the republic of the union of myanmar ministry of electric power
DESCRIPTION
The Republic of the Union of Myanmar Ministry of Electric Power. Present & Future Power Sector Development in Myanmar. Place - Naypyitaw Date - 27-2-2013. Policies . Policies. To employ the available energy resources in power generation for the sufficient supply of electricity. - PowerPoint PPT PresentationTRANSCRIPT
The Republic of the Union of MyanmarMinistry of Electric Power
Present & Future Power Sector Development in Myanmar
Place - NaypyitawDate - 27-2-2013
Policies
2
1. To employ the available energy resources in power generation for the sufficient supply of electricity.
2. To promote the effective and efficient use of electricity for future energy sufficiency, reserves and sustainability in our nation.
3. To conduct the reliable power quality to be supplied safely.4. To enhance the electricity distribution system to be developed in
accordance with the advance technologies.5. To adopt the environment-friendly ways in electricity generation,
transmission and distribution.6. To encourage the expansion of power transmission and distribution
throughout the country and the Public-Private-Participation in each sector.
7. To get millennium achievements, besides of constructing of thermal power plants, have to construct more hydro power plants yearly by the least of EIA and SIA, whereas hydro power is the clean and renewable energy.
Policies
3
Present Condition
4
5
Department of Hydropower Implementation
Hydropower Generation Enterprise
Department of Hydropower Planning
Department of Electric Power
Myanma Electric Power Enterprise
Electricity Supply Enterprise
Yangon City Electricity Supply Board
Ministry of Electric Power (MOEP)
DistributionDistribution TransmissionTransmissionGenerationGeneration
GenerationGeneration
SystemSystemOperatorOperator
Tigyit120MW
Hydro Power Plant
Sr No.
Type of Power Plant Number
Installed Capacity
(MW)
1.2.
Hydro Power Gas & Steam
1911
2660.0834.9
Total 30 3494.9
Mone75MW
Sedawgyi25MW
Zawgyi-212MW
Zawgyi-118MW
Bluchaung-128MW
Paunglaung280MW
Shwetaung55.35MW
Yenwe25MW
Zaungtu20MW
Myanaung34.7MW
Hlawga154.2MW
Thaton50.95MW
Mawlamyaing12MW
Ahloneံ�154.2MW
Ywama70.3MW
Yeywa790MW
Khapaung30MW
Shweli-1600MW
KengTawng54MW
Shwekyin75MW
Kun60MW
KyeeOhnKyeeWa74MW
Tapein240MWံ�
Steam Power PlantGas Power Plant
Current Generation FacilitiesOf Power System
6
Thaphanseik30 MW
Kyunchaung54.3 MW
Man36.9 MW
Thaketa92 MW
Kinda56 MW
Bluchaung-2168MW
Voltage(kV)
Lengthmiles km
230 1,982.65 3,190.77132 1,542.24 2,481.9966 2,511.6 4,042.03
Total 6,036.49 9,714.79
Voltage(kV)
Nos. ofSubstation
Capacity(MVA)
230 24 3,990
132 26 1,783.5
66 113 2,580.6
Total 163 8,282.1
7
Voltage(kV)
Lengthmiles km
33 4,516.48 7,268.5811 8,682.98 13,973.876.6 8,24.51 1,326.92
Total 14,023.97 22,569.35
Voltage(kV)
Capacity(MVA)
33 4,278.89
11 4,399.38
6.6 1,475.23
Total 10,153.5
Transmission Facilities
Distribution Facilities
Demand Forecasting and Situation for Short Term Period during 2013 to 2016
8
Sr. No.
Year Demand (MW)Increased Rate(%)
1 2013 2060 15 %
2 2014 2370 15 %
3 2015 2725 15 %
4 2016 3130 15 %
Demand Forecast
Increased rate will be 15% based on peak load (1790) MW of 2012 year.
Demand for industrial zones and special economic zones is not included.
