the rac industry phase new challenges ods phase …...the rac industry phase new challenges ods...

11
The RAC industry phase new challenges ODS phase out is just a start Energy efficiency is the future challenge Side event on servicing sector during the OEWG in Bangkok 2013 Klas Berglöf, ClimaCheck Sweden SWEDEN [email protected] Tel. int +46 70 594 95 52

Upload: others

Post on 15-Feb-2020

3 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: The RAC industry phase new challenges ODS phase …...The RAC industry phase new challenges ODS phase out is just a start Energy efficiency is the future challenge Side event on servicing

The RAC industry phase new challenges

ODS phase out is just a start

Energy efficiency is the future challenge

Side event on servicing sector during the OEWG in Bangkok 2013

Klas Berglöf, ClimaCheck Sweden

[email protected]

Tel. int +46 70 594 95 52

Page 2: The RAC industry phase new challenges ODS phase …...The RAC industry phase new challenges ODS phase out is just a start Energy efficiency is the future challenge Side event on servicing

The industry must change

§ New refrigerants require new and more competencies

§ ODS – out

§ HFC – phase down new skills required -technical

§ HFO – under introduction new skills required - technical

§ HC – increase new skills required – tech. safety flammability

§ NH3 – increase more need the skills – tech. safety toxicity

§ CO2 – increase new skills required – tech. high pressure

§ Energy efficiency is the main challenge after ODS

§ RAC industry lack competence on operating efficiency

§ Equipment owners lack awareness and long term perspective

Page 3: The RAC industry phase new challenges ODS phase …...The RAC industry phase new challenges ODS phase out is just a start Energy efficiency is the future challenge Side event on servicing

Challenging for industry to changein developing and emerging economies

Ø Large informal sector compete on price

How to invest in training and tools

Ø Short term focus on investment ROI

Equipment owners want to buy cheap operating cost secondary

priority

Ø Often unclear policies-regulations – more urgent issues

Refrigerants

Energy prices and supply

Requirement on competence/capabilities

Page 4: The RAC industry phase new challenges ODS phase …...The RAC industry phase new challenges ODS phase out is just a start Energy efficiency is the future challenge Side event on servicing

Energy efficiency does not come easy

§ Few systems operate at rated conditions and performance

§ Equipment owner judge cooling on temperature not kWh

§ Regulations to support change is considered a pre-requisite in

latest International Energy Agency status report June 2013.

§ Performance inspections of AC systems required by the energy

performance of buildings directive (EPBD)

§ Competence must be built – structures for training and

certification from ODS phase out are needed for the future

Page 5: The RAC industry phase new challenges ODS phase …...The RAC industry phase new challenges ODS phase out is just a start Energy efficiency is the future challenge Side event on servicing

5

Huge variation in COP even in new plants

% Variation in COP (vs.) Nominal capacity kW

-40

-30

-20

-10

0

10

0 200 400 600 800 1000

Nominal capacity kW

% va

riatio

n in

CO

P

Source: Master Thesis by John Arul Mike Prakash, , KTH Stockholm 2006

Page 6: The RAC industry phase new challenges ODS phase …...The RAC industry phase new challenges ODS phase out is just a start Energy efficiency is the future challenge Side event on servicing

EU - Energy Performance in Building Directive(EPBD)

All office and apartment buildings in Europe should have an evaluation of energy performance

Performance inspections required all AC-system with more than 12 kW capacity

The inspection is to include “an assessment of the air conditioning efficiency

and the sizing compared to the cooling requirements of the building”.

Advice is also to be provided to the users on “possible improvement or replacement of the air-conditioning

system and on alternative solutions”.

Page 7: The RAC industry phase new challenges ODS phase …...The RAC industry phase new challenges ODS phase out is just a start Energy efficiency is the future challenge Side event on servicing

HCFC phase out relation to energy efficiency

§ Do not optimise “junk”

§ Check performance before retrofit

§ Fix problems in connection with retrofit

§ Optimise systems in connection with retrofit

§ There is often a 20-30% improvement through low cost

measures = ensure system operate as well as possible

§ Integrate energy optimisation as a step in

training, certification and regulatory framework

Page 8: The RAC industry phase new challenges ODS phase …...The RAC industry phase new challenges ODS phase out is just a start Energy efficiency is the future challenge Side event on servicing

Optimisation start with measurements

MeasureMeasure AnalyseAnalyse OptimiseOptimise SaveSave

§ Fixed monitoring system, or

§ Portable field measurement system- 20 minutes to connect

More than 1000 analysing systems in operation

Traditional methods are not in proportion to high cost

Page 9: The RAC industry phase new challenges ODS phase …...The RAC industry phase new challenges ODS phase out is just a start Energy efficiency is the future challenge Side event on servicing

Case – monitoring system

Six Carrefour supermarkets Italy:

Reduction of electricity 23% = savings of 318 k€/year

Page 10: The RAC industry phase new challenges ODS phase …...The RAC industry phase new challenges ODS phase out is just a start Energy efficiency is the future challenge Side event on servicing

Visualise energy optimisation

10

Energy profile statistical –last 12 month

Feedback on optimisation Italian ”hyper market”

Optimisation controls

Outdoor temp

Energy profile reference period

Page 11: The RAC industry phase new challenges ODS phase …...The RAC industry phase new challenges ODS phase out is just a start Energy efficiency is the future challenge Side event on servicing

GlobalIndustry need

tools and training

to optimise

11

ClimaCheck the toolfor the refrigeration expert