The Regional Municipality of
Peel
Review of Property Requirement Changes to
the Class Environmental Assessment
Project File Report
Burnhamthorpe Road Watermain Project BRM-605644-A0
Prepared By: Joel Gretton / Jesse Newton
Reviewed By: Jean Louis Gaudet
exp Services Inc. 1595 Clark Blvd Brampton, ON L6T 4V1 Canada
Date December 8, 2017
The Regional Municipality of Peel
Review of Property Requirement Changes to the Class Environmental Assessment Project File Report
Project Name: Burnhamthorpe Road Watermain Project
Project Number: BRM-00605544
Prepared By: Joel Gretton / Jesse Newton
Reviewed By: Jean Louis Gaudet exp Services Inc. 1595 Clark Blvd Brampton, ON L6T 4V1 Canada T: +1.905.793.9800 F: +1.905.793.0641 www.exp.com
Date:
December 8, 2017
The Regional Municipality of Peel Burnhamthorpe Road Watermain Project | exp ref 605544
Review of Property Requirement Changes to the Class EA Project File Report December 8, 2017
Legal Notification
This report was prepared by exp Services Inc. for the account of The Regional Municipality of Peel.
Any use which a third party makes of this report, or any reliance on or decisions to be made based on it, are the responsibility of such third parties. Exp Services Inc. accepts no responsibility for damages, if any, suffered by any third party as a result of decisions made or actions based on this project.
The Regional Municipality of Peel Burnhamthorpe Road Watermain Project | exp ref 605544
Review of Property Requirement Changes to the Class EA Project File Report December 8, 2017
i
Table of Contents
Table of Contents ............................................................................................................................ i
Glossary .......................................................................................................................................... ii
1 Introduction ........................................................................................................................ 1
2 Project Overview ............................................................................................................... 1
2.1 General Description ............................................................................................................. 1
2.2 Description of Project Changes ........................................................................................... 1
3 Overview of Project Modifications ................................................................................... 3
3.1 55 City Centre Drive (Morguard Corp.) Easement Requirements ....................................... 3
3.2 201 City Centre Drive (Morguard Corp.) Easement Requirements ..................................... 5
3.3 325 Burnhamthorpe Road West (YMCA) Easement Requirements ................................... 7
3.4 691 Burnhamthorpe Road East (V. & E. Amaral) Easement Requirements ....................... 9
4 Conclusion and Recommendations .............................................................................. 11
5 Bibliography ..................................................................................................................... 11
Appendix A – Property Requirement Maps
Appendix B – Revised Notice of Completion
The Regional Municipality of Peel Burnhamthorpe Road Watermain Project | exp ref 605544
Review of Property Requirement Changes to the Class EA Project File Report December 8, 2017
ii
Glossary
BTEX benzene, toluene, ethylbenzene and xylenes
EC electrical conductivity
MOECC Ministry of the Environment and Climate Change
PAHs polycyclic aromatic hydrocarbons
PCBs polychlorinated biphenyls
PDR Preliminary Design Report
PE permanent easement
PFR Project File Report
PHCs petroleum hydrocarbons
SAR sodium adsorption ratio
Table 1 SCS Table 1 Full Depth Background Site Condition Standards, in MOECC (2011).
Table 3 SCS Table 3 Full Depth Generic Site Condition Standards in a Non Potable Ground Water Condition for a Residential/Parkland/Institutional Property Use with Medium and Fine Textured Soil, in MOECC (2011).
TE temporary easement
VC valve chamber
VOCs volatile organic compounds
WM watermain
The Regional Municipality of Peel Burnhamthorpe Road Watermain Project | exp ref 605544
Review of Property Requirement Changes to the Class EA Project File Report December 8, 2017
1
1 Introduction This Review outlines the relevant changes to the Project File Report (PFR) for the Schedule ‘B’ Class Environmental Assessment (EA) completed for the Region of Peel’s Burnhamthorpe Road Watermain Project. This Review is being completed as part of the approved Class EA process for amending project file reports to account for changes to the project occurring after completion of the PFR (Municipal Engineers Association, 2000, as amended 2007, 2011, 2015; Section A.4.1).
The original PFR, filed in September 2015 (GHD, 2015a) identified properties that would require easements to facilitate construction and maintenance. This Review addresses modifications in the easement requirements associated with changes in the project since the original PFR.
2 Project Overview
2.1 General Description
The Burnhamthorpe Road Watermain Class EA aimed to improve water supply through water infrastructure upgrades in support of approved growth in the Mississauga City Centre (MCC) area. The identified Preferred Alternative was to construct a new 1500 mm diameter watermain using trenchless / tunnelling construction methods between Grand Park Drive and Cawthra Road. Additional improvements included interconnections between existing 600/750 mm diameter and 1050 mm diameter watermains and the new 1500 mm diameter watermain to maintain pressure in the water system within acceptable limits, and construction of two local distribution watermains (600 mm diameter along Duke of York Boulevard from Webb Drive to City Centre Drive; and 400 mm diameter from Kariya Drive, running west along Webb Drive and north up Grand Park Drive to Burnhamthorpe Road West).
All property requirements previously identified were associated with the 1500 mm diameter deep tunnel watermain, and changes in property requirements remain limited to the same.
2.2 Description of Project Changes
Since the 2015 Project File Report, minor modifications have been made to the proposed design during the detailed design stage. These include modifications to the alignment of the 1500 mm dia. watermain, the location of shafts for riser pipes and valve chambers and the staging area requirements. These changes have resulted in updated property requirements, as outlined in Table 1.
