis selected by

P-750 PROTOTYPE ‘PHILOSOPHY’

OCEAN POWERDELIVERY LTD.www.oceanpd.com

- Pre-production unit- 15 year design life- Conservative design- Design independently verified

(WS Atkins)- Systems proven- Moorings system as for farm- Fully instrumented- SCADA- Insured

DESIGN DRIVERS:- Build methods- Deployment methods- Maintenance methods

Page 17: The Pelamis Wave Energy Converter OCEAN POWER_M._The_Pelamis... · The Pelamis Wave Energy Converter ... THE PELAMIS WEC Concept −Articulated cylinder ... - Pelamis selected by
Page 18: The Pelamis Wave Energy Converter OCEAN POWER_M._The_Pelamis... · The Pelamis Wave Energy Converter ... THE PELAMIS WEC Concept −Articulated cylinder ... - Pelamis selected by
Page 19: The Pelamis Wave Energy Converter OCEAN POWER_M._The_Pelamis... · The Pelamis Wave Energy Converter ... THE PELAMIS WEC Concept −Articulated cylinder ... - Pelamis selected by
Page 20: The Pelamis Wave Energy Converter OCEAN POWER_M._The_Pelamis... · The Pelamis Wave Energy Converter ... THE PELAMIS WEC Concept −Articulated cylinder ... - Pelamis selected by
Page 21: The Pelamis Wave Energy Converter OCEAN POWER_M._The_Pelamis... · The Pelamis Wave Energy Converter ... THE PELAMIS WEC Concept −Articulated cylinder ... - Pelamis selected by
Page 22: The Pelamis Wave Energy Converter OCEAN POWER_M._The_Pelamis... · The Pelamis Wave Energy Converter ... THE PELAMIS WEC Concept −Articulated cylinder ... - Pelamis selected by
Page 23: The Pelamis Wave Energy Converter OCEAN POWER_M._The_Pelamis... · The Pelamis Wave Energy Converter ... THE PELAMIS WEC Concept −Articulated cylinder ... - Pelamis selected by
Page 24: The Pelamis Wave Energy Converter OCEAN POWER_M._The_Pelamis... · The Pelamis Wave Energy Converter ... THE PELAMIS WEC Concept −Articulated cylinder ... - Pelamis selected by
Page 25: The Pelamis Wave Energy Converter OCEAN POWER_M._The_Pelamis... · The Pelamis Wave Energy Converter ... THE PELAMIS WEC Concept −Articulated cylinder ... - Pelamis selected by
Page 26: The Pelamis Wave Energy Converter OCEAN POWER_M._The_Pelamis... · The Pelamis Wave Energy Converter ... THE PELAMIS WEC Concept −Articulated cylinder ... - Pelamis selected by
Page 27: The Pelamis Wave Energy Converter OCEAN POWER_M._The_Pelamis... · The Pelamis Wave Energy Converter ... THE PELAMIS WEC Concept −Articulated cylinder ... - Pelamis selected by
Page 28: The Pelamis Wave Energy Converter OCEAN POWER_M._The_Pelamis... · The Pelamis Wave Energy Converter ... THE PELAMIS WEC Concept −Articulated cylinder ... - Pelamis selected by
Page 29: The Pelamis Wave Energy Converter OCEAN POWER_M._The_Pelamis... · The Pelamis Wave Energy Converter ... THE PELAMIS WEC Concept −Articulated cylinder ... - Pelamis selected by

FINAL ASSEMBLY, ROSYTHFINAL ASSEMBLY, ROSYTH

Page 30: The Pelamis Wave Energy Converter OCEAN POWER_M._The_Pelamis... · The Pelamis Wave Energy Converter ... THE PELAMIS WEC Concept −Articulated cylinder ... - Pelamis selected by

EMEC

OCEAN POWERDELIVERY LTD.www.oceanpd.com

Page 31: The Pelamis Wave Energy Converter OCEAN POWER_M._The_Pelamis... · The Pelamis Wave Energy Converter ... THE PELAMIS WEC Concept −Articulated cylinder ... - Pelamis selected by

EMEC, ORKNEY

Page 32: The Pelamis Wave Energy Converter OCEAN POWER_M._The_Pelamis... · The Pelamis Wave Energy Converter ... THE PELAMIS WEC Concept −Articulated cylinder ... - Pelamis selected by
Page 33: The Pelamis Wave Energy Converter OCEAN POWER_M._The_Pelamis... · The Pelamis Wave Energy Converter ... THE PELAMIS WEC Concept −Articulated cylinder ... - Pelamis selected by
Page 34: The Pelamis Wave Energy Converter OCEAN POWER_M._The_Pelamis... · The Pelamis Wave Energy Converter ... THE PELAMIS WEC Concept −Articulated cylinder ... - Pelamis selected by