9
Dry Season (May)(MW)
Wet Season (Sep:)(MW)
Hydro Generation 1210 1897
Thermal Generation 350 242
Total Generation 1560 2139
Demand Forecast 2060 1957
Difference (-) 509 (+) 182
If there is no additional generation from new power plant, power shortage will be
about 500 MW (25% shortage) in Dry Season. Thermal power is the best solution to
reduce power shortage because it is not depend on season and establishing time
saving as well. Therefore, priority to establish gas engine power plant and gas turbine
power plant. 10
Description2013 2014 2015 2016
Dry Wet Dry Wet Dry Wet Dry Wet
Hydro Generation 1301 2017 1259 2289 1341 2289 1346 2319
Thermal Generation 540 492 1076 1182 1572 1784 2153 2089
Total Generation 1841 2509 2335 3471 2913 4073 3499 4408
Demand Forecast 2060 1957 2370 2252 2725 2589 3130 2974
Difference (-) 219
(+) 552 (-) 35 (+)
1219(+) 188
(+) 1484 (+) 369 (+)1434
11
(MW)
12
Sr.No. Project Name Type
Installed
Capacity
Completion Year
1 Thaukyekhat-2 Hydel 120 20132 Hlawga (Zeya Co.) Gas Engine 50 20133 Ywama (MyanShwePyay Co.) Gas Engine 50 20134 Thaketa (CIC Co.) Gas Engine 50 20135 Ahlone (Toyo Thai Co.) Gas Turbine 120 20136 Phyu Hydel 40 20147 Namcho Hydel 40 20148 Ywama ( Transferred from Thailand) Gas Turbine 240 20149 Thaketa (BKB Co., Korea) Gas Turbine 500 201410 Hlawga ( Hydrolancang Co., China) Gas Turbine 530 201411 Upper Paunglaung Hydel 140 201512 Baluchaung No.(3) Hydel 52 201513 Mawlamyaing (Myanmar Lighting Co.) Gas Turbine 150 201514 Kyaukphyu Gas Turbine 50 201515 Upper Baluchaung Hydel 29 201616 Kyunchaung (Extension) Gas Turbine 70 201617 Shwedaung (Extension) Gas Turbine 80 2016
Total 2311
To be Completed Power Plant Projects during Year 2013 to 2016 (MW)
12
Sr. No State/ Region
Transmission Lines Substations500 kV
(mile)
230 kV
(mile)
132 kV
(mile)
66 kV
(mile)
33 kV
(mile)
500 kV 230 kV 132 kV 66 kV
No. MVA No. MVA No. MVA No. MVA
1. Kachin State 285 60 161 3 300 1 60 5 422 Kayar State 120 16 145 1 100 5 330 3 653 Kayin State 80 56 2 200 3 304 Chin State 174 6 245 Mon State 50 91 1 100 4 1006 Rakhaing State 404 374 3 300 11 927 Shan State 60 447 2 200 1 100 12 1258 Sagaing Region 84 30 2 226 2 200 3 209 Tanintharyi Region 132 2 200 2 2010 Bago Region 167 509 2 1000 3 30011 Magway Region 380 66 110 4 460 3 220 4 12012 Mandalay Region 146 80 38 10 1 500 3 300 5 460 3 60
13 Ayeyarwaddy Region 245 202 3 300 10 160
14 Yangon Region 140 9 1500
Total 313 2569 142 182
8 10 3 1500 38 4486 17 137
0 66 858
(4,862) miles (8,214) MVA
Transmission Line & Substation Projects during Year 2012-13 to 2015-2016
13
Distribution Line & Substation Projects during Year 2012-13 to 2015-2016
Sr No State/ Region
Distribution Lines Substations66kV mile
33 kV mile
11 kV mile
0.4 kV mile
66 kV 33 kV 11 kVNo. MVA No. MVA No. MVA
1. Kachin State - 15.0 70.88 26.00 - - 3 8.50 26 5.322 Kayar State - 12.50 135.25 9.08 - - 2 8.00 9 2.153 Kayin State - 80.00 73.40 47.00 - - 4 10.25 61 12.424 Chin State - - 30.88 31.25 - - - - 23 4.525 Mon State - 83.00 176.66 228.8
1 - - 22 123.00 166 35.04
6 Rakhaing State - 67.50 142.73 63.95 - - 2 6.00 88 17.827 Shan State (South) - 94.2 151.25 143.4