The Regional Municipality of Peel Burnhamthorpe Road Watermain Project | exp ref 605544
Review of Property Requirement Changes to the Class EA Project File Report December 8, 2017
2
Table 1: Details of Properties with Updated Easement Requirements
Property Property Owner
Update to 2015 PFR (GHD, 2015a)
Revised Required Areas (m2)
TE Details PE Details
TE PE
55 City Centre Drive, (northwest corner of Burnhamthorpe Road and Hurontario Street) PIN’s 13142-0012 and 13142-0011
Morguard Corporation
No easements previously identified; TE and PE now required
2774 810 Construction staging
WM and VC installation
201 City Centre Drive (northeast corner of Burnhamthorpe Road and Duke of York Boulevard) PIN 13142-0005
Morguard Corporation
TE previously identified only; PE now required in addition
520 85 Construction staging
VC installation
325 Burnhamthorpe Rd W (east of Confederation Parkway, north side) PIN 13141-0205
YMCA TE previously identified only; PE now required in addition
436 86 Construction staging
VC installation
691 Burnhamthorpe Rd E (northwest corner of Burnhamthorpe Road and Cawthra Road ) PIN 13170-0241
Victor and Eduarda Amaral
TE previously identified only; PE now required in addition
2676 623 Construction staging and equipment storage
Riser pipe connection shaft access, WM connection and water VC
TE = temporary easement; PE = permanent easement; WM = watermain; VC = valve chamber
The Regional Municipality of Peel Burnhamthorpe Road Watermain Project | exp ref 605544
Review of Property Requirement Changes to the Class EA Project File Report December 8, 2017
3
3 Overview of Project Modifications
3.1 55 City Centre Drive (Morguard Corp.) Easement Requirements
3.1.1 Changes and Rationale
This property (PINs 13142-0012 and 13142-0011) is owned by Morguard Corporation and is located at 55 City Centre Drive (northwest corner of Burnhamthorpe Road and Hurontario Street). In the 2015 PFR, no easements were identified for this property. It now requires both a temporary and permanent easement due to a change in watermain alignment and water valve chamber location (see Table 2).
Table 2: Changes in Easement Requirements for 55 City Centre Drive
TE Area (m2) PE Area (m2) TE Details PE Details
Original EA N/A N/A N/A N/A
Amended Requirements 2774 810 Construction staging
WM alignment and VC installation
TE = temporary easement; PE = permanent easement; WM = watermain; VC = valve chamber
Figure 1 shows both the original and revised proposed works and watermain alignment. The original proposed chamber was set within a City of Mississauga Property, with the watermain crossing this City of Mississauga Property before returning to the road right-of-way (ROW). The revised design locates the proposed chamber at 55 City Centre Drive. This change was made during detailed design as it was deemed to be superior with respect to both construction and operations.
Figure 1: Watermain Alignment – 55 City Centre Drive
Note: The chamber structure will be located within the noted shaft.
The Regional Municipality of Peel Burnhamthorpe Road Watermain Project | exp ref 605544
Review of Property Requirement Changes to the Class EA Project File Report December 8, 2017
4
3.1.2 Overview of Potential Impacts and Mitigation
Table 3 outlines the potential impacts, mitigations, and net effect of the change to property requirements.
Table 3: Impacts for 55 City Centre Drive Property (Morguard Corp.)
Impact Category
Impact Details Measures to Mitigate Impacts
Net Effect
Trees 37 trees to be removed: (5 for PE areas, 32 for TE areas)
Tree removal addressed through compensation/ tree replacement program; Shallow/removable vegetation may be considered in locations in which PEs are required
Net 5 of 37 trees anticipated not being replaced; Owner compensated where appropriate.
Groundwater • Negligible change in potential dewatering requirements
• Comparatively fewer potential impacts identified/exceedances of Table 1 SCS and Table 3 SCS standards; (Original site’s monitoring wells’ samples had exceedances for EC, SAR, PHCs, BTEX and VOCs, Chlorides, Sodium, PHCs and
VOCs, see WSP, 2017b)
• None beyond those previously identified (GHD, 2015a, 2015b)
• Groundwater infiltration expected to be suitable for discharge to the municipal sanitary sewer (WSP, 2017a, 2017b; GHD, 2015a). Filtration may be required to reduce TSS if needed.
• Contaminant sampling required pre- and post-construction at minimum
No change in dewatering requirements anticipated.
Soil • Negligible change in anticipated impacts
• Comparatively fewer potential impacts identified/exceedances of Table 1 SCS and Table 3 SCS (Original site has exceedances for Metals, Inorganics and VOCs; New site shows only exceedances for EC and SAR)
• Soil cuttings classified as non-hazardous waste (WSP, 2017b)
• Salt-impacted soils may be reused onsite or on municipal roads; excess and otherwise contaminated soils will be disposed at an MOECC licensed facility (GHD, 2015c; WSP, 2017b)
• Proposed three (3) additional boreholes will provide baseline levels and post-construction comparison.
Negligible change anticipated.
Archaeological No archaeological potential identified during Class EA (ASI, 2015). Expanded easement area requires further investigation.
Expanded easement area confirmed as disturbed through additional investigation during detailed design (report forthcoming).
No archeological impacts.
Property Owner/ Occupier
TE and PE are now required resulting in temporary and permanent usage limitations for the owner.
Region of Peel is engaging with property owner to achieve an agreement.
Working towards fair easement agreement.
3.1.3 Owner Consultation
Morguard property owner representatives were engaged by the Region to discuss property requirements. Prior to the filing of the PFR, the Region and their consultant GHD met on May 6, 2015 regarding a separate property owned by Morguard. Since the filing of the PFR, additional
The Regional Municipality of Peel Burnhamthorpe Road Watermain Project | exp ref 605544
Review of Property Requirement Changes to the Class EA Project File Report December 8, 2017
5
email correspondence has occurred between the Region of Peel and Morguard, and additional meetings took place as follows:
• May 26, 2016 with Region of Peel and Hatch/exp (present consultant);
• June 27, 2016 with Region of Peel and Hatch/exp (present consultant); and
• June 26, 2017 with Region of Peel.
Meeting discussions led to modifications to easements and uses pertaining to snow storage and pedestrian access. Additional discussion included: construction details; irrigation lines onsite; electrical wiring for lighting; minimizing impacts to a sign; and site restoration. At the time of writing, development of the agreement was underway. See Appendix A for a delineation of the easement requirements.
3.2 201 City Centre Drive (Morguard Corp.) Easement Requirements
3.2.1 Changes and Rationale
This property (PIN 13142-0005) is owned by Morguard Corporation and is located at the northeast corner of Burnhamthorpe Road West at Duke of York Boulevard (at 201 City Centre Drive, in the boulevard of Burnhamthorpe Road). In the 2015 PFR, a temporary easement was identified for this property. A permanent easement is now required (see Table 4).