MOORINGS INSTALLED

Page 35: The Pelamis Wave Energy Converter OCEAN POWER_M._The_Pelamis... · The Pelamis Wave Energy Converter ... THE PELAMIS WEC Concept −Articulated cylinder ... - Pelamis selected by

PELAMIS INSTALLED

Image © Aquatera.co.uk

Page 36: The Pelamis Wave Energy Converter OCEAN POWER_M._The_Pelamis... · The Pelamis Wave Energy Converter ... THE PELAMIS WEC Concept −Articulated cylinder ... - Pelamis selected by

Image © Aquatera.co.uk

Page 37: The Pelamis Wave Energy Converter OCEAN POWER_M._The_Pelamis... · The Pelamis Wave Energy Converter ... THE PELAMIS WEC Concept −Articulated cylinder ... - Pelamis selected by

ONWARD PROGRAMME- Rigorous testing of prototype- Commercialisation- Project development… (Cornwall, Scotland, Portugal, USA + others…)- Target = demonstration projects installed during 2005

OCEAN POWERDELIVERY LTD.www.oceanpd.com

Year 2003 2004 2005Quarter 1 2 3 4 1 2 3 4 1 2 3 4

FULL-SCALE DEMONSTRATORBuild

LaunchTest

PROJECTS - PHASE ONE

PROJECTS - PHASE TWO

Page 38: The Pelamis Wave Energy Converter OCEAN POWER_M._The_Pelamis... · The Pelamis Wave Energy Converter ... THE PELAMIS WEC Concept −Articulated cylinder ... - Pelamis selected by

PROJECTS – PHASE ONE

Example (2005)- 4-10 x 750kW machines- 3-7.5MW rated output- BUT infrastructure & development

work for whole project

OCEAN POWERDELIVERY LTD.www.oceanpd.com

Page 39: The Pelamis Wave Energy Converter OCEAN POWER_M._The_Pelamis... · The Pelamis Wave Energy Converter ... THE PELAMIS WEC Concept −Articulated cylinder ... - Pelamis selected by

PHASES TWO AND ONWARDS

EXAMPLE

- 39 x P-750 machines- 30MW- £30-50m installed cost- 2.0km x 0.5km- 30 MW/km2

- 110 GWh/year (~20,000 homes)

OCEAN POWERDELIVERY LTD.www.oceanpd.com

Page 40: The Pelamis Wave Energy Converter OCEAN POWER_M._The_Pelamis... · The Pelamis Wave Energy Converter ... THE PELAMIS WEC Concept −Articulated cylinder ... - Pelamis selected by

PORTUGALGRUPO ENERSIS- 3-5MW demonstration, Nazaré- Target build/install 2005- Wave measurement underway- Survey underway- Local manufacturing content- 20MW accepted by DGE

OCEAN POWERDELIVERY LTD.www.oceanpd.com

Page 41: The Pelamis Wave Energy Converter OCEAN POWER_M._The_Pelamis... · The Pelamis Wave Energy Converter ... THE PELAMIS WEC Concept −Articulated cylinder ... - Pelamis selected by

WIND PROSPECT- Wind Prospect (2nd UK wind farm, Burbo)- Ocean Prospect formed- Phased wave-farm deployment- Demo at ‘Wave Hub’?- General site survey underway- Target installation 2006

OCEAN POWERDELIVERY LTD.www.oceanpd.com

SW ENGLAND

Page 42: The Pelamis Wave Energy Converter OCEAN POWER_M._The_Pelamis... · The Pelamis Wave Energy Converter ... THE PELAMIS WEC Concept −Articulated cylinder ... - Pelamis selected by

UNITED STATES OF AMERICA

Electrical Power Research Institute

- Public/private project part funded byDOE, NREL and individual states

- Project: four state wave energydemonstration projects in Maine, Oregon,Washington, Hawaii

- Pelamis selected by EPRI as the bestand only system currently recommendedfor deployment.

- Target installation 2006OCEAN POWERDELIVERY LTD.www.oceanpd.com

Page 43: The Pelamis Wave Energy Converter OCEAN POWER_M._The_Pelamis... · The Pelamis Wave Energy Converter ... THE PELAMIS WEC Concept −Articulated cylinder ... - Pelamis selected by

- Consortium development- Sites identified- Staged development- Target: first stage installed 2005/6- Onward routemap defined- Expected funding from £50m DTI

marine deployment fund

SCOTLAND

2000

m

500m

OCEAN POWERDELIVERY LTD.www.oceanpd.com

Page 44: The Pelamis Wave Energy Converter OCEAN POWER_M._The_Pelamis... · The Pelamis Wave Energy Converter ... THE PELAMIS WEC Concept −Articulated cylinder ... - Pelamis selected by