8 - - 7 37.55 84 19.458 Shan State (East) - - 11.98 2.27 - - - - 34 7.499 Shan State (North) - 49.2 151.25 143.4
8 - - 4 18.0 144 32.5210 Sagaing Region - 149.68 47.07 30.09 - - 12 61.50 81 16.2011 Tanintharyi Region - 132 401.12 151.8
5 - - 8 60.0 225 45.4612 Bago Region (East) - 63.55 115.3 80.02 - - 3 15.0 131 27.9313 Bago Region (West) - 20.0 96.78 56.86 - - 2 6.0 90 18.1214 Magway Region - - 41.91 56.77 - - - - 65 13.4615 Mandalay Region - 115.70 81.95 92.30 - - 14 94.00 221 45.0516 Ayeyarwaddy Region - 19.00 38.90 38.69 - - 1 5.00 97 21.3617 Naypyitaw - 25.10 89.89 55.62 - - 11 95.0 119 24.9518 Yangon Region 117.9
1 71.25 380.00 346.0 27 680 33 320.0 608 191.52
Total 117.91 997.58 2430.181583.2
2 27 680 128 867.8 2272 540.76
(5,128.89) miles (2,088.56) MVA14
Demand Forecasting and Project Implementation for the Long Term Period
during 2016-17 to 2030-31
15
Planned Target for Long Term Yr.(2011-12) to Yr.(2030-31)Planned Target for Long Term Yr.(2011-12) to Yr.(2030-31)
Project Term
Population
Forecast(million)
Power DemandPer Capita
Consumption
(kWh)
Electrified Household
(%)Demand
(MW)Generation(GWh)
Yr. 2011-12 60.44 1,806 10,444 173 27%From Yr.(2012-13) to Yr.(2015-16) 63.14 3,078 17,797 282 34%
From Yr.(2016-17) to Yr.(2020-21) 66.69 5,686 32,874 493 45%
From Yr.(2021-22) to Yr.(2025-26) 70.45 10,400 60,132 854 60%
From Yr.(2026-27) to Yr.(2030-31) 74.42 19,216 111,100 1,493 80%
16
Generation Plan to Fulfill the Demand from year (2016-17) to Generation Plan to Fulfill the Demand from year (2016-17) to (2030-31) (2030-31)
Project TermDemand
Forecasting Reserve Power
Installed Capacity
To be Implemented
during (5) year plan
From Yr.(2012-13) to Yr.(2015 - 16)
3,236 765 4,001 1,740
From Yr. (2016-17) to Yr.(2020 -21)
5,686 1,706 7,392 3,391
From Yr. (2021-22) to Yr.(2025 -26)
10,400 3,120 13,520 6,128
From Yr.(2026-27) to Yr.(2030 - 31)
19,216 5,765 24,981 11,461
(MW)
17
Generation Plan for Long Term
Sr. Description Type
No. of
Project
Installed Capacity
(MW)
1 Implemented by MOEP Hydel 10 3,1902 Implemented by Local Investor Hydel
Coal51
497.6300
3 Implementing by Foreign Investment(a) Had been signed JVA Hydel 4 11,399(b) Had been signed MOA Hydel
Gas222
17,566.5620
(c) Had been signed MOU HydelCoalGasWind
17362
12,6901,3701,3002,850
4 To be Implemented Gas Fired Power Plant Gas 15 2,825Total 54,608.
118
Yenam
Kaunglanghpu
PisaWutsok
GawlanLawngd
inWxhonhgze
HkankwanTongxinqiao
Chibwe
Chibwengae
Lasa
Myitsone
Natabat
Power Plant Projects in Northern Side
Sr. Name
Installed Capacity
(MW)1 Myitsone 6,0002 Chibwe 3,4003 Wutsok 1,800
4 Kaunglangphu 2,700
5 Yenam 1,2006 Pisa 2,0007 Lasa 1,9008 Chibwengae 999 Gawlan 10010 Wxhonhgze 6011 Hkankwan 14012 Tongxinqiao 32013 Lawngdin 435
14 Natabat(Kachin) 200
Total 20,345
Tapain(2)
Konlong(Upper Thanlwin)
Naung Pha/Mantaung
Nankha
Keng TongWantapeng
Solu
Heku
Keng Yan
Shweli(2)
Mongwa
Sr. Name
Installed Capacity
(MW)1 Tapain(2) 168
2Konlong(UpperThanlwin)
1,400
3 Naung Pha 1,0004 Mantaung 2005 Shweli(2) 5206 Keng Tong 967 Wantapeng 258 Solu 1659 Mongwa 5010 Keng Yan 2811 Heku 8812 Nankha 200
Total 3,940
Power Plant Projects in East & North –East Side