Table 4: Changes in Easement Requirements for 201 City Centre Drive
TE Area (m2) PE Area (m2) TE Details PE Details
Original EA 480 N/A Construction staging (for a connection shaft)
N/A
Amended Requirements
520 85 Construction staging Permanent rock bolts to stabilize excavation
TE = temporary easement; PE = permanent easement; WM = watermain; VC = valve chamber
Figure 2 below shows both the original and new proposed works.
Figure 2: Watermain Alignment – 201 City Centre Drive
Note: The chamber structure will be located within the noted shaft.
The Regional Municipality of Peel Burnhamthorpe Road Watermain Project | exp ref 605544
Review of Property Requirement Changes to the Class EA Project File Report December 8, 2017
6
3.2.2 Overview of Potential Impacts and Mitigation
Table 5 outlines the potential impacts, mitigations, and net effect of the change to property requirements.
Table 5: Impacts for 201 City Centre Drive (Morguard Corp.)
Impact Category
Impact Details Measures to Mitigate Impacts
Net Effect
Trees Approx. 4-5 additional trees to be removed in new TE; 4 trees previously in TE area now in PE; total of 30 trees requiring removal.
Tree removal addressed through compensation/ tree replacement program. Shallow/removable vegetation may be considered in locations in which PEs are required.
Net 4-5 of 30 trees anticipated not being replaced; Owner compensated where appropriate.
Groundwater • Negligible change in potential dewatering requirements
• Negligible change in potential impacts identified/ exceedances of Table 1 SCS and Table 3 SCS standards (Metals and Inorganics and VOCs according to samples from adjacent monitoring well)
• No additional mitigation measures required beyond those associated with the PFR and PDR.
• Groundwater infiltration is expected to be suitable for discharge to the municipal sanitary sewer after filtration to reduce TSS levels sewer (WSP, 2017a, 2017b; GHD, 2015a).
• Contaminant sampling pre- and post- construction at minimum.
No change in dewatering requirements anticipated.
Soil • Negligible change in anticipated impacts
• Negligible change in associated potential impacts identified/exceedances of Table 1 SCS and Table 3 SCS standards (still include EC, SAR and VOCs according to samples from adjacent monitoring well)
• Salt-impacted soils may be reused onsite or on municipal roads; excess and otherwise contaminated soils will be disposed at an MOECC licensed facility (GHD, 2015c; WSP, 2017b).
• Proposed three (3) additional boreholes will provide baseline levels and post-construction comparison.
Negligible change anticipated.
Archaeological No archaeological potential (ASI, 2015)
N/A N/A
Property Owner/Occupier
PE is now required resulting in permanent usage limitations for the owner.
Region of Peel is engaging with property owner to achieve a fair easement agreement.
Working towards fair easement agreement.
3.2.3 Owner Consultation
Prior to the filing of the PFR, the Region of Peel and their consultant GHD met with Morguard representatives on May 6, 2015 to discuss property requirements. Since the filing of the PFR, additional email correspondence has occurred, and additional meetings as follows:
• May 26, 2016 with Region of Peel and Hatch/exp (present consultant);
The Regional Municipality of Peel Burnhamthorpe Road Watermain Project | exp ref 605544
Review of Property Requirement Changes to the Class EA Project File Report December 8, 2017
7
• June 27, 2016 with Region of Peel and Hatch/exp (present consultant); and
• June 26, 2017 with Region of Peel.
In these meetings, the proposed property impact plan was presented and discussed. Discussions pertained to a power line, irrigation lines, recent tree removals and site restoration. At the time of writing, development of the agreement was underway. See Appendix A for a delineation of the easement requirements.
3.3 325 Burnhamthorpe Road West (YMCA) Easement Requirements
3.3.1 Changes and Rationale
This property (PIN 13141-0205) is owned by the YMCA and is located at 325 Burnhamthorpe Road West (east of Confederation Parkway, north side). In the 2015 PFR, a temporary easement was identified for this property. A permanent easement is now required for future maintenance access (see Table 6).
Table 6: Changes in Easement Requirements for 325 Burnhamthorpe Road West
TE Area (m2) PE Area (m2) TE Details PE Details
Original EA 360 N/A Construction staging (for a connection shaft)
N/A
Amended Requirements
436 86 Construction staging Permanent rock bolts to stabilize excavation
TE = temporary easement; PE = permanent easement; WM = watermain; VC = valve chamber
Figure 3 shows both the original and revised proposed works.
Figure 3: Watermain Alignment – 325 Burnhamthorpe Road West
Note: The chamber structure will be located within the noted shaft.
The Regional Municipality of Peel Burnhamthorpe Road Watermain Project | exp ref 605544
Review of Property Requirement Changes to the Class EA Project File Report December 8, 2017
8
3.3.2 Overview of Potential Impacts and Mitigation
Table 7 below outlines the potential impacts, mitigations, and net effect of the change in the property requirements.
Table 7: Impacts for 325 Burnhamthorpe Road West (YMCA)
Impact Category
Impact Details Measures to Mitigate Impacts Net Effect
Trees No additional impacts. N/A Removal of 1 tree previously identified; Owner compensated where appropriate
Groundwater • Negligible change in potential dewatering requirements
• Negligible change in potential impacts identified/ exceedances of Table 1 SCS and Table 3 SCS standards (one adjacent monitoring well exceeded Metals and Inorganics, PHCs and VOCs)
• No additional mitigation measures required beyond those identified (GHD, 2015a, 2015b).
• Groundwater infiltration is expected to be suitable for discharge to the municipal sanitary sewer, after suitable pre-treatment (WSP, 2017a, 2017b; GHD, 2015a).
• Contaminant sampling pre- and post-construction at minimum.
No change in dewatering requirements anticipated.
Soil • Negligible change in anticipated impacts
• Negligible change in potential impacts identified/ exceedances of Table 1 SCS and Table 3 SCS standards (including Metals and Inorganics, VOCs and PCBs according to samples from adjacent monitoring well)
• Salt-impacted soils may be reused onsite or on municipal roads; excess and otherwise contaminated soils will be disposed at an MOECC licensed facility (GHD, 2015c; WSP, 2017b)
• Proposed three (3) additional boreholes will provide baseline levels and post-construction comparison.
Negligible change anticipated.
Archaeological No archaeological potential (ASI, 2015)
N/A N/A
Property Owner/ Occupier
PE is now required, resulting in permanent usage limitations for the owner.
Region of Peel is engaging with property owner to achieve a fair easement agreement.
Working towards fair easement agreement.
3.3.3 Owner Consultation
Prior to the filing of the PFR, the Region of Peel and their consultant GHD met with YMCA representatives on April 24, 2015 to discuss property requirements. Since the filing of the PFR, additional email correspondence has occurred, and a second meeting between the Region and the YMCA was held on June 23, 2017.
In these meetings, the proposed property impact plan was presented and discussed. Discussions pertained to construction noise, dust, debris and a fibre optic cable connection. At the time of writing, development of the agreement was underway. See Appendix A for a delineation of the easement requirements.
The Regional Municipality of Peel Burnhamthorpe Road Watermain Project | exp ref 605544
Review of Property Requirement Changes to the Class EA Project File Report December 8, 2017
9
3.4 691 Burnhamthorpe Road East (V. & E. Amaral) Easement Requirements
3.4.1 Changes and Rationale
This property (PIN 13170-0241) is owned by Victor and Eduarda Amaral and is located at 691 Burnhamthorpe Road East (northwest corner of Burnhamthorpe Road and Cawthra Road). In the 2015 PFR, a temporary easement was identified for this property. A permanent easement is now required due to the change in the location of a shaft and also to allow for future utility work by the Region (see Table 8).
Table 8: Changes in Easement Requirements for 691 Burnhamthorpe Road East
TE Area (m2) PE Area (m2) TE Details PE Details
Original EA 3300 N/A Construction staging N/A
Amended Requirements
2676 623 Construction staging
Connection shaft, WM connection and VC installation, maintenance access, future work
TE = temporary easement; PE = permanent easement; WM = watermain; VC = valve chamber
Figure 4 below shows the original and revised proposed works. In the original design, the shaft and watermain were set within the road ROW. In the revised design, the shaft has been moved to within the Amaral property, and connections of the watermain likewise cross the Amaral property before returning to the ROW. The shaft was relocated during detailed design because it was deemed to be a superior design.
Figure 4: Watermain Alignment – 691 Burnhamthorpe Road East
Note: The valve chamber structure will be located within the noted chamber shaft.
The Regional Municipality of Peel Burnhamthorpe Road Watermain Project | exp ref 605544
Review of Property Requirement Changes to the Class EA Project File Report December 8, 2017
10
3.4.2 Overview of Potential Impacts and Mitigation
Table 9 below outlines the potential impacts, mitigations, and net effect of the change to property requirements.
Table 9: Impacts for 691 Burnhamthorpe Road East (V. & E. Amaral)
Impact Category
Impact Details Measures to Mitigate Impacts Net Effect
Trees No additional trees to be removed; 1 tree previously in TE area now in PE area; total of 9 trees requiring removal
Tree removal addressed through compensation/ tree replacement program. Shallow/removable vegetation may be considered in locations in which PEs are required.
Net 1 of 9 trees anticipated not being replaced; Owner compensated where appropriate
Groundwater • Negligible change in potential dewatering requirements;
• Uncertain change in potential impacts identified/ exceedances of Table 1 SCS standards (one adjacent monitoring well exceeded Metals and Inorganics, and VOCs, whereas another adjacent monitoring well did not identify exceedances)
• No additional mitigation measures required beyond those identified (GHD, 2015a, 2015b).
• Groundwater infiltration is expected to be suitable for discharge to the municipal sanitary sewer, after suitable pre-treatment (WSP, 2017a, 2017b; GHD, 2015a).
• Contaminant sampling pre- and post- construction at minimum
No change in dewatering requirements anticipated.
Soil • Negligible change in anticipated impacts
• Uncertain change in potential impacts identified/ exceedances of Table 1 and Table 3 SCS standards including SAR, cyanide, BTEX and VOCs)
• Salt-impacted soils may be reused onsite or on municipal roads; excess and otherwise contaminated soils will be disposed at an MOECC licensed facility (GHD, 2015c; WSP, 2017b).
• Proposed three (3) additional boreholes will provide baseline levels and post-construction comparison.
Negligible change anticipated.
Archaeological No archaeological potential identified during Class EA (ASI, 2015). Expanded easement area requires further investigation.
Expanded easement area confirmed as disturbed through additional investigation during detailed design (report forthcoming).
No archeological impacts.
Property Owner/ Occupier
PE is now required on the property resulting in permanent usage limitations for the owner.
Region of Peel is engaging with property owner to achieve a fair easement agreement.
Working towards fair easement agreement.
3.4.3 Owner Consultation
Prior to the filing of the PFR, the Region of Peel and their consultant GHD met with the property owner on June 15, 2015 to discuss property requirements. Since the filing of the PFR, the following additional meetings took place:
• August 10, 2016 with Region of Peel; and
• September 9, 2017 with Region of Peel (via teleconference).
The Regional Municipality of Peel Burnhamthorpe Road Watermain Project | exp ref 605544
Review of Property Requirement Changes to the Class EA Project File Report December 8, 2017
11
In these meetings, the proposed property impact plan was presented and discussed. Discussions pertained to plans for utilizing the property and the Region’s project timelines. At the time of writing, development of this agreement was underway. See Appendix A for a delineation of the easement requirements.
4 Conclusion and Recommendations The purpose of this Review was to update the public record regarding the Burnhamthorpe Watermain Project Schedule ‘B’ Class EA that was filed in September 2015.
In this Review, we have identified the impacts of the project changes, the resulting potential environmental impacts of those changes, and mitigation measures to minimize or eliminate impacts. A Revised Notice of Completion will subsequently be filed to reflect these changes (see Appendix B).
5 Bibliography ASI. (2015). Stage 1 Archaeological Assessment Burnhamthorpe Road Watermain Former
Township of Toronto, County of Peel, City of Mississauga, Regional Municipality of Peel. Prepared for GHD on behalf of the Regional Municipality of Peel. Dated July 6, 2015. Included as Appendix 2F in GHD, 2015a.
GHD. (2015a). Burnhamthorpe Road Watermain Class Environmental Assessment Project File Report. Prepared for The Regional Municipality of Peel. Dated September 2015.
GHD. (2015b). Burnhamthorpe Road Watermain Preliminary Design Report. Prepared for The Regional Municipality of Peel. Dated December 2015.
GHD. (2015c). Burnhamthorpe Road Watermain Tunnelling Technical Memo. Prepared for The Regional Municipality of Peel. Dated December 2015. Included as Appendix J in GHD, 2015b.
MOECC. (2011). Soil, Ground Water and Sediment Standards for Use Under Part XV.1 of the Environmental Protection Act. Published April 15, 2011.
Municipal Engineers Association (MEA). (October 2000, as amended in 2007, 2011, and 2015). Municipal Class Environmental Assessment.
WSP. (2017a). Draft Hydrogeological Investigation - Burnhamthorpe Water Project (BWP) Detail Design – Contract 1 & 2. Prepared for the Regional Municipality of Peel. Dated August 14, 2017.
WSP. (2017b). Draft Stage II ESA Report Environmental Site Assessment for the Burnhamthorpe Water Project. Prepared for the Regional Municipality of Peel. Dated September 8, 2017.
The Regional Municipality of Peel Burnhamthorpe Road Watermain Project | exp ref 605544
Review of Property Requirement Changes to the Class EA Project File Report December 8, 2017
Appendix A – Property Requirement Maps
This appendix contains maps delineating the permanent easements for the properties identified through the detailed design stage that were not identified during the initial Class EA (GHD, 2015a). The properties are as follows:
• 55 City Centre Drive (owned by Morguard Corporation).
• 201 City Centre Drive (owned by Morguard Corporation).
• 325 Burnhamthorpe Road West (owned by YMCA).
• 691 Burnhamthorpe Road East (owned by Victor and Eduarda Amaral).
Date
Area
Drawn by
Sheet
Project No.
Checked byPlan No.
CAD Area
DATE DETAILS
REVISIONS
INIT.
Approved byDesigned by
Chkd.
UTILITIES TO BE VERIFIED BY SUBSURFACE UTILITY ENGINEERING INVESTIGATION.3.
PURPOSES AND WILL BE VERIFIED THROUGH A LEGAL SURVEY
EASEMENT ALIGNMENTS AND DIMENSIONS ARE PRELIMINARY FOR DISCUSSION 2.
ALL PROPERTY LINES TO BE VERIFIED THROUGH A LEGAL PROPERTY SURVEY.1.
NOTES:
BH16-307
55
4033 - 50
60
0
12
M
TJBTJBTJB
HC
GV
ASPHALT WALK
CONCRETE WALKCONCRETE WALK
TV VAULTT VAULT
ASPHALT WALKWAY
PAVING S
TONES
BM
SI
GN
HLPHLPHLP
HLP
HLP
HWHW
HW
HW
HW
HW
HW
HW
HW
HW
TS
TS
TS
HP
ELMH
GVGV
JB
JB
ELMH
ELMH
LS
TSTS
TS
TS
TS
TSTS
TS
TS TS
TS
TSTSTS
TS
LS
SI
GN
LS
LS
HP
LS
LS
OW OW OW
OW
OW
TS
TS
TS
TS
SW
AL
E
TS
TS
CO
NC
CU
RB
(TYP.)
CO
NC/ILB
OW
OW
OW
OW
OW
OW
TS
ILBC
ON
C
ILB
CP
ILB
SW
ICV
JB
ILB
ILBTCL
TCL
SW
SW
SW
SW
ILB
CO
NC
CO
NC
CO
NC
CONC ILB
SW
SW
CO
NC
ILB
OW
S
S
S
S
S
S
S
S
S
S
S
S
TL
TL
ILB
HW
HW
HW
HW
HW
HW
CONCCONCCONC CONC
ILB
CONCCONC
CONC
CO
NC
RE
TE
WA
LK
CONCRETE WALK
CO
NC
RE
TE
WA
LK
CONCRETE WALK
AN
D
GU
TT
ER
CO
NC
RE
TE
WA
LK
CO
NC
RE
TE
WA
LK
CO
NC
RE
TE
WA
LK
CO
NC
RE
TE
WA
LK
CONCRETE WALK
SW
CONC CONC
ILB
CONC
ILB
ILB
CONCRETE WALK
CO
NC
CU
RB
AN
D
GU
TT
ER
CONC CURB AND GUTTER
CONCCONC CONC CONCSW
SW
ILB
ILB
ILB
ILB
ILB
ILB
ILB
CO
NC
CO
NC
CO
NC
CO
NC
& IL
B
CR
OS
SW
AL
K
CONC
CONC
CO
NC
ASPHALT PATH
ILB
ILB
ILB
CO
NC
CU
RB
AN
D
GU
TT
ER
CO
NC
CU
RB
AN
D
GU
TT
ER
AND G
UTTER
CO
NC
CU
RB
AN
D
GU
TT
ER
CONC CURB AND GUTTER
CO
NC C
URB
AN
D
GUTTER
CO
NC C
URB
GR
AS
S
GR
AS
S
GR
AS
S
GR
AS
S
GRASS
GA
RD
EN
GR
AS
S
GR
AS
S
CONC & ILB CROSSWALK
ILB
ILB
CONC & ILB CROSSWALK
CO
NC
& IL
B
CR
OS
SW
AL
K
ILB
GA
RD
EN
GARDEN
ILB
GR
AS
S
GD
N
GA
RD
EN
GR
AS
S
GR
AS
S
GR
AS
S
CONC
GD
N
GD
N
GD
N
GD
N
GD
NG
DN
GD
N
CO
NC
CU
RB
AN
D
GU
TT
ERB
US
CB
RW
CR
W
CB
RW
CR
W
LS
BA
SE
LS
TL
TL/
PS
LS
LS/
TL/
PS
LS/
TL/
PS
LS/
TL/
PS
GV
HP/
LS
LS
UC
GP
BX
BX
BM
HB
MH
BM
H
TL
TL
LS/
TL
HP/
LS
LS
5G
W
CONC CURB AND GUTTER
CO
NC
CU
RB
AN
D
GU
TT
ER
CO
NC
CU
RB
AN
D
GU
TT
ER
CO
NC
CU
RB
AN
D
GU
TT
ER
CO
NC
CU
RB
AN
D
GU
TT
ER
CUT
CU
RB
TL
TL
LS
LS
HP
HM
H
TL
B
PS
HM
H
TL
LS/
TL
LS/
PS
HP/
LS
BC
HB
CH
BC
H
BC
HB
CH
BC
H
BC
H
BC
H
BC
HB
CH
BC
HB
CH
BC
HB
CH
GA
TE
DR
IVE
CL
EV
ED
ON
DU
RS
LY
CR
ES.
BS
HO
PS
TO
KE
LANE
BISHOPSTOKE
MEADOWS
DRIVE
MACEDONIA
DR.
PLACE
ENFIELD
GATE
GA
TE
WA
LF
OR
D C
T.
ARIS
TA
WA
Y
KA
NE
FF
CRES.
MIS
S
ISS
AUGA
HU
RO
NT
ARIO
WALES DR.
ROYAL DR.
ABSOLUTE
VALLEY
MATTHEWS
SU
SS
EX
KA
RIY
A
GA
TE
E
I
KA
RIY
ASQUARE
CELEBRATION
DU
KE O
F Y
OR
K B
LV
D.
CIT
Y C
EN
TR
E D
RIV
E
SQUARE ONE
HU
RO
NT
ARIO S
TR
EE
T
BL
VD.
DU
KE O
F Y
OR
K
BURNHAMTHORPE ROAD WEST
AVE
NU
E
ROBERT SPECK PKWY
BURNHAMTHORPE ROAD EAST
KEY PLAN (N.T.S.)
0 10 20 30m10m
HU
RO
NT
ARIO S
TR
EE
T
SU
SS
EX G
AT
E
BURNHAMTHORPE ROAD WEST
LEGEND:
N.L.
13-1125
PROPERTY IMPACT PLAN
PROPERTY OWNER:
MORGUARD CORPORATION
SK002
EXISTING R.O.W
EXISTING PROPERTY LINE
(810.1m², 0.200 acres)PERMANENT EASEMENT
a
BURNHAMTHORPE ROAD
6.6
m
ABSOLUTE DRIVE
ROAD/ACCESS RAMP
POTENTIAL CONSTRUCTION
8.0m124.3m
44.0m
22.3
m
109.5m
10.0m
A.R.
JUNE 2017
(2773.7m², 0.685 acres)TEMPORARY EASEMENT
12.1m
12.4
m
56.1m
68.9
m
ROAD/ACCESS RAMP
CONSTRUCTION
POTENTIAL
8.0
m
CONSTRUCTION
BE RELOCATED DURING
EXISTING BUS SHELTER TO
LANEWAY
PARKING LOT
73.1
m
5.3
m
27.8
m
SNOW STORAGE AREA
DURING CONSTRUCTION
SIGN TO BE MAINTAINED
EXISTING TRIOS COLLEGE
Date
Area
Drawn by
Sheet
Project No.
Checked byPlan No.
CAD Area
DATE DETAILS
REVISIONS
INIT.
Approved byDesigned by
Chkd.
UTILITIES TO BE VERIFIED BY SUBSURFACE UTILITY ENGINEERING INVESTIGATION.3.
PURPOSES AND WILL BE VERIFIED THROUGH A LEGAL SURVEY
EASEMENT ALIGNMENTS AND DIMENSIONS ARE PRELIMINARY FOR DISCUSSION 2.
ALL PROPERTY LINES TO BE VERIFIED THROUGH A LEGAL PROPERTY SURVEY.1.
NOTES:
SC
H
GA
TE
WALLENBERG
PARKVIEW
TURNBRIDGE
BLVD.
ROAD
DRIVE
DR.
PLACE
ENFIELD
GATE
GA
TE
RO
AD
WEBB DRIVE
HU
RO
NT
ARIO
PRINCE OF WALES DR.
PRINCESS ROYAL DR.
LIVIN
G
AR
TS D
RIV
E
MATTHEWS
SU
SS
EX
KA
RIY
AK
ARIY
A
EN
CT.
RU
SS
O
VIA
CO
NF
ED
ER
ATIO
N P
KW
Y.
ARBUTUS
WAY
HA
MM
ER
SO
N
DRIVEONE
ASQU RE
CITY
CENTRE DR.SQUARE
CELEBRATIONPL.
CURRAN
CRES.
BRIC
KS
TO
NE
ME
WS
PA
RK
SID
E VIL
LA
GE D
R.
DU
KE O
F Y
OR
K B
LV
D.
CIT
Y C
EN
TR
E D
RIV
E
SQUARE ONE
SQUARE ONE DRIVE
HU
RO
NT
ARIO S
TR
EE
T
BURNHAMTHORPE ROAD WEST
BL
VD.
DU
KE O
F Y
OR
K
BURNHAMTHORPE ROAD WEST
ST
RE
ET
KEY PLAN (N.T.S.)
0 10 20 30m10m
DU
KE O
F Y
OR
K B
OU
LE
VA
RD
BURNHAMTHORPE ROAD WEST
EXISTING PROPERTY LINE
78.5m
7.8
m
EXISTING R.O.W
LEGEND:
, 0.129 acres)2
(520.1m
TEMPORARY EASEMENT
ASPHALT WALKWAY
CONCRETE WALKWAY
CO
NC
RE
TE W
AL
KW
AY
N.L.
13-1125
PROPERTY IMPACT PLAN
PROPERTY OWNER
MORGUARD CORPORATION
NOVEMBER 2016
SK003a
BURNHAMTHORPE RD WEST
21.1m
4.0
m
, 0.021 acres)2
(84.5m
PERMANENT EASEMENT
CITY CENTRE DRIVE
J.M./A.R.
Date
Area
Drawn by
Sheet
Project No.
Checked byPlan No.
CAD Area
DATE DETAILS
REVISIONS
INIT.
Approved byDesigned by
Chkd.
UTILITIES TO BE VERIFIED BY SUBSURFACE UTILITY ENGINEERING INVESTIGATION.3.
PURPOSES AND WILL BE VERIFIED THROUGH A LEGAL SURVEY
EASEMENT ALIGNMENTS AND DIMENSIONS ARE PRELIMINARY FOR DISCUSSION 2.
ALL PROPERTY LINES TO BE VERIFIED THROUGH A LEGAL PROPERTY SURVEY.1.
NOTES:
325 - 329
TSC
TSC
ASPHALT WALK
CONCRETE WALK
CONCRETE WALK
ST
ON
E
FE
NC
E
DCB
TS
TS
TS
CONTAINER
STONE
STORAGE
CONC
CO
NC
CONCASPHALT
CONC
COL
CONC
ASPHALT
SW
CONC
ILB
PS
CS
SW
SWSW
SW
SW
COL
CPLX
MG
MG
MG MG
CURBC
ONC
CU
RB
CU
T
TPLX
CONC CURB AND GUTTER
CONC CURBCONC CURB
GA
TE
WALLENBERG
PARKVIEW
TURNBRIDGE
BLVD.
ROADGATE
RIDEAU
EID
ER
DO
WN
PL.
LIONS
GATECHELMSFORD
CT.
HARTFORDSHIRE
PAVILLION
CT.
CIRCLE
EL
OR
A
US
DR.
CT.
CR
OA
TIA
DR.
DRIVE
MACEDONIA
CRES.
NA
BL
US
DR.
PLACE
ENFIELD
RIE
L
RE
DM
ON
DR
OA
D
WA
LF
OR
D C
T.
PA
RK
DRIV
E
RO
AD
ITA
LIA
CRES.
ITALIA
COMMONWEALTCIR
CLECOMMONWEALTH
RD.
C
WEBB DRIVE
PRINCESS ROYAL DR.
MA
LA
GA
LIVIN
G
AR
TS D
RIV
E
ELM DR.
KA
RIY
A
GA
TE
LOTUSPOND
H
KA
RIY
A
ARBUTUS
WAY
CITY
CENTRE DR.SQUARE
CELEBRATIONPL.
CURRAN
CRES.
BRIC
KS
TO
NE
ME
WS
PA
RK
SID
E VIL
LA
GE D
R.
DU
KE O
F Y
OR
K B
LV
D.
SQUARE ONE
BURNHAMTHORPE ROAD WEST
BL
VD.
DU
KE O
F Y
OR
K
BURNHAMTHORPE ROAD WEST
KEY PLAN (N.T.S.)
N.L.
13-1125
BURNHAMTHORPE ROAD
0 10 20 30m10m
LIVIN
G A
RTS D
RIV
E
BURNHAMTHORPE ROAD WEST
NOVEMBER 2016
LEGEND:
EXISTING PROPERTY LINE
EXISTING R.O.W
PROPERTY IMPACT PLAN
PROPERTY OWNER:
SK004
YMCA
40.3m
12.9
m
a
, 0.021 acres)2
(85.9m
PERMANENT EASEMENT
,0.108 acres)2
(436.4m
TEMPORARY EASEMENT
21.2m
4.0
m
J.M./A.R.
Date
Area
Drawn by
Sheet
Project No.
Checked byPlan No.
CAD Area
DATE DETAILS
REVISIONS
INIT.
Approved byDesigned by
Chkd.
UTILITIES TO BE VERIFIED BY SUBSURFACE UTILITY ENGINEERING INVESTIGATION.3.
PURPOSES AND WILL BE VERIFIED THROUGH A LEGAL SURVEY
EASEMENT ALIGNMENTS AND DIMENSIONS ARE PRELIMINARY FOR DISCUSSION 2.
ALL PROPERTY LINES TO BE VERIFIED THROUGH A LEGAL PROPERTY SURVEY.1.
NOTES:
MID
HU
RS
T
LA
NE
MIDHURST
LA
NED
U
NM
OW
CR
ES.
MOLLY
AV
E.
TWINE
CR
ES
CE
NT
SYCAMORE
CT.
WIL
CO
X
AMHERST
CT.
BOOKHAM
CR
ES.
CA
RIG
AR
CT.
CARIBBEANCT.
RA
YFIE
LD
GR
EY
CE
DA
R
RESCENT
RO
AD
WIL
LO
WB
AN
K
TRAGR
EY
CE
DA
RC
OU
RT
WEST
MI
ST
ER
PL.
WETHERBY
VI
N
R
WETHERBY LN.
ANNAMORE
ROAD
GREENORE
ROAD BR
OO
MHIL
L
CR
ES
CE
NT
RUNNINGBROOK
DRIVE
HOLLOWTREE
CRES.
SADDLE
CRES.
LA
ME
WO
OD
DR.
SWIR
LIN
GE
AV
ES
CR
ES.
GALEDOWNS
COURT
HEIGHTS HOLDEN
CR
ES.
HASSALL RD.
AV
E.
O
LY
EVERSLEY
DRIV
E
KIL
MA
NA
GH
RO
AD
BOULEVARD
SU
NS
ET V
ALLE
Y C
T.
WI
LL
O
RATHBURN
AD
EAST
DA
RA
LE
A
F
L
M
NT
EDR.