COST REDUCTIONMECHANISMS

• Required returns on capital

• Economies of Scale

• Learning by doing

OCEAN POWERDELIVERY LTD.www.oceanpd.com

Page 45: The Pelamis Wave Energy Converter OCEAN POWER_M._The_Pelamis... · The Pelamis Wave Energy Converter ... THE PELAMIS WEC Concept −Articulated cylinder ... - Pelamis selected by

REQUIRED RETURNS

Influenced by:• Risks during project

development• Risks during

construction/installation• Risks during operation

(technical & political)• Availability of debt• Project length• Due diligence costs• Bankable warranties• Future uncertainty

OCEAN POWERDELIVERY LTD.www.oceanpd.com

Page 46: The Pelamis Wave Energy Converter OCEAN POWER_M._The_Pelamis... · The Pelamis Wave Energy Converter ... THE PELAMIS WEC Concept −Articulated cylinder ... - Pelamis selected by

ECONOMIES OF SCALE

• Planning– Onshore costs, Env. Impacts, Seabed survey,

Resource assessment and measurement• Construction

– Cable costs, Cable lay costs, Grid connection,Machine installation

• Machine– Bulk ordering of components, Tooling costs, Plant

overhead, Verification costs• Operation

– Insurance, Maintenance, Spares

OCEAN POWERDELIVERY LTD.www.oceanpd.com

Page 47: The Pelamis Wave Energy Converter OCEAN POWER_M._The_Pelamis... · The Pelamis Wave Energy Converter ... THE PELAMIS WEC Concept −Articulated cylinder ... - Pelamis selected by

ECONOMIES OF SCALE

Economies of scale - example of ratio of fixed costs to variable costs (machines)1-4, 4-10 and 10-28 machine project examples

0.00

5.00

10.00

15.00

20.00

25.00

30.00

35.00

1 2 3 4 4 5 6 7 8 9 10 10 12 14 16 20 24 28

No. of machines in project

To

tal P

roje

ct C

ost

0%

10%

20%

30%

40%

50%

60%

70%

No

n m

ach

ine

cost

s %

of

tota

lMachine costs

Non-machine costsFixed costs % of total

OCEAN POWERDELIVERY LTD.www.oceanpd.com

Page 48: The Pelamis Wave Energy Converter OCEAN POWER_M._The_Pelamis... · The Pelamis Wave Energy Converter ... THE PELAMIS WEC Concept −Articulated cylinder ... - Pelamis selected by

EXPERIENCE & TECHNOLOGICALIMPROVEMENT

• Project capital costs– Machine cost – components– Prototype – Batch – Series production– Development costs (EIA etc)

• Project operation– Improvements in energy capture– Insurance costs– O&M costs

OCEAN POWERDELIVERY LTD.www.oceanpd.com

Page 49: The Pelamis Wave Energy Converter OCEAN POWER_M._The_Pelamis... · The Pelamis Wave Energy Converter ... THE PELAMIS WEC Concept −Articulated cylinder ... - Pelamis selected by

BRIDGING THE GAP- High initial costs...- High initial risks...- High initial opportunities…

- Costs fall as a result oftechnical refinement

- Costs fall in line withinstalled capacity

- Costs fall as a result ofinvestor confidence

OCEAN POWERDELIVERY LTD.www.oceanpd.com

Page 50: The Pelamis Wave Energy Converter OCEAN POWER_M._The_Pelamis... · The Pelamis Wave Energy Converter ... THE PELAMIS WEC Concept −Articulated cylinder ... - Pelamis selected by

THE OPPORTUNITY

• First projects: attractive returns,through market enablementmechanisms (eg: UK: RenewableObligation + Capital grants;Portugal €c23/kWh)

OPDManufacture and

supply waveenergy converters

DeveloperPlan, permit,finance and

install wave farms

OperatorOwn and operatewave farms, sell

electricity generated

Additional renewables generating capacity required by 2010 to meet targets(assumes typical 30% capacity factor for all renewables)

0.00

2.00

4.00

6.00

8.00

10.00

12.00

14.00

United K

ingdom

France

Irela

nd

Denm

ark

Norway

Spain

Portugal

South A

frica

Austra

lia

Vanco

uver I

sland

Califo

rnia

*

GW

re

qu

ire

d t

o b

e in

sta

lled

Total Requirement: 60GW, approx £50bn

* proposed targets for California and South Africa. SA target for all energy use in 2012.

• Strategic:Accessible globalmarket size >£50bnby 2010, unlimitedby resource

OCEAN POWERDELIVERY LTD.www.oceanpd.com

Page 51: The Pelamis Wave Energy Converter OCEAN POWER_M._The_Pelamis... · The Pelamis Wave Energy Converter ... THE PELAMIS WEC Concept −Articulated cylinder ... - Pelamis selected by

OCEAN POWER DELIVERY LTDOCEAN POWER DELIVERY LTD

OCEAN POWERDELIVERY LTD.www.oceanpd.com

www.oceanpd.com