Sr. Name
Installed Capacity
(MW)1 Htamanthi 1,2002 Mawlight 520
3 Kalaywa (Coal) 600
4 Manipu 3805 Shwesaryae 669
Total 3,360Mawlight
Kalaywa (Coal)
ManipuShwesary
ae
Power Plant Projects in North-West Side
Htamanthi
Htukyan
HannaThakya
Natabat(Kayar)Palaung
Bawlakae
Ywathit
Hutgyi
Sr. Name
Installed
Capacity
(MW)
1Mong Tong(Upper Thanlwin)
7,110
2 Htukyan 1053 Hanna 454 Thakya 1505 Palaung 1056 Bawlakae 180
7 Natabat(Kayar) 180
8 Ywathit 4,0009 Hutgyi 1,360
10 His-Hsone (Wind) 220
11 Pekon(Wind) 950Total 14,405
Mong Tong(Upper Thanlwin)
Pekon
His-Hsone
Power Plant Projects in South-East Side
Power Plant Projects in Western Side
Sr. NameInstalled Capacity
(MW)
1 Sinedin 76.52 Laymyo 6003 Laymyo(2) 904 Thahtay 111
Total 877.5
Sinedin
Laymyo
Laymyo(2)
Thahtay
Tanintharyi
Sr. Name
Installed Capacity
(MW)1 Tanintharyi 600
2 Pharpon (Wind) 290
3 Zinkyauk(Wind) 160
4 Kawkareik (Wind) 580
5 Mudone(Wind) 510
6 Dawei(Wind) 220
7 Yangon (Coal)(Huaneng Lancang)
270
8 Yangon(Coal)( Virtue Land)
300
Total 2,930
Pharpon
Zinkyauk
Kawkareik
Mudone
Dawei
Power Plant Projects in Southern Side
Yangon(Huanenglanca
ng)
Yangon(Virtue Land)
Sr. No State/ Region
Transmission Lines Substations
230 kV (mile)
66 kV (mile)
230 kV 132 kV 66 kVNo. MVA No. MVA No. MVA
1. Kachin State 3 252 Kayar State3 Kayin State 25 25 1 50 1 454 Chin State 95 2 45 Mon State 30 1 100 4 506 Rakhaing State7 Shan State 306 393 5 500 21 1558 Sagaing Region 70 1 100 1 59 Tanintharyi Region 345 70 4 400 3 1810 Bago Region 1 200 1 1011 Magway Region 64 3 3012 Mandalay Region 143 9 1380 4 560 5 3513 Ayeyarwaddy Region 80 17 1 100 7 8014 Yangon Region
Total 963 700 22 2730 5 660 51 457(1,663) miles (3,847) MVA
Transmission Plan during Year 2016-17 to 2030-2031
25
Sr No State/ Region
Distribution Lines Substations66 kV mile
33 kV mile
11 kV mile
0.4 kV mile
66 kV 33 kV 11 kVNo. MVA No. MVA No. MVA
1. Kachin State 123.50 24.00 120.11 79.85 6 26.0
0 5 50.00 66 13.202 Kayar State - 53.00 287.76 278.40 - - 3 30.00 167 33.403 Kayin State - 80.00 196.00 487.00 - - - - 646 129.204 Chin State - - 15.6 39.00 - - - - 53 10.605 Mon State - 26.00 456.00 1138.0 - - 3 30.00 1519 303.806 Rakhaing State - - 91.45 170.50 - - - - 245 49.007 Shan State (South) - 12.00 325.50 813.75 - - 4 40.00 1085 217.008 Shan State (East) - 135.00 171.00 427.50 - - 11 110.00 570 114.009 Shan State (North) - 20 265.80 664.50 - - 4 40.00 886 177.20
10 Sagaing Region - 369.00 712.90 1686 - - 52 520.00 2252 450.4011 Tanintharyi Region - - 586.00 1174 - - - - 1638 327.6012 Bago Region (East) - 46.00 470.00 1177 - - 32 320.00 1566 313.2013 Bago Region (West) - 17.50 372.00 928.00 - - 19 190.00 1236 247.2014 Magway Region - 95.00 498.00 1174 - - 7 70.00 1564 312.8015 Mandalay Region - 188.00 3851.90 9580.4 - - 201 2010 12773 2554.616 Ayeyarwaddy Region - - 782.00 1786 - - 2 20.00 2573 514.6017 Naypyitaw - 102.00 1468.00 3673 - - 76 760.00 4896 979.2018 Yangon Region 486.0
0 16.00 848.00 668.00 107 3210 - - - -
Total 609.50
1103.50 11518 25945 113 3236 419 4190 33735 6747
(39,176) miles (14,173) MVA
26
Distribution Planduring Year 2016-17 to 2030-2031
Thank You