C
SIL
VE
RH
AZ
E
LI
N
CA
WT
HR
A
W
BURNHAMTHORPE ROAD
CA
WT
HR
A R
OA
D
691
695
699
703
CO
NC
RE
TE
CU
RB
CONC. WALK
ASP
HA
LT SID
EW
AL
K
BOARD FENCE
BO
AR
D
FE
NC
E
ASPHALT WALK
CONCRETE WALK
TL
SHELTER
BUS
BUS PAD - CONCRETE
BUS PAD - CONCRETE
CO
NC
RE
TE
CU
RB
POLE
HW
HW
HW
HW
HW
HW HW
HW HW
HW
LS
LS
LS
LS
LS
LS
LS
TL
TL
TL TL
TL
TS
TS
TS
HP
JB
VE
NT
FUEL
HP
OW
OW
PV
C
VP
x x x x x x x x
xx
xx
x
BUS
MW
MW
MW
MW
PL
PL
PL
PL
PL
PLPL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
BLOCK 57
LOT 41
(REGISTERED PLAN 43M-466)
(0.30 RESERVE)
REGISTERED PLAN 43M-466
REGISTERED PLAN A-24LOT 5
BLOCK 54
(REGISTERED PLAN 43M-466)
REGISTERED
PLAN 43M-466
(0.30 RESERVE)
LO
T 40
BLOCK 61
BLOCK 56
LO
T 39
HY
D
WV
WV
WVWV
WV
WV
WV
CONC
SW
CP
CONC
AS
PH
AL
T
SW
CP
SW
SW
AS
PH
AL
T
RO
AD
WA
Y
4C
P
CO
NC
4C
BL
CONC
4CBL
CONCASPHALT
ASP
HA
LT
SW
CONC
GR
AV
EL
WX
ASPHALT
5CBL
AS
PH
AL
T
RO
AD
WA
YC
ON
C
TREES
OPEN FIELDTR
EE
S
AN
D
BU
SH
GRASS
GRASS
CB
MH
MH
MH
MH
CB
MH
CB
CB
MH
MH
CB
DC
B
MH
MH
DC
B
MH
MH
MH
MH
CB
DC
B
MH
MH
MH
MH
BS
TS
BS
TS
TS
BS
TS
TS
TS
S
S
S
S
CURB CUT
CU
RB
CU
T
RE
MAIN
S
OF
CO
NC
CU
RB
CONC CURB AND GUTTER
CURB CUT
REMAINS
OF CONC
CURB
AN
D
GU
TT
ER
CU
RB
CUT
RE
MAIN
S
OF
CO
NC
CU
RB
CO
NC
CU
RB
CO
NC
CU
RB
CO
NC C
URB
CUT
CONC CURB
AND GUTTER
CONC CURB
CO
NC
CU
RB
CU
RB
CO
NC
CU
RB
REMAINS OF CONC CURB
CU
RB
CU
T
REM
AINS
OF
AN
D
GU
TT
ER
PART 2, PLAN 43R-10037
PL
AN 43
R-10
037
PA
RT 6
5G
W
LS
HP
LS/TL
LS
TL/PS
LS
TL
GW
TL/PS
GP
LS
LS
GW
OW
GWX2
LS
TL/P
S
HPGW
TL
TL
LS
CF
BFBF
CF
CF
CF
BFKEY PLAN (N.T.S.)
N.L.
13-1125
BURNHAMTHORPE ROAD
0 10 20 30m
J.M.
NOVEMBER 2016
10m
BURNHAMTHORPE ROAD
CA
WT
HR
A R
OA
D
EXISTING R.O.W
LEGEND:
EXISTING PROPERTY LINE
62.6m
12.1
m
PROPERTY IMPACT PLAN
PROPERTY OWNER:
VICTOR AND EDUARDA AMARAL
SK007
, 0.154acres)2
(622.9m
PERMANENT EASEMENT
, 0.661 acres)2
(2675.7m
TEMPORARY EASEMENT
a
77.8m
42.8
m
38.3
m
25.5
m
40.5m
The Regional Municipality of Peel Burnhamthorpe Road Watermain Project | exp ref 605544
Review of Property Requirement Changes to the Class EA Project File Report December 8, 2017
Appendix B – Revised Notice of Completion
Revised Notice of Completion Burnhamthorpe Road Watermain Class Environmental Assessment
Study Background The Region of Peel completed a Class Environmental Assessment (EA) in September 2015 to improve water supply for projected growth in the Mississauga City Centre area. The preferred alternative, which would minimize disruption along Burnhamthorpe Road, included tunnelling a new 1500 mm (5 foot) diameter watermain from Grand Park Drive to Cawthra Road. Nine connections between the new watermain and existing water infrastructure will also be constructed. The Class EA also included two new smaller diameter watermains to be constructed by open-cut method along Grand Park Drive and Webb Drive and Duke of York Boulevard from Webb Drive to City Centre Drive. Following the Notice of Completion and the Project File Report filing, the Region started detailed design work to prepare for the installation of these watermains. Revised Notice of Completion Through the design process, minor modifications were made to the 1500 mm watermain alignment, shaft locations, valve chambers, and the required construction staging areas. These changes require new permanent easements at four locations along Burnhamthorpe Road West, including:
• 55 City Centre Drive (northwest corner of Burnhamthorpe Road and Hurontario Street).
• 201 City Centre Drive (northeast corner of Burnhamthorpe Road and Duke of York Boulevard).
• 325 Burnhamthorpe Road West (east of Confederation Parkway, north side of Burnhamthorpe Road).
• 691 Burnhamthorpe Road East (northwest corner of Burnhamthorpe Road and Cawthra Road).
We Want to Hear from You - Comments Invited The Region of Peel would like to hear from you. A report with the revisions is available for public review between December 14, 2017 and January 31, 2018 at peelregion.ca/pw/construction/miss/bwp.htm and at the following locations:
• Region of Peel: Clerk’s Department, 5th Floor, Suite A, 10 Peel Centre Drive, Brampton (Mon-Fri: 8:30 a.m. to 4:30 p.m.)
• Mississauga Central Library: 301 Burnhamthorpe Road West, Mississauga (Mon-Fri: 9 a.m. to 9 p.m., Sat: 9 a.m. to 5 p.m., Sun: 1 p.m. to 5 p.m.)
If you have any comments, please send them to the Project Manager by January 31, 2018:
• Heather Jefferson, Project Manager, Water Division, Capital Works, 10 Peel Centre Drive, Brampton, L6T 4B9 Tel: 905-791-7800 ext. 7881 / Email [email protected]
If concerns regarding this Class EA cannot be resolved in discussion with the Region of Peel during this minimum 30-day review period, a person or party may request that the Minister of Environment and Climate Change make an order for the project to comply with Part II of the Environmental Assessment Act (1990). This request must be received by the Ministry, at the addresses listed below and copied to Heather Jefferson at the Region of Peel, on or before January 31, 2018.
• The Ministry/Minister of Environment and Climate Change,
77 Wellesley St West, 11th Floor, Toronto ON M7A 2T5 and
• Ministry of the Environment and Climate Change, Environmental Approvals Branch
135 St. Clair Avenue West, 1st Floor, Toronto, ON M4V 1P5
Subject to requests and comments received as a result of this notice and issue of the necessary permits and approvals, the Region of Peel intends to proceed with construction of this preferred alternative.
This notice was first issued on December 14, 